World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document 18 Months Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan: January 19, 2016 2. Date of General Procurement Notice: August 5, 2016 3. Period covered by this procurement plan: June 2016 to December 2017 4. Implementing Agencies: • Component 1: Ministry of Agriculture, Forestry and Fisheries (MAFF): Fisheries Administration (FiA) • Component 2: Cambodian National Mekong Committee (CNMC) II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. Public Disclosure Authorized Procurement Method Prior Review Comments Threshold US$ 1. Each package estimated Goods to cost more than 2,000,000 2. Each package estimated Works to cost more than 10,000,000 3. (Non-Consultant Services) Each package estimated to cost more than 2,000,000 Public Disclosure Authorized 2. Prequalification. Not applicable. 3. Any Other Special Procurement Arrangements: Not Applicable 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) Component 1: Fisheries and Aquatic Resources Management in Northern Cambodia 1 2 3 4 5 6 7 Public Disclosure Authorized Ref. Descriptio Estimate Packages Dome Review Commen No. n d stic by Bank ts Cost Prefer (Prior / US$ ence Post) (yes/n o) Office equipment, office furniture, Shopping boats, and NCB Laboratory methods FiA- Aquatic life will be G001 and water 343,000 8 No Post followed -008 quality to monitoring procure equipment these , Mapping goods. Equipment, motorbikes , vehicles, Constructio n of Office for FiA Stung Shopping FiA- Treng and and NCB CW00 Kratie, 660,000 3 No Post methods 1- Hatchery will be 003 constructio followed n, and FiA office renovation Component 2: Support for WRM in the Northern Cambodia and trans- boundary dialogue 1 2 3 4 5 6 7 Ref. Description Estimate Package Domestic Review Comments No. d s Preferenc by Bank Cost e (Prior / US$ (yes/no) Post) Office furniture, office equipment, Hydro- metrological equipment, Shopping and G01- Water and NCB methods 1,000,50 10 hydrological 10 No Post will be followed 0 (goods) measurement to procure equipment, these goods. vehicles, motorbikes, Supply and Installation of Meteorology measurement equipment, ect. Construction of PDOWRAM office building in Kratie, W01a Steung Treng 390,000 1 No Post NCB (Works) , Rattanakiri, and Mondulkiri Province ( 4 buildings) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comment Threshold 1. Each package estimated Selection of Consulting firms to cost more than 1,000,000 2. Each package estimated Selection of Individual Consultant to cost more than 300,000 2. Any Other Special Selection Arrangements: Not Applicable 3. Consultancy Assignments with Selection Methods Component 1: Fisheries and Aquatic Resources Management in Northern Cambodia 1 2 3 4 5 6 Ref. Description of Estimate Packa Review Comments No. Assignment d ges by Cost Bank US$ (Prior / million Post) FiA-CS FM consultants, 001- Procurement 26 individual 026 Consultants, national and 1,873,00 International 26 Post international 0 Fishery Resource consultants will Management be engaged. Specialist, International Community Fishery Specialist, National Lead Fishery Resource Specialist, National Lead Community Fishery Specialist, National Environmental and Social (safeguards) specialist, National Gender Specialist, Regional Aquaculture Specialist, National Infrastructure Engineer, etc. Component 2: Support for WRM in the Northern Cambodia and trans- boundary dialogue 1 2 3 4 5 6 Ref. Description of Estimate Packa Review Comments No. Assignment d ges by Cost Bank US$ (Prior / million Post) 2 FM consultants, 2 5 individual Procurement national and CS 01- Consultants, 302,000 5 Post international 05 Project consultants will accountant be engaged. consultant. Bundled auditor selected by MEF. SSS method will CS07 External audit 50,000 1 Post be followed to firm engage the auditor for this project Technical Water 2,500,00 QCBS method will CS08 1 Prior Resource 0 be followed. Management Firm NIS upgrading CS09 support CQS method will 50,000 1 Post consultant ( be followed. Firm) PROCUREMENT Cambodia : Mekong Integrated Water Resources Management Project- Phase III PLAN General Information Country: Cambodia Bank’s Approval Date of the Original Procurement Plan: 2017-03-21 Revised Plan Date(s): (comma delineated, leave blank if none)2021-04-20 Project ID: P148647 GPN Date: Project Name: Mekong Integrated Water Resources Management Project- Phase III Loan / Credit No: IDA / 57770 Executing Agency(ies):Fisheries Administration WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 1. Fisheries and Aquatic FIA-CW-003 / Office Request for Single Stage - One 2017-12- IDA / 57770 Resources Management in Post Open - National 20,000.00 19,995.83 Signed 2017-07-26 2017-10-08 2017-08-24 Renovation for FiA Quotations Envelope 07 Northern Cambodia FIA-CW-001 / Construction of New Office Buildings for 1. Fisheries and Aquatic Request for Single Stage - One 2019-10- PFiA Stung Treng and Kratie IDA / 57770 Resources Management in Post Open - National 140,000.00 247,481.42 Completed 2019-03-04 2019-04-23 2019-05-17 Quotations Envelope 20 (Including renovation of Northern Cambodia existing office of PFiA Kratie) FIA-CW-074 / Natural Laterite Road Reconstruction (Length 690m Width 4m Earth 1. Fisheries and Aquatic Community Driven 2019-06- Work Heigh t0.3m Natural IDA / 57770 Resources Management in Post Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-04 2019-02-13 2019-02-08 2019-03-04 2019-02-22 Development 02 Gravel Height 0.1m) in Preaek Northern Cambodia Prasab Commune, Preaek Prasab District, Kratie Province FIA-CW-075 / Natural Laterite Road Reconstruction (Length 630m Width 5m Earth 1. Fisheries and Aquatic Community Driven 2019-06- Work Height 0.3m Natural IDA / 57770 Resources Management in Post Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-10 2019-02-13 2019-02-10 2019-03-04 2019-02-21 Development 02 Gravel Height 0.15m) in Bos Northern Cambodia Leav Commune, Chetr Borei District, Kratie Province FIA-CW-076 / Laterite Road Reconstruction (Length 1278m Width 6m, Earth Work 1. Fisheries and Aquatic Community Driven 2019-06- Height 0.2m, Laterite Height IDA / 57770 Resources Management in Post Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-10 2019-02-13 2019-02-10 2019-03-04 2019-02-22 Development 02 0.15m) in Preah Rumkel Northern Cambodia Commune, Thalaborivat District, Stung Treng Province FIA-CW-077 / Pipe Culverts Construction (4 Pipe Culverts 1. Fisheries and Aquatic Diameter of Pipe 1m, Length Community Driven 2019-05- IDA / 57770 Resources Management in Post Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-10 2019-02-13 2019-02-10 2019-03-04 2019-02-22 6m) in Koh Sampeay Development 03 Northern Cambodia Commune, Siem Bouk District, Stung Treng Province FIA-CW-078 / Pipe Culverts Construction and Earth Road 125m (Pipe Culverts and 1. Fisheries and Aquatic Community Driven 2019-06- Double Pipe Culvert, Diameter IDA / 57770 Resources Management in Post Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-10 2019-02-13 2019-02-10 2019-03-04 2019-02-22 Development 02 of Pipe 1m, Length 6m) in Northern Cambodia Sdao Commune, Se San District, Stung Treng Province FIA-CW-079 / Natural Gravel Road Reconstruction (Length 690m, Width 4m, 1. Fisheries and Aquatic Earth Work Height 0.3m, Community Driven 2019-07- IDA / 57770 Resources Management in Post Direct 10,000.00 10,000.00 Signed 2019-03-18 2019-03-29 2019-03-23 2019-03-29 2019-04-11 2019-04-08 Natural Gravel Height 0.15m) Development 10 Northern Cambodia in Ruseykeo Commune, Sambour District, Kratie Province FIA-CW-081 / Natural Gravel Road Reconstruction and Culvert (Length 1300m, Width 3m, Earth Work Height 0.2m, 1. Fisheries and Aquatic Community Driven 2019-07- Natural Gravel Height 0.15m, IDA / 57770 Resources Management in Post Direct 10,000.00 10,000.00 Signed 2019-03-18 2019-03-29 2019-03-23 2019-03-29 2019-04-11 2019-04-08 Development 10 and Single Culvert Length 5m, Northern Cambodia Diameter 0.6m) in Sambour Commune, Sambour District, Kratie Province FIA-CW-082 / Natural Gravel Road Reconstruction (Length 800m, Width 4m, 1. Fisheries and Aquatic Community Driven 2019-07- Natural Gravel Height 0.2m) in IDA / 57770 Resources Management in Post Direct 10,000.00 10,000.00 Signed 2019-03-18 2019-03-29 2019-03-23 2019-03-29 2019-04-11 2019-04-08 Development 10 Kampong Cham Commune, Northern Cambodia Sambour District, Kratie Province FIA-CW-083 / Laterite Road Reconstruction (Length 930m, Width 5m, Earth Work Height 1. Fisheries and Aquatic Community Driven 2019-08- 0.2m, Laterite Height 0.15m) IDA / 57770 Resources Management in Post Direct 10,000.00 10,000.00 Signed 2019-05-06 2019-05-07 2019-05-11 2019-05-07 2019-05-30 2019-05-17 Development 28 in Koh Pras Commune, Siem Northern Cambodia Bouk District, Stung Treng Province FIA-CW-084 / 2 Culverts Construction and Fill Earth 1.
Recommended publications
  • Annual Report 2017 T R O P E R
    C O M M U N I T I E S B U I L D W A T H N A K P H E A P C A M B O D I A O R G A N I Z A T I O N WATHNAKPHEAP ANNUAL REPORT 2017 T R O P E R L A U N N A 7 1 0 2 A WORD FROM THE DIRECTOR ................................................................................................. 2 GOVERNING BOARD ................................................................................................................. 3 P W PROJECT REACH AND PARTNERS .............................................................................................. 4 DIRECT BENEFICIARIES BY PROJECTS ....................................................................................... 5 COMMUNITY-LED NUTRITION: KEY ACHIEVEMENTS................................................................... 6 CASE STUDY: SOM'S STORY ..................................................................................................... 7 EDUCATION FOR ALL PROGRAM: KEY ACHIEVEMENTS ............................................................ 8 CASE STUDY: THIDA'S STORY ................................................................................................... 9 GOOD GOVERNANCE & CIVIC ENGAGEMENT: KEY ACHIEVEMENTS .................................... 10 CASE STUDY: CHANGKRANG COMMUNE'S STORY ................................................................. 11 ORGANIZATIONAL GOALS: PROGRESS & CHALLENGES.......................................................... 13 1997-2017: 20 YEARS OF WATHNAKPHEAP...............................................................................
    [Show full text]
  • Phnom Penh O Mes
    103° 105° 107° :)eµ :)m’Ùy SAKOU Samoth 14° Géographie 13° du Cambodge NaÙtNkø;&=)n 11° 11° 6 NaÙt:I"t§:p 103° 105° 107° 5 105° 7 j ?Ó;§< a 7 Preah Vihear Banlung St.Trèng Sisophon Angkor 4NaÙtqH)nmp Battambang 3 1 13° Mon 13° Krati <µp§a; Mékong é Pursa Stung Sèn ts t 2 Card Kg.Cham am Phnom Penh o mes Sihanoukville KepDaunKeo Golfe de Mer SAKOU SAMOTH Thaïlande de Chine Magazine Angkor Vat . Paris - Décembre 2013 105° ISBN 2-9524557-5-9 . Dépôt légal : Bibliothèque nationale de France . Décembre 2013 . ISSN: 1162-1680 Utilisation du sol dans les années 1970 et cours d’eau THAILANDE Samrong Banlung Poïpet Sisophon Krong Preah Vihear Païlin Pursat Krong Stung Sèn Senmonorom Kg.Chhnang Agriculture diffuse Forêt tropicale dense Kg.Cham Forêt sèche et savane Phnom Penh Marécages Khémarak VIETNAM Phouminville Châr Môn Prey Vèng sens du courant de juin à octobre Mangroves Takhmau sens du courant de novembre à mai Grande pêche en eau douce N GOLFE DE Svay Rieng THAILANDE Daun Keo Les cultures principales (riz, caoutchouc) restent toujours les mêmes Bokor Sihanoukville Kampot Kep Koh Trâl Preah Vihear Samrong Réseau routier : Distances de Phnom Penh à la ville de : Phnom Kulean Siem Pang Borkeo Battambang : 291 km Prey Vèng : 91 km Angkor Stung Trèng Siem Reap : 314 km Svay Rieng : 124 km Tonl Phnom Dèk Samrong : 440 km g Krong Chbar Môn : 48 km Battambang Pich Rada Païlin Krong Stung Sèn : 169 km Krong Daun Keo : 78 km kon Sap Kg.Thom M Krong Preah Vihear: 292 km Kampot : 148 km Bou Sra des cardam Kratié Pursat : 186 km Kh.Phouminville
    [Show full text]
  • Promoting Good Governance by Increasing Access to Information and Strengthening the Independent Media”
    DCI-NSAPVD/2014/348-051 1 Jan. 2015 – 30 June 2018 1. Description 1.1. Name of Coordinator of the grant contract: DanChurchAid (Folkekirkens Nødhjælp) 1.2. Name and title of the Contact person: Eva Pineda Hansen, Head of Global Partnerships and Donor Relations (GPDR) Unit 1.3. Name of Beneficiary(ies) and affiliated entity(ies) in the Action: • Advocacy and Policy Institute (API) • Cambodian Center for Independent Media (CCIM) 1.4. Title of the Action: “Promoting good governance by increasing access to information and strengthening the independent media” 1.5. Contract number: DCI-NSAPVD/2014/348-051 1.6. Start date and end date of the reporting period: 1 Jan. 2015 – 30 June 2018 1.7. Target country(ies) or region(s): Cambodia (21 Communes, 7 districts of 4 provinces) • Pursat Province (Pursat Municipality, Bakan District) • Kratie Province (Chetr Borei District) • Banteay Meanchey Province (Thmor Pouk District, Phnom Srok District) • Kampong Thom Province (Santuk District, Brasat Balank District) 1.8. Final beneficiaries &/or target groups1 (if different) (including numbers of women and men): Final beneficiaries: - 8.5 million Voice of Democracy (VOD) radio listening audience members nationwide - 227,905 residents of the 21 targeted communes Target groups: - 28 citizen journalists (CJs) - 4 provincial broadcasters (PBs) - 120 local authorities (LAs) - 120 leaders of community-based organisations (CBOs) - 6,300 community members 1.9. Country(ies) in which the activities take place (if different from 1.7): N/A 1 “Target groups” are the groups/entities who will be directly positively affected by the project at the Project Purpose level, and “final beneficiaries” are those who will benefit from the project in the long term at the level of the society or sector at large.
    [Show full text]
  • Ysssbf
    ERN>01620233</ERN> D384 2 ANNEX ~ LIST OF CIVIL PARTY APPLICATIONS INADMISSIBLE 3|b SifIffe Full Name Reasons for Inadmissibility Finding Province Foreign Lawyer Isis \b 2 The Applicant described the following enslavement and OIA at various locations murder of her father and s I uncle s family in Siem Reap Province While it is recognised that these are traumatising events they do not UTH Rathana }tctf Banteay Meanchey 5 Chet Vanly S relate to any matter which would permit the admission of the Applicant to be joined as a civil party as they fall a Q Sr 5 outside of the territorial scope of the Case File ~~ n 3 The Applicant described being ordered to carry out hard labour from 1975 onwards including at Trapeang 23 ru I Thma Dam However her identification document confirmed in the information entered in her VIF state that 02 CHEN Savey she was bom in 1974 and was thus an infant in 1975 While this is traumatising these inconsistencies make it Banteay Meanchey s Chet Vanly s 02 ~ to deduce that it is more than not to be true that she suffered as a of one of the 3 ~~ impossible likely consequence crimes ~~ charged n 3 s ¦02 The Applicant s VIF and Supplementary Information are contradictory The Applicant was not sent to 3 a Khnol Security Centre He was a RAK soldier throughout DK While he witnessed various crimes and NHOEK Yun c Banteay Meanchey 5 Chet Vanly S numerous members of his family died during the Regime it is not established that it is more likely than not to b 3 Q £ a true that the Applicant suffered as a result of one of the crimes
    [Show full text]
  • Cambodia Organic Farm Clinic Internship
    Thailand -Cambodia Organic Farm Clinic Internship Thailand 20-29 June 2013 Background As participants of the Pro-Poor Public Private Partnership Learning Route (organized by PROCASUR in Thailand during 2012), the Project for Agricultural Development and Economic Empowerment (PADEE) of the Ministry of Agriculture, Forest and Fisheries (MAFF) of Cambodia designed a proposal for improving life quality of the rural farmers through the access to innovative agricultural and business techniques and strategies. PADEE’s team drew its attention to the peer-to-peer extension service approach promoted by the Ministry of Agricultural and Cooperatives of Thailand. Particularly importance has been given to the Community Learning Centres (CLC) model as a public private partnership tool for the provision of technical assistance and capacity building. On that basis, PADEE developed the “Organic Farm Clinic” as its Innovation Plan, aiming to pilot the CLCs peer-to-peer training approach with organic rice and safe vegetables in the provinces of Takeo and Kandal where Organic Rice and Safe Vegetables Value Chains are being promoted. The Innovation has a total cost of USD 107 500 and a duration of twelve months. The Innovation plan considered two exchanges between Cambodia and Thailand, first an internship in Thailand where PADEE staff and beneficiaries learn directly from the CLC the agricultural techniques that allows them to become self-sufficient, improve famers organization and access to new markets. Moreover, during this internship Cambodian farmers will learn how to define, provide and evaluate technical assistance and capacity building services by the establishment of sustainable and profitable “Organic Farms Clinics”. The second exchange will occur in October 2013, when a delegation of Thai CLC Managers and MOAC officials visit the province of Takeo and Kandal and support the establishment of the “Organic Farm Clinics”.
    [Show full text]
  • List of Merchant in Phnom Penh As of 29 June 2021
    List of Merchant in Phnom Penh As of 29 June 2021 No. Logo Merchant Name Merchant Type Address No.518, St.271, Sangkat Beung Tompong, Khan Baby Swag 1 Baby Shop Mean Chey, Phnom Penh St.184,S.K Beoung Rang,Khan Doun Penh, , CHILI BAKERY best in town 2 Bakery Shop Phnom Penh N.36,St.164, Sangkat Orussey, 7Makara, , Phnom Bread House 3 Bakery Shop Penh #152AA, St.143 Coner368, Sangkat Beong Keng Rasmey Dara Bakery 4 Bakery Shop Kong3, Beong Keng Kong, , Phnom Penh #209, St155, Sangkat Toul Tumpoung, Khan HAPPINESS CAKE WORLD 5 Bakery Shop Charmkamon, , Phnom Penh St.199 Corner 404, Sangkat Tumnob Teuk, Khan Sor's Cheese Corndog 6 Bakery Shop Chamkarmon, , Phnom Penh No.102, St.143, Sangkat Boeng Keng Kang 2, Khan Royal Cake 7 Bakery Shop Boeng Keng Kang No.124 and125, St.Hun Neang, Sangkat Chak Pa Pa Pav 8 Bakery Shop AngreKrom, Khan Meanchey 9 Moon Cake Bakery Shop St.69, Sangkat Boung Tompun, Khan Mean Chey ANGEL FOOD WAT TOUL #524c, St.99, Sangkat Toul Sangke, Khan Russey 10 ORS LUK Bakery Shop Keo 11 KHANG LAY CAKE USD Bakery Shop National road 2, chak Ahgre leu, Mean Chey # 125 C St.143, Sangkat Boeng Keng Korng 3, KHMER DESSERT 12 Bakery Shop Khan Boeng Keng Korrg #.670BC, St.271, Sangkat Boueng Tompun, Khan SINCERE BOOK CENTER 13 Book Shop Mean Chei, , Phnom Penh Café and #90, St.360, Sangkat Boeung Keng Kong3, Khan 14 NOIR 360(Tan Linda) Restaurnt Boeung Keng Kong, , Phnom Penh Café and No.40, St.105, Sangkat Beung Prolet, Khan 7 15 NOIR COFFEE YUKUNTHOR Restaurnt Markara Café and #19A st 156,Sangkat Veal Vong, 7markara,phnom 16
    [Show full text]
  • Battambang Province
    Table of contents Page 1 Introduction ................................ ......................................................................................................................... 2 Banteay Mean Chey Province ................................ .............................................................................................. 5 Battambang Province ................................ ........................................................................................................... 8 Kaeb Province .................................................................................................................................................... 12 Kampot Province ................................ ................................................................................................................ 15 Kandal Province ................................ .................................................................................................................. 18 Koh Kong Province ................................ ............................................................................................................. 21 Kompong Cham Province ................................ ................................................................................................... 24 Kompong Chhnang Province ................................ .............................................................................................. 28 Kompong Som Province ................................ ....................................................................................................
    [Show full text]
  • DRAFT MID - YEAR PROGRESS REPORT 2017 Disability Rights Initiative Cambodia (DRIC) Reporting Period: 01 January – 30 June 2017
    DRAFT MID - YEAR PROGRESS REPORT 2017 Disability Rights Initiative Cambodia (DRIC) Reporting period: 01 January – 30 June 2017 Report Submitted by Name: Ms. Kristina Seris Title: DRIC Programme Coordinator Email: [email protected] 1 Contents A. Executive Summary ............................................................................................................................ 3 B. Qualitative Assessment ....................................................................................................................... 4 i) Introduction ..................................................................................................................................... 4 ii) Progress recorded towards achievement of the component intermediate outcomes for the period January to June 2017 .............................................................................................................. 4 iii) Monitoring and Evaluation ............................................................................................................ 7 iv) Risk Analysis ................................................................................................................................... 7 v) Adherence to the programme principles during the reporting period .......................................... 8 C. Assessment of the Programme Results ............................................................................................ 11 D. Challenges .......................................................................................................................................
    [Show full text]
  • Microsoft Office 2000
    ROYAL GOVERNMENT OF CAMBODIA National Committee for Sub-National Democratic Development Secretariat (NCDD) Land Allocation for Social and Economic Development IDA Credit No. 4441-KH Grant No. H 386-KH INTERIM FINANCIAL REPORT (IFR) Fourth Quarter Report as of ended December 31, 2010 Contents 1. Summary of Project Progress 2. Financial Report 2-1 – Project Sources and Uses of Funds by Project Components 2-2– Uses of Funds by Project Activity 2-3 – Project Cash Withdrawals (Disbursements) 3. Project Progress Report 4. Procurement status and Procurement Management Report A – Procurement Process Monitoring (Goods and Works) B – Procurement Process Monitoring (Consultants’ Services) C – Contract Expenditure Report (Goods and Works) D – Contract Expenditure Report (Consultants’ Services) 5. Issues and Challenges 6. Continuing Activities Implementation Plan 1 1. Summary of Project Progress International Financial Report (IFR) as part of Progress Report The attached IFR is prepared for the fourth quarter as of December 31, 2010 of all LASED targeted provinces. The overall of all LASED Financial Management System through the computerized system is in place for accounting record of revenues and expenses at the three LASED target provinces. The actual total revenues to this fourth quarter has been deposited into LASED designated account with the amount of USD737,314.00 from World Bank at rate of 13.91% reflecting to annual LASED budget. The actual expense to date is amount of USD895,413.07 at the rate of 16.87% reflecting to the budget. Comments on the IFR (including explanation of major variances) The Financial Reports summarizes the funds received from the Royal Government of Cambodia and the World Bank.
    [Show full text]
  • 1 Royal Government of Cambodia (Rgc) I. Background
    ROYAL GOVERNMENT OF CAMBODIA (RGC) Land Allocation for Social and Economic Development (LASED) Project (Credit No. 44410-KH and Grant No. H3860-KH); and Associated JSDF-Funded Projects on: (1) Strengthening Good Governance in Land Distribution Project (TF091833) (2) Strengthening Civil Society-Government Partnership to Deliver Land Tenure Security Project (TF091836) (3) Community Empowerment Through Access to Land Project (TF091839) Mid-Term Review and Sixth Joint IDA-GIZ Implementation Support Mission October 3-21, 2011 Aide Memoire I. BACKGROUND 1. Overview. The World Bank (the Bank) Team1 and GIZ Team2 assembled in Cambodia on October 3-21, 2011 to carry out the Mid-Term Review (MTR) and Implementation Support Mission for the: (a) “Land Allocation for Social and Economic Development (LASED) Project”; and (b) associated NGO-implemented social land concession (SLC) projects supported under the World Bank’s Japan Social Development Fund (JSDF) namely: (i) “Strengthening Good Governance in Land Distribution Project” being implemented by Wathnakpheap (WP); (ii) “Strengthening Civil Society-Government Partnership to Deliver Land Tenure Security Project” being implemented by Habitat for Humanity International in Cambodia (HFHI-C); and (iii) “Community Empowerment through Access to Land Project” being implemented by Life with Dignity (LWD). 2. The mission held meetings and discussions in Phnom Penh with the: (a) officials of the Ministry of Land Management, Urban Planning and Construction (MLMUPC), National Committee for Sub-national Democratic Development (NCDD); (b) staff of General Secretariat for Social Land Concessions (GSSLC) and Secretariat of the National Committee for Sub-national Democratic Development (NCDDS); (c) representatives and staff of associated partner–NGOs implementing SLC activities/projects; and (d) Cambodian Mine Action Centre (CMAC).
    [Show full text]
  • KINGDOM of CAMBODIA Nation Religion King Ministry of Public
    KINGDOM OF CAMBODIA Nation Religion King Public Disclosure Authorized Ministry of Public Works and Transport Public Disclosure Authorized Cambodia Road Connectivity Public Disclosure Authorized Improvement Project ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN: NR 7 PK300+00-331+25 DRAFT Public Disclosure Authorized March 2020 LIST OF ACRONYMS AH Affected Household BRP Basic Resettlement Plan CED Conceptual Engineering Designs COI Corridor of Impact CRCIP Cambodia Road Connectivity Improvement Project DDIS Detailed Design Implementation and Supervision (Consultants) DED Detailed Engineering Designs DRP Detailed Resettlement Plan EIA Environmental Impact Assessment ESCP Environment and Social Commitment Plan ESF Environment and Social Framework ESMF Environmental and Social Management Framework ESMP Environmental and Social Management Plan ESO Environment and Social Office ESS Environment and Social Standard FPIC Free Prior and Informed Consent GBV Gender-Based Violence GDR General Department of Resettlement HIV/AIDS Human Immunodeficiency Virus / Acquired Immune Deficiency Syndrome IDA International Development Association IP Indigenous Peoples IPF Investment Project Financing IRC Inter-Ministerial Resettlement Committee LAR Land Acquisition and Involuntary Resettlement MEF Ministry of Finance MPWT Ministry of Public Works and Transport MRD Ministry of Rural Development RGC Royal Government of Cambodia ROW Right of Way SA Social Assessment SEP Stakeholder Engagement Plan SOP Standard Operating Procedures on LAR UXO Unexploded Ordinance VLD
    [Show full text]
  • World Bank Document
    KINGDOM OF CAMBODIA Nation Religion King Public Disclosure Authorized Ministry of Public Works and Transport Public Disclosure Authorized Cambodia Road Connectivity Improvement Project Public Disclosure Authorized ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN: PR 377 PK 00+500 – 36+000 & PR 377a PK 0+000 – 13+670 DRAFT Public Disclosure Authorized March 2020 LIST OF ACRONYMS AH Affected Household BRP Basic Resettlement Plan CED Conceptual Engineering Designs COI Corridor of Impact CRCIP Cambodia Road Connectivity Improvement Project DDIS Detailed Design Implementation and Supervision (Consultants) DED Detailed Engineering Designs DRP Detailed Resettlement Plan EIA Environmental Impact Assessment ESCP Environment and Social Commitment Plan ESF Environment and Social Framework ESMF Environmental and Social Management Framework ESMP Environmental and Social Management Plan ESO Environment and Social Office ESS Environment and Social Standard FPIC Free Prior and Informed Consent GBV Gender-Based Violence GDR General Department of Resettlement HIV/AIDS Human Immunodeficiency Virus / Acquired Immune Deficiency Syndrome IDA International Development Association IP Indigenous Peoples IPF Investment Project Financing IRC Inter-Ministerial Resettlement Committee LAR Land Acquisition and Involuntary Resettlement MEF Ministry of Finance MPWT Ministry of Public Works and Transport MRD Ministry of Rural Development RGC Royal Government of Cambodia ROW Right of Way SA Social Assessment SEP Stakeholder Engagement Plan SOP Standard Operating Procedures on
    [Show full text]