MTR Corporation Limited

South Island Line (East)

Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period

(January 2016 – December 2018)

Final Monitoring Report

South Island Line (East)

Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period

(January 2016 – December 2018)

Final Monitoring Report (Issue 1) Date of Submission

Name

Prepared by: Ida YU (Qualified Ecologist)

Certified by: (Environmental Team Leader) Dr Michael LEVEN

Date: 22 February 2019

Job Ref.: 11/503/210F MTRC-SIL South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

CONTENTS

1 INTRODUCTION ...... 1 2 SUMMARY OF INSPECTION FINDINGS ...... 1 3 DISCUSSION ...... 11 4 CONCLUSION ...... 15 5 REFERENCES ...... 16

LIST OF TABLES

Table 1 Tree/ Palm/ Shrub Species for planting along the Nullah and on Slope Table 2 Tree Species for Compensatory Planting at lower course of the Nullah. Table 3 Summary of the compensatory trees and palms planted along Nullah Table 4 Summary of severe rainstorm warning signals and tropical cyclone warning signals hoisted during the 3-year post-planting care and maintenance period (2016-2018) Table 5 Survey points for the ardeid roost survey and their respective targets

LIST OF FIGURES

Figure 1 Ecological Planting and Landscape Plan along Wong Chuk Hang Nullah Figure 2 The Latest Management and Maintenance Matrix of the Ecological Planting and Landscape Area along Wong Chuk Hang Nullah Figure 3 Locations of the additional ardeid night roosting survey points

LIST OF APPENDICES

Appendix 1 Photographs of the overall growth performance of the planted vegetation and site condition along the EPLP area Appendix 2 Site photos of the new ardeid night roosts in Aberdeen area

January 2019

South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

1 INTRODUCTION

1.1.1 The SIL(E) Environmental Permit (EP) Condition 2.13(a) specifies that the Permit Holder/ Qualified Ecologist shall deposit with EPD an Ecological Planting and Landscape Plan (EPLP) showing the compensatory planting at the lower course of Wong Chuk Hang (WCH) Nullah, habitat compensation/ enhancement works at the nullah side and a 3-year post-planting care and maintenance plan. According to the latest approved EPLP (June 2016), the results and findings of the monitoring along the proposed habitat compensation/ enhancement work areas have been reported in the quarterly compensatory planting monitoring reports and submitted to EPD on regular basis.

1.1.2 The implementation of the planting works proposed in the approved EPLP was carried out in phases by the landscape contractor appointed by the Works Contractor of SIL(E), and the planting works were completed by January 2016. Accordingly, the 3-year post-planting care and maintenance period had commenced in January 2016 and was ended by December 2018. Due to the completion of the construction phase of SIL(E), the role as an Environmental Team Leader (ETL) to undertake the ETL services and comply with the requirements as stipulated in Clause 2.13(c) of the EP of SIL(E) has been changed from MTR to AEC Ltd. The Qualified Ecologist and Independent Environmental Checker (IEC) have remained unchanged in both construction and operation phases of SIL(E).

1.1.3 According to the EP Condition 2.13(c) and the approved EPLP, a Final Monitoring Report should be prepared and deposited by the Qualified Ecologist upon the completion of the 3-year post-planting care and maintenance period. The Report should include:

 A summary record of the monitoring results (including the survival rate and percentage coverage of the planted vegetation, any invasive species in the compensatory plantation, and monitoring of ardeid species using the planted vegetation along the Wong Chuk Hang (WCH) Nullah);

 A summary record of the monitoring and maintenance works undertaken; and

 Assessment of the effectiveness of the planting measures in enhancing the ecological and amenity values of the areas along the WCH Nullah, and the compensatory planting in attracting the ardeid.

1.1.4 This Report will summarise and evaluate the monitoring findings on the planted vegetation and ardeid species along the habitat enhancement area and compensatory planting area collected from January 2016 to December 2018.

2 SUMMARY OF INSPECTION FINDINGS

2.1 Monitoring and maintenance works taken on planted vegetation along WCH Nullah

2.1.1 The general objective of the approved EPLP is to mitigate and compensate ecological impacts to ardeid roosting sites resulting from the construction of SIL(E) at WCH Nullah. Design of the habitat enhancement area and compensatory planting area had considered the plant composition and structure in the degraded

January 2019 Page 1 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

woodland where it was used by egrets as night roosting site, as well as the habitat requirements of the avifauna and other site and engineering constraints (e.g. size and shape of the compensation area, and geology, soils and steepness of the slope area). Habitat enhancement area and compensatory planting area were designed along WCH Nullah (Figure 1), with proposal of the latest management and maintenance matrix as proposed in Figure 2.

2.1.2 Site inspection along the whole EPLP area was conducted on monthly basis with the representatives of MTR, the Qualified Ecologist, and the landscape contractor. Quarterly inspection was conducted together with the Independent Environmental Checker (IEC) and the Environmental Team Leader (ETL). Additional site inspections were arranged after the cancellation of tropical cyclone warning signal No. 8 or above, or severe rainstorm warning signals.

2.1.3 The habitat enhancement area (from Zones A to E except compensatory planting area as shown in Figure 1) was proposed on the south side of WCH Nullah for ecological compensation and enhancing the amenity values along the pedestrian link and the woodland mix on the slopes by the nullah side. This area comprises woodland mix areas (planted with native whip trees and shrub seedlings, together with hydroseeding within this woodland mix), purely hydroseeded area on the slopes, hydromulched area with erosion control mat, undisturbed areas with preserved vegetation on the slopes, and planting areas of native trees and palms. Grasses used in the hydroseeded and hydromulched areas are common grass species (such as Bermuda Grass Cynodon dactylon) following the CEDD’s General Specification For Civil Engineering Works. The native whip trees, shrub seedlings, trees and palms proposed in the approved EPLP are summarised in Table 1 below. However, planting of ornamental shrubs (including but not limited to Allamanda cathartica Alpinia zerumbet cv. ‘Variegata’, Ixora chinensis, Monstera deliciosa, Philodendron selloum and Schefflera arboricola) along the planting beds to the south of the Nullah is not under the monitoring and management regime of the approved EPLP. Such shrub planting has been carried out for amenity purposes only.

Table 1 Tree/ Palm/ Shrub Species for planting along the Nullah and on Slope. Species[1] Type[1] Location[1] Planted locations in EPLP area Bischofia javanica (BIS. JAV.)* Heavy Standard Tree Nullah side Compensatory planting area for ardeid night roosting site Bauhinia x blakeana (BAU. BLA.)* Heavy Standard Tree Nullah side Along nullah side (only in Pet Garden) Celtis sinensis (CEL. SIN.)* Heavy Standard Tree Nullah side Compensatory planting area for ardeid night roosting site Cleistocalyx nervosum (CLE. NER.)* Heavy Standard Tree Nullah side Compensatory planting area for ardeid night roosting site (including Pet Garden) Ilex rotunda (ILE. ROT.) Heavy Standard Tree Nullah side Compensatory planting area for ardeid night roosting site and along nullah side Liquidambar formosana (LIQ. FOR.) * Heavy Standard Tree Nullah side Compensatory planting area for ardeid night roosting site and along nullah side Macaranga tanarius var. tomentosa Heavy Standard Tree Nullah side Compensatory planting area for ardeid night roosting site (MAC. TAN.)* Mallotus paniculatus (MAL. PAN.)* Heavy Standard Tree Nullah side Along nullah side

January 2019 Page 2 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Species[1] Type[1] Location[1] Planted locations in EPLP area Sapium discolor (SAP. DIS.)* Heavy Standard Tree Nullah side Compensatory planting area for ardeid night roosting site and along nullah side Schima superba (SCH. SUP.)* Heavy Standard Tree Nullah side Compensatory planting area for ardeid night roosting site Caryota ochlandra (CAR. OCH.) Palm Nullah side Along nullah side * Caryota mitis with the same ecological function was planted to replace Caryota ochlandra Chrysalidocarpus lutescens (CHR. Palm Nullah side Along nullah side LUT.) Roystonea regia (ROY. REG.) Palm Nullah side Along nullah side Aquilaria sinensis * Whip On Slope Woodland mix area along the nullah side Bichofia javanica * Whip On Slope Woodland mix area along the nullah side Castanopsis fissa * Whip On Slope Woodland mix area along the nullah side Celtis sinensis * Whip On Slope Woodland mix area along the nullah side Ficus microcarpa* Whip On Slope Woodland mix area along the nullah side Litsea glutinosa * Whip On Slope Woodland mix area along the nullah side Machilus breviflora * Whip On Slope Woodland mix area along the nullah side Mallotus paniculatus * Whip On Slope Woodland mix area along the nullah side Polyspora axillaris * Whip On Slope Woodland mix area along the nullah side Reevesia thyrsoidea * Whip On Slope Woodland mix area along the nullah side Schefflera heptaphylla * Whip On Slope Woodland mix area along the nullah side Sterculia lanceolata * Whip On Slope Woodland mix area along the nullah side Ilex asprella * Shrub On Slope Woodland mix area along the nullah side Litsea rotundifolia var. oblonglifolia * Shrub On Slope Woodland mix area along the nullah side Ligustrum sinense Shrub On Slope Woodland mix area along the nullah side Psychotria asiatica * Shrub On Slope Woodland mix area along the nullah side Rhaphiolepis indica * Shrub On Slope Woodland mix area along the nullah side Rhododendron simsii * Shrub On Slope Woodland mix area along the nullah side Rhodomyrtus tomentosa * Shrub On Slope Woodland mix area along the nullah side Notes: 1. Extracted from the approved EPLP 2. *Native species 3. The plant composition includes the proposed heavy standard trees to be planted in compensatory planting

2.1.4 Within the habitat enhancement area, particular portions of the existing vegetation (including herbaceous vegetation, shrubs and trees) on the slopes and within the wooded area to the south of WCH Nullah have been retained and

January 2019 Page 3 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

preserved in situ. During the construction phase of SIL(E), the wooded area on slopes or to the south of the Nullah between viaduct columns “D8” and “D11” was protected within a Tree Protection Zone (TPZ). Preservation of these and other undisturbed areas has been incorporated into the design of both habitat enhancement and compensatory planting areas.

2.1.5 Compensatory planting area was proposed at the lower course of the WCH Nullah, approximately 200m to the west of the historical ardeid night roosting site identified in the EIA Report of SIL(E). This area is designed with reference to the plant composition of the historical ardeid roosting site to the south of the Nullah, as well as the plant species often used by ardeids for roosting. Compensatory trees of common tree species, as shown in the below Table 2, were planted in staggered pattern within the compensatory area for ardeid roosting site (location shown in Figure 1).

Table 2 Tree Species for Compensatory Planting at lower course of the Nullah. Species[1] Type[1] Location[1] Planted locations in EPLP area Bischofia javanica (BIS. JAV) * Heavy Standard Lower course of Compensatory planting area for Tree Nullah side ardeid night roosting site Bauhinia x blakeana (BAU. Heavy Standard Lower course of Along nullah side (only in Pet BLA.)* Tree Nullah side Garden) Celtis sinensis (CEL. SIN.)* Heavy Standard Lower course of Compensatory planting area for Tree Nullah side ardeid night roosting site Cleistocalyx nervosum (CLE. Heavy Standard Lower course of Compensatory planting area for NER.)* Tree Nullah side ardeid night roosting site (including Pet Garden) Ilex rotunda (ILE. ROT.) Heavy Standard Lower course of Compensatory planting area for Tree Nullah side ardeid night roosting site and along nullah side Liquidambar formosana (LIQ. Heavy Standard Lower course of Compensatory planting area for FOR.) * Tree Nullah side ardeid night roosting site and along nullah side Macaranga tanarius var. Heavy Standard Lower course of Compensatory planting area for tomentosa (MAC. TAN.)* Tree Nullah side ardeid night roosting site Mallotus paniculatus (MAL. Heavy Standard Lower course of Along nullah side PAN.)* Tree Nullah side Schima superba (SCH. SUP.)* Heavy Standard Lower course of Compensatory planting area for Tree Nullah side ardeid night roosting site Notes: 1. Extracted from the approved EPLP 2. *Native species

2.1.6 By the end of the 3-year post-planting care and maintenance period (31st December 2018), a total of 200 compensatory trees and palms have been planted and maintained in the habitat enhancement and compensatory planting areas (Table 3), while all native whip trees and shrub seedlings were planted in different planting quantities at the woodland mix areas designed on the engineered slopes, flat ground to the south of the nullah, as well as within the compensatory planting area. Photographic records of selected compensatory trees, palms, whip trees and shrub seedlings are shown in Appendix 1.

January 2019 Page 4 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

2.1.7 More compensatory trees were planted in the habitat enhancement and compensatory planting areas. The number is higher than the proposed number (i.e. 179) in the approved EPLP. This is because an additional 15 trees of Lagerstroemia speciosa and Podocarpus macrophyllus were planted in the EPLP area, as well as additional trees planted by the landscape contractor within these three years (including Liquidambar formosana, Sapium discolor and Schima superba). Both Lagerstroemia speciosa and Podocarpus macrophyllus are not included in the approved EPLP and were planted to compensate for tree loss and to provide visual screening for the SIL Project. In addition, as reported in the submitted quarterly reports, 15 palms of Caryota ochlandra (new scientific name for Caryota maxima) were replaced by another palm Caryota mitis due to a stock problem. Caryota mitis shares similar ecological characteristics to Caryota ochlandra, and the former species showed fair survival rate and growth performance in the EPLP areas.

Table 3 Summary of the compensatory trees and palms planted along Wong Chuk Hang Nullah. No. of trees should be No. of planted trees Chinese Scientific Name planted based planted in the EPLP area Name on the approved by 31st Dec 2018 EPLP Chrysalidocarpus lutescens 58 58 Liquidambar formosana 21 22 Schima superba 16 18

Caryota mitis 1 0 15

Celtis sinensis 11 11 Ilex rotunda 11 11 Macaranga tanarius var. 9 9 tomentosa Mallotus paniculatus 9 9 Cleistocalyx nervosum 9 9 Lagerstroemia speciosa 2 0 8 Podocarpus macrophyllus2 0 7 Bauhinia x blakeana 6 6 Bischofia javanica 5 5 Roystonea regia 2 2 Caryota ochlandra (former scientific name was Caryota maxima) 15 0 Sapium discolor 7 10 Total no. of trees: 179 200 Notes: 1. 15 palms of Caryota ochlandra (new scientific name as Caryota maxima) were replaced by another palm Caryota mitis due to a stock problem. Caryota mitis shares similar ecological characteristics to Caryota ochlandra. 2. Trees of Lagerstroemia speciosa and Podocarpus macrophyllus have been planted in the habitat enhancement area between columns “D8” and “D11”. They were not included in the approved EPLP, and were planted for tree compensation and/or amenity purposes for SIL(E).

Habitat enhancement area (Zones A to E except compensatory planting area)

2.1.8 Except the defined delineation of the compensatory planting area close to columns “D13” to “D16”, the remaining planting areas were planted with three species of compensatory palms (Caryota mitis, Chrysalidocarpus lutescens and

January 2019 Page 5 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Roystonea regia), five species of compensatory trees (Bauhinia variegata, Ilex rotunda, Liquidambar formosana, Mallotus paniculatus and Sapium discolor), 12 species of whip tree and seven species of shrub seedlings (refer to Table 1). Two additional tree species Lagerstroemia speciosa and Podocarpus macrophyllus were planted for tree compensation and/or amenity purposes for SIL(E), while six trees of Bauhinia x blakeana were planted within the Pet Garden (location refers to Figure 1) currently managed by LCSD. As explained in the approved EPLP and the submitted quarterly reports for EPLP, LCSD has provided regular maintenance of this Garden since the 4th Quarter of 2016, including its hardscape and landscape according to their standards and practice. Ecological monitoring at this Pet Garden is not required as stated in the approved EPLP.

2.1.9 Native whip trees and shrub seedlings were mainly planted within the woodland mix areas designed on the engineered slopes of Zones A and B, and the planting areas between “D8” and “D12”. With the preservation of the existing trees and shrubs on these Zones and the wooded area close to the aforementioned columns, growth of the planted whip trees and shrub seedlings can further enhance the plant diversity and structure within these wooded areas. No quantitative monitoring of the survival rates of each planted seedlings is proposed in the approved EPLP, however the overall survival rate of these planted seedlings was found to be satisfactory from qualitative evaluation, particularly for whip trees Aquilaria sinensis, Bischofia javanica, Celtis sinensis, Mallotus paniculatus, Ficus microcarpa, Polyspora axillaris, Schefflera heptaphylla and Sterculia lanceolata, and most shrub species. Replacement planting of these seedlings (such as Ligustrum sinensis and Rhododendron simsii) was only carried out on a as needed basis in the 3-year post-planting care and maintenance period. The woodland mix areas were regularly weeded to remove weedy climbers and unwanted self-sown seedlings (Ficus hispida, Leucaena leucocephala and Macaranga tanarius var. tomentosa) to avoid overgrowth of the planted seedlings.

2.1.10 A total of 125 compensatory trees and palms, including 15 Lagerstroemia speciosa and Podocarpus macrophyllus not included in the approved EPLP, were planted in the habitat enhancement area. Design of each planting area use plant one tree or palm species only in order to achieve a uniform screening pattern. Replacement planting was carried out occasionally in these 3 years, and trees Liquidambar formosana, Mallotus paniculatus and Sapium discolor were replaced once due to site problems (e.g. drainage issues, insufficient irrigation during the dry season and transplantation shock). Rather than planting heavy standard trees (i.e. stem diameter exceeding 75mm but not exceeding 150mm), these three tree species were planted with undersized specimens to facilitate their adaptation in the planting areas with less than optimum growth environment (e.g. the area with a previous drainage problem for Mallotus paniculatus, and a windthrow area at the end of the Nullah for Liquidambar formosana). Smaller specimens of Sapium discolor were planted as this tree species usually exists as a large shrub/ small tree in nature. Furthermore, heavy standard-sized tree specimens of this species are seldom available in nurseries, hence this species was planted as ‘undersized’ specimens. The growth performance of the planted compensatory trees and palms in the habitat enhancement area was fair to good, with almost 100% survival rate by the end of December 2018.

January 2019 Page 6 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

2.1.11 Hydromuched slopes with erosionl control mat and hydroseeded slopes were formed within or close to the wooded areas to the south of the Nullah. The green coverage on these hydromulched slopes and hydroseeded slopes varied along the nullah side. Grass germination was initially satisfactory on the newly hydroseeded/ hydromulched slopes but the growth performance declined in the following months. Slopes in Zone B and hydromulched slopes close to column ‘D12” and the Pet Garden were re-hydroseeded in early wet season in 2016 and 2017 to improve the grass coverage. The green coverage fluctuated seasonally in response to various site constraints (e.g. under the shade of viaduct, soil washout, rock slope surface unfavorable for natural establishment of climbers and herbs). Throughout the three monitoring years, the green coverage significantly increased during the wet seasons and green coverage of individual slopes reached almost 70% during this period. Regular rainfall during this period not only nourished the hydroseeded grass, but also encouraged natural development of self-seeded grass, fern, herb and tree seedlings. However, grass germination was poor in certain hydromulched slopes underneath the shade of viaduct or on rock slopes with thin surface soil coverage. It is not feasible to maintain 100% green coverage on these hydromulched and hydroseeded slopes, but it is anticipated that the spread of climbers and naturally colonising grass, herbs and ferns on these slopes may help to improve the green coverage in the long term.

2.1.12 According to the Observatory, six tropical cyclones reaching warning signal no. 8 and two reaching signal no. 10 (Hato in August 2017 and Mangkhut in September 2018) were hoisted during this 3-year monitoring and maintenance period (see Table 4). Red and Black Rainstorms mostly occurred from May to October each year. During these three years, Super Typhoons Hato and Mangkhut mainly caused damage to the existing trees growing on the engineered slopes in Zones A and B next to Tai Wong Ye Temple, as well as blowing down small number of compensatory trees in the habitat enhancement areas. Uprooted and collapsed trees, broken scaffold branches, damaged canopy crowns and distorted tree trunks were found after these two typhoon strikes and photographic records were provided in the relevant Quarterly Reports (July – September 2017 and 2018). Tree risk assessment was carried out immediately by the landscape contractor to evaluate the tree stability and structural condition after the super typhoon strikes, and remedial works (such as pruning of broken or overhanging branches, and removal of unstable trees and broken tree parts) were carried out in the followed months. On the other hand, damage to the planted whip trees, shrub seedlings, compensatory trees and palms was comparatively limited.

Table 4 Summary of severe rainstorm warning signals and tropical cyclone warning signals hoisted during the 3-year post-planting care and maintenance period (2016-2018). Rainstorm Color/ Tropical Cyclone Warning Signal Issue Dates (Time) Red Rainstorm 10th May 2016 (07:35-09:35; 11:20-13:45) Typhoon Warning Signal No. 8 (Nida) 1st - 2nd Aug 2016 Red Rainstorm 10th Aug 2016 (06:55-08:35) Red Rainstorm 28th Aug 2016 (00:30-02:20) Typhoon Warning Signal No. 8 (Haima) 21st Oct 2016 (06:10-17:20) Red Rainstorm 1st Oct 2016 (05:55-07:00) Red Rainstorm 19th Oct 2016 (15:30-16:00) Black Rainstorm 19th Oct 2016 (16:00-17:15)

January 2019 Page 7 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Rainstorm Color/ Tropical Cyclone Warning Signal Issue Dates (Time) Red Rainstorm 9th Oct 2016 (17:15-18:15) Red Rainstorm 24th May 2017 (09:15-11:30) Black Rainstorm 24th May 2017 (11:30-12:30) Typhoon Warning Signal No. 8 (Merbok) 12th – 13th June 2017 Red Rainstorm 13th Jun 2017 (08:45-11:50) Red Rainstorm 17th Jun 2017 (02:25-04:05) Red Rainstorm 17th Jul 2017 (20:45-22:30) Typhoon Warning Signal No. 8 (Roke) 23rd Jul 2017 Red Rainstorm 3rd Aug 2017 (05:30-07:05) Typhoon Warning Signal No. 8, 9 and 10 (Hato) 23rd Aug 2017 Typhoon Warning Signal No. 8 (Pakhar) 27th Aug 2017 Typhoon Warning Signal No. 8 (Khanun) 15th Oct 2017 Red Rainstorm 8th Jun 2018 (11:30-12:30) Red Rainstorm 26th – 27th Aug 2018 (23:06-00:45) Red Rainstorm 29th Aug 2018 (18:40-21:50) Red Rainstorm 16th Sept 2018 (10:55-18:50) Typhoon Warning Signal No. 8, 9 and 10 (Mangkhut) 16th – 17th Sept 2018

2.1.13 During the three monitoring years, the following routine site and vegetation management works were carried out by the landscape contractor:

 Routine inspection and repairing of any damaged soil erosion control mats and anchor pins found on both slope batters in Zones A and B;

 Regular irrigation of all planted whip trees, shrub seedlings, compensatory trees and palms planted in the habitat enhancement area;

 Clearance of all the U-channels and removal of any plant debris (e.g. cut vegetation, broken twigs and branches) and rubbish left in the habitat enhancement area;

 Manual removal of the weedy climbers (such as Mikania micrantha and Paederia scandens), wrongly planted whip tree of Eucalyptus sp., and unwanted self-sown tree seedlings (mainly Bauhinia variegata, Ficus hispida, Leucaena leucocephala and Macaranga tanarius var. tomentosa) regenerated on selected slope batters and along U-channels of Zones A and B;

 Manual removal of the weedy climbers (such as Ipomoea cairica, Mikania micrantha and Paederia scandens), unwanted herbs (such as Bidens alba and Sesbania cannabina) and unwanted self-sown tree seedlings of Leucaena leucocephala in the woodland mix areas and planting areas of compensatory trees and palms in the remaining habitat enhancement area;

 There was a drainage problem in the planting area of the nine compensatory trees Mallotus paniculatus (i.e. next to columns “D12”) since the commencement of the monitoring period. The Contractor rectified the waterlogging problem by constructing a new U-channel along the nearby slope toe in September 2017, and replanted new trees of Mallotus paniculatus which showed unsatisfactory growth performance.

January 2019 Page 8 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Native shrub seedlings (Ligustrum sinense and Psychotria asiatica) were also planted at the reinstated area after the drainage improvement work;

 Checking, replanting or re-staking of any leaning, distorted or unstable compensatory trees and palms after the cancellation of each severe typhoon strike with typhoon warning signal no. 8 or above, as well as after the cancellation of Red or Black Rainstorm;

 Replacement planting of any dry or dead whip trees or shrub seedlings (such as Ligustrum sinense and Rhododendron simsii) on the slope batters of Zones A and B, and woodland mix areas between columns “D8” and “D12”;

 Replacement planting of any dead trees or trees of poor growth performance of the compensatory trees and palms found in the habitat enhancement area; and

 Removal of the whole trees or tree parts of the existing trees (including Ficus hispida, Leucaena leucocepahla and Macaranga tanarius var. tomentosa) which were identified to be hazardous after the severe typhoon strikes.

Compensatory planting area for ardeid night roosting site (along the lower course of nullah)

2.1.14 Compensatory planting area for ardeid night roosting site is designed to create a wooded area, with hydroseeded ground, to provide a dense tree canopy for ardeids to roost along the nullah side. A total of 72 compensatory trees and three palms (Chrysalidocarpus lutescens) were planted at this area. In addition, three trees of Sapium discolor and two trees of Schima superba were planted by the landscape contractor in this area. Except one tree of Cleistocalyx nervosum and six trees of Bauhinia variegata planted within the Pet Garden, and nine trees of Mallotus paniculatus platned in the habitat enhancement area, all remaining compensatory trees in Table 2, as well as Sapium discolor in Table 1, were planted in this compensatory planting area. Almost all trees are native species and half of them can produce fleshy fruits for wildlife using this area.

2.1.15 By the end of December 2018, the overall survival rate of the remaining compensatory trees was almost 100%. The overall growth performance of these trees in this area was fair to good, particularly for Celtis sinensis, Cleistocalyx nervosum, Ilex rotunda and Macaranga tanarius var. tomentosa. However, a total of 16 trees of Schima superba planted at the two planting areas close to the footbridge connecting to the CityBus Depot had suffered from drainage problems during the monitoring period. Replacement planting of new Schima trees was arranged several times, and improvement of the growth performance was achieved by the completion of the drainage improvement work in 2018. In addition, replacement planting of a small number of trees Bischofia javanica, Liquidambar formosana and Sapium discolor was carried out on an as needed basis (e.g. poor structural condition or growth performance, uprooted after severe typhoon strike, etc.) during the three years.

2.1.16 Considerable numbers of whip trees (such as Aquilaria sinensis, Bischofia javanica, Celtis sinensis and Sterculia lanceolata) and shrub seedlings (such as Ligustrum sinense, Psychotria asiatica and Rhaphiolepis indica) were planted by the

January 2019 Page 9 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

landscape contractor under the tree canopy at the compensatory planting area. In addition, seedlings were planted in the compensatory area albeit this is not required in the approved EPLP. These were not removed so as to minimise the disturbance to this compensatory area as the seedling planting could increase the long-term naturalness of this wooded area and its value to wildlife. The growth performance of these planted seedlings was good, and with almost 100% survival rate. In particular, whip trees of Bischofia javanica developed very well, and some of them reached over 1.5m in height.

2.1.17 As explained in Section 2.1.11 and Table 4, a number of severe tropical cyclones and Rainstorms were hoisted during the 3-year monitoring and maintenance period. Severe typhoons (Hato and Mangkhut) did not cause significant impact on the planted vegetation in the compensatory planting area. Only a small number of trees such as Liquidambar formosana and Schima superba were found either leaning or uprooted by the strong winds. The landscape contractor arranged to re- erect and re-stake these affected trees as soon as possible after the cancellation of typhoon signals.

2.1.18 During the three monitoring years, the following routine site and vegetation management works were carried out by the landscape contractor:

 Regular irrigation of all planted whip trees, shrub seedlings, and compensatory trees planted in the compensatory planting area;

 Clearance of all the U-channels and removal of any plant debris (e.g. cut vegetation, broken twigs and branches) and rubbish left in the compensatory planting area;

 Manual removal of weedy climbers (such as Mikania micrantha and Paederia scandens), and unwanted self-sown tree seedlings (mainly Leucaena leucocephala) regenerated in the understorey of this wooded area;

 There was a drainage problem in the planting area of the 16 compensatory trees Schima superba (i.e. next to the footbridge connecting with the CityBus Depot) since the commencement of the monitoring period. The Contractor completed the drainage improvement works in late 2018 and continued to maintain the planted Schima trees;

 Checking, replanting or re-staking of any leaning, distorted or unstable compensatory trees after the cancellation of each severe typhoon strike with typhoon warning signal no. 8 or above, as well as after the cancellation of Red or Black Rainstorm signals; and

 Replacement planting of any dead trees or trees of poor growth performance of the compensatory trees found in the compensatory planting area.

2.1.19 Monitoring, site and vegetation maintenance works in the Pet Garden were managed by LCSD since the approval of the EPLP and are excluded from the Inspection Record. One tree of Cleistocalyx nervosum, six trees of Bauhinia variegata and three palms of Chrysalidocarpus lutescens were under LCSD’s management.

2.2 Monitoring of ardeid species along compensatory planting area

2.2.1 The planting work in the proposed compensatory planting area for the ardeid night roost was completed by January 2016. Monitoring of the ardeid species

January 2019 Page 10 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

using this proposed compensatory planting area and along the nullah side (i.e. the habitat enhancement area) was carried out on a monthly basis from January 2016 to December 2018. Survey methodology followed the procedure described in the approved EPLP. The survey recorded the species, numbers and locations of the roost at the compensatory planting area. The survey commenced approximately one hour before sunset and continued for 20 minutes after sunset, or until nightfall, whichever came sooner. Meanwhile, the historical ardeid roosting site at the wooded area to the south of the Nullah was also checked during each monthly monitoring survey to review its utilisation by ardeids.

2.2.2 No ardeids were seen utilising the compensation planting area for roosting or for any other purpose during the monthly monitoring surveys conducted between January 2016 and December 2018; nor were any ardeids were seen entering the area of the historical night roost next to Wong Chuk Hang Nullah. During the surveys, only single ardeids such as Little Egret were occasionally seen loafing or foraging in the Wong Chuk Hang Nullah and leaving the area before sunset. With the absence of any roosting ardeids for over three years, it can be concluded that the historical night roost at Wong Chuk Hang has been abandoned, and the compensatory planting area has not yet attracted any night-roosting ardeids. Ardeid night roosts are known to be highly dynamic and often relocate to a new roost site for unknown reasons.

3 DISCUSSION

Effectiveness of planting measures in enhancing the ecological and amenity values of the areas

3.1.1 Prior to the establishment of the EPLP area, this area was paved and lined with ‘shotcreted’ slopes, rock slopes and degraded woodlands to the south of the nullah. A canopy of common trees (such as Ficus hispida and Macaranga tanarius var. tomentosa) and weedy tree Leucaena leucocephala hung over the channelised nullah and provided a sheltered area for night-roosting ardeids. These ardeids once roosted on a group of mature trees (mainly Ficus variegata and other shorter native trees) to the northwest of TWGHs Jockey Club Rehabilitation Complex. As observed during the construction period and throughout the 3-year monitoring period, the roost tree group (including the key individual trees of Ficus variegata) has been preserved and protected since the commencement of the railway project, except for a very small portion of the degraded woodland connecting the roost tree group and the nullah which was unavoidably lost due to the construction of the viaduct. This woodland loss has been compensated by creating more native wooded areas and enhancing the nullah and the adjacent slope area, with a total area of about 1 ha (refer to the approved EPLP).

3.1.2 The compensatory ecological and landscape planting areas were designed with woodland mix areas of whip trees and shrub seedlings on the slopes and flat ground near the nullah, as well as planting strips and areas of compensatory palms and trees. Though it takes a longer time for the planted seedlings to reach a mature size, seedling planting, especially of species such as shrub Rhododendron simsii, and whip trees Machilus breviflora, Reevesia thyrsoidea, Castanopsis fissa which were absent in the degraded woodland, would increase the overall plant diversity and structure along the nullah side. Flowering shrubs Rhododendron simsii, Ligustrum sinensis and fruiting shrubs Psychoria asiatica and Rhaphiolepis

January 2019 Page 11 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

indica were observed during the monitoring period. These have enhanced the overall greenery, color and amenity value along the whole pedestrian link.

3.1.3 The original degraded woodland mainly comprised the weedy tree Leucaena leucocephala close to the slope toes and the Nullah. Removal of most of these weedy tree individuals has reduced its colonisation and minimised further deterioration of the woodland. Ecologically, most of the planted seedling species are typical woodland species which produce fleshy fruits providing food for wildlife and which can increase the naturalness of the woodland mix areas and engineered slopes at Zones A and B. Seedling planting will accelerate the woodland formation and enrich the existing degraded woodland to the south of the Nullah. For example, some whip trees Bischofia javanica, Ficus microcarpa, Mallotus paniculatus and Sterculia lanceolata have developed into young saplings of almost 1.5m – 2m tall. Continued development of the planted whip trees and shrub seedlings at the woodland mix areas on the slopes and flat area to the northwest of TWGHs Jockey Club Rehabilitation Complex is anticipated to form a woodland area with higher ecological and landscape values in the long term.

3.1.4 Compensatory palms (Caryota ochlandra, Chrysalidocarpus lutescens and Roystonea regia) were mainly planted around the viaduct columns and as planting strips along the pedestrian link. The planting of palms and trees have screened off the columns, increased greenery and amenity values (e.g. Lagerstroemia speciosa trees produce eye-catching purple flowers, while fruiting Ilex rotunda trees produce red-colored fruits) along the nullah. Fleshy fruits produced by these palms and trees (including Celtis sinensis, Cleistocalyx nervosum, Ilex rotunda and Macaranga tanarius var. tomentosa) are food sources for smaller birds (such as Chinese Bulbul and Red-whiskered Bulbul) using the nearby woodland.

3.1.5 The compensatory planting area aimed to re-provide a wooded area for ardeid night roosting, and planted tree species were selected based on the degraded woodland previously used by the roosting ardeids. As yet, however, the ardeid night roost has not become re-established. This may be because the trees need time to develop into a denser and continuous tree canopy to be suitable as a roost; whilst the pedestrian link bisecting the planting area, as well as the viaduct structure itself, have unavoidably caused a source of disturbance which may deter roosting ardeids. Once the understorey formed by the planted whip trees and shrub seedlings becomes taller and denser, this may help in reducing disturbance impact in the long term. Meanwhile, however, the compensatory planting area has at least increased the ecological and amenity values of the area by providing more native tree species, and providing increased feeding, resting and roosting opportunities for birds in general.

Effectiveness of the compensatory planting area in attracting ardeids

3.1.6 It is considered premature to evaluate the effectiveness and attractiveness of the compensatory planting area to the ardeid species at this stage since the compensatory trees and shrub species are still developing and the tree canopies are still too limited to provide roost habitat for a large group of ardeids. In addition, the pedestrian link along the Nullah bisects the compensatory planting area and the constant pedestrian flow may cause disturbance to any large roosting ardeids. Ardeids, such as Little Egrets, Chinese Pond Herons and Black-

January 2019 Page 12 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

crowned Night Herons, were sometimes observed loafing or foraging along the Nullah, where there is perhaps less disturbance from people.

3.1.7 However, it should be recognized that there are a number of factors which may cause birds to select or to cease to use a roost site and once a roost site has changed, the original site will not necessarily be re-occupied even if it again becomes suitable, for example if the new roost site is more secure, or is closer to foraging areas, it may be preferred to the original site.

3.1.8 Thus, in view of the absence of ardeids in the historical night roost next to WCH Nullah or in the compensatory planting area, it is considered likely that the ardeids may have switched to another preferred site or sites. Accordingly, additional ardeid night roost surveys were carried out from October to December 2018, at the same time period as detailed in Section 2.2.1 above, to detect the presence of any new night roost(s) in the Aberdeen area.

3.1.9 A total of five survey points were selected for the roost survey (see below in Table 5) and their locations are shown in Figure 3:

Table 5 Survey points for the ardeid roost survey and their respective targets. Point No. Location Target Breakwater of the Aberdeen West Typhoon Potential ardeid movement in and along the 1 Shelter Aberdeen Harbour (i.e. Aberdeen West Typhoon Shelter) Shek Pai Wan Landing No. 1 (Structure No. Potential ardeid night roost at the wooded slope 2 HP012) north of Estate (i.e. Southern Horizon) Wong Chuk Hang Nullah (near Heung Yip Road Sitting-out Area) Historical ardeid night roost(s) adjacent to Wong 3 (i.e. Uphill woodland habitats to the west of the Chuk Hang Nullah, and uphill woodland to the original night roost area and the south facing west of the historical roost slope to the south of the Holy Spirit Seminary) Ap Lei Chau Praya Road (near Sham Wan Potential ardeid night roost(s) at the wooded 4 Towers) slopes south of Holy Spirit Seminary and northeast (i.e. Aberdeen Channel) of Sham Wan Towers Ap Lei Chau Landing No. 5 (Structure No. Historical ardeid night roost at Tai Shue Wan and 5 HP023) potential ardeid movement associated with the (i.e. Tai Shue Wan at Ocean Park) roost

3.1.10 The findings of the additional ardeid surveys carried out from October to December 2018 are summarised in the following sections.

Point No. 1 – Breakwater of the Aberdeen West Typhoon Shelter

3.1.11 A net influx of ardeids (largely Little Egrets and Great Egrets) from over the sea to the west of the survey point into the Aberdeen West Typhoon Shelter was noted, though small numbers were travelling in the opposite direction (i.e. westbound), leaving the Typhoon Shelter.

3.1.12 The ardeids, travelling either singly or in groups (up to 50 birds), appeared from the southwest of the survey point over the sea, flying towards the east and finally landed on a wooded, north-facing slope to the north of Ap Lei Chau Estate.

January 2019 Page 13 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Point No. 2 – Shek Pai Wan Landing No. 1

3.1.13 Ardeids were seen moving from both the east and the west along the harbour and gathered on the slope mentioned above. The ardeids utilising the roost were largely from the west of the survey point (nearly 90% as recorded in December 2018), with the remaining birds arriving the roost from the east.

3.1.14 The number of ardeids using the roost increased from 100-140 in October to approximately 250 in November, and to around 420 in the last survey in December. The increase is presumably caused by the arrival of wintering/migrating birds. The presence of water body and possible food source in its nearby areas, as well as the mature trees on the wooded slope at north Ap Lei Chau are considered as major factors making this site a suitable roosting site for ardeids.

Point No. 3 – Wong Chuk Hang Nullah

3.1.15 No ardeids were seen roosting in the compensatory planting area (for ardeid roosting site), the historical night roost in the previous demarcated Tree Protection Zone (TPZ) (i.e. next to the habitat enhancement area) to the south of the nullah, or the woodland uphill to the west of the historical roost.

3.1.16 Ardeid use of the WCH nullah appeared to be low. Only one Little Egret was observed foraging/loafing in the nullah during all three surveys; the bird eventually left before sunset, flying along the nullah towards the Aberdeen Typhoon Shelter.

Point No. 4 – Ap Lei Chau Prava Road (North)

3.1.17 No ardeids were observed roosting on the wooded slope south of Holy Spirit Seminary, or the slope northeast of Sham Wan Towers.

3.1.18 Some ardeids were observed lingering in the Aberdeen South Typhoon Shelter, circling in mid-air and occasionally making brief stops on boats in the Typhoon Shelter, either in singles or in small groups. Some of these ardeids were still lingering in the Shelter by the end of the survey, therefore it is not known whether these birds eventually moved to other area(s) to roost.

3.1.19 A number of ardeids (largely Great Egrets and Little Egrets) were observed flying from the south across the Ap Lei Chau Bridge and towards the Aberdeen Typhoon Shelter, though it is not known for sure whether the destination of these birds is the night roost on Ap Lei Chau or not.

3.1.20 Small numbers of ardeids were observed stopping on boats staying in the Typhoon Shelter by the end of each survey. Due to limited visibility near nightfall, it is not known whether they flew elsewhere after the surveys.

Point No. 5 – Ap Lei Chau Landing No. 5

3.1.21 Regarding Tai Shue Wan at Ocean Park, no ardeids were seen entering the historical roost area during the survey in October. No further surveys were carried out at this point in the following months.

January 2019 Page 14 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

3.1.22 To conclude, the absence of roosting ardeids from the WCH site for over 3 years indicates that this roost has been abandoned. The addition surveys carried out from October to December 2018 have revealed a newly recorded ardeid roosting site on the wooded slope at north Ap Lei Chau (see Appendix 2). As the newly recorded roost is only about 1.5km from the WCH Nullah night roost, it is believed that the ardeids had switched from the WCH Nullah night roost to the new night roost. on the wooded slope at north Ap Lei Chau. This conforms with the literature about the nature of Ardeid night roosts that they can be dynamic and may periodically shift naturally. (Mott MacDonald Ltd. 2010).

4 CONCLUSION

4.1.1 This Final Monitoring Report summarises and evaluates the monitoring findings for the planted vegetation and ardeid species along the habitat enhancement area and compensatory planting area collected from January 2016 to December 2018.

4.1.2 A total of 200 compensatory trees and palms, together with 12 whip trees and seven shrub seedling species were planted in the whole EPLP area (i.e. habitat enhancement area and compensatory planting area along the Nullah). The landscape contractor conducted routine site and vegetation maintenance works (such as weeding, irrigation and replanting works) during the three years.

4.1.3 Though the planted seedlings, compensatory palms and trees are still not fully grown by the end of this monitoring period, the planting will enhance the ecological and amenity values along the nullah side by creating more ecologically diverse woodland in the long run.

4.1.4 No ardeids were seen utilising the compensatory planting area for roosting or for any other purpose in these three years. No ardeids were seen entering the area of the historical night roost next to the nullah either. During the surveys, only single ardeids such as Little Egret were occasionally seen loafing or foraging in the nullah, and leaving the area before sunset. With the absence of any roosting ardeids for over three years, it can be concluded that the historical night roost at Wong Chuk Hang has been abandoned, and the compensatory planting area has not yet attracted any night-roosting ardeids.

4.1.5 Additional ardeid night roosting surveys were carried out from October to December 2018 to determine if the ardeid night roosting site had shifted to elsewhere in the Aberdeen area. Monitoring was undertaken from five survey points around Aberdeen Channel at the same time period as the monthly ardeid monitoring. This survey revealed that the ardeids had switched from the WCH Nullah night roost to the new roost on the wooded slope at north Ap Lei Chau, where the number of ardeids using the roost increased from 100-140 in October to around 420 in the last survey in December. The increase was presumably caused by the arrival of wintering/ migrating birds.

4.1.6 In conclusion, the whole EPLP planted area has been monitored and maintained for 3 years. The growth performance of the planted compensatory trees, palms, whip trees and shrub seedlings was generally fair by the end of the monitoring period. The 3-year post-planting care and maintenance period has demonstrated the successful establishment of the planted vegetation. It is considered that this 3-

January 2019 Page 15 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

year monitoring and maintenance period has been sufficient to review the performance of the planted vegetation in its early establishment period.

5 REFERENCES

MTR Corporation Limited (2016). South Island Line (East) – Ecological Planting & Landscape Plan (June 2016).

Mott MacDonald Ltd. (2010). Consultancy Agreement No. NEX/2301. South Island Line (East) Environmental Impact Assessment Report.

January 2019 Page 16 of 16 South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Figure 1 Planting areas and landscape treatment works along Wong Chuk Hang Nullah (Figures 1b-1e extracted from the approved EPLP)

January 2019 FIGURES

P

U

P

3 M

2 A

R 2 NOS. BAU.VAR.

2 1

81 :

8 8 2 1

150 3

3 N 34 5

5 40

0 0

7 9

0 0

E E

653 686 F » 655654 O

¿ 670 658 R

Z C

? 3 656 »

7 O ? 6 H

659 N

? 64 63662661 657 o T

656 6 9 ¿ I 6 0

N 7 660 e 66 3

668 U

8 675 687 / 3 676 n W

7 66 A

8 6 u T 6 ? /

6 669 I

9 688 5 3 . e O

C 7 0 2 N n

h 6 » 0

e / I 680 ? ¿

n u ? A

d 8 n 1 g 2 T u 130 g s 681N K

t /

r T S A

a ? ia

l k 5

682B 8

u u / i Y

ld 6 in ? 6

5 g b

i

p ?

s W

t KEYPLAN ah M

a 5 i R n .0 Buil g

t din

o g

0 4 8 12 16 20 i

o

a

METRES n d » 1 : 400 P LEGEND: odi um LOCATINO OF COMPENSATORY AREA FOR ARDEID ROOSTING SITE D4 4 WOODLAND MIX .6 81 211 0 N EXISTING TREE t D3 n - RETAINED e » m

n RUN Po r -IN dium e EXISTING TREE v

o - TRANSPLANTED G

C g ANOP

n Y RUN o -IN 4. K PROPOSED TREE 6

g n o H

@ PROPOSED PALM

, s d n a

L WP WATER POINT

f o

r o t c e r

i This area is not relevant

D EVA

e

h MOVABLE

t PLANTER to the Ecological Planting

f L 8 SEE DETAIL o 1 209 0 N A58/791 n

o and Landscape Plan i s s i m r e p S F M

E O h A E R t

T D i

C C w W O H

N G d L e I T 9 N c I 0 N E u 3 U d / W o A r T / p I 3 O e 2 N r 0

/ s A p T a K M / 5 NOS. CHR.LUT. A 5 8 / 6

7 JOINT (GOVERNMENT & 5

PRIVATE) SIMAR SLOPE FEATURE NO. 11SW-DF73

WOODLAND MIX 439.15 sq.m HB 81 HYDROSEEDING 439.15 sq.m 207 0 N WP

WP J T15 47 K72 T12 U47

T11 S47

T14 R46 T10 $ + E 12 .0 Q M 0 45 I T $ d P46 a t $ o E T T 9 O46 R e A

D k

$ T13 n r N47 a a

$ h M R E

S S U

$ d M 48 g o : Y

B WOODLAND MIX 399.85 sq.m n o T16 D HYDROSEEDING 399.85 sq.m o F E J O L4 T I 8

N N L I T 77 NOS. SCI.AUR.

R ( 14 NOS. SCH.ARB. P & GO d P PR VER I N DRAWN e VA ME JH TITLE FE TE) NT m k AT S DESIGNED UR IM IY ECOLOGICALa o PLANTING AND $ E AR L N CHECKED N o $ V O. SL IY L R O E $ 1 P D 1 E SOUTH ISLAND LINE (EAST) LANDSCAPEC PLAN ALONG E D APPROVED T S

L W O IY L I - ORIGINATOR

M D P F / $ $ $ F7 DATE WONG CHUK HANG NULLAH 3 12/MAY/2014 ecology

DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE arboriculture :

E

: VERIFIED ON SITE. aec : M V MTR CORPORATION LIMITED 2008 COPYRIGHT IN landscape E A R

M RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE N D A L MTR CORPORATION LIMITED OF HONG KONG. NO N E T CADD REF. SCALE DRAWING NO. REV.

E REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART D O

L 1 : 400 (A3) O L I REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY DATE APPROVED BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR

P M F $FILES$ Figure 1a E WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.

8 8 8 8 8 8 8 8 S M F 3 3 3 3 3 3 3 3 E O 4 4 4 4 4 4 4 4 A E R 7 7 8 8 8 8 8 9

T D

7 9 1 3 5 7 9 1 C C W 0 0 0 0 0 0 0 0 O H

N G E E E E E E E E L I T 9 N I 0 N E 9 3

D U

653 / W A T 686 0 / 655654 I D1 3 1 O 670 1 2 658 D N 656 0 3 / 67 A 4 3 659 T 566 66 662661 657 K 66 / 667 660 A 8 675 668 687 5 3 7 676 6 8 8 66 / 6 6 6 669 9 688 7

7 5

6

680 2 681 D1 682

812090 N KEYPLAN

0 4 8 12 16 20

METRES 1 : 400 t n e m n

r m

e . q v s m

o . 8120701 q N G .4 s

4 1 3 g .4 1 n 4 X 3 6 NOS. CHR.LUT. o I 1 MK G D N

g I N D A n 5 NOS. MAL.PAN. L E 6 NOS. CHR.LUT. WP D E o

S H O O O R W D @ Y 3 NOS. CHR.LUT. 5 NOS. CAR.OCH. H , WOODLAND MIX 99.49 sq.m 5 NOS. CHR.LUT. s

d HYDROSEEDING 99.49 sq.m HB n

a 5 NOS. CAR.OCH. WP L

f WP o

WP r HB o t

c WP e

r RR R i R R RR R RR R RR R R R

D R RR R R

e R R h R R t R R R R R R R R R f

o R R R R R R R R

n R R R R R R R o R i R

s R R

s R R R R R R R i R R R R R m R R r R WOODLAND MIX C 875.90 sq.m e

p 812050 N R HYDROSEEDING 875.90 sq.m

R R h R

t R R R

i R R R w

d R R R e R R c R R R R R

u R R

d R R R R R o R r R p R R R R e R R r R R

R s R R p R a R R M R R R R RR

R R R R LEGEND: R R R R R R LOCATION OF COMPENSATORY AREA R R FOR ARDEID ROOSTING SITE R R R UndisturbedR Vegetation 343.11 Sq.m. R R R WOODLAND MIX R

R HYDROMULCHING 26.72 sq.m

HYDROMULCHING 404.29 sq.m EROSION CONTROL MATTING WIRE MESH & HYDROMULCHING 812030 N R SEE DETAIL "Q"

903/W/320/ATK/A58/787

UNDISTURBED EXISTING

VEGETATION TO REMAIN

EXISTING TREE - RETAINED S F M $ IMPORTANT NOTE: E O E A E M R I

T 1. D

T EXISTING TREE C C W $ O H SHOULD BE TREATED WITH EROSION

N - TRANSPLANTED G

L I T 9

N CONTROL MAT. SEE LEGEND I 0 N E 3

U / $ W A

E 2. PROPOSED TREE T T / I 3

A O D 2

N $ 0 NON-BIODEGRADABLE EROSION CONTROL MATTING,

/ A WIRE MESH & HYDROMULCHING T PROPOSED PALM K

/ 3. 1 ALL NO-FINES CONCRETE SLOPES A $

5 R 8 E / S

6 WP

U WATER POINT 7 $ 8

BIODEGRADABLE EROSION CONTROL MATTING

:

Y 812010 N B

D E T N I R P

DRAWN JH TITLE DESIGNED IY ECOLOGICAL PLANTING AND $ L $ V CHECKED IY L R E $ D SOUTH ISLAND LINE (EAST) E D LANDSCAPE PLAN ALONG T APPROVED L O L

I IY ORIGINATOR M P F $ $ $ DATE 12/MAY/2014 ecology WONG CHUK HANG NULLAH

DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE arboriculture :

E aec : VERIFIED ON SITE.

: landscape M V MTR CORPORATION LIMITED 2008 COPYRIGHT IN E A R

M RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE N D A L MTR CORPORATION LIMITED OF HONG KONG. NO N E REV. T CADD REF. SCALE DRAWING NO.

E REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART D O L O L I REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY DATE APPROVED BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR $FILES$ P M F WRITTEN CONSENT OF THE MTR CORPORATION LIMITED. 1 : 400 (A3) Figure 1c D1

South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Figure 2 The Latest Management and Maintenance Matrix of the Ecological Planting and Landscape Area along Wong Chuk Hang Nullah

(This management and maintenance matrix will be updated on a need basis according to the latest arrangement.)

January 2019 FIGURES 5.22 5.20 LEGEND: 4.14 MAINTENANCE RESPONSIBITIES: 5.18 * 5.19 LCSD INCLUDING IRRIGATION BENCH 5.28 MTR 5.22 4.19 5.22 5.25 4.21 HYD 4.98 4.06 4.36 4.07 EMSD FOR HYD 5.22

UP 5.20 R 3 LB1 4.37 ASD FOR FEHD 5.20

TEMPLE 4.14 5.21 BENCH WP LCSD ALLOCATED LAND 5.19 5.22 B 4.18

P H 8.16

U

P

UNALLOCATED GOVERNMENT LAND M 4.41 A

R

2 1

: 5.19 DSD 1 21) (8. * SOFT LANDSCAPE TO BE MAINTAINED BY LCSD AND HyD ELECTRIC ROOM HARD LANDSCAPE TO BE MAINTAINED BY HyD 4.48 FOR FOOTBRIDGE 4.23 WATER POINT AND WATER HOSE BOX 4.43 WP (WHB) FOR IRRIGATION OWNED BY LCSD 4.50 MAINTAINED BY ASD 4.43 HB SFD 4.42 WATER HOSE RAILING 4.49 4.27 G LIGHTS OWNED BY LCSD MAINTAINED BY EMSD 4.37 4.41 4.39 N HyD TYPE II RAILING AT JUNCTION N-I 4.28 RU 4.43 4.44 4.46 HyD TYPE II RAILING 4.30 4.65 4.29 4.45 4.37 DSD TYPE II RAILING 2 4.46 4.45 4.41 ND-02 4.24 HyD ROAD BARRIER 4.45 SFD 4.32 N N-I 4.31 RU 4.46 4.64 4.51 4.31 4.33 4.45 G 4.59 1 WP -IN 4.31 GAZETTE BOUNDARY RUN 4.62 ND-01 4.30 4.33 4.47 HB WP 4.61 4.61 4.35 4.31 4.56 H -IN RUN 4.41 4.47 4.47 4.31 4.63 4.65 4.64 SFD 5.33 4.40 4.51 4.54 CANOPY (9.85) 4.44 4.58 L RUN-IRNUN-IN 4.39 4.43 RUN-IN 4.54 4.36 4.38 4.33 4.49 4.38 4.50 4.45 4.49 4.40 4.40 4.64 4.32 4.39 4.42 4.38 4.62 4.33 4.32 4.72 4.50 4.42

4.42 4.44 4.43 4.36 4.53 4.48 4.42 4.55 4.48 4.43 4.46 SFD 4.43 REMOVABLE PLANTER TO AH BE MANAGED AND 4.41 L 4.59 WP 4.55 L 4.29 U 4.78 MAINTAINED BY LCSD 4.29 N 4.29 H LIFT BY EMSD FOR HYD 4.28 4.29 4.73 4.31 4.66 4.31 5.16 4.27 4.29 4.26 OUT RUN- 4.49 4.66 4.68 EVA 4.48 4.48 4.72 L 4.79 4.69 4.52 CRASH GATES 4.83 4.53 4.75 P 4.64 4.64 W HB 4.75 4.62 4.81 4.64 CRASH GATES 4.62 4.80 4.65 4.74 4.89 5.02 EVA 4.61 4.63 5.09 IN 4.60 RUN- 4.64 L 4.71 4.70 4.97 4.70 LB1 5.10 4.59 4.72 5.43 TRIPODPILLAR BOX FOR PEDESTRIAN RAILING TO BE M&M BY HyD 4.74 5.42 LINK LIGHTING TO BE 4.71 4.72 4.66 4.73 MANAGED BY HyD AND LB1 5.35 4.59 4.71 MAINTAINED BY HyD/LIGHTING 5 4.58 4.73 . 5.42 ABLE 2 RAILING TO BE MANAGED AND T AMP 8 4.59 L 4.63 4.82 4.72 R 5.58 MAINTAINED BY DSD 5.46 5.26 WORSHIPPING MP 5.51 4.55 RA STATUES 6.42 5.57 4.61 6.89 AMP 5.61 4.59 4.73 R 6.40 4.67 4.75 4.81 5.85 6.49 TS 6.90 U-CHANNEL TO BE MANAGED 4.58 4.70 L 5.61 4.60 4.75 AND MAINTAINED BY HyD 4.59 5.09 6.46 6.38 6.42 6.42 6.46 FB 5.46 7.66 4.60 4.61 L 6.20 7.44 5.55 4.58 6.42 7.67 7.66 5.82 A n 4.69 7.29 6.59 g 4.59 7.58 7.18 6.47 5.91

6.17 7.57 d 4.61 P 6.49

. W 1 7.57 - 0 4.67 6.21 7.59 7.58 7.62 7.30 _ 5.88

L 6.97 L

P HB 6.51 6.34

\ A

x 4.69 5.95 6.08 i LB1 P 7.67 7.58 7.40

TREE POT W SHRINE ANDr 7.40 6.99 t 4.67 8.27 7.94 5.96

E a 5.90 6.82 WORSHIPPING

M 4.85 4.67

N 8.03 7.87 7.48 7.37 STATUES 4.69 ¤j¤ý oad 5.91 e han R 4.76 5.69 9.36 9.54 Nam Long S

I c ng yground n Tai Wo ldren's Pla 5.12 5.60 Chi

L a 5.94 9.76 11.05 10.29 7.38 n 4.73 TS emple 6.76 4.96 Ye T

e 4.70 10.19 6.36 t

H n g FB i 6.39 9.19 f a C 5.10 10.34 9.68

c 12.23 11.83 11.75 M 5.73 B P 7.14 t 5.60 H7.36 11.90 W l T 11.24 7.86 2 12.13 7.73

d p 7.58 11.10

0 . 11.88

n 10.59 11.51 :

A 5.98

r 12.28 9.66

2 a 8.97 12.56

u 13.40 0 6.90 8.55 12.34 11.43 6.78 M 11.47

: 11.36

o 6.77 t l 11.52

6 9.96 13.21

1 11.44 9.48 n o 8.74 8.55 12.60 11.58 7.84

e 10.28 c 12.26 7.71 11.58 13.49 9.44 7.67 6.92 - 11.48 10.14 m 14.60 13.38 11.48 6.68 6.33 f 8 13.02

e 14.70 1 14.25 d 9.09 10.94 g 0 14.07 13.32 12.83

p 9.84 6.61

2 14.00 a 15.40 12.64 9.48 7.52 \ 13.59 13.75 6.77 / n 15.53 13.72 11.23

g 15.44 13.43 9.49 7 a 12.47 12.2711.17 7.99 f 14.36 0 M 11.42 13.12 12.43 c

/ 14.83 \ 15.81 16.05 14.92 13.96

t 12.40 6 14.90 10.24 9.94 l P 13.73 11.42 14.93 9

0 7.11 E p 11.62 15.51 8 Pla U 8.53 n 12.90 ter - 0 11.01 0 R 16.44 3 \ 12.28 12.70 14.35 11.82 18 1 S \ 15.47l n 15.78 o 9.20 11.97 11.66 p 15.95 e T 14.84 op 15.02 7.66

P 14.33 o 15.88 15.83 14.48 i 14.06 14.02 13.51 F e \ 15.90 n 19 c 16.43 e

t 13.21 0 K 12.44 16.52 14.33 9.12 6.96 a 3 12.15 T 10.19 7.22 9 t

13.02A 12.48 6.78 6 s 2 7.41

\ 15.15 16.86 16.29 20 26 7.13 t o 12.93 3 16.28 16.27 7.67 i 15.89 15.71 12.24 10.19 7.11 r 30 0 u 14.91 14.01 c

9 29 h i 15.90 17.61 15.34 14.34\ 30 14.14 8.26 0-U M

17.91 15.33 U L 17.17 16.87 15.13 16.44 - 0 I 15.10 0

\ 15.90 3 16.41 34 31 S 3 S 17.29 12.84 l

D o p 21 e 28 7.26 _ : 16.39 9.17 B

D 7.66 15.11 o 15.45 t 15.02

2 12.84 t Y 15.58 0 2 4 6 8 10 o 33 6.98 A 17.39 m 142 3 2 00 B 17.93 -U F 16.15 e n C 10.66 32 c Slope Bottom 15.50 15.49 e 4 16.15 15.78 300-u 27 \ 9.32 4 100 D 16.52 GI 15.32 E PIPE IP s 16.18 P I \ 17.73 16.78 14.86 G E 18.14 0 6.92 16.76 16.48 10 d

s 133

T 17.84 50GI PIPE 64 Fence Fence METRES 16.84 50GI PIPE 4 r 18.32 6535 7.35 Wall Edge t 18.53 300-u 15.84 5 6 7 N 18.00 16.47 16.44 16.56 60 58 61 13.5262 63 I 18.57 16.43 99 15.23 34 33 32 a 59 8.85 7.69 c 16.43 50GI 132 25 300 100 8.06-U R 16.4516.16 16.18 10.41 14 1 : 200 d 16.97 16.77 16.61 83 8.04 50GI 13 e 101 16.80 98 14.80 66 104 P 130 102 103 17 30 j n 16.86 22 12 7.19 16.40 14.10 1516 o a 11.39 67 7.88 18.50 84 r t 7.28 S P Title \ \ D D D D A A C C

\ \ WCH Station To Pedestrian Link Bridge Area A A t K K l H H u N N a C C f Management and Maintenance Matrix \ \ e : : D P P Sheet 1 :

E : : M V E A R M N D A L

N E

T Scale at A1 Date Figure No. E D O L O L I As Shown Jul 2018

P M F PL-01-G1 ­

»

Z

H

o

e

¸

n

u

e

n ­

g

S ¹

Y u

D

b

i

p

s

¤ ­

t

R a

À

t ¥ o

i

o a 4.7 d n

L H ¥­ ¥­ 4.8 P 5.0 odium Podium 4.54 4.6 4.49 4.59 4.54 4.32 4.6 (9.07) (9.08) (9.06) 4.38 4.38 4.59 4.33 L 4.46 4.44

4.43 4.43 4.46 4.52 4.43 ­»¸ 4.62 L 4.29 4.26 4.27 4.34 4.36 4.45 4.46 4.52 L 4.53 4.55 H 4.59 a 4.65 Sitting-out Are Heung Yip Road

´ Nullah

RAILING TO BE MANAGED AND U-CHANNEL TO BE MANAGED FOOTHPATH TO BE U-CHANNEL TO BE MAINTAINED BY DSD AND MAINTAINED BY ASD MANAGED BY TD AND MAINTAINED BY HyD MAINTAINED BY HyD

4.61 U-CHANNEL TO BE MANAGED 4.61 4.63 AND MAINTAINED BY HyD 4.63 TS 4.57 4.62 4.56 4.70 LB1 4.57 4.73 4.66 4.73 SHRINE AND TREE POT 4.68 4.67 4.64 4.64 M 5.47 5.46 WORSHIPPING 4.69 A 4.85 4.83 5.00 WP WORSHIPPING STATUES 4.69 5.06 T 4.76 4.88 5.28 5.11 4.71 STATUES 4.59 5.86 C 5.12 4.48 5.94 4.47 4.45 5.48 4.71 4.73 H 4.48 5.55 5.84 4.66 4.70 4.96 4.65 4.63 4.67 LB1 4.46 5.94 4.47 5.11 4.95 4.65 4.68 4.40 5.84 L 5.14 6.18 6.46 5.74 5.99 5.10 4.54 4.37 5.44 5.73 5.96 6.02 7.45 I 5.60 4.48 HB 4.50 7.21 5.34 N 7.58 7.74 5.92 4.62 WP 7.39 5.98 8.09 7.60 6.90 E 7.72 6.80 6.84

6.86 5.09 6.81 8.28 6.90 8.74 5.13 8.78 6.33 7.71 A 4.82 4.67 8.74 8.88 6.51 8.54 9.09 7.21 9.84 8.08 - 4.65 9.54 10.78 10.9810.87 6.79 12.05 11.92 9.49

4.69 11.00 A 4.66 6.15 10.56 11.42 11.75 13.12 9.20 9.86 11.62 5.07 7.99 11.43 12.03 11.16 12.28 11.01 UNALLOCATED 9.08 8.80 10.52 11.97 11.66 12.92 10.22 15.60 14.90 12.74 12.50 5.12 12.44 5.01 GOVENMENT LAND 9.95 12.95 13.46 12.15 7.10 9.22 12.25 12.67 12.48 4.79 5.31 12.71 10.76 13.02 5.60 5.31 10.88 12.09 13.68 5.07 15.18 5.35 7.57 13.48 11.47 13.69 14.15 14.22 18.68 14.34 9.88 10.80 19.13 5.17 14.70 13.00 4.75 12.74 15.43 5.67 15.48 19.59 14.90 15.11 15.58 18.99 13.18 16.90 4.77 SLOPE NO. 11SW-D/F73(4) TO BE SLOPE NO. 11SW-D/F73(2) TO BE 7.95 15.94 20.67 19.21 15.59 15.32 5.57 5.97 21.43 18.80 13.79 14.77 11.83 MANAGED AND MAINTAINED BY ASD FOR SWD 22.06 15.97 MANAGED AND MAINTAINED BY MTR 17.88 14.64 6.08 20.64 15.32 6.39 10.70 18.02 16.97 n 12.50 15.11 22.62 19.62

g 19.51 17.36 18.50 d 22.10 18.52 18.44 . 4.53 8.23 11.18 G 22.95

2 20.92 13.38 18.54 18.46 0 22.73 19.19 _ 4.66 20.38 24.34 20.64 19.33LEGEND: L 15.30 24.05 24.16 21.69 G 17.93 19.52 P 19.28 8.08 17.53 19.06 \ 22.62 13.05 21.59 23.49 20.85 19.11 19.49MAINTENANCE RESPONSIBITIES:

x 24.24 i 11.47 16.92 19.33 19.59

r 21.93 18.40 15.93 20.98 24.22 *

t 18.69 22.49 23.37 23.06 18.96 LCSD INCLUDING IRRIGATION a 16.27 18.09 24.40 24.25 19.10 M 14.35 20.26 21.24 15.44 19.90 21.69 24.40 21.99 21.09 19.29 e 10.13 14.76 23.85 20.37 MTR c

n 5.10 7.24 15.27 24.46 a 9.08 17.11 18.66 19.81 21.63 23.27 24.45 24.45 HYD n 10.32

e 5.12

t 7.32 n g

i ASD f

a EXISTING STAIRCASE NOT AFFECTED c M t

l

5 BY CONSTRUCTION WORKS DSD d p 0 . n :

r EXISTING STAIRCASE NOT AFFECTED 2 a

u S 0 ES

: UNALLOCATED GOVERNMENT LAND o t l BY CONSTRUCTION WORKS 6 1 n o e c - m f 8 e B 1 * SOFT LANDSCAPE TO BE MAINTAINED BY LCSD AND d g

0 m p 2 a HARD LANDSCAPE TO BE MAINTAINED BY HyD \ / n 19.8 g 7 a -

f A® u 0 WATER POINT AND WATER HOSE BOX M c

/ i \ WP t

6 (WHB) FOR IRRIGATION OWNED BY LCSD l P 0 E p B MAINTAINED BY ASD R

\ d \ n

P o HB i \ E

t WATER HOSE RAILING 0

K o a 3 T N 9 t A 6 s

\ Block A

I LITTER BINS OWNED & MAINTAINED t o

3 P i LB1 r 0 u

L BY FEHD c 9 h i \ M

L I \ S D H DSD TYPE II RAILING _ : D 2 Y 0 2 4 6 8 10 A C 2 B C 4

\ 4 T D s \ E d s A T METRES G r t N I

a GAZETTE BOUNDARY c M

R 1 : 200 20.9 d e P j n o a S r t T

S P Title \ \ D D D D A A C C

\ \ WCH Station To Pedestrian Link Bridge Area A A t K K l H H u N N a C C f Management and Maintenance Matrix \ \ e : : D P P Sheet 2 :

E : : M V E A R M N D A L

N E

T Scale at A1 Date Figure No. E D O L O L I As Shown Jul 2018

P M F PL-02-G ®ü Seawall ®ü Seawall

D E G C A E N H A M Y B RAILING TO BE MANAGED AND E B D U-CHANNEL TO BE MANAGED MAINTAINED BY HyD E O N F T I AND MAINTAINED BY HyD F A T 1 G N F 6 N I I A . L M 8 LI A D R N A L SEAWALL TO BE M&M BY LCSD HWM HWM H P 1 A 7 F . 3 3 3 3 3 3 3 3 3 ...... 3 3 3 3 3 3 3 9 3 3 7 7 7 7 . 7 . 7 3 . . 9 6 . . . 1 . 7 . 5 5 7 6 7 3 . 6 9 6 8 7 7 7 7 6 2 7 2 7 3 3 3 3 3 5 3 3 8 3 3 C . 3 3 4 3 LB1 4 ...... O 3 8 . 8 WP 3 7 7 8 7 7 7 7 7 L . 3 . 5 3 6 5 4 H 6 4 7 2 6 U . 3 7 . 8 7 8 . 4 3 M 5 3 3 . 8 N 4 5 7 9 WP LB1 . . 7 3 . 8 8 7 9 WP 3 1 1 . 4 6 3 HB . ¬ 0 9 . 3 3 6 WP 6 . M 3 5 3 8 S . L . c 2 9 8 1 4 1 3 . 4 4 3 4 . 3 LB1 4 . . . C 6 B2 • . 3 . L 7 HO O 3 3 0 0 8 . LB1 NG KO 0 8 4 3 4 1 N2G 6 L . 3 . . 8 6 2 ELEC 3 2 3 3 9 LB TRI U . C M 7 C . . 3 9 S 4 MA 0 3 2 8 5 NHO M LB1LB . O n 1 . LE 4 3 3 . N 9 L 2 0 3 7

U 4 7 3 M . À E N LB1 L 4 4 4 C . H P 9 . 8 3 0 WP 4 7 4 . 7 4 . 2 . 5 . 4 4 D 1 L 6 LB2 1 A . 5 R.O 6 . GE 4 8 T HB ID WP 4 7 BR 0 0 5 I CHAU 8 8 4 T 3 . AP LE4 HB 7 4 5 . WP . 2 . . . . 1 8 1 0 2 8 4 3 4 7 2 8 5 3 . 3 3 3 L 5 0 . . 4 . . . 4 C L 9 9 3 7 7 7 S5 (ROCK CUT SLOPE) . O 7 8 7 1 7 2 5 5 . 4 2 L 6 . . 3 6 0 . 3 U . 5 7 . 4 CP 7 1 . M 6 2 67 4 3 4 . 7 2 8 UNALLOCATED N 3 2 . 0 . . 2 4 . 3 3 0 . 4 E 8 4 9 . 3 3 . . 4 0 . 9 2 4 4 GOVENMENT LAND 2 . 4 3 5 . 9 6 8 7 0 8 . 4 1 5 2 4 3 I . 1 9 C4 3 . 4 . 2 0 3 6 4 . . L 4 4 O . 1 3 1 0 . 6 . 0 7 L 4 6 E 9 9 7 6 9 4 0 2 U 4 C U . . . 5 DOG FENCE TO BE MANAGED . 7 6 M 8 9 6 O 5 . C 5 6 6 5 2 . . 1 0 L . N . 8 4 5 5 6 U-CHANNEL TO I 2 1 U AND MAINTAINED BY LCSD2 2 0 1 1 . RAILWAY PROTECTION5 MAINTENANCE4 . ACCESS 8 7 L 0 5 M 6 7 9 . 9 . 3 . . N T . 1 U-CHANNEL TO BE MANAGED 8 . 1 BE MANAGED 2 1 1 F 2 8 S 1 2 2 4 0 9 FENCE TO BE MANAGED6 BY MTR9 t 2 2 . 2 6 ai AND MAINTAINED 2 . . 1 AND MAINTAINED BY LCSD 6 6 rc 8 2 2 2 2 8 1 0 AND MAINTAINED. BY MTR . . 6 a . 2 . 8 8 E 0 9 8 . se . 5 5 1 . . 2 1 3 7 3 BY LCSD3 6 2 0 . 4 2 S7 (ROCK SLOPE)2 2 3 1 2 9 8 2 1 5 4 8 2 9 . 2 . 7 . 1 . 8 0 1 . . 4 8 0 2 1 . . 9 2 1 4 8 0 6 1 2 1 1 . 1 1 . 2 8 2 3 1 8 7 8 3 1 7 8 3 . . . CP. . 2 2 4 8 8 . 0 5 5 6 9 6 1 . 0 . . 9 . . F . 3 8 2 9 1 0 1 . 8 4 4 9 2 3 2 1 5 6 6 2 3 7 2 1 7 1 3 . 9 I 1 1 CABLE RISER 1 2 7 9 8 6 5 1 . 6 . L 0 . . . 3 4 8 6 7 . 5 9 9 7 1 1 . 4 1 . 9 . 2 3 1 3 9 1 7 0 2 6 3 2 . 2 1 1 2 . . 1 6 1 . 1 7 4 5 . 1 7 5 4 1 5 8 1 . . 9 . 8 S 1 2 1 8 1 3 7 1 2 CP 1 0 . 5 1 1 1 . . 3 t 1 1 0 0 6 4 1 8 5 1 . 0 . . . 4 6 4 1 4 1 5 a 0 . 4 2 7 5 . . 8 1 1 3 i . 8 . 6 0 4 7 0 3 . 7 8 6 1 1 9 . 1 5 . . . r 0 I 1 5 8 3 1 9 4 0 5 1 4 c L 3 . F 7 1 4 6 SLOPE NO. 15NW-B/F1410 a 3 . 6 0 . 7 8 . 1 3 s 6 0 2 3 9 2 TO BE M&M BY HyD . e 0 1 1 1 . 1 1 6 9 8 6 5 . 8 CABLE RISER TO BE MANAGED 1 . . 6 . 9 4 4 1 5 5 1 9 1 1 . 8 7 5 9 3 1 5 6 1 AND MAINTAINED3 BY HEC 1 . . 1 8 6 5 2 2 . 9 1 . 7 8 . 8 . 7 1 1 5 . 3 8 . 2 1 I . 9 4 7 7 3 . 5 1 L 6 2 . 2 2 1 2 . 9 3 4 5 1 3 4 0 1 1 0 9 9 8 . 30 8 2 2 6 9 . 2 2 . . I 0 . 1 . I . 7 0 7 3 L UC 0 . 0 7 0 4 2 4 5 . 8 5 . 4 L 6 . 4 . 0 SLOPE NO.4 15NW-B/C212 5 3 6 1 1 2 2 2 I 2 9 2 2 2 2 5 0 4 8 2 1 1 0 0 H TO BE M&M BY HyD L . 2 . . . . 2 9 . C 3 7 2 3 3 2 7 0 2 2 . 9 2 U . 9 . 2 9 1 0 4 W 3 1 1 5 2 . 1 8 9 . 3 1 LEGEND: 9 3 5 1 7 9 . 1 . 2 5 .

. 8 4 2 9 . 8 2 9 5 7 2 2 2 0 1 2 3 M 6 9 . 2 2 2 375 UC 2 MAINTENANCE RESPONSIBITIES: 4 1 2 1 . 2 8 3 2 2 7 . 3 . 7 9 . . 3 . * 0 6 1 . 3 . 8 . 8 4 LCSD INCLUDING IRRIGATION 3 0 2 4 8 2 0 2 6 . 1 8 2 8 6 2 0 2 2 . 2 0 . 2 7 7 2 5 1 0 . 8 3 2 2 . MTR 3 8 . 1 . 2 7 4 2 1 6 . 6 . 3 . 2 0 5 2 8 . 4 2 . 5 4 2 3 0 3 9 7 . 2 2 HYD 6 2 6 . 0 0 6 4 3 3 7 . 2 . 3 8 . . 4 2 6 1 0 2 8 5 3 9 2 3 4 . 9 3 9 n HEC UNALLOCATED GOVENMENT LAND . 1 2 7 0 3 . 0 g 2 3 6 1 S1 (RETAINING. WALL). 3 4 6 . 3 d 2 6

. . 2 LCSD ALLOCATED LAND 6 . 1 1 0 3 1 1 0 . 5 5 8 1 . 0 1 . 7 8 0 MAINTAINED BY ASD 0 6 2 1 . 1 .

_ 3 6 2 1 2 2 9 L RETAINING WALLS TO BE . 7 6 3 P UNALLOCATED GOVERNMENT LAND 1 3 .

\ 1 9 2 2 3 MANAGED AND MAINTAINED S23 (SOIL CUT SLOPE) x 1 2 0 i . 0 0 0 . . r 7 2 . DSD . 9 1 3 4 t 1 4 BY MTR 1 8 3 5 4 2 0 2 a F 6 7 4 . . 8 . 3 3 M . 4 1 . 2 0 3 0 3 3 2 5 3 9 4 . 0 . 0 S6 (FILL SLOPE AND 0 3 e 4 F 2 5 5 . 4 . 3 . 0 c 3 9 3 3 5 6 3 3 2 3 0 5 . n * SOFT LANDSCAPE TO BE MAINTAINED BY LCSD AND 0 RETAINING WALL) . 0 0 2 0 3 0 4 . 8 a . 2 4 HARD LANDSCAPE TO BE MAINTAINED BY HyD . . . 0 . 4 n 4 6 1 2 2 3 7 . 3 1 1 3 e 9 1 7 4 4 5 0 3 3 0 t WATER POINT AND WATER HOSE BOX 1 . 8 . 0 .

n 1 g 2 6 i 2 3 . 2 2 WP (WHB) FOR IRRIGATION OWNED BY LCSD . 3 FP3 f 0 a 9 6 3 0 0 2 9 4 3 0 3 3 D c

M . MAINTAINED BY ASD 3 1 . 0 . F . 0 3 . 0 0 t OO TPA 6 l 3 . T 6 7 3 . 3 H . 0 .

d 2 p 7 1 0 5 1 3 6 5 5 1 1 . HB F 2 . n : . 9 0 3 3 - r 1 5 2 a WATER HOSE RAILING 2 . 4 u 9 0 2 4

2 : 5 o t l î 0 . 6 3 1 n o 7 . D e c 1 4

- 3

m y 2 2 f 8 ² 0 e 3 1 8 d .

g 0 0 F a . E p 6 2 a 2 0 . \ 2 9 / n 4 w 1 1 N g

7 4 a . 9 f

0 . M p T 7 I c / 6 3 \ i

t 6 6 l 0 l P 4 L 0

E . p F S

R S \ 6

\ n 0 P o

LITTER BINS OWNED & MAINTAINED H i \ LB1 2 t 0 K BY FEHD 3 0 C a 3 T 0

9 . t A 1 . 3 T 6 s 9 \ 6 3 0 t o 9 3

i . .

HyD TYPE II RAILING 4 A r 0

u 8 5 c 9

h 6 i 9 M \ M

L F I \ S D

_ : B D 2 Y 0 2 4 6 8 10 A 2 B

C GAZETTE BOUNDARY

4 3

\ 4

D a s 0 \ E d s T . METRES r t N I

a s

c ¨ F 7 ¬ R ² 1 : 200 d e

P Ä j n

o a k r t

S P Title \ \

² e D D F D D x ootball A A Field

C C t

\ \ WCH Station To Pedestrian Link Bridge Area A A b t K K l î H H

u ² N N a

C C a f Management and Maintenance Matrix \ \ e : :

D

P P l

l Sheet 5

:

E : C : M V E A R M N D A L

o N E

T Scale at A1 Date Figure No. E D O L O L

I As Shown Jul 2018 u

P M F PL-05-F

r t B us D 4. 74 ep ot D LEGEND: 5 B 5 . US MAINTENANCE RESPONSIBITIES: . 0 4 K 1 . IO * I 5 4. 4 SK 29 .4 LCSD INCLUDING IRRIGATION MTR R L 4 .2 2 HYD B HEC

LCSD ALLOCATED LAND 3 .9 MAINTAINED BY ASD 4. 5 34 T UNALLOCATED GOVERNMENT LAND 4. U 08 UTILITY BRIDGE TO BE MANAGED DSD RAILING TO BE 3. AND MAINTAINED BY HEC 96 MANAGED AND A MAINTAINED BY HyD 3. * SOFT LANDSCAPE TO BE MAINTAINED BY LCSD AND 83 4. RAILIN 15 HARD LANDSCAPE TO BE MAINTAINED BY HyD H G TO B E MANAGE AND M D RAI WATER POINT AND WATER HOSE BOX AINTAIN LING T G WP ED BY Hy O BE MAN (WHB) FOR IRRIGATION OWNED BY LCSD D D AGED G AND MA MAINTAINED BY ASD C S INTAI 4. NED BY 16 4 D DSD D . N G 7 HB E WATER HOSE RAILING A D G G L S A U-CHANNEL TO BE MANAGED LITTER BINS OWNED & MAINTAINED D N D Y LB1 N A BY FEHD E I B AND MAINTAINED BY HyD A M G L A D E DSD TYPE II RAILING N E Y B A E N B M I O HyD TYPE II RAILING A D T E T E L B N RAILWAY PROTECTION FENCE N G I I N O A A I GAZETTE BOUNDARY T M 4 4 T L . . 4 1 13 . N I 2 1 G D 5 I A 4 L N . 4 N 0 . A R 4 1 4 I P . A 7 1 4 M 8 8 . L 4 19 4. 4 2 1 4 I . 9 . D 0 P 3 2 A 0 W 05 4. AN 2 R E 1 A E 4. 4 2 0 RAILING TO BE MANAGED .2 4. .3 4 56 4 21 0 1 AND MAINTAINED BY DSD 1 . .0 34 . 1 P B 1 7 .2 3 7 W L 12 4. 1 32 4I . 0 4. L 8 M 3 3. 4 71 04 00 9 . 6 U A HB 7 1 4 C 3. 1 4. 4 8 . 4.

B P 4 T 96 L 45 .4 W . 02 4 22 1 13 7 .1 4 0. 7 4 8 . 3 C P 3. 4. . 14 2 0 W 96 4. 4. 16 5 08 . 01 0 16 36 2 .9 5 4. 15 4 .3 H 4. E 6 4. 9 5 02 7 .2 5I U-CHANNEL TO BE MANAGED 3 10 4. 91 4. 7 14 L .9 16 17 4 6 64. .1 AND MAINTAINED BY HyD L 05 3 93 0 4 4. 5 .9 .3 I . 3 7. 8. 4 93 3 4 8 0 N 7 1 8 09 99 .0 .3 0. .1 8 88 5 0 6 .8 IL E 3. 3 9 90 8 ¬ . 4. 4. 0. 1 7 C 4 0. 10 5 14 39 4 31 . 7 .5 3 B. LB 0 0 0 1 1 . 4. 2 1 1 WP H 6 3 2 4 1 2. 4. 4. 6I 8 4 - ..0 1. 97 12 17 00 L E 039 19 . 1 3 3. c 5 1 8 98 3 9. 4. 2 4.

. C 4. 4 4 11 79 1 1 07 16 4. 08 0 07 .2 .4 . 1 5. 2. 9 02 . 3. 4. 2 8 55 3. 5 0 8 29 97 21 UNALLOCATED 4 3 7 .9 4 0. • U-CHANNEL TO 4 8. 4 .3 36 B2 4 05 I L GOVENMENT LAND RAILWAY PROTECTION FENCE 7 6. 4 L B1 BE MANAGED 13 .1 4 L 3. 1 S8 (FILL SLOPE) 5 .0 84 4. 0 TO BE MANAGED AND1 3 D 0 AND.9 MAINTAINED 6. 1 1 1 4 IS 4 8 1 1 4. 2. 1 7 . C0H n 1 5. 2 0 4 . . 24 EX .AR BY ASD 6 5 MAINTAINED BY MTR 9 2 25 9 IS 2GE 1 .0 0 1 ( TI 5 T 4 3 OU0 NG O 3. .8 WP T .3 N H 3. 7 1 1 4 3. 2) 2 UL 7 5 1 1 . 9 ILLA 5 16 3 12 .0 6. 4 19 7 H B 3 . .7 . 9 7 . À H 3. . 40 0 86 6 11 P 7 7 1 W 2 2 1. 47 CATCHPIT TO BE MANAGED 20 20 19 S9 (FILL SLOPE) 4 8. 1 2 .7 .9 2 .8 6. .2 12 0. 0. 23 6 0. 2 12 42 5 U-CHANNEL TO AND MAINTAINED34 BY DSD 6290 1. 29 19 .3 4 14 .9 2 .7 7 3.

.1 .4 1 3 21 22 C 3 9. 8 U 9 5 . 4 BE MANAGED 6 2 2 .4 .1 7 4 0 0. 20 4 1 1 6. .1 4. A . I AND MAINTAINED 12 2 66 .8 5 0. 98 3 09 D 12 1.38 9 4 2 2 60 2 . .91 rcase 2. 2 BY MTR 54 817 1 Stai 1 1 20 3 1 0 1 0 3 10 1 4. 166 1 9. 9. .2 5 20 7. 6 . 4 4 7 .. 7 6 7 0 . 6 . 6 82 .0 6. 8. .5 1 .2 4 3136 .6 9 6 23 57 0 3 2 80 32 3 3. 1 18 5 .4 2 4 1 66 14 1 .5 19 2 . 4. 0. .7 6. 2 .9 14 12 24 0 5 6 rcase8. 7 4 7 0 .4 .9 .0 3. 7 . .3 Stai 1 5 5 2 5 1 99 24 1 6 3 20 375 UC 1 1 .9 8. .5 9. 3. 7. 6. 7 41 14 9 375 UC 1 0 2 8 7. . 2 2 4 3 7 6 2 82 1 35 1 5 S 7 . 2 . 25 . 2 2 T1 .8 31 8 .5 1 05 .2 96 5 2. 11 9 .7 1 7 9 24 9 UC .2 1 .

8 6 0 .2 2 . 2 375 0 5 1 91 4. . C 3 4 2 6 .3 7 2 . 5 5 . 6. 29 8 3 2 21 U 21 2 .2 03 88

8. 1. .9 4. 7 2 2 1 5 0 49 85 8 36 6. 6. . 2 2 5 33 97

1 2 2 0 7 . UC 7 .4 1 91 75 .2 27 1 1. 18 2 3 2 6 .2 . 5 2 C 51 5 5. . C 8 5 1 375 8 2 9 U . S 20 5 70 0 00 4 9. UC 21 .1 22 .1 3 7 72 14 1 . 7 .3 7 3 3 2 30 1 . 5 7 1 1 0 0 7 . 6 1 UC 0. . 7. 7 7 10 9 00 U . 3 9 3 53 24 84 C 80 .6 2 3 0

C 9. 3 1

11 2U 2 2 03 3 1 .2 . 1 7 4

5 6 1 C . 9. 1 . 375 5 . U . 6 .8 9 5 50 1 2 2 UC

9 3 2 3 37 2 2 9 7 . 2 7 8 2 48 27 .UC . 1. 2 1 2 . 00 14 32 30 9 1 5 2 3. 113 .0 29 4 .1 .4 0. 27 8 .1 28 6 8 n 74 22 2 2 .2 19 g 1 9 . 1 2 . 2 . 3 3 5 1 E d . 8 3 6 3 3 0 1 5 P .. 89 6 . 8 0 . 3 . 0 3 . 1I 4 4 99 0 6 93 0. 7 . 8 P 0 3 3 31 00

_ 4 3 U C C L 20 1. V P .9 330 24 24 P \ 3 0.. .1 C 2 2 x U 0 6 E 2 0 i 5 8 8 9 37 . . 2 0 15 r 6 9 7 7 2 1. 0 .8 t 2 . 43 3 4 8 a 2 3 2 9 0 0 26 0 6 6 300 0 U M .2 23 .8 .7 .7 UC C

3 5 .2 3 0 6 6 1 e 0 28 .6 4. c .7 6 78 n 7

a 2 n 0 e M t RETAINING WALLS TO BE S3 (ROCK CUT SLOPE) n g i 22 f a .1 MANAGED AND MAINTAINED c M 19 2 t

3 l . 0 9 9

d . p 1 BY MTR5 0 . n

: 4

r 2 2 a 9 u . 3 0 2 4

: 0 o 3 2 3 1 t l . 0 . UNALLOCATED GOVERNMENT LAND 6 5 7 2 1 . . n

o 4 9 9 26

e 3 c 2

- 3 m 3. 0 f 8 .

e 6 1 8 5 d 2 8 g

0 4

p . D 2 a 4

\ 8 / n g 7 a

f 2 0

4 M c . - / \ 7

t

6 6 l

P 3 0 0 E

p S6 (FILL SLOPE AND .4 R \ 1 2 D \ n 9.

P o RETAINING WALL) 6

i 2 \

t 0 K E a 3

T 3 9

t A 0 N

6 . s

\ 3

t

o 4 3 I i r

0 3

u 0 3 c 9 . 0 L h i 3 2 .

\ 0 0 4 M M 4 L . I

\ 42

S D 3 H _ : 0 D . 2

Y 1 0 2 4 6 8 10 A 7 C 2 B

C 3

4 0

\ . T 4

D 5

s 3

\

E 3 d 0 A s T . METRES

r 1 t

N 3 I a M c 3 R 1 : 200 d 0 e . P P j n 30 75 3 o a .6F 1 r t 0 .4 S P Title \ \ D D D D A A C C

\ \ WCH Station To Pedestrian Link Bridge Area A A t K K l H H u N N a C C f Management and Maintenance Matrix \ \ e : : D P P Sheet 4 :

E : : M V E A R M N D A L

N E

T Scale at A1 Date Figure No. E D O L O L I As Shown Jul 2018

P M F PL-04-G In dustr ial Bu ilding

Sitting-out Area

eung Yip Road C H

­»¸­¹D -

¥

C ­

E

N 4.9

I

L

H

C

T

A M

1

- U-CHANNEL TO BE MANAGED FOOTPATH TO BE MANAGED BY TD RAILING TO BE MANAGED AND MAINTAINED BY HyD AND MAINTAINED BY HyD AND MAINTAINED BY DSD

4.48 FOOTPATH TO BE MANAGED AND 4.38 MAINTAINED BY HyD 4.54 4.37 0.21 4.29 4.36 0.23 4.21 4.23 800UC 0.24 4.62 0.25 0.27IL 0.28IL 4.16 4.28 0.29 0.27IL 4.12 4.24 WP 0.32IL 4.09 LB1 4.29 0.36IL 4.17 4.13 4.34 4.82 4.34 4.64 4.17 4.65 LB1 3.88 HB 4.28 4.03 4.01 4.22 4.07 WP 4.69 3.89 4.21 4.63 3.89 4.13 4.14 4.19 5.07 3.97 4.17 WP 4.29 4.11 4.33 WP HB 4.58 4.10 4.24 5.12 4.08 4.15 5.01

4.13 4.30 4.79 5.31 4.58 4.48 5.07 4.27 4.34 4.06 4.11 4.28 5.35 3.98 4.53

4.39 4.28

4.25 5.17 4.50 4.55 4.35

4.09 4.50 4.36 4.58 4.30 4.75

4.42 4.23

4.77 3.99 4.62 4.42 4.13 4.35 4.17 4.84 4.54 5.57 4.244.01 4.29 4.10 4.45 4.25 6.08 4.42 4.28UNALLOCATED 4.57 4.42 6.32 4.56 GOVENMENT LAND 4.53 4.88

7.27 4.35 4.59 4.66 M 4.29 5.34 4.85 5.94 4.15 A 4.47 5.08 4.61 T 3.99 4.47 4.51 C 4.21 4.01 4.16

10.97 4.32 H 7.44 4.48 4.54 5.00 11.91 4.13 4.48 4.02 4.04 10.60 4.33 4.76 8.14 4.08 4.56 4.04 5.10 L 7.24

4.20 I 4.58 4.41 5.12 4.03 4.07 4.10 7.32N 14.07 7.92 E

8.20 4.74 6.11

8.94 B 10.57 3.99 15.48 15.17 12.47 10.28 10.12 4.14 10.92 10.85 -

14.78 4.84

15.88 11.45 B 19.51

300 UC 20 S10 (FILL SLOPE)

UC 300 21.43

SLOPE NO. 11SW-D/F659 n g

d TO BE MANAGED AND . 3

0 MAINTAINED BY ASD FOR SWD _ L P \

x LEGEND: i G r t

a MAINTENANCE RESPONSIBITIES: M

*

e LCSD INCLUDING IRRIGATION c n

a MTR n e

t RCP n g i HYD f a c M t l

7 DSD d p 0 . n : r 2 a u 0

: ASD o t l 6 1 n o e c

- 20.2 m UNALLOCATED GOVERNMENT LAND f 8 e 1 d g 0 p 2 a \ / n g 7 a FOOTPATH TO BE * SOFT LANDSCAPE TO BE MAINTAINED BY LCSD AND f 0 M c /

\ HARD LANDSCAPE TO BE MAINTAINED BY HyD t

6 M&M BY HyD l P 0 E p 30 WATER POINT AND WATER HOSE BOX R \

\ WP n (WHB) FOR IRRIGATION OWNED BY LCSD

P RAILING TO BE o

i 31.6 \ MAINTAINED BY ASD t 0 K a

3 M&M BY DSD T 9 t A 6 s D® \ HB WATER HOSE RAILING t o 3

i G r 0 u c 9 h i

\ LITTER BINS OWNED & MAINTAINED M

L LB1 I \

S BY FEHD D _ : D Block D 2 Y 0 2 4 6 8 10 A 2 B C 4

\ DSD TYPE II RAILING 4 D s \ E SECTION 1 d s T METRES r t N I a GAZETTE BOUNDARY c SCALE 1:200 -

R 1 : 200 d e P j n o a r t

S P Title \ \ D D D D A A C C

\ \ WCH Station To Pedestrian Link Bridge Area A A t K K l H H u N N a C C f Management and Maintenance Matrix \ \ e : : D P P Sheet 3 :

E : : M V E A R M N D A L

N E

T Scale at A1 Date Figure No. E D O L O L I As Shown Jul 2018

P M F PL-03-G South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Figure 3 Locations of the additional ardeid night roosting survey points

January 2019 FIGURES Locations of Viewing Points for Each ￿￿ ￿￿￿￿ ￿￿￿￿￿￿ ￿￿￿￿￿￿ Potential/ Historical Ardeid Roost ￿￿￿￿￿￿￿￿￿￿￿￿ I ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ !( ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ !( ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ !( ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ !( ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ !( ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ !( ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ !( Locations of the Potential/ Historical Ardeid Roosts ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ !( ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ !( ￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿ Potential ardeid movements along the Aberdeen Harbour/ Aberdeen Channel ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

!(

￿￿

￿￿

￿￿

￿￿

￿￿ ￿￿

￿￿ ecology

￿￿ ￿￿

￿￿ arboriculture ￿￿

￿￿ lan dsca pe aec

￿￿

￿￿

￿￿

￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿

￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿

￿￿

￿￿

￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿

￿￿

￿￿

￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿

￿￿

￿￿

￿￿

￿￿

￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿

￿￿ ￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿

￿￿ ￿￿ ￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿

￿￿ ￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿

￿￿ ￿￿

￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿ ￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

￿￿ ￿￿ South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Appendix 1 Photographs of the overall growth performance of the planted vegetation and site condition along the EPLP area

January 2019 APPENDICES South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Photos 1-11 show the latest growth performance of the selected shrub seedlings and whip trees planted in the woodland mix areas.

Photo 1 Photo 2

Ligustrum sinense Psychotria asiatica

Photo 3 Photo 4

Rhaphiolepis indica Rhododendron simsii

Photo 5 Photo 6

Rhodomyrtus tomentosa Aquilaria sinensis

January 2019 APPENDICES South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Photo 7 Photo 8

Bischofia javanica Machilus brevifolia

Photo 9 Photo 10

Reevesia thyrsoidea Schefflera heptaphylla

Photo 11

Sterculia lanceolata

January 2019 APPENDICES South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Photos 12-34 show the latest site condition and growth performance of planted vegetation as inspected on 21st December 2018. (Photos 12-15 for slopes at Zone A; Photos 16-21 for slopes at Zone B; Photos 22-34 show the remaining EPLP areas along the nullah; Photos 22-25 show planted trees at the compensatory planting area for the ardeid roosting site; Photos 26-30 show the planted trees and palms in the remaining part of the EPLP area; Photos 31-32 show the performance of the planted seedlings in the woodland mix areas; Photos 33-34 show the general appearance of the hydromulched slopes).

Photo 12 Photo 13

Photo 14 Photo 15

Photo 16 Photo 17

January 2019 APPENDICES South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Photo 18 Photo 19

Photo 20 Photo 21

Photo 22 Photo 23

Photo 24 Photo 25

January 2019 APPENDICES South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Photo 26 Photo 27

Photo 28 Photo 29

Photo 30 Photo 31

Photo 32 Photo 33

January 2019 APPENDICES South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Photo 34

January 2019 APPENDICES South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Appendix 2 Site photos of the new ardeid night roosts in Aberdeen area

January 2019 APPENDICES South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1)

Photos 35-36 show the new ardeid night roosting site at the north of Ap Lei Chau. Waterbirds were also observed roosting on the roof of yacht repairing industry along the Aberdeen Channel during the additional ardeid survey.

Photo 35 Photo 36

Photo 37

January 2019 APPENDICES