1 10 Major Infrastructure Projects for Hong Kong's Economic Growth
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Initial Transport Assessment of Development Options
This subject paper is intended to be a research paper delving into different views and analyses from various sources. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not necessarily represent the views of the HKSARG. WORKING PAPER NO. 35 INITIAL TRANSPORT ASSESSMENT OF DEVELOPMENT OPTIONS Purpose 1. The purpose of this paper is to provide information on the reference transport demand forecasts, assessment of Reference Scenario and framework for option evaluations. Background 2. Under Stage 3 of the HK2030 Study, Development Scenario and Development Options are formulated. The Development Options are then subject to transport, economic, financial as well as environmental assessments. Under the integrated approach adopted for the Study, the transport requirements identified for the Development Options are also assessed in terms of the environmental, economic and financial implications in order that a meaningful comparison of the Development Options could be made. 3. Under the Reference Scenario, various development choices have been considered to satisfy the land requirements. They can broadly be categorised into two different options of development patterns, namely Decentralisation and Consolidation. The details are presented in the paper on Development Options under the Reference Scenario. Assessments have been carried out to identify the transport requirements of the two Development Options in 2010, 2020 and 2030. The findings are summarised in the following sections. Development Options 4. Under the Reference Scenario, the population in 2030 could be in the region of 9.2 million which is only marginally more than the population of 8.9 million for 2016 adopted in the previous strategic planning. -
(T&TC) Southern District Council (SDC) Date Time Venue
Minutes of the 23rd Meeting of the Traffic and Transport Committee (T&TC) Southern District Council (SDC) Date : 4 April 2011 Time : 2:30 p.m. Venue : SDC Conference Room Present: Mr LEUNG Ho-kwan, MH (Chairman) Mr CHAN Fu-ming (Vice-Chairman) Ms MAR Yuet-har, BBS, MH (Chairlady of SDC) Mr CHU Ching-hong, JP (Vice-Chairman of SDC) Mr AU Lap-sing Mr CHAI Man-hon Ir CHAN Lee-shing, William, JP Mrs CHAN LEE Pui-ying Ms CHEUNG Sik-yung Mr CHEUNG Siu-keung Mr FUNG Se-goun, Fergus Mr FUNG Wai-kwong Mr LAM Kai-fai, MH Ms LAM Yuk-chun, MH Mr MAK Chi-yan Mrs MAK TSE How-ling, Ada Mr TSUI Yuen-wa Mr WONG Che-ngai Mr WONG Ling-sun, Vincent Mr Paul ZIMMERMAN Dr YANG Mo, PhD Mr CHEUNG Hon-fan Mr CHOW Seung-man Mr PANG Siu-kei Mr PUK Kwan-kin Dr TANG Chi-wai, Sydney TTC2011/mins23 1 Absent with Apologies: Dr MUI Heung-fu, Dennis Secretary: Miss LI Mei-yee, Ivy Executive Officer II (District Council)3, Home Affairs Department In Attendance: Mr WONG Yin-fun, Alex, JP District Officer (Southern), Home Affairs Department Miss LEUNG Tsz-ying, Almaz Assistant District Officer (Southern), Home Affairs Department Mr YAU Kung-yuen, Corwin Acting Senior Transport Officer/Southern, Transport Department Mr LEE Chen-sing, Sidney Engineer/Southern & Peak 1, Transport Department Mr LIU Po-wa, Paul Engineer 10 (HK Island Division 2), Civil Engineering and Development Department Mr MA Wing-tak, Peter Senior District Engineer/HES, Highways Department Ms AU Siu-ping District Operations Officer (Western), Hong Kong Police Force Mr LAU Wing-fu Officer-in-charge, District -
For Discussion on 6 November 2015 Legislative Council Panel On
CB(4)119/15-16(03) For discussion on 6 November 2015 Legislative Council Panel on Transport “Universal Accessibility” Programme PURPOSE This paper reports on the latest progress of the “Universal Accessibility” (UA) Programme, and consults Members on the proposal of the Government to seek approval from the Finance Committee (FC) of the Legislative Council for an allocation of $770.90 million in 2016-17 for the block allocation Subhead 6101TX – “Universal Accessibility Programme” under Capital Works Reserve Fund (CWRF) Head 706 – “Highways”. BACKGROUND 2. The Government has been installing barrier-free access facilities at public walkways1 for years. In response to public requests, the Government launched in August 2012 a new policy to expand the programme to retrofit barrier-free access facilities at public walkways, striving to create a “universally accessible” environment in the community to facilitate the access to public walkways by the public. Under the new policy – (a) from now on, when considering retrofitting of barrier-free access facilities to existing or newly constructed public walkways, the Government will treat lifts and ramps equally (unless the site conditions dictate one form over another). This is a change from the past practice which gave priority to ramps; and (b) as long as site conditions permit, we will consider installing lifts at walkways where there is already a standard ramp installed. After a lift has been installed, we will evaluate whether to keep the ramp or demolish it for more spacious pavement or to make way for roadside greening. 3. With the support of the Panel on Transport and the Panel on Development, the Government obtained approval from the FC in January 2013 to create a new block allocation Subhead 6101TX – “Universal Accessibility 1 i.e. -
Industry Overview
THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED ‘‘WARNING’’ ON THE COVER OF THIS DOCUMENT. INDUSTRY OVERVIEW The information and statistics set forth in this section and elsewhere in this document have been derived from an industry report, commissioned by us and independently prepared by Ipsos in connection with the [REDACTED]. In addition, certain information is based on, or derived or extracted from, among other sources, publications of government authorities and internal organisations, market data providers, communications with various government agencies or other independent third-party sources unless otherwise indicated. We believe that the sources of such information and statistics are appropriate and have taken reasonable care in extracting and reproducing such information. We have no reason to believe that such information and statistics are false or misleading in any material respect or that any fact has been omitted that would render such information and statistics false or misleading. Our Directors confirm that, after taking reasonable care, they are not aware of any adverse change in market information since the date of this document which may qualify, contradict or adversely impact the quality of the information in this section. None of our Company, our Directors, and any of the Relevant Persons (other than Ipsos) have independently verified such information and statistics contained in the Ipsos Report and no representation has been given as to their accuracy. Accordingly, such information should not be unduly relied upon. SOURCE AND RELIABILITY OF INFORMATION We commissioned Ipsos, an independent market research consulting firm, to conduct an analysis on and to report on the industry development trends, market demand and competitive landscape of the façade works industry and building metal finishing works industry in Hong Kong for the period from 2014 to 2023, at a fee of HK$496,000 and our Directors consider that such fee reflects the market rates. -
Better Safe Than Worry
VSLnews MONITORING OF STRUCTURES BETTER SAFE THAN WORRY SPECIAL REPORT Match-cast segmental bridge piers ABERDEEN CHANNEL BRIDGE Full-scope construction VSLnews ISSUE ONE • 2013 Anticipating structural behaviour VSL has built its reputation by providing services of high added-value Daniel Rigout, through the technical expertise of its strong worldwide network, backed Chairman and up by a dynamic R&D effort. From the earliest project phases until the end Chief Executive Officer of a structure’s life, VSL’s experts provide consultancy and engineering services that produce cost-effective, durable and sustainable solutions for our clients. The life of any structure is divided into three key phases: planning, construction and maintenance. VSL’s engineers are of invaluable support to designers carrying out feasibility studies at the planning stage, and, if relevant, can propose alternative solutions to achieve what is best for the project. How to build the structure becomes the critical issue once the design is optimised and here VSL’s teams take up the challenge to ensure fast-track and safe construction. Monitoring of structural behaviour may be required either during construction or later, when the structure is in service, in order to forecast maintenance works and allocate the corresponding budgets. In each case, our experts respond to the requirements by providing a monitoring system that is adapted to the needs and economic constraints. Once the inspection plan has been established, VSL can also handle any corresponding strengthening and repair works required. True turnkey and full-scope projects covering all phases of a structure’s life are at the heart of our business. -
2. Project Description
Consultancy Agreement No. NEX/2301 South Island Line (East) Environmental Impact Assessment 2. Project Description 2.1 Project Background The South Island Line (SIL) was originally proposed as part of the Second Railway Development Study (RDS-2) completed in May 2000 as an extension to the existing railway network to serve the Southern District of Hong Kong. In June 2002, MTRCL submitted a preliminary proposal for a medium-capacity SIL, which involved a monorail system looping from University Station of the planned West Island Line (WIL) to the southern part of Hong Kong Island and back to Wanchai Station of the existing Island Line (ISL). The study identified that SIL would not be commercially viable without Government’s funding support. Subsequently, MTRCL further developed the proposed SIL as part of a Feasibility Study (FS) entitled “West Island Line and South Island Line Feasibility Study” which was completed in March 2004. After an evaluation of various alternative options, the FS recommended the implementation of the proposed SIL(E) from South Horizons to Admiralty, via intermediate stations at Lei Tung, Wong Chuk Hang and Ocean Park, for serving the Southern District and provision of a necessary depot at Wong Chuk Hang to support the operation of SIL, amongst other recommendations related to WIL. The FS also evaluated the feasibility of providing additional intermediate stations at Happy Valley and Wanchai. In February 2005, MTRCL submitted a project proposal to the Government for phased implementation of the SIL and WIL. In December 2007, the Executive Council gave the green light for MTRCL to proceed with preliminary planning and design of the SIL(E), which will be a medium capacity railway line running from Admiralty to South Horizons, with three intermediate stations at Ocean Park, Wong Chuk Hang and Lei Tung. -
PWSC(2000-01)97 on 21 February 2001
For discussion PWSC(2000-01)97 on 21 February 2001 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 707 - NEW TOWNS AND URBAN AREA DEVELOPMENT New Territories West Development Transport - Roads 52TH - Route 5 - section between Shek Wai Kok and Chai Wan Kok Members are invited to recommend to Finance Committee the upgrading of 52TH to Category A at an estimated cost of $1,098.5 million in money-of-the- day prices. PROBLEM We need to construct the remaining section of Route 5 between Shek Wai Kok and Chai Wan Kok to relieve traffic congestion in Tsuen Wan. PROPOSAL 2. The Director of Territory Development (DTD), with the support of the Secretary for Transport, proposes to upgrade 52TH to Category A at an estimated cost of $1,098.5 million in money-of-the-day (MOD) prices for the construction of the remaining section of Route 5 between Shek Wai Kok and Chai Wan Kok in Tsuen Wan. PROJECT SCOPE AND NATURE 3. The scope of works for 52TH comprises - / (a) ..... PWSC(2000-01)97 Page 2 (a) construction of a 1 300-metre (m)-long dual 2-lane carriageway from Cheung Pei Shan Road at Shek Wai Kok to Castle Peak Road near Tsuen Wan Police Station at Tsuen King Circuit, including a 97m-long flyover across the Mass Transit Railway (MTR) tracks (a 190m section through Discovery Park has been completed by the developer); (b) widening and upgrading of a 700m-long existing section of Castle Peak Road between Tsuen Wan Police Station and Chai Wan Kok to dual 4-lane carriageway; (c) improvement of Chai Wan Kok Interchange including extension of -
Amendments to Kwun Tong Line Extension Gazetted ***********************************************
Amendments to Kwun Tong Line Extension gazetted *********************************************** The Government published in the Gazette today (June 25) under section 7 of the Railways Ordinance the proposed amendments to the Kwun Tong Line Extension (KTE) scheme. The KTE scheme gazetted in November 2009 includes an approximately 2.6 kilometres long railway extending from Yau Ma Tei Station on the existing MTR Kwun Tong Line with two new railway stations in Ho Man Tin and Whampoa. Passengers can interchange at the proposed Ho Man Tin Station for the future Sha Tin to Central Link. The extension will provide convenient railway services to the residents of the Ho Man Tin, Hung Hom and Whampoa areas. The KTE will help reduce traffic on the roads in the Ho Man Tin and Whampoa areas. Passengers from Ho Man Tin and Whampoa will be able to reach Mong Kok within five minutes, compared with more than 25 minutes by using road-based transport between Whampoa and Mong Kok during rush hours. The Government and the MTR Corporation Limited (MTRCL) have been keeping close contact with the major stakeholders in reviewing the scheme design and will continue to keep the Traffic and Transport Committee of the Yau Tsim Mong District Council and the Kowloon City District Council abreast of the scheme development. "Some of the proposed amendments gazetted are to address concerns of the public expressed after the proposed KTE scheme was gazetted in November 2009 while others are to accommodate the latest changes and improvement measures proposed by the MTRCL which has been carrying out the detailed design of the KTE," a government spokesman said. -
TRANSPORT DEPARTMENT NOTICE Special Traffic and Transport
TRANSPORT DEPARTMENT NOTICE Special Traffic and Transport Arrangements for the Hong Kong Marathon 2009, 8 February 2009 Notice is hereby given that the following special traffic and transport arrangements will be implemented on Sunday, 8 February 2009 to facilitate the holding of Hong Kong Marathon 2009. I. SPECIAL TRAFFIC ARRANGEMENTS FOR 10KM RACE AT ISLAND EASTERN CORRIDOR, HONG KONG ISLAND (A) Road Closures and Traffic Diversion (Please refer to Plans 2 and 3): The following roads will be closed to all vehicular traffic at the time as specified below (except for vehicles with labels issued by the organizer): Phase I From 2.00 a.m. to about 8.30 a.m. (depending on the exact finishing time of 10 km race, and it is safe to re-open the roads to vehicular traffic): Road Closures: (i) Island Eastern Corridor eastbound between Victoria Park Road eastbound and Tung Hei Road slip road; (ii) Hing Fat Street slip road leading to Island Eastern Corridor eastbound; (iii) Man Hong Street slip road leading to Island Eastern Corridor eastbound; (iv) Taikoo Wan Road slip road leading to Island Eastern Corridor eastbound; and (v) Roads leading from Eastern Harbour Crossing Exit to Island Eastern Corridor eastbound. Traffic Diversion: (i) Vehicles on Victoria Park Road eastbound heading for Island Eastern Corridor eastbound and Eastern Harbour Crossing will be diverted via Gordon Road, Electric Road and Java Road; (ii) Vehicles on Hing Fat Street heading for Island Eastern Corridor eastbound and Eastern Harbour Crossing will be diverted via Gordon Road, -
2019 Bus Routes and Stop Locations
Berlin Public Schools 2018 - 2019 Bus Routes and Stop Locations Please note the following: • Routes, stops and times were current as of 8/15/2018 and are subject to change. • Students must be waiting at listed bus stops at least 10 minutes prior to scheduled stop times. • Parents/guardians are responsible for ensuring the safety of their child up until the point that their child boards the bus and after their child gets off the bus. • Kindergarten parents/guardians must receive their child at assigned bus stops after school. BHS Route 1 AM TIME LOCATION 6:22 am 666 WORTHINGTON RDG 6:23 am 973 WORTHINGTON RIDGE 6:24 am 1097 WORTHINGTON RDG 6:25 am 1153 WORTHINGTON RDG 6:26 am 1198 WORTHINGTON RDG 6:27 am 1326 WORTHINGTON RIDGE RD 6:29 am MEADOW LN & TREE HILL RD 6:30 am OLISKY BLVD & TOLL GATE RD 6:31 am 243 TOLL GATE ROAD 6:33 am 534 TOLL GATE RD 6:34 am ANTON LN & TOLL GATE RD 6:34 am NORTON LN & TOLL GATE RD 6:36 am LAKE DR & WORTHINGTON POINT RD 6:37 am CANOE BIRCH CT & BERLIN TURN PIKE 6:40 am HAWTHORNE DR & BERLIN TURNPIKE 6:45 am SPRUCE BROOK RD & WILKS POND RD 6:52 am ANGELI CT & ORCHARD RD 6:53 am O'CONNELL DR & ORCHARD RD 6:53 am ELIZABETH RD & ORCHARD RD 6:54 am 1410 ORCHARD RD 6:55 am METACOMET DR & ORCHARD RD 6:55 am 1256 ORCHARD ROAD 6:57 am ELTON RD & MALLARD LN 6:58 am ELTON RD & OLD FARMS RD 6:59 am ELTON RD & KENSINGTON RD 7:00 am CROOKED BROOK & KENSINGTON RD 7:03 am 909 FOUR ROD ROAD 7:04 am 10 TOLL GATE ROAD 7:05 am LOWER LN & MEADOW LN 7:06 am KRAMER DR & LOWER LN 7:08 am EARL ST & LOWER LN 7:10 am BHS BHS Route 1 -
MTR Corporation Limited South Island Line (East)
MTR Corporation Limited South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Final Monitoring Report South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Final Monitoring Report (Issue 1) Date of Submission Name Prepared by: Ida YU (Qualified Ecologist) Certified by: (Environmental Team Leader) Dr Michael LEVEN Date: 22 February 2019 Job Ref.: 11/503/210F MTRC-SIL South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1) CONTENTS 1 INTRODUCTION ................................................................................................................................. 1 2 SUMMARY OF INSPECTION FINDINGS .............................................................................................. 1 3 DISCUSSION ..................................................................................................................................... 11 4 CONCLUSION ................................................................................................................................... 15 5 REFERENCES ................................................................................................................................... -
Head 186 — TRANSPORT DEPARTMENT
Head 186 — TRANSPORT DEPARTMENT Controlling officer: the Commissioner for Transport will account for expenditure under this Head. Estimate 2011–12................................................................................................................................... $1,306.0m Establishment ceiling 2011–12 (notional annual mid-point salary value) representing an estimated 1 260 non-directorate posts as at 31 March 2011 rising by 22 posts to 1 282 posts as at 31 March 2012. ....................................................................................................................................... $470.5m In addition, there will be an estimated 27 directorate posts as at 31 March 2011 rising by one post to 28 posts as at 31 March 2012. Commitment balance ............................................................................................................................ $238.2m Controlling Officer’s Report Programmes Programme (1) Planning and Development This programme contributes to Policy Area 21: Land and Waterborne Transport (Secretary for Transport and Housing). Programme (2) Licensing of Vehicles and This programme contributes to Policy Area 21: Land and Drivers Waterborne Transport (Secretary for Transport and Housing) and Policy Area 25: Revenue Collection and Financial Control (Secretary for Financial Services and the Treasury). Programme (3) District Traffic and These programmes contribute to Policy Area 21: Land and Transport Services Waterborne Transport (Secretary for Transport and Housing). Programme