1 Proposed Improvement of Makiling Creek, Brgy. Bagong Lipunan Ng

Total Page:16

File Type:pdf, Size:1020Kb

1 Proposed Improvement of Makiling Creek, Brgy. Bagong Lipunan Ng AWARDED INFRASTRUCTURE PROJECTS AS OF OCTOBER 2015 FLOOD CONTROL PROJECTS (FCSMO) CONTRACT NO. PROJECT TITLE CONTRACTORS AMOUNT Proposed Improvement of Makiling Creek, Brgy. 1 4,973,680.10 EXPRESS CONSTRUCTION Bagong Lipunan ng Crame, District IV, Quezon City Drainage Improvement/Desilting of Buendia Outfall 2 and Vicinity and Raising of Revetment Wall along 4,474,608.10 DAHL CONSTRUCTION Estero de Sunog Apog Drainage Improvement along Zapote Road (From 3 Road I to Caloocan Sub City Hall) Caloocan City, 6,973,874.59 DAHL CONSTRUCTION District I Proposed Rehabilitation of Floodgate, Barangay 4 Napindan, Taguig City 980,894.25 DAHL CONSTRUCTION Proposed Drainage Improvement along General Luis ARMAL CONSTRUCTION SUPPLY AND 5 Avenue, Barangay Novaliches Proper, District V, 5,469,927.38 Quezon City SERVICES INC. Proposed Drainage Improvement along Dagat- 6 dagatan Avenue (from Langaray to Tanigue) District 1,979,323.45 I.M. CONSTRUCTION CORPORATION II, Caloocan City Proposed Drainage Improvement along Gil 7 Fernando St., Marcos Highway, Marikina City 1,981,050.51 EXPRESS CONSTRUCTION Proposed Drainage Improvement along Ortigas B. VALENCERINA TRADING & 8 1,979,426.89 Avenue going to Floodway, Pasig City CONSTRUCTION Riprapping along Kalawaan Creek, Kalawaan and B. VALENCERINA TRADING & 9 6,972,263.36 San Joaquin, Pasig City CONSTRUCTION Rehabilitation of Existing Pump at Provident Village, 10 St. Mary's Street, Marikina City 4,475,198.62 TUCHAR CONSTRUCTION CORP. Drainage Improvement /Desilting of Solis Tecson 11 Drainage Main, Earnshaw to Antipolo St., Tondo, 4,476,030.84 DAHL CONSTRUCTION Manila, District II Proposed Construction of Drainage System along C.B.TAMPENGCO CONSTRUCTION & 12 McArthur Highway, Phase I, District II, Valenzuela 1,980,560.00 City SUPPLY Proposed Drainage Improvement along Maysan 13 Road, Phase I, District I, Valenzuela City 1,979,628.24 EXPRESS CONSTRUCTION Declogging of Drainage along Cagayan Syquia 14 Street corner Cagayan Street, Sta. Ana, Manila, 1,891,782.01 EXPRESS CONSTRUCTION District VI Proposed Deepening of Estero de Pandacan From 15 Jesus Street to Zamora Street, Pandacan, Manila, 6,972,071.63 TUCHAR CONSTRUCTION CORP. District VI Drainage Improvement along Maysan Road, Phase 16 II, District I, Valenzuela City 6,972,239.20 EXPRESS CONSTRUCTION Proposed Strengthening of Existing River Wall along 17 San Juan River (From Aurora Boulevard Bridge to 6,971,957.07 E.F. CHUA CONSTRUCTION, INC. San Juan Elementary School) Proposed Improvement/Riprapping with Perimeter 18 Fence along North & South Antipolo Open Canal, 2,976,710.01 A.J. LAVA BUILDERS CORPORATION Tondo, Manila, District II Proposed Drainage Improvement along National 19 Road Infront of Metropolis, Alabang, Muntinlupa 3,975,943.43 RNN CONSTRUCTION CORPORATION City 20 Deepening of Tonsuya Creek, Malabon City 6,970,341.50 RNN CONSTRUCTION CORPORATION Dredging/Deepening and Riprapping of Marapa B. VALENCERINA TRADING & 21 2,975,950.88 Creek, Pasig City CONSTRUCTION Dredging/Deepening and Riprapping of Sapang B. VALENCERINA TRADING & 22 2,728,841.13 Malapit, Pasig City CONSTRUCTION Proposed Deepening of Navotas River, Northbay 23 Blvd., Navotas City 6,671,980.76 STRUKTURA TEKNIKA SERVICES CO. Proposed Improvement of Buwaya Creek, Brgy. 24 Milagrosa to Masagana, District III, Quezon City 1,980,621.86 DAHL CONSTRUCTION Proposed Drainage Improvement along Bulelak 25 Street and Vicinity, Marikina City, District I 2,979,936.69 KAI CONSTRUCTION Proposed Drainage Improvement along 20th 26 Avenue, P. Tuazon Blvd. - Don Jose Creek, Brgy. 1,977,697.51 DAHL CONSTRUCTION Tagumpay, District III, Quezon City Proposed Improvement of Ermitanyo Creek, 27 Barangay Valencia, District IV, Quezon City 2,977,580.18 TUCHAR CONSTRUCTION CORP. Riprapping of Usiw-Bangkaan Creek, Marikina City, 28 District II 2,975,190.88 EXPRESS CONSTRUCTION Proposed Dredging/Deepening to the Designed 29 Elevation of Estero Tripa de Gallina (Retarding Pond 5,772,614.35 EXPRESS CONSTRUCTION to EDSA) Pasay City Upgrading of Pumping Stations - Small Pumping FREEPORT SHIPYARD & ENGINEERING 30 Stations at Central Post Office and Jones Bridge 29,988,677.22 Underpass (north and south) CORPORATION Upgrading of Pumping Stations - Hagonoy Pumping 31 Station 164,563,781.75 E.F. CHUA CONSTRUCTION, INC. Upgrading of Pumping Stations - Taguig Pumping TOKWING CONSTRUCTION / SCION 32 202,176,506.68 Station CONSTRUCTION JV Proposed Construction of Retarding Pond along the 33 Sidewalk of EDSA Beside Camp Aguinaldo, District 4,775,054.08 ST. GERRARD CONSTRUCTION III, Quezon City Proposed Drainage Improvement/Riprapping of 34 Poblacion River (from Bruger St. - PNR Track going 2,230,116.43 RNN CONSTRUCTION CORPORATION to Poblacion River), Muntinlupa City Proposed Drainage Improvement along Quirino 35 Avenue from Kabihasnan to Saulog, District I, 3,975,148.15 ILFREO CONSTRUCTION & TRADING Parañaque City Dredging/Deepening and Riprapping of Mahabang B. VALENCERINA TRADING & 36 2,975,405.28 Ilog Creek, Pasig City CONSTRUCTION Proposed Dredging/Deepening to the Designed 37 Elevation of Tributary of Makati - Pateros River, 2,978,698.01 RAIN CONSTRUCTION CORPORATION Brgy. Rizal, Makati City, District II Proposed Riprapping/Desilting of Pasong Cobra 38 Creek, Brgy. Moonwalk Village, Talon V, Las Piñas 2,980,540.54 E.M. ANGELES ENTERPRISES City Dredging/Deepening and Riprapping of Champaca 39 Creek, Marikina City, District II 2,977,042.72 A.J LAVA BUILDERS CORPORATION 40 Dredging/Deepening of Balanti Creek, Marikina City 2,726,144.85 DAHL CONSTRUCTION Proposed Drainage Improvement along Montillano 41 2,227,055.45 RNN CONSTRUCTION CORPORATION St. going to M.L. Quezon Road, Muntinlupa City Dredging/Deepening of Tumana Creek, Marikina 42 City, District II 2,726,187.52 DAHL CONSTRUCTION 43 Proposed Drainage Improvement along Tramo Road 2,727,941.20 RNN CONSTRUCTION CORPORATION from Golden Haven to F. Santos, Las Piñas City Proposed Drainage Improvement along V. Luna 44 Road Extension corner Anonas Extension, Barangay 1,977,463.79 TUCHAR CONSTRUCTION CORP. Malaya, District IV, Quezon City Proposed Riprapping/Dredging/Deepening to the 45 Designed Elevation of Makati - Pateros River (Phase 3,728,416.27 RAIN CONSTRUCTION CORPORATION IX) Makati City, District II Proposed Riprapping/Desilting of Sapang Buwaya 46 Creek and Tributaries from Junction of Villanueva 1,979,687.44 RNN CONSTRUCTION CORPORATION Creek to Limit, District I, Parañaque City Dredging/Deepening and Riprapping of Bonanza 47 2,977,703.65 STAR WILLIAM CONSTRUCTION Creek, Marikina City Proposed Construction of Gravity Wall along Veinte 48 8,772,301.93 TUCHAR CONSTRUCTION CORP. Reales Creek, District I, Valenzuela City Proposed Desilting of Marulas Creek, Brgy. Manuyo 49 2,979,062.18 RNN CONSTRUCTION CORPORATION Dos to Limit, Las Piñas City Proposed Drainage Improvement along J.P. Rizal 50 Street, Makati City, District I 1,979,340.99 RAIN CONSTRUCTION CORPORATION Proposed Drainage Improvement of Baclaran 51 Vicinity Redemptorist to Junction of Taft Extension, 4,724,271.12 ILFREO CONSTRUCTION & TRADING Parañaque City, District I Proposed Drainage Improvement along Upper 52 Matapat St., Brgy. Pinyahan, District IV, Quezon 1,978,296.02 DAHL CONSTRUCTION City Proposed Drainage Improvement along Elisco Road, 53 from Almeda St. to Lexington, Brgy. Sto. Rosario 4,475,083.59 PETT BUILDERS Silangan, Pateros Proposed Drainage Improvement and Concreting 54 along Dinorado St., Sitio Palayan Area A, Brgy. 4,174,973.69 EXPRESS CONSTRUCTION Payatas, Quezon City, District II Riprapping along Tributaries of Tullahan River, 55 Barangay Fairview, District V, Quezon City 2,777,229.67 TUCHAR CONSTRUCTION CORP. Proposed Drainage Improvement and Concreting 56 along Palayan Area A, Brgy. Payatas, Quezon City, 4,574,311.27 EXPRESS CONSTRUCTION District II 57 Proposed Drainage Improvement along Quezon 1,978,166.59 TUCHAR CONSTRUCTION CORP. Avenue cor. Biak na Bato., District IV, Quezon City 58 Drainage Improvement along Pasong Tamo (Arnaiz 2,775,458.80 RAIN CONSTRUCTION CORPORATION Avenue - Don Bosco St.) Makati City, District I Proposed Drainage Improvement along General Luis 59 St., District I, Caloocan City 4,476,116.08 DAHL CONSTRUCTION Proposed Drainage Improvement along Buendia 60 Avenue, Filmore St. - Dian St.), Makati City, District 1,978,182.00 RAIN CONSTRUCTION CORPORATION I Proposed Drainage Improvement along Legarda FLORDES CONSTRUCTION & TRADING 61 2,728,970.23 Street, Quiapo, Manila, District III CORP. Bank Improvement along Intermittent Section of 62 Conga Creek and Hagonoy River, Taguig City 4,973,303.52 DAHL CONSTRUCTION Proposed Deepening/Desilting to the Designed 63 Elevation of Cutcut Creek, Pasay City 2,978,173.10 IVAHRICK CONTRACTORS Proposed Drainage Improvement along C.M. Recto FLORDES CONSTRUCTION & TRADING 64 1,978,555.96 Avenue, Quiapo, Manila, District III CORP. ALE BUILDERS CONSTRUCTION & 65 Proposed Drainage Improvement along A. Soriano, 2,730,345.47 Intramuros, Manila (Anda Circle to Pasig River) DEVELOPMENT CORPORATION Proposed Drainage Improvement along Rizal FLORDES CONSTRUCTION & TRADING 66 1,979,670.06 Avenue, Sta. Cruz, Manila, District III, Phase II CORP. Dredging/Widening of Daang Kalabao Creek, Brgy. 67 San Miguel, Taguig City 4,474,538.76 DAHL CONSTRUCTION Proposed Drainage Improvement along San ALE BUILDERS CONSTRUCTION & 68 Gregorio St., Paco, Manila (Canonigo St. to Union 1,979,912.46 St.) DEVELOPMENT CORPORATION Proposed Drainage Improvement of Bodoni St., 69 Brgy. San Antonio, Parañaque City, District II 1,980,434.90 RNN CONSTRUCTION
Recommended publications
  • History of Quezon City Public Library
    HISTORY OF QUEZON CITY PUBLIC LIBRARY The Quezon City Public Library started as a small unit, a joint venture of the National Library and Quezon City government during the incumbency of the late Mayor Ponciano Bernardo and the first City Superintendent of Libraries, Atty. Felicidad Peralta by virtue of Public Law No. 1935 which provided for the “consolidation of all libraries belonging to any branch of the Philippine Government for the creation of the Philippine Library”, and for the maintenance of the same. Mayor Ponciano Bernardo 1946-1949 June 19, 1949, Republic Act No. 411 otherwise known as the Municipal Libraries Law, authored by then Senator Geronimo T. Pecson, which is an act to “provide for the establishment, operation and Maintenance of Municipal Libraries throughout the Philippines” was approved. Mrs. Felicidad A. Peralta 1948-1978 First City Librarian Side by side with the physical and economic development of Quezon City officials particularly the late Mayor Bernardo envisioned the needs of the people. Realizing that the achievements of the goals of a democratic society depends greatly on enlightened and educated citizenry, the Quezon City Public Library, was formally organized and was inaugurated on August 16, 1948, with Aurora Quezon, as a guest of Honor and who cut the ceremonial ribbon. The Library started with 4, 000 volumes of books donated by the National Library, with only four employees to serve the public. The library was housed next to the Post Office in a one-storey building near of the old City Hall in Edsa. Even at the start, this unit depended on the civic spirited members of the community who donated books, bookshelves and other reading material.
    [Show full text]
  • Robbery & Theft Prediction Using Probabilistic Graphical Model
    Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020 Event of Crime against Property: Robbery & Theft Prediction using Probabilistic Graphical Model Rex Aurelius C. Robielos School of Industrial Engineering and Engineering Management Mapua University Intramuros, Manila, Philippines [email protected] Nico Duran School of Information Technology Mapua University Intramuros, Manila, Philippines [email protected] Abstract This study analyzed the occurrence of robbery and theft in the City of Manila using discrete Bayesian network model. Using a 5-year data of robbery and theft in the City of Manila (with conviction), the results showed that February and July emerged as the months with highest probability of crime happening at 10.66 percent and lowest on April with 6.80 percent. In terms of crime happening on a week, the highest probability occurred on the 2nd week with 28.3 percent and lowest on the 5th week at 6.8 percent. Most of the crimes happened between 3PM to 6PM with 17 percent and lowest occurrence between 6AM to 9AM at 7.0 percent. Male population are more likely to be a victim of crime in almost all of the identified locations except for Pandacan where female population has a higher probability at 53 percent. With these information, a patrol priority location table was developed to show the location where the crime is more likely to happen in a particular time range of the day. This information can help the Philippine National Police in the police resource deployment. Keywords Crime against property, robbery and theft prediction, probabilistic graphical model 1.
    [Show full text]
  • Resettlement Plan PHI: EDSA Greenways Project (Balintawak
    Resettlement Plan February 2020 PHI: EDSA Greenways Project (Balintawak Station) Prepared by Department of Transportation for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area CURRENCY EQUIVALENTS (As of 30 January 2020; Central Bank of the Philippines) Philippine Peso (PhP) (51.010) = US $ 1.00 ABBREVIATIONS ADB Asian Development Bank AH Affected Household AO Administrative Order AP Affected Persons BIR Bureau of Internal Revenue BSP Bangko Sentral ng Pilipinas CA Commonwealth Act CGT Capital Gains Tax CAP Corrective Action Plan COI Corridor of Impact DA Department of Agriculture DAO Department Administrative Order DAR Department of Agrarian Reform DAS Deed of Absolute Sale DBM Department of Budget and Management DDR Due Diligence Report DED Detailed Engineering Design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DMS Detailed Measurement Survey DO Department Order DOD Deed of Donation DOTr Department of Transportation DPWH Department of
    [Show full text]
  • MMARAS Annual Report 2006
    MMARAS Metro Manila Accident Reporting and Analysis System Annual Report January to December 2006 Produced by the Road Safety Unit (RSU) Traffic Operations Center (TOC) Metropolitan Manila Development Authority (MMDA) 1 Introduction The Metro Manila Accident Reporting and Analysis System (MMARAS) is operated by the Road Safety Unit (RSU) of the MMDA-Traffic Operations Center (TOC), with the cooperation and assistance of the Traffic Enforcement Group under National Capital Regional Police Office (TEG-NCRPO) Philippine National Police (PNP). The objective is to compile and maintain an ongoing database of „Fatal‟ and „Non Fatal‟ including the „Damage to Property‟ road accidents, which can indicate areas where safety improvements need to be made. The system will also allow the impact of improvement measures to be monitored. This report is intended to be an annual analysis of „Fatal‟, “Non Fatal‟ and „Damage to Property‟ road accidents that have been recorded by the PNP Traffic Accident Investigators for the year 2006. The information is presented in graphical and tabular form, which provides a readily identifiable pattern of accident locations and causation patterns. Annual comparisons of traffic accident statistics are also included in this report. The Road Safety Unit currently has 9 data researchers who gather traffic accident data from different traffic offices and stations of the Traffic Enforcement Group (TEG-NCRPO) within Metro Manila. Previously, only those incidences involving Fatal and Non Fatal are gathered and encoded at the MMARAS database. But for the year 2005 up to present, we included the Damage to Property incidence so that we can see the significance and the real picture of what really is happening in our roads and also it gives us additional information in analyzing the causes of accident.
    [Show full text]
  • Chapter 5 Project Scope of Work
    CHAPTER 5 PROJECT SCOPE OF WORK CHAPTER 5 PROJECT SCOPE OF WORK 5.1 MINIMUM EXPRESSWAY CONFIGURATION 5.1.1 Project Component of the Project The project is implemented under the Public-Private Partnership (PPP) Scheme in accordance with the Philippine BOT Law (R.A. 7718) and its Implementing Rules and Regulations. The project is composed of the following components; Component 1: Maintenance of Phase I facility for the period from the signing of Toll Concession Agreements (TCA) to Issuance of Toll Operation Certificate (TOC) Component 2: Design, Finance with Government Financial Support (GFS), Build and Transfer of Phase II facility and Necessary Repair/Improvement of Phase I facility. Component 3: Operation and Maintenance of Phase I and Phase II facilities. 5.1.2 Minimum Expressway Configuration of Phase II 1) Expressway Alignment Phase II starts at the end point of Phase I (Coordinate: North = 1605866.31486, East 502268.99378), runs over Sales Avenue, Andrews Avenue, Domestic Road, NAIA (MIA) Road and ends at Roxas Boulevard/Manila-Cavite Coastal Expressway (see Figure 5.1.2-1). 2) Ramp Layout Five (5) new on-ramps and five 5) new off-ramps and one (1) existing off-ramp are provided as shown in Figure 5.1.2-1. One (1) on-ramp constructed under Phase I is removed. One (1) overloaded truck/Emergency Exit is provided. One (1) on-ramp for NAIA Terminal III exit traffic and one existing off-ramp from Skyway for access to NAIA Terminal III. One (1) on-ramp along Andrews Ave. to collect traffic jam from NAIA Terminal III traffic and traffic on Andrews Ave.
    [Show full text]
  • Naval Reserve Command
    NAVAL RESERVE OFFICER TRAINING CORPS Military Science –1 (MS-1) COURSE ORIENTATION Training Regulation A. Introduction: The conduct of this training program is embodied under the provisions of RA 9163 and RA 7077 and the following regulations shall be implemented to all students enrolled in the Military Science Training to produce quality enlisted and officer reservists for the AFP Reserve Force. B. Attendance: 1. A minimum attendance of nine (9) training days or eighty percent (80%) of the total number of ROTC training days per semester shall be required to pass the course. 2. Absence from instructions maybe excuse for sickness, injury or other exceptional circumstances. 3. A cadet/ cadette (basic/advance) who incurs an unexcused absence of more than three (3) training days or twenty percent (20%) of the total number of training during the semester shall no longer be made to continue the course during the school year. 4. Three (3) consecutive absences will automatically drop the student from the course. C. Grading: 1. The school year which is divided into two (2) semesters must conform to the school calendar as practicable. 2. Cadets/ cadettes shall be given a final grade for every semester, such grade to be computed based on the following weights: a. Attendance - - - - - - - - - - 30 points b. Military Aptitude - - - - - 30 points c. Subject Proficiency - - - - 40 points 3. Subject proficiency is forty percent (40%) apportioned to the different subjects of a course depending on the relative importance of the subject and the number of hours devoted to it. It is the sum of the weighted grades of all subjects.
    [Show full text]
  • Part Ii Metro Manila and Its 200Km Radius Sphere
    PART II METRO MANILA AND ITS 200KM RADIUS SPHERE CHAPTER 7 GENERAL PROFILE OF THE STUDY AREA CHAPTER 7 GENERAL PROFILE OF THE STUDY AREA 7.1 PHYSICAL PROFILE The area defined by a sphere of 200 km radius from Metro Manila is bordered on the northern part by portions of Region I and II, and for its greater part, by Region III. Region III, also known as the reconfigured Central Luzon Region due to the inclusion of the province of Aurora, has the largest contiguous lowland area in the country. Its total land area of 1.8 million hectares is 6.1 percent of the total land area in the country. Of all the regions in the country, it is closest to Metro Manila. The southern part of the sphere is bound by the provinces of Cavite, Laguna, Batangas, Rizal, and Quezon, all of which comprise Region IV-A, also known as CALABARZON. 7.1.1 Geomorphological Units The prevailing landforms in Central Luzon can be described as a large basin surrounded by mountain ranges on three sides. On its northern boundary, the Caraballo and Sierra Madre mountain ranges separate it from the provinces of Pangasinan and Nueva Vizcaya. In the eastern section, the Sierra Madre mountain range traverses the length of Aurora, Nueva Ecija and Bulacan. The Zambales mountains separates the central plains from the urban areas of Zambales at the western side. The region’s major drainage networks discharge to Lingayen Gulf in the northwest, Manila Bay in the south, the Pacific Ocean in the east, and the China Sea in the west.
    [Show full text]
  • 1 Introduction
    Formulation of an Integrated River Basin Management and Development Master Plan for Marikina River Basin VOLUME 1: EXECUTIVE SUMMARY 1 INTRODUCTION The Philippines, through RBCO-DENR had defined 20 major river basins spread all over the country. These basins are defined as major because of their importance, serving as lifeblood and driver of the economy of communities inside and outside the basins. One of these river basins is the Marikina River Basin (Figure 1). Figure 1 Marikina River Basin Map 1 | P a g e Formulation of an Integrated River Basin Management and Development Master Plan for Marikina River Basin VOLUME 1: EXECUTIVE SUMMARY Marikina River Basin is currently not in its best of condition. Just like other river basins of the Philippines, MRB is faced with problems. These include: a) rapid urban development and rapid increase in population and the consequent excessive and indiscriminate discharge of pollutants and wastes which are; b) Improper land use management and increase in conflicts over land uses and allocation; c) Rapidly depleting water resources and consequent conflicts over water use and allocation; and e) lack of capacity and resources of stakeholders and responsible organizations to pursue appropriate developmental solutions. The consequence of the confluence of the above problems is the decline in the ability of the river basin to provide the goods and services it should ideally provide if it were in desirable state or condition. This is further specifically manifested in its lack of ability to provide the service of preventing or reducing floods in the lower catchments of the basin. There is rising trend in occurrence of floods, water pollution and water induced disasters within and in the lower catchments of the basin.
    [Show full text]
  • Policy Briefing
    WAVES Policy Brieng Philippines Policy October 2015 Brieng Summary Ecosystem Accounts Inform Policies for Better A pilot ecosystem Resource Management of Laguna de Bay account was developed for the Laguna de Bay Laguna de Bay is the largest inland body of water in the Philippines to provide information providing livelihood, food, transportation and recreation to key on ood mitigation capacity, water, shery provinces and cities within and around the metropolitan area of Manila. resource management; Competing uses, unsustainable land and water uses coupled with to identify priority areas population and industrial expansion have caused the rapid degradation for protection, regulation of the lake and its watershed. The data from the ecosystem accounts of pollution and sediment can help counter the factors that are threatening the Laguna de Bay's loading; and to inform water quality and ecology. strategies on water pricing and sustainable Land Cover Condition Water Quality development planning. Land conversion due to urban Pollution coming from domestic, sprawl and rapid industrial industrial and agricultural/forest Background development are causing a decline wastes contribute to the The development of the in forest cover and impacting degradation of the water quality. agriculture production. ecosystem accounts is Fish Production based on data collection Flood Mitigation The lake can still sustain sheries and analysis conducted Increase in soil erosion from the production but is threatened by by the Laguna Lake watershed has changed the pollution. Development Authority contours of the lake. (LLDA), the agency responsible for the water and land management of the Laguna Lake Basin. 2003 2010 Technical staff from the different units of the LLDA undertook the analyses supported by international and local experts under the World Bank's Wealth Accounting and the Valuation of Ecosystem Services (WAVES) Global Partnership Programme.
    [Show full text]
  • No. Company Star
    Fair Trade Enforcement Bureau-DTI Business Licensing and Accreditation Division LIST OF ACCREDITED SERVICE AND REPAIR SHOPS As of November 30, 2019 No. Star- Expiry Company Classific Address City Contact Person Tel. No. E-mail Category Date ation 1 (FMEI) Fernando Medical Enterprises 1460-1462 E. Rodriguez Sr. Avenue, Quezon City Maria Victoria F. Gutierrez - Managing (02)727 1521; marivicgutierrez@f Medical/Dental 31-Dec-19 Inc. Immculate Concepcion, Quezon City Director (02)727 1532 ernandomedical.co m 2 08 Auto Services 1 Star 4 B. Serrano cor. William Shaw Street, Caloocan City Edson B. Cachuela - Proprietor (02)330 6907 Automotive (Excluding 31-Dec-19 Caloocan City Aircon Servicing) 3 1 Stop Battery Shop, Inc. 1 Star 214 Gen. Luis St., Novaliches, Quezon Quezon City Herminio DC. Castillo - President and (02)9360 2262 419 onestopbattery201 Automotive (Excluding 31-Dec-19 City General Manager 2859 [email protected] Aircon Servicing) 4 1-29 Car Aircon Service Center 1 Star B1 L1 Sheryll Mirra Street, Multinational Parañaque City Ma. Luz M. Reyes - Proprietress (02)821 1202 macuzreyes129@ Automotive (Including 31-Dec-19 Village, Parañaque City gmail.com Aircon Servicing) 5 1st Corinthean's Appliance Services 1 Star 515-B Quintas Street, CAA BF Int'l. Las Piñas City Felvicenso L. Arguelles - Owner (02)463 0229 vinzarguelles@yah Ref and Airconditioning 31-Dec-19 Village, Las Piñas City oo.com (Type A) 6 2539 Cycle Parts Enterprises 1 Star 2539 M-Roxas Street, Sta. Ana, Manila Manila Robert C. Quides - Owner (02)954 4704 iluvurobert@gmail. Automotive 31-Dec-19 com (Motorcycle/Small Engine Servicing) 7 3BMA Refrigeration & Airconditioning 1 Star 2 Don Pepe St., Sto.
    [Show full text]
  • 1623400766-2020-Sec17a.Pdf
    COVER SHEET 2 0 5 7 3 SEC Registration Number M E T R O P O L I T A N B A N K & T R U S T C O M P A N Y (Company’s Full Name) M e t r o b a n k P l a z a , S e n . G i l P u y a t A v e n u e , U r d a n e t a V i l l a g e , M a k a t i C i t y , M e t r o M a n i l a (Business Address: No. Street City/Town/Province) RENATO K. DE BORJA, JR. 8898-8805 (Contact Person) (Company Telephone Number) 1 2 3 1 1 7 - A 0 4 2 8 Month Day (Form Type) Month Day (Fiscal Year) (Annual Meeting) NONE (Secondary License Type, If Applicable) Corporation Finance Department Dept. Requiring this Doc. Amended Articles Number/Section Total Amount of Borrowings 2,999 as of 12-31-2020 Total No. of Stockholders Domestic Foreign To be accomplished by SEC Personnel concerned File Number LCU Document ID Cashier S T A M P S Remarks: Please use BLACK ink for scanning purposes. 2 SEC Number 20573 File Number______ METROPOLITAN BANK & TRUST COMPANY (Company’s Full Name) Metrobank Plaza, Sen. Gil Puyat Avenue, Urdaneta Village, Makati City, Metro Manila (Company’s Address) 8898-8805 (Telephone Number) December 31 (Fiscal year ending) FORM 17-A (ANNUAL REPORT) (Form Type) (Amendment Designation, if applicable) December 31, 2020 (Period Ended Date) None (Secondary License Type and File Number) 3 SECURITIES AND EXCHANGE COMMISSION SEC FORM 17-A ANNUAL REPORT PURSUANT TO SECTION 17 OF THE SECURITIES REGULATION CODE AND SECTION 141 OF CORPORATION CODE OF THE PHILIPPINES 1.
    [Show full text]
  • Pasig River Pasig River Rehabilitation Commission
    PASIG RIVER REHABILITATION COMMISSION OUTLINE OF THE PRESENTATION I. SITUATIONER A. BIOPHYSICAL B. GEOPOLITICAL C. CHALLENGES II. HISTORICAL BACKGROUND A. INSTITUTIONAL B. ACTIVITIES AND PROGRAMS C. MASTERPLAN III. PRRC A. MANDATE B. POWER/FUNCTIONS C. PARTNER AGENCIES D. PROGRAMS/PROJECTS 1. COMPLETED 2. ONGOING IV. PROPOSED PROJECT A. TROMMET I. SITUATIONER The Pasig River System Boundaries EtEast LgLaguna de Bay West Manila Bay North Manila, Mandaluyong, Pasig South Manila, Makati, Pateros Length: 27 Kms Average Width 91 m Average Depth 4 m Water Volume 6.548 million m3 Low Flow, March to May 12 m3 /sec High Flow, October to November 275 m3/sec Depth Deepest: 6 m Shallowest: 2 m I. SITUATIONER Cities and Municipalities in the Project Area: •Makati •Mandaluyong •Manila •Marikina •Pasig •Pateros •Quezon City •San Juan •Taguig I. SITUATIONER CURRENT CONDITIONS Existing informal settlers along river bkbanks to be reltdlocated. I. SITUATIONER CURRENT CONDITIONS Floating Garbage from Minor and Major Tributaries draining in Main River I. SITUATIONER CURRENT CONDITIONS Domestic and Industrial Wastewater I. SITUATIONER SOURCES OF POLLUTION 5% Solid Waste 30% Industrial Waste 65% Domestic Waste I. SITUATIONER WATER QUALITY OF PASIG RIVER Pasig River Annual Average DO Level 8 Pas s ed 6 4 mg/L Failed 2 0 2007 as 1999 2000 2001 2002 2003 2004 2005 2006 of 2nd Qtr Marikina 5 4.2 5.36 6.34 5.26 4.71 2.85 2.74 3.7 Bambang 4.59 5.97 6.43 5.60 4.32 4.45 5.24 4.58 6.13 Lambingan 3.41 4.84 4.42 4.93 2.90 2.57 2.31 2.76 3.93 Sanchez 0.65 0.04 0.91 1.20 1.49 0.55 0.62 0.28 1.45 Jones 2.47 3.56 3.37 4.79 2.77 1.29 1.76 1.37 3.60 DENR Standard: > mg/l= passed; <5mg/l= failed I.
    [Show full text]