Journal Issue # 90

Total Page:16

File Type:pdf, Size:1020Kb

Journal Issue # 90 AUGUST 2010 JOURNAL ISSUE # 90 PUBLISHED BY FEDERATION OF RAIL ORGANISATIONS NZ INC : P O BOX 140, DUNEDIN 9054 PLEASE SEND CONTRIBUTIONS TO EDITOR BY E-MAIL : [email protected] Paul’s Progress 1 Track Materials Update 6 IN THIS Strand Station 1 Sad Day for FOTR. 6 ISSUE Saving Those Provincial Lines 2 Tramway Open Day At Waikino 7 Tower Wagon Update 3 Three Hours For Rescue Too Slow 7 More Bureaucracy 4 Air Quality Standards Being Loosened? 8 Adventure Tourism ? 5 UK Office Of Rail Regulation Report 8 An Apology – Our President, Paul Dillicar, had prepared a July Journal but was rushed to hospital before he could send it out.. This was not discovered until after a scratch Journal was sent out on 18 July. Much of this issue comes from Paul’s edition and we apologise that many of the articles are now a month late. PAUL’S PROGRESS Recent reports say that Paul Dillicar is making good progress in re-hab (though not greatly enamoured of the physio). He is more animated and understanding conversations. While he has a long way to go it is good to hear that he is now fighting back. To those who have sent mail to Paul’s post box, we have recently discovered that, in anticipation of his overseas trip, he had put his mail on hold. We hope that we will be able to retrieve this after the 17th. STRAND STATION Recently the Auckland Regional Transport Authority indicated that they were considering changes to the Strand Station in Auckland. As FRONZ members use this station we have written to the ARTA to register our interest. Below is part of an e-mail sent to ARTA. "FRONZ has a written agreement with an ARTA predecessor, ARTNL, for the use of the Auckland railway network for trains of our member groups. Our interpretation of this agreement is that if any changes are made to facilities such as the nature of stations, including but not limited to platform heights, or configurations, we should be invited to be involved in the planning process. The Strand is an important facility for us as it is used by a number of our member groups when running excursion trains to and from Auckland." For information on the proposal see http://www.aucklandtrains.co.nz/2010/08/05/strand-emergency-stop- confirmed/ SAVING THOSE PROVINCIAL RAILWAY LINES …… 2 The Taranaki Daily News [TDN] reported on 17 June that a combined visit by the Mayors of Stratford and Ruapehu District to KiwiRail and the Minister of Transport Steven Joyce, had failed to secure the retention of the Stratford to Okahukura (SOL) Railway. The TDN reported “The fate of the Stratford to Okahukura (SOL) line, which has been unprofitable for decades and closed since November last year after derailment damage, should be decided at a coming KiwiRail meeting, with final recommendations to be taken to Transport Minister Steven Joyce. At yesterday's Regional Transport Committee meeting, Stratford mayor Neil Volzke spoke of his trip to Wellington. He said they wanted to provide information in favour of keeping the line open, but the response remained the same. "The future of the line depends on whether or not there is a commercial future for it," Mr Volzke said. "They [KiwiRail] need to have a major user - long term, bulk major user. "They did point out they are not in the business of social handouts." The Government has committed $250 million to support KiwiRail's "turn-around-plan" to increase New Zealand's economic productivity and growth through rail. The plan indicates that "minor lines that carry little or no traffic will only survive if they have proven future and/or an imminent anchor customer." The four "minor lines" mentioned are North Auckland line, Napier to Gisborne, North Wairarapa, and the SOL. Mr Volzke said their party did point out the potential for the dairy, gold, and forestry industries to still use the line. In addition, as the turn-around-plan may mean parts of the rail network will have to be closed temporarily for renovations, the SOL line could be used as an alternative to move freight. He asked KiwiRail officials what exactly mothballing the line would mean. "It will remain but not in use. They were aware of the decommission costs,“ he said. KiwiRail also said the mothball period would only be for a certain amount of time however, and if the line did close, further improvements would be made to the Marton - New Plymouth Line, he said. (end abstract). =============== Commenting on the report, FRONZ President Paul Dillicar noted that there was clear concern amongst delegates at the recent 2010 FRONZ AGM, that too much of the KiwiRail Network was now under threatened closure and that was why Don Selby had been appointed by the AGM to act as a “Convenor for Retention of the KiwiRail Network”. This decision was not only driven by the need of the Heritage Network Operating Groups to retain as much of it as possible for operational purposes, but also because as various branch lines threatened over the years for closure had demonstrated, (Dargaville, Ngapara, Kapuni, etc) there was potential for them to rise again to play an important role in keeping convoys of trucks off the roading network in a fuel-efficient way. This was driven by a concern at the way Government was denying KiwiRail the capital required for it to not only improve existing track, but also retain the whole network. “The intention of the AGM was quite clear” Paul noted, “in supporting the work that Don Selby had already done in appealing for the retention of the Masterton-Pahiatua section of the Wairarapa Line, as well as other sections such as the Napier-Gisborne Line which potentially also threatens our member Gisborne City Vintage Railway”. =============== Don Selby has meantime contributed the following statement of how your organisation might contribute : “As reported in the last Journal I was elected FRONZ "Convenor for the retention of the KiwiRail Network". The seeds of this started earlier this year when Minister of Transport Steven Joyce announced that several under utilised rail lines faced an uncertain future unless traffic could be found, or in his words "communities could demonstrate why they should be retained". The North Wairarapa line was high on his hit list so this represented a serious threat to all our local communities and the Pahiatua Railcar Society in particular. 3 As President of the PRS I decided to start a campaign to save the line. This went really well and within weeks I had our (National) MP, both local District Mayors and Councils, all the newspapers in the area, and most of all the general public both aware and right behind me. Radio Stations, Reporters, and even a TV Channel were constantly ringing me (and still are). The news media rapidly became interested in all four threatened lines and to my surprise started quoting things I had said in reports about these others, notwithstanding I had said nothing directly about them. This caused me to realise that the rail heritage movement as a group had a role to play in trying to save all of them - not just our line. What was needed was a group approach to give us critical mass and consequently a louder and more authoritative voice. Knowing the FRONZ Conference was imminent I cast around in the lead-up for support and was sufficiently encouraged to arrange for the proposal to be placed on the agenda. My presentation caused a healthy debate and I'm pleased to say this resulted in a decision to appoint me to this new convenorship. My sincere thanks to all those who supported me - particularly my South Island friends. I am already working closely with Steam Inc and MLST executives and we were able to arrange for our voice to be heard at the recent high level Gisborne line talks. I am hoping other groups like Feilding and the R.E.S. will nominate someone to work with us. There have been some promising developments on our local line and I haven't given up hope on the SOL just yet. North Auckland is also on my radar screen. Be assured none of the four lines will be closed or "mothballed" without strenuous efforts to prevent it being made on your behalf. TOWER WAGON UPDATE Trevor Burling reports:- Western Springs Tramway at MOTAT have received a letter from the Department of Labour (DoL) explaining why they have banned the use of MOTAT’s tower wagons. Essentially they are saying the wagons do not comply with the current code of practice for power operated elevating work platforms and could not be made to comply because of their design. An officer of the department visited the museum to discuss the situation and the response was that the ban still stood even though the maintenance and care to original specifications were explained and operational practices covered. DoL’s response was that the standard they were built to was not acceptable and MOTAT should buy a modern work platform if they want to continue over head maintenance. DoL even said MOTAT were failing in their duty to “take all practical steps” to ensure the safety of their volunteer staff. Our response to that is these practical steps must be reasonable and the intention is to manage the risk, which MOTAT were certainly doing after all they are the experts, not DoL. Also it is not the intention of the law to close down an operation unless there was serious risk involved and that is hardly the case here.
Recommended publications
  • Wairarapa Train Services: Survey Results
    Wairarapa train services: survey results Introduction Greater Wellington Regional Council carried out a survey of passengers on the north-bound Wairarapa trains on 22 June 2011 as part of the Wairarapa Public Transport Service Review. A total of 725 completed forms were returned. We would like to thank passengers and train-staff for your help with this survey. A summary of the results are shown below. The full survey report is available at www.gw.govt.nz/wairarapareview Where people live and how they get to the station About 25% of passengers live in each of Masterton, Carterton or Featherston. A further 13% of passengers live in Greytown and 6% in Martinborough. Sixty-eight percent of passengers travel to the station by car (57% parking their car at the station and 11% being dropped off). A further 23% of passengers walk or cycle to the station and 7% use the bus. Origin and destination The main boarding station in Wairarapa is Featherston (33%), followed by Masterton (28%), Carterton (25%) and Woodside (12%). Most passengers (85%) are going to Wellington, with the rest (15%) going to the Hutt Valley. Why people use the train, and purpose and frequency of travel The main reason people said they use the train is because it is cheaper than taking the car (56% of passengers) and a significant number also said it is quicker than driving (29% of passengers). Comfort (45% of passengers) and ability to work on the train (47% of passengers) were also important. Twenty-six percent of passengers also indicated that it’s environmentally responsible and 20% said they had no other transport option.
    [Show full text]
  • Rail Network Investment Programme
    RAIL NETWORK INVESTMENT PROGRAMME JUNE 2021 Cover: Renewing aged rail and turnouts is part of maintaining the network. This page: Upgrade work on the commuter networks is an important part of the investment programme. 2 | RAIL NETWORK INVESTMENT PROGRAMME CONTENTS 1. Foreword 4 2. Introduction and approval 5 • Rail Network Investment Programme at a glance 3. Strategic context 8 4. The national rail network today 12 5. Planning and prioritising investment 18 6. Investment – national freight and tourism network 24 7. Investment – Auckland and Wellington metro 40 8. Other investments 48 9. Delivering on this programme 50 10. Measuring success 52 11. Investment programme schedules 56 RAIL NETWORK INVESTMENT PROGRAMME | 3 1. FOREWORD KiwiRail is pleased to present this This new investment approach marks a turning point that is crucial to securing the future of rail and unlocking its inaugural Rail Network Investment full potential. Programme. KiwiRail now has certainty about the projected role of rail Rail in New Zealand is on the cusp of in New Zealand’s future, and a commitment to provide an exciting new era. the funding needed to support that role. Rail has an increasingly important role to play in the This Rail Network Investment Programme (RNIP) sets out transport sector, helping commuters and products get the tranches of work to ensure the country has a reliable, where they need to go – in particular, linking workers resilient and safe rail network. with their workplaces in New Zealand’s biggest cities, and KiwiRail is excited about taking the next steps towards connecting the nation’s exporters to the world.
    [Show full text]
  • Planning Committee Meeting Held on 4/02/2020
    Memorandum 20 December 2019 To: Planning Committee Independent Māori Statutory Board Subject: The Draft New Zealand Rail Plan From: Ryan Falconer Lead Transport Advisor Contact information: [email protected] Purpose 1. To provide an overview of the background to and content of the Draft New Zealand Rail Plan (the Plan), and analysis of preliminary implications of this Plan for Auckland Council and Auckland Transport. 2. To provide advice on the relevance of the Plan to Auckland and recommend providing informal feedback to the Ministry of Transport in advance of formal engagement in 2020. Summary 3. The Draft National Rail Plan provides context for proposed reform of rail network planning and investment in New Zealand, integrating rail with the balance of the land transport system and establishing a funding basis from the National Land Transport Fund. 4. The Plan is being publicised simultaneously with proposed legislative change (related amendments to the Land Transport Management Act 2003 and Land Transport Act 1988). This proposed legislative change is addressed in a separate Planning Committee memorandum. 5. The Plan emphasises the planning, funding and operations of both Auckland and Wellington’s metropolitan rail networks and prioritises addressing the needs of both passenger and freight traffic. 6. The Government has invited informal comments on the Plan. The Plan will be out for formal public engagement, alongside the Government Policy Statement on Land Transport, in 2020. However, the Government has invited informal feedback on the plan prior to this. Staff propose providing informal feedback to the Ministry of Transport in January in accordance with the points raised in this memorandum.
    [Show full text]
  • Wellington Network Upgrade
    WELLINGTON NETWORK UPGRADE Better rail services for the region. Around 500,000 Wellingtonians and visitors take over 14 million passenger journeys each year on our Metro Rail Network. KiwiRail, Greater Wellington Regional Council and Metlink are working together to modernise the rail, thanks to investment of almost $300 million from the Government to enable: Train services to be more reliable. More people and freight travelling on rail in the future. The Wellington Metro Upgrade Programme is being delivered on a busy, well-maintained but ageing network where trains run 18 hours a day. The focus of our work is: Renewing existing network infrastructure to improve rail services. Renewing traction power overhead line system and signals power supply, and improving the track across the network including inside the four major tunnels. Adding capacity to the network so more people can travel on trains in the future while still allowing for freight services. This includes: Double tracking between Trentham and Upper Hutt. Improvements to Wellington station approaches. Changes at Plimmerton. More information www.kiwirail.co.nz (Wellington Metro Upgrade) HUTT LINE DOUBLE TRACKING More frequent, reliable trains. The 2.7 kilometres of rail line between Trentham and Upper Hutt is being double tracked so trains can travel in both directions at the same time. This will allow more frequent and reliable services along this section of the busy line from Wellington to Upper Hutt and Wairarapa. Stations are being upgraded and we are making it safer around our tracks. Wairarapa Existing Upper Hutt Future Connecting new second track to the network Level crossing upgrade at Blenheim Street Wallaceville Closing pedestrian crossing just North of Wallaceville New platform with shelters will be built in the style of Ava’s (pictured).
    [Show full text]
  • Attachment 1 Wellington Regional Rail Strategic Direction 2020.Pdf
    WELLINGTON REGIONAL RAIL STRATEGIC DIRECTION 2020 Where we’ve come from Rail has been a key component of the Wellington Region’s transport network for more than 150 years. The first rail line was built in the 1870s between Wellington and Wairarapa. What is now known as the North Island Main Trunk followed in the 1880s, providing a more direct route to Manawatū and the north. Two branch lines were later added. The region has grown around the rail network, as villages have turned into towns and cities. Much of it was actively built around rail as transit-oriented development. Rail has become an increasingly important way for people to move about, particularly to Wellington’s CBD, and services and infrastructure have been continuously expanded and improved to serve an ever-growing population. The region is a leader in per capita use of public transport. Wellington Region Rail Timeline 1874 1927 1954 1982 2010 2021 First section of railway between Hutt line deviation opened as a branch Hutt line deviation to Manor EM class electric FP ‘Matangi’ class Expected Wellington and Petone between Petone and Waterloo Park, creating Melling line multiple units electric multiple completion 1955 introduced units introduced of Hutt line 1876 1935 Hutt line duplication to Trentham duplication, Hutt line to Upper Hutt Kāpiti line deviation to Tawa, creating 1983 and electrification to Upper Hutt 2011 Trentham to 1880 Johnsonville line Kāpiti line Rimutaka Tunnel and deviation Upper Hutt 1 Wairarapa line to Masterton 1 electrification Kāpiti line 2 1938 replace
    [Show full text]
  • Report 08-102 Metro Passenger Train Derailment, Sylvia Park, 14 April 2008
    Report 08-102 Metro passenger train derailment, Sylvia Park, 14 April 2008 (incorporating inquiries 08-104 and 08-107) Diesel motor fires on board metro passenger trains, 3 June 2008 and 25 July 2008 The Transport Accident Investigation Commission is an independent Crown entity established to determine the circumstances and causes of accidents and incidents with a view to avoiding similar occurrences in the future. Accordingly it is inappropriate that reports should be used to assign fault or blame or determine liability, since neither the investigation nor the reporting process has been undertaken for that purpose. The Commission may make recommendations to improve transport safety. The cost of implementing any recommendation must always be balanced against its benefits. Such analysis is a matter for the regulator and the industry. These reports may be reprinted in whole or in part without charge, providing acknowledgement is made to the Transport Accident Investigation Commission. Final Report Rail Inquiry 08-102 Metro passenger train derailment, Sylvia Park, 14 April 2008 (incorporating inquiries 08-104 and 08-107) Diesel motor fires on board metro passenger trains, 3 June 2008 and 25 July 2008 Approved for publication: August 2011 Transport Accident Investigation Commission About the Transport Accident Investigation Commission The Transport Accident Investigation Commission (Commission) is an independent Crown entity responsible for inquiring into maritime, aviation and rail accidents and incidents for New Zealand, and co-ordinating and co-operating with other accident investigation organisations overseas. The principal purpose of its inquiries is to determine the circumstances and causes of occurrences with a view to avoiding similar occurrences in the future.
    [Show full text]
  • KAIPARA SPATIAL PLAN - KEY URBAN AREAS Adopted | 27 May 2020
    DARGAVILLE | MAUNGATŪROTO | KAIWAKA KAIPARA SPATIAL PLAN - KEY URBAN AREAS Adopted | 27 May 2020 Prepared for By RESILIOSTUDIO Kaipara District AR & Associates Resilio Limited Council Level 2, 129 Hurstmere Road 10 West Terrace 42 Hokianga Rd, Takapuna Newton Dargaville 0310 Auckland 0622 Auckland 1010 +0800 727 059 www.arassociates.co.nz www.resilio.nz North Island: Contact_ Gary Marshall Contact_ Joao Machado +64 21 591 279 +64 272 950 386 [email protected] [email protected] South Island: Contact_ Gavin Flynn +64 21 704 332 [email protected] KAIPARA SPATIAL PLAN_KEY URBAN AREAS MIHI Whakatōngia te kākano ki a tipu ia ngā māramatanga. Mā te ako ka mōhio, mā mōhio ka mārama, mā te mārama ka mātau, mā te mātau ka ora e! Sow the seed to nurture understanding. With learning comes knowledge, with knowledge comes understanding, with understanding comes awareness, with awareness comes wisdom, with wisdom comes wellness! Resilio Studio | AR + Associates Limited | May 2020 KAIPARA SPATIAL PLAN_KEY URBAN AREAS FOREWORD It is my pleasure to present the Kaipara Key Urban Areas Spatial Plan, our guide for how we plan for growing the historic towns of Dargaville, Maungatūroto and Kaiwaka. This is planning of a shape, size and scale never undertaken before in Kaipara District. Thanks to all who have contributed to the collaborative engagement approach of this spatial planning process. For some this has been an ‘eye opener’ on how to locate where appropriate development could occur and what are the important parts we cherish in each of the towns; it's given us new ways to see our familiar places.
    [Show full text]
  • Rail Electrification and Extension from Papakura to Pukekohe Updates Glossary
    Agenda Item 13 (iv) Rail Electrification and Extension from Papakura to Pukekohe Updates Glossary Auckland Council (AC) Auckland Electrified Area (AEA) Auckland Plan (AP) Auckland Transport (AT) Construcciones y Auxiliar de Ferrocarriles (CAF) Diesel Multiple Unit (DMU) Electric Multiple Unit (EMU) KiwiRail Group (KRG) New Zealand Transport Agency (NZTA) North Auckland Line (NAL) North Island Main Trunk Line (NIMT) Onehunga Branch Line (OBL) Regional Land Transport Programme (RLTP) Rapid Transit Network (RTN) Executive Summary Item 1: Auckland Rail Electrification Update AT and KRG are currently undertaking preparatory works for electrification of the Auckland Rail Network between Papakura and Swanson Stations, with the first EMU services being tested and commissioned from September 2013. The target is for EMU passenger services to be introduced from December 2013, initially on the OBL. The remainder of the EMU fleet will be introduced in stages until the full fleet is in service under current programme timelines in mid-2016. The electrification projects can be grouped as follows: a) Installation and commissioning of electrification infrastructure: overhead wires, gantries, earthing of stations, etc., primary responsibility with KRG. b) Station and depot infrastructure: preparation for electrification includes construction of an EMU depot at Wiri, upgrading of a number of existing stations to a common standard, construction of a new station at Parnell, ensuring sufficient stabling for the EMU fleet. Responsibility is primarily with AT; c) Procurement of new EMU fleet: Including operational transitioning from the existing DMU and diesel locomotives to the new EMUs. Responsibility rests with AT. d) Operational readiness for electrification: Training of staff, train drivers and contractors for working within an electrified environment, agreement on responsibility for maintaining electrification assets, agreement on safety provisions for public and contractors, communications with the public and other stakeholders.
    [Show full text]
  • Delivering Rail Decarbonisation to New Zealand
    Delivering rail decarbonisation to New Zealand TRANSFORMATIONAL CHANGE AND BOLD DECISIONS REQUIRED TO DELIVER A DECARBONISED RAIL NETWORK IN NEW ZEALAND. 1 Introduction ........................................................................................................3 Contents 2 Challenges ............................................................................................................4 3 Opportunity .........................................................................................................7 4 Conclusion ............................................................................................................9 PAGE | 2 WSP | 01 | 02 | 03 | 04 | 01 Introduction Angus Gabara, Principal Rail and Transit Advisory Here, KiwiRail has embarked on a study to understand WSP NZ Rail and Transit discipline, describes the the costs of completing the electrification partos of the transformational change and bold decisions required network including: to deliver a decarbonised rail network in Aotearoa, • the North Island Main Trunk Line between Auckland New Zealand. and Wellington, At the end of 2020, with mounting pressure to affect • the East Coast Main Trunk to Tauranga, change that delivers its carbon reduction goal, the Labour Government declared a climate emergency • the Wairarapa line to Masterton for New Zealand. The transport industry’s response to Electrification will be a huge step towards this emergency is pivotal and the rail industry is no decarbonisation, and provide efficient and safe exception. intercity
    [Show full text]
  • City Rail Link - Summary of Submissions
    City Rail Link - Summary of Submissions Sub Sub Submitter Organisation Name Topic Description Summary No. Matter Name I am writing to add my voice of support for the CRL project. As a daily user of commuter trains in Wellington I strongly believe that the link will make Glenn Auckland a more vibrant city, which is easier to travel around. It will also make Auckland a more attractive holiday destination - especially to those 1 1/1 1.1 Support - NOR All Chadwick who don't drive - or won't drive in a city that they are unfamiliar with. I feel it is important to register my support - despite not living in Auckland, because it should be on record that this project has support from people outside Auckland. 2 2/1 Erin E Wi 1.1 Support - NOR All 5 The submitter seeks that: (a) The NOR for the CRL proposal be cancelled and withdrawn. (b) That any designation of other approval of the CRL proposal includes and is subject to LIFE's property and facilities first being relocated and re-established on an alternative site with the same CLC Trust attn Malcolm 1.23 Oppose / withdraw - 3 3/1 attributes as the LIFE Central site and facilities and within a specified timeframe not exceeding 2 years from the designation approval date; (c) That Board McLean NOR All the lapsing period of any designation or approval be limited to 5 years; and (d) Any further, additional or consequential relief that is necessary or appropriate in respect of the matters referred to in this submission.
    [Show full text]
  • Railwayoccurrencerepo Rt
    R A I L W A Y O C C U R R E N C E R E P O R T 04-125 collision between an over-dimensioned road load and rail over road 2 October 2004 bridge No.98 on Opaki-Kaiparoro Road, between Eketahuna and Mangamahoe TRANSPORT ACCIDENT INVESTIGATION COMMISSION NEW ZEALAND The Transport Accident Investigation Commission is an independent Crown entity established to determine the circumstances and causes of accidents and incidents with a view to avoiding similar occurrences in the future. Accordingly it is inappropriate that reports should be used to assign fault or blame or determine liability, since neither the investigation nor the reporting process has been undertaken for that purpose. The Commission may make recommendations to improve transport safety. The cost of implementing any recommendation must always be balanced against its benefits. Such analysis is a matter for the regulator and the industry. These reports may be reprinted in whole or in part without charge, providing acknowledgement is made to the Transport Accident Investigation Commission. Report 04-125 collision between an over-dimensioned road load and rail over road bridge No.98 on Opaki-Kaiparoro Road, between Eketahuna and Mangamahoe 2 October 2004 Abstract On Saturday 2 October 2004, at about 1015, an exhaust outlet at the top of a bulldozer being carried on a road trailer collided with the underside and damaged rail over road bridge No.98, located at 117.95 km on the Wairarapa Line, about 9 km south of Eketahuna. A nearby farmer who had heard the collision reported details of the damage to train control.
    [Show full text]
  • Mahere Waka Whenua Ā-Rohe Regional Land Transport Plan 2021 - 2031
    Mahere Waka Whenua ā-rohe Regional Land Transport Plan 2021 - 2031 1 Mahere Waka Whenua ā-rohe Regional Land Transport Plan - 2021-2031 AUTHOR SERVICE CENTRES Horizons Regional Transport Committee, Kairanga which includes: Cnr Rongotea and Kairanga -Bunnythorpe Roads, Horizons Regional Council Palmerston North Marton Horowhenua District Council 19 Hammond Street Palmerston North City Council Taumarunui Manawatū District Council 34 Maata Street Whanganui District Council REGIONAL HOUSES Tararua District Council Palmerston North Rangitīkei District Council 11-15 Victoria Avenue Ruapehu District Council Whanganui 181 Guyton Street Waka Kotahi NZ Transport Agency New Zealand Police (advisory member) DEPOTS KiwiRail (advisory member) Taihape Torere Road, Ohotu Road Transport Association NZ (advisory member) Woodville AA road users (advisory member) 116 Vogel Street Active transport/Public transport representative (advisory member) CONTACT 24 hr freephone 0508 800 800 [email protected] www.horizons.govt.nz Report No: 2021/EXT/1720 POSTAL ADDRESS ISBN 978-1-99-000954-9 Horizons Regional Council, Private Bag 11025, Manawatū Mail Centre, Palmerston North 4442 Rārangi kaupapa i Table of contents He Mihi Nā Te Heamana - Introduction From The Chair 02 Rautaki Whakamua - Strategic Context And Direction 03 1 He kupu whakataki - Introduction 04 1.1 Te whāinga o te Mahere / Purpose of the Plan 05 Te hononga o te Mahere Waka Whenua ā-Rohe ki ētahi atu rautaki - Relationship of the Regional Land Transport Plan to other 1.2 06 strategic documents 2 Horopaki
    [Show full text]