ORDINARY MEETING 17 24 OCTOBER 2018
COUNCIL INFRASTRUCTURE PROJECTS IN DIVISIONS 1, 2 AND 3
H Visser | 1/3/21 | #5899502
RECOMMENDATION:
That Council notes the infrastructure projects that have been completed in Divisions 1, 2 and 3 over the last six months and future works planned for the rest of this financial year.
EXECUTIVE SUMMARY:
This report provides an update of the infrastructure projects that have been completed in the southern part of Cairns in Divisions 1, 2 and 3 over the last six months. Future projects that are planned for the remainder of this financial year are also identified.
The projects have been classified into Community, Road, Drainage, and Water and Waste Infrastructure and include general maintenance; new and renewal of assets. The projects illustrate the continued investment by Council into assets in the suburbs of Cairns.
BACKGROUND:
Council continues to invest in new and renewal of infrastructure across the local government area to ensure service standards are maintained or improved. The following projects in Divisions 1, 2 and 3 have been completed, or are planned to be completed shortly.
Infrastructure Works – Division 1: April to October 2018
Location Project
Community Infrastructure
Babinda Library Installation of all abilities facilities and parent room
Johnson Park, Gordonvale Shade sail renewal
Redbank Road, Packers Camp (started Sept) Boat ramp car park upgrade
Babinda Boulders camping area Installation of bollards
Tuppy Park, Edmonton Vandal deterrent improvements
Various Street Litter bin and Bin enclosure upgrade completed Mirriwinni Signage improvements
Agenda Ordinary Meeting 24 October 2018 - #5895192 292
Deeral boat ramp Overflow carpark facility
Boat ramps and jetties Programmed maintenance
Bramston Beach area Signage upgrade to parks
Golden Hole Toilet improvements
Bill Wakeham Park, Babinda Pressure cleaning stands and shelter areas
Russel river catchment Weed management
Various locations Feral animal management
Road Infrastructure
Mt Peter – Sandy Creek Completion of Mt Peter Road culvert repair works
Mirriwinni Bridge repair works
Gordonvale – Hawkins Street, Sheppards Street, Road reseals Hoare Lane, Moller Street, Norman Street, Gordon Street, Digger Street, Blackwell Street, Howe Street
Pollard Road, Babinda Footpath works
Petersen Road and Moroney Street, Edmonton Roundabout improvement works
Moller Road, Aloomba Shoulder widening and guard rail improvements
Cairns Road, Gordonvale - Various locations Shoulder widening
Cooper Bridge and Dexter Bridge Repairs to timber structure, termite treatment and pavement repairs to approaches Sheppard Street, Gordonvale Footpath renewal ( W4Q Project)
Henry McDonnell Bridge - Glen Boughton Construction of new culvert crossing commenced
Completed Bridge and culvert inspections Defect repairs are underway
Various locations Rural roads edge repairs
Accatino Access Shape and reseal road
Bramston Beach Road Cassowary signs installed
Drainage Infrastructure
Munro Street, Babinda Culvert renewal
Hooper Close, Gordonvale Deepen and widen table drain and turf
Vico Street, Gordonvale Culverts clean out silt
Nelson Street Aloomba Table drain reshape and pipe clean out along front of school
Agenda Ordinary Meeting 24 October 2018 - #5895192 293
Clyde Road, Babinda Reshape drainage easements
Harvey Creek and Behana Creek Bridges Signage and stencil on road
Peever Bridge Upgrade works
Templeton Street, Gordonvale Kerb and channel renewal
Water and Waste Infrastructure
Babinda Wastewater Treatment Plant Secondary sedimentation tank and trickle filter remediation works Gordonvale Wastewater Treatment Plant Replace Inlet Screens
Various locations Bulk water meter replacement (as required)
Infrastructure Works – Division 1: Future Works
Location Project
Community Infrastructure
Greenpatch, Gordonvale Construction for upgrade of camping area to commence in December Robert Rossi Park, Aloomba Playground replacement
Various locations Playground equipment defects / repairs ongoing
Various locations Herbicide program with newly purchased Gator continuing
Road Infrastructure
Various locations - Bartle Frere, Woopen Creek, Road reseals Waugh’s Pocket, Eubenangee, Mirriwinni, Babinda, Bellenden Ker, Deeral, Fishery Falls, Aloomba, Gordonvale, Packers Camp, Green Hill, Mount Peter, Wrights Creek, Edmonton
Various locations Line marking programme
Various locations Retro reflective pavement markers (cats eyes)
Various locations Gravel road maintenance
Various locations Footpath & traffic island mould treatment will commence at the start of the wet season Drainage Infrastructure
Butterworth Close Install non-return valve
Various locations Table drain rehabilitation
Various locations CCTV inspections
Agenda Ordinary Meeting 24 October 2018 - #5895192 294
Various locations Reval findings
Mount Peter Drainage Management Plan
Water and Waste Infrastructure
Bellenden Ker Intake access crossings assessment
Gordonvale Wastewater Treatment Plant Control system upgrade Switch room install smoke detector Dickson Road to Jackson Street, Bruce Highway Design and Construct Water Main
Various locations Bulk water meter replacement (as required)
Edmonton Wastewater Treatment Plant Clarifier upgrade
Redbank Road Connection and services to new main
Babinda Reservoir Connection of 300mm trunk inlet main
Infrastructure Works - Division 2: April to October 2018
Location Project
Community Infrastructure
Sugarworld Playground, Edmonton Retaining wall works
Forest View Cemetery Mt Sheridan Office extension
Men’s Shed, Edmonton Cairns Museum off-site storage shed
Hambledon House, Edmonton Building refurbishment
Little Fretwell Park, Bentley Park Youth activities space
Petersen Park, Edmonton Replacement of rugby goals, repair fences, gates and bollards, reseal and linemark car park, carpark garden refurbishment (replant & mulching) Forest View Cemetery Improvements to parking
Various Street litter bin and bin enclosure upgrade completed Fuller Park, Edmonton Reshape BMX jumps
PCYC, Edmonton Landscape improvements
Whereat Park, Edmonton Playground upgrade
Fuller Park, Edmonton Dog exercise area improvements, self-locking gate, fence repairs Sugarworld Gardens, Edmonton All abilities playground upgrade
Road Infrastructure
Agenda Ordinary Meeting 24 October 2018 - #5895192 295
Golden Grove Drive, Bentley Park Traffic calming replacement
Robert Road, Bentley Park, Ravizza Drive, Asphalt overlay Edmonton, Foster Road, Mt Sheridan and Barnard Drive, Mt Sheridan
Mill Road, Edmonton Repair edge breaks between School and roundabout McLaughlin Road, Bentley Park Replace lifted footpath damaged by trees on school grounds Completed Bridge and culvert inspections Defect repairs are underway
Various locations Commenced line marking programme
Hardy Road, Bentley Park Shoulder widening (bus pullover) near Malabar Road Fitzmaurice Drive, Edmonton 1.2km Asphalt footpath
Drainage Infrastructure
Green Street, Graham Street Edmonton Kerb and channel renewals
Idahlia Road Bentley Park Culvert Bridge - trim trees, remove silt and debris and constructs access ramp Trafalgar Road, Mount Sheridan Culvert Bridge - trim trees, remove silt and debris and reshape access ramp Dorunda Street, Mount Sheridan K&C repairs
Caesar Street, Bentley Park Repair pipe collapse including joint reline
Petersen Road, Edmonton Clean and reshape drains
Thompson Road, Edmonton Table Drainage improvements along various sections Hardy Road, Bentley Park Drainage improvements
Berrima Street, Bentley Park Relining of concrete drain
Infrastructure Works – Division 2: Future Works
Location Project
Community Infrastructure
Little Fretwell Park, Edmonton Completion of park works including post and rail installation Whereat Road Park, Edmonton Playground and shade renewal
Boyce Street Park, Bentley Park Installation of basketball key and combined rugby/soccer goals Hambledon House, Edmonton Security key access upgrade
Various locations Playground equipment defects / repairs ongoing
Agenda Ordinary Meeting 24 October 2018 - #5895192 296
Various locations Herbicide program with newly purchased Gator continuing
Road Infrastructure
Mill Road, Edmonton Complete road upgrade
Bicentennial and Robert Road, Bentley Park Bus shelter replacement
Various locations Footpath & traffic island mould treatment will commence at the start of the wet season
Drainage Infrastructure
Fretwell Park Upgrade drainage pit
Various locations CCTV inspections
Various locations Reval findings
Infrastructure Works - Division 3: April to October 2018
Location Project
Community Infrastructure
Woree Pool, Woree Amenities upgrade, creation of all abilities change facilities and flood lighting renewal Bayview Heights Installation of suburb entry signage
Reys Park, White Rock New playground
Treetops park, Forest Gardens Infrastructure improvements
Harlequin Park, Whiterock New shade sail
Forest Gardens Duck pond water line repairs
Hollywood Street Park, Whiterock Improvements to eliminate water ponding
Reys Park, Whiterock New playground and shade sail
Forestview cemetery and precinct depot Flood immunity improvements
Various Street litter bin and bin enclosure upgrade completed Road Infrastructure
Currawong Street, Bayview Heights Traffic calming replacement
Toogood Road, Bayview Heights Line-marking improvements
Links Drive, White Rock New street naming in effect
Southgate Close, Woree Road rehabilitation work
Agenda Ordinary Meeting 24 October 2018 - #5895192 297
Sondrio Street, Woree Footpath works
Woree Pool New footpath installed
Mentana Close, Mt Sheridan Pedestrian bridge upgrade
Kowinka Street, White Rock Footpath works outside Oak Tree Retirement Village
Sandown Close, Woree New footpath
Windarra Street, Woree Asphalt overlay
Various locations Footpath repairs
Forest Gardens Footbridge maintenance and repairs
Skull Road, White Rock New footpath
Progress Road, White Rock Shoulder widening
Drainage Infrastructure
Progress Road, White Rock Kerb and channel renewal
Progress Road near Mission Road, White Rock Remove debris under culvert bridge
Kidman Street, White Rock Concrete lined drain clean out rubbish, silt and rocks Foster Road, Forest Gardens Drainage improvements
Hollywood Boulevarde, White Rock K&C repairs
Kambarra Street, White Rock (near Golf course) Drainage improvements and tree planting
Griffin Road, White Rock Table drain cleaning
Water and Waste Infrastructure
Southern Waste Water Treatment Plant Condition assessment and remediation of clarifier #1 Various locations Sewer main and manhole refurbishment program
Infrastructure Works – Division 3: Future Works
Location Project
Community Infrastructure
Mercurio Road, White Rock Fencing of dog off-leash park
Henley Hill, Earlville Park embellishments
Lissner Park, Earlville Installation of post and rail
Various locations Playground equipment defects / repairs ongoing
Agenda Ordinary Meeting 24 October 2018 - #5895192 298
Various locations Herbicide program with newly purchased Gator continuing
Road Infrastructure
Various locations Footpath & traffic island mould treatment will commence at the start of the wet season Drainage Infrastructure
Kowinka Street, White Rock Kerb and channel renewal
Mecurio Street / Sheldon Avenue, White Rock Drainage upgrades
Giffin Street Drain upgrade
Various locations CCTV inspections
Various locations Reval findings
COMMENT:
Council manages and maintains over $5 billion worth of infrastructure and assets on behalf of the community. Council staff take a systematic approach to the management of these assets which includes routine inspection of the condition of assets, together with planned and reactive maintenance as issues are identified.
The need for new or improved assets are generally driven by population growth, aging assets, or new community desires identified during consultation with residents. Council also has a suite of strategic plans and masterplans for various assets that identify future improvements. Issues may also be identified by residents and raised via Council’s Customer Request Management system.
Council has adopted a star rating framework to assist in prioritising maintenance activities and response times to identified maintenance issues. Applying this framework, 5-star rated assets are very important to the community and have a high profile, high usage, or have a high risk rating if they fail.
The expectation of the community is that a 5-star asset is always presented in top condition and is able to support a high level of service. A 5-star asset requires a high frequency of inspections and a proactive level of maintenance to ensure the asset remains at a 5-star rating. At the other end of the spectrum, 1-star assets, which are not very critical or important to the community, would receive less frequent inspections and only reactive minimal maintenance. The majority of Council’s assets are considered to be 3-star rated.
OPTIONS:
Option 1:
That Council notes the infrastructure projects that have been completed in Divisions 1, 2 and 3 over the last six months and future works planned for the rest of this financial year.
Agenda Ordinary Meeting 24 October 2018 - #5895192 299
Option 2: That Council requests additional details on projects listed in this report.
CONSIDERATIONS:
Council Finance and the Local Economy:
The 2018/19 Annual Budget specifies the anticipated financial activity for Council for the 2018/19 financial year.
Corporate and Operational Plans:
This report supports the Liveability and Community & Culture Strategic Goals in the Council’s Corporate Plan
Statutory:
In formulating the 2018/19 Budget, Council has complied with all relevant sections of the Local Government Act 2009 and Local Government Regulation 2012.
CONSULTATION:
Council Officers and Managers from across the organisation were involved in the identification of the projects listed in this report and the development of the budget. Additionally, workshops were held with Councillors and Executive Officers throughout the budget process.
Helius Visser Manager Infrastructure Planning
Bruce Gardiner General Manager Infrastructure Services