Page 1

FUND RELEASED BY THE NEC DURING 2012-13

SI.N Sanction Order No. & Name of schemes/ projects Approved Cost of NEC Fund Released by O Date (Rs. In lakhs) the NEC (Rs. In Lakhs) 1 NO.NEC(IPR)/340/2012 Extension and Modernization of Galleries of J.N. 495.00 120.00 dated 25.04.2012 State Museum, , (1st installment) 2 No.NEC/HRD/SPORTS/AP Construction of Football Stadium at 494.39 180.00 /8/2012 dated 25.04.2012 under District, Arunac hal Pradesh(1st installment) 3 NO.NEC/HRD/SPORTS/98 Construction of Boy's and Girl's Hostel-cum- 240.00 90.00 /2012 dated 25.04.2012 Boundary Wall and Water Supply at SSA ME Schoo, Dipu Gongo-II, , Arunachal Pradesh (2nd installment) 4 No.NEC/POW/529/2010- Augmentation and Improvement of existing T&D 469.69 180.00 11/2/2789 dated System in and around Sangram Administrative 16.07.2012 HQ in , Arunachal Pradesh (2nd installment) 5 NO.NEC/TRSM/AP/207/20 Construction of Tourist Lodge near Pamluk 277.16 99.77 10 dated 06.07.2012 dated village under Kamporijo Circle under Raga Sub 06.07.2012 Division, Division, Lower Subansiri District, Arunachal Pradesh (1st installment) 6 NO.NEC/HRD/SPORTS/3- Financial Assistance for Chairman's Sports 21.00 3/08 (Pt) dated 25.06.2012 Award for excellence on international and National Sportsmen by the Sportsmen/ Sportswomen in NER 7 NO.NEC/ST/AP/1/2009 Research Development, Conservation of Wild 10.00 dated 29.06.2012 Edible, Aromatic and Medicinal Plants of Arunachal Pradesh and adjoining state of the region(2nd installment) 8 NO.NEC/HRD/SPORTS/73 Construction of Football Stadium at Changlang in 180.00 /2010 dated 08.06.2012 , Arunachal Pradesh (2nd installment) 9 NO.NEC/POW/521/2010- System Improvement in and around 485.58 150.00 11/2776 dated 11.06.2012 Township including Sub- Station, , Arunachal Pradesh (2nd installment)

10 NO.NEC/ST/AP/667/2012 Hill Road Allignment by Satellite Image, Remote 299.33 90.00 dated 24.05.2012 Sensing GIS Technique, Scientific Study and technological Intervention in the hill road onstruction to improve the life of hil androads and constructrion of demo road (1st installment)

11 No.NEC/TRSM/THANGHA Development & Beautification of Thangaphey 446.34 175.73 PHEY/AP/212/2010 dated lakes in District, Arunachal Pradesh(2nd 28.08.2012 installment) 12 No.NEC/HRD/SPORTS/77/ Construction of Boy's and Girl's Hostel for Higher 460.00 80.00 2010 dated 28.08.2010 Secondary School at , West Kameng District, Arunachal Pradesh (3rd installment)

13 No.NEC/HRD/SPORTS/75/ Infrastructure Development of Govt. H.S. School, 460.00 80.00 2010 dated 27.08.2010 Lumla in , Arunachal Pradesh (3rd installment) 14 No.NEC/TRSM/PTSO/AP/ Development & Beautification of PTSO lakes in 195.75 97.88 211/2010 dated 13.08.2012 Tawang District, Arunachal Pradesh(2nd installment) 15 NO.NEC/AGRI/AP/A6/07 Double Cropping in the State of Arunachal 331.45 119.32 dated 22.08.2012 Pradesh(2nd installment) Page 2

SI.N Sanction Order No. & Name of schemes/ projects Approved Cost of NEC Fund Released by O Date (Rs. In lakhs) the NEC (Rs. In Lakhs) 16 No.NEC/TRSM/SELA- Beautification of Sela lakes in Tawang District, 311.10 124.44 LAKE/AP/213/2010 dated Arunachal Pradesh(2nd installment) 21.08.2012 17 NO.NEC/HRD Infrastructure Development of Govt. Secondary 151.00 &e/SPORTS/AP/17/2011 School and ME School under Tali Circle of dated 31.08.2012 Kurung Kumey District, Arunachal Pradesh (2nd installment) 18 No.NEC/IRGN/ARP/2K/37/ Anti- Erosion Work on Pare river at Midpu area 86.97 312-35 dated 13.09.2012 under , Arunachal Pradesh (3rd installment) 19 NO.NEC/HORT/AP/11/201 Establishment of Orange / Large Cardamom 279.00 100.44 0 dated 19.09.2012 Horticulture Garden at Rikung village under Chetam Circle of Upper Subansiri District, Arunachal Pradesh (1st installment) 20 No.NEC/POW/431/2007- Improvement and Renovation i/c realignment of 96.26 08/2825 dated 08.10.2012 existing 33 KV Line from to Mebo and C/o Tower over river Siang and Siku, Arunachal Pradesh (3rd and final installment) 21 No.NEC/POW/475/2008- System Improvement under Raga Electrical Sub- 40.56 09/2824 dated 08.10.2012 Divsision in Lower Subansiri District, Arunachal Pradesh (3rd and final installment) 22 No.NEC/POW/519/2010- C/o 33 KV Single Circuit Express Line from 160.00 11/2826 dated 08.10.2012 Changlang Power Sub- Station to Khimiyang i/c P/o 2X! MVA, 33/11 KV Power Sub- Station at Khimiyang, Arunachal Pradesh (2nd installment)

23 No.NEC/POW/AP/558/201 C/o 33 KV Line from Pakke to Chayangtajo i/c 440.57 180.00 2-13/2837 dated 2X1 MVA, 33/11 KV Sub-Station at Chayangtajo, 08.11.2012 , Arunachal Pradesh (1st installment) 24 No.NEC/MED/AP/8/09 Infrastructure Development of 50 (fifty) bedded 200.00 dated 07.11.2012 Hospital at Palin (Ph-II), Kurung Kumey District (3rd installment) 25 NO.NEC/IND/AP/13/2010 Establishment of Entrepreneurship Development 206.60 83.00 dated 26.11.2012 Institute at Jote under Papum Pare District, Arunachal Pradesh(1st installment)

26 NO.NEC/HORT/AP/26/12 Cultivation of Citronella in Pongchau and Wakka 442.62 177.00 dated 23.11.2012 Circle of , Arunachal Pradesh (1st installment) 27 No.NEC/HRD/SPORTS/42/ C/o Indoor Stadium at Raga under Lower 450.00 AP/2012 dated 21.11.2012 Subansiri District, Arunachal Pradesh(1st installment) 180.00 28 NO.NEC/IRGN/ARP/2K/52/ Anti- Erosion Work on Right & Left Bank of 445.50 170.00 446-69 dated 26.11.2012 Kolma river to protect Kolmajuli village at Nirjuli in Arunachal Pradesh (1st installment) 29 No.NEC/HRD/SPORTS/41/ Infrastructure Development of VKV, Kuporijo 452.70 160.00 AP/2012 dated 04.12.2012 under Dumporijo Assembly Constituency of Upper Subansiri District(1st installment) 30 NO.NEC/MED/AP/HIHM/1 Development of Health Information and Hospital 448.00 180.00 8/2012 dated 19.12.2012 Management System in Papum Pare District(1st installment) 31 No.NEC/EM/CONF/12/49 Conducting of 1st IEEE International 8.00 6.00 dated 17.12.2012 Conference on Power & Energy in NERIST, 2012(1st installment) 32 No.NEC/TRSM/A.P./ANGL Organising the Angling/ Fishing Festival in 9.00 7.00 ING/FISHING/306/2012 Arunachal Pradesh (1st installment) Page 3

SI.N Sanction Order No. & Name of schemes/ projects Approved Cost of NEC Fund Released by O Date (Rs. In lakhs) the NEC (Rs. In Lakhs) 33 NO.NEC/AGRI/AH/AP/1/12 Strengthening and Expansion of District Pig 376.53 150.61 dated 23.11.2012 Breeding Farm at Siro in Lower Subansiri District (1st installment) 34 NO.NEC/(T&C)/APPROVA C/o Laimekuri- Nari- Telam Road(revised 7800.00 L/2012-2013/10 dated administrative approval) 30.11.2012 35 NO.NEC/HRD/SPORTS/3- Development of Sports Infrastructure and 21.00 3/08 (Pt) dated 25.06.2012 Promotion of Sports & Youth Activities in NE Region 36 No.PD(NEC)- Publicity and Promotion of Tourism products of 413.67 90.00 TRSM/A.P./PUBLICITY/30 Arunachal Pradesh with an innovative approach 4/2012 dated 21.12.2012 integrating advertisement through Print & Electronic Media, Organization of Events and facelift of few select tourist destination(1st installment) 37 No.NEC/IND/AP/14/2011 Integrated Development of Community 50.00 dated 24.12.2012 Sericulture Garden at Solungyar village under Kurung Kumey District(2nd installment) 38 No.NEC/IRGN/ARP/@K/18 Flood Protection Work at Dirang Township in 90.00 /743-66 dated 20.12.2012 Arunachal Pradesh (4th installment)

39 No.NEC/T/RELEASE/ARU C/o Digboi- Pengri Bordumsa Road(10th Plan) 500.00 NACHAL PRADESH/2012- (6th installment) 13/42 dated 27.12.2012

40 No.NEC/POW/507/2010- Augmentation and Improvement of Power 77.00 11/2875 dated 11.01.2013 Distribution System in and around Yangte Administrative HQ, Kurung Kumey District, Arunachal Pradesh (2nd installment) 2782.15 1435.50

NEW SCHEMES SANCTIONED DURING 2012-13

1 NO.NEC(IPR)/340/2012 Extension and Modernization of Galleries of J.N. 495.00 120.00 dated 25.04.2012 State Museum, Itanagar, Arunachal Pradesh(1st installment) 2 No.NEC/HRD/SPORTS/AP Construction of Football Stadium at Jairampur 494.39 180.00 /8/2012 dated 25.04.2012 under Changlang District, Arunac hal Pradesh(1st installment) 3 NO.NEC/TRSM/AP/207/20 Construction of Tourist Lodge near Pamluk 277.16 99.77 10 dated 06.07.2012 dated village under Kamporijo Circle under Raga Sub 06.07.2012 Division, Ziro Division, Lower Subansiri District, Arunachal Pradesh (1st installment) 4 NO.NEC/ST/AP/667/2012 Hill Road Allignment by Satellite Image, Remote 299.33 90.00 dated 24.05.2012 Sensing GIS Technique, Scientific Study and technological Intervention in the hill road onstruction to improve the life of hil androads and constructrion of demo road (1st installment)

5 NO.NEC/HORT/AP/11/201 Establishment of Orange / Large Cardamom 279.00 100.44 0 dated 19.09.2012 Horticulture Garden at Rikung village under Chetam Circle of Upper Subansiri District, Arunachal Pradesh (1st installment) 6 No.NEC/POW/AP/558/201 C/o 33 KV Line from Pakke to Chayangtajo i/c 440.57 180.00 2-13/2837 dated 2X1 MVA, 33/11 KV Sub-Station at Chayangtajo, 08.11.2012 East Kameng District, Arunachal Pradesh (1st installment) Page 4

SI.N Sanction Order No. & Name of schemes/ projects Approved Cost of NEC Fund Released by O Date (Rs. In lakhs) the NEC (Rs. In Lakhs) 7 NO.NEC/IND/AP/13/2010 Establishment of Entrepreneurship Development 206.60 83.00 dated 26.11.2012 Institute at Jote under Papum Pare District, Arunachal Pradesh(1st installment)

8 NO.NEC/HORT/AP/26/12 Cultivation of Citronella in Pongchau and Wakka 442.62 177.00 dated 23.11.2012 Circle of Tirap District, Arunachal Pradesh (1st installment) 9 No.NEC/HRD/SPORTS/42/ C/o Indoor Stadium at Raga under Lower 450.00 AP/2012 dated 21.11.2012 Subansiri District, Arunachal Pradesh(1st installment) 180.00 10 NO.NEC/IRGN/ARP/2K/52/ Anti- Erosion Work on Right & Left Bank of 445.50 170.00 446-69 dated 26.11.2012 Kolma river to protect Kolmajuli village at Nirjuli in Arunachal Pradesh (1st installment)

11 No.NEC/HRD/SPORTS/41/ Infrastructure Development of VKV, Kuporijo 452.70 160.00 AP/2012 dated 04.12.2012 under Dumporijo Assembly Constituency of Upper Subansiri District(1st installment) 12 NO.NEC/MED/AP/HIHM/1 Development of Health Information and Hospital 448.00 180.00 8/2012 dated 19.12.2012 Management System in Papum Pare District(1st installment) 13 No.NEC/EM/CONF/12/49 Conducting of 1st IEEE International 8.00 6.00 dated 17.12.2012 Conference on Power & Energy in NERIST, 2012(1st installment) 14 No.NEC/TRSM/A.P./ANGL Organising the Angling/ Fishing Festival in 9.00 7.00 ING/FISHING/306/2012 Arunachal Pradesh (1st installment)

15 NO.NEC/AGRI/AH/AP/1/12 Strengthening and Expansion of District Pig 376.53 150.61 dated 23.11.2012 Breeding Farm at Siro in Lower Subansiri District (1st installment) 16 No.PD(NEC)- Publicity and Promotion of Tourism products of 413.67 90.00 TRSM/A.P./PUBLICITY/30 Arunachal Pradesh with an innovative approach 4/2012 dated 21.12.2012 integrating advertisement through Print & Electronic Media, Organization of Events and facelift of few select tourist destination(1st installment) 1565.88 489.77