RP20 Volume 9 PEOPLE'S REPUBLIC OF

CHONGQING MUNICIPAL GOVERNMENT THE WORLD BANK Public Disclosure Authorized

l * -v

CHONGQING URBAN ENVIRONMENT PROJECT NEW COMPONENTS

DESIGN REVIEW AND ADVISORY SERVICES Public Disclosure Authorized OVERALL RESETTLEMENT ACTION PLAN

AUGUST 2004 No. 23500321.R4 Public Disclosure Authorized

;8'SOGREAH._ . OI,, .,, I .. ______I

I PEOPLE'S REPUBLIC OF CHINA CHONGQING MUNICIPAL MANAGEMENT OFFICE OF T WORLD BANK'S CAPITAL (eiOGREAH UTILIZATION

CHONGQING URBAN ENVIRONMENT PROJECT NEW COMPONENTS

OVERALL RESETTLEMENT ACTION PLAN

IDENTIFICATION N 23500321.R4

DATE: AUGUST 2004

as part of the World Bank financed has been produced by SOGREAH Consultants Office This document 1) to the Chongqing Municipal Management Chongqing Urban Environment Project (CUEP of the World Bank's capital utilization. the supervision of the Project Director has been prepared by the project team under This document in compliance with ISO9001. following Quality Assurance Procedures of SOGREAH

APPROVED aY AUTHOR CHECKED BY (PROJECT MODIFICATION DATE ~~~~~DIRECTOR) INOEX PURPOSE OF ______

CSJ FCU GDM C Third Issue 05/08/04

1 Chongqing Project Management iiahui(ctadcq.cn Office cmqpmo(acta.cq.cn

2 The World Bank tzearley(aRworldbank.org

SOGREAH (SOGREAH France, alain.queguen(absopreah.fr, 3 qmovs(sogreah.com.cn I SOGREAH China) I I CHONGQING MUNICIPALITY- THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

TABLE OF CONTENTS

EXECUTIVE SUMMARY.1

13A. PROJECT BACKGROUND . B. IMPACTS OF THE PROJECTS.3 .5 C. POLICIES ON RESETTLEMENT COMPENSATION ...... 8 D. HOUSE REBUILDING PLAN ...... E. INCOME REHABILITATION PLAN .10 F. REHABILITATION OF VULNERABLE GROUPS .13 G. BUDGET AND IMPLEMENTATION PLAN .14 15 H. ORGANIZATIONAL ARRANGEMENT. I. PUBLIC CONSULTATION AND DISCLOSURE .17 18 J. COMPLAINTS AND GRIEVANCES .. K. MONITORING AND EVALUATING.18...... 19 L. REVIEW ON THE IMPLEMENTED RESETTLEMENT OF CUEP . ; ...... 21 OBJECTIVE OF THIS RAP AND DEFINITION OF RESETTLEMENT TERMINOLOGY

1 INTRODUCTION .23 ...... ------.-..-- """..--23 1.1 BACKGROUND ...... (CUEP 11)...... 24 1.2 THE CHONGQING URBANISATION & ENVIRONMENT PROJECT 1.3 PROJECTS FOR INCLUSION INCUEP NEW COMPONENTS .28 OF BACHUAN AND HUAIYUAN RIVERS IN 1.3.1 COMPREHENSIVE ENVIRONMENT IMPROVEMENT WORKS COUNTY HEREAFTER). 30 TONGLIANG COUNTY (REFERRED TO AS THE PROJECT INTONGLIANG SECTION) IN DAZU ENVIRONMENT IMPROVEMENT WORKS OF LAIXI RIVER (LONGSHUI 1.3.2 COMPREHENSIVE ...... 30 COUNTY (REFERRED TO AS THE PROJECT INDAZU COUNTY HEREAFTER) IN CHANGSHOU ENVIRONMENT IMPROVEMENT WORKS OF TAOHUAXI RIVER 1.3.3 COMPREHENSIVE .31 (REFERRED TO AS THE PROJECT INCHANGSHOU DISTRICT HEREAFTER) 1.3.4 PROJECT INBISHAN COUNTY (TWO COMPONENTS) .31 ALONG RIVERSIDES INWULONG COUNTY 1.3.5 COMPREHENSIVE ENVIRONMENT IMPROVEMENT PROJECT AS THE PROJECT INWULONG COUNTY HEREAFTER) .32 (REFERRED TO IN TOWNSHIP, JIANGJIN CITY (REFERRED TO AS THE PROJECT 1.3.6 WATER SUPPLY WORKS IN SHUANGFU 32 JIANGJIN CITY HEREAFTER) ...... (REFERRED TO AS THE PROJECT IN BEIBEI 1.3.7 WATER SUPPLY WORKS IN DONGYANG, DISTRICT HEREAFTER) .32 .33 1.4 TYPE AND SIZE OF CUEP NEW COMPONENTS PROJECTS ...... 35 1.5 AREAS BENEFITING FROM AND AFFECTED BY THE PROJECT 35 1.6 SOCIOECONOMIC BACKGROUND OF THE AFFECTED AREAS ...... 36 1.7 MEASURES TO MINIMIZE IMPACT CAUSED BY THE PROJECT

PAGEI SOGREAH CONSULTANTS- 23500321.R4 - AuGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

36 1.7.1 PROJECT PLANNING AND DESIGNING PERIOD ...... 1.7.2 CONSTRUCTION PERIOD ...... 37 ...... 37 1.7.3 LAND ACQUISITION AND RESETTLEMENT ACTION PLAN AND ITS IMPLEMENTATION PERIOD 2 IMPACTS OF THE PROJECT .39 2.1 PERMANENT LAND ACQUISITION AND TEMPORARY LAND OCCUPATION .40 2.2 RESIDENTIAL HOUSES OF AFFECTED PEOPLE .40 2.2.1 HOUSES OF AFFECTED RURAL RESIDENTS .40 2.2.2 HOUSES OF AFFECTED URBAN RESIDENTS .40 2.3 AFFECTED ENTERPRISES.. 4 2.4 AFFECTED INSTITUTIONS.41 2.5 AFFECTED SHOPS.41 2.6 AFFECTED POPULATION.41 2.7 VULNERABLE GROUPS AFFECTED .41 2.8 AFFECTED INFRASTRUCTURE AND GROUND ATTACHMENTS .41 57 3 SOCIO-ECONOMIC SURVEY OF PEOPLE AND UNITS AFFECTED .. 3.1 FUNDAMENTAL FACTS ABOUT THE AFFECTED NATURAL VILLAGES .57 3.2 BASIC FACTS ABOUT AFFECT RURAL FAMILIES FOUND INTHE SURVEY .58 58 3.2.1 NUMBER OF FAMILY MEMBERS ...... 58 3.2.2 AGE STRUCTURE OF THE POPULATION ...... 59 3.2.3 EDUCATION BACKGROUND ...... 59 3.2.4 EMPLOYMENT OF LABORERS ...... 59 3.2.5 ANNUAL FAMILY INCOME AND EXPENDITURE ...... 3.3 BASIC FACTS ABOUT AFFECTED URBAN FAMILIES FOUNDING INTHE SURVEY .59 3.3.1 NUMBER OF FAMILY MEMBERS ...... 59 3.3.2 AGE STRUCTURE OF THE POPULATION ...... 59 3.3.3 EDUCATION BACKGROUND ...... 60 60 3.3.4 EMPLOYMENT OF LABORERS ...... 3.3.5 ANNUAL FAMILY INCOME AND EXPENDITURE ...... 60 3.4 BASIC FACTS ABOUT THE AFFECTED ENTERPRISES FOUND INTHE SURVEY . .60 3.5 BASIC FACTS ABOUT THE AFFECTED INSTITUTIONS FOUND INTHE SURVEY .60 3.6 BASIC FACTS ABOUT THE AFFECTED SHOPS FOUND INTHE SURVEY .60 70 4 LAWS AND POLICY FRAMEWORK .. 4.1 MAIN LAWS AND POLICIES OF RESETTLEMENT .70 4.2 RELEVANT LAWS AND POLICY EXCERPTS FOR RESETTLEMENT .71 4.2.1 RELEVANT LAWS AND POLICY EXCERPTS FOR PERMANENTLY ACQUIRED LAND .71 4.2.2 RELEVANT LAW AND POLICIES ON HOUSE DISMANTLING AND RESETTLEMENT .77 4.3 WORLD BANK OPERATIONAL POLICIES ON INVOLUNTARY RESETTLEMENT . .82 4.4 RESETTLEMENT POLICY OF THE PROJECT .. 83 4.4.1 RESETTLEMENT PRINCIPLES ...... 83 4.4.2 RESETTLEMENT POLICY OF THE PROJECT .85

PAGE ii SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

91 . RATES ...... 5 COMPENSATION 91 HOUSES ...... AND RESETTLEMENT OF URBAN RESIDENTS' 5.1 DEMOLITION 91 RESIDENTS' HOUSES ...... DEMOLITION AND RESETTLEMENT OF RURAL 5.2 91 FOR ENTERPRISES ...... 5.3 RATES OF COMPENSATION 91 5.4 RATES OF COMPENSATION FOR INSTITUTIONS.91...... SHOPS .91 5.5 RATES OF COMPENSATION FOR AFFECTED COLLECTIVE-OWNED LAND .92 5.6 COMPENSATION FOR ACQUISITION OF TEMPORARY LAND OCCUPATION .92 5.7 COMPENSATION FOR 92 AND GROUND ATTACHMENTS. 5.8 COMPENSTION RATES FOR INFRASTRUCTURES 101 .. AND LIVELIHOOD REHABILITATION PLAN 6 PRODUCTION 101 PLAN ...... 6.1 RESETTLEMENT 101 ACQUISITION ...... 6.1.1 REHABILITATION OF PERMANENTLY LAND 102 6.1.2 HOUSE-REBUILDING PLAN ...... 103 INTONGLIANG COUNTY ...... 6.2 PROJECT 104 ACQUISITION ...... 6.2.1 REHABILITATION OF PERMANENT LAND 106 OCCUPATION ...... 6.2.2 REHABILITATION OF TEMPORARY LAND 106 HOUSES ...... 6.2.3 REHABILITATION OF URBAN RESIDENTIAL 107 HOUSES ...... REHABILITATION OF RURAL RESIDENTIAL 109 6.2.4 AND SHOPS ...... 6.2.5 RESETTLEMENT OF ENTERPRISES, INSTITUTIONS 110 GROUPS ...... 6.2.6 REHABILITATION OF AFFECTED VULNERABLE PROJECT IN DAZU COUNTY..111 6.3 11Ill OF PERMANENT LAND ACQUISTION ...... 6.3.1 REHABILITATION ...... 113 6.3.2 REHABILITATION OF TEMPORARY LAND OCCUPATION 113 ...... 6.3.3 RESETTLEMENT OF URBAN RESIDENTS 114 ...... 6.3.4 RESETTLEMENT OF RURAL RESIDENTS 115 ...... 6.3.5 RESETTLEMENT OF AFFECTED ENTERPRISES 115 6.3.6 RESETTLEMENT OF AFFECTED SHOPS ...... GROUPS .116 REHABILITATION OF AFFECTED VULNERABLE 118 6.3.7 AND GROUND ATTACHMENTS ...... REHABILITATION OF AFFECTED INFRASTRUCTURES 6.3.8 . 119 PROJECT IN ...... 6.4 119 ACQUISITION ...... 6.4.1 REHABILITATION OF PERMANENT LAND 121 OCCUPATION ...... 6.4.2 REHABILITATION OF TEMPORARY LAND 121 ...... 6.4.3 RESETTLEMENT OF RURAL RESIDENTS 123 6.4.4 RESETTLEMENT OF ENTERPRISES ...... 123 GROUPS ...... RESETTLEMENT OF AFFECTED VULNERABLE 6.4.5 ...... 124 SUPPLY PROJECT INBISHAN COUNTY 6.5 BICHENG WATER 124 OF PERMANENT LAND ACQUISITION ...... 6.5.1 REHABILITATION ...... 126 65.2 REHABILITATION OF TEMPORARY LAND OCCUPATION 126 GROUPS ...... 6.5.3 REHABILITATION OF AFFECTED VULNERABLE 127 ...... 6.5.4 AFFECTED GROUND ATTACHMENTS 127 RIVER PROJECT IN BISHAN COUNTY ...... 6.6 BINAN 128 LAND ACQUISITION ...... 6.6.1 REHABILITATION OF PERMANENT 130 OF TEMPORARY LAND OCCUPATION ...... 6.6.2 RESTORATIONREHABILITATION 131 ...... 6.6.3 RESETTLEMENT OF RURAL RESIDENTS

PAGEs SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

132 6.6.4 RESETTLEMENT OF ENTERPRISES AND INSTITUTIONS ...... 133 6.6.5 REHABILITATION OF AFFECTED INFRASTRUCTURES AND GROUND ATTACHMENTS ...... 6.6.6 REHABILITATION OF AFFECTED VULNERABLE GROUP ...... 133 6.7 PROJECT INWULONG COUNTY ...... 134 134 6.7.1 REHABILITATION OF PERMANENT LAND ACQUISTION ...... 6.7.2 REHABILITATION OF TEMPORARY LAND OCCUPATION ...... 136 6.7.3 RESETTLEMENT OF URBAN RESIDENTS ...... 136 6.7.4 RESETTLEMENT OF RURAL RESIDENTS ...... 137 6.7.5 RESETTLEMENT OF ENTERPRISES ...... 138 6.7.6 RESETTLEMENT OF SHOPS ...... 138 6.7.7 REHABILITATION OF VULNERABLE GROUPS ...... 139 140 6.7.8 REHABILITATION OF AFFECTED INFRASTRUCTURE AND GROUND ATTACHMENTS ...... 140 6.8 PROJECT INJIANGJIN CITY ...... 6.8.1 REHABILITATION OF PERMANENTLY LAND ACQUISITION ...... 140 6.8.2 REHABILITATION OF TEMPORARY LAND OCCUPATION ...... 142 142 6.8.3 REHABILITATION OF VULNERABLE GROUPS ...... 142 6.8.4 REHABILITATION OF INFRASTUCTURE AND GROUND ATTACHMENTS ...... 143 6.9 PROJECT IN BEIBEIDISTRICT ...... 143...... 6.9.1 REHABILITATION OF PERMANENT LAND OCCUPATION ...... 143 6.9.2 REHABILITATION OF TEMPORARY LAND OCCUPATION ...... 145 145 6.9.3 REHABILITATION OF INFRASTRUCTURE AND GROUND ATTACHMENTS ...... 146 6.10 INTEGRATION WITH HOST RESIDENTS .. 147 7 PUBLIC PARTICIPATION .. 7.1 STRATEGY FOR PUBLIC PARTICIPATION .147 7.2 PUBLIC OPINION SURVEY .148 7.3 PUBLIC PARTICIPATION PROCESS AND OPENNESS OF POLICIES .149

8 PROCEDURE FOR COMPLAINTS .156 157 9 ORGANIZATIONAL ARRANGEMENT .. 9.1 AGENCIES IN CONNECTION WITH RESETTLEMENT ACTION .157 9.2 ORGANIZATIONAL CONSTRUCTIONS AND RESPONSIBILITIES .157 9.2.1 CHONGQING MUNICIPAL LEADING GROUP FOR EXECUTING WB-ASSISTED PROJECTS. 157 9.2.2 CHONGQING PMO ...... 157 158 9.2.3 DISTRICT, COUNTY OR CITY PMO ...... 9.2.4 DISTRICT, COUNTY OR CITY PROJECT OWNER ...... 158 9.2.5 DISTRICT, COUNTY OR CITY RESETTLEMENT-EXECUTING ANGENCY ...... 159 9.2.6 RURAL OR URBAN TOWNSHIP RESETTLEMENT WORKING GROUP ...... 159 9.2.7 VILLAGE COMMITTEE AND VILLAGER GROUP ...... 160 9.2.8 PROJECT DESIGNER ...... 160 9.2.9 INDEPENDENT EXTERNAL MONITORING AND ASSESSMENT AGENCY ...... 160 9.3 ORGANIZATION CHART .. 161 9.4 QUALIFICATIONS AND STAFFING OF AGENCIES .162 9.5 MEASURES TO STRENGTHEN CAPABILITIES OF AGENCIES .163

10 IMPLEMENTATION TIMETABLE .165

PAGE iv SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

...... 165 PROGRESS OF RESETTLEMENT AND PROJECT CONSTRUCTION 10.1 165 ACQUISITION OF LAND ...... 10.2 KEY TASKS TO BE PERFORMED IN PERMANENT 165 DEMOLITION AND RESIDENT RESETTLEMENT ...... 10.3 KEY TASKS TO BE PERFORMED FOR URBAN HOUSE * 166 DEMOLITION AND RESIDENT RESETTLEMENT ...... 10.4 KEY TASKS TO BE PERFORMED FOR RURAL HOUSE 167 OF ENTERPRISES AND INSTITUTIONS . 10.5 KEY TASKS TO BE PERFORMED IN RESETTLEMENT ...... 167 10.6 KEY TASKS TO BE PERFORMED INRELATION OF SHOPS 10.7 KEY RESETTLEMENT TASKS AND TIMETABLE .168 .168 PRINCIPLES FOR MAKING THE RESETTLEMENTTIMETABLE 10.7.1 HOUSE DEMOLITION AND RESETTLEMENT AND 10.7.2 GENERAL PROGRESS SCHEDULE FOR LAND ACQUISITION, RESIDENT RESETTLEMENT .169 171 .. 11 EXPENSES AND BUDGETS 11.1 EXPENSES.171 INVESTMENT PLAN .176 11.2 YEARLY ;176 11.3 SOURCE OF FUND ...... 177 11.4 FUND FLOW AND ALLOCATION PLAN . 11.4.1 FUND FLOW.177 177 11.4.2 ALLOCATION PLAN ...... 12 MONITORING AND EVALUATION .179 12.1 INTERNAL MONITORING..179 12.1.1 EXECUTING PROCEDURE .79 12.1.2 CONTENT OF MONITORING .179 12.1.3 INTERNAL MONITORING REPORT .179 180 .. 12.2 INDEPENDENT EXTERNAL MONITORING 180 12.2.1 EXTERNAL MONITORING AGENCY ...... PROCEDURE AND CONTENT OF MONITORING .181 12.2.2 . 182 12.3 MONITORING AND ASSESSMENT INDICATORS ...... 12.4 POST ASSESSMENT.182

13 ENTITLEMENT MATRIX .183

LIST OF APPENDICES

APPENDIX 1: LIST OF PROJECT IMPACTS IN THE FOR LAND ACQUISITION AND RESETTLEMENT APPENDIX 2: STANDARDS OF COMPENSATION AFFECTED DISTRICTS, COUNTIES AND CITIES FOR LAND ACQUISITION AND RESETTLEMENT APPENDIX 3: LIST OF BUDGETS PROPOSED PROJECT COMPONENTS APPENDIX 4: GENERAL LAYOUT OF MONITORING AND EVALUATION ON RESETTLEMENT APPENDIX 5: OUTLINE OF INDEPENDENT

PAGE v SOGREAH CONSULTANTS-23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

LIST OF TABLES

3 ENTERPRISES AND SHOPS ...... TABLE I LIST OF AFFECTED POPULATION, HOUSEHOLDS, INSTITUTES,

...... -4 TABLE 2 SCOPE OF LAND ACQUISITION

...... ,, 4 TABLE 3 SCOPE OF HOUSE DEMOLITION OF CUEP LOAN SAVING PROJECTS

...... 6 TABLE 4 RATE OF COMPENSATION FOR PERMANENT ACQUISITION OF LAND

...... 7 TABLE 5 COMPENSATION RATE FOR URBAN RESIDENTIAL HOUSES DEMOLITION

...... 7 TABLE 6 COMPENSATION RATE FOR RURAL RESIDENTIAL HOUSES DEMOLITION 11 TABLE 7 ANALYSIS OF IMPACT BY LAND ACQUISITION ...... 15 TABLE8 BUDGET FOR IMPLEMENTING THE RESETTLEMENT PLAN ......

. .1 6 TABLE 9 EXECUTING AGENCIES FOR EACH PROJECT ...... 19 TABLE 10 IMPACTS AND BUDGET OF CUEP ......

BY CUEP) ...... 25 TABLE 1-1 SUMMARY OF PROJECTS WITHIN CUEP Il (SOME PARTLY FINANCED

(AS OF JULY 2003) ...... 28 TABLE 1.2 INITIAL LIST OF COMPONENTS TO BE FINANCED FROM THE LOAN SAVINGS

SAVINGS ...... 29 TABLE 1-3 REVISED LIST OF COMPONENTS TO BE FINANCED FROM THE LOAN

OF 2004) ...... 29 TABLE 1i4 LIST OF COMPONENTS TO BE FINANCED FROM THE LOAN SAVINGS (AS 33 TABLE 1-5 TYPE AND SIZE OF CUEP NEw COMPONENTS PROJECTS ......

IN2002 ...... 35 TABLE 1-6 FUNDAMENTAL SOCIOECONOMIC DATA OF THE PROJECT AREA 42 TABLE 21 PERMANENT LAND ACQUISITION ...... 44 TABLE 2.2 TEMPORARY LAND OCCUPATION ......

...... 45 TABLE 2.3 AFFECTED RURAL RESIDENTIAL HOUSES AND THEIR ATTACHMENTS

...... 45 TABLE 2-4 AFFECTED URBAN RESIDENTIAL HOUSES AND THEIR ATTACHMENTS ...... - - .- 46...... ------46 TABLE 2-5 FACTS ABOUT AFFECTED ENTERPRISES ...... 48 TABLE 2-6 FACTS ABOUT AFFECT INSTITUTIONS ...... 48...... -.--48 TABLE 2-7 FACTS ABOUT AFFECTED SHOPS ...... 52 TABLE 2-8 LIST OF AFFECTED POPULATION ......

...... 54 TABLE 2-9 VULNERABLE GROUP OF PEOPLE AFFECTED BY THE PROJECT

PAGE vi SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

55 AND PUBLIC FACILITIES ...... TABLE 2-10 AFFECTED GROUND ATTACHMENTS ...... 57 TO BE AFFECTED BY LAND ACQUISITION ...... TABLE 3-1 BASIC FACTS ABOUT THE VILLAGES 61 1 EAFFECTED RURAL FAMILIES ...... * 3-2 TABBASIC FACTS ABOUTL 64 OF AFFECTED RURAL FAMILIES ...... TABLE 3-3 ANNUAL INCOME AND EXPENDITURE 65 URBAN FAMILIES ...... TABLE 3-4 BASIC FACTS ABOUT AFFECTED 65 OF AFFECTED URBAN FAMILIES . TABLE 3.5 ANNUAL INCOME AND EXPENDITURE

TABLE 3-6 BASIC FACTS ABOUT THE AFFECTED ENTERPRISES.66 67-- TABLE 3-7 BASIC FACTS ABOUT THE AFFECTED INSTITUTIONS.- .-. . . . .67 SHOPS. -. - . - - TABLE 3.8 BASIC FACTS ABOUT THE AFFECTED 92 RESIDENTS' HOUSES AND ATTACHMENTS. DEMOLITION AND RESETTLEMENT OF URBAN TABLE 5-1 RATES OF COMPENSATION FOR AND ATTACHMENTS .93 AND RESETTLEMENT OF RURAL RESIDENTS' HOUSES TABLE 5-2 COMPENSATION RATES FOR DEMOLITION 93 RESETTLEMENT OF ENTERPRISES . TABLE 5-3 RATES OF COMPENSATION FOR

OF INSTrTUTIONS .94 TABLE 5-4 COMPENSATION RATESS FOR RESETTLEMENT 95 SHOPS . TABLE 5-5 COMPENSATIONRATES OFFOR AFFECTED 95 IN THE PAST THREE YEARS . TABLE 5-6 AVERAGE ANNUAL OUTPUT VALUES

LAND ACQUISITION .97 TABLE 5-7 RATES OF COMPENSATION FOR PERMANENT 99 USE OF LAND ...... TABLE 5-8 RATES OF COMPENSATION FOR TEMPORARY AND INFRASTRUCTURES AFFECTED BY THE PROJECT FOR VARIOUS TYPES OF GROUND ATTACHMENTS TABLE 5-9 RATES OF COMPENSATION ...... 99 ...... 104 VILLAGES ...... TABLE 6-1 IMPACT OF LAND ACQUISITION ON THE AFFECTED THE DEVELOPMENT ZONES ...... 106 NEW CITY CONSTRUCTION AND ENTERPRISES IN TABLE 6.2 JOB OPPORTUNMES CREATED BY ...... 108 HOUSE BUILDINGS AND SECOND-HAND HOUSES TABLE 6-3 DISTRIBUTION OF NEW COMMERCIAL 109 AND INSTITUTIONS ...... TABLE 6-4 RESETTLEMENT OF AFFECTED ENTERPRISES 110 TABLE 6-5 RESETTLEMENT OF SHOPS ...... 110 TABLE 6-6 SURVEY OF VULNERABLE GROUPS ...... , .111 LAND ACQUISITION ...... TABLE 6-7 ANALYSIS OF IMPACT CAUSED BY

.113 TABLE 6-8 STATISTICS OF VILLAGE ENTERPRISES 113 AFFECTED HOUSES..... TABLE 6-9 STATISTICS OF SPACE DISTRIBUTION OF

TABLE 6-10 DISTRIBUTION OF RESETTLEMENT HOUSES.,114

PAGE vii 2Q04 SOGREAHi CONSULTANTS- 23500321 R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

115 TABLE 6.11 RESETTLEMENT OF AFFECTED ENTERPRISES ...... 116.1 TABLE 6.12 INFORMATION ABOUT SHOP MARKET INLONGSHUI TOWNSHIP ...... 117 TABLE 6-13 STATUS QUO OF VULNERABLE GROUPS AFFECTED BY THE PROJECT ...... 119 TABLE 6-14 ANALYSIS OF IMPACT CAUSED BY LAND ACQUISITION ...... 121 TABLE 6-15 JOB OPPORTUNITIES CREATED BY NEW CITY CONSTRUCTION AND ENTERPRISES INTHE DEVELOPMENT ZONES ...... 122 TABLE 6-16 DISTRIBUTION OF NEW COMMERCIAL HOUSE BUILDINGS AND SECOND-HAND HOUSES ...... 123 TABLE 6.17 CONDITIONS OF AFFECTED VULNERABLE GROUP'S FAMILIES ...... 124 TABLE 6.18 ANALYSIS OF IMPACT CAUSED BY LAND ACQUISITION ...... 128 TABLE 6-19 ANALYSIS OF IMPACT CAUSED BY PERMANENT ACQUISITION OF LAND ...... IN THE TABLE 6-20 FORECAST OF POSSIBLE JOB OPPORTUNITIES PROVIDED BY NEW URBAN AREA CONSTRUCTION AND ENTERPRISES 130 DEVELOPMENT ZONES ...... 132...... 132 TABLE 6-21 DISTRIBUTION OF SUPPLY OF HOUSES FOR RESETTLEMENT ...... 133 TABLE 6-22 BASIC FACTS ABOUT THE AFFECTED ENTERPRISES, INSTITUTIONS AND SHOPS ...... 134 TABLE 6-23 BASIC FACTS ABOUT THE AFFECTED VULNERABLE GROUP ...... 134 TABLE 6-24 ANALYSIS OF IMPACT CAUSED BY LAND ACQUISITION ...... 137 TABLE 6-25 AVAILABILITY OF RESETTLEMENT HOUSES ...... 138 TABLE 6-26 RESETTLEMENT OF ENTERPRISES ...... 139 TABLE 6 27 BASIC FACTS ABOUT VULNERABLE GROUPS ...... 140 TABLE 6-28 IMPACT OF LAND ACQUISITION ...... 143 TABLE 6-29 ANALYSIS OF IMPACT CAUSED BY LAND ACQUISITION ...... 144 TABLE 6-30 BASIC FACTS ABOUT ENTERPRISES ...... 149 TABLE 7-1 SURVEY OF PUBLIC OPINIONS AND PSYCHOLOGICAL REACTIONS ...... 150 TABLE 7-2 PROCESS OF ENSURING AFFECTED PEOPLE' PARTICIPATION ...... TABLE 7-37 POLICYP Y OPENNESSO ASSURINGA PROCESS.153...... I...... P153 162 TABLE 9-1 STAFFING OF AGENCIES INVOLVED INPROJECT EXECUTION AND RESETTLEMENT ., 170 TABLE 10-1 SCHEDULE OF IMPLEMENTATION ...... 172 TABLE 11-1 PLANNED OVERALL BUDGET FOR RESETTLEMENT ...... 176 TABLE 11-2 YEARLY INVESTMENT PLAN ......

vlii SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 PAGE CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

ABBREVIATIONS a 5

Affected Persons APs Chongqing Municipal Leading Group CMLG Monitoring and evaluation M&E Project Management Office PMO Station PS Pumping Resettlement Action Plan RAP Water Pumping Station RWPS Raw River Embankment RE Village Committees VCs Villager Groups VGs World Bank WB Wastewater Treatment Plant WVVTP Wastewater Network WWN Water Supply Treatment Plant WSTP Water Supply Network WSN

Notes

Currency Unit -Yuan(Y) Y1O00 = $ 0.125 $1.00 = Y 8.00

1 Ha= 15 Mu

PAGE ix SOGREAH CONSUL1ANTS- 23500321 R4 - AUGUST2004 I

I

-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ - THE WORLD BANK CHONGOING MUNICIPALITY ENVIRONMENT PROJECT CHONGQING URBAN RESETTLEMENT ACTION PLAN

EXECUTIVE SUMMARY

A. PROJECT BACKGROUND municipality, the municipalof economic and social development of Chongqifg of increasing the ratio With the national fully realized the importance of Chongqing has and improvement of the people's government of urban infrastructure speeding up the construction in a sustainable urbanization and national economy in Chongqing spur the development of the people and environment. In order to the living environment of economic growth rate, improve benefit from the manner, increase the of the whole society can which the various groups a series of specific enlarge the extent to municipality has selected government of Chongqing of districts, cities improvement, the people's projects in a number and infrastructure construction In 2001, the improvement amount of funds to them. environment and has input a huge for urban counties within its territory from the World Bank and a loan of US$200 million social government obtained infrastructure function and municipal move to perfect Chongqing's For the construction in a the urbanization process. environment rural townships and promote source of facilities in urban and of works, changes in the livelihood and reduced volume to 70 of reduced number of subprojects budget, there will be a US$60 reasons funds than the investment smaller amount of bidding has decided to continue.using funds and and the municipal government of the World Bank loan infrastructure in Chongqing. million saving environment facilities and saved sum of money for constructing this improvement consists of five environment Saving Loan Project improvement of Chongqing Urban Environment Comprehensive environment supply projects. They are: improvement of projects and three water Comprehensive environment Rivers in Tongliang County; improvement of Bachuan and Huaiyuan Comprehensive environment section) in Dazu County; Project in Bishan Laixi River (Longshui District; Urban Water Supply section) in Changshou in Bishan County; Taohuaxi River (Longshui Project of Binan River Environment Improvement Water supply County; Comprehensive Project in Wulong County; Environment Improvement Township, Riverside Supply Project in Dongyang Comprehensive Ji.angjin City and Water project in Shuangfu Township, as shown in Fig. 1. of these eight projects are Beibei District. The locations the burden of pollution plants is helpful to mitigate of these sewage treatment the residents' living The construction environment, and improve improve the ecological solve the problem of caused by sewage, water plants is helpful to the construction of these of these conditions and quality, while livelihood. The construction production and domestic only the flood- water supply for industrial is helpful to improve not improvement projects but also improve comprehensive environment the riverside area from flood, riverbanks and protect as well as the containing capability of the and living environment urban natural environment the city, urban road transportation, are helpful to beautify the speaking, these projects in the of the city. Generally economic development overall functions and investment, spur the the environment for tourism process. improve and quicken the urbanization districts, counties and cities involved living in an benefit to 1.5 million people will bring about direct sustainable construction of these projects will promote the The The success of these projects of 1,329 square kilometers. area in the project area of society and economy development 2006. from October 2004 to October in a period of 24 months These projects will be constructed

PGPAGE 1 .R4- AUGUST2004 SOGREAH CONSULTANTS -23500321 BANK CHONGQING MUNICIPALITY - THE WORLD PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

CUEP 1 LOAN SAVINGS Location map

Improvement River and Huaiyuan River Environment 1 Tongliang County Bachuan Improvement 2 Dazu County Laixi River Environment River Environment Improvement 3 Changshou DistrictTaohua and Flood Protection Construction 4 Bund Road Improvement 5 Bishan County Binan River Environment Water Supply 6 Bishan County Bicheng Town Water Supply 7 Beibei District Dongyang Town Water Supply s Jiangjin City Shuangfu Town

+N n Chang

a River Embarkment A WasteWaterTreatmentPlant X Sewage Network + Water Supply km 0 50 100 Chongqing Metropolitan Area

projects in Chongqing Fig. 1. Locations of CUEP loan saving

PAGE 2 .R4 - AUGUST2004 SOGREAH CONSULTANTS-23500321 WORLD BANK CHONGOING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

B. IMPACTS OF THE PROJECTS will permanently acquire land house demolition, this project of 7 acquisition (or occupation) and 2 46 villages in 8 rural townships By land areas of 42514.2M , affecting in 122 of 1595.8mu, demolish house of which 420 people totaling 4,525 people in 1,146 households, taken by the counties (cities or districts) and house demolition. As the land will be affected both by land acquisition of land acquisition is households shaped in narrow strips, the impact environment projects is mostly rate is only 32%. In addition, urban rate of 3% and the highest impact mainly limited with an average impact of the resettled people comes survey, the major income impact on the according to the socioeconomic acquisition will not cause a major sources. Therefore, land of affected population, from non-agricultural production. See Table 1 for a list persons' income form agricultural resettled and shops. households, institutes, enterprises, AND SHOPS HOUSEHOLDS, INSTITUTES, ENTERPRISES TABLE I LIST OF AFFECTED POPULATION, Water in Project supply Binan Project in Project Project in Project in Project in Jiangjin inBeibei Total project in River Wulong Tongliang Dazu Changshou City Distrct Type of impact Bishan project County County County Distnct County 14 890 194 200 39 134 69 68 Households 172 604 126 50 3142 277 210 700 Persons 693 482 Permanent 1963 force 544 19 24 acquisition of land Labor 194 54 483 reseftlement 308 337 15 40 5 190 54 23 15 17 21 153 14 665 Temporary Affected households 86 41 47 55 87 182 66 occupation of land Persons 1 0 0 60 0 0 Affected households 5 Demolition of 6 0 0 330 of urban 0 0 houses 26 298 0 0 122 residents Persons 0 30 4 13 19 56 of Affected households Demolition 12 0 0 420 of rural 189 0 100 houses Persons 57 62 0 15 residents 6 3 0 2 3 0 0 138 Enterpnse 1 31 28 0 Affected 38 0 0 Persons 41 3 enterpnses 0 0 0 0 0 2 Institution 1 0 0 70 .___ 70 0 0 Affected institubions 0 0 0 Persons 0 0 0 38 0 2 2 34 0 0 0 180 Shops 0 12 4 164 0 shops Persons 19 1268 Affected 239 220 79 234 179 91 Affected households 207 0 0 56 0 8 5 4 36 3 279 64 4945 Shops 296 942 709 876 1131 648 Total Persons 544 19 24 1963 Labor force 194 54 483 resettlement 308 337 Households affecied 0 122 30 4 0 19 56 0 acquisitbon and house 13 Of which demolition by 12 0 0 420 Persons affected 189 0 100 land acquisition 57 62 both 19 1148 and house demolition 209 216 79 194 215 123 91 Total number of ARecied householdc and households 279 94 4525 29 842 697 819 1069 459 pers actaually A ected persons

PAGE 3 .R4 - AUGUST2004 SOGREAH CONSUL7ANTS- 23500321 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

or districts) to be affected by these of 8 rural townships of 7 counties (cities In the 46 villages of which 1,149.3 mu is collective- 1,595.8 mu of land permanently acquired, projects, altogether land and 55 mu of land to 1048.5 mu of farmland), 391.5 mu is state-owned owned land (including will be temporarily occupied, construction, and a total of 366:8 mu of land be used by enterprises for 3,142 people in 890 The permanent acquisition of land will affect including 189.4 mu of farmland. See Table 2 will affect 665 people in 190 households. households and temporary land occupation for the scope of permanent land acquisition.

TABLE 2 SCOPE OF LAND ACQUISITION State Rural land type Enterprise Riverside oro ownedwe location Total institute land S/N Project rlkl~~~~~~~~~~~~~~~~~~at Garden Fishpond Nursery shallow Waste Subtotal Farmland Forest land land ______~~~~~land 0.0 0.0 54.5 3.4 2.2 0.0 0.0 1 Tongliang County 221.3 221.3 161.3 0.0 0.0 0.0 0,0 125.4 125.4 0.0 0.0 0.0 2 Dazu County 125.4 41.7 0.8 0.0 0.0 0.0 14.5 243.7 187.6 186.8 0.0 0.0 3 Changshou Dist. 0.0 2.5 0.0 37.0 34.6 0.0 0.0 0.0 0.0 4 Bishan County 37.0 39.2 160.3 0.0 0.0 15.5 0.0 8.1 0.0 5 Binan River 537.0 337.6 314.0 0.0 0.0 3.0 8.0 1.3 186.3 County 395.8 208.2 197.2 0.0 0.0 6 Wulong 0.0 0.0 0.0 0.0 0.0 3.0 0.0 7 Jiangjin City 12.4 12.4 9.4 0.0 0.0 3.3 19.9 0.0 0.0 0.0 0.0 8 Beibei Dist. 23.2 19.9 391.5 3.4 18.5 3.0 11.1 10.5 54.9 Total 1595.8 1149.3 1048.5 54.5 rural households and 66 urban families, 18 house demolition, the project will affect 122 By a total area of 42,514.2m2 and 1,138 people in enterprises and institutions and 38 shops involving 2 rural Wulong only, and this includes 16,283.1m Tongliang, Dazu, Changshou, Bishan and 2 2 of urban residences accounting for 27%, 12,800.2m residences accounting for 30%, 11,288.9m of the for 30%, 2,142m2 of shops, accounting for 5% of enterprise or institution houses, accounting for 51%, 21,724.8m2 of brick+concrete structures, accounting total; arid the affected houses include 2 structures, 2 for 32%, 1,632.8m of earth+wood 13,444.8m of brick+wood structures, accounting 2 accounting for 13% of the total floor space. accounting for 4%, and 5,711.8m of simple structures, in constructing the projects. See Table 3 for the impact of house demolition PROJECTS TABLE 3 SCOPE OF HOUSE DEMOLrTION OF CUEP LOAN SAVING Binan River Wulong Total Structure Tongliang Dazu Changshou Project 1654.4 790.0 8684.4 Brick+concrete 1108.8 840.9 4290.4 447.9 0.0 4839.2 2 574.1 469.2 3348.0 821.2 Rurae( r ) Brick+wood 0.0 0.0 541.2 280.0 Rural residence (m ) Earth+wood 1550.0 0.0 1938.3 Simple 31.2 53.5 303.5 380.0 4084.4 314.6 3389.7 Birck+concrete 5709.9 2 Brick+wood 249.2 5460.7 Urban residence (M) 1494.6 Simple 1494.6 1360.0 7981.3 177.3 6444.0 Birck+concrete 0.0 2287.4 48.2 1867.2 372.0 Enterprise or Brick+wood houses 0.0 685.0 811.5 institution2 Earth+wood 126.5 (m) 1720.0 0.0 1720.0 Simple 974.7 165.6 809.2 Birck+concrete 608.4 2 Brick+wood 203.6 404.8 Shop (M) 558.9 Simple 26.2 532.7 3495.0 42514.2 2898.7 15449.1 7941.9 12729.5 Total

PAGE 4 2004 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST WORLD BANK CHONGQING MUNICIPALITY - THE PROJECT CHONGOING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

the vulnerable projects include 124 people of the people affected by these 17 are urban In addition, 36 are rural households and in 53 households, of which attachments and public group will affect 33 types of ground households. The project package facilities.

COMPENSATION C. POLICIES ON RESETTLEMENT on the Land Administration for these projects are based policies applied to the resettlement for Urban Residence Demolition The Land Administration in Provisions Law of the PRC, Regulations on No. 53 by Chongqing Municipal Municipality (issued in Ordinance in and Relocation in Chongqing for Land Acquisition 1999) and Measures for Compensation on Government on March Municipal People's Government People's No. 55 by Chongqing or city Chongqing (issued in Ordinance by the local district, county and regulations promulgated September 1999) laws resettlement. policies regarding involuntary governments and World Bank

The major policy principles are: resettlement to a minimum; reduce the negative impact of 1) Measures are acquired to persons' living can improve the resettled and resettlement plans made 2) Compensation level; or at least restore them to the previous standards in the them chance to fully participate adequately consulted to give 3) The resettled persons are the resettlement plan; making and implementation of for at the replacement cost; affected properties are compensated 4) All the and the losses before land acquisition paid all the compensation for 5) The displace persons are house demolition.

implemented: The following polices are to be acquisition of land (1) Compensation for permanent losses shall be reasonably compensated. land is acquired, all the resettlement When the rural collective-owned include the land compensation, for acquiring farmland shall farmland, The compensation and crops. In the case of acquiring compensation for ground attachments times as much as the subsidy and be paid at the rate of 10 to 30 resettlement compensation shall of acquiring garden land, land and past three years; in the case yield of the farmland in the times as much as the average annual shall be paid at the rate of 1.2 land and resettlement compensation the land and resettlement the in the case of acquiring ftshponds, compensation rate for farmland; the compensation rate for farmiand the rate of 1.3 times as much as be compensation shall be paid at and resettlement subsidy shall non-farmland, the land compensation state- in the case of acquiring farmland; in the case of acquiring the rate of compensation for the case of paid at the rate of 1/2 of for the crops on it only. In land, compensation is made land price. owned riverside.shallow shall be made at the evaluated or institution's land, compensation acquiring enterprise for permanent acquisition of land. See Table 4 for the rate of compensation

PAGE 5 .R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

ACQUISITION OF LAND TABLE 4 RATE OF COMPENSATION FOR PERMANENT Sum total of land compensation, Rural or subsidy and crop Sum total of tax and fees Land type Village Group resettlement Project urban compensation township 31000 12315 Farmland 37680 2377 Garden 10334 2103 Bachuan Forest Tongliang 40300 12315 ______Fishpond 22650 26634 Farmland Mingguang 35025 26981 Farmland Xmngguang 42000 27176 Longshui Farmland Yongyi Dazu 22650 26634 Farmland Longdong 22650 26634 Farmland Yujian 29000 12295 Farmland 37750 12439 C.angshouDuzhou Fishpond 22400 3 39875 Farmland 6860 3 19338 Wasteland Huangjiao 22439 5 43700 Bicheng Farmland Bishan 33143 22333 Farmland Wuli 6 15972 6826 Wasteland 6 36050 14296 Farmland 46705 14473 Fishpond Binan River Bicheng 18025 2180 Riverside

_____ shallow land ______46000 12465 Farmland 23000 2230 Wasteland Wulong Xiangkou 1000 Riverside shallow land 22264 Hailuo 2 26384 22264 Taping 8 26384 22264 Jiangjin Shuangfu Farmland Gaohu 1 26384 22264 Luopan 6 26384 30850 64457 Farmland Jingtan 6415 Beibei Dongyang Dongyang 23200

temporary land occupation (2) Policies regarding compensation for following manner: one growing land occupation shall be made in the Compensation for temporary less than one growing if the temporary land occupation lasts season's crop compensation is made lasts is made if the temporary land occupation growing seasons' crop compensation season, or 2.5 land occupation lasts for half a year. year's yield of land is paid if the temporary for one year or one be not less than the loss incurred be paid directly to the farmers and shall The compensation shall responsibility of the project of land temporally taken shall be the to the farmers. The re-cultivation persons after an land is handed over to the affected construction unit and the re-cultivated leadership. acceptance inspection by the village

PAGE 6 2004 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST WORLD BANK CHONGQING MUNICIPALITY - THE PROJECT CHONGOING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

for urban residential houses demolition (3) Policies regarding compensation the estimated market demolition compensation at families shall receive house price. They shall at the The urban residents' equivalent to the replacement land price), which shall be and transition allowance, price (including for demolished house attachments in the time receive the compensation rates implemented same See Table 5 for a list of compensation movement allowance and bounty. affected localities. URBAN RESIDENTIAL HOUSES DEMOLITION TABLE 5 COMPENSATION RATE FOR Unit: RMB/unit

land price) (RMB/m2) House compensation (including structure location structure Simple Project Brick+ concrete structure Brick+wood 400 350 Tongliang County 276 341 310 County Dazu 450 Wulong County for rural residential houses demolition (4) Policies regarding compensation the estimated market demolition compensation at families shall receive house of house sites shall be The rural residents' replacement price. The loss shall be equivalent to the price. They shall at the price, which 2 person at the actual local land for at the rate of 3Dm per and transition allowance, compensated for demolished house attachments in the time receive the compensation rates implemented same See Table 6 for a list of compensation movement allowance and bounty. affected localities. RURAL RESIDENTIAL HOUSES DEMOLITION TABLE 6 COMPENSATION RATE FOR Unit: RMB/unit

4 compensation (RMB/m ) House 2) Simple Land price (RMB/m Project location Brick+wood Earth+wood Brick+concrete structure structure structure structure. . 55 180 206 . 115 Tongliang County 220 70 226 205 300 Dazu County - 50 190 300 Changshou District 215 60 220 150 150 Project 270 - Binan River - 180 Wulong County 270 institutions for affected enterprises and (5) Policies regarding compensation for demolished houses and shall receive compensation enterprises and institutions facility compensation, financial The affected and at the same time receive land at the replacement price allowances. After receiving acquired of operation) and relocation their subsides (for loss due to discontinuation may choose to rebuild the affected enterprise or institutions used, or the monetary compensation, renovate existing houses not location, at another location, houses at the back of original not to rebuild.

PAGE 7 - AUGUST2004 SOGREAH CONSULTANTS- 23500321.R4 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

affected shops (6) Policies regarding compensation for price for loss of land and houses at the replacement The shop owners shall receive compensations resettlement allowances. facility compensation, financial subsides and and at the same time receive choose to purchase shops. Temporary the monetary compensations, they may After receiving construction of the project shall also be compensated discontinuation of operation of shops during for. be made ground attachments and sparse trees shall (7) Compensation for affected public facilities, at the replacement price. for at not demolished in time shall be compensated (8) Illegal buildings and temporary structures the replacement price for buildings.

D. HOUSE REBUILDING PLAN and households, 122 rural households, 18 enterprises The house-rebuilding plan involves 66 urban institutions, and 38 shops. houses (1) Rehabilitation of urban and rural residential 2 residences, and relocation of 11,288.9m of urban projects will cause the demolition 2 420 persons These and 16,283.1m of rural residences, affecting affecting 330 persons in 66 households price, the affected persons After receiving the compensation at the replacement in 122 households. resettlement apartments, new commercial choose to purchase cheap uniformly constructed to build their may In addition, the rural residents may choose apartments or second-hand apartments. own houses. houses at the compensation price cheap resettlement houses may buy such of Those who purchase Tongliang County) per person. For limitation the space standard of 18 m2 (17m2 in cost if it and at at a rate 50% as much as the construction design, the excessive space is to be purchased than the space of the if the space is in excess of 5m2 but less is not more than 5m2 and (construction cost plus land price). may be purchased at the combination price demolished house, it to be purchased at the market price of a the space of the demolished house is in Any part exceeding facilities such as water and ground leveling house. The demolisher shall construct houses. commercial supplies shall be constructed in the resettled the resettlement area; water and power houses in the affected compensation and purchase commercial Those who choose monetary 18m2 (17m2 in Tongliang County) per exempted from the tax derived from the localities may be to buy commercial apartments, resettlement space standard. For those who cannot afford after they person government shall provide cheap rent houses houses or second-hand houses, the local have received the compensation. themselves shall be provided with sites who choose to build their own houses by Rural residents per-capita space standard. They shall build of charge by the local government at the average free the village or township. such houses according to the plan made by

PAGE 8 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 R4 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

and cable TV gas supplies, transportation, communications Facilities such as water, power and commercial residential centers. in the resettlement areas and be systems shall be constructed hospitals and other facilities shall banks, food markets, bus stops, may Schools, post offices, the residents. The resettled persons around the residential area to convenience These houses constructed the residential area at their own will. apartments of different grades in 1980s) in quality, choose to buy of which were built in the 1970s to better than their former houses (most old houses left by are much The second-hand houses are mostly environment and accessibility. location, quality and structure, better than their former houses in and institutions and are also provided with cheap-rent the enterprises suffering domestic poverty shall be structure. Part of the vulnerable group houses by the government. (2) Affected enterprises one operates of which two are no longer in production, projects will affect 15 enterprises, land acquisition only, six These Three enterprises are affected by and one is not running well. Enterprises whose land is seasonally rest are to be partly demolished. be completely relocated and the those to be completely are to at the estimated land price, while acquired will receive land compensation land and buildings, choose to receiving the compensation for construction relocated may, after new urban areas. As the transportation, the local industrial parks or planned will have better move into are uniformly planned, such enterprises supplementary facilities and environment of such enterprises during the before. The'income loss of the employees to operating conditions than to be partly demolished may choose will be compensated for. Enterprises transition period for other purposes. rebuild their houses or use the compensation (3) Affected institutions two whose old offices are to be will affect three institutions including The The proposed projects and will receive house compensation. These two institutions have new offices demolished. rebuild backwards. Shuren College partly demolished will

(4) Affected shops demolished and relocated and 34 shops of which 36 are to be completely of The projects will affect 38 all on the ground floor of the building in Dazu County. These shops are will not be of them are located living area. Two shops in Wulong County the second floor serves as the domestic of the project. which be temporarily affected during construction demolished and only their operation will families will receive compensation at are all run by the families and these in The 36 affected shops shops of a similar floor space and structure price with which they can purchase operation or use the the displacement choose to purchase shops to continue similar locations. The shop owners may compensation for other investments. The tenants can be resettled in in Wulong County are operated on rent. as The two affected shops the tenants houses that can be rented in the first place, the demolisher provides and arrange new two ways: rate and helps them look for 2 shops of similar location and rent RMB15/m . The shops including a movement allowance at the rate of houses. The tenants shall receive second place, the tenants production compensation for loss of rent. In the owners of both shops shall receive due to discontinuation of operation for loss of income (including wages) be paid a shall be compensated the owners of the two shops shall period of temporary impact and can be calculated during the rate of RMB20,000 per year, which compensation for loss of rent at the according to the actual duration of impact.

PAGE 9 R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT REsETTLEMENT ACTION PLAN

E. INCOME REHABILITATION PLAN from land accounts for shows that, for the affected farmers, the income The socioeconomic survey from non-agricultural activities, total income and the majority of income comes 13-40% of their as migrant laborers in the city constitute for more than 60%. Wages earned by working As accounting accounting for more than 43% of the total amount. the major source of non-agricultural income, of the farmers will are mostly built on narrow strips of land, most the urban environment projects caused by land acquisition is completely acquired. The average rate of impact not have their land acquisition will bring about no major the highest rate of impact is 32%. Therefore, land 3% and Table 7 for detail. impact on the income of the affected persons. See

PAGE 10 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 VVURLWJ bAItA CI-HONGOING MUNICIPALITY - I HE PROJECT CHONGOING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

LAND ACQUISITION TABLE 7 ANALYSIS OF IMPACT BY Percentage of Pretg fwg Per-capita Rate of Before land acquisition agrculura Araolnd space of impatcbeNetpe-ceita income innon- er~pt imPad bY Net Per-CaPIa agriculal Rural or farmland income in total agricultural income Village Population BefOre lal d a after lan land income Project location urban Farmland space of acquired (mu) township icm farmland ~~~acquisition acquisition 1.9% 2906 0.87 29.8 0.86 62.6% Ludong 1796 1568 20.5% 2964 34Q2% 0.33 66.1 0.26 34.2% 62.6% Yandu 987 323 0.46 3.1% 2960 1650 0.48 50.5 BaChUan TiYUjie 3446 3.6% 2913 TOngliang COUntY 0.70 68.5 0.68 Yueyang 2712 1900 2.6% 3250 0.77 56.8 0.75 M;n99Uan9 2867 2208 2857 12.5 0.50 0.8% 60.0% 2994 1497 . 0.5 3300 26.0% Xin99Uan9 18.0 0.39 2.3% 1967 787 0.4 2868 Longshui YOn9Yi 25.1 0.92 1.0% Dazu County 2652 2440 0.92 Yujian 0.92 0.8% 3000 4389 0.92 35.0 Longdong 4749 0.68 24.3% 2517 466 0.89 113.4 YanqiaO 521 0.85 18.5% 2487 186 1.05 34.4 33.3% 50.0% DUZhOU Xinghua 178 0.77 5.5% 2690 251 0.82 13.7 Huohua 307 1.03 6.2% 2204 Changshou District 132 1.09 8.1 Fengcheng Kejiaping 121 0.89 9.3% 2200 193 0.98 18.0 22.7% 87.3% _ Madao 197 0.33 16.0% 3101 164 0.40 26.2 Bicheng Huangiiao 412 0.53 4.4% 3186 Bishar water supply 188 0.56 8.4 Wuli 337 1.06 2.4% 2606 1250 1.08 29.6 Guanyin 1156 0.54 5.5% 2031 891 0.58 49.2 Hualong 1549 0.33 7.0% 2611 370 0.34 25.9 29.2% 50.9% Shibao 1077 0.64 11.7% 3022 756 0.73 88.5 Bicheng Xinta 1039 0.87 5.8% 2752 Binan River 1080 0.92 62.5 Yangyu 1171 0.92 2.5% 3937 1209 0.95 30.0 Outang 1278 0.56 3.7% 2126 1172 0.59 43.8 Wuli 2002 0.18 32.1% 2098 212 0.26 68.1 39.6% 45.1% Zhongduiba 808 0.34 15.8% 2365 407 0.41 64.5 Xiangkou ZitZOn 1000 0.47 0.7% 2184 Wulong County 1010 0.47 6.9 Huangjin 2144 0.77 6.7% 1941 901 0.83 60.4 Ba;Yan9 - 1091 0.1% 3191 0.67 2.6 0.67 Hailuo 2567 1720 73.2% 0.1% 2975 13.0% 0.67 3.2 0.66 0.0% 2631 TaPing 3401 2262 0.72 0.7 0.72 Jiang9in City Shuangfu Gaohu 4500 3249 0.1% 3000 0.88 3.0 0.88 Luopan 3250 2864 43.2% 12.2%/. 2065 40.5% 1 0.60 17.8 0.53 2050 PE Jingtan9 242 146 0.76 1.2 Beibei District Dongyang 220U2." 0.80 SOGREAH___CONSULTADongyang_ 2 1170 PAGE I1 2004 SOGREAH CONSuJLTA~ITS-23500321.R4 -AuGuST BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

at the rate of acquired shall be reasonably compensated Farmers whose land is permanently three alternatives for persons may choose from the following RMB21,450-45,000/mu. The affected production resettlement: the land is reallocated among the villages and of farmland, by which the farmland equally among 1) Reallocation received after reallocation are divided compensation and resettlement subsidy method. villagers. Dazu County will adopt the per-capita space of farmland by which farmers in villages where the 2) Monetary compensation: by monetary compensation, that is, the acquisition is more than 0.5 mu are resettled on the after land are paid to the affected persons depending land compensation and resettlement subsidy space of land acquisition. the per-capita space of farmland is less of status by which farmers in villages where into non- 3) Change their status as agricultural population changed than 0.5mu are resettled by having of RMB16,000 as land These people will thus receive a sum agricultural population. number of status-changed persons is and resettlement subsidy. After the in the compensation may be reallocated among villagers remaining decided, the farmland given up by them village depending on their willingness. acquisition may be resettled by monetary status-changed farmers affected by land The support, etc. compensation, insurance, social security and resettlement subsidy are paid to compensation, by which the land compensation 1) Monetary to make a living; the status-changed persons to allow them of by which those who are above 16 years by basic social endowment insurance, may, by 2) Resettlement of retirement specified by the state government age but have not yet reached the age endowment insurance register and ID card, apply for the, basic presenting their urban resident who have secured this type of at the local social insurance agency. Those for urban workers 15 years and longer may receive endowment and have actually paid the premium for men and insurance they have reached the age of 60 years for insurance money on a monthly basis after 55 years for women. may apply for by which those status-changed persons 3) Resettlement by social security support, of them and their subsistence-allowance if the average income the minimum urban resident local subsistence level of urban living together is lower than the minimum family members according to the cost of clothing, food and The level of the allowance is determined of the residents. for a local urban resident and in consideration shelter necessary to maintain a decent life young children. The gas) and compulsory schooling of their cost of water and fuel (coal or localities are respectively: subsistence allowance in the affected standard of urban minimum in Jiangjin County, Changshou in Beibei District, RMB145/month and RMB185/person/month RMB115/person/month in Wulong County District, Tongliang County and Bishan County, RMB130/person/month in Dazu County.

PAGE 12 2004 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

complete labor service the local government will establish a For those farmers losing farmland, the affected people will The relevant labor service agency for system to provide assistance to them. get employed through all acquisition to help the resettled person be founded one month before land status-changed persons free access Such help includes, for example, giving the possible channels. local sources and providing it to the resettled market, collecting job information from the a month to the job and then publishing such information once persons one month before land acquisition persons (Such training is free vocational training to the status-changed afterwards, providing instance, in Dazu County, the training is to the demand of the local job market. For to the mainly oriented skills, and in Bishan County, it is oriented oriented to the acquisition of metalworking also consult the enterprises skills, etc.). The labor service agency will acquisition of shoe-making certain preferential incentive seeking expansion and provide them with in being constructed or if they employ the status-changed persons) (such as being exempted from part of tax policies to get employed. order to make it easier for these persons

GROUPS F. REHABILITATION OF VULNERABLE most easily harmed by these projects as groups refer to those groups of people themselves The vulnerable which they live makes them unable to adjust well as those to whom the environment in groups include the construction of these projects. The vulnerable to the changes brought about by persons, families consisting families, families consisting of handicapped 65 mainly impoverished old people (single and aged more than women, families consisting of alone-living mainly of families of ethnic minority people. years and having no legal supporters) and 75 people in 15 families of the vulnerable group including The projects will affect 124 persons in 53 13 people in 7 in 18 families having handicapped members, impoverished families, 18 people consisting of old people living mainly of women, and 18 people in 13 families families consisting people. alone, and will affect no families of ethnic minority preferential vulnerable groups shall enjoy the following Except the policies described above, the policies. may be paid, at their will, to the county public land compensation and resettlement subsidy in the rest (1) The or their children who will take care of them welfare bureau or county (village) rest house of their lives. difficulty getting adequately affected by house demolition and having (2) Those vulnerable groups situation such as by providing cheap- provided with assistance according to the sheltered shall be in their families and providing them with job offering vocational training to the laborers rent houses, chance of getting employed. information and guidance to increase their demolisher shall assist who choose to build their owr houses, the (3) For those vulnerable groups training to their children and help the houses and offer free agricultural technical them in building their income from farming. them develop agricultural production to increase groups affected by land occupation. (4) Land shall be restored first for those vulnerable

shall be given to employing the children of construction of the project, prior consideration (5) During no special skill. the vulnerable groups to do jobs requiring

PAGE 13 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 .R4 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

G. BUDGET AND IMPLEMENTATION PLAN the projects is RMB103 million, including RMB38.862 The total resettlement budget for constructing for 38%, RMB9.817 compensation for permanent acquisition of land, accounting million in making rural residential houses, accounting for making compensation for demolishing urban and million in for the affected enterprises and institutions, 10%, RMB16.993 million in making compensation in making compensation for the affected shops, accounting accounting for 17%, RMB3.512 million cost of the whole total resettlement expense will be included in the for 3% of the total budget. The fund and loans of the local The major source of fund includes the developer own project package. is as shown in Table 8. govemments. The budget for each individual project the resettlement agency by for land acquisition and house demolition is paid to The compensation land compensation and resettlement owner. The resettlement agency then pays the the project crop compensation is paid directly to the subsidy to the affected villages or households. The divides the land compensation and resettlement affected households. The village leadership by the compensation is paid to the owner of the house subsidy in different ways. The house demolition and agency in installments as stipulated in the house resettlement implementation and shops is paid directly compensation for affected enterprises, institutions relocation contract, the attachment and sparse trees and the compensation for infrastructure, ground to their owners, and payment receipts must be kept in to its owner. Those copies of compensation contracts directly time. The fund circulation process chart is as the project owner and county PMOs at the same shown in below.

Fig.2 Resettlement fund flow

District, county or city project owner

agency District, county or city land and housing administration

w~~~~~~~~~~~~~~~~~~~~~~

the project will begin in July 2004 and end in The land acquisition and resettlement activities for December 2006.

PAGE 14 SOGREAH CONSULTANTS- 23500321 R4 -AUGUST2004 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

PLAN TABLE 8 BUDGET FOR IMPLEMENTING THE RESETTLEMENT ojerct in Project in Project in Wainanpplinproject Ri Beibei Total Project in prjct Binan River WulongWun Jianglin Project Tongliang Dpy Chagshou Project County City Distftt S/N Dhansthou Bishan _ _ _ County County isct County _ _ _ _ _ 9257280.0 326106.2 1072970.8 38862704.3 3342391.5 5446820.0 1449147.0 12189990. 1.0 Permanent land acquisition 5777998.3 42500.0 124152.0 8910.0 604448.0 49680.0 211250.0 48956.0 65000.0 2.0 Temporary land occupation 54000.0 175808.0 0.0 0.0 3809147.9 3405642.4 0.0 0.0 0.0 3.0 Compensabon for demolition 227697.5 of urban residential houses 326132.0 0.0 0.0 6008510.8 543373.6 2734084.8 0.0 1697084.5 4.0 Compensation for demolition 707835.9 of rural residential houses 811891.0 0.0 0.0 14200403.5 953321.7 2900000.0 0.0 9411980.0 5.0 Relocation of enterprises 123210.8 916.0 0.0 0.0 27926984 0.0 0.0 0.0 2781082.0 6.0 Relocation of institutions 10700.4 0.0 3512493.1 0.0 0.0 0.0 45733.3 0.0 Relocation of shops 152315.2 3314444.6 7.0 643921.3 127555.0 32840.0 2980660.8 224830.0 259264.0 108155.5 731175.0 8.0 Ground attachments 852920.0 26876312. 11304181. 577813.2 1114720.8 72877551.8 7906678.1 11940168.7 11551418.8 1606258.5 ~~~6_ ~ ~~~~~~0_ Total of Items 1-8 _ _ _ _ ~~ 226083.6 11556.3 22294.4 1457551.0 238803.4 231028.4 32125.2 537526.2 9.0 Cost of planning and design 158133.6 17334.4 33441.6 2186326.6 of implementation and 2303 346542.6 48187.8 806289.4 339125.4 10.0 100CostoimanagementCost 237200.3 358205.1 2889.1 5573.6 42358.1 8031.3 72713.3 49133.0 236016.3 of technical training (in 34112.4 ______11.0 Cost rural area) 21205.6 11556.3 22294.4 238803.4 231028.4 32125.2 537526.2 226083.6 12.0 C oStof supervision and 158133.6 62114.9 119832.5 7821499.7 1240237.6 172672.8 2883036.7 1214460.7 Basic reserve fund 849425.8 1279718.6 13.0 2482378.7 276338.0 1301252.5 17377002.7 3352947.0 2306296.1 791553.6 4729919.3 14.0 Tax 2136317.5 959602.1 2619409.8 103287580.6 15948909.9 2690954.4 36443323. 15841446. _ 11480001.2 17303933.1 _ ~~~~~~~~~~~~~~~~~~~~~~~~~~2 Total cost _ _ _ _

H. ORGANIZATIONAL ARRANGEMENT World Bank Loans and Chongqing PMO Leading Group for Projects Utilizing the Chongqing Municipal land acquisition and house demolition, direct the managing and coordinating agency for according to act as their respective resettlement action plans county, city and district offices in preparing the implementation of the on social security, supervise and monitor the World Bank policies internal monitoring reports on the and resettlement plan, and furnish periodic compensation submit them to the World Bank. implementation of the resettlement plan and district, county and are headed by the responsible leaders of the The district, county and city PMOs housing administration bureau, staffed by leaders of the national land and city governments and and other agencies. These offices are bureau, water conservation bureau or environment protection action plan of the district, county and city mainly responsible for preparing the resettlement land acquisition and institute, coordinate work of the agencies for entrusting it to a dedicated design and furnish periodical internal supervise work on land acquisition and resettlement plan resettlement, the district, city and county resettlement action monitoring reports on the implementation of and submit them to Chongqing PMO.

PAGE 15 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

for respective districts, cities and counties is the executive agency The owner of each project in the personnel to the project and shall, in resettlement activities, designate special-duty constructing includes authorizing the designer to supervise and manage the process. Its major responsibility plan, participating in resettlement surveys, confirming the prepare the resettlement action and managing action plan, consigning or organizing resettlement action, supervising resettlement progress of resettlement to the the resettlement implementation, paying money, reporting the district, city or county PMOs and furnishing internal monitoring reports. the resettlement work in two ways: firstly, the owner The resettlement-executing agency performs and work to the district, city or county land administration bureau entrusts the resettlement Of the eight loan secondly, the owners carry out the resettlement plan by themselves. demolisher; option. The resettlement executing saving projects, seven's are to be carried out using the first agency in Dazu County is project owner itself. See Table 9 for detail. committee and villager group The urban or rural township resettlement work group, village assist in the preparation of the Resettlement Action Plan, take participate in the project survey and regarding survey, organize public participation, publicize policies part in the engineering within the township, carry out, insect, monitor and record the resettlement activities resettlement, and resettlement, participate in help secure formalities necessary for effecting house demolition of houses and attached buildings and resettlement and supervise the acquisition of land, demolition in allocate funds, coordinate and handle contradictions and issues and reconstruction of houses, report the resettled organize production, development and other resettlement activities, the work, and provide assistance for the persons' complaints and suggestions to the superior agency, resettled families in difficulty.

TABLE 9 EXECUTING AGENCIES FOR EACH PROJECT person Telephone Project Executing agency Responsible Rivers environment Land acquisition office of Tongliang L C Bachuan and Huaiyuan Bureau Lei Chan 45633123 improvement, Tongliang county County Land Administration Li Wei 43640686 Laixi River environment improvement, Dazu Dazu Jinkai Ltd. of TaohuxienironentRier iproveent, Land acquisition affair center He Xicheng 40230469 Taohuaxi River environment improvement, Changshou District Land Changshou District Administration Bureau 41439799 system, Land renovation center of Bishan Hu Jin Bicheng Township water supply u we4 Bishan County County Land Administration Bureau Land renovation center of Bishan . . Binan River environment improvement, Hu Jiwei 41439799 Bishan County County Land Administration Bureau Land acquisition office of Wulong Dai Hongjun Zhou 77729568 Riverside environment improvement, County Land Administration Bureau; Wulong County House demolition office of Wulong County Construction Commission Xinlin 77729019 City Zhangxiang 47534197 Shuangfu Township water supply system, Land acquisition office of Jiangjin Jianqiin City Land Administration Bureau system, Land acquisition office of Dongyang . . Dongyang Township water supply Liqing 68893094 Beibei District Land Administration Bureau WB- PMO is highly experienced in managing and implementing Founded in 1993, Chongqing the affected it is the first time for the WB-assisted project offices of assisted projects. However in resettlement and counties to handle such projects and they lack experience districts, cities of this resettlement action implementation and management. To ensure the smooth implementation in the following aspects: plan, municipal office will strengthen organizational capability technical the organization at each level will be made up of specialized 1) Staff reinforcement: qualified in technology and personnel and managerial personnel who must be adequately management;

PAGE 16 SOGREAH CONSUL1ANTS- 23500321.R4 - AUGUST2004 WORLD BANK CHONGQING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

major invited several times to train March 2003, experts have been (OP4.12) 2) Intensified training: since as World Bank's operation policy organization on such subjects and house staff members of each and regulations on land acquisition involuntary resettlement, laws and livelihood rehabilitation regarding surveys, and production on demolition, conduction of socioeconomic for workers involved in the work and further training will be provided resettlement for resettled persons the proposed projects, including and resettlement for constructing monitoring and land acquisition of resettlement, resettlement polices, implementation and management evaluation, etc.; work efficiency; finance and equipment to improve 3) Providing sufficient support in supervision and monitoring to system and intensifying internal 4) Strengthening the reporting solve any problem found; an early warning system. and evaluation mechanism and 5) Establishing an external supervision

DISCLOSURE PUBLIC CONSULTATION AND issued by the central policies, laws and regulations and In compliance with the resettlement governments of districts, cities municipal government and local persons and government, Chongqing rights and interests of the resettled in order to protect the legal will be attached to the counties involved, and disputes, great importance and minimize dissatisfactions policy making and plan development entities, people in the whole process of participation of the resettled and views. to widely hear their suggestions and implementation or project owner, each district, city is being prepared, the plan maker, and While the settlement plan resettlement office, township government office, land administration bureau, persons before fixing the county project discussions with the affected village committee has held several rates and resettlement alternatives. compensation booklets office will distribute the resettlement is executed, the resettlement booklets from the Before the project residents will then obtain the villages. The affected profile, project impacts, among the affected which contains detail on project committee, village committee, complaints and grievances, residential executing institution, channel to lodge polices on compensation, project etc. been approved by the World Bank have reseKtlement plan reviewed and issued on Up to August 2004, the office and library and public notices each district, city or county resettlement a full understanding of the placed in that the affected persons can get local newspapers or cable TV so major of their own rights. reseKtlement plan and be aware

PAGE 17 - AUGUST2004 SOGREAH CONSULTANTS- 23500321.R4 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

J. COMPLAINTS AND GRIEVANCES she may file his or resettlement plan during implementation, he or If the affected person objects the committee, township orally or in writing to the leaders of the neighborhood her complaint written record of the complaint and give a government and village committee. The latter shall take is unsatisfied with the result, he or she may, upon response within one week. If the affected person PMO, which appeal to the district, and county or city PMOs or Chongqing receiving the resolution, unsatisfied with the result, he case within one week. If the affected person is still shall resolve the county or city land administration may, upon receiving the resolution, appeal to the district, or she for land acquisition) or house demolition and agency (monitoring and arbitration agency days. If arbitration, which should arbitrate the case within ten resettlement office for administrative arbitration, he or she may, person is still unsatisfied with the result of administrative the affected a civil law court in case of objection to any upon receiving the arbitration result, bring a lawsuit to aspect of the resettlement plan.

K. MONITORING AND EVALUATING an internal and external to the World Bank's guide for monitoring and evaluating, According planning and implementing the proposed monitoring mechanism will be established during and Internal monitoring will be carried out by the municipality environment projects in Chongqing. supervision and PMOs, while extemal monitoring by an independent each district, city or county evaluation group shall be chosen by competitive.bidding. The supervision and evaluation agency experts. made up of highly experienced resettlement and socioeconomic of resettlement, compensation for and The subject for internal monitoring includes mainly: progress of land acquisition, compensation for land acquisition, rebuilding of resettlement houses, space use of and reconstruction of infrastructure, allocation and labor force resettlement, rehabilitation resettlement agency handling of complaints and grievances, staffing of each resettlement funds, and efficiency of each resettlement and personnel training, working schedule, function performance agency, etc. is placed on the rehabilitation of production The emphasis of external supervision and evaluation and living standards of the affected persons, which includes: urban resident resettled resident households (10%): payment of 1) Monitoring of typical rehabilitation; availability fund, availability of resettlement houses, and income compensation of house construction, payment of of house sites for resettlement of rural residents, progress compensation fund, quality of houses constructed, etc.; fund, availability of typical shops (20%): payment of shop compensation 2) Monitoring of of production, and rehabilitation of resettlement houses, progress of relocation, rehabilitation employees' income; compensation fund, land of enterprises and institutions (20%): payment of 3) Monitoring of relocation, production rehabilitation, acquisition for new sites, houses construction, progress rehabilitation of employees' income. of resettlement progress, compensation rates and allocation In addition, it is necessary to monitor by resettled persons, of executing agencies, depth and effect of public participation fund, capability and grievances, etc. operation and efficiency of mechanisms handling complaints

PAGE 18 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST BANK CHONGQING MUNICIPALITY - THE WORLD CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

months internal monitoring report every three city or county PMOs will prepare one to be Each district, prepare a year-end summary statement it to Chongqing PMO, which will one and submit external monitoring agency will produce the World Bank. The independent 2004 and the submitted to survey will be conducted in December report every half a year. The basic second issue in monitoring produced in August 2005 and the of the monitoring report will be be submitted from first issue reports (Issue 3 to Issue 5) will February 2006. Monitoring and assessment August 2006 to August 2007. monitoring and will be conducted on the basis of is completed, post evaluation successful After the project theory and method to evaluate the already made and using the relevant enterprises and evaluation in the resettlement of residents, shops, experience and lessons to be learnt for constructing small city usable to later resettlement activities institutions and provide experience projects in Chongqing.

RESETTLEMENT OF CUEP L. REVIEW ON THE IMPLEMENTED of five components, namely, Chongqing Environment Project (CUEP) consists Water Chongqing Urban Solid Waste Component, Fuling Waste Water Component, Chongqing Urban The two Urban Waste and Wanzhou Water Supply Component. Shizhu Water Supply Component houses and thus no Component, did not acquire land and demolish components of Shizhu and Wanzhou resettlement involved. acquire land of WB, totally this project would permanently According to the RAP confirmed by in 3193 households. 247184.95M2, affecting 13418 people 3550.84mu, demolish house areas of See table 10 for details. The total budget is RMB762 million.

TABLE 10 IMPACTS AND BUDGET OF CUEP Permanently House Affected population Affected Total budget land demolition hoshls (RMB) ara(M 2 (person Components ~ acquisition )) household) (mu) 666664864.89 230541.9 12585 2905 Waste Water Component 2588.74 92236777.2 Chongqing Urban 14525 667 215 Urban Solid Waste Component 952 3088910.89 Chongqing 2118.05 166 _ 73 Waste Water Component 10.1 761990552.98 Fuling 247184.95 l3418 3193 Total 3550.84

implement in 2001 and schedule, the resettlement began to On the basis of the project progress was 2705mu, 76% of the of 2003, the completed land acquired planned to fulfil in 2004. By the end fund paid was 245000M2, 91% of the planned: resettlement planned; house demolition area was planned. about RMB540 million, 710% of the

PAGE 19 2004 SOGREAH CONSULTANTS- 23500321.R4 - AUGUsT CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Science Institute is Transportation University and Chongqing Social As a joint team, Southwest five monitoring reports have been monitoring agencies of the project. Up to now, independent construction has been in smooth progress; submitted. These reports revealed that: the project governments paid compensation in time without delaying, owners and executing agencies of local environment of the resettlement fund; the planning, construction, skimping and embezzling APs, and the income and housing sites and house structure are fully consulted with resettlement the resettled are satisfied with the relocation. condition of the APs are a bit better than before; and and put forward that on the resettlement sites of Jiguanshi At the same time, these reports also APs based on the were not built up and allocated in time to the Tangiatuo farming markets have already paid more attention plan. Chongqing municipal government and CPMO resettlement the resettlement problems according to the to the problems, and made a commitment to solve action plan agreed by WB,

lessons from the ongoing CUEP is very the implementation of saving loan project, to draw During external independent monitoring institute, PMOs necessary. Besides establishing the resettlement implementation internal monitoring mechanism; reseKtlement should establish resettlement the WB involuntary participate in the RAP preparation, and understand agencies should in the light of RAP confirmed by WB, policies. They should implement the resettlement resettlement reports to project owners and PMOs. and periodically submit reseKtlement internal monitoring

PAGE 20 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 BANK CHONGOING MUNICIPALITY - THE WORLD PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

OF RESETTLEMENT TERMINOLOGY OBJECTIVE OF THIS RAP AND DEFINITION relevant national and local laws (RAP) is prepared according to the This Resettlement Action Plan the clauses in OP4.12: "Involuntary in the People's Republic of China and is "to and regulations effective The purpose of preparing the document of World Bank Operation Guidelines. so as to ensure they Resettlement" a resettlement and rehabilitation plan provide the affected people with such at least restored to the pre- their living standards improved or benefit from the project and have displacement level after the project is completed." as follows: The term "affected people" is defined being or will be adversely people whose standard of living is "Affected people" refers to those by the temporary or permanent implementation of the project or affected sites, affected due to the to any houses, lands (including house their ownerships, rights or interests their businesses, acquisition of immovable or the negative effect on and pastures) or other movables or farmlands habits. takings and jobs or inhabitations and such as enterprises and public be individuals or legal persons legal 'Affected people" may either not limit the permission of their definition of "affected people" does nor limit the institutions. The carried out within the affected area and livelihood or businesses being registration properties and includes the following: compensation for the damage of their they are present when legal rights and interests or whether (1) All the people regardless of their their properties are acquired and in a particular area. People not given permission to reside (2) of their and recorded as affected people regardless Therefore, all these people will be considered properties, lands or locations. or household are to be used or of more than one person and If the acquired lands or properties made depending on the damage and rehabilitation will be a direct compensated for, compensation The definition of affected people has received on their rights and living standards. rights and interests. impact of the project regardless of their legal relationship with the adverse impact as follows: The term "compensation" is defined to improve or at least all the people affected by the project Compensations should be made to properties. The compensation for and for the damages caused to their or restore their living standards are bought new and not at a reduced will be made at the price as if there be given damages of properties reasons. All the affected people should price based on depreciation or other for being given the discounted the impacts they receive, and, except the rights and interests derived from for rehabilitation. Those damage, they should also be subsidized compensation for the property rights and legal permission for residence the project but have no properties, be treated who are affected by building construction without should in businesses, land cultivation or and are qualified and are engaged and legal permission for residence to those who have properties, rights as equal property damages compensated for. to have their livelihood restored and as follows: The term "resettlement" is defined in production or made for people affected by the project refers to the arrangement involves the following: "Resettlement' benefit from the project. This mainly livelihood activities so that they can (1) Movement of shelters; people; (2) Seeking reemployment for the affected

PAGE 21 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 R4 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

of lands, work places, trees and (3) Making rehabilitation of (or compensation for) the loss infrastructures; is adversely affected (such as (4) Restituting welfare for those whose living standards (or quality) harmed by polluting gases) due to land acquisition and resettlement; and (5) Restoring or compensating for the affected private or public enterprises; (6) Restoring cultural or public properties adversely affected. The term "rehabilitation" is defined as follows: their to bring back the capability of the affected people to continue 'Rehabilitation" means it at the level before the production activities or improve their living standard or at least maintain project is constructed. by the project to purpose of this "Resettlement Action Plan' is to enable those affected The ultimate improved or kept at the level have their damages compensated so that their living standard is achieve this purpose, the plan outlines rehabilitation measures before the project is constructed. To the people can regain their income to enable them to live on. Meanwhile, so that the affected public properties, business and production resources (including shops and enterprises), affected restored to the level before the infrastructures and cultural relics will also be improved or at least project is constructed.

PAGE 22 SOGREAH CONSULTANTS- 23500321.R4-AUGUST 2004 WORLD BANK CHONGOING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

1 INTRODUCTION

1.1 BACKGROUND World Bank in Fiscal Year 2001, has Environment Project approved by the both key The Chongqing Urban Municipality by providing a blend of to address pollution problems in the Urban been designed reforms. The objective of the Chongqing infrastructure investments and institutional for the sustainable long- provide a safe environmental setting Environment Project (CUEP) is to (CM). The project wouid support of urban areas in Chongqing Municipality term economic growth long-term urban environmental improvement in implementing the first phase of a of safe water the Municipality degradation, provide an adequate supply to recover from past environmental of the wider Yangtze River program that are compatible with the needs and maintain water quality at levels Basin.

CUEP 1 LOAN SAVINGS and Huaiyuan River Environnement improvement 1.7 Tongliang County Bachuan River Improvement 1.2 Dozu County Laixi River Environmer Location m ap Evironment Improvement 1.3 Chongshou District Taohua River water supphl 1.4 Bishan County Bicheng Town Improvemeit (phase 1) 1.5 Bishan County Binon River Envimemt water Supply Beibei District Dongyong Town 1.6 c- 'i Public Toilet Improvement 7.7 Chongqing . . Tawn ofl:ongiin 1.8 WaterSupply Works otShuangfu __ , . flowd woterprotection construction 1.9 Wulong district bund road and

Agglomeration de Chongqing

1.9

P Cl tcononnvand Ecoloq -.ie rlazt nItIrsthreeGaegei:.

WesternEconomic Corroor

DevelopedEcono-c Beltf the Caputl

PAGE 23 - AUGUST2004 SOGREAH CONSULTANTS- 23500321.R4 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

there will be significant of the loan ($200 million) it has become apparent that Since approval which may be re-allocated the loan (estimated at approximately $60 to $70 million), savings from estimate is the trend in procurement for existing and/or new project components. The basis for this activities, namely: 50 percent and 60 percent of the (a) Bid prices of already awarded contracts average between estimated prQject costs indicated in the Project Appraisal Document; (b) Reductions in the scope of works, and (c) Cost reductions arising from refined detailed engineering design, bund road works, ahead of (d) Loan savings due to works being completed along with ongoing schedule using Chongqing's own funds.

PROJECT (CUEP Il) 1.2 THE CHONGQING URBANISATION & ENVIRONMENT World Bank Chongqing Municipality began to enter in a dialogue with the As of November 2002, projects in Chongqing. concerning a second possible loan to finance both urban and environmental As initially outlined the project focussed on four broad sectors: parks; * Infrastructure construction to support the development of business * Water Supply; * Bund Roads (including fiood control/protection); * River Harness (Wastewater and Flood Control/Protection). Bank is presented in TABLE 1-1 A list of the projects initially presented for financing by the World below. it has been of a number of the below projects was relatively well advanced, As the preparation loan savings from the first urban proposed that these projects cowld be possibly financed using the environment project in Chongqing, the CUEP.

PAGE 24 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGOING MUNICIPALITY - I HE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Il (SOME PARTLY FINANCED BY CUEP) TABLE 1 1 SUMMARY OF PROJECTS WITHIN CUEP Total Investment Loan Amount Designation of Sub-project Estimate (million S/N CitylDistrictYCounty RMB)

248.94 to be defined Machinery & Electronic Industrial Infrastructure construction of Dongfanghong 1 Jiangjin City Park) Park, Jiangjin City, Chongqing (Industrial to be defined Chongqing (Industrial 186.70 construction of Hechuan Industrial Park, 2 Hechuan City Infrastructure Park) to be defined (Industrial Park) 227.10 construction of Da'an Industrial Park, Chongqing 3 Yongchuan City Infrastructure to be defined Chongqing (Industrial Park) 317.00 construction of Qiaohe Industrial Park, 4 Qijiang County Infrastructure to be defined Park, Chongqing 209.70 construction of Yuxi Sci-Tech Development 5 Tongliang County Infrastructure (Industrial Park) to be defined Chongqing (Industrial Park) 266.73 construction of Youting Industrial Park, 6 Dazu County Infrastructure to be defined Chongqing (Industrial 245.21 construction of Bicheng Industrial Park, 7 Bishan County Infrastructure Park) to be defined Park, Chongqing 250.00 construction of Wansheng Tourist Industrial 8 Infrastructure (Industrial Park) to be defined Chongqing (Industrial 400.00 of Zhengyang Eco-industrial Park, Qianjiang, 9 Infrastructure Park) 249.95 to be defined Degan, Jiangjin (Bund) of Flood Control Dyke of Yangtze River, 10 Jiangjin City Harness to be defined Chongqing (Bund) 284.36 of Flood Control Dyke of Binan River, Bishan, 11 Bishan County Harness to be defined (Bund) 528.52 of Bund and Flood Control, Wulong, Chongqing 12 Wulong County Harness 181.86 to be defined Chongqing (Bund) of Bund and Revetment of Xiaozi River, 13 Wansheng District Harness 354.0to be defined of Bund, Qianjiang, Chongqing (Bund) 14 Qianjian District Harness

PAGE 25 SOGREAH CONSLIANTS - 23500321 R4 - AUGUST2004 UHONGOING URBAN ENVIRONMEN I PRUJEC I RESETTLEMENT ACTION PLAN Loan Amount Designation of Sub-project Total Investment S/N City/District/County Estimate (million RMB)

to be defined Jiangjin, Chongqing (Water Supply) 49.50 15 Jiangjin City Water Supply for Shuangfu Town, to be defined Linjiang Town, Jinlong Town, Yongchuan 43.78 16 Yongchuan City Water Supply for Zhangjia Town, (Water Supply) to be defined Chongqing (Water Supply) 122.78 17 Qijiang County Water Supply for Urban Area, Qijiang; 46.41 to be defined ChongqingBishan, (Water Supply) 18 Bishan County Water Supply for Major Towns, to be defined Town, Bishan, Chongqing (Water Supply) 925 19 Bishan County Regional Water Supply for Bicheng to be defined Baima, Jiangkou and Xiannushan (Water 62.91 20 Wulong County Water Supply for Towns of Yangjiao, Supply) to be defined Beibei, Chongqing (Water Supply) 55.21 21 Beibei District Water Supply for Dongyang Town, 22.40 to be defined Water Supply for Urban Area, Wansheng (Water Supply) 22 Wansheng District ~~~~52.00 23Water Qianjiang Supply PipeDistrict Network defined Group, Qianjiang, Chongqing (Water to be l23 Qianjiang District Water Supply Pipe Network for Zhengyang Supply) 40% from WB loan Tongliang, Chongqing (Water Supply) 20.08 24 Tongliang County Water Supply for Towns-Anju Town, 40% from WB loan Town, Tongliang, Chongqing (Water Supply) 23.45 25 Tongliang County Water Supply for Towns-Hufeng 40% from WB loan River & Huaiyuan River, Tongliang (River 400.00 26 Tongliang County Environmental Harness of Bachuan Harness) 40% from WB loan (Longshui Town section), Dazu (River 220.00 27 Dazu County Environmental Harness of Laixi River Harness) 40% from WB loan (Phase I), Changshou (River Harness) 385.00 28 Changshou District Environmental Harness of Taohuaxi 40% from WB loan River Basin, City proper (River Harness) 800.00 29 City proper Environmental Harness of Liangtan 6349.84 To be defined Total: 29 projects in 3 cites, 5 districts and 5 counties

PAGE 26 SOGREAH CONSULTANTS- 23500321 .R4- AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT-PROJECT PLAN .______RESETTLEMENT ACTION Total Investment Loan Amount Designation of Sub-project (million City/DistricVCounty Estimate S/N RMB)

To be defined 1 for each 186 Industrial Park, Bund and Water Supply, Including: Jiangjin City 3 projects: 18670. To be defined Park Hechuan City 1 project: Industrial 270.88 To be defined Park and Water Supply, 1 for each Yongchuan City 2 projects: Industrial 800.00 40% from WB loan Harness City Proper 1 project: River 454.26 To be defined Supply, I for each 3 projects: Industrial Park, Bund and Water Wansheng District 55.21 . To be defined Supply Beibei District 1 project: Water 385.00 40% from WB loan Harness Changshou District 1 project: River To be defined 1 for each 806.00 Industrial Park, Bund and Water Supply, Oianjiang District 3 projects: 486.73 To be defined Park and River Harness, 1 for each Dazu County 2 projects: Industrial 672.23 To be defined Park, Bund and Water Supply, 1 for each Bishan County 3 projects: Industrial 653.23 To be defined each; 2 for Water Supply Industrial Park and River Harness, 1 for Tongliang County 4 projects: 439.78 To be defined Park and Water Supply, 1 for each Oijiang County 2 piojects: Industrial 591.43 To be defined and Water Supply, 1 for each Wulong County 2 projects: Bund

PAGE 27 2004 SOGREAH CONSIJLTANTS-23500321 R4 -AuGuST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

1.3 PROJECTS FOR INCLUSION IN CUEP NEW COMPONENTS Bank to June 2003, Chongqing Municipal government requested the World By letter of 4th of for water the use of some of the loan savings to support 5 new project components consider were among those sewerage and solid waste treatment investment. Four of the projects supply, Chongqing Small Cities identified by the Chongqing Municipality for inclusion in the proposed Infrastructure Improvement Project (CUEP II), now under preparation. the CUEP, is summarised The initial list of projects to be financed as part of the loan savings from in TABLE 1-2. SAVINGS (AS OF JULY 2003) TABLE 1-2 INITIAL LIST OF COMPONENTS TO BE FINANCED FROM THE LOAN

Total Investment WB Financing USD Million No Subcomponent Name RMBY 10,000 15 1 Tongliang County Bachuan River and Huaiyuan 400 River Pollution Control and Environment Improvement Subcomponent 1 2 Tongliang County Water Supply for Hufeng Town 25 and Anju Town 9 3 Dazu County Laixi River (Mituo Town - Longshui 210 Town Section) Environment Improvement Subcomponent 15 4 Changshou District Taohuaxi River Pollution Control 385 and Environment Improvement Subcomponent (Phase I) To be determined 5 Closure of 8 existing landfills in Chongqing (to be To be determined estimated)

that there were potentially During the period from July to October 2003, it became evident projects have been proposed for additional loan savings; during this period an additional series of financing from the loan savings as summarised in the next Table.

PAGE 28 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

BE FINANCED FROM THE LOAN SAVINGS TABLE 1-3 REVISED LIST OF COMPONENTS TO 2003) (AS OF OCTOBER Total (Million USD) Name Investment N° Component (Million RMB) (MlinUD 12.91 River and Huaiyuan River 268.02 1 Tongliang County Bachuan Environment Improvement 8.55 Improvement 177.38 2. Dazu County Laixi River Environment 13.92 River Environment 288.81 3 Changshou District Taohua Improvement 20.20 Construction 419.18 4. Wulong County Bund 12.48 improvement 258.96 Binan River Environment _ .5. Bishan County ______(Phase I) 2.24 Water Supply 46.62 6. Beibei District Dongyang Town 4.30 Water Supply 89.29 7. Bishan County Bicheng Town 2.60 Water Supply 54.14 8. Jiangjin City Shuangfu Town 3.00 Improvement 50.00 9. Chongqing Public Toilet 1652.4 80.2 TOTAL consists of five and environment projects in Chongqing loan saving project of urbanization (See below) The and three water supply components environment improvement components

FROM THE LOAN SAVINGS (AS OF 2004) TABLE 1-4 LIST OF COMPONENT.S TO BE FINANCED WB Financing Total Investment USD) S/N Component Name (Million RMB) (Million 9.72 and Huaiyuan River 214.29 1 Tongliang County Bachuan River Environment Improvement 8.55 Improvement 177.38 2 Dazu County Laixi River Environment 11.53 River Environment 254.50 3 Changshou District Taohua Improvement _ 4.25 Improvement 88.20 4 Bishan County Binan River Environment 12.67 Supply 238.03 5 Bishan County Bicheng Town Water 448.93 21.64 County Bund Construction 6 Wulong 47.09 2.30 City Shuangfu Town Water Supply 7 Jiangjin 46.93 2.25 Dongyang Town Water Supply 8 Beibei District 1515.35 72.91 TOTAL

PAGE 29 2004 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

AND COMPREHENSIVE ENVIRONMENT IMPROVEMENT WORKS OF BACHUAN 1.3.1 IN HUAIYUAN RIVERS IN TONGLIANG COUNTY (REFERRED TO AS THE PROJECT TONGLIANG COUNTY HEREAFTER)

urbanization the five major strategies (namely west region development strategy, According to strategy) industrial county strategy, sustainable development strategy and open-up strategy, strong construction of in the 10th five-year plan of Tongliang County, the intensification of the outlined to perform. and ecological environment has become an outstandingly important task infrastructures Longdu of Tongliang County has therefore decided at the right time to appoint The government environment Water Resources Development Co. Ltd. as the owner of the comprehensive preliminary work on the improvement projects of Bachuan and Huaiyuan Rivers, which started the has passed the domestic project in the spring of 2002. Currently the feasibility study of this project appraisal. environment for the urban The project, after its completion, will improve the production and living and bridges and green residents and the arrangement of waters, protective embankments, roads to exhibit the style of a spaces within the 4.8 km2 county seat will be rationalized and complete progress and quicken modern city. This will further promote the economic development and social the process of urbanization to achieve the goal of building a well-off society.

LAIXI RIVER 1.3.2 COMPREHENSIVE ENVIRONMENT IMPROVEMENT WORKS OF IN DAZU (LONGSHUI SECTION) IN DAZU COUNTY (REFERRED TO AS THE PROJECT COUNTY HEREAFTER)

Counties, to solve the water supply problem facing the people in Dazu and Rongchang In order along the Laixi spur socio-economic development and urban construction, improve the environment for the sustained River to promote environmental and ecological protection and lay a foundation improvement of the Laixi development of Dazu County, it is essential to conduct comprehensive and passed the domestic River and so far the feasibility study of the project has been completed appraisal. body of the Laixi purpose of constructing this project is to mitigate the pollution of the water The environment of the River by sewage water from Longshui Township so as to restore the ecological residing alongside the river system and improve the condition and quality of living for the people river.

PAGE 30 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

RIVER IN IMPROVEMENT WORKS OF TAOHUAXI 1.3.3 COMPREHENSIVE ENVIRONMENT THE PROJECT IN CHANGSHOU DISTRICT CHANGSHOU DISTRICT (REFERRED TO AS HEREAFTER) of work on Plan of Changshou District", the priority By 2005, according to the "Urban Master protection of the to the prevention and elimination of pollution, environment protection will be given wastewater to the cleaning up and management of industrial drinking water resources, deepening and garbage to put and curbing pollution by domestic sewage achieve the goal of clean production, the district government of into a positive cycle. For this reason, the ecological environment comprehensive environment improvement has decided at the right time to initiate the Changshou study of the project has now been completed. project of the Taohuaxi River and the feasibility the environment, will achieve the goal of comprehensively improving The project, once completed, threat of floods, and of water pollution, eliminating the potential effectively solving the problem into a positive cycle so as to the urban ecological and domestic environment gradually putting create for the people a favourable social progress and economic development, promote the investment atmosphere and realize sustainable environment in which to work and live, improve development.

COMPONENTS) 1.3.4 PROJECT IN BISHAN COUNTY (TWO County seat (referred to as about the urban water supply works in Bishan Background information to improve the water supply capacity in in Bishan County hereafter): The project is intended Project constructing the Bisheng-Qinggang-Dingjia County seat and provide a guarantee for Bishan study of the project has been completed. economy corridor by 2010. So far the feasibility in the domestic living quality of the residents of the Bishan project is to improve of The purpose County and heighten the general level Puyuan and Shizi Townships of Bishan Bicheng, sustainable development. urbanization in these townships to support their improvement project of Binan River information about the comprehensive environment Background hereafter): According to the "10th five-year County (referred to as Binan River project 13th in Bishan County" passed at the 4th session of the for national and social development of Bishan plan 20, 2002, the Binan River Project in Bishan congress of Bishan County on February Now the people's of work to be performed in the near future. County was officially included in the schedule feasibility study of the project is under way. project has been registered and approved and the improving the flood resisting capability of project serves the purpose of effectively and The side of the river against flood damages to protect people living along either and riverbanks the road transportation condition and urban meanwhile, by improving the riverbanks, bettering the overall function of the city. domestic living environment and perfecting

PAGE 31 2004 SOGREAH CONSULTANTS-23500321 .R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

ALONG RIVERSIDES IN 1.3.5 COMPREHENSIVE ENVIRONMENT IMPROVEMENT PROJECT IN WULONG COUNTY WULONG COUNTY (REFERRED TO AS THE PROJECT HEREAFTER)

strategy of "being based in the Area, getting support According to the development the arrangement of Chongqing, developing tourism as the pioneering industry, rationalizing from from both flanks" and to achieve the urban area along both rivers and achieving economic takeoff and economically strong county where the local goal of building Wulong County into an ecologically and and environment find harmonious development, the CPC committee economy, population the "project of riverbank of Wulong County had decided at the right time to construct govemment flood prevention in Wulong County". roads construction and comprehensive improvement works for Currently the feasibility study of the project has been completed. of both banks of the Wujiang River T he purpose of this project is to improve the flood resistance to once every 20 years so as to ensure normal life of from occurring once every two years transport construction in the countryseat, improve the water and land residents and economic wharf facilities, the riverbank road to function as the main road, complete the condition, enable spur economic construction beautify the city, improve the sightseeing and investment atmosphere, and quicken the urbanization process.

JIANGJIN. CITY (REFERRED TO 1.3.6 WATER SUPPLY WORKS IN SHUANGFU TOWNSHIP, AS THE PROJECT IN JIANGJIN CITY HEREAFTER) in Shuangfu Township and the The fact that there is no sufficient source of raw water nearby present water source cannot meet the demand of people for volume and sanitation level of the of drinking economic development, the serious shortage of water and absence domestic life and grave hindrance to the meeting the national standard have combined to constitute a water source need for constructing this project. local socio-economic development. Therefore, there is an urgent Currently the feasibility study of the project has been completed. of provide water supply for production in the industrial park area The project is mainly meant to residents in improve the condition of water supply for domestic use for Shuangfu Township, bring up the level of Jinfu, Xiangtang and Shengquan villages of Shuangfu Township, Shuangxi, socio-economic development of urbanization of the area and promote the industrial production and the region.

(REFERRED TO AS THE 1.3.7 WATER SUPPLY WORKS IN DONGYANG, BEIBEI DISTRICT PROJECT IN BEIBEI DISTRICT HEREAFTER) demand for local supply facilities are far from being able to meet the increasing The existing water and the backward situation economic development and domestic life of the local people, local socio-economic development and improvement of living constitutes a major factor hindering of water supply the local people. Therefore there is an urgent call for the construction standard of of the projects have now been system in Dongyang, Beibei District and the feasibility study completed. production and domestic life in the The project, after completion, is able to ensure water supply for planned area of Dongyang, the seat of Beibei District.

PAGE 32 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

PROJECTS 1.4 TYPE AND SIZE OF CUEP NEW COMPONENTS

projects are detailed in Table 1-5. The type and size of CUEP New Components

COMPONENTS PROJECTS TABLE 1-5 TYPE AND SIZE OF CUEP NEW Remarks Type Size Project . Sewage pipeline to be 3 per day laid along side flood capable of treating 30,000m of sewage Sewage treatment plant prevention 23.05km in total embankment and land work 6000-14000mm in diameter and acquisition and house Projectin Sewage pipeline length for both Projecti length demolition Tongliang County 2 subcomponents to be riverbank improvement and 5,38Bm Flood 4.3km long carried out green space on riverbanks and roads control/prevention . simultaneously embankment to be capacit Sewage pipeline Township 30,000-ton/day along side flood Longshui , Y laid sewage treatment plant reinforced concrete sewage prevention DN300-DN1200 embankment and land pipeline 23,85km in total length Project in Dazu Pipeline work acquisition and house demolition for both County to be of embankment subcomponents Riverbank improvement 5.486km carried out simultaneousiv Flood Flood 12.43km both sides of river control/prevention control/prevention totalling embankment, green embankment belt and pedestrian Green belt and passageway to be 15m2 both sides of river Project in pedestrian passageway constructed along the Changshou construction river and main sewage along both District interception MainDistrict sewageemnknt;ld and house totalling 36.3km acquisition interception pipeline demolition to be carried system out simultaneously 35,000 tons per day capacity Qiancengyan sewage treatment plant Water supply pump station at Xiangjiawan midway in Bishan Pressurizing pump Pressurizing project along supply pipeline to Puyuan Township County station totalling 42km in length Pipeline system Pipeline 11.556km on both sides Flood control Embankment totalling elevation of 276.72m embankment along with top Flood control both sides of river pipeline embankment and Planned to be 20m in width with sewage Green belt and riverside outer riverbank and road in inner side and rain water pipeline in river road construction laid green belt to be Binan side of pedestrian passageway improvement constructed along the project in Bishan river; land acquisition and house demolition to County out 14.05km in length be carried Pipeline system Pipeline totalling simultaneously

PAGE 33 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 .R4 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Remarks Project Type Size Flood control embankment, bank-top belt to 4062.280m long on left side and 4365.491 m on road and green Flood control be buit alongnver; land embankment right side, totalling 8.7km in length .acquisition and house Project in VWuiong demolition to be carried County out simultaneously Including two baffle dams, seven rows of baffle River piers, and one flood guide embankment; Changtu River to improvement constructing a new outlet of Changtu connect it to Wujiang mainstream pump Three pressurizing pump stations to be built Pressurizing Daily water supply station tank to be built capacity to be 30,000 in Jiangjin High-elevation water One high-elevation m Project City tank Oehg-lvtotaktbeuit km in length Water pipeline system, pipeline systems totalling 37.96 tons/day Water purification plant Capacity to be 30,000 capacity of Water intake and Civil work size to be suited to an output 33,000 tons/day Project in Beibei delivery pump house water tank to be constructed District High-elevation water One high-elevation tank pipeline Pipeline system Including DN300-DN500 water supply of 19.7km construction construction with a total length

PAGE 34 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

THE PROJECT 1.5 AREAS BENEFITING FROM AND AFFECTED BY

2 this project, which will bring about a totalling 1,329 km will be involved for constructing An area if successfully constructed, will no benefit to as many as 1,500,000 people. The project, direct and economy in the project area. doubt spur the sustainable development of local society this project will affect 46 villages in 8 By land acquisition (or occupation) and house demolition, 4,525 people in 1,146 households, of which rural townships of 7 counties (cities or districts) totaling land acquisition and house demolition. 420 people in 122 households will be affected both by

AREAS 1.6 SOCIOECONOMIC BACKGROUND OF THE AFFECTED full, Loan Saving Projects under Chongqing "2003 Chongqing WB loan saving projects" (or, in The consisting of 8 components, namely, 5 Environment Project in 2003) is a project group Urban projects. These projects are located in the environment improvement projects and 3 water supply suburbs. The fundamental socio-economic metropolitan area and its western and northeastern in below: data of the 7 districts (or cities) involved are as listed

AREA IN 2002 TABLE 1-6 FUNDAMENTAL SOCIOECONOMIC DATA OF THE PROJECT Average Per-capita Per- total Per-capita Per-capita o ural PouatoeretaArao capita agrcultural finandal industial uranl E Puia&km- Per-caPa Ave of | S_N DiStrict Or farmland (mu) area of output revenue (RMB output (RMB townships (10,000) (k GDP (RMB) inrmer farmland (RMB 10,000) 10,000) SIN cunt caunty townships fa~~~RMer (RMB) ~~~~~~10,000) 643815 0.796 914.24 203.92 4724.72 Tongliang 80.84 1343 6218 2702 1 997.54 142.81 9321.25 13.024 100 7136 2915 76215 0.585 Tongliang Bachuan 5117.84 2613 42488 0.046 1604.95 261.43 2 Dazu 92.5 1399 - 5200 3200 0.031 1739.13 560.39 19671.50 Dazu . Longshui 10.35 111.88 9792 2966 42184.6 0.048 984.50 210.80 3505.01 Changshou 87.76 1415.49 6309 2720 2520 1807 0.046 4050.90 248.08 5703.32 3 Changshou Fengcheng 3.91 72.8 5892 0.073 3123.05 285.87 6319.70 Duzhou 2.69 65 5700 2533 1968.5 ______Changshou 241.39 11046.76 6740 2707 477989.76 0.784 1524.86 4 Bishan 60.95 914.56 613.57 887.77 23922.14 116,78 13000 3485 44798 0.341 ______Bicheng 13.151 474405 1,201 1100.03 211.65 1235.72 Wulong 39.5 2901.3 4041 1666 48000 0.800 1108.50 1084.67 622.33 Wulong Xiangkou 6 277 4688 1905 2667 1461498 1.000 1376.46 239.48 3080.27 6 Jiangjin 146.15 3200.22 6887 37409 0.870 2013.72 171.40 1196.28 Jiangjin Shuangfu 4.3 66 7465 2505 294700 0.437 627.41 272.92 4014.54 7 Beibei 67.42 755 9735.78 4721 19532 0.376 1038.97 127.69 4423.08 Beibei Dongyang 5.2 48.79 8150 2456 with a total area of 1,;343 km2. It belongs to Tongliang County is located in the west of Chongqing zone with a mild climate and rich in rainfall the wet subtropical seasonal-wind prevailing climatic and resources. and the west of Chongqing. It is located in the southeastern part of the Sichuan Basin Dazu County Rongchang County in the south, Tongliang County in the east, Yongchuan City and borders County in the north with a total area of Sichuan Province's Anyue County in the west and Tongnan 1,399.34 km2.

PAGE 35 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

area of Chongqing District is located in the northeastern suburbs of the metropolitan Changshou and consists of 633 away from the downtown area. It has a territory of 1,415.49km2 and 76km total population of the district villages and neighbourhoods in 36 rural and urban townships. The was 877,600 by the end of 2001. the western located in the west of Chongqing and is known as the traffic gate in Bishan County is highway route with the Chongqing as it is located at the junction point of the G319 national part of area. provincial highway route and is only 44km away from the downtown in fold jointly formed by the Wulong County is located on the southeastern rim of Chongqing ranges of the Yunnan- plateau. The territory lies between Daloushan and Wuling mountain 75 km 0 0 29002'-29040'N and measures 82.7km long from east to west and 107 13'-108 56'E and Daozhen County in north to south. It borders Pengshui in the east, Guizhou Province's wide from County in the north. the south, Nanchuan County and in the west and Fengdu is located by the side of the Jin-Ma highway route and 3km Jiangjin City's Shuangfu Township of exit of the Chongqing-Chengdu expressway. Shuangfu township consists away from the Zouma and Jinfu is within the Shuangxi, Jinfu, Xiangtang and other neighbourhoods, or which Shuangxi boundary of the planned Shuangfu Township industrial park area. metropolitan is located to the northwest of Chongqing and is 45km away from the Beibei District Dongyang Township is located area of Chongqing. The district covers a total area of 755km2 and in the north by the northern side of the Jialing River.

1.7 MEASURES TO MINIMIZE IMPACT CAUSED BY THE PROJECT and of planning, designing, construction and resident resettlement, the designer During the periods impact of the project on the project owner have acquired some effective measures to minimize the local society and economy of the project area.

1.7.1 PROJECT PLANNING AND DESIGNING PERIOD multi-story or high design to avoid as much as possible densely populated areas or Optimise the and house demolition and buildings as an effort to minimize the area of land acquisition resettlement and the number of non-voluntary resettlement of residents. alternatives the sewage treatment plants and water supply plants, a number of site When designing of houses. are provided to find out the one involving the least demolition and resettlement have been determined planning green belts and pedestrian passageways, their widths When as possible demolishing and section by section according to the actual situation to avoid as much relocating permanent buildings within the project area. stations, due considerations have been given to the When planning the pressurizing pump along water supply pipeline route and the actual topographical conditions technical requirement for it easier to lay the sites chosen are far from the residential area. This not only makes the route and domestic life and production out the pipeline but also minimizes the impact of the project on the activities of the local residents.

PAGE 36 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

the will be laid along the highway route or follow The water delivery and distribution pipelines affecting the land acquisition and house demolition and avoid existing pipeline route to minimize of ensuring safe life and production. In addition, under the condition local residents' domestic for construction and pipeline will be adopted to minimize the space needed supply of water, single are residential houses and it is In places along the highway route where there transportation. to void resettlement of residents. impossible to lay pipes, a bypass route will be followed

1.7.2 CONSTRUCTION PERIOD improving the construction techniques, the construction period, special efforts such as At and separate rehabilitation will be made to strengthening the management and separate operation land acquisition and construction operations minimize the impact on the local people caused by affected people to proceed with their work and and at the same time make it convenient for the daily lives. exploitation of local materials for occupation of land will be minimized or avoided and Temporary from the market. All the temporary construction will be avoided. Materials will be purchased range of acquired land to avoid additional buildings for construction will be arranged in the and occupation are unavoidable in pipeline occupation of land. Though temporary excavation the impact. construction, positive measures will be taken to minimize will be shortened as much as possible to construction period and the time of land occupation The farmers. minimize the impact on the shop business of the affected in advance. In actual practice, of demolished facilities will be planned and arranged Rehabilitation ensure safety, effectiveness, promptness and the local conditions will be made the best use of to living nearby. accuracy and minimize the adverse effect on the people local transport facilities and labour services so If technically feasible, priority will be given to using that the affected local people can benefit from the project.

ACTION PLAN AND ITS 1.7.3 LAND ACQUISITION AND RESETTLEMENT IMPLEMENTATION PERIOD

are inevitable, the following measures will be When land acquisition and resettlement of people acquired to minimize the impact on the local people. compensation for all their damages at a price as Ensure that every affected group of people get the are properly resettled and restored to share the if the property were purchased new and that they benefit brought about by the project. analysis of the local situation, a reasonable the basis of the socio-economic survey and further On to minimise the projects impacts of house and practicable resettlement plan should be prepared persons' income rehabilitation. demolition and land acquisition and ensure resettled resettled persons, announce the policies and Make detailed plans to safeguard the interests of the the claims of the resettled persons and the practices about compensation in time, accept openly through consultation with the resettled local resettlement office will solve any problem occurring on their domestic lives. people to ensure they receive no or the least impact of the masses Encourage public participation and accept the monitoring

PAGE 37 2004 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

and free internal and external monitoring and monitoring, establish an efficient Strengthen resettlement will be feedback mechanism and channel. The actual situation of the work on evaluated by an independent supervising agency. The time for handling feedbacks supervised and during the project will be shortened as much as possible to ensure that all the problems occurring executing process receive timely solutions.

PAGE 38 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

2 IMPACTS OF THE PROJECT of of the project, the project office, in compliance with the requirement To understand the impact of a special survey team to conduct detailed investigations into the families the World Bank, formed The survey enterprises, institutions and shops from June 2003 to March 2004. the affected people, the content a combination of door-to-door visits and face-to-face interviews and work was done in and number such details as the area and type of acquired land, affected people, of survey included of workers number of family members, area of houses to be resettled and number of households, of demolition and institutions and shops. During the survey into the tangible impact in enterprises, in the work. The involved in executing the project, the affected people participated resettlement enterprises, institutions and team listened to the comments of the residents and owners of survey and extensive discussions shops on land acquisition, house demolition and resident resettlement were held. will affect 46 villages in 8 land acquisition (or occupation) and house demolition, this project By in 1,146 households, of which rural townships of 7 counties (cities or districts) totaling 4,525 people and house demolition. 420 people in 122 households will be affected both by land acquisition by the project, of 8 rural townships of 7 counties (cities or districts) to be affected In the 46 villages land permanently mu of land will be acquired and occupied and 1,595.8 mu of altogether 1,962.5 farmland), 391.5 1,149.3 mu is collective-owned land (including 1048.5 mu of acquired, of which and a total of land and 55 mu of land to be used by enterprises for construction, mu is state-owned The land acquisition mu of land will be temporarily occupied, including 189.4 mu of farmland. 366.8 of which 3,142 people in 890 (or occupation) will affect a total of 3,807 people in 1,080 households, households will be permanently affected. will affect 188 urban and rural families, 18 By house demolition and resettlement, the project 2 42,514.2m in floor space will be enterprises and institutions, and 38 shops. Houses totalling demolished and 1,138 people will be affected. and resettled with a total area Rural houses holding 420 people in 122 families will be demolished houses, 4,839.2m2 of brick+wood of 16,283.1m2, including 8,684.4m2 of brick+concrete structure 1,938.3m2 of simple -structure structure houses, 821.2m2 of earth+wood structure houses and be affected with houses to be houses. Altogether 330 urban residents in 66 households will 4,084.4m2 of brick+concrete demolished and resettled totalling an area of 11,288.9m2, including 1,494.6m2 of simple structure structure houses, 5,710.9m2 of brick+wood structure houses and houses. 138 people in 15 enterprises. The houses of enterprises to be demolished The project will affect .houses, a floor space of 8,162m2 including 3,391m2 brick+concrete structure and resettled total houses and brick+wood structure houses, 811.54m2 of earth+wood structure 2,239.2m2 of and houses to simple structure houses. The project will affect 70 people in 3 institutions 1,720m2 of brick+concrete and resettled total a floor space of 4,638m2 including 4,590m2. be demolished in 38 commercial and 48m2 of brick+wood structure houses. A total of 180 people structure houses and resettled, be affected by the project and 2,142m2 of shops to be demolished shops will structure houses and including 975m2 brick+concrete structure houses, 608m2 of brick+wood 559m2 of simple structure houses. vulnerable group, including 36 The project will affect 124 people in 53 households of the households in rural areas and 17 in urban areas. and public facilities. In addition, the project will affect 33 varieties of ground attachments

PAGE 39 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

2.1 PERMANENT LAND ACQUISITION AND TEMPORARY LAND OCCUPATION

In the 46 villages of 8 rural townships of 7 counties (cities or districts) to be affected by the project, altogether 1,962.5 mu of land will be acquired and occupied affecting 3,807 people in 1,080 households. Of the 1,595.8 mu of land permanently acquired, 1,149.3 mu is collective-owned land (including 1048.5 mu of farmland), 391.5 mu is state-owned land and 55 mu of land to be used by enterprises for construction, affecting 3,142 people in 890 households. See TABLE 2-1 for detail. Of the 366.8 mu of temporarily occupied land, 189.4 mu are farmland, affecting 665 people in 190 households. See TABLE 2-2 for detail.

2.2 RESIDENTIAL HOUSES OF AFFECTED PEOPLE

2.2.1 HOUSES OF AFFECTED RURAL RESIDENTS

This project will affect 420 rural residents in 122 households and the total area of rural houses to be demolished and resettled is 16,283.1m2, including 8,684.4m2 of brick+concrete structure houses, 4,839.2m2 of brick+wood structure houses, 821.2m2 of earth+wood structure houses and 1,938.3m2 of simple structure houses. In addition, attachments to some of the houses will also be affected. See

TABLE 2-3 for detail.

2.2.2 HOUSES OF AFFECTED URBAN RESIDENTS

This project will affect 330 urban residents in 66 households and the total area of rural houses to be demolished and resettled is 11,288.9m2, including 4084.4m2 of brick+concrete structure houses, 5,709.9m2 of brick+wood structure houses and 1,494.6m2 of simple structure houses. In addition, attachments to some of the houses will also be affected. See TABLE 2-4 for detail.

2.3 AFFECTED ENTERPRISES

This project will affect 15 enterprises. It is found in the survey that of these affected enterprises, only six need to be resettled, three ones are only affected by land acquisition, some of them have been shut down or moved to elsewhere for years except a few still in operation. In their places remain only the empty workshops to be demolished. Altogether 8,162m2 of enterprise houses need to be demolished and resettled, including 3,391m2 of brick+concrete structure houses, 2,239m2 of brick+wood structure houses, 812m2 of earth+wood structure houses and 1,720m2 of simple structure houses. In addition, attachments to some of the houses will also be affected. See TABLE 2-5 for detail.

40 SOGREAH CONSULTANTS- 23500321 R4 - AuGuST 2004 PAGE CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

2.4 AFFECTED INSTITUTIONS 4,638m2 of their houses need to be This project will affect three institutions and altogether brick+concrete structure houses and 48m2 of demolished and resettled, including 4,590m2 of detail. brick+wood structures houses. See TABLE 2-6 for

2.5 AFFECTED SHOPS shop houses to be demolished and will affect 38 shops with altogether 2,142m2 of This project houses, 608m2 of brick+wood structures resettled, including 975m2 of brick+concrete structure See TABLE 2-7 for detail. houses and 559m2 of simple structures houses.

2.6 AFFECTED POPULATION in 8 townships, of rural public land for this project will involve 36 villages The permanent acquisition be resettled by means of in 890 households including 1,963 people to affecting 3,142 people in 8 townships and last for a temporary occupation of land will involve 42 villages production. The households. The demolition which will temporarily affect 665 people in 190 period of 3-12 months, and the demolition of rural houses will affect 330 people in 66 households of urban residential Altogether 15 enterprises are affected, houses will affect 420 people in 122 households. residential 70 people. Altogether 38 shops are 138 people and 3 institutions affected, affecting affecting 420 people in 112 households will be affected affected, affecting 180 people. During the process, The actual number of affected population is 4,525 both by land acquisition and house demolition. detail. people in 1,146 households. See TABLE 2-8 for

2.7 VULNERABLE GROUPS AFFECTED groups of the persons affected by the project. vulnerable groups are the most easily harmed The unable to adjust themselves to the changes environment in which they live makes them The The vulnerable groups mainly include brought about by the construction of the project. of handicapped persons, families consisting mainly impoverished families, families consisting and people (single and aged more than 65 years women, families consisting of alone-living old minority people. having no legal supporters) and families of ethnic households of the vulnerable survey shows that of the 124 people in 53 The socio-economic families, 18 people in 18 families having groups affected, there are 75 people in 15 impoverished 13 consisting mainly of women, and 18 people in handicapped members, 13 people in 7 families no families of ethnic minority people. See families consisting of old people living alone, and

TABLE 2-9 for detail.

ATTACHMENTS 2.8 AFFECTED INFRASTRUCTURE AND GROUND and public facilities. See TABLE 2-10 for The project will affect 33 varieties of ground attachments detail.

PAGE 41 2004 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 2-1 PERMANENT LAND ACQUISITION Unit: mu

Land Acquisition Affected Populaton Rural/Urban Riverhea Waste- Oher Household Populatio APed Component Township Village Total Subtota Farm- Forest Garden Fish Nursery S/N Project City Sutoaland FrsGadnPond Garden d Land land Otenoshl Pouato affuete 62 248 127 Yandu 66.12 66.12 42.02 23.9 0.2 _ 24 96 28 Bachuano Ludong 29.84 29.84 24.6 5.24 4 15 5 O Flood-preventionembankment Yueyang 3.33 3.33 3.33 _ _ 47 188 66 l______._ Tieyue 50.54 50.54 31.56 18.98 _ Enterprise ~~6,53 6.53 2.52 1.83 2.18 ______land ______0 0 0 0 0 35 146 82 Sewage treatment plant Bachuan Yueyang 64.95 64 95 57.3 4.5 3.15 0 0 172 693 308 Total . 221.31 2Z1.31 161.33 54.45 3.35 2.18 0 0 61 118 82 Sewage treatment plant Longshui Mingguang 56.76 56.76 56.76 _ _ _ _ 19 66 46 ,4 Xingguang 12.5 12.5 12.5 41 234 164 Longshui Yongyi 18 18 18 54 38 2 Riverbank improvement Longdong 35 35 35 10 O,(.. o 7 1Yujian 3.1 3.1 3.1 103 10 0.0 134 482 337 Total 125.4 125.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 42 168 118 Duzhou Yanqiao 113.4 113.4 113.4 12 50 35 Xinghua 34.38 34.38 34.38 6 24 17 Huohua 13.7 13.7 12.9 0.8 3 12 8 Fengcheng Kejiaping 81 8.1 8.1 18 18 6 23 16 3 Madao 18 14.5 0 14.5 _ O Entlearnpdrise ______land _ _ _ _ _ 41.66 2 ~~~~~~~~~~~Saeond41.66 0 land I______I______69 277 194 Total 243.74 187.58 186.78 0 0 0.8 0 0 0 56.16 26.2 0 0 0 0 0 1.6 0 46 146 45 ts= = Qiancengyan water plant Bich Huangjiao 27.8 27,8 I_ _ 086 22 64 9 m Pressurizing pump station 921 921 8.35 4 m . 0 0 2.46 0 68 210 54 _ Total 37.01 37.01 34.55 0 0 0 PAGE 42 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Affected Population Land AcquisiUon Houshold Populati Af Rural/Urban Fish Nursery Riverhea Waste- Ober Village Total Subtota Farm- Foest Garden labourers Township land _ ___n StN Project City Component Subtotal ~~~~~~~landFoet Pond Garden dLand S(N Project Ci~~~~~Component Township 15 39 27 27.89 1.7 3.7 Guanyin 33.29 33.29 35 120 85 50.4 49.2 = = = 1.2 Hualong 50.4 109 76 Z, 10.3 3.2 _ 27 Shibao 29.1 29.1 15.6 48 172 121 88.5 88,5 88 0.5 Bicheng Xinta 22 90 68 co _ _ _ _ _ 1.5 ______62.5 62.5 61 _ __ Yangyu __ _ _ _ 50 32 co _ _ 12 a__ 30 _ a Outang 30 30 35 120 74 5 ., .o 1.5 CD Wuli 43.82 43.82 42.32 cm 39.17 Enterprie = 39.17 0 ._ land 160.27 a ~~~~~~~~~~~~~Stale-owned0160.265 0 ______land 700 483 ______0 199.435 194 cn ~ ~ 337 61 314.01 0 0 15 5 0 8.1 Total . 537.045 61 201 182 Zhongdui 56.4 56.4 56.4 0 0 0 47 159 143 64.5 64 5 64.5 0 0 0 0 9 8 Xingkou Zitong 0 0 0 0 3 a 6.9 6 9 6.9 0 0 0 123 108 Xingkou Huanjin 0 0 0 0 0 51 Baiyang 60.38 60 38 60.38 0 0 ='Flood-preventing c embankment 1.27 Enterprise land 1.27 0 6 O _86.3 State-owned 186,3 0 . O land ______38 112 103 0 0 0 0 3 8 0 Xiangkou Zhongdui 20 20 9 604 544 Changtu River rehabilitation 0 3 8 187.57 200 395.75 208.18 197.18 0 0 0 Total 11 28 4 = Hailuo 2.55 2.55 2.55 14 49 3 a _ _ Shuangfu Taping 3.16 3.16 316 =Pressurizing pump station 11 37 8 C: 3.65 0.65 3 .~. ____ Gaohu 3.65 7 .s' a 3 12 4 3 3 3 High-elevation tank Shuangfu Luopan 19 a) 0 0 0 39 126 12.36 9.16 0 0 0 3 Total . 12.36 12 45 21 17.8 17.8 17.8 _ Water purification plant Dongyang Jingtan 2 5 3 21 2.1 tank Dongyang Dongyang 2.1 *: 0High-elevation=:n State-owned 33 3 0 8 Water pickup source Dongyang land 3.3 14 50 24 19.9 0 0 0 0 0 0 Total 23.2 19.9 PAGE 43 2004 SOGREAH CONSULTANTS-23500321 .R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

RurallUrban Land Acquisibon Affected Population Townhip illae Toal SbtotVillageFoeSubtotalFisFursry Rverha Wate- theruouseold l Affectede S/NCit Pojec Comonen ladPodGardeii d Land land nthrlabourers 446.465 890 3142 1963 Grand Total 1595.775 1149.31 1048.47 54.45 3.35 18.48 3 11.1 10.46 TABLE 2-2 TEMPORARY LAND OCCUPATION (Unit: rnu) Temporary Land Occupation Impact PROJECTI County/City Component Rural/Urban Township Total Farm- Paddy Dry Fish Nursery Othe House- Ttl land Field Field Pond Garden Ohr hold Population Bachuan 20.97 20.97 0 0 0 0 0 16 53 16.2 Comprehensive environmentToment ent Enterprise land 16.2 _ _ T F e . 1 improvement of Bachuan and Huaiyuan 1 2 inTongliang County I Sewage treatment plant Bachuan 0.63 0.63 Rivers 17 55 Total . 37.8 21.6 0 0 0 0 16.2 0 27.6 0 0 0 21 87 Comprehensive environment Dazu Riverbank improvement Longshui 27.6 0 0 0 27.6 0 0 0 21 87 2 improvement of Laixi River inDazu Total 27.6 County l ___ Duzhou 60.23 60.23 0 0 0 0 0 31 111 0 0 0 23 71 Comprehensive environment Changshou |Fengheng 24.27 24.27 0 0 2 3 improvement of Taohuaxi River in C F State-owned land 10.32 10.32 Changshou District 182 Total 94.82 84.5 0 0 0 0 10.32 54 0 0 0.4 0 0 23 86 4 Water supply works inBicheng Bishan Water supply pipeline Bicheng 40.73 40.33 0 0 0.4 0 0 23 86 Township, Bishan County Total 40.73 40.33 0 0 0 0 0 15 41 Comprehensive environment Bishan Bicheng 26 26 26 26 0 0 0 0 0 15 41 5 improvement of Binan River inBishan Total

____ County T 17 0 0 0 0 13 15 47 6 Comprehensive environment Wulong Flood-preventing embankment Xiangkou 17 0 0 0 0 13 15 47 improvement project inWulong County Total 30 7 37.1 7.05 40 153 Water supply works inShuangfu Jiangjin Water deliveryanddistbution Shuangfu 101.71 0 16.05 34.51 7 Tonhp inint ipelinesIII 7 37.1 7.05 40 153 Township, Jiangjin City Total 101.71 0 16.05 34.51

= 4 4.1 5 14 8 Water supply works inDongyang Beibei Pipeline works Dongyang 8.1 4 4.1 0 0 0 5 14 Township, Beibei District Total 8.1 0 46.57 190 665 Grand Total 366.76 189.43 20.05 66.21 7.4 371

PAGE 44 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST 2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 2-3 AFFECTED RURAL RESIDENTIAL HOUSES AND THEIR ATTACHMENTS h+W EW S Te TVcacbnle No. of households No. of people Tota Ara of S/N Project Component 409.53 8317 5 6 Flood- 6 31 492.7 6 3 preventing embankment 7 1 Project inTongliang County 1221.4 699.22 490,91 31.24 2 treatment plant 7 26 Sewage 3 3 3 8 180 180 inDazu County Sewage treatment plant 16 16 2 Project 54 1183.6 660.86 469.24 53.5 Riverbank improvement 16 303.5 56 56 56 189 7941.9 4290.44 3348 3 Project in Changshou District 541.24 1550 17 30 30 100 4193 5 1654.35 447.9 4 Binan River Project in Bishan County 510 280 3 3 Flood- 3 790 3 Project inWulong County preventing embankment 1 1 5 1 3 280 280 Changtou River renovation 122 420 16283.1 8684.4 4839.2 821.2 1938 3 103 Grand Total 122 structure. structure, E+VW for earth+wood structure and S for simple Note: B+C for brick+concrete structure, B+W for brick+wood

TABLE 2-4 AFFECTED URBAN RESIDENTIAL HOUSES AND THEIR ATTACHMENTS Area of house (m') Attachment- No. of households No, of people Tel TV cable SIN Project Component Total Bdck &concrete Brck &wood Simple 5 5 26 563.79 . 314.62 249.17 1 Project inTongliang County Sewage treatment plant 5 5460.72 1494.63 50 50 60 298 10345.09 3389.74 2 Project in Dazu County Riverbank improvement Flood- 1 1 1 6 380 380 3 Project inWulong County embankment -~~~~~~~~rjc preventing 56 56 11288.9 4084.4 5709.9 1494.6 Grand total 66 330

PAGE 45 SOGREAHl~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~AE4 CONSULTANTS- 23500321.R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 2-5 FACTS ABOUT AFFECTED ENTERPRISES Total area of houses to be demolished (mi) Attachment TV cable Affected Total Brick & Brick & wood Earth &wood Simple Tel Project Component S/N Enterprise Severity of impact population . . concrete _____ Occupying 2.52 mu of farmland and 1.83 mu of forest, 2.18 mu of fish pond being Flood Fish Breeding left unused (not good for use for poo Project in Tongliang o 41 177.3 177.3 County preventing 1 Centre quality of water), accounting for 10% embankment total area owned; 3 guard houses to be demolished (but not be rebuilt as there are additional guard houses) 17 580.86 580.86 1 1 Project in Dazu Riverbank 2 Grease Refinery To be demolished 21 1412.85 1286.3 126.5 1 1 County improvement 3 Post & Telecom To be demolished _Equipment Factory T Shizitan Power 1.4 mu of land to be permanently acquired 0 4 ShizPlant only, causing no impact to the operation of 0 _ the enterprise 3.5 mu to be permanently acquired only, .rojeclin the 0 0 Project in 5 Guangrun Company causing no impact to the operation of Changshou District _company 9.6 mu to be permanently acquired only, 6 Yufa Company causing no impact to the operation of the 0 0 company 1 1 completely 10 600 600 Binan River Project 7 Xinta Concrete Slab To be demolished inBishan County Pre-casting Yard 1 1 Mill Workshops to be demolished including 1 700 700 8 Bishan Cotton pump house 0 0 of enclosure wall around pump house 1 68 68 9 Chongqing Fuji Part ._. Machinery Plant to be demolished 25 1500 1 0 10 Bishan Farming Wood market to be demolished as it is a 3 1525 I Supplies Company temporary building

PAGE 46 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST 2004 4 I

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~

BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN Attachment Total area of houses to be demolished (me) Earth &wood Simple Tel TV cable Affecled Total Brick & Brick &wood Severity of impact ______Enterprise ______Component S/N ______Project population __ _ _ _ concrete 220 1 1 681 461 _ _ _ _ _ 16 _ _ _ __ To be demolished completely ______11Concrete Stab Pre- _ _ 1 casting Plant 372 1 wall and warehouse to 0 372 12 Datong Machinery Part of enclosure Plant be demolished no Slab Pre- 400m of space to be acquired, causing Concrete 0 380 380 Yardlity impact on the operation of the pre-casting 13 casticPublic Facility yard Company 2 2 1 450m of houses and space to be to 8 305 305 in Wulong Flood- Material Recyclin demolished and acquired and operation ProjectCroeIuonty preventing 14 Company be discontinued at time of resettlement_ County embankment Company Temporary houses built as workers' and to be Tobacco Re-drying dormitory in production season 1360 dangerous, causing 20 1360 15 Plant demolished as being _ the operation of the plant no impact to 811.54 1720 . 9 7 ______138 8162.01 3391 2239.2 Grand total

PAGE 47 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 2-6 FACTS ABOUT AFFECT INSTITUTIONS Total area of houses to be demolished (m') Attachment Project Component SIN Institution Severity of impact Affected people Total Bdck &concrete Bwnood Simple Tel TV cable

Flood- Project inTongliang Bachuan Township Part of offices to be demolished and resettled, causing County preventing 1 Enterprises Office no impact on office work as there are other houses 0 48.20 48.2 embankment

2 Chongqing Shuren Multi-functional building (including classrooms and 70 4500 4500 4 4 Binan River Project in College dormitory) to be resettled 90 0 0 .Bishan County 3 BWelfareBureau Not inthe new office building 0 90 0 4 4 Grand total . 70 4638.2 4590 48.2

TABLE 2-7 FACTS ABOUT AFFECTED SHOPS

Attachment l . [] ] Severity of Affected Area of houses to be demolished (me) Project Component S/N Description Location Owner impact people Total Brick & Ttl concrete Brick &wood Simple Tel TV cable

1 Project in Flood-preventi 9 1 Bicycle repair Yishe, Ludong Dong Weiqun to be demolished 3 165.55 165.55 Projectiang Flood-preventing shop Yicun Village completely 26.24 1 County 2 Grocery store Village Liu Wenqing to be demolished 1 229.8 203,56

42.63 1 1 Dazu Project Riverbank 3 SmaYl shop #57 Wujin Street ao to be demolished 8 42.63 improvement 3 Salso #5WuiStet Shanghai completely to be demolished 5 35.91 35.91 1 1 4 Small shop #49 Wujin Street Yan Linzhong completely 1 5 Small shop #43 Wujin Street Luo to be demolished 3 32.12 32.12 1

PAGE48 SOGREAH CONSULTANTS-23500321 .R4 - AUGUST2004 ~~~~~~~~~~~~~~~~~~~~~~~~~~~CHONGQINGMUNICIPALITY - THE WORLD BANK I ~~~~~~~~~~~~~~~~~~~~~~~~~~~CHONGQINGURBAN ENVIRONMENT PROJE-CT I ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~RESETTLEMENTACTION PLAN | Attachment Area of houses to be demolished (mz) of Afet Te cal .~~ ~ ~~ ~ ~ ~ ~~ ~~~~~~~Svrt Brieckd Ow2ner imac peopleo S/ Dscipin Location | | ~~~~~ProjectComponent 15.51 1 1 ompletdemlyse 5 15.51 6 Small shop Wujin Street RuCixieang 14.73 1 1 tobedmolished 5 14.73 7 Small shop #'139 Chaoyang LiZnhgoun 1 1 to bce demoleished 4 32.65 _32.65 8 Small shop #141 Chaoyang She Weimu __1 1 to be demolished 5 68.76 68.76 9 Small shop Streetayan Ou Zhiming be demolished 6 410 41411 10Smal shop#145 Chaoyang teDao 41.04~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 10Small Streetshop XeDean completefy 6 4`1,04 36.67 t __ to be demolished 5 83.36 46.69 11 Small shop #147 Chaoyang Luo Xiaofang 1 1 to bcedepmeotlshed 4 38.27 38.27 12 Small shop #149 Chaoyang Guo Linjiu . 1 1 74.76 44.31 30.45 Chaoyang iCghyeOnto bcedepmeotlshed 4 . ~~~~~~~~13Small shop #151 1 1 to bcedepmeotlshed 5 71.36 71,36 14 Small shop Streethaoan Xe Junhu'a 1 1 tO be demolished 4 48.84 48.84 15 Small shop Streetyan Luo RUiX; .. 1 1 tobedmolished 7 73.S2 73.92 16 Small shop #153 Chaoyang ChTnang9a 1 | 1 5 326 326 Choyn S lee15Li to be demolished l l | ~~~~~~~17 |Small shop 1 | 1 4 |49.81 | 49.8 1|| shop| *1Wujin Street | Tang lio be demolished L l | ~~~~~~~18|Small

PAGE 49 SOGREAH CONuSULTANTs-2350p321.R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Area of houses to be demolished (m;) Attachment Component S/N Description Location Owner Severity of Affected Project Total Brick& Bick & wood Simple Tel TV cable Project Component S/N Description Location Owner impact people concrete

1 1 19 Small shop #1 Wujin Street Tang to be demolished 5 27.62 27.62 Guangui completely ___ 1 to be demolished 4 35.57 35.57 1 20 Small shop #9 Wujin Street Yin Guolin completely 13.3 1 1 21 Small shop #11 Wujin Street Yang Shijin to bedmpolshed 3 13.3

83.31 1 1 and #17 Wujin Chen to be demolished 7 83.31 22 Small shop #15 Street Guowen completely

to be demolished 4 36 26 36.26 1 1 23 Small shop #23 Wujin Street MingzhongGu completely 93 81 1 1 24 Small shop #25 Wujin Street Gu Ziyin ompetely . 5 93.81

32,04 1 1 25 Small shop #47-1 Wujin Street Zhao to be demolished 6 32.04 ______Fangguan completely

61.95 1 1 26 Small shop #51 Wujin Street RuCihxieangto be demolishe 8 61.95

1 1 27 Small shop #115 Chaoyang Chen Dailin to be demorished 5 89.91 89.91 Street completely ___ be demolished 4 7878711 28Small shop 1 Streetn lo 78_7 1 1 28 Small shop #117 Chaoyang Chen Bing completely 4 78_7

40.26 1 1 29 Small shop #121 Cha6yang Zhang to be demolished 4 40.26 Street Xueme completely 1 1 30 Small shop #123 Chaoyang Pan Nenghuato be demolished 5 36.73 36.73 Street P n N gh a completely ______1 1 31 Small shop #125 Chaoyang Dai Guoan to be demolished 4 525 85.25 SOGEAStreet completely 4 85.25 85.25

PAGE 50 SOGREAH CONSULTANTS-23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

(ml) Attachment of Affected Area of houses& to be demolished Location Owner Severityimpact people Brick Tel TV cable ProjectComponentProject SNSINCmponent |DescriptionDescripion Locaton Total cocee Brick &wood Simple

1 1 3 39.6 39.6 shop 1#27 Chaoyang Zhou be demolished 32 Small Street Xiaodong completely 1 1 5 35.6 35.6 #129 Chaoyang Peng to be demolished 33 SmallSmall shop Street Hongzhu completely 1 1 4 50.05 50.05 #131 Chaoyang Wang to be demolished 4 50 34 Small shop Street Shuzt'ong completely 1 1 56.72 56.72 Chaoyang Zhou to be demolished 5 35 SmallSmall shopshop#133 Street Xiangqing completely 93.64 1 1 to be demolished 4 93.64 36 Small shop Sreet37# Hu Xihua Smallhop Choyangeu Xi7u completely to be Operation 1 1 discontinued 6 37 Luoyingshan Baisunxi Luoyingshan during Coalmine Coalmine construction Project in Flood-preventing Operation to be Wulong County embankment Maritime discontinued 611 38 Maritime during 6 38 affairs office Baisunxi affairs office construction 38 36 180 2142.01 974.71 608.38 558.92 Grand total

PAGE51 SOGREAH CONSULTANTS- 2350032.R4 -AUGUST 2004 CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 2-8 LIST OF AFFECTED POPULATION

Unit: household and persons Binan n Project in River Prjc Project in Beibel District Tongliang Project in Dazu CPhjetginu Bishan Water Supply project in Project in Project in Jiangjin Project County County Dhinstric Project Projctan Wutong County City County ______-______._____ - - Total C a) CD a)C - - 0 Co a L ( Compc . .e00 ) - o) 0) ) aEc. 0o .0a ... om wEE 0 a C UD(U .>0 Component a, -cii ia -a PI "0 >> a. to-'~a, c7c) LI a, 0) ~~~~~-~~~~ D.~~~1 -.- 12 14 124 534 .~~ ~~~~~~~~~~' 14 cmmqujsnjOnnto:laio1 65 36E4 7 4 4 _ 70 42E

Temporaryland affected89 21 3 1963 226 82 255 194 45 9 483 441 103 15 4 occupn an -Pouation___Affected labourers 82 40 5 190 Households 1 16 21 54 23 15 15

153 14 665 occupation Persons affected 2 53 87 182 86 41 47 1 Demolition of Households 5 60 0 66 affected urban ___._._ residential 6 330 houses Persons affected 26 298 0 3 1 Demolition of Households 7 6 3 16 56 30 122 rural residential affected 420 houses Persons affected 26 31 8 54 189 100 9 3

3 15 0 1 2 3 6 15__ Resettlement of affected __ enterprises fecte 138 enterprises Persons affected 0 41 38 0 31 28 0 1 0 2 Resettlement of Households _ 3 institutions affected

PAGE 52 SOGREAH CONSULTANTS-23500321.R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Binan Project in River in Beibei District Project in Project in Project in Project in Jiangjin Project Project in Dazu Bishan Water Supply Project Tongliang Bishan Wulong County City County County Dianstric Project County - - ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Total ______

C~~~~~~~~~~~~~~~~C 0 0W-a _0 _ 16 0 w Cn -E0 ( 0J C: m -, 0 a) 0*= 0co C m-~ c aHce Component ~ ~ ~ ~ ~ Persons~0 ~ ~~~~~~~~~~~~~~2 a, a) ~ ~0707 70 70 0 0 0 0 126 Personsaffected 3 4 2 2 5 3 29 8 9 3 170 179 46 2 38 Households 480 159 64 2 0 2 3 Demolitionot affected 4 12 240 52128180 2 3 29 11 3 6 3 48 19 6 707 6 7012 Demliionof Householdsaffected 0 4 106 Personsaffected 4 44 111182 505 5 14 4644 8 94 159 Persons affected 20 674 2 10

0 1963 103 15 4 0 21 3 0 194 45 9 0 483 441 . Affected labourers 82 226 82 255 Households 122 affected by both 3 1 16 56 . 30 land acquisition 7 6 3 and house Of which demolition 420 Persons affected 3 189 100 9 by both land 26 31 8 54 acquisition and demolition house 2 0 5 1146 209 178 38 36 3 40 12 61 154 123 46 22 23 Totalof Households 41 153 households and affected 45 5 0 14 4525 actually 842 | 585 112 114 12 153 people 118 952 459 146 614 | 86 affected Persons affecled 174 645

PAGE 53 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 2-9 VULNERABLE GROUP OF PEOPLE AFFECTED BY THE PROJECT Total Impoverished family Faming with Handicapped Family consisting Family of old people member(s) mainly of women living alone

no = U, S/N Project Component 5 o~~~~~~- 0~~~~~~~~~~ rt o o 0- . o rt . o =0

3 3 3 3 1 Project in Tongliang County 3 3 3 3 2 Project inDazu County Sewage treatment plant 9 2 4 22 90 Riverbank improvement 15 75 2 2 3 1 1 2 4 3 5 3 Project in Changshou District 2 3 2 3 4 Bishan Water Supply Project Qiancengyan water plant 3 3 2 2 5 5 5 Binan River Project inBishan County 2 2 4 4 5 5 11 11 6 Flood-preventing Project Embankment 2 2 Pressurizing station 2 2 Water delivery and 7 Project inJiangjin City 2 2 distribution pipelines 2 2 7 13 13 18 53 124 Total 15 75 18 18

SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 PAGE 54 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 2.10 AFFECTED GROUND ATTACHMENTS AND PUBLIC FACILITIES Binan River in Beibei District in Project inWulong Project in Jiangjin Project in Project in Bishan Water Supply Project Project in Project Bishan County City Dazu County Changshou District Project Tongliang County County a c _ - Item Unit c -

495 4 .0.5 High- voltage KM 4_5 1.5 _3 07 power line 105 2 __ Low- peower KM 0.02 _ _ _ 330 . 330 oTptijlceaPlc°anblae M 1 1 Cell phone Piece 230 relay tower ______.____ 230 Waptieprpiperlinesliunpeply KM_4______9_5M 3 _ _6 _ ____. 260 Pump station Piece 3 200 ___ 60 1970 _Water pipe M . 80 _OO _ 31 Power wire M __ 1170 3 8 4 6 12 352 Power pole Piece ______232 120 Natural gas M 1024 360 35 = 112 500 17 Piece 790 5 ____3897 Bamibnoeo 553 1500 _____ 65 984 tree Piece _ 80 3729 Fruit 2000 40 260 501 94 754 Copse Plece 1484 __ _ 820 376 288 Y0trne9ef Piece ______i__ _o10 Young tree Piece _1100 ____ 1700 5878 947 14 2777 13 Mulberry tree Piece _440 13 Piece Huangjue 1 treetower Century-old Piece 331

PA~F 55 SOGREAH CONSULTACNTS-23500321 R4 -AUGUSTI204 CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Binan River Project in Jiangjin Project in Beibei District Project in Project in Project in Bishan Water Supply Project in Project in Wulong City Tongliang County Dazu County Changshou District Project Bishan County County .- Total Item Unit _5 ToiletQU_ M2 26 4. 0 C: -W al) -L 0) *~~~)n CA. CU 0) .- a.E CU 2 _ -C:. - C ~~~~~~~ m . a)I tE_I _ _ . 346.2~~~~~~~~~~~~~~~~~~~ Water_ lank M3 12 260 74.2 219 Publicozloilet. M2 177 42E n C 219~~~~~~~~~ Public toilet M2 177 42 I

0 494 ._ 4869 Grun M2_ 05 2760 Enlosure KM 1735 1725. 173 3446 Emairkdryin M2 325 1383 39 500 _60 = = 109 S M2=_89______47.71750 24 3 180 141 227. WaembtankmnWrasterrounepvd prait M3M3 36 Piece 9 395 13__6 3892 StlionletpveWellf M2 38924

90 104 49346 ground M2 4846 934 Wharf Piece 3 1 143 l ll GrSavlbde| Piece 81

2.68 Road KM 1.73 __ _0.95 __ _60 2762 _ _ _ 452 1750 500 Tractor trail M ______3 _ 3 _ __ ,Small bridge IPiece ______

PAGE 56 SOGREAH CONSULTANTS-23500321 .R4 - AUGUST2004 BANK CHONGOING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

UNITS AFFECTED 3 SOCIO-ECONOMIC SURVEY OF PEOPLE AND affected area and obtain understand the socio-economic situation of the To further in compliance with the facts about the affected people, the project office fundamental a preliminary survey of the socio- requirement of the World Bank carried out 2003 to provide data for analysis. In economic situation of the affected area in April while continuing investigations into the quantity September 2003, the project office, of the sample survey of the socio-economic situations of tangible work, conducted a form of institutions and shops. The survey took the affected families, enterprises, (accounting for interviews and involved 1,848 rural residents questionnaires and for 38% of the population), 270 urban residents (accounting 40% of the total affected for 100% of the total population), 18 enterprises and institutions (accounting affected the total number). number) and 38 shops (accounting for 100% of

NATURAL VILLAGES 3.1 FUNDAMENTAL FACTS ABOUT THE AFFECTED will affect 36 villages in 8 townships of The permanent land acquisition for the project of these villages are listed in below Chongqing. The socio-economic situations TABLE 3-1. BE AFFECTED BY LAND ACQUISITION TABLE 3-1 BASIC FACTS ABOUT THE VILLAGES TO Net percapitarea of Gross Gross farmland agrcultural industral Village Ppulton Area2 income(RMB) of (mu) (RBoutput oRuBtput SIN CountyDtncU Ruralurbantownship (persons) (kin ) farmer 290 3200 Yandu 987 0.22 2964 323 108 2360 Ludong 1796 1.16 2906 1568 1 TOng1iang BaChUan ____ 635 2775 Yueyang 2712 1.33 2913 1900 126 2868 Tiyuejie 3446 1.23 2960 1650 977 23790 Mingguang 2867 1.96 3250 1966 460 5750 Xingguang 2994 0.85 2857 817.4 3300 213.8 126 52170 2 Dazu Longshui Yongyi 1967 0.35 3442 3200 Longdong 4749 4.10 3000 4389 1246 4450 Yujian 2652 1.79 2868 1145 3463 Shengtian 1726 1.38 2619 1336 1977 449 46 Duzhou YanqiaO 2054 2.04 2517 406 3 Xinghua 1500 1.68 2487 1554 275 4 Hongmiao 1067 1.18 2549 1188 2690 448 102 0 3 Changshou Huohua 638 0.50 415 2 Madao 1323 1.51 2200 1466 1294 350 1 Fengcheng Lianglu 1798 1.35 2690 258 0 Kejiaping 1157 1.09 2204 1053 115 0 Songbai 1226 0.50 2690 464 3101 1667.4 279 785 4 Bishan Bicheng Huangjiao 3432 2.02 851 Wuli 3446 2.32 3186 1842 247

PAGE 57 SOGREAH CONSULTANTS- 23500321 R4 - AUGUS1 2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

DistnSctl RuraVurban Population Area Net per-capita Area of Gross Gross SIN Village income of farmland agncultural industrial (kmn2) farmer (RMB) (mu) oupt upt County township (persons) (RMB10,000) (RMB10,600)

Chuanxin 3468 2.52 2487 3426 224 638 Guanyin 1156 1.63 2606 1250 186.32 44.32 Hualong 1549 1.32 2031 891 263.65 103.89 Shibao 1077 0.51 2611 370 114.74 3 5 Bishan Bicheng Xinta 1039 1.10 3022 756 121.77 82.8 Yangyu 1171 1.52 2752.3 1080 279.4 49 Outang 1278 1.63 3937 1209 495.2 36.1 Wuli 2002 1.55 2126.3 1172 113 371 Zhongdui 808 2.5 2098 212 57.22 2 Zitong 1000 4.2 2365 407 43.67 18.21 6 Wulong Xiangkou Huangjin 2144 4.6 2184 1010 76.72 14.76 Baiyang 1091 3.4 1941 901 135.57 12.61 Hailuo 2567 3.66 3191 1720 450 81.5 Taping 3401 6.06 2975 2262 501 153 7 J;ang;;n ShUangfU Gaohu 4500 2.4 2631 3249 323 600 Luopan 3250 2.06 3000 2864 420 500

Jingtan 490 1 2065 285 60 70 8 Beibei DOngYang9 Dongyang 220 0.7 2050 170 50 80

3.2 BASIC FACTS ABOUT AFFECT RURAL FAMILIES FOUND IN THE SURVEY

3.2.1 NUMBER OF FAMILY MEMBERS

The survey of rural families involved 1,848 persons including 891 women, accountirig for 48% of the total number of people surveyed, and 1,015 labourers, accounting for 55% of the total number. No minority nationalities were involved in the survey. See TABLE 3-2 for detail.

3.2.2 AGE STRUCTURE OF THE POPULATION

Of the 1,848 people surveyed, 230 were under 6 years of age, accounting for 12% of the total number, 411 were within 7-15 years of age, accounting for 22%, 989 were within 16-60 years of age, accounting for 54%, and 218 were above 60 years of age, accounting for 12% of the total number. See TABLE 3-2 for detail.

SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 PAGE 58 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

3.2.3 EDUCATION BACKGROUND for 5.46% of the total people surveyed, 108 were illiterate, accounting Of the 1,848 for 26%, 917 attended secondary 476 attended primary school, accounting number, school, accounting for 18%, 9 accounting for 50%, 337 attended high school, and 1 attended university and above, attended college, accounting for 0.49%, accounting for 0.05%. See

TABLE 3-2 for detail.

3.2.4 EMPLOYMENT OF LABORERS labourers, of whom, 524 were working as The 1,848 people surveyed included 1,015 and 481 were working as migrant workers farmers at home, and accounting for 53% away from home, accounting for 47%. See

TABLE 3-2 for detail.

EXPENDITURE 3.2.5 ANNUAL FAMILY INCOME AND

expenditure of rural families. See TABLE 3-3 for the annual income and

URBAN FAMILIES FOUNDING IN THE 3.3 BASIC FACTS ABOUT AFFECTED SURVEY

3.3.1 NUMBER OF FAMILY MEMBERS 117 270 persons in 55 households including The survey of urban families involved 145 total number of people surveyed, and women, accounting for 43% of the were total number. No minority nationalities labourers, accounting for 54% of the for detail. involved in the survey. See TABLE 3-4

3.3.2 AGE STRUCTURE OF THE POPULATION 6 years of age, households surveyed, 25 were under Of the 270 people in 55 age, accounting number, 69 were within 7-15 years of accounting for 9% of the total and 218 were 16-60 years of age, accounting for 54%, for 26%, 147 were within 3-4 for 11 % of the total number. See TABLE above 60 years of age, accounting for detail.

59 2004 PAGE SOGREAH CONSULTANTS - 23500321 R4 - AUGUST CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

3.3.3 EDUCATION BACKGROUND

Of the 270 people in 55 households surveyed, 1 was illiterate, accounting for 0.4% of the total number, 95 attended primary school, accounting for 35%, 95 attended secondary school, accounting for 35%, 63 attended high school, accounting for 23%, 1 attended college, accounting for 0.4%, and 10 attended university and above, accounting for 4%. See TABLE 3-4 for detail.

3.3.4 EMPLOYMENT OF LABORERS

The 270 people in 55 households surveyed included 145 labourers, of whom, 71 stayed at home doing housework, accounting for 49% and 74 were employed, accounting for 51 %. See TABLE 3-4 for detail.

3.3.5 ANNUAL FAMILY INCOME AND EXPENDITURE

See TABLE 3-5 for the annual income and expenditure of urban families.

3.4 BASIC FACTS ABOUT THE AFFECTED ENTERPRISES FOUND IN THE SURVEY

The socio-economic survey covered the situation of the affected enterprises in operation and the salary level of their employees. See TABLE 3-6 for detail. Of the 15 enterprises, 6 are by privates, 7 by the collective, 1 by the state and I is a stock company. Except two enterprises that had stopped production and one that operated seasonally, all the 13 enterprises are operating quite well and the average monthly salary level of their employees is within RMB500-2,500.

3.5 BASIC FACTS ABOUT THE AFFECTED INSTITUTIONS FOUND IN THE SURVEY

The socio-economic survey covered the situation of the affected institutions and the salary level of the workers. See TABLE 3-7 for detail. There are 3 institutions to be affected by the project and the average monthly salary level of the workers there was RMB850-1150.

3.6 BASIC FACTS ABOUT THE AFFECTED SHOPS FOUND IN THE SURVEY

The socio-economic survey covered the situation of the affected shops in operation and the income level of the shop owners. See TABLE 3-8 for detail. Of the 38 affected shops, 36 were private shops and most of them are in the residential houses built along the street or riverside. Most of the shops are run by the owners of the residences themselves. The shop assistants are basically the owners' own family members. There are only one collective-run shop and one state-owned shop.

SOGREAH CONSULTANTS- 23500321 .R4 - AUGUS1 2004 PAGE 60 - THE WORLD BANK CHONGOING MUNICIPALITY PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

RURAL FAMILIES TABLE 3-2 BASIC FACTS ABOUT AFFECTED

Age Minority Education Sex Population Labourers (persons) SxEuaonAenationality (persons) _ _ _ _ _ Rurall urban Village _. County/ Villge| _ a district Township _ _ 61 CD2 g >c 16 2 E d811/01 26 10 0 0 9 D0zu 16 CD 28 5 2 Ludong~~~c47 14 21 12110 0 28 7 21 26 8 223 9 0 Ludong 47 47 21 3 1 7 17910 17 2m1 4 17 226 co150 1108 22 1 0 0 41 4641 21 6 17 4 1 7 Bachuan YueyangXingguang~~. 46 3 24 Tongliang 14 17 8110 0 0 31 21 17 4 19 57 114 24 Tiyue 31 52 109 29 24 117 97 12110 0F 72 26 46 3 17 23 3 0 Mingguang 214 214 8 25 11 2 26 20 13f10 0 0 46 23 6 17 26 35 88 17 Xingguang 46 44 70 35 17 63 87 79 11/10 8 0 _0 166 166 84 21 6 11 33 Longshui Yongyi 19 25 14 Oazu 30 28 11/10 0 0 58 29 10 19 2 10 23 3 YVui an 5B 19 16 3 19 19 1 0 a 38 19 8 11 4 28 2 Longdong 38 20 10 4 8 18 16 11f10 34 28 20 2 11 3 0 0 Beiqiao 34 2 4 1 14110 11 3 10 7 18 5 0 0 17 17 11 8 6 2 6 6 Duzhou Hongmiao 11 16 Changshou 8 17 18 9110 8 0 0 35 35 18 10 7 17 Shengtian 1 11 15 5 13 19 7/10 0 0 32 16 10 6 6 8 55 7 Songbai 32 15 49 12 0 Fengcheng 36 11(10 0 0 0 0 5 40 40 3 3 8 1 76 73 45 _ _ 5 Huangjiao _ _ __ 4 6 _ __ 1110 _ _ 8 7 Bicheng __ _ _ 9 2 7 Bishan BWuli Bicheng15 15 PAGE 61

.R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 UkLi,. CHONGOING MUNICIPALITY - I HE VYUJLU PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

e dcationAeMinority A9e nationality Populatin Lbues(pros SeX EdUCatsOn (perSOnS) LabOUsonS (PerSOnS) !C -6 CD Vilg - County/ Rurall urban CD0) C,- Villge E0 5 district Township 0 5 C I- o,a. I-'- CD (D8 50 4510 0 0 3 140 8 2 48 80 73 11a10 153 153 100 72 28 23 5 0 0 GUanY;n 53 6 1 1520 33 30 110 _3 63 63 40 30 10 0 0 HUalOn 91 0 13 20 8 1 _1 40 38 25 13 26 25 0 ShibaO 51 51 1 22 35 50 25 0 - 1 70 50 0 0 70 20 62 70 9/10 50 0 12 30 406 Xinta 132 132 90 8 30 30 20 48 40 12110 uYangyU 88 88 50 20 20 6 0 0 7 20 30 1 12 28 30 9/10 = = 58 58 35 20 15 30 4 0 0 Outang 20 40 0 10 20 349110 4 64 50 35 15 30 0 Wuli ______64 1 20 1 0 Biuhang Biahngko 1 1 1 1 1 2 2 1 4 4 384 3 5 49 7 0 0 Ganiano 5 19 30 8 3 31 33 9110 0 2 0 64 45 27 18 10 6 8 81 11 0 ZhOngdUiba 64 0 1 9 35 51 33 24 52 54 1 Z;ton9 106 101 57 WUIOn9;anGkU 1 4 6 0 0 2 2 1 5 6 41 5/10 0 0 1B0 10 3 1 2 3 1 0 0 J;an9;in Shuangfu HailuO 4 0 0 1 1 3 1 0 0 2 6 2 0 2 3 0 OuTaPing 6 3 2 4 16 4 0 0 1 10 10 2 3 3 14 12 12/10 GaOhu 26 26 6 0 2 1 0 0 0 0 1 3 1 2 2 1 0 0 4 4 1 0 1 0 0 LUOPan 2 3 1 2 122 0 0 2 10 3 7 10 7/10 17 17 5 2 1 0 0 ZChangling 0 1 0 1 10 0 0 1 10 2 7 5 14/10 12 12 3. 1 3 0 0 Datang 30 6 2 5 28 1 1 0 0 7 20 18 11/10 38 38 10 3 7 0 0 TUbao 10 9 1 1 10 0 0 0 0 2 4 11 8 14110 19 19 6 2 0 0 0 Huamuyuan 1 1 0 1 0 2 0 0 1 1 1 0 2 1 Sanhe 3 3 PAGE62

- AUGUST2004 SOGREAH CONSULIANTS - 23500321 .R4 62 ~ ~ ~~ ~~~~~~~~~~~~~~~~~~~~~~PG .~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ - THE WORLD BANK CHONGQING MUNICIPALITY PROJECT CHONGOING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

Age nationality SxEuainAeMinority Education Population Labourers (persons) Sex (persons) . a . 1 X '- .S 'D C ' 2-f -a =.0 Rural/ urban Village a' oa ~ ~~~~ E~~5 5 Countyl 0 0 ~ ~~~~~~o~ ~ a'F ~ U district Township 0 ~~~~~~.C - ' 0,0 FZ m,~~ CL CL 0 0 0 0 0 1 4 0 0 3 2 2 15110 0 0 2 1 1 3 3 19 3 0 Poshi 5 5 10 1 4 1 9/10 0 1 10 3 5 12 14 4 0 0 0 26 26 8 4 2 1 1 Guanghua 0 0 0 0 1 3 3 1 7 0 0 6 6 2 1 1 4 4 20 Zhongdu 2 9 22 4 21 17 12/10 0 0 0 38 29 15 14 0 1 4 3 Jingtan 38 0 1 3 1 15110 0 0 ______2 2 3 2 Beibei Dongyang 5 5 4 989 21 0 0 Dongyang 476 108 230 411 1 9 337 917 481 957 891 11/10 1848 1840 1015 534 Grand total

PAGE 63

- AUGUST2004 SOGREAH CONSULTANTS- 23500321.R4 lANK CHONGQING MUNICIPALITY - THE WORLD PROJECT CHONGQING URBAN ENVIRONMENT PLAN . RESETTLEMENT ACTION

OF AFFECTED RURAL FAMILIES TABLE 3-3 ANNUAL INCOME AND EXPENDITURE Annual expenditure of the family .______Family Income 6 U E =3824 | | P:jed ( Item X S 1. 1-. 2 ): Item lue 3679'a ) a- ILC Project a.- 8-~~~~~~~~~~~~~L a Lu 0~~~~~~~~~~~~~~~~C-0 97 2846 117 400 150 81 2978 833 2145 1300 1258 2421 23D2 in Per-capita value 3679 ______5.04% 2.72% 3.26% Project 72.03% 43.65% 3.93% 13.43% Tongliang (RMB/personl) 62.57% 1 27.97% 1 34.19% 65.81% 855 2476.8 County Structural ratio 161 92 638.2 1617 428 81 37.91% 1870 2255.2 ______4_0_ 4.08% 3115 811 2304 71.70% 18.98% 3.59% 7.14% Project in Per-capita value 60.03% 1 28.30% Dauouty (RMBlperson) 26.04% 73.96% 87 89 2375 County Stuctural ratio 100.00% 87.5 350 87 Dazu 625 1750 1050 _ 2000 1500 2375 Per-capita value 30D0 1000 _ 3.66% 3.66% 3.75% Project in 73,68% 44.21% 3.68% 14.74% (RMBlperson) 50.00% 1 26.32% 50 36 3727 Changshou 1 33.33% 66.67% 586 250 100 150 District Structural ratio 3427 786 200 3927 500 3427 BWsanteri(RMB lperson) 4.58% 12.72% 19.08% 0.00% 6.36% 1 25.45% 74.55% 31.81% 12.73% 87.27% 87.27% Structural ratio 1 97.5 97.5 78 3213 Supply 1365 780 117 195 Project 1599.47 3320 1955 5168 3059.2 2108.8 Binan River Per-capita value Project in (RMB(person) 2.94% 2.94% 2.35% 41.11% 23 49% 3.52% 5.87% 30.95% 1 . 58 89% 139 50 233 1766 1 59.20% 40.80% 736 50 210 County Structural ratio 1925 507 1418 1581 692 471 in Per-capita value 2273 7.22% 2.60% 12.10% Project 73.66% 38.23% 2.60% 10.91% Wulong (RMB/person)______20.72% 1 26.34% 1 69.56% 30.44% 50 2360 County Structural ratio 50 120 50 _____ 420 100 320 50 11.90% 0.00% - 2140 1800 11.90% 28.57% 11.90% Per-capita value 2460 320 1 23.81% 76.19% 11.90% Project in (RMBlperson) 86.99% 73.17% 1663 JinginCiy ratio 1 13.01% 153 0 51 City Structural 54 _ _ _ Jiangjin 1563 1305 ______230 ______819 1793.26 ______1126 ______767 ______value 1893 ______2.85% | 0.00 ! in Per-capita _ _ _ 856% 000!, Project ______3900%3 ______87.16% 7275% (RMB/person) 4324% 1 12,84% Beibei ' 4054% 5946% District Strudural ratio

PAGE 64

- AUGUST2004 SOGREAH CONSULTANTS- 23500321 .R4 THE WORLD BANK CHONGOING MUNICIPALITY - PROJECT CHONGOING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

URBAN FAMILIES TABLE 3-4 BASIC FACTS ABOUT AFFECTED Age Minority Education nationality Labourers (persons) Sex - 4;~- ~- T S .q 1 0 1 W MTS!$ ~ - 2 ~ -7 - j ~~~~.,

0 0 I 3 3 16 4 I 8 7 6 14 12 12/10 32 42 i i 0 0 5 26 16 5 11 10 66 8 Bachuan Dongfangshe 14/10 3 12 12 0 0 Tongliaiig 28 28 54 39 to It 27 71 Chaoyangjie 23 93 56 4 35 72 0 32 32 68 53 1 .10 3 7 18 2 0 Wujinjie 21 121 64 8 6 13 Dazu Longstiui 17 13 13/10 3 69 147 29 0 0 6 30 9 6 3 63 95 95 I 25 Zonghejie 117 13/10 10 I 270 145 71 74 153 Grandiotal 55 OF AFFECTED URBAN FAMILIES TABLE 3-5 ANNUAL INCOME AND EXPENDITURE Annual expenditure of the family Annual income of the family i 0 0* 0 E ~ E 2 CCu E- E i 8 - E --- C0 ~ ~CL~~~~~ Project Item & C~ ~~~~~~~~~~~ 37 5260 930 340 280 3492 1643 262 I I 315 620 95 I 5260 4230 I 8.02% 106% | Project in Per-capita value 7.50% I 26.63% 974% (RMB/person) 1.81% 100.00% 47,05% Tongliang 80.42% 5.99% 11.79% 109 43 4893.41 Structural ratio 1 829.99 327.6 440.25 County 4018.24 1958.01 352 96 4036.89 283.77 572.75 _, 10.96% 2.72% I Per-capita value 4893 41 ,_,,__,._.,_ 8.78% 20.66% I 8.15%0/ Project inDazu _ 48.73% ______0.00% 100.00%/ (R MB P er o ) ,_ _ _ _ ._ 82.50% 5.80%0/ 1170% County__C ounty Structural ratio _

PAGE 65

- AuGUST 2004 SOGREAH CONSUTANTS- 23500321.R4 - I HE VVul-LU bA1 CHONGOING MUNICIPALITY PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT AcTION PLAN

AFFECTED ENTERPRISES TABLE 3.6 BASIC FACTS ABOUT THE Basic facts Revenue Operating conditMon Employee Monthly salary Operating space 10,000) Location Ownership ~ ~~~~~~~~(person) ~ ~~~~~~~~(inlevel (RMB Project SIN Enterprise ~~~~ ______Normal 500 0 B Fish Breeding 177.3 41 Project in Collective Centre Ludong Yishe Good Corngtyin I B00 580.86 17 #43 Wujin Street Private Moderate 2 Grease Refinery 21 540 Project inDazu Private 1412.85 Pmet Placo #51 Wujin Street County 3 Pant Normal Equipment 1500 500 Taohua NBH,. 7000 2000 Fengcheng State . 4 Shizitan Power Plant Township, Changshou District 200 Normal Taohua NBH, 120 2000 Stock 30000 Guangrun Co. Fengcheng Changsrou istric 5 Charsoje inTownship,3001220000Nraisrct Changshou District Normal Gufu NBH, 2500 6000 8000 7000 Fengcheng Collective 6 Yufa Co. Township, 2.4 Normal Changshou District 10 550 Beside Yangyucun Private . 7 Xinta Concrete 52.3 Stopped Fact. Cotton Mill 576 620 Slabs collective ISO Normaf Mill Yangyucun Village 327 868 8 Bishan Cotton Private Fuji Dawangqiao, Normal 9 Chongqing P6 837 8 Plant Beierhuan Rd. 20 River Machinery Collective Binan Farming Dawangqiao, Project in 10 Bishan Normal Supplies Co. Beierhuan Rd. 600 3.5 Bishan County 16 Dawangcun Private Nomal l l Concrete Slab 876 180 Casting Yard Neighbourhood 350 Dawangcun Private for 12 Datong Machinery non Not operating Neighbourhood 10 500 Plant 380 ______years 12 ______Collective _ _ _ _ _ Huancheng Rd. ______Slab _ _ _ _ _ 13 Concrete ______Normal _ _ _ _ _ Sales income Casting Yard __ _ _ _ B 550 ______Collective 305 4% Recycling S.Bridgehead, Project in 14 Material Operating seasonally Co. HuanchengRd. 600 150,0001year Wulong County 72 mu 40 Zitong Sishe Collective 15 Tobacco Re-drying PAGE 66

.R4 - AUGuST 2004 SOGREAH CONSULTANTS-23500321 WORLD BANK CHONGOING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

INSTITUTIONS 3-7 BASIC FACTS ABOUT THE AFFECTED TABLE Basic fact ______level Location No. of workers Monthly salary SIN Inslitulion Space (m) Project Project.S/N InstutionLocation 24 850 Yandu Sishe 48.2 1 Bachuan Enterprise OMice 1150 inTongliang County 4500 113 Project Wenfeng Neighbourhood 2 Chongqing Shuren College 1000 90 80 inBishan County Nanguan Neighbourhood Binan River Project 3 Bishan Public Welfare Bureau

ABOUT THE AFFECTED SHOPS TABLE 3-8 BASIC FACTS Analpot Per-capita Anulicm Shop ARuBpofit assistants monthly ARMBlome Ownership Owner (RMB) RB000 (MBO00 Shop Location (person) income Component SIN 0 8 Project 500 37 Dong Weiqun 3 Ludong Yicun private P Bicycle repair Yishe, 3.6 0 7 shop Village 1 600 Flood-preventing ____ private Liu Wenqing Project in store Sishe, Yanducun works 2 Grocery 0 25 Tongliang County Village 8 4 private Yao Shanghai 4 0.25 Small shop #57 Wujin Street 5 Riverbank 3 private Yan Linzhong 0.25 Project inDazu Small shop #49 Wujin Street 4 improvement 4 Luo Fangneng 3 County #43 Wujin Street private 4 0.25 5 Small shop Ruixiang 5 Street private Chen 6 Small shop Wujin 9 0.5 Zhou Liangrong 5 #13 9Street private 7 Small shop 9 0.5 She Weimu 4 #141 Chaoyang private _ _ _ _ 8 Small shop Street 0.5 5 9 43 private Ou Zhiming shop #1 Chaoyang 9 Small 9 0.5 6 _ _ _ _ _ ovate Xe Dean _ shop #145 Chaoyang 10 Small Street 9 05 5 private Luo Xiaofang shop #147 Chaoyang 11 Small Street 9 0.5 4 __ __Stre private Guo Linjiu ______#149 Chaoyang ______12 Small shop t ______St ee ______PAGE 67 ______.R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN Annual profit Shop Per-capita Annual income | monthly (RMB10,00i) (RMB1AP000) Ownership Owner assistants SIN Shop Location (pe~~~~~~rson)j income (RM B) Component ______Prject ______8 0.4 Xingyong 4 ______#151 Chaoyang private Chen 13 Small shop Street B 0.4 Junhua 5 ______#153-1 Chaoyang private Xe 14 Small shop Street 8 0.4 private Luo Ruixi 4 Small shop #155 Chaoyang 15 0.4 Tang 7 #153 Chaoyang private 16 Small shop Street Cegun80 8 0.4 17 Small shop Chaoyang Ma Li 5 # jStreet't55-1# private 0.4 .17l8 Small shop 4 B private Tang Guanhui 0.35 18 Small shop #1Wujin Street 8 private Tang Guangui 5 19 Small shop #1Wujin Sireet 6 0.3 private Yin Guolin 4 Small shop #9 Wujin Street 6 0.3 20 Shijin 3 #11 Wujin Street private Yang 21 Small shop 6 03 Guowen 7 #15 and #17 Wujin private Chen 22 Small shop 6 0.3 private Gu Mingzhong 4 23 Small shop #23 Wujin Street 6 0.3 private Gu Ziyin 5 Small shop #25 Wujin Street 6 0.3 24 Zhao Fangguan 6 #47-1 Wujin Street private 0 25 25 Small shop 8 4 Street private Chen Ruixiang 26 Small shop #51 Wujin 14 07 Dailin 5 private Chen _ _ 27 Small shop #115 Chaoyang ______Street__ 08 4 16 SChaoyang t#117 private Chen Bing 28 Small shop ____ 28Small shop ~Street______11 06 Zhang Xueme 4 private ______#121 Chaoyang ______29 Small shop ______S treet__ _ 10 0.6 private Pan Nenghua 5 #123 Chaoyang ______30 Small shop ~Street______Smallshop 10 0.6 private Dai Guoan 4 31 Small shop #125 Chaoyang Street 0.6 3 10 private Zhou Xiaodong ______Small shop 1#27 Chaoyang 32 Street 0.6 10 _ _ _ _ _ Peng Hongzhu 5 ______Chaoyang private_ _ _ 33 Small shopmall #129~Street _ _ Sshop 10 0.6 Wang 4 #131 Chaoyang private 34 Small shop - Shuzhong SmalEhoR4 - AUUS_20_PGE6Street PAGE 68 2004 SOGREAH CONSULTANTS- 23500321 .R4 -AUGUST WORLD BANK CHONGQING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN Annual income Annual profit ~ ~~~~ ~~~~~~~~~~~~~~~~~~~ShopPer-capita 0,000) (RMB10,000) assistants monthly (RMB1 Ownership Owner ) ______(r Project Shop Location (person)n incomei c e (RRM B) Component SIN 0.5 lProject ______._. . ______Zhou Xiangqing 5 Chaoyang private huXinqn Small shop #133Street rvt 35 § 0.5 Hu Xihua 4 Street137# private 36 Small shop 6 2 6 500 - collective . . Baisunxi 2 Flood- 37 Luoyingshan 500 6 preventing Coalmine 6 Project in Baisunxi state-owned 38 affairs office Wulong County embankment themselves and their family they are run by the owners Project in Dazu County as for shops affected by the Note: No salary data available members.

PAGE 69

- AUGUST2004 SOGREAH CONSULTANTS- 23500321.R4 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

4 LAWS AND POLICY FRAMEWORK

4.1 MAIN LAWS AND POLICIES OF RESETTLEMENT on January 1, 1999) People's Republic of China (effective * Law on Land Administration of the of China (effective on Administration of the People's Republic * Law on Urban Real Estate Assets January 1, 1995) (effective on Dismantling and Resettlement Administration * Regulations on Urban Housing November 1, 2001) Municipal Government of Chongqing Municipality (Chongqing * Provisions on Land Administration Decree No. 53, on March 30, 1999) of Chongqing Dismantling and Resettlement Administration * Regulations on Urban Housing 1 2002) Municipality (effective on December of Chongqing Municipality Compensation and Resettlement * Measures for Land Acquisition, Decree No. 55, on September 13, 1999) (Chongqing Municipal Government Acquired Land of Chongqing Green Crops and Attachment on * Provisions on Compensation for Government decree (1995) 171) Municipality (Chongqing Municipal at No. 87 standing Land of Chongqing Municipality (passed * Administration Method of Construction 1, 1991) in August, 1991 and effective on September meeting of Chongqing Municipal Govemment Municipality (effective on for Construction Land of Chongqing * Application and Approval Procedures November 23, 1988) Municipality (decided Dismantling and Resettlement of Chongqing * Fee Criteria on Urban Housing 1995 and effective on July 1,1995) at No. 16 Mayor meeting on April, of Chongqing Municipality for Resettled persons from Agriculture * House Resettlement Provisions (effective July 15, 1995) persons from Agriculture of Calculation Criteria for Resettled * Notice on Resettlement Fee July 15, 1995) Chongqing Municipality (effective on Acquired Land of Chongqing Green Crops and Attachment on * Provisions on Compensation for 15, 1995) Municipality (effective on September and resettlement, and criteria of land requisition dismantling * Documents on compensation counties. resettlement by involved districts and PAGE 70 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST - THE WORLD BANK CHONGOING MUNICIPALITY PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

2001 Bank Chongqing Municipal Government * Loan Agreement CUEP World (December, 2001) and 13: Involuntary Resettlement Operational Policies OP 4. * The World Bank (Involuntary Resettlement) Policies: OP 4. 12 - Annex A the World Bank Operational

POLICY EXCERPTS FOR RESETTLEMENT 4.2 RELEVANT LAWS AND

ACQUIRED LAND POLICY EXCERPTS FOR PERMANENTLY 4.2.1 RELEVANT LAWS AND CHINA OF THE PEOPLE'S REPUBLIC OF 4.2.1.1 LAW ON LAND ADMINISTRATION and China)) sets forth: Any unit of the People's Republic of ((Law on Land Administration state land. has to legally apply for using individual needing land for construction according to the original purpose is acquired shall be compensated Article 47: Owners whose land of the land before acquisition. resettlement shall include land compensation, for acquisition of farmland acquisition The compensation crops on the land. The land for attachments and green subsidy and compensation output value of three years as much as the average annual shall be six to ten times as per the number compensation subsidy shall be calculated acquired. The resettlement before the farmland was to be resettled shall be calculated The number of rural residents residents to be resettled. land of the owning unit of rural average per - capita area of area of land acquired by the resettled by dividing the for each rural resident to be standard of resettlement subsidy the before acquisition. The value in three years before the average annual output four to six times as much as farmland shall shall be subsidy per hectare of acquired However, the resettlement at the farmland was acquired. before acquisition by 15 times output value in three years not exceed the average annual most. shall be for acquisition of other land and resettlement subsidy of The rate of compensation with reference to the rate autonomous region and municipality determined by the province, acquisition of farmland. and resettlement subsidy for compensation by the on the land shall be determined attachments and green crops The rate of compensation for and municipality. province, autonomous region under clause 2 of this article and resettlement subsidy paid where the land compensation living standard, the In cases resettled to maintain the original to enable the farmers to be the people's is not enough with the prior approval of subsidy may be increased land amount of resettlement However, the sum total of the autonomous region or municipality. government of the province, as much as the average annual subsidy shall not be 30 times compensation and resettlement years before the land was acquired. output value of the land in three

PAGE 71 23500321.R4 - AuGusT 2004 SOGREAH CONSULTANTS- BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

ACQUIRED LAND OF CHONGQING MUNICIPALITY 4.2.1.2 RELEVANT POLICIES ON PERMANENTLY

Chongqing Municipality Land Administration Provisions of to construction land. shall be required in converting farmland Article 19 Legal approval formalities with overall land use planning; (2) the shall comply with: (1) the land complies The converted land planned data for village and township planning; (3) yearly land complies with the urban planning or farm land measure is implemented. converted land is obtained; (4) Make - up subsidy, green crop and land attachment Article 22 Land compensation, resettlement three months from the date when land compensation compensation shall be completely paid within and resettlement plan is approved. 2 shall be 20 to 25 m per person for space standard of residential house site Article 32 The 2 within non- and 20 to 30 m per person for those living villagers living within the metropolitan area minority counties) and cities. Families districts, counties (or autonomous ethnic metropolitan and four persons as four persons shall be counted as three persons consisting of less than three of land shall be counted as five persons. The area those consisting of more than five persons and the space of the original house residential shall be taken into account with taken in expanding the 2 residences residence shall be 10 m per person for site. The standard of land pace for building 2 person for those living in non-metropolitan the metropolitan area and 15 m per living within of less than three counties) and cities. Families consisting districts, counties (or autonomous of more and four persons as four and those consisting persons shall be counted as three persons persons. than five persons shall be counted as five to the applicable laws, the land using unit or individual shall pay, according Article 39 The land crops and subsidy and compensation for green acquisition compensation, resettlement attachments on the land acquired.

PAGE 72 2004 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST WORLD BANK CHONGQING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

annual times as much as the average acquisition shall be six to ten The compensation for the land and fish - farming land, pastureland, orchard land value of the farmland (multi-purpose be regarded output other non - farming lands to as farmland and two mus of water space to be regarded laws or regulations, the specified in the applicable of farmland except as otherwise value as one mu (the average annual output in three years before acquisition same rule applying hereunder) uniformly by the acquisition shall be determined urban area in three years before - of farmland in the shall be determined by the county individual land in the urban area municipal goveMment; that of and that of the of rural or urban township; people's government in unit (or city - ) standard pond shall be calculated as land and special - purpose fishing land, grain seed breeding in three years vegetable annual output value of the farmland times as much as the average being 1.2 to 1.5 resettlement subsidy for the land rule applying hereunder). The before acquisition, the same to be resettled. The to the number of agricultural population shall be calculated according the area of acquired shall be calculated by dividing population to be resettled per - number of agricultural the unit before acquisition (the of farmland owned per capita of farmland acquired by the area in the certificate and 0.5 sum of the farmland area registered area of farmland equals to the rural collective capita by the total population of the as the non - farming land divided times as much for each individual of the agricultural standard of resettlement subsidy economic organization). The the farmland in three as the average annual value of shall be four to six times as much population per hectare of the acquired farmland However, the resettlement subsidy years before acquisition. the farmland in three years as the average annual value of shall not exceed 15 times as much before acquisition. as per clause 2 of this and resettlement subsidy paid that the land compensation of living, In the event to maintain his original standard enable the farmer to be resettled article is not enough to approval of the municipal may be increased with the prior of the resettlement subsidy subsidy the amount compensation and resettlement However, the sum total of the land people's government. of the in three years before much as the average annual value shall not exceed 30 times as acquisition. the collective economic organization, of acquiring land owned by a rural Article 41 In the case way: shall be resettled in the following agrarian population of that organization is completely acquired and its members shall be disintegrated after its land (1) The organization non-agricultural population from agricultural population to shall have their status changed hereinafter) (briefly referred to as status-changed persons shall be is acquired, the number of status-changed (2) After the land of the organization of land before acquired by the per-capita space by dividing the area of farmland by calculated persons shall be determined jointly The actual number of status-changed land acquisition. and leadership of the affected government, village committee the rural or urban people's household. of land acquired per person or per organization according to the area

PAGE 73 R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

space is more than 0.5mu or the per-capita that the per-capita space of farmland (3) In the event the urban planning after the organization's land outside of vegetable land is more than 0.4mu the can be reallocated according to acquired and the contracted farmland area is partly by applying to the may choose not to change his status applicable law, the affected person shall pay land acquisition compensation for approval. However the land user village committee farmland to the committee shall reallocate the contracted and resettlement subsidy. The village entitlement as per the applicable law. affected person and assure his contractual shall resettle the county) or city people's government The involved district, county (or autonomous such as providing monetary compensation, persons properly by various means status-changed the principle of ensure social to the actual local conditions following land and insurance according used for the and resettlement subsidy shall be development. The land compensation stability and shall be developed The specific resettlement measures purpose of promoting production. government. separately by the municipal people's be managed as urban become urban residents and shall The status-changed rural residents residents. of Chongqing Municipality Compensation and Resettlement Measures for Land Acquisition, and compensation for attachments for land acquired, resettlement subsidy Article 4 Compensation 26 of "regulations for be paid in accordance with Article and green corps on the land shall Law of the People's republic of China" Implementation of the Land Management and green crops and green crops for acquired land, resettlement subsidy Article 5 Compensation land Acquisition, with Article 39 of Measures for on the land shall be paid in accordance Chongqing Municipality. Compensation and Resettlement in to the legal the land shall be calculated according compensation for the buildings on Article 6 The ownership certificate. The tenure certificate and rural house area registered in the collective land to the actual area and the compensation for structures shall be calculated according compensation when the land is acquired. according to the actual growing area for green crops shall be calculated being in patches on the farmland without compensation for ordinary trees planted Article 7 The for green crops. according to the compensation rate properly approved shall be calculated according to actual case. Trees planted in patches shall be compensated to 1.5 times of be compensated according to 1.2 garden, mulberry and nursery shall Orchard, tea relevant state provisions previous three years. For rare trees, the average annual output value of shall apply. on the land: made for the following buildings (structures) Article 8 No compensation shall be and rural house not granted a land tenure certificate House and other buildings (structures) ownership certificate;

PAGE 74 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 .R4

- __ ------s~~~~~~~~~ BANK CHONGOING MUNICIPALITY - THE WORLD PROJECT CHONGOING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

erected after the date on planted and buildings (structures) Flowers, grasses, trees and crops acquisition is issued by the government; which the official document on land has expired or which land whose approved service period Buildings (structures) on the temporary has been used for more than two years; has no specified service period but on the collectively owned land; Buildings (structures) built illegally

Wild natural grasses and shrubs. shall be resettled by of the unit whose land has been acquired Article 13 The following personnel changing the from of to non - agriculture resident or by changing their identity from agricultural land contracting:

Agrarian population; polytechnic schools; Students studying at universities and

Compulsory servicemen; and being re-educated through labour. Criminals serving jail terms or personnel shall not be resettled: of the unit whose land has been acquired Article 14 The following personnel in non - agricultural resident moved been changed from agricultural to Personnel whose identity and who have no or fostering (supporting) relationship without a lawful marital relationship contracted. land; leave their jobs to their to the rural area to settle down to Retired personnel who have returned children who have granted urban citizenship. resettlement, land persons, money resettlement, insurance Article 15 To agriculturally resettled resettlement shall apply. resettlement or civil affairs department has been changed from of the land to be acquired whose identity Article 16 For those personnel form, the land chose to be resettled in monetary to non - agricultural resident who agricultural resettlement subsidy to the rural shall pay the land compensation and management department specific period of time or be collected by such personnel in the collective economic organization to pay them directly to such personnel. and with his or her of 45 agriculturally resettled persons Article 17 For male of 50 and female and pay full or half of the land compensation land administration department shall application, the as pension. The details shall Life Insurance Co. Chongqing Branch resettlement subsidy to China by the municipal and insurance company and approved be drafted by the land department government.

PAGE 75 R4 - AUGuST 2004 SOGREAH CONSULTANTS- 23500321 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

the enterprises, which can owned land is completely acquired and Article 18 After the collective competent be established, with the approval of more than 10 resettled persons, can accept compensation and resettlement department can pay at one time land govemment, the land the land of 20 - contribution of the resettled persons. Meanwhile, subsidy to the enterprises as the persons. production and resettling the resettled 30 m2per capita shall be allocated for developing required. The enterprises shall pay land cost as legally and resettlement the land department shall pay land compensation Article 19 for following persons, fee as one time, and the latter shall issue subsistence subsidy to the civil affairs department at stipulated or monthly:

Orphans of under 18; no family; Elderly males of 60 and female of 50 of guardians; Disabled persons with certificate and without guardians. the hospital above county level and without Persons with mental disease certified by

shall be applied to resettled person Land acquisition regulating fund method Article 20 by district (autonomous fund shall be 3000 Yuan per mu and collected resettlement. Regulating county, town). 2000 by other district, county or town (autonomous county, town) government and person construction land user and used for resettled This regulating fund shall be paid by the resettlement regulation. Method of Chongqing Municipality Relevant provisions in Forest Administration shall pay following fees: Approved unit or individual acquiring forestland of cultivated land; than 80% of the compensation criteria Forestland compensation fee: Not less forestland for operation. not less than 20% for temporarily occupied

Trees and attachment compensation: as much as invested for heavily to 500 Yuan per mu for tree planting. Pay a. Young trees: Pay 300 for economic Yuan every year for forest care (400 Yuan invested forestland. Pay additional 300 shall be counted as three. trees). Young trees under three years old on 6 to 10 cubic according to the local market price based b. Middle aged and mature trees: Pay meter per mu. 5 times of the mature tree volume. c. Protective trees: Pay as much as 3 to mu. d. Nursery: Pay 10,000 to 15000 Yuan per

PAGE 76 2004 SOGREAH CONSULTANTS- 23500321 R4- AUGUST WORLD BANK CHONGQING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

value of as 3 to 5 times of actual output bamboo forest): Pay as much e. Economic trees (including and care cost. previous three years or planting as follows. forestland shall be compensated f. Attached dismantled on the or relevant regulations. to land administration code Resettlement subsidy: Refer

Vegetation rehabilitation fee. meter of young forestland; a. Pay 3 to 4 Yuan per square meter of special tree land; b. Pay 4 to 6 Yuan per square meter of other forestland. c. Pay 1 to 2 Yuan per square

RESETTLEMENT ON HOUSE DISMANTLING AND 4.2.2 RELEVANT LAW AND POLICIES

Dismantling and Resettlement Regulations on Urban House has been obtained by and resettled only after the permission Article 6 Houses can be dismantled the dismantling unit. period shall be publicly announced. person, scope and dismantling Article 8 The dismantling to explain to the dismantled and the unit shall work together Dismantling administration department persons. person as set forth herein. shall compensate the dismantled Article 22 The dismantling person right ...... can apply. or exchange of house property Article 23 Money compensation to market evaluation price. shall be determined according Money compensation amount Article 24 and municipal governments. by provincial, autonomous region The details shall be set forth

Resettlement of Chongqing on House Dismantling and Relevant Law and Policy Excerpts Municipality apply with certificate to the construction unit shall obtaining project site permit, town) Article 8 After county (autonomous county, department of concerned district, involved house dismantling formalities. for suspension of handling related

PAGE 77 .R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 BANK CHONGOING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

of the construction unit's application without delay on receipt The said department shall check the city work and industrial and commercial and issue notice to the land, planning, request, within seven work days if of suspension of handling related formalities administration departments notice in writing are not satisfied, non - acceptance the conditions are satisfied. If the conditions shall be made in the same period. must be obtained from the competent dismantling and resettlement permit- Article 9 House and resettling the for construction use, compensating department in dismantling houses dismantled persons. house dismantling and resettlement department shall issue Municipal house dismantling and projects involving more than one to municipal key projects, construction 2 resettlement permits over 10000 m of town) and city proper projects requiring district, county (autonomous county, dismantled space. shall sign the dismantling person and the dismantled 15 Within the resettlement period, Article shall be set forth such as agreement, in which the details compensation and resettlement house quality, house size, quality and location, transition compensation form, amount, resettlement transition form and period and breaching. and renter shall sign the dismantling person, the dismantled To dismantle rented house, to the The signed agreement shall be submitted compensation and resettlement agreement. in file. house-dismantling department for keeping relocate beyond the the dismantled or renter refuses to Article 16 After signing the agreement, arbitration or file a lawsuit to the people's the dismantling person can apply for resettlement period, dismantling. person can apply to the court for advance court. During lawsuit the dismantling and fund shall be used only for compensation Article 20 Compensation and resettlement resettlement and not used for other purpose. town) levels shall district, county (autonomous county, House dismantling department at municipal, and resettlement fund. supervise the use of the compensation or exchange of form can be money compensation, Article 25 Compensation and resettlement compensation amount. house property right of same money form. the dismantled can select compensation Unless otherwise legally specified, according to the market evaluation compensation amount shall be determined Article 26 Money space of the house to the position, use, construction or indoor price by acquiring into consideration be dismantled. average price of house shall not be less than 70% of The compensation amount of the dismantled same use. new house price of same position and

PAGE 78 .R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 WORLD BANK CHONGOING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

the approved use period, or the laws, temporary set-up exceeding Article 30 The buildings violating shall not be compensated. no use period stipulations two years use despite of the exceeding temporary building not exceeding right shall not apply to the Exchange of house property person shall provide money compensation. approved use period. The dismantling public the attachment of dismantled property right shall not apply to Article 31 Exchange of house shall provide money compensation. houses. The dismantling person (or user) and shall not be shall be dismounted by the owner Decoration of dismantled house compensated. after being demounted shall be demounted or loses service value Decoration, which cannot be properly compensated. of ChongqingMunicipality Metlhod on Acquired Land Compensation and Resettlement properly compensated in persons to be resettled shall be Under the current method, the For those Article 9 his or her house is dismantled. house construction cost after reference to the farmer by 50% of the above criteria. compensation shall be increased persons not to be resettled, their the dismantling scope, no resettled persons are outside of Article 10 If the houses of agriculturally However, based on the no resettlement shall be made. no compensation and be paid to the dismantling, One time compensation shall certified in land use certificate. of residence space average annual output value according to 1 to 2 times of collective economic organization equal treatment in the resettled persons shall share three years. After compensation, previous for state construction, house compensation residence space is to be acquired public facilities. If the provisions. with according to the land acquisition and resettlement shall be dealt villagers of the acquired land) facilities of the acquired unit (excluding Article 11 Water and power facilities compensation, to the actual cost. For water conservancy shall be compensated according refer to the relevant state regulations. shall be compensated according circuits, natural gas installations broadcast and closed TV telecommunication Wired be compensated according to Telephone set resettlement shall and to actual cost. shall be dismounted by the owner Decoration of dismantled house department provisions. dismounted, shall be properly decoration, which cannot be shall not be compensated. The compensated. according to residential house. purpose shall be compensated Farmer's house modified for other and other legal (structures) with land use certificate 12 To dismantle enterprise buildings buildings Article based replacement value original after the compensation is calculated loss fee certificate, land department. Resettlement to the state and handled by the (structures) shall belong be calculated according to etc.) of enterprise shall be shall (including resettlement loss, stoppage, of the depreciated equipment. 15% to 20% of the net value

PAGE 79 R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

of dismantled approval is issued, resettled persons Article 21 Prior to date when land acquisition and land use certificate shall be resettled. housed with house property certificate cases shall not be the persons with one of the following Article 22 Inside the dismantled scope, resettled: farming persons; and who are not converted to non - (1) Villagers whose houses are dismantled

(2)Persons whose houses are not dismantled. through purchasing, inheritance, have obtained house property right (3) Township persons who mentioned in have no house in towns. The persons donation, etc., with exception of those who after their houses have been dismantled. item (1)can apply for residence land as stipulated at cheaper price, house includes purchasing uniformly built houses Article 23 House resettlement meters. houses. Space criteria are 17-20 square resettlement by money and self-building criteria shall be as set herein, the be uniformly built are possible, the space Article 24 If houses to persons shall and pre-stressed cover plate, the potential house structure shall be of brick, stone at cheaper price. apply to the land department for prohibiting 50% space beyond the criteria shall charge type design limitation, 5 square meters Due to house families due to divorce 5 square meters, complete cost. For separated of construction cost, over shall charge the house space exceeding the criteria after the land acquisition notice is issued, complete construction cost. party according shall be compensated by the resettling For under sized houses, under sized space to the construction cost. The room shall can apply for purchasing one more room. Article 25 Married persons without child charge 50% of the construction cost. and have no house through of the resettled belongs to township persons If the spouse or juvenile at 50% of the or she can apply for purchasing one room check and stay together for long time, he the resettled person. cost, this room has to be combined with have no mantel or support those persons who have moved in, but Prior to land acquisition, construction cost for purchasing houses according to the relationship and have houses, can apply as set forth herein. in dismantling area and house those resettled persons who have houses Prior to land acquisition, houses at 50% of are available, can apply for purchasing property right and land use certificates set herein. construction cost through examination as The room shall apply for purchasing one more room. Article 25 Married persons without child charge 50% of the construction cost.

PAGE 80 - AUGUST2004 SOGREAH CONSULTANTS- 23500321.R4 THE WORLD BANK CHONGQING MUNICIPALITY - PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

through persons and have no house the resettled belongs to township If the spouse or juvenile of one room at 50% of he or she can apple for purchasing stay together for a long time, check and person. be combined with the resettled the cost, this room has to or support moved in, but have no mantel those persons who have cost Prior to land acquisition, according to the construction can apply for purchasing houses relationship and have houses, as set forth herein. in dismantling area and house persons who have houses land acquisition, those resettled houses at 50% of Prior to can apply for purchasing certificates and available. property right and land use as set herein. construction cost through examination department shall sign the for house resettlement, land If money resettlement is chosen Article 26 money at one time. and pay complete resettlement contract with the resettled adjacent economic between average price of amount shall be the difference by Money resettlement cover plate house multiplied of brick, stone and press stressed house and compensation criteria forth by local authorities. the resettlement space set provide subsidy the land department shall houses are not practicable, Article 27 If uniformly built construction cost, allocate multiplied by locally prevailing to the locally set house space ensure the according and residence land criteria, to the planning requirement residence land according by themselves. resettled persons to build houses rural collective economic registration belong to two Husband and wife's household be provided Article 28 one resettlement house shall resettled at the same time, organizations and are to be to them. only one two rural economic organizations, houses in two or more than The resettled persons have be provided. time resettlement house shall by the be checked and announced of resettlement houses shall Article 29 Construction cost departments. county and district competent be reduced. But natural gas some taxes and fees can built and self-built houses, For uniformly persons. shall be borne by the resettled installation and supply cost 17 to 20 square meters construction house-trading fee based on For money resettlement persons, space per capita shall be exempted. to the house property right belongs formalities are completed, After house resettlement issued to them. Article 30 ownership certificate are use certificate and house the resettled persons, land pledge. They cay transfer, rent and of the total construction land unit shall allocate 2%-3% built houses, the construction administration For uniformly facilities, hand over to house maintenance fund for public cost as equipment modernization of equipment. for overhaul, updating and department or home care company PAGE 81 - AUGUST2004 SOGREAH CONSULTANTS- 23500321.R4 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

shall be dismantled by attachment on the dismantling scope Article 31 Buildings structures and the owners within the set limit time. of can have resettlement subsidy. Household household resettled in set limit time The dismantled over 3 persons, 500. For 300 Yuan max. and household of 3 persons and under shall receive in two times. transition households, subsidy is issued fee or resettlement subsidy is to be is required, transition resettlement If advance resettlement Yuan per built house resettled households, 80-100 the date of transition. For uniformly issued from resettlement and self- date of actual transition. For money capita is issued every month from the Yuan per capita is issued. built house persons, one time 300-500

POLICIES ON INVOLUNTARY RESETTLEMENT 4.3 WORLD BANK OPERATIONAL

Policies on InvoluntaryResettlement: Objective of World Bank Operational resettlement. option to avoid or reduce involuntary * Explore all feasible project design implemented based on activities shall be conceived and * If unavoidable, resettlement share the adequate fund to enable the resettled sustainable.development option. Provide through discussions. benefit, participate the planning implementation restore original living standard or higher. * Assist the resettled to improve livelihood, the World Bank requires the difficulty in compulsory resettlement, To solve livelihood covering. plan or policy framework on resettlement borrower to prepare a resettlement to enable the resettled persons (1) Resettlement plan or policies measures on resettlement. a. Know optional right and other right discussion and and economically, and participate in b. Be aware of feasibility scheme, technically enjoy opportunity of selection; the direct with full replacement cost so as to counteract c. Obtain quick and effective compensation property loss caused by the project.

PAGE 82 - AUGUST2004 SOGREAH CONSULTANTS- 23500321.R4 WORLD BANK CHONGOING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

implement measures shall be acquired to resettlement, then corresponding (2) If effect involves the resettlement policies, thus to or framework of the resettled plan of the resettled resettlement to: ensure that the resettled are able resettlement; subsidy for resettlement) during the a. Get help (for instance obtaining The agricultural production upon request. or homestead, or have site of b. Obtain residence and other comprehensive factors production site, location advantage potential of such agricultural site. advantageous condition of the original shall be at least equivalent to the

acquired measures, as necessary, shall be objective of this policy, corresponding (3) To realize the resettled resettlement policies, resettlement or framework of the to implement plan of the resettled are able to: thus to ensure that the resettled and living standard and a proper required for resuming livelihood a. Reasonably estimate the time is available; transition period during which assistance training or job finding. such as land management, credit, b. Obtain assistance of development,

OF THE PROJECT 4.4 RESETTLEMENT POLICY on the relevant laws of the in this project is constituted based Resettlement Policy implemented counties and Municipal Government, urban districts, People's Republic of China, Chongqing policy of World Bank. (county-level) cities as well as resettlement

4.4.1 RESETTLEMENT PRINCIPLES and living standard of the and resettlement, level of production 1) After land acquisition level than that before enhanced to a relatively higher resettled shall be recovered or of the project. resettlement or prior to implementation integral part of the project construction resettlement shall be executed as 2) All the involuntary the project. the resettled that benefit them from so as to provide sufficient fund to

PAGE 83 R4 - AUGusT 2004 SOGREAH CONSULTANTS- 23500321 BANK CHONGOING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

affected by the project. When the acquisition compensation for the property of person 3) Make compensated out, all the losses shall be reasonably of the rural collective land is carried affected by resettlement will obtain on the relevant laws. The resident (farmers) based in terms of traffic least equivalent to the original residence resettlement house at get and surrounding environment, or convenience, various necessary installations residence. For the affected enterprises equivalent to the value of their original compensation restored as early as the original business environment shall be & institutions and stores, same equivalent to price of their houses. At the possible, or let them obtain compensation shall be also compensated. The loss of suspending business due to the project time, the lower than the completely so that its function is at least not infrastructure shall be recovered the nearby persons who are not resettled, within original level to maintain normal life of the temporarily affected by the project and those range of project construction. For the resettled is needed, equivalent compensation is also have partial property losses and no resettlement possible. resettlement resettled following the principle of "making 4) Labour force of the resettled shall be of employment". During the process, local at local place and creating multiple channels administration committee evaluated price government, the project undertaker and village thereby exerting no influence on the living jointly make arrangement for employment, price implement a policy Office of the project undertaker evaluated standard of the resettled. evaluated in which, all the forces of the local governments of exploitation type resettlement, job the resettled employment and creating more price be brought into full play in training of allow the resettled to adapt to the environment opportunities for them. This evaluated price period, so that they evaluated price live through of the resettlement points in a short time of settling the resettled evaluated price self-reliance economically, hence the responsibility to the resettled themselves. be transferred in time from resettlement organization during solicitude to the resettled for their difficulties 5) Office of project evaluated price show and help them fit into community of the resettlement and a time period after resettlement, the resettled places as quickly as possible. much attention to the weak group people. project undertaker evaluated price pays 6) The such as residence and they are able to enjoy preferential policies During the resettlement, who visit shall also be paid to them, and those employment. After resettlement, periodical assistance until their being transferred to have special difficulties evaluated price receive local civil administration organ. plan of resettlement, the resettled are encouraged 7) During the implementation of compiling be given to the resettled in relation to the mode participating in the process; full respect shall of their resettlement. the resettled evaluated price obtains all expenses 8) Before the construction and land taking, they lost.

PAGE 84 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUSUST WORLD BANK CHONGQING MUNICIPALITY - THE PROJECT CHONGOING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

have maximum cost-benefit price and try its best to project undertaker evaluated 9) The price make great efforts to resettlement organization evaluated effectiveness. The resettled work resettlement, standardize the of conducting the resettled enhance its work capability mechanism, and perfect the interior control resettling the resettled, establish as behaviour of benefits and corruption so state fund, seeking private prevent waste of fund, withholding In other best effect of resettlement. for resettlement and realize make full use of the funds means to to they evaluated price try all resettlement effectiveness, word, in the set index of the reduce cost of resettlement.

OF THE PROJECT 4.4.2 RESETTLEMENT POLICY LABOR FORCE FOR LAND ACQUISITION AND 4.4.2.1 POLICY OF COMPENSATION RESETTLEMENT

Acquisition Policy of Compensation for Land on the evaluated price be made depending of acquiring farmland, compensation 1) In the case includes the compensation land is used. The compensation original purpose for which the for ground attachments and crops. The compensation for land, resettlement, ground their owner. attachments and crops belongs to should be made according to compensation and resettlement subsidy 2) The payment of land County, Changshou district, county or city. In Tongliang the actual conditions of each the land and Beibei District, Bishan County, Wulong County, rural District, price be paid fully to the affected and resettlement subsidy evaluated compensation is reallocated and the land County, the land-evaluated price households. In Dazu equally among the subsidy evaluated price be divided compensation and resettlement villagers. price be calculated according to and resettlement subsidy evaluated 3) The land compensation by dividing the space to be resettled, which is calculated the number of agrarian population space of farmland before land acquisition. of farmland acquired by the per-capita to be paid at the rate farmland, land and resettlement compensation 4) In the case of acquiring in the past three average annual yield of the farmland of 10 to 30 times as much as the years. to be paid at land, the land and resettlement compensation 5) In the case of acquiring garden compensation rate for farmland. the rate of 1.2 times as much as the to be paid at the the land and resettlement compensation In the case of acquiring fish pond, 6) rate for farmland. rate of 1.3 times as much as the compensation

PAGE 85 .R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

for land, resettlement and forest is to 7) In the case of acquiring forestland, the compensation be paid to the owner. as wasteland, collective owned riverside 8) In the case of acquiring non-farmland (such subsidy are to be paid at the shallow land, etc.), the land compensation and resettlement rate of 1/2 of the rate of compensation for farmland. shallow land, compensation is made for the 9) In the case of acquiring state-owned riverside crops on it only. paid as specified above cannot enable 10)If the land compensation and resettlement subsidy before land acquisition, the amount of the farmers to be resettled to live at the level by the provincial people's government. resettlement subsidy may be increased as approved and resettlement subsidy should not However the total amount of land compensation land acquired. exceed 30 times as much as the annual yield of the to be compensated for, compensation 11)1n the case of acquiring state-owned land that needs consultation with the local government, evaluated price be made by the project owner in land administration bureau and affected persons. enterprises and institutions, compensation 12)ln the case of acquiring the land owned by evaluated price be made at the evaluated price. impact has not yet affected one growing 13)ln the case of temporary land occupation, if the price be made as if one growing season season, compensation for loss of crops evaluated of growing, compensation for loss of were affected; if the impact has affected one year growing seasons were affected; if the crops evaluated price be made as if two and half evaluated price be made as if impact has affected half a year of growing, compensation evaluated price be paid directly to yield of the land in one year were lost. The compensation not be lower than the loss caused to the the farmers affected by land acquisition and should the constructor evaluated price re- farmers. For the rehabilitation of land temporarily taken, is completed and return it to the village cultivate the farmland acquired after construction re-cultivated land in collaboration with and the village committee evaluated price accept the the related agencies.

Policy of Labour Resettlement

All the affected labour forces shall be properly resettled. ways: status-changing, monetary compensation The affected villagers shall be resettled in three persons affected by land acquisition may be and land reallocation, and the status-changed insurance, endowment insurance and minimum resettled by providing monetary compensation, subsistence allowance.

PAGE 88 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Other Policies price be of compensation for resettlement evaluated 1) The compensation fees for land and sum court costs. exempted from any tax & fees and relevant of registered price help the resettled in making change 2) The resettlement executor evaluated of their children. permanent residence and transferring schooling

RESETTLEMENT 4.4.2.2 POLICIES FOR URBAN RESIDENT

houses shall be evaluated by an Evaluation on the replacement value, the demolished First, based to the factors such as of evaluating urban houses according Organization with Qualification chosen by the area. The evaluation organization shall be location, use and building area or service organization, before fixing the evaluation whose houses are demolished. The evaluating people the opinion of the persons of the demolished houses, shall listen to price of the real estate market on the compensation should be adjusted based whose houses are demolished. The actual evaluated price at the time of demolishment.

Policy of Resettlement land price), choose to receiving the house compensation (inducing The resettled person may, after such theirfinancial capabilities and personal preference get resettled in different ways according to houses, commercial houses or second-hand as purchasing uniformly constructed resettlement by the local government. houses, and renting cheap-rent houses provided

Subsidy Policy During Resettlement cable TV and other devices, families equipped with telephone sets, * For the resettled of charge shall be made at the prevailing standard compensation for relocating such facilities belong. set by the companies to which these facilities user allowance and transition allowance to the actual * The demolisher shall pay the movement of the residential house. within the a bounty for moving out of their house * Each resettled household shall receive specified time limit.

Other Policies tax persons shall be exempted from any relevant * During the resettlement period, the resettled and fees. registered help the resettled in making change of * Person in charge of resettlement shall of their children. permanent residence and transferring schooling

PAGE 87 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 R4 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Policies of people, and for details, refer to 4.4.2.5 * Offer assistance to the weak group Resettlement. in actual building beyond expiry period are found * No illegal building and temporary is found during actual resettlement, compensation investigation of the project. If such a case price of the building. shall be made in accordance with replacement

RESETTLED RESIDENT 4.4.2.3 POLICIES FOR RESETTLING RURAL

Policies of Compensation replacement houses shall be made according to the Compensation for demolition rural residential principle.

Policy of Resettlement resettled in the house compensation, choose to get The resettled persons may, after receiving preference. These financial capabilities and personal different ways according to their cheap resettlement themselves, purchasing uniformly built arrangements include building houses low-rent houses provided by the houses or second-hand houses or renting houses commercial of shall pay compensation to the owner In the former case, the resettlement agency government. at the him free of charge with a house site demolished and at the same time provide the house counted as 3 2 consisting of less than 3 persons to be space standard of 30m per person (families as 5). In the latter two cases, the resettlement 4 persons as 4 and more than 5 persons persons, but also compensation not only for the house demolished agency shall pay the affected household the house site taken.

Subsidy Policy During the Resettlement devices, telephone sets, cable TV and other the resettled families equipped with (1) For of charge shall be made at the prevailing standard compensation for relocating such facilities belong. set by the companies to which these facilities actual user allowance and transition allowance to the (2) The demolisher shall pay the movement of the residential house. within the a bounty for moving out of their house (3) Each resettled household shall receive specified time limit.

Other Policies tax and fees. resettled will be exempted from any relevant (1) During the resettlement period, the

PAGE 88 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

help the resettled in making change of registered (2) Person in charge of resettlement shall of their children. permanent residence and transferring schooling and for details, refer to 4.4.2.5 Policies of (3) Offer assistance to the weak group people, Resettlement. beyond expiry period are found in actual (4) No illegal building and temporary buildings during actual resettlement, compensation investigation of the project. If such a case is found price of the building. shall be made in accordance with replacement

AFFECTED ENTERPRISES & INSTITUTIONS AND 4.4.2.4 POLICIES OF RESETTLEMENT FOR SHOPS

Policies of Compensation land of the affected enterprises, institutions and Evaluation shall first be made of the houses and and shops shall be compensated not only for shops. The owners of such enterprises, institutions but also for the financial losses incurred to them. the loss of land, houses and attachments thereto medical care, social security, dividend, bonus, The entitlements and interests including salaries, relocation, and no employee shall lose his/her etc. of their employees shall not be affected during shop for which he/she works. job due to relocation of the enterprise, institute or

Other Policies the affected enterprises & institutions and (1) During the period of resettlement and recovery, stores are exempted from any relevant tax & fees. buildings beyond expiry period are found (2) No building involving violation of rules and temporary case is found during actual resettlement, in actual investigation of the project. If such a replacement price of the building. compensation shall be made in accordance with

GROUP 4.4.2.5 POLICIES FOR RESETTLEMENT OF VULNERABLE

groups shall enjoy the following preferential Except the policies described above, the vulnerable policies.

PAGE 89 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

be fees and sum of compensation may either (1) According to their desire, the land compensation (village) rest home or their children, Administration Bureau of County or county given to Civil for looking home or their children will be responsible then the Administration Bureau or rest after them in their old age. are difficult in by the demolished house, those who (2) For the vulnerable group people affected to them, for instance the supply of mode of assistance shall be provided residence, some family of will be delivered to labour force in the cheap-rent house. At the same time, training for job and guidance in this group people. Information on various opportunities such vulnerable for finding a enabling them to have more opportunities regard will be provided to them, thus job. the resettlement executor people who will build house themselves, (3) For the vulnerable group will Meanwhile, training of agricultural technique shall help them during the house building. so as to help them in developing agricultural delivered to their children free of charge production to increase income from agriculture. priority people affected by temporary land acquisition, (4) For the family of such vulnerable group land. shall be given to them for restoring their group shall be given to children of such vulnerable (5) During the project construction, priority with low technical requirement. family in recruiting them to do some job

AFFECTED INFRASTRUCTURE AND LAND ATTACHMENT 4.4.2.6 POLICIES OF COMPENSATION FOR shall give compensation to and land attachments, the demolisher For the affected infrastructures of such cost, who will resume the rebuilding the owner of title at the rate of replacement infrastructures and land attachments.

PAGE 90 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 .R4 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

5 COMPENSATION RATES this project are formulated according of compensation for damages caused by The following rates of the actual the preceding section and in consideration to the legal framework presented in situation of the counties and districts involved.

OF URBAN RESIDENTS' HOUSES 5.1 DEMOLITION AND RESETTLEMENT See houses of different structure types, which rates of compensation for demolition of TABLE 5-1 for calculating in including the land price surveying and are based on the displacement prices March 2004 by RAP preparation team. OFRURAL RESIDENTS' HOUSES 5.2 DEMOLITION AND RESETTLEMENT See types, which for demolition of houses of different structure TABLE 5-2 for rates of compensation. and calculating in March 2004 by RAP preparation are based on the displacement prices surveying team. ENTERPRISES 5.3 RATES OF COMPENSATION FOR financial includes the compensation for houses, The compensation for resettlement of enterprises of operation), compensation for compensation for losses due to discontinuation subsidy (in rates, which are TABLE 5-3 for detailed compensation facilities and subsidy for movement. See houses of the affected enterprises. based on evaluation of the land and demolished INSTITUTIONS 5.4 RATES OF COMPENSATION FOR financial includes the compensation for houses, The compensation for resettlement of institutions See TABLE 5-4 for detailed for facilities and subsidy for movement. subsidy, compensation houses of the on evaluation of the land and demolished compensation rates which are based affected institutions. SHOPS 5.5 RATES OF COMPENSATION FOR AFFECTED subsidy, includes the compensation for houses, financial The compensation for the affected shops for movement. See TABLE 5-5 for detailed for resettlement of facilities and subsidy compensation houses of the evaluation of the land and demolished compensation rates, which are based on affected shops.

PAGE 91 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AuGUST CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

COLLECTIVE-OWNED LAND 5.6 COMPENSATION FOR ACQUISITION OF 'Chongqing Municipal of the "PRC Land Management Law", In line with the stipulations for "Chongqing Municipal Measures for Compensation Regulations regarding Land Management", of the counties and districts applicable local policies and regulations Land Acquisition" and for includes the compensation for land, subsidy involved, the compensation for land acquisition See TABLE 5-6 and resettlement and compensation for crops.

TABLE 5-7 for detail.

OCCUPATION 5.7 COMPENSATION FOR TEMPORARY LAND Chongqing temporary land occupation promulgated by According to the regulations concerning the crop compensation shall be made for and county and district governments involved, municipal government in that a way compensation for loss of crops shall be calculated the temporary land occupation .In principle, as one quarter and one year as 2.5 quarters period of shorter one quarter shall be regarded that an affected See TABLE 5-8 for shall restore the land to its original condition. or half a year as one year. The constructor of land. the rates of compensation for temporary use

AND GROUND ATTACHMENTS 5.8 COMPENSTION RATES FOR INFRASTRUCTURES for various types of infrastructures and ground TABLE 5-9 contains the rates of compensation attachments. AND AND RESETTLEMENT OF URBAN RESIDENTS' HOUSES TABLE 5-1 RATES OF COMPENSATION FOR DEMOLITION ATTACHMENTS Other compensations Compensation for house Compensation for (land prices incl ded) attachments

,-E8E Ea,oec EE in c:l - a) ,co- Project U " 0 -E Z M 0 - .E~~~~~~~~~~Eg a3: t U) .

400 300 100 400 - 158 310 Tongliang 400 350 County 100 400 - 80 120 400 300 Project in 341 310 276 Dazu County_____ 400 300 Project in 300 250 300 100 Wulong 450 - 158 County for at the actual standard of charge set lines and TV cables is to be compensated of Note: The movement of telephone belong. The bounty is paid at the rate companies to which such facilities The actual forth by the respective the rate RMB16-20/day is used here. To simplify calculation, is void and this applies RMB20-30/household/day. number of days. The "-' sign means the item compensation is calculated by the actual also to the following table.

PAGE 92 2004 SOGREAH CONSULTANTS-235003?21R4 -AUGUST BANK CHONGQING MUNICIPALITY - THE WORLD CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

HOUSES AND AND RESETTLEMENT OF RURAL RESIDENTS' TABLE 5-2 COMPENSATION RATES FOR DEMOLITION ATTACHMENTS

Compensation for Other compensations Compensation for house (land prices not i ciuded) attachments

, 8E ' 8 2S 22 funouse c .E 00 Project e 2 a=-) + 0 + 0 In

C _~~~~~~~~C o 0M.m 300~~~~~C Projectin 400 300 100 400 55 180 158 310 TonglCan9 220 206 . .f . 100 400 . County 115 80 120 400 Paongluan 226 205 70 in ProjectCounty 400 300 100 400 50 300 83 500 Changshou 215 190 District Binan 300 100 400 River 300 158 600 400 Project in 270 220 150 60 Bishan . - County ___ 300 100 400 Project in 150 158 300 250 Wulong 270 180 County - - --

OF ENTERPRISES TABLE 5-3 RATES OF COMPENSATION FOR RESETTLEMENT Attachmer Compensafion for house m (RMBIM2) 2 '5 C)

E Q E ,8 Project Enterprise 0:0 0 &R4 E -~~~~~~~~~~~-. C.2)- i n-% 2 u

160 50000 16 158 31 Centre 15 220 - Project in Tongliang Fish Breeding 1, CountyI 226 205 120 1928 16 80 Grease Refinery 115 80 1 226 205 = 120 1928 16 Equipment Factory 115 Project in Dazu County Post & Telecom - - - - Shizitan Power Plant 300 300 _ - - = Changshou Guangrun Company Project in Gagu opn 0 District l Yufa Company 300

PAGE 93 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Compensation for house . - Attachment 2 E (RMB/m ) m _

8 t26 a Pmject Enterpise . 0 a) 60 + + 5L)

15 300 380 - 120 10000 Binan River Project in Chongqing Fuji Machinery Plant 380 = 90 120 10000 15 158 Bishan County Bishan Farming Supplies Company 300 15020 38012 90 120 1000020000 1515 158- 600 Binnivr Pojctin .ChonreteConcrete Slab SlabPr Pre-castingacasingeYrdyo Plant Pulict 300 380 120 10000 15 158 600 Datong Machinery Plant 300 . 330

150 200 2000 15 Facility Company 300 150 - 200 120 2000 15 158 Project inWulong County Material Recycling Company

- - - 15 = Tobacco Re-drying Plant 150 350 _ - the rural area and will be compensated for at the Note: Tongliang County's fish-breeding centres are located in standard for farmhouses. As the affected standard for farmland. The houses will also be compensated for at the area, they will be compensated for at the enterprises of other counties or districts are all located in the urban urban land price and house compensation.

TABLE 5.4 COMPENSATION RATESS FOR RESETTLEMENT OF INSTITUTIONS

for Subsidy for ONE Compensation for house Financial Compensabon subsidy facilities movement Project Institution EL 2 2 rx (RMB/m2) (RMB/enterprise) (RMBim ) _ Brick+concrete Brick+wood structure structure Project in Bachuan - - 16 Tongliang Township - - 206 County Enterprise Office I 50000 15 Chongqing Shuren 300 380 - 120 Binan River Coliege Project inBishan Bishan County - 15 County Public Welfare . 380 Bureau Welfare Bureau are both have their houses built on Note: As Bachuan Township Enterprise Office and Bishan Public state-owned land, only the up structure will be compensated.

PAGE 94 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 BANK CHONGOING MUNICIPALITY - THE WORLD CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

SHOPS TABLE 5-5 RATES OF COMPENSATION FOR AFFECTED

m _ iS Compensation for house (RMBIm2) ' a3 = ~~~~~~~~Eo : rf E 3tc* . |ea . 8 8 n2 U ' ~~~~~~~~~~~~~~~~~~~~~~~0 Project Shop 1

S -J 160 1000 16 220 Ias67h1 Project in Bicycle repair 180 shop ~ 1000 16 Tongliang. ~ ~~~~Luyigsa .0067shp1c 206 55 160 Grocery 180 220 1 County 1780 (incI. 1280 (incI.12198 inDazu 1980 (incI. 6 Project land price) land price) land price)12198 County ____ - 15 Luoyingshan -16667/shop Coalmine -- 5 Project in -167shp Maritime Affairs -- Wulong County ______~O ffice_ residences and located in the out-of- County are run in the ship-owners' own Note: Most of the shops in Tongliang County are mostly located inthe suburban areas while the shops in Dazu the-way intersection of urban and considerably from each other. of compensation in the two counties differ urban area. Therefore the standards elsewhere for operation. affected temporarily and will be moved The shops in Wulong County are most INTHE PAST THREE YEARS TABLE 5-6 AVERAGE ANNUAL OUTPUT VALUES

Output value of Per- Efg farmland Multple of Multiple of capita EE in compensation subsidy for Total z 8 e Village Neighbourhood area of previous for land resettlement multiple Project RurallurbanProjecttownship farmland (mu) 3years co (RMBlmu) 30000 1200 8 17 25 Bachuan Project inTongliang . County 7 6 13 21450 Mingguang 0.77 1650 8.5 12 20.5 33825 Xingguang 0.5 1650 9 15 24 40800 Yongyi 0.40 1700 21450 0 Project Longshui 7 6 13 Dazu Longdong 0.92 1650 7 6 13 21450 Yujian 0.92 1650 9.5 17.5 28000 5 0.78 1600 8 Yanqiao 9 5 17.5 28000 6 0.84 1600 8 Duson Yanqiao 8 9.5 17.5 28000 Yanqiao 7 1.04 1600 8 9.5 17.5 28000 Xinghua 12 1.05 1600 Changshou Project 9.5 17.5 28000 1 0.82 1600 8 Huohua 9.5 17.5 28000 7 1.09 1600 8 Fengcheng Kejiaping 9.5 17.5 28000 1 0.98 1600 8 . ______Madao 13 75 22.75 38675 3 0.45 1700 9 25 42500 Bishan ater Spp(y Hungjtao 1700 10 15 Bicheng Huangjiao 5 0.33 PBishanWaer Supply 18.79 31943 0.557 1700 8.2 10.59 Wuli 6 20.5 34850 1.08 1700 8.5 12 Binan River Project BIcheng v 30 45000 inBishan County 031 1500 10 20 Project inWulong Xiangkou Zhongdui

PAGE 95 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Output Per- value of E capita farmland Multple of Muliple of aE subsidy for ' aLTBota s Village Neighbourhood area of in compensaoon _9 Pnoject Rurallurban township resettlement ~~~~~~~~~~~~muftipleZ 8 Projecttownship ~~~~~~~~~~farmlandprevious for land (mu) 3yearsE (RMB/mu) W,M 10 20 30 45000 County 2 0.31 1500 1 0.45 1500 10 . 20 30 45000 Zitong 5 0.45 1500 10 20 30 45000 30 45000 Huangjn 5 0.82 1500 10 20 10 20 30 45000 ______1 0.82 1500 1 0.56 1500 10 20 30 45000 2 0.56 1500 10 20 30 45000 30 45000 Baiyang 3 0.56 1500 10 20 1500 10 20 30 45000 .______5 0.56 15.74 25184 Hailuo 2 0.67 1600 8 7.74 8 7.74 15.74 25184 inJiangjin Shuangfu Taping 8 0.665 1600 Project 8 7.74 15.74 25184 City Gaohu 1 0.722 1600 7.74 15.74 25184 Shuangfu Luopan 6 0.881 1600 8 8 9.5 17.5 29750 Project in Beibei Jingtan 0.6 1700 7 6 13 22100 District Dongyang Dongyang 0.8 1700

PAGE 96 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

ACQUISITION TABLE 5-7 RATES OF COMPENSATION FOR PERMANENT LAND

(D CD~~~~~~~~~~~~~~~~ -.3 8 0 2. ! ,, 0 38 _ [-~~~~~~~~~~~~~~~~~T Projedi1RuraVUrban _ ID~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~I Projesin E C-)2 . 12315 Baha _ 6 310 2000 Tongliang _ ~ ~~~~~ 1000 31000 3001 5 70035 9600 20400 30000 376 8 2000363. 2376.8 Farmland - 133-- 66 00 a15 24480 36000 1680 26037680 400 Garden Miggan 11520 990120 2103.34 Project inDau tongshuip -103 34 2000 10334 - Tongliang Bachuan 10334 - 2000 12315 County Forest 3001.5 700335 310 30600 45000 1300 46300 --Fish pond 14400 2000 634.2 26634.2 22650 4000 13333 6667 Project in 11550 9900 1200 Dazu Longshui Mingguang 21450 13333 6667. 2000 980 7 26960.7 County______33825 1200 35025 4000 Xingguang 14025 19800 2000 1176 27176 42000 4000 13333 6667 15300 25500 40800 1200 Yongyi -T 634,2 26634.2 4000 13333 6667 2000 9900 1200 22650 Longdong 11550 _ ~~21450______6667 2000 634 2 26634.2 1200 22650 4000 13333 1550 9900 21450 2000 12295 Yujian 3001.5 7003.5 - 290 15200 28000 1000 29000 Farnniand 12800 Project in 433 5 2000 12438.5 43350 3001.5 7003 5 Changshou Duzhou 19200 22800 42000 1350 2000 22400.9 Fish pond 4002 11333.4 4666.7 398 75 District 23375 38675 1200 39875 Farmland 3 15300 4666.7 193.38 2000 6860.1 11687.5 19337.5 - 19337.5 23. Wasteland Huangjiao 3 7650 420 4666.7 437 2000 22439.1 Bishan 1200 43700 4002 11333 4 5 17000 25500 42500 Water 6Bicheng Farnland 4666.7 331.43 2000 22333.5 Spply _ 1200 33143 4002 11333.4 Supply h 6 13940 18003 31943 2000 6826.4 Project Farmland V . 4666.7 159 72 9001.5 15971.5 - 15971.5 Wasteland 6 6970 2000 14296.2 4002 7933 73 . 360 5 20400 34850 1200 36050 Farmland 144 Binan River . 536.75 2000 14472.5 Bicheng FI_ 53675 4002 7933.73 Project in 21675 30600 52275 1400 180.25 2000 2180.3 __eng_Fishpond _ . Bishan 17425 600 18025 - 7225 10200 2000 12465.0 County Bottomtand 30015 7003.5 460 30000 45000 1000 46000 Farmland 15000 230 2000 2230.0 Projed in Xiangkou 2300 . 7500 15000 22500 500 uonmhWasteland

PAGE 97 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

8

E! re a .5! r Rural/Urban a. twsi ' 8U I-F Project W T~~~~~~wS ;1 H%a' H

1000 . _ 1000 County Botlomland 22263.8 26384 4000 10000 8000 263.84 Hailuo 2 12800 12384 25184 1200 4000 10000 8000 263.84 22263.8 8 12800 12384 25184 1200 26384 Project in Shuangfu Farmland Taping 4000 10000 8000 263.84 22263.8 12800 12384 25184 1200 26384 Jiangiin Cdy Gaohu 1 22263.8 26384 4000 10000 8000 263.84 Luopan 6 12800 12384 25184 1200 4262.4 13320 26640 1234 19000 64456.4 13600 16150 29750 1100 30850 Project in Jingtan 4 13320 26640 928 190 64150.4 10200 22100 1100 23200 4262 District Dogyng Farnan Dongyang 11900

PAGE 98 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

USE OF LAND TABLE 5.8 RATES OF COMPENSATION FOR TEMPORARY Crop Rehabilitation Management fee Project Land te compensation fee X___Project_____Land____type___ 2500 inTongliang County Farmland Project 1800 inDazu County Dry field Project 2500 inChangshou District Farmland Project 1200 12 Bishan Water Supply Project Farmland 14 Fish pond 1400 2500 inBishan County Farmland Binan River Project 2500 Project inWulong County Farmland 900 9 Project Farmland Jiangjin Fish pond 1200 1100 110 Project in Beibei District Farmland

TYPES OF GROUND ATTACHMENTS AND INFRASTRUCTURES TABLE 5-9 RATES OF COMPENSATION FOR VARIOUS AFFECTED BY THE PROJECT Water Binan . Proec Proje Project in Supply River Project in Project in Project in Wulong in oBeicei Tongliang in Dazu Changshou Project in Project Item Unit Bishan Bishan County City Distfict County County District _ County County _ _ 50000 50000 High- voltage power KM 200000 line 15000 15000 KM 15000 _ _ _ _ Low- voltage power ______line______30000 . . Telephone optical M

cable -50000 - -- Cell phone relay towel Piece - L - - 40 Water supply pipeline M 15000 15000 - Pump station Piece 2 2 Water pipe M . . 2 M - 2 Power wire - 85 85 Power pole Piece 85 85 . - 70 - Natural gas pipeline M - 75 40 35 35 40 Bamboo Piece 35 60 - 70 60 60 Fruit tree Piece . 60 - 10 12 10 - 10 Copse Piece - 10 18 20 - Young fruit tree Piece 10 - - Young tree Piece '14 15 14 14 Mulberry tree Piece 200 - Piece - - Harangue tree 1000 Piece Century-old tree 8 M2 8 B - Air drying ground 280 . - 280 280 280 Well Piece 25 M3 25 - 25 Water tank 60 Toilet M2 65 - 60 toilet M2 - 70 . Public 40 wall M2 40 Enclosure 25 25 Waste pit M3 . 28persons)ble- 180 Grave Piece

PAGE 99 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Water Binan Project in in Project Project in Project Project in Supply River Project Changshou Project in Project in Wulong Jia in Beibei Item Unit Tongliang in Dazu cngi Distrct County County District Bishan Bishan County .______County County ity 12 Ground M2 . 10 - 30 M3 40 Embankment - M2 35 - Stone-paved road - Wharf Piece 300 .80000 - Road KM - 80000 80 85- 80 Tractor trail M 150000 Small bridge Piece that in other districts and rate for high-tension power lines in Tongliang County is higher than Note: The compensation functions. counties because the towers have to be made higher to restore proper

PAGE 100 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

6 PRODUCTION AND LIVELIHOOD REHABILITATION PLAN

6.1 RESETTLEMENT PLAN

6.1.1 REHABILITATION OF PERMANENTLY LAND ACQUISITION

be reasonably compensated at the rate of Farmers whose land is permanently acquired shall choose from the following three alternatives for RMB21,450-45,000/mu. The affected persons may production resettlement: among the villages and the Reallocation of farmland, by which the farmland is reallocated 1) after reallocation are divided land compensation and resettlement subsidy received method. equally among villagers. Dazu County will adopt the the per-capita space of compensation: by which farmers in villages where 2) Monetary resettled by monetary after land acquisition is more than 0.5 mu are farmland subsidy are paid to the compensation, that is, the land compensation and resettlement affected persons depending on the space of land taken. in villages where the per-capita space of farmland is 3) Change of status by which farmers into by having their status as agricultural population changed less than 0.5mu are resettled as land These people will thus receive a sum of RMB1.6 non-agricultural population. persons is and resettlement subsidy After the number of status-changed compensation among villagers remaining in decided, the farmland given up by them may be reallocated the village depending on their willingness. acquisition. may be resettled by monetary The status-changed farmers affected by land compensation, insurance, social security support, etc. and resettlement subsidy are Monetary compensation, by which the land compensation 1) a living; paid to the status-changed persons to allow them to make who are above 16 basic social endowment insurance, by which those 2) Resettlement by by the state but have not yet reached the age of retirement specified years of age ID card, apply for the may, by presenting their urban resident register and government insurance agency. Those endowment insurance for urban workers at the local social basic paid the premium for 15 years who have secured this type of insurance and have actually on a monthly basis after they have and longer may receive endowment insurance money for women. reached the age of 60 years for men and 55 years those status-changed persons may Resettlement by social security support, by which 3) allowance if the average income of apply for the minimum urban resident subsistence living together is lower than the minimum local subsistence them and their family members the cost of The level of the allowance is determined according to level of urban residents. resident necessary to maintain a decent life for a local urban clothing, food and shelter schooling of the cost of water and fuel (coal or gas) and compulsory and in consideration allowance in the children. The standard of urban minimum subsistence of their young in Beibei District, affected localities are respectively: RMB185/person/month Tongliang County and Bishan RMB145/month in Jiangjin County, Changshou District, and RMB130/personlmonth in Dazu County, RMB115/person/month in Wulong County County.

PAGE 101 SOGREAH CONSULTANTS- 23500321.R4 - AUGUS2004 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

will establish a complete labor service losing farmland, the local government will For those farmers service agency for the affected people assistance to them. The relevant labor all system to provide resettled person get employed through month before land acquisition to help the be founded one giving the status-changed persons free access channels. Such help includes, for example, the displace possible from the local sources and providing it to to the job market, collecting job information information once a month land acquisition and then publishing such persons one month before persons (such training is mainly free vocational training to the status-changed is afterwards, providing For instance, in Dazu County, the training to the demand of the local job market. to the oriented skills, and in Bishan County, it is oriented oriented to the acquisition of metalworking also consult the enterprises skills, etc.). The labor service agency will acquisition of shoe-making with certain preferential incentive or seeking expansion and provide them in being constructed if they employ the status-changed persons) (such as being exempted from part of tax policies get employed. order to make it easier for these persons to

6.1.2 HOUSE-REBUILDING PLAN and households, 122 rural households, 18 enterprises The house-rebuilding plan involves 66 urban institutions, and 38 shops. houses (1) Rehabilitation of urban and rural residential 2 residences, and relocation of 11,288,9m of urban projects will cause the demolition 2 420 persons These and 16,283.1m of rural residences, affecting affecting 330 persons in 66 households price, the affected persons After receiving the compensation at the replacement in 122 households. resettlement apartments, new commercial to purchase cheap uniformly constructed to build their may choose addition, the rural residents may choose apartments or second-hand apartments. In own houses. such houses at the compensation price and cheap resettlement houses may buy excessive Those who purchase 2 2 per person. For limitation of design, the space standard of 18 m (17m in Tongliang County) 2 and if the at the as the construction cost if it is not more than 5m space is to be purchased at a rate 50% as much be purchased at the 2 the space of the demolished house, it may space is in excess of 5m but less than of the demolished house is cost plus land price). Any part exceeding the space combination price (construction demolisher shall construct facilities such as at the market price of a commercial house. The to be purchased area; water and power supplies shall be constructed water and ground leveling in the resettlement commercial houses in the monetary compensation and purchase 2 as planned. Those who choose the 18m 2 (17m in Tongliang County) may be exempted from the tax derived from affected localities afford to buy commercial apartments, space standard. For those who cannot rent per person the local government shall provide cheap resettlement houses or second-hand houses, houses after they have received the compensation. shall be provided with sites choose to build their own houses by themselves Rural residents who per-capita space standard. They shall build charge by the local government at the average free of the village or township. such houses according to the plan made by and cable TV supplies, transportation, communications Facilities such as water; power and gas residential centers. in the resettlement areas and commercial systems shall be constructed and other facilities shall be banks, food markets, bus stops, hospitals Schools, post offices, the residents. The resettled persons may around the residential area to convenience houses constructed the residential area at their own will. These to buy apartments of different grades in 980s) in quality, choose (most of which were built in the 1970s to 1 are much better than their former houses mostly old houses left by accessibility. The second-hand houses are structure, environment and former houses in location, quality and and institutions and are also better than their the enterprises domestic poverty shall be provided with cheap-rent structure. Part of the vulnerable group suffering houses by the government.

PAGE 102 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 R4 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

(2) Affected enterprises one operates of which two are no longer in production, These projects will affect 15 enterprises, only, six Three enterprises are affected by land acquisition seasonally and one is not running well. Enterprises whose land is and the rest are to be partly demolished. are to be completely relocated while those to be completely compensation at the estimated land price, acquired will receive land construction land and buildings, choose to may, after receiving the compensation for relocated planned new urban areas. As the transportation, move into the local industrial parks or will have better environment are uniformly planned; such enterprises supplementary facilities and of such enterprises during the than before. The income loss of the employees operating conditions to be partly demolished may choose to period will be compensated for. Enterprises transition other purposes. rebuild their houses or use the compensation for (3) Affected institutions whose old offices are to be will affect three institutions including two The proposed projects will receive house compensation. The These two institutions have new offices and demolished. backwards. Shuren College partly demolished will rebuild (4) Affected shops demolished and relocated and 34 affect 38 shops of which 36 are to be completely of The projects will are all on the ground floor of the building are located in Dazu County. These shops not be of them living area. Two shops in Wulong County will the second floor serves as the domestic the project. which temporarily affected during construction of demolished and only their operation will be will receive compensation at are all run by the families and these families The 36 affected shops of a similar floor space and structure in price with which they can purchase shops use the the displacement to purchase shops to continue operation or similar locations. The shop owners may choose compensation for other investments. on rent. The tenants can. be resettled in affected shops in Wulong County are operated rented as The two provides the tenants houses that can be two ways: in the first place, the demolisher for and arrange new and rent rate and helps them look 2 shops including shops of similar location of RMB15/m . The shall receive a movement allowance at the rate production houses. The tenants In the second place, the shall receive compensation for loss of rent. owners of both shops wages) due to discontinuation of compensated for loss of income (including pennants shall be owners of the two shops shall be paid a during the period of temporary impact and the operation of RMB20,000 per year, which can be calculated compensation for loss of rent at the rate according to the actual duration of impact.

6.2 PROJECT IN TONGLIANG COUNTY 37.8 mu of land for temporary 221.32 mu of land for permanent use and The project will acquire in 5 urban households, 41 people in 2 57 people in 13 rural households, 26 people 2 will be use, affecting shops. Altogether 2,898.71m of houses or institutions, 4 people in 2 resettled by enterprises households, and 308 people need to be demolished, affecting 819 people in 194 production.

PAGE 103 - AUGUST2004 SOGREAH CONSULTANTS- 23500321.R4 BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

LAND ACQUISITION 6.2.1 REHABILITATION OF PERMANENT BY LAND ACQUISITION 6.2;1.1 ANALYSIS OF IMPACT CAUSED 161.33 mu of farmland, 221.31 mu of land, which includes project will permanently acquire 693 people in 4 villages The and 2.18 mu of fish pond, affecting mu of garden, 54.45 mu of forest, 3.35 need to be resettled by production. of Bachuan Township, and 308 people 57.3 mu of farmland, will acquire 64.95 mu of land, including The sewage treatment plant project work will acquire of forest. The flood-preventing embankment 3.15 mu of garden, and 4.5 mu 49.95 mu of forest and 2.18 mu of farmland,.0.2 mu of garden, 156.36 mu of land, including 104.03 mu of fishpond. affected villages. See TABLE 6-1 for the impact on the

ON THE AFFECTED VILLAGES TABLE 6-1 IMPACT OF LAND ACQUISITION to be acquired Per-capita space Population Farmland Per-capita space of Permanently after resetiled by Populatlon before land (mu) of farmland Village (person (mu) farmland acquisition (mu) production (person) (person) (mu) acquisition (mu) Total Farmland 0.28 127 0.33 66.12 42.02 Yandu 987 323 0.86 28 0.87 29.84 24.60 Ludong 1796 1568 60.63 0.68 87 1900 0.70 68.28 66 Yueyang 2712 50.54 31.56 0.47 Tiyue 3446 1650 0.48

project. Currently there are 987 receives the greatest impact of the Table 6-1 shows that Yantu acquire 42.02 mu of farmland, in Yandu Village. The project will people and 323 mu of farmland be resettlement by production. The rural households, and 127 need to affecting 248 people in 62 Before acquisition, the per-capita for 13% of the total area of farmland. If the land acquired accounts it becomes 0.28 mu, down by 7%. is 0.33 mu and after acquisition, income will space of farmland is RMB1, 258, the per-capita annual annual turnover of one mu of farmland 964 in 2003, land average income of this village was RMB2, by RMB63. As the per-capita secondary and tertiary reduce The contribution of agriculture and will reduce it by about 2%. and tertiary industries acquisition 8% and 92% (with the secondary industries to the income is respectively calculated as a whole). by the project is from the income of the labourers affected Obviously, the major source of significant impact on their and land acquisition will cause no secondary and tertiary industries income.

PAGE 104 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 WORLD BANK CHONGQING MUNICIPALITY - THE PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

OF INCOME 6.2.1.2 REHABILITATION

(1) Resettlement plan following resettlement alternatives with the affected villagers, the Through repeated consultation will be provided for this project: status (DChanging of the the per-capita space of farmland in construction of the project, Therefore Affected by land acquisition in Tiyu Village not yet 0.5mu. will be not yet 0.3 mu and that changed. residents in Yandu Village be resettled by having their status in both villages may choose to subsidy and crop the affected labourers land compensation, resettlement person may receive in the planned expansion Each status-changed As the four villagers are all located totalling RMB17,000. the next few years in the ongoing compensation land will be gradually taken in by area of the county seat, their villages may choose to get resettled affected labourers in other two not willing urbanization process, the have their status changed but are If some villagers who can the villagers, that having their status changed. by reallocating farmland among committee will resettle them are willing to have their to do so, the village affected by land acquisition but given up by those who are not their status changed and is, the land the former and the latter will have changed will be reallocated to status resettlement subsidy. receive land compensation and

(2) Monetary compensation for farming rather in the rural area to contact land farmers who are willing to remain resettlement subsidy Those affected receive land compensation and having their status changed will at the rate of RMB30,000 per than taken from the resettlement agency depending on the space of land mu. rate term, excluding tax on interest interest rate of 2.79% for 5 years 000 in the Based on the current deposit deposit the compensation RMB30, rate is 2.232%. If the affected their current yearly 20%, the real deposit each year, which is more than 50 years, they will get about RMB997 bank for land. net income RMB1 50 from cultivated

) Livelihood support insurance and minimum subsistence persons may enjoy the basic endowment insurance and have The status-changed have secured basic endowment for urban residents. Those who insurance money on a allowance and longer may receive endowment In paid the premium for 15 years men) and 55 years (for women). actually reached the age of 60 years (for is RMB482 monthly basis after they have is paid RMB145/month, which the minimum subsistence allowance Tongliang County, of RMB1,258 from farming. more than their average annual income compensation and get resettled by receiving monetary on villagers who have chosen to will provide them with training For those surplus labourers, the village committee whose families include their farming business to improve technology and help them restructure of being close to agricultural production vegetable planting using the advantage income, such as developing greenhouse the urban area. to the service system to provide assistance will establish a complete labour training, The local government information on employment, vocational such as providing them with get employed. affected villagers etc. to pave the way for them to consultation with the local enterprises,

PAGE 105 .R4 - AUGUST2004 SOGREAH CONSULTANTS- 23500321 BANK CHONGOING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

within the planned to the cities and most of them are located The four affected villages are close and the new founded city. The construction of the new city area for construction of the new zones provide a lot of job seeking expansion in the development enterprises and those The local government will help the rural labour force (See TABLE 6-2). and opportunities for the providing employment information to get employment through training, and affected labourers can get a monthly wage of RMB400-800 with the enterprises. In this way, they discussions higher than it used to be. their income level will restore or get even IN THE BY NEW CITY CONSTRUCTION AND ENTERPRISES TABLE 6-2 JOB OPPORTUNITIES CREATED DEVELOPMENT ZONES stimated umber o job Remarks Item Monthly wage level of opportunities ConstructionArea Enterprise migrant workers (RMB)

Civil works 400-800 300 Baituba new City Chongqing Linda Ltd, Gan Siwan construction area Eider Down Producton Ltd Jiangqing Shoe-Making C w Csvel works, 160 Ltd, Heping Pharmacy shoemakers, 400-600 Leather shoe Ltd, Meng Keda Shoe- Lidng Keda Soe repairers, odd jobs, industrial park Making Ltd. Nongteng etc. Cotton Goods Ltd Manual Civil works 400-800 200 Special industrial labour park Service Property management Plumbing, electric 150 work Urban property esipenlrse ng 400-600 management area company

LAND OCCUPATION 6.2.2 REHABILITATION OF TEMPORARY involves five villages of Bachuan Township. occupation of land for this project land. Crop The temporary including 21.6 mu of collective-owned 37.8 mu of land will be occupied loss in one year Altogether will be paid in such as manner that the for land temporarily occupied sum of compensation compensation as 2.5 quarters, which means a total occupation will be compensated for one year and the of project will occupy the land for about of RMB2,500. Constructing the annual output value of money than the actual loss as the average compensation obtained is much higher not be affected. Therefore, the farmers' livelihood will the farmland is only RMB1, 200 per mu. land. The constructor re- affected choose how to restore the After the project is completed, the group organize to check retums it to the affected; village and cultivates the farmland occupied and and accept. HOUSES 6.2.3 REHABILITATION OF URBAN RESIDENTIAL Bachuan Township will houses for constructing this project in The resettlement of urban residents' 2 houses have been totaling563.79m . Residents whose 2 involve 26 people in 5 households, being RMB400 per m for monetary compensation (the standard demolished will be resettled by 2 houses, land prices RMB350 per m for brick+wood structure brick+concrete structure houses and alternatives to make, the compensation money have three The affected people receiving and rent cheap-rent included). price, purchase commercial houses namely, to buy houses at a preferential houses.

PAGE 106 2004 SOGREAH CONSULTANTS - 23500321 .R4 - AUGUST BANK CHONGOING MUNICIPALITY - THE WORLD CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

by the government at to buy resettlement houses provided (1) The resettled persons may choose to the compensation and at buy such houses at the price equivalent a reduced price. They may the excessive space is to be per person. For limitation of design, price the space standard of 17m2 price (construction cost and land a rate 50% as much as the combination 2 the space purchased at 2 is in excess of 5m but less than is not more than 5m and if the space price. Any part included), if it be purchased at the combination former house demolished, it is may at the price of of the demolished is to be purchased the space of the former house ground and providing exceeding is responsible for smoothing the commercial houses. The demolisher affected households. water, power and gas supplies to the various new urban area and complete with area is located in the planned There is a road The resettlement transportation and communication. supplementary facilities and well-developed connectivity has reached a national highway route and the highway system based on the G319 one zone" (namely, the strontium salt km. There, the 'five industries and silk and total distance of 2,516 and mechanical machining industry, industry, building material industry, metallurgical Technology Park) processing industry and West Chongqing garment industry, farm product are much better than the former Furthermore, the newly built houses before have acquired shape. persons will feel more convenient than in structure and quality and the resettled improvement in houses schooling. They will notice dramatic in livelihood, work and their children's living standard and quality. or built their houses provided at a preferential price families who are not willing to purchase money received to (2) For free, they might use the compensation own houses on sites provided should include the iand price, houses in the city. The compensation a rich purchase commercial houses in Tongliang County. There is which enables them to buy new or second-hand house buildings are houses in Tongliang County. The new supply of new and second-hand facilities. The second-hand at places with convenient transportation fully equipped and built and institutions. They are relatively are houses left by many enterprises former house buildings In comparison with the resettled person's in location and good in structure and structure), these convenient the 1980s and are inferior in quality houses (which were mostly built in or self-build by the resettled uniformly constructed by the government houses, whether they are houses, are much better in quality, new commercial houses or second-hand in Tongliang persons or are who purchase commercial houses and location. What is more, those information structure fees and taxes. See TABLE 6-3 for will be exempted from all the purchase County houses and second-hand houses. about the supply of new commercial be provided houses and resettlement houses should (3) Those who cannot afford commercial cheap-rent houses by the government.

RESIDENTIAL HOUSES 6.2.4 REHABILITATION OF RURAL Township will for constructing this project in Bachuan The resettlement of rural residents' houses whose houses have been households, totalling 1714.07m2 . Residents 2 for involve 57 people in 13 (the standard being RMB220 per m be resettled by monetary compensation RMB55 per demolished will m2 for brick+wood structure houses and structure houses, RMB206 per people receiving the brick+concrete land prices not included). The affected m2 for simple structure houses, construct their own houses, buy three alternatives to make, namely, to compensation money have commercial houses. In the former case, a preferential price, and purchase at the resettlement houses at owner of the house demolished and agency shall pay compensation to the resettlement the resettlement house site. In the latter two cases, the provide him free of charge with a demolished but also same time compensation not only for the house agency shall pay the affected household the house site taken.

PAGE 107 SOGREAH CONSULTANTS-23500321.R4 -AuGusT2004 BANK CHONGQING MUNICIPALITY - THE WORLD PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

of local government shall provide free choose to build their own houses, the for (1) For those who 2 per person. The demolisher is responsible house sites at the space rate of 30m households. The charge water and power supplies to the affected smoothing the ground and providing floor used as a shop to build multi-story houses with the ground resettled persons may choose persons can perfectly build houses of It is known through survey that the resettled money for business. in the resettlement area with the compensation the same area as their former houses received. government at resettlement houses provided by the persons may choose to buy compensation and at (2) The resettled houses at the price equivalent to the a reduced price. They may buy such the excessive space is to be 17m2 per person. For limitation of design, the space standard of price (construction cost and land price at a rate 50% as much as the combination but less than the purchased and if the space is in excess of 5m2 included), if it is not more than 5m2 at the combination price. Any demolished, it is may be purchased space of the former house is to be purchased at the price of the space of the former house demolished and providing part exceeding is responsible for smoothing the ground commercial houses. The demolisher and power supplies to the affected households. water complete with various in the planned new urban area and The resettlement area is located communication. There is a road and well-developed transportation and a supplementary facilities and the highway connectivity has reached on the G319 national highway route strontium salt system based industries and one zone" (namely, the distance of 2,516 km. There, the "five industry, silk and total metallurgical and mechanical machining industry, building material industry, Chongqing Technology Park) have product processing industry and West in garment industry, farm are much better than the former houses Furthermore, the newly built houses in livelihood, acquired shape. will feel more convenient than before and quality and the resettled persons in living standard and structure They will notice dramatic improvement work and their children's schooling. quality. houses or build their own houses, they are not willing to purchase resettlement the city. The For families who to purchase commercial houses in compensation money received 2 for house may use the (RMB180/m ). As they will be compensated 2 should include the land price price (of RMB180m ), the compensation 2 per person and the price of urban land sites at the space rate of 30m in the urban area of Tongliang to buy new or second-hand houses compensation enables them houses in Tongliang County. The new a rich supply of new and second-hand The County. There is with convenient transportation facilities. fully equipped and built at places They are buildings are left by many enterprises and institutions. second-hand house buildings are houses with the resettled person's location and good in structure in comparison these relatively convenient in are inferior in quality and structure), were mostly built in the 1980s and the resettled former houses (which by the government or self-build by whether they are uniformly constructed much better in quality, houses, houses or second-hand houses, are persons or are new commercial commercial houses in Tongliang County What is more, those who purchase about the structure and location. and taxes. See next Table for information exempted from all the purchase fees will be second-hand houses. supply of new commercial houses and HOUSE BUILDINGS AND SECOND-HAND HOUSES TABLE 6-3 DISTRIBUTION OF NEW COMMERCIAL Total space of and Average selling .vIntemal residential Facilibies Name of environment price (RMB/m2) Status Location layout area Type residental Developer (10,000m2) area Chongqing Dashun Completed 450 Completed Baidiba Vanous 10 New Baituba Real Estate Development Co. Completed Hulu Chongqing Ziyuan Inside 6.0 Completed 410 Real Estate residential Various New Gadn area Garden Development Co Completed About 350 Completed & Varous 20 Abu35 Coped Second- Old urban Left by enterprises 2 Copee hand ara isiuinVaiu house ara isiuon

PAGE 108 2004 SOGREAH CONSULTANTS-23500321 R4 - AUGUsT CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

INSTITUTIONS AND SHOPS 6.2.5 RESETTLEMENT OF ENTERPRISES, to be demolished 2 enterprises and institutions with houses The project will affect 41 people in 2 to be demolished. 2 in 2 shops with 395.35m of houses totalling 225.5 m in space, and 4 people to get monetary houses are to be demolished chose The enterprises and institutions whose centre can get rebuild the houses. The fish-breeding compensation and decided not to a total amount of permanently occupied and will receive compensation for its farmland being the three brick+concrete subsidy and crop compensation. In addition, RMB187,200 as resettlement of RMB220/m2 as if they were bought will be compensated for at the rate of guardhouses demolished houses, it can get compensation for the loss Since the centre decided not to rebuild the for new. mu for rural house sites). Thus the total compensation house site (at the rate of RMB9, 600 per center are all migrant 100. The affected employees of the fish-breeding houses is RMB123, them 2 months before land acquisition take and the project-executing agency will inform workers reemployed. place so that they have sufficient time to get to be demolished and therefore its Enterprise Office has only one empty house Bachuan Township the office is an institution whose land was will not affect the office's normal work. As demolition it can get the house compensation only. provided by the government free of charge, part of their residences, they be demolished were made by the owners from Since all the shops to by the government after receiving resettled by getting house sites provided are all willing to get income to build their own houses. In the for house demolition and loss of operation as the compensation multi-storry houses with the ground floor used resettlement area, they may chose to build providing water, is responsible for smoothing the ground and shop for business. The demolisher in the planned new urban the area. As the resettlement area is located power and gas supplies to transportation and communications complete supplementary facilities and well-developed area with an improved business atmosphere. systems, the affected shop owners can expect of the affected enterprises, institutions and See TABLE 6-4 and TABLE 6-5 for the resettlement shops. AND INSTITUTIONS TABLE 6-4 RESETTLEMENT OF AFFECTED ENTERPRISES Form of resettlement

( - 0 C. = C~- .9-~ Sierity of impact __E S/N Enterprise or insvtution Loction

2.52 of farmland, 1.83 mu of forest and 2.18 mu of fish pond (dilapidated for bad the Yishe, quality of water) to be occupied with accounting for 10% of the Monetary means 31.0310 Fish-breeding centre LVudos0ng9acquired land of land it owns, three Mntr en I Fish-breeingcentre Ludoge total space be 1 Village guardhouses to be demolished (not to rebuilt as there are other ones elsewhere)\ be Sis One empty office will building to normal Monetary means 1.32 ndheu demolished, causing no impact on inMoeaymns 13 2 EntepBachuanTownship Yilagde work as there is a new office building 2 Enterprise Office l_l the township government area l

PAGE 109 2004 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 6-5 RESETTLEMENT OF SHOPS Form of resettlement of of ownershipChange Address S/N Shop Locaflon Severityimpact Resettlement Address

Sishe, Yandu To be Settlement area store Village demolished Self-building 1 Grocery Village completely_____ Yishe,LudongTo be Self-building Settlement area VieLdg demolished ______2 Bicyde repair shop ______Village com pletely _ _

6.2.6 REHABILITATION OF AFFECTED VULNERABLE GROUPS

families. See TABLE 6-6 for detail. The project will affect 3 handicapped people in 3

TABLE 6-6 SURVEY OF VULNERABLE GROUPS eeiyo mat Demolishing area Preferred form of Labourer Lee fdsblt Severty of impact (M) resettlement Project Name Address infamily Level of disability Sl-uligo Zhu Jiushe, Nersgtd Land acquired Land house 240.2 Self-building of Xinghu Yueyang 2 levl 2 Sew2age Village level__2 demolishedhos trewatmen Xnghui Land hoqusred2efbuligo pleatmnt -hng Jiushe, Land acquired 22 hof aent Zankang Yueyang 1 Near-sighted evel 2 demolished house Jianang Village _____ ~~~~~~~~~~~~~~~~~~~Smallpiece of land_ Ershe, acquired only, Embankment Ren LuonrsMnalyhed,cuie continuing to work Xingfa Vllaoge 2 Mentable,lyvl cont nu,former toas works VillaglmentErshe Xla2 disabled, level 2 Land acquired and house people, two will be affected by both land acquisition Of the three handicapped Jiankang are one family by land acquisition only. Zhou Xinghui and Zhang demolition and one large in floor space, the Because their house to be demolished is fairly living separately. to them free of charge. In the enables them to self-build houses on sites provided compensation will offer assistance. process of building construction, the village committee the land compensation and resettlement those vulnerable groups affected by land acquisition, For responsibility for arranging their livelihood. The subsidy may be paid to their children who take the labourers in their families or provide them with village leadership will offer vocational training for the easier for them to get employed. employment information and instruction to make it

PAGE 110 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

6.3 PROJECT IN DAZU COUNTY use and 27.6 mu of land for temporary will acquire 125.36 mu of land for permanent *The project in 60 urban households, 38 people in 2 62 people in 19 rural households, 298 people 2 use, affecting Altogether 15,449 m of houses will be and institutions, and 164 people in 34 shops. enterprises and 337 people need to be resettled by demolished, affecting 1,070 people in 215 households, production.

ACQUISTION 6.3.1 REHABILITATION OF PERMANENT LAND ACQUISITION 6.3.1.1 ANALYSIS OF IMPACT CAUSED BY LAND field, mu of collective-owned land, all being dry The project will permanently acquire 125.36 by Township, and 337 people need to be resettled affecting 482 people in 5 villages of Longshui production. mu of land and the flood-preventing embankment The sewage treatment plant will acquire 56.76 works will acquire 90.6 mu of land. ACQUISITION TABLE 6-7 ANALYSIS OF IMPACT CAUSED BY LAND

C E EE 8 a AR-9cc , - - p

05 2 a) Mg 1 2 a a 0.40 1ET 18 164 0 E m.. Yongy8 1 1967 21787C.).m co embankmentpreventmg Yujian 3 25 66 46 0.496 5. Sewage~~~~~~~~~~~~~~~~~~99 19 05 12.5 12.5 Fb- ingun 1 145 0. 77 56. 76 156. 76 118 82 0. 75 2. Sewatgenpan Mingguang 1 2867 2208 66 46 0. 496 5. 4 13 2994 1497 0. 50 12. 50 12. 50 Flood- Xingguang 0. 39 5. 4 787 0. 40 18 j 18 234 164 preventing Yongyi 1 1967 08 0. 92 3. 1 j3. 11 10 7 0. 919 14. embankment Yujian 3 2652 2440 project_ 35 35 54 38 0. 917 2.145 Longdong 4 4749 4389 0. 92 has the largest space of acquired land, 6-7, it can be seen that Mingugang Village From TABLE need to be resettled by production, and that is 56.76 mu, affecting 118 people and 82 people which land, which is 3.1 mu only, affecting 10 people Village has the smallest space of acquired Yujian Mingguang Village has 1 group, where has 2867 and 7 people need to be resettled by production. 2.6% acquire 56.76 mu of farmland, accounting for and 2208mu farmland. The project will The people and 82 need to be resettlement by production. of the total farmland, which affects 118 people, is RMB3250, including industrial income RMB2275, per-capita annual income of Mingguang Village annual for 30% of the total income. If the average agricultural income RMB975 that accounts RMB132, the per-capita annual income will reduce by turnover of one mu of farmland is RMB500, less than 1%.

PAGE 11 1 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

acquisition on the farmers' total it can be seen that the impact of land From the above analysis, these villages rely very little on the The survey reveals that the farmers in income will be limited. present, more than 90% of the villagers seems to have lost its appeal to them. At farmland, which of them run small metal ware plants in their in the metal ware industry and about 50% their family are engaged workshops in their houses normally have houses. Those who do not run metal ware income from running ware enterprises in the urban area nearby. The members working in the metal 81% of the villagers' non- and working in the enterprises account for their own businesses a fairly small part. Moreover, most of and their income from farming constitutes It agriculture income instead hire other people to do it from them. now do not work in the field themselves but change them farmers. living in the project area will not can be said definitely that the livelihood of significantly due to land acquisition.

6.3.1.2 REHABILITATION OF INCOME that they will be resettled by reallocation of discussions with the villagers, it is decided to each By extensive resettlement subsidy will be paid equally farmland and the land compensation and household. land of RMB3.19 million as compensation for affected villages can get a total amount million, The of which Mingguang Village gets RMB1.218 acquisition and subsidy for resettlement, million, Longdong Village RMB0.423 million, Yujian Village RMBO.066 Xingguang Village The land compensation and resettlement million and Yongyi Village 0.734 million. 2.79% RMB0.751 Based on the current deposit interest rate subsidy for each mu is RMB21, 450-40,800. is 2.232%. If the affected tax on interest rate 20%, the real deposit rate above 5 years, excluding bank for 50 years, they will get about compensation RMB21,450-40,800 in the deposit the their current yearly net income RMB600(RMB220) RMB713-1458 each year, which is more than from dry land(paddy field). small metal ware the villagers may continue to invest in After receiving the compensation, level of RMB600-700 per month even will help them make their current income can workshops. This of the total population) who live on farming Those villagers (accounting for about 10% higher. by renting the farmland of other villagers. expect to get a high income from agriculture in metal ware products the business is fairly large Township has a long history in making are engaged in Longshui operation. Currently some 50,000 people scale with a complete sales network in and 12 categories. out products of 20,000 sizes in 200 varieties this industry, which turns centre, surface-treating centre and are widely employed in the hardening on Advanced technologies Yonghong and Wangsheng are selling well centre. Some famous brands like Jinzhong, market and grinding The metal transaction market, metal ware both the domestic and overseas markets. an annual sales been constructed and put into operation. With metal ware tourist centre have now the largest production. and 800 million, Longshui Township has become volume of RMB1, China. distribution centre for small metal ware in Southwest which are doing quite well. The of enterprises around the affected villages, There are a number will provide some jobs for the labourers in the of these enterprises have promised that they owners of these enterprises. affected villages. See TABLE 6-8 for statistics

PAGE 112 2004 SOGREAH CONSULTANTS- 2350032 1.R4 - AUGUsT BANK CHONGOING MUNICIPALITY - THE WORLD PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

TABLE 6-8 STATISTICS OF VILLAGE ENTERPRISES Number of Average annual Population employees value employees income of by land Number of Industrial output (peron) (RMB) Village Total populaton affected (RM81O,000) (person) acquisition enterprises (person) 3450 9936 82 23790 2867 214 9996 Mingguang 5750 1410 46 36 10464 Xingguang 2994 3790 166 99 52170 Yongyi 1967 933 10512 58 25 4450 Yujian 2652 9660 20 3200 820 4349 38 Longdong 10403 546 262 89360 Total 14829 sufficient capability to arrange the seen that the five villages have a From the table above, it can be therefore be better than it was enterprises and their income will affected farmers to work in the before land acquisition.

LAND OCCUPATION 6.3.2 REHABILITATION OF TEMPORARY Altogether 27.6 the project will affect five villages. occupation of land for constructing land occupation will be Temporary the compensation for temporary land will be temporarily occupied; of occupation will be mu of of these dry fields. Half a year according to the annual yield RMB1, 800. Since the made the per-mu 'compensation being for as one whole year with of yield is then RMB1, compensated will last for 6 months, the loss will temporarily occupy the land received is more project as one year. Therefore, the compensation as the period is regarded affected by the temporary 000-1200/mu the farmer' livelihood will not be than the actual loss caused and occupation of land. has been reached occupied, a preliminary agreement rehabilitation of land temporarily constructor shall As for the executor, which stipulates that the the affected villages and the project and improve the quality between compacted by engineering machinery smooth the land, loosen the ground the restored land. agency will conduct acceptance of of soil and the land-administration

RESIDENTS 6.3.3 RESETTLEMENT OF URBAN Township will be demolished, of 60 urban families in Longshui construct the project, the houses 2 To floor space of 10,345.09 m . affecting 298 people, with a total 45m2 in space. See affected by the project are above houses of these urban residents All the distribution of the houses. TABLE 6-9 for statistics of the space OF AFFECTED HOUSES TABLE 6-9 STATISTICS OF SPACE DISTRIBUTION 2 % Total space (mi) */ / Number of people Size Number of families 11.9% 502.89 4.9% 11 4% 43 95.1% 45sHA<65 255 88 1% 9842.2 60•HA 49 86% 298 10345.09 Total 60

PAGE 113 - AuGuST 2004 SOGREAHCONSULTANTS- 23500321 R4 - THE WORLD BANK CHONGQING MUNICIPALITY PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

Project in Project InWulong Prqect in supply project Binan River Beibei District Tota inDazu Project in Water Counq Jiangjin ciq Project inTongliang Project inBishan Count Project County Changshou County 1114720.3 72771066.8 SIN Projecl 11304181.6 577813 2 1606258.5 26876312.0 11833683.7 11551418.8 22294.4 1455421.3 7906678.1 226083.6 11556.3 Total of llems 1-8 32125.2 537526.2 2366137231028.4 design 158133.6 9.0 Cosl oflolanning and 17334.4 334416 2183132.0 806289.4 339125.4 3465426 48187.8 of implementation and 237200.3 355010.5_. 2354838 10.0 Cost 491330 2889.1 55736 management 8031.3 72713.3 20673.1 42358,1 (inrural 34112.4 2067____235483_8 11.0 Cost of technical training 11556.3 22294.4 1455421.3 area) 537526 2 226083.6 231028.4 32125.2 Cost ofsuperision and monitoring 7810052.5 12.0 1214460.7 62114.9 1198325 172672.8 2883036 7 7810____ 1268271.5 1240237.6 ______5_____5_ und 849425.8 5 17377002.7 130 Basicreserve 335~~~~~~~~262470. 2482378.7 276338 0 1301252 Tan 2136317.5 791553.6 4729919 3 2306296.1 1032Z7560.6 2136317.5 .,M 2619409.8 Tax "158414467 595Z2..1 14 0 2690954.4.-.#, 36441323 2 . .,1594890Y9 11480001.2 173039331-. lOt3tCIis BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

ENTERPRISES 6.3.5 RESETTLEMENT OF AFFECTED 2 and 1,993.71 m of to be resettled, affecting 38 people, The project will cause two enterprises houses will have to be demolished. Equipment Plant, Refinery and Post And Communication The two affected enterprises are Grease rates, the enterprises demolished. According to the compensation which houses will be completely 2 structure houses and of RMB226/m for their brick+concrete 2 will get compensation at the rate at the rate of RMB1 15/M 2 structure houses, and be paid compensation RMB205/m for brick+wood financial subsidies for resettlement paid for the damage of facilities and for house lands, and be Township authorities, the affected According to the general plan of Longshui and reconstruction. in the industrial park area of the township. resettled by monetary compensation 000- enterprises will be park at preferential prices (RMB8O, can buy the land of the industry The The affected enterprises new factories in the industry park. compensation enables them to rebuild that 120,000/mu). The for reconstruction in advance so enterprises may then make preparations and employee. resettled to minimize impact on the enterprise reconstruction takes place before demolition government as one of in 2003 by Chongqing municipal industrial park was approved 6 square kilometres. At Longshui park covers a planned area of 2 30 feature industrial parks. The which 0.78 km has Chongqing's 2 of the park has been initiated, of construction of the first 1.55 km an annual present, have moved into the area, generating been completed. Currently 93 enterprises and profit of RMB118 million, sales income of RMB478 million industrial output value of RMB520 million. of affected enterprises. See Table 6.11 for the resettlement ENTERPRISES TABLE 6-11 RESETTLEMENT OF AFFECTED Resettlement Amount of Severty of impact Project Enterprise Type Location compensation (RMB10,000) 20 Monetary Industrial park Grease refinery Completely demolished ~~~~~~~~~compensationIdsra ak2 Riverb)ank Riverbank Completely demolished Monetary improvement Post and telecom equipment Industrial park 4 Completelydemolishe compensation ______plant

SHOPS 6.3.6 RESETTLEMENT OF AFFECTED 164 people, with a total be demolished and resettled, affecting The project will cause 34 shops to from residential houses 2 have the following features: (1) made space of 1,746.68 m . These shops basically by the their by the owners themselves and helped along the road or riverside, (2) run in metal ware products. family members, and (3) engaged concerning into the preferences of the shop owners survey involved inquiries consideration of The socio-economic the demolisher and shop owners in Through discussions between that the resettlement resettlement. the shops are located, it is decided the actual condition of the places where will take the form of monetary compensation.

PAGE 115 AUGUST2004 SOGREAH CONSULTANTS- 23500321 .R4 - CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

(at the rate of owners will receive house compensation After demolition and resettlement, the shop 2 structure houses 2 structure houses, RMB1,780/m for brick+wood RMB1,980/m for brick+concrete price). The financial subsidy for 2 simple structure houses, all including land and RMB1,280/M for caused by closure of business will be of facilities and compensation for damages get RMB63, movement million and this means that each shop can amount to a total amount of RMB3.2569 to purchase business shop owners may use this compensation money 000 on the average. The business side walk st.) in Longshui location and space (Longshui Teacher's st., houses of better the shop market in Longshui Township. Township. See TABLE 6-12 for information about Nanyuan residential area, which was affected by the project will be resettled in 2 The shops has a total floor space of 12,00Om . The average developed by Dazu Nanyuan Real Estate Co. and layouts 2. The houses have been designed into different selling price of the houses is RMB36G/m square meters to suit the tens of square meters to more than one hundred with sizes ranging from is complete with water, power and gas of the resettled families. The residential area requirements cable TV systems. Schools, post offices, transport facilities and communication and the supplies, and other infrastructures have been built around banks, grocery market, bus stops, hospitals area to convenience the residents. except for a very shops are mostly family members of the owner The employees of the demolished these migrant workers 2 months workers. The project executing agent will inform few migrant time for them to get reemployed. Rescannable before land acquisition takes place to allow enough at the rate caused during movement and closure of business compensation will be made for losses in Longshui Township are 2 on the operation of these shops. As the shops of RMB120/M depending the shops are moved are all busy in metal ware industry and the places to which engaged mostly perfectly expect an income level not lower the township, these affected shop owners can areas of their business in their new houses. than before as long as they properly manage shops. See TABLE 6-12 for the resettlement of affected INLONGSHUI TOWNSHIP TABLE 6-12 INFORMATION ABOUT SHOP MARKET floor space Average sellinpg price DescriptionLand class Purpose Status ~~Total (r2)(M; (RMB/m) Description Land class Purpose - ( constructed 8600 2300 area II Commercial and Being Nanyuan residential ______residential ______16000 1200 ll Commercial and Being constructed Longshui Teachers' House B Building residential 2600 19000 II Commercial and BeingBen construcedcos r t d26 01 Commercial walk street ______residential ______

GROUPS 6.3.7 REHABILITATION OF AFFECTED VULNERABLE by land acquisition and 21 by house affect 25 households, of which 3 are affected 2 2. The project will to be demolished ranges from 5Om to 30Om The floor space of the residential houses demolition. families, most of which consist of unemployed households include 15 impoverished and 2 The affected 3 families consisting mainly of women 5 families with handicapped members, have laid- labourers, The impoverished families are those who families consisting of old people living alone. See TABLE for detail. offs and haven't found jobs of higher salary.

PAGE 116 2004 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST BANK CHONGOING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

BY THE PROJECT TABLE 6.13 STATUS QUO OF VULNERABLE GROUPS AFFECTED of Impac Remarks Number of Average Income level Severity Name Address familySeetofIpcRmak members (RMBlmotlVpersan) 140 House demolition &land Poverty-stricken Zhao Caiming #7-3 Wujin St. 3 Poverty-stricken Li______Dalu #7- ujn10acquisition t House demolition &land Poverty-stricken Wujin St. 4 140 ~~~~~~~~~~~~~~~~~~acquisition Li Dailu #47-2 I 140 auuisition Poverty-stricken Zhao Caiguan #47-1 Wujin St. 4 ~~House demolition & land Poet-ncn WangXingguangZuxiu Village 13-S, 100 &land Poverty-strcken 100 House demolitionacqusto Wang Zuxiu 13-S, Xingguang Village 5 acquisition 140 House demolition &land Poverty-stricken Luo Guoiie #61-1 Wujin St. 8 acquisition &land Poverty-stricken 4 140 House demolition YaCShanghai #5 Wujin St. acquisition House ademolition i0 &land Poverty-stricken Chen Ruimo #651 Wujin St. 8 House demolition &land Poverty-stricken Chaoyang St. 4 140 acquisition Chen Dailin #15 Pvrysrce t 4cuisition &land Poverty-stricken Zhou~~Xiodn~ #17Cayn 7-800 House demolition _lan _Povety-sticke Zhang Xuemo #21 Chaoyang St. 5 aLuisition & 140 House demolition &land Poverty-stricken Zhou Xiaodong #127 Chaoyang St. 5 acquisition Poverty-stricken 140 House demolition &land H Zhou Xiangjie #133 Chaoyang St. 4 acquisition Zhang______Jiulin__ #119_Chaoyang_St._4_RMB1001month,parents 140 House demolition &land Poverty-stricken Hu Xibei #137 Chaoyang St. 5 acquisiton Poverty-stricken 140 House demolition &land Zhou #13 Wujin St. 4 acquisition Liangrong #139 Chaoyang St. 140 House demolition & land PovrystickenPom en OuZhiming #5143Chuang S. acquisition Oueyoiming #143 Chaoyang St._4 &land Poverty-stricken Fathers monthly income House demolition Old_pople_ivingalon Chen Bing #117 Chaoyang St. 4 of RMB400 acquisition Lu______Daughter Handicapped RMB100lmonth, parents House demolition &land Zhang Jiulin #-1S9Chaoyang St. 4 RMB700Zmonth and son acquisition RM8600(month ______Handicapped 140 House demolition & land Pan Lunhua #129 Chaoyang St. 1 acquisition House demolition &land Consisting mainly of acquisition women #47-7 Wujin St. 2 140 Xie Zuohe House demolition &land Consisting mainly o women 3 140 acquisition Gu Mingzhong #23 Wujin St. demolition &land Consisting mainly of Zheng C UjNTS- 2House ~~~~~~~~~~acquisitionwomen XueyonqWujin St. #51-4 4 140 House demolition &land Old people living alone 2 140 _ _ _ _ _ Luo Fanglun #43 Wujin St. acquisition _ _ _ _ _ people living alone 140 House demolition &land Old #83-7 Wujin St. 2 ______Lu Dali ______acquisition ______Handicamed 140 Land acquisition 1-S, Mingguang Village 3 Handicapped Lin Shicheng 140 Land acquisition Shilun 1-S, Mingguang Village 4 Handicapped Zhao 140 Land acquisition Jiang Shuliang 1-5, Mingguang Village 4 listed above income of the members of all the families According to the survey, the average Note: level being RIV111 40/person/month). is at the lowest level (the minimum subsidence

PAGE 117 SOGREAH CONSULTANTS - 23500321 R4 - AuGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

three (affected by land group's families, four are rural families with Of the affected vulnerable and house demolition) Village and one (affected by both land acquisition acquisition) in Mingguang I impoverished person. The source of their Xingguang, including 3 handicapped persons and in authorities launch the collective land development family income is chiefly farming. If the village or renting the a large scale, they will give priority to hiring them plan such as growing vegetables on labourers of the three families, and priority will be given to training the land of the vulnerable group' As for the impoverished family skills and then arranging them to work in the enterprises. families in them build their own house. in Xingguang Village, the village leadership will help As their all urban families affected by house demolition. The other vulnerable group's families are rates, the money than 80m2 in floor space, according to the compensation houses are mostly larger or second-hand houses. For those will be enough to enable them to purchase new they receive 2 poverty and unable to afford to buy houses, houses area is below 50m , if troubled by sheer whose rental houses, which are chiefly located on Longgu government will provide them with cheap 2 cost the are within 80-90 m in floor space and monthly Road and Gunang Street. These houses Though cheap M22 and RMBO.6/m2 for brick+wood structure. RMB1.2/m for brick+concrete structure and complete located in places with convenient transport systems in rent, these houses are schools to ensure the quality of facilities such as shopping centres, hospitals and supplementary with their former houses demolished, these the vulnerable group's livelihood. In comparison houses are superior in all aspects. will in the vulnerable group's families, the government On the other hand, for the surplus labourers Township has metal them to work in the local enterprises. As Longshui give priority to arranging ware market in China, it poses no its major industry and boasts the iargest metal ware product as group's families. problem to arrange a few labourers from the vulnerable the government and caring about the old in Longshui Township, Following the custom of respecting Through such visits, people's homes in all major traditional holidays. will pay visit to the affected and find out the problems they is able to know how this vulnerable group are living the government the project owner and independent supervisor. have in daily life and feed back the information to AND GROUND ATTACHMENTS 6.3.8 REHABILITATION OF AFFECTED INFRASTRUCTURES to the farmers' in Mingguang Village are used to supply power (1) The affected power poles with the land being occupied. and pumps for irrigation and will lose their function homes nearby means. The loss incurred will be compensated for by monetary lose its function with the land being is used by the residents living nearby and will (2) The toilet owner for the loss. acquired. The project owner will compensate its by new embankment. (3) The stone. pavement demolished will be replaced will be rebuilt when constructing the embankment. (4) The wharf is a simple passenger wharf and for by monetary means during land (5) The fruit trees and bamboos will be compensated clearance. until they are constructed in gas pipeline and power line will not be demolished (6) The natural on the residents around the construction area. other suitable locations so as to minimize impact

PAGE 118 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

6.4 PROJECT IN CHANGSHOU DISTRICT enterprise land for permanent use will acquire 243.74 mu of land including 14.5 mu of The project people in 56 households, and cause 94.82 mu of land for temporary use, affecting 189 and people in 123 households, and 194 people 7,941.9m2 of houses to be demolished, affecting 459 need to be resettled by production.

6.4.1 REHABILITATION OF PERMANENT LAND ACQUISITION LAND ACQUISITION 6.4.1.1 ANALYSIS OF IMPACT CAUSED BY PERMANENT

use including 186.78 mu of farmland and project will acquire 243.74 mu of land for permanent The in Duzhou Township and three villages in mu of fishpond, affecting 277 people in two villages 0.8 by production. Fenghuang Township and 194 people need to be resettled

TABLE 6-14 ANALYSIS OF IMPACT CAUSED BY LAND ACQUISITION Number Per.capfta'. Per-capita Final per- of Per-capita Farmland space of Predicted other capita farmland after land to be space of labourers Village (person) (mu) farmland before permanently farmland affected acquisibon (mu) acquired (mu) acquisition acquired (mu) (person) acquisition(mu) ~~~(mu) (MU)

To be acquired <0C3 137 1977 0.96 113.4 0.91 ~~~~incoming years Yanqiao 2054 ______35 34.4 0.85 To be acquired <0.3 Xinghua 178 186 1.05 incoming years 03 1 0.77 Tnromnbeaured <0.3 17 Huohua 307 251 0.82 13.7 8 8.1 1.03 Tnbe are <03 Kejiapong 121 132 1 09 incoming years <0.3 16 18 0.89 Tocoming be acquired years <03 1 Madao 197 193 0.98 ______in

space of farmland to be 6-14, it can be seen that the percentage of per-capita From TABLE impact of land acquisition. The 5%-9% and Madao Village will receive the heaviest affected is for 14.6% of the total space of will have 18 mu of farmland to be acquired, accounting village to be resettled by production. After and 23 people will be affected and 16 labourers need farmland 0.89mu, down by 9%. If the average acquisition, the per-capita space of farmland will become acquisition will cause the yield to drop by annual per-mu yield of the farmland is RMB500, land was RMB2, 487 in 2003, land acquisition will RMB45. As the net per-capita income of this village bring it down by 2%. has no major impact on the per- analysis shows reveals the fact that land acquisition The above of the labourers in each of the five income of all the affected villages. Moreover, about 20% capita income they get by working as migrant no longer rely on their land for making a living. The villages land acquisition does not constitute a workers accounts for 50% of their total income. Therefore, major impact on the villagers.

PAGE 119 SOGREAH CONSULTANTS- 23500321.R4 - AuGusT 2004 BANK CHONGOING MUNICIPALITY - THE WORLD PROJECT CHONGQING URBAN ENVIRONMENT RESETTLEMENT ACTION PLAN

6.4.1.2 REHABILITATION OF INCOME

plan (1)Resettlement be arranged in the the affected villagers, resettlement will Through extensive consultations with following ways: status 6 Changing of the county seat, located in the planned area for construction As all the five affected villages are ongoing urbanization process. gradually in the coming years in the the land will be acquired take the form of changing status depending of the affected villagers may changed but Therefore, resettlement For those who can have their status condition and villagers' willingness. that is, to on the actual will reallocate land among the villagers, to do so, the village committee are willing to have their are unwilling not affected by land acquisition but allocate farmland give up by villagers changed and receive the land and the latter will have their status of status changed to the former persons will receive a total amount and resettlement subsidy. The status-changed compensation resettlement subsidy. RMB16,000 as land compensation and

Q Monetary compensation rural to farmers who choose to stay in the project-executing agency will pay compensation space of land taken from The their status changed according to the area for farming rather than having of RMB5.2634 million as land villages may receive a total amount them. The five affected RMB3.175 million for Yanqiao Villager, resettlement subsidy, including million for compensation and million for Huohua Village, RMBO.227 million for Xinghua Village, RMBO.395 RmB0.963 for Maodao. Kejiaping Village and RMB0.504 million Based on the current deposit interest can be compensated for RMB 28,000. If the Each mu of land taken rate 20%, the real deposit rate is 2.232%. 5 years, excluding tax on interest will get about rate 2.79% above 000 in the bank for 50 years, they deposit the compensation RMB28, RMB650 from cultivated affected than their current yearly net income RMB930 each year, which is more land. (®Livelihoodsupport insurance and minimum subsistence persons may enjoy the basic endowment and have The status-changed have secured basic endowment insurance for urban residents. Those who insurance money on a allowance and longer may receive endowment actually paid the premium for 15 years and 55 years (for women). In reached the age of 60 years (for men) monthly basis after they have is paid RMB145/month, which is more the minimum subsistence allowance Changshou District, from farming. than their average annual income of RMB1,000 monetary compensation and have chosen to get resettled by receiving on For those villagers who committee will provide them with training surplus labourers, the village to improve whose families include restructure their farming business production technology and help them of being close to agricultural vegetable planting using the advantage income, such as developing greenhouse the urban area. system to provide assistance to the will establish a complete labour service training, The local government information on employment, vocational villagers such as providing them with affected etc. to pave the way for them to get employed. consultation with the local enterprises, the planned and most of them are located within affected villages are close to the cities the new founded The five The construction of the new city and area for construction of the new city. zones provide a lot of job seeking expansion in the development the enterprises and those 6-15). The local government will help the rural labour force (See TABLE and opportunities for training, providing employment information labourers to get employment through RMB400-800. affected way, they can get a monthly wage of discussions with the enterprises. In this

PAGE 120 2004 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

IN THE NEW CITY CONSTRUCTION AND ENTERPRISES TABLE 6-15 JOB OPPORTUNITIES CREATED BY DEVELOPMENT ZONES level Estimated number Remarks Item Monthly wage Reak Construction Area Enterprise of migrant workers of job opportunfties ConstructionEnterprise Are Item ______(R M B) ______400-800 300 Under construction Civil works Taohua new urban ______area______Sichuan Vinylon Output capacity 80 expansion projects for Changshou Plant, Changshou 50 acetylene, acetic acd 400-600 chemical industral Chemical Plant, and30 3 Chemical and neoprene _ park Changfeng carbonic add ester ______park Ch~~~PangtnPlant proi~~~~ect 200 Manur Civil works 400-800 industial park Under construction Property Plumbing, electnc 150 Serkic sevcing, 400-600 area management equipment husbandry company ~~deaners

LAND OCCUPATION 6.4.2 REHABILITATION OF TEMPORARY use including 84.5 mu of collective-owned will occupy 94.82 mu of land for temporary occupied will This project compensation for the land temporarily 10.32 mu of state-owned land Crop for as 2.5 land and year of occupation will be compensated in such as manner that the loss in one the project will be paid million in compensation. Constructing which means a total sum of RMB25 than the actual quarters, compensation obtained is much higher the land for about o'ne year and the mu. Therefore, the occupy of the farmland is only RMB1, 600 per loss as the average annual output value farmers' livelihood will not be affected. and return it to will re-cultivate the farmland occupied After the project is completed, the constructor and group organize to check and accept. the village and group, and the village

6.4.3 RESETTLEMENT OF RURAL RESIDENTS will involve 189 people in for constructing this project in 2 resettlement of rural residents' houses 7,941.9 m of houses The and Fengcheng Townships. Altogether 56 households of 7 villages in Duzhou resettled by monetary houses have been demolished will be demolished. Residents whose 2 houses, RMB190 will be per m for brick+concrete structure standard being RMB215 2 The compensation (the per m for simple structure houses). 2 brick+wood structure houses and RMB50 to per m for have three alternatives to make, namely, receiving the compensation money houses affected people the demolish, purchase resettlement own houses on sites provided free by construct their houses. In the former case, the resettlement price and purchase commercial same time at a preferential of the house demolished and at the shall pay compensation to the owner agency shall agency In the latter two cases, the resettlement him free of charge with a house site. also the house provide not only for the house demolished but pay the affected household compensation site taken.

PAGE 121 AUGUST2004 SOGREAH CONSULTANTS- 23500321 R4 - BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

shall provide free of their own houses, the local government For those who choose to build 2 is responsible for (1) of 3Om per person. The demolisher charge house sites at the space rate households. The water and power supplies to the affected smoothing the ground and providing ground floor used as a shop choose to build multi-story houses with the resettled persons may persons can perfectly build houses of It is known through survey that the resettled money for business. resettlement area with the compensation the same area as their former houses in the received. government at to buy resettlement houses provided by the (2) The resettled persons may choose the compensation and at buy such houses at the price equivalent to a reduced price. They may excessive space is to be 18m2 per person. For limitation of design, the the space standard of price (construction cost and land price at a rate 50% as much as the combination 2 space purchased 2 space is in excess of Sm but less than the included), if it is not more than 5m and if the price. Any part it is may be purchased at the combination of the former house demolished, purchased at the price of of the former house demolished is to be exceeding the space smoothing the ground and providing houses. The demolisher is responsible for commercial households. water, power and gas supplies to the affected at a preferential price or built their who are not willing to purchase houses provided to (3) For families might use the compensation money received own houses on sites provided free, they the house site the project-executing agency pays 2 commercial houses in the city. As RMB300/m , this purchase of 3Om2 per person at the price of compensation at the space rate District. Many of the them to buy second-hand houses in Changshou compensation enables are houses left by enterprises and house buildings in Changshou District those second-hand in location and good in structure. Furthermore, institutions. They are relatively convenient commercial houses in by monetary compensation and purchase who choose to get resettled fees and taxes. See TABLE 6-16 for District will be exempted from all the purchase Changshou houses and second-hand houses. information about the supply of new commercial HOUSE BUILDINGS AND SECOND-HAND HOUSES TABLE 6-16 DISTRIBUTION OF NEW COMMERCIAL Interal of Faclties and Average Nameof Land selling price Status Location layout residential area environment S/N residential dass Developer (1,0m)(RMB/m') area Complete with 500 Under Taohua Various 8.0 water, power 11 Xenia Co 3-Z, Huohua and gas construction 1 resettlement Village area I ~~~~~supplies Complete with Completed Changshou 11.3 water, power 550 Infrastructure Duzhou Various gas 50 2 Peninsula 12 C.and supplies Garden Ltd. Complete with water, power 450 Completed Duzhou Various 013 gas 3 houses Enterpnses Dho Vaou 018and hoseoshn Etrrss supplies Complete with Duzhou Competed 0.11 water, power 500 chino Duzhou Vanous 4 Second-hand and gas 50 ComplEted MlanTe u I_____I_ houses Plant ~~~~~~~~~~supplies

PAGE 122 2004 SOGREAH CONSULTANTS-23500321 R4 - AUGUST BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

are among 80-120m ) and resettlement area resettlement houses (the layout types are The uniform and complete with various supplementary in the new urban area of Taohua Township is the future located communication systems. Taohua New City facilities and well-developed transport and will be moved as all the major district government agencies political centre of Changshou District, administrative offices, facilities have been planed, which include here. A number of public medical and sanitation and financial establishments, entertainment, apartments, commercial As the area is located at the joint of the green spaces and other urban infrastructures. institutions, urbanization of the area has been in and Chongqing-Wanzhou expressways, Chongqing-Fuling to traffic. According to the schedule, the since these expressways were opened km2 fast development Taohua New City Area covers an area of 6.7 will reach its planed size in 3 to 5 years. The small and area million. Since the existing old city area is too with a planed population of nearly 100,000 city area and so will be the 30,000 residents will be moved to the new too densely populated, a number of schools will be built agencies, institutions and functionaries and district government area. Further, the construction of chemical of which will bring about 20,000 people this 2 design of there, all park will enlarge the area to 36km . As the industrial park and special product Industrial go to reside in the residential area, about 20,000 people will both parks does not include the it is estimated that 6,000 With the quickening of the urbanization process, Taohua New City area. means an increase of 30,000 people in go to reside in the new city area each year. This in 5 people will area will take shape in 3 years and completed 5 years. The city plan requires that the new city years with a total population of 99.100. residents will feel more are better in structure and quality and the resettled The newly built houses than before. Their living standard and in daily life, work and their children's schooling prefer to convenient survey shows that more than 90% of them quality of life will be much improved. The field build their own houses.

6.4.4 RESETTLEMENT OF ENTERPRISES of land will be acquired. enterprises by land acquisition and 14.5 mu The project will affect three will not affect the operation of the be acquired is left unused, land acquisition Since the land to land only at the rate of RMB200,000/mu. They can get the compensation for loss of is enterprises. to the actual assessment when the compensation The price is subject to change according made.

GROUPS 6.4.5 RESETTLEMENT OF AFFECTED VULNERABLE in three families, one consisting of will affect five people of the vulnerable group The project alone. See TABLE 6-17for detail. handicapped people and two of old people living FAMILIES TABLE 6-17 CONDITIONS OF AFFECTED VULNERABLE GROUP'S House demolition Living ondition Name Age Family condition ~area (m )1L vn o dt o Village Classification ______0Living on welfare YuDmn 2Dsbe Handicapped Disabled allowance people's family Yu Demmg 72 Shengtian Huang Changqing upported by 12-Z, 70 Dsabled 76 Village Old and Zhang children family sung70 supported 70 Dbld 80Partly Hongmiao Old people's Zhou Liangzhong by children 5-Z 70 Isa 8 Village family and Ye Shufang

PAGE 123 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

and house demolition. They are all affected by temporary land occupation These three families them, none of them are willing to in their families. Through consultation with have remained land compensation, they are willing to by changing status. After receiving the monetary get resettled to them free of charge and the village their own houses on the house sites allocated give build At the same time, the project constructor will committee will assist them in house construction. priority in restoring their land temporarily taken. them training for the vulnerable group and help village leadership will provide free technical The income and at the same time provide vocational develop agricultural production to get better and supply them with information about employment training for the labourers in their families and guidance to increase their chance to get employed.

BISHAN COUNTY 6.5 BICHENG WATER SUPPLY PROJECT IN use and occupy 40.7 mu of land for will acquire 37.01 mu of land for permanent The project including 54 labourers. temporary use, affecting 296 people in 91 households

ACQUISITION 6.5.1 REHABILITATION OF PERMANENT LAND

LAND ACQUISITION 6.5.1.1 ANALYSIS OF IMPACT CAUSED BY land including 34.55 mu of farmland and 2.46 This project will acquire 37.01 mu of collective-owned in Binan in three groups of Huangjiao and Wuli Villages mu of wasteland, affecting 210 people water supply plant need to be resettled by production: The Qiancengyan Township and 54 people and 1.6 mu of wasteland, 27.B mu of land including 26.2 mu of farmland project will acquire by production. The pressurizing pump 146 people and 46 people need to be resettled affecting 8.35 mu of farmland and 0.86 mu of wasteland, station will acquire 9.21 mu of land including for the be resettled by production. See TABLE 6-18 affecting 66 people and 9 people need to impact on each village. ACQUISITION TABLE 6.18 ANALYSIS OF IMPACT CAUSED BY LAND

ET

..- E 2 0 co o ~ ..-E co E .5. _ 2 ~~~~~~~ ~ ~ E ~ '~E ' 5

34 921 83 40.3 33 1aB8 057 StatlOn ~WUI 06 0.43 38675 0t45 6.1 4.5 30 6 waterwlgi 3 236 106 42500 piancengyan 21.7 21.7 166 39 0.21 Hagio 5 176 58 0.33 supply plant h frin166 peoleand3sRB0coulyedo ducin If the bavrg .1 m o 3% affetin 9 0.53 31943 peoplepr-aptasacto b need resettled o frma bypr il dcras 9.21 8.35 64 Thpump Wuli 6 337 188 0.557 Pressurizing ______station will receive the heaviest be seen that Group 5 of Huangjiao Village From the table above, it can total space of farmland. will be acquired, accounting for 37% of the 39 impact-21.7 mu of farmland by 0.12 mu or 36%, affecting 166 people and The per-capita space of farmland will decrease annual yield of the farmland is RMB500 need to be resettled by production. If the average people per-capita income of people in Huangjiao Village per mu, it will go down by RMB93. As the annual income by about 3%. is RMB3, 101, land acquisition will reduce their

PAGE 124 2004 SOGREAH CONSULTANTS- 23500321 R4 - AUGUSI CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

and poor in yield and that the land acquired is sloppy, difficult to toil It is found from the survey output value of the two are willing to cultivate. In addition, the agricultural none of the farmers from farming, which is 12.7%, of a for about 1/4 of the total turnover. The income villages account but the income from working in the constitutes only a small part of its total income rural family 87.3%. Therefore, the impact caused by land urban area accounts for a lion's share, which is acquisition on the two villages will be quite limited. 6.5.1.2 REHABILITATION OF INCOME

(1) Resettlement plan farmers in Bishan County. Young labouring people Currently there are many job opportunities for Through instead go to work and run business in the city. are now seldom engaged in farming but structure, per-capita of economic development, features of the agro-economic analysis of the scale income and repeated hearing of the of land resources and composition of the villagers' ownership is agreed that the villagers affected by land comments of the villagers' representatives, it acquisition will be resettled in the following manners: (1) Changing status and receive a total amount of farmers may choose to have their status changed The affected subsidy. The village leadership will reallocate RMB16,000 as land compensation and resettlement land among villagers. but are unwilling to do so, the village committee will .For those who can have their status changed not affected by villagers, that is, to allocate farmland give up by villagers reallocate land among the former and the latter will have but are willing to have their status changed to the land acquisition and resettlement subsidy. their status changed and receive the land compensation (2) Monetary compensation land for farming who are willing to remain in the rural area to contact For those affected farmers agency will make compensation rather than having their status changed, the project-executing according to the space of land taken. land compensation may receive a total amount of RMB1.408 million as The two affected villages 3 and RMBO.922 million for subsidy, including RMBO.205 million for community and resettlement million for Wuli Village. community 5 of Huangjiao Village and RMBO.2805 for RMB31,943-42,500. Based on the current deposit Each mu of land taken can be compensated real deposit rate is 5 years, excluding tax on interest rate 20%, the interest rate 2.79% above in the bank for 50 years, the affected deposit the compensation RMB31,943-42,500 2.232%. If is more than their current yearly net income they will get about RMB1,061-1,284 each year, which RMB650 from cultivated land. (3) Livelihood support endowment insurance and minimum subsistence The status-changed persons may enjoy the basic and have Those who have secured basic endowment insurance allowance for urban residents. insurance money on a for 15 years and longer may receive endowment actually paid the premium and 55 years (for women). In after they have reached the age of 60 years (for men) monthly basis is paid RMB145/month, which is more than Bishan County, the minimum subsistence allowance their average annual income of RMB600 from farming.

PAGE 125 2004 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

and resettled by receiving monetary compensation For those villagers who have chosen to get on village committee will provide them with training whose families include surplus labourers, the restructure their farming business to improve production technology and help them to agricultural planting using the advantage of being close income, such as developing greenhouse vegetable the urban area. to provide assistance to the establish a complete labour service system The local government will employment, vocational training, such as providing them with information on affected villagers the way for them to get employed. consultation with the local enterprises, etc. to pave have experienced a fast growth, 20 years, township enterprises and private businesses In the past county's industrial sector and become the major which have accounted for more than 90% of the become building, building materials and shoe making have part of the local economy. Machine Anzi Cement Mill in Bishan County. Large enterprises such as Bishan three mainstay industries into being. In Bicheng Township, Dajiang Motorcycle Engines Co. Ltd. have come and Chongqing Shock Absorbers Factory, Shudong Machinery there are Aokang Shoe-making Co., Chuandong Parts Factory, Shoe Factory, Bluelight Motorcycle and Car Plant, Shazhichuan Leather Zongshen Three-wheel Shoes Factory, Kerse Leather Shoes Factory, Qiangrenzhou Leather in these enterprises receive a Co. and Bicheng Knitting Mill. The ordinary workers Motorcycles enterprises and private businesses in Bicheng salary of RMB600-1,200. The township and each year, including cleaners, cargadors and construction Township provide 3,000-4,000 jobs workers in the local the survey, the average monthly salary of the ordinary workers. According to the farmers' income will increase is about RMB500-600. By acquisition such measures, enterprise be lower than it was before land acquisition or as the enterprises keep growing so that it will not even higher.

OCCUPATION 6.5.2 REHABILITATION OF TEMPORARY LAND of water supply for this project is caused by the construction The temporary land occupation will be temporarily occupied. The This will affect two villages and 40.73 mu of land pipelines. (but will be regarded as three months when occupation of land will last for not yet three months temporary to the rates of compensation for loss of crops during making compensation). According and RMB1, 400/mu for the compensation will be RMB1, 200/mu for farmland occupation of land, is about RMB500/mu and RMB800/mu As the loss of crops and fishes during one quarter fishpond. the actual loss of farmland and fishpond. respectively, the compensation is much higher than the after use by the constructor. As the operation on The temporarily occupied land will be restored the constructor will includes trench cutting, pipe laying and backfilling, temporarily occupied land section according to the actual by cutting and backfilling the ground section by restore the land 2 months. By this method, the impact Each section will be restored in no longer than condition. to a minimum. caused by temporary occupation of land will be reduced villagers' livelihood will not deteriorate but In one word, after getting the compensation, the affected instead will recover to the level before land taking. GROUPS 6.5.3 REHABILITATION OF AFFECTED VULNERABLE village. project are old people's families in Huangjiao The vulnerable groups to be affected by this Their conditions are as follows: a Village. There are 12 members in his family with Zhang Guangming, aged 97, lives in Huangjiao for constructing of 1.4 mu, of which o.65 mu will be occupied permanently total space of farmland 720 mainly eared by his children from plant. The annual income of the family is RMB14, the water accounts for only a very small part in the total away from home. The income from farming working no major impact on the financial standing of their income. Therefore land acquisition will produce families.

PAGE 126 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

old couple only Village. The family consists of the 84 years of age, lives in Huangjiao occupied Zhu Yuqing, of 0.7 mu, of which 0.3 mu will be any children and has a space of farmland 000 and without The annual income of the family is RMB4, permanently for constructing the water plant. farming is the major source of income. people: There are three altematives to resettle these disadvantaged pays the land leave them in the family. The project owner Alternative 1: Change status and village leadership so subsidy to them (or their children) through the compensation and resettlement bear all the cost of supporting them the rest of their life in the family. Their children that they spend given to the urban residents. and at the same time they enjoy all the welfare to his children looking after him/her) wishes 2: Reallocate the land. If the old person (or get Alternative and uses their chance of status change to get farmland, the village leadership will coordinate acquisition but wish to in the village who are not affected by land the farmland of other people land reallocation within a narrow way they will get the farmland they want. By change status. In this and by providing them with technical old people's families can get more farmland scope, the their livelihood can recover to the level before training and assistance to restructure their farming, land acquisition. for land compensation and resettlement subsidy Alternative 3: Resettle by public welfare. The can pay welfare bureau. In this way Zhu and his wife these people are paid to the local public land compensation bureau to get their subsistence money. Or the regular visit to the public welfare in Bicheng Township where the subsidy are paid to the neighbourhood rest home and resettlement of their life. old couple will be acquired care of for the rest the children of of the water plant, priority will be given to employing Moreover, during construction such as ground smoothing, group to do some work of low technical requirement the vulnerable site so that they can get some income. excavation and soil removal on the construction about the old in Longshui Township, the government Following the custom of respecting and caring such visits, homes in all major traditional holidays. Through will pay visit to the affected people's find out the problems they to know how this vulnerable group are living and the government is able owner and independent supervisor. life and feed back the information to the project have in daily according to the actual situation. The project owner will then come up with solutions

6.5.4 AFFECTED GROUND ATTACHMENTS for by the project-executing agency and The affected ground attachments will be compensated rebuilt by the farmers.

6.6 BINAN RIVER PROJECT IN BISHAN COUNTY and 26 mu for temporary use, acquire 537.045mu of land for permanent use This project will people in 8 enterprises and institutions. 100 people in 30 rural households and 101 and affecting 2 affecting 842 people in 209 households Altogether 12,729.5 m of houses will be demolished, 483 people need to be resettled by production.

PAGE 127 2004 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST BANK CHONGQING MUNICIPALITY - THE WORLD CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

ACQUISITION 6.6.1 REHABILITATION OF PERMANENT LAND BY PERMANENT LAND ACQUISITION 6.6.1.1 ANALYSIS OF IMPACT CAUSED mu of land including 314.01 mu of farmland, 15.5 project will permanently acquire 537.045 mu Bicheng The land, affecting 700 people in 7 villages of fish pond and 8.1 mu of riverside shallow of by production. Township and 483 people need to be resettled ACQUISITION OF LAND TABLE 6-19 ANALYSIS OF IMPACT CAUSED BY PERMANENT Milected population lAffected Per-capita space Farmland Per-capita spaceof Land permanently Wab"Onn_gl4S after Population farmand before (mu) ¢2:S,(person) population Offarmland _ (P,5Village nl aRrMml)nd(erson)(u) farrNad before apaurred (prsn acquisition (mu) Village(person) (mu) ~acquisition (mu) 39 27 1.06 1156 1250 1.08 29.59 Guanyin 120 85 0.54 891 0.58 49.2 Hualong 1549 109 76 0.33 370 0.34 25.9 Shibao 1077 172 121 0.64 1039 756 0,73 88.5 Xinta 62.5 90 68 0.87 Yangyu 1171 1080 0.92 30.0 50 32 0.92 Outang 1278 1209 095 43.82 120 74 0.56 Wuli 2002 1172 0.59 are will receive the heaviest impact. There 6-19, it can be seen that Xinta Village of From TABLE village. The project will acquire 88.5 mu 1,039 people and 756 mu of farmland in the currently of farmland and affecting 172 people including accounting for 4.36% of the total space After farmland, for 1.6% of the total space of farmland. labourers. The land acquired accounts the 121 diminish by 0.64 mu, down by 12.3%. If the per-capita space of farmland will will acquisition, per mu, the per-capita income from farmland annual yield of the farmland is RMB500 will go average income of the village was RMB3, 022, it go down by RMB61. As the net annual per-capita down by 5% after land acquisition. significant impact on any of these villages. Apparently, land acquisition will create no 6.6.1.2 REHABILITATION OF INCOME

(1) Resettlement plan for this affected villagers, resettlement will be arranged Through extensive consultations with the project in the following two ways:

( Changing status county in the planned area for construction of the all the seven affected villages are located process. As coming years in the ongoing urbanization the land will be acquired gradually in the seat, may take the form of changing status depending resettlement of the affected villagers a total Therefore, The status-changed persons will receive actual condition and villagers' willingness. will be on the and resettlement subsidy and their land amount of RMB16,000 as land compensation reallocated among villagers. do so, the village committee will their status changed but are unwilling to For those who can have up by villagers not affected by the villagers, that is, to allocate farmland give reallocate land among to the former and the latter will have but are willing, to have their status changed land acquisition and resettlement subsidy. The affected changed and receive the land compensation as their status and receive a total amount of RMB16,000 may choose to have their status changed among .farmers The village leadership will reallocate land land compensation and resettlement subsidy. villagers.

PAGE 128 SOGREAH CONSULTANTS- 23500321 .R4 - AuGusT 2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

do so, the village committee will their status changed but are unwilling to For those who can have give up by villagers not affected by the villagers, that is, to allocate farmland reallocate land among to the former and the latter will have are willing to have their status changed land acquisition but and resettlement subsidy. their status changed and receive the land compensation ( Monetary compensation for farming to remain in the rural area to contact land For those affected farmers who are willing make compensation changed, the project-executing agency will rather than having their status be compensated for RMB34,850. of land taken. Each mu of land taken can according to the space 5 years, excluding tax on interest rate 20%, the current deposit interest rate 2.79% above bank Based on deposit the compensation RMB34,850 in the real deposit rate is 2.232%. If the affected current yearly the each year, which is much more than their for 50 years, they will get about RMB1,158 net income RMB500 from cultivated land. and of RMB1 1.895 million as land compensation The seven affected villages will get a total amount resettlement subsidy. Q)Livelihood support and minimum subsistence persons may enjoy the basic endowment insurance The status-changed secured basic endowment insurance and have allowance for urban residents. Those who have money on a years and longer may receive endowment insurance actually paid the premium for 15 and 55 years (for women). In have reached the age of 60 years (for men) monthly basis after they RMB1451month, which is more than the minimum subsistence allowance is paid Bishan County, farming. their average annual income of RMB600 from and to get resettled by receiving monetary compensation For those villagers who have chosen them with training on labourers, the village committee will provide whose families include surplus their farming business to improve production technology, and help them restructure agricultural planting using the advantage of being close to income, such as developing greenhouse vegetable the urban area. provide assistance to the establish a complete labour service system to The local government will employment, vocational training, such as providing them with information on affected villagers the way for them to get employed. consultation with the local enterprises, etc. to pave businesses have experienced a fast growth, past 20 years, township enterprises and private major In the the county's industrial sector and become the which have accounted for more than 90% of have become building, building materials and shoe making part of the local economy. Machine Bishan Anzi Cement Mill in Bishan County. Large enterprises such as three mainstay industries into being. In Bicheng Township, Dajiang Motorcycle Engines Co. Ltd. have come and Chongqing Shock Absorbers Factory, Shudong Machinery there are Aokang Shoe-making Co., Chuandong Factory, Factory, Bluelight Motorcycle and Car Parts Plant, Shazhichuan Leather Shoe Zongshen Three-wheel Shoes Factory, Kerse Leather Shoes Factory, Qiangrenzhou Leather workers in these enterprises receive a Co. and Bicheng Knitting Mill. The ordinary Motorcycles enterprises and private businesses in Bicheng salary of RMB600-1,200. The township and construction each year, including cleaners, cargadors and Township provide 3,000-4,000 jobs workers in the local survey, the average monthly salary of the ordinary workers. According to the the farmers' income will increase is about RMB500-600. By acquisition such measures, or enterprise not be lower than it was before land acquisition as the enterprises keep growing so that it will even higher.

PAGE 129 AUGUST2004 SOGREAH CONSULTANTS- 23500321 .R4 - CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

under and enterprises now in operation and those At present, the ongoing urban construction for the zones may provide a great number of job opportunities construction in the development centre that integrates the TABLE 6-20). It consists of the machine-building affected people (See Shoemaking Park that integrates of development, production and sales and West-China functions provision, and technical training and product the functions of shoemaking, technical information distribution. 2 used as the start-up zone, 1.98 a total space of 11.4 km of which 1.4 km2 is The Park Area covers The planned target of this park 2 zone and the rest as far-future planning zone. km as the expansion 2003 to 2007) to introduce 120 constructing 6 km2 of it within 5 years (from area is to finish are relatively large in size. The total that produces high value-added products and enterprises RMB4 billion with an annual output value of over of these enterprises will amount up to of investment are expected to generate a total tax revenue RMB15 billion. In five years time, these enterprises and employ 70,000 people. RMB1.2 billion, or at least RMBO.4 billion by 2007 into this park area, covering a 22 industrial enterprises have been introduced Currently, altogether 2 constructed with a total mu, of which 406,000 m of houses have been total space of 2,417.26 value of the completed of RMB81.574 million. The designed total output construction investment area will generate a yield of billion, meaning every square kilometre of the space is RMB4.79591 park has turned out an output of billion. Up to the end of November 2003, the RMB2.97883 employing more than 6,000 people. So billion and tax revenue of RMB52.11 million, RMBI1.79623 19 enterprises has moved into it, of the 1.4 km2 start-up area has finished and far, construction AUTOS and HONGYU PRECISION have been in operation such as JINGUAN including 8 that THREE WHEELERS and 7 that 4 that will get into operation such as the ZONGZAO MACHINES, GROUP. are under construction such as the SHUANGXING PROVIDED BY NEW URBAN AREA CONSTRUCTION TABLE 6.20 FORECAST OF POSSIBLE JOB OPPORTUNITIES AND ENTERPRISES INTHE DEVELOPMENT ZONES Remarks Job Saary level Number of jobs Location Enterprise (RMBlmonth) available 400-800 200 New urban area Civil work and production 400-600 10000 Shoemaking Buildirig construction shoes zone and sales of 400-800 200 Manual labour Development Construction zones company Pipeline and electric equipment work Urban Property cleaner, 400-400 200 Servce area management repairer, security guard, residenbal servant, etc. I__ s____ a____a___ company domestic

LAND OCCUPATION 6.6.2 RESTORATIONREHABILITATION OF TEMPORARY

involves 26 mu of land Crop compensation for The temporary occupation of land for this project will manner that the loss in one year of occupation temporarily occupied will be paid in such as of land means a total sum of compensation money be compensated for as 2.5 quarters, which the land for about one year and the compensation RMB2,500. Constructing the project will occupy is the average annual output value of the farmland obtained is much higher than the actual loss as livelihood will not be affected. only RMB1, 200 per mu. Therefore, the farmers' re- choose how to restore the land. The constructor After the project is completed, the affected check it to the affected; village and group organize to cultivates the farmland occupied and returns and accept.

PAGE 130 SOGREAH CONSUL1ANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

6.6.3 RESETTLEMENT OF RURAL RESIDENTS be demolished for constructing this project. Altogether 4,193.49 m2 of rural residential houses will by monetary compensation (the standard being The resettled residents will be resettled 2 houses, structure houses, RMB220/m for brick+wood structure RMB270/m2 for brick+concrete houses). The structure houses, and RMB60 for simple structure RMB150/m2 for earth+wood to make, namely, to receiving the compensation money have three alternatives affected people and purchase commercial their own houses, purchase cheap resettlement houses, construct shall pay compensation to the owner of the houses. In the former case, the resettlement agency free of charge with a house site. In the latter house demolished and at the same time provide him household compensation not only for the two cases, the resettlement agency shall pay the affected house demolished but also the house site taken.

local government shall provide free of (1) For those who choose to build their own houses, the 2 The demolisher is responsible for house sites at the space rate of 3Dm per person. charge the affected households. The the ground and providing water and power supplies to smoothing with the ground floor used as a shop resettled persons may choose to build multi-story houses persons can perfectly build houses of business. It is known through survey that the resettled for area with the compensation money the same area as their former houses in the resettlement received. provided by the government at resettled persons may choose to buy resettlement houses (2) The to the compensation and at price. They may buy such houses at the price equivalent a reduced of design, the excessive space is to be space standard of 18m2 per person. For limitation the price (construction cost and land price purchased at a rate 50% as much as the he combination 2 2 of 5m but less than the space included) if it is not more than 5m and if the space is in excess at the combination price. Any part of the former house demolished, it is may be purchased be purchased at the price of the space of the former house demolished is to exceeding smoothing the ground and providing commercial houses. The demolisher is responsible for water, power and gas supplies to the affected households. at a preferential price or built their (3) For families who are not willing to purchase houses provided compensation money received to own houses on sites provided free, they might use the compensated for house sites at the purchase commercial houses in the city. As they will be 2 2, the compensation enables them to space rate of 3Dm per person at the price of RMB300/m buy new or second-hand houses in Bishan County seat. from all the commercial houses in Tongliang County will be exempted (4) Those who purchase new commercial taxes. See TABLE 6.22 for information about the supply of purchase fees and house buildings second-hand houses in Bishan County. Many of the second-hand houses and relatively convenient are houses left by enterprises and institutions. They are in Bishan County choose to get resettled and good in quality and structure. Furthermore, those who in location in Bishan County will be monetary compensation and purchase commercial houses by 6-21 for information about the exempted from all the purchase fees and taxes. See TABLE supply of new commercial houses and second-hand houses.

PAGE 131 SOGREAH CONSULIANTS - 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 6-21 DISTRIBUTION OF SUPPLY OF HOUSES FOR RESETTLEMENT Total space Of Facilities and Average sellinpq House Name of residential eient pce (RMBm) Status type residenbial area Developer Location Layout pdeRM/ area residenbal ~~~~~~~areaeniomt type 2 (1'000Dm ) Complete with water, Competed or Yuanlin Yuanlin #65 Bitong 38 and gas 700 under MingyuanCmpany Rd. various 38power supplies constnrcbon Mimgyuan Company Rd. Complete with water, Competed or Hanen Hanen Opposite 1010 under Company power supply various 50 power and gas z Yangguang supplies constructon YanggangCmpany bureau Complete t water, Under Yanghe Walk Jianlian Jisanjiao 689conston Junction varous 15 power and gas street Company ______supplies inside radio Complete with water, Dormitory power and gas 580 Completed buildingity and TV various bureau supplies with water, Bicheng- Complete 610 Completed 8 Tianmen varous power and gas CD Dijing Garden supplies Niujiaowan, Complete with water, . Resettlement power and gas 15001year Completed esarea Bicheng varous Township supplies Complete with water, Pige residential ~Pige power and gas 1800/year Completed Pige residential residential vanous supplies area area

Bicheng Township will be the traffic gate According to the general plan of Chongqing municipality, city chiefly for farm product processing and in the west and a small industrial and commercial 2 the township and 13.16 km of land is distribution. By 2020, the population will be 150,000 in uniform resettlement houses and for construction with per-capita space of 87 m2 . The planed Bicheng Township and complete with resettlement area are located in the new urban area of and communication systems. The various supplementary facilities and well-developed transport the resettled residents will feel more newly built houses are better in structure and quality and than before. Their living standard and convenient in daily life, work and their children's schooling with the affected rural residents, more quality of life will be much improved. Through discussions than 90% of them are willing build their own houses.

6.6.4 RESETTLEMENT OF ENTERPRISES AND INSTITUTIONS

This project will affect 101 people in 8 enterprises. two concrete resettlement of the affected enterprises and institutions. The See TABLE 6-22 for the by monetary cotton mill and Datong Machinery Plant choose to get resettled slab-casting yards, office, classroom and and rebuild the houses themselves. Shuren College whose compensation near the original site and buildings will be demolished will rebuild them on a new location dormitory causing impact on the normal reconstruction will be arranged during the vacation to minimize enterprises will be compensated for operation of the college. In either case, the land price for these at the evaluated actual price. house are demolished may use the The enterprises or institutions whose enclosure wall and pump compensation to rebuild them.

PAGE 132 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

be exempted from any taxes and fees during The affected enterprises and institutions will of the workers in the enterprise, institution and resettlement and recovery. The rights and interests include salary, medical care, social security, will not be affected during resettlement, which shops that they do not lose their jobs due etc. and measures will be acquired to ensure dividend, bounty, and Concrete Slabs Casting workers of Xinta Concrete Slabs Casting Yard to resettlement. The these migrant workers 2 workers. The project executing agent will inform Yard are almost migrant get reemployed. The takes place to allow enough time for them to months before land acquisition one worker continue working in new site. The affected employees in Farm Supplies Company will still work in the plant. in Pump station of Fuji Machinery Plant will

INSTITUTIONS AND SHOPS TABLE 6-22 BASIC FACTS ABOUT THE AFFECTED ENTERPRISES, Form of resetement Change of impact Compensation SIN Name Location Seventy Resettement (RMB10,000' Of Address ownership no loss Monetary Xinta Concrete Beside the Tobe completely demolished but because Ithas been shut compensation 49 I Slabs Casbng cotton mill in will be caused Yard Yangyu Village down pump house lo be Monetary 5 2 Bishan Cotton Workshop and will be caused compensation 56 2 8 Mill Yangyu Village demoiished but noloss . because it has been shut down Monetary 6 Dawang bndge on Pump station and part of 3 Fuji Machinery compensation Plant Beierhuan Rd enclosure wall to be demolished buildings to be Monetary 62 4 Farm Supplies Dawang bndge on Temporary demolished in wood market compensation ______Company _eierhuan Rd. no loss Monet Concrete Datong To be completely demolished but will becaused because ithas been shut Moetr 5 Slabs ng compensation Castng Yard Neighbourhood down 31 Datong Part of storehouse and enclosure wall to Monetary Datong compensation be demobshed ______lMachineryNeighbourhood ______P lant__ 265 Wenteng Mufti-function building (classroom Reconstruction 7 Shuren insame place College Neighbourhood and dormitory) to be demolished One empty house to be Public work will not Monetary9 B Welfare Nanguan demolished, office Neighborhood be affected as the bureau has compensation Bureau moved to another office building

AND GROUND ATTACHMENTS 6.6.5 REHABILITATION OF AFFECTED INFRASTRUCTURES and reconstructed their and ground attachments will be recovered The affected infrastructures project owner. Special compensation money paid to them by the respective owners with the until the new that the existing ones will not be demolished facilities will be restored in such a way of the affecting the livelihood and business operation ones are built in other places to void around the project area. residents, enterprises, institutions and shops

GROUP 6.6.6 REHABILITATION OF AFFECTED VULNERABLE to the and 2 old people living alone. They belong The project will affect 3 handicapped people living conditions. vulnerable group. See TABLE 6-23 for their

PAGE 133 2004 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 6-23 BASIC FACTS ABOUT THE AFFECTED VULNERABLE GROUP Affecting condition Land acquired Land remained Village Group Name Classification (mu) - (mu) 0.1 4.9 Guanying 1 He Fangji Handicapped Land acquisition Land acquisition 0.4 1 Hualong 8 Zhou Handicapped ______Xianm o ______Li Jiangang Handicapped Land acquisition 0.2 0.5 Feng Aged and living alone Land acquisiion 0.1 0.6 Dingfang Zhou Aged and living alone Land acquisition 0.4 0.3 Shimmied to get resettled These vulnerable groups will be affected by land acquisition, none of which choose may be paid to their by changing status. The land compensation money and reseKtlement subsidy technical training children who take the responsibility for arranging their livelihood. Meanwhile, free so that they can get will be offered to their children to help them develop agricultural production offered the more income. Vocational training, information about employment and guidance will be labourers in the vulnerable group's families to increase their chance of getting employed.

6.7 PROJECT IN WULONG COUNTY

for temporary use, The project will acquire 395.75 mu of land for permanent use and 30 mu of land 28 people in 3 affecting 12 people in 4 rural households, 6 people in 1 urban household, 2 demolished, affecting enterprises, and 12 people in 2 shops. Altogether 3,495m of houses will be 697 people in 216 households, and 544 people need to be resettled by production.

6.7.1 REHABILITATION OF PERMANENT LAND ACQUISTION

6.7.1.1 ANALYSIS OF IMPACT

owned farmland, 8 This project will acquire 395.75 mu of land including 197.18 mu of collectively 186.3 mu of state- mu of wasteland, 3 mu of riverside shallow land, 1.27 mu of enterprise land and owned land. 188.18 mu of flood-preventing embankment component will acquire 375.25 mu including The land; the collectively owned farmland, 1.27 mu of enterprise land, and 186.3 mu of state-owned 9 mu of collectively Changtou River improvement component.will acquire 20 mu of land including owned farmland, 8 mu of wasteland and 3 mu of riverside shallow land.

TABLE 6-24 ANALYSIS OF IMPACT CAUSED BY LAND ACQUISITION

Per-capita fampcPofn(ermanenty Land acquired of afected ope to be space of Space of other PoPueaonarmland farmland after land acquired Remarks Village PpaonFrln offan(m) N.oafetdresettled by (mu) (person) (mu) before acquistion person production acquisimfon (mu) - _ -(mu) Total Farmland 0.3 Totally acquired Most ofland inthe Zhongduiba 692 212 0.31 68.2 68.2 201 182 I acq~~~~~~~~~~~~~~~~~~~~~~~~Ifuireviulngeswl the Totally acquired acquirbeadozaungthe Zitong 903 407 0.45 64.5 64.5 159 143 0.38 0.82 Totally acquired process Huangjin 1093 901 0.82 6.9 6.9 9 8 acquired Baiyang 1815 1010 0.56 60.4 60.4 123 108 0.52 Totally

PAGE 134 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

From TABLE 6-24, it can be seen that this project has no significant impact on the four villages because only a small percentage of farmland will be acquired. Of the four villages, Zitong Village is affected most. Altogether 64.5 mu of land is acquired; accounting for 15% of the total space, and 159 persons are affected of whom 143 need to be resettled by production. The per-capita space of farmland is 0.38 mu after acquisition, down by 1.6%. The average annual yield of farmland in the village is RMB500 per mu and land acquisition will reduce this figure by RMB8. As the per-capita net income of the village was RMB2, 356, Apparently, the project has no significant impact on the four villages by land acquisition and just as the land acquired accounts for only a small part of the total area of farmland, the impact of land acquisition on the farmer's income is thus quite limited. According to the survey, all the farmland to be acquired is within the flood-affected area and thus either seeding or harvesting will be significantly affected each year. After the embankment is completed, part of the farmland originally affected by flood but not acquired will have a better yield. Therefore land acquisition of the project has no significant impact on the local residents.

6.7.1.2 REHABILITATION OF INCOME

1. Resettlement plan As all the four affected villages are located in the planned area for construction of the county seat, the land will be acquired gradually in the coming 5-10 years during the ongoing urbanization process. Therefore, resettlement of the affected villagers may take the form of changing status depending on the actual condition and villagers' willingness. The status-changed persons will receive a total amount of RMB16,000 as land compensation and resettlement subsidy.

2. Monetary compensation For those affected farmers who are willing to remain in the rural area to contact land for farming rather than having their status changed, the project-executing agency will make compensation according to the space of land taken. Each mu of land taken can be compensated for RMB45,000. Based on the current deposit interest rate 2.79% above 5 years, excluding tax on interest rate 20%, the real deposit rate is 2.232%. If the affected deposit the compensation RMB34,850 in the bank for 50 years, they will get about RMB1,497 each year, which is much more than their current yearly net income RMB600 from cultivated land. The four affected villages will get a total amount of RMB8.913 million as land compensation and resettlement subsidy.

3. Livelihood support The status-changed persons may enjoy the basic endowment insurance and minimum subsistence allowance for urban residents. Those who have secured basic endowment insurance and have actually paid the premium for 15 years and longer may receive endowment insurance money on a monthly basis after they have reached the age of 60 years (for men) and 55 years (for women). In Bishan County, the minimum subsistence allowance is paid at the rate of RMB145/month. For those villagers who have chosen to get resettled by receiving monetary compensation and whose families include surplus labourers, the village committee will provide them with training on agricultural production technology and help them restructure their farming business to improve income, such as developing greenhouse vegetable planting using the advantage of being close to the urban area.

PAGE 135 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

system to provide assistance to the The local government will establish a complete labour service employment, vocational training, affected villagers such as providing them with information on to get employed. consultation with the local enterprises, etc. to pave the way for them County in the past to a survey of the income level of status-changed persons in Wulong According tertiary industries the average annual income of those engaged in the secondary and three years, higher than it used to be in the city will be about RMB5,000 to 6,000 by 2005, which is much before resettlement.

6.7.2 REHABILITATION OF TEMPORARY LAND OCCUPATION acquired for land acquisition will affect three villages. Altogether 30 mu of land will be Temporary occupation of farmland temporary use, including 17 mu of collectively owned land. The temporary compensation for loss of crops. As the farmland will be acquired for one year will necessitate the each mu growing seasons will be affected which will be compensated for as 2.5 seasons, and two in terms of the annual of farmland may receive a crop compensation of RMB2,500. If calculated in one year, the temporary occupation of land will bring about a loss of RMB1,500 yield of farmland This means that the per mu. The compensation is thus more than the actual loss of the farmland. villagers' livelihood will not be affected. by the constructor. The temporarily acquired land will be restored and returned to the village

6.7.3 RESETTLEMENT OF URBAN RESIDENTS 2 380m2 of urban This project will involve the demolition of 1,450m of residential houses including 1,070m2 of rural residences, affecting 18 persons in 5 households. The urban residences and 2 (land prices resettled persons may receive monetary compensation at the rate of RMB450/m structure houses, and the rural resettled persons may receive included)for brick+concrete at their option, RMB270/m2 for brick+concrete structure houses (including land price). They may, purchase houses in the urban area at a reduced price. from a preferential Those who purchase commercial houses in Wulong County seat will benefit them to buy a space of 18m2 per person at the compensation price. For limitation policy that allows as the combination of design, the excessive space is to be purchased at a rate 50% as much 5m2 and if the space is in cost(construction cost and land prices included)if it is not more than 2 than the space of the former house demolished, it is may be purchased at excess of 5m but less is to be the combination price. Any part exceeding the space of the former house demolished purchased at the price of commercial houses. to not willing to purchase cheap resettlement houses may use their compensation Those who are information about buy commercial or second-hand houses in the urban area. See TABLE 6-25 for the supply of houses for resettlement. has another house There is only one urban residence to be resettled. The owner of the residence in question is currently being rented by other people. The tenant of the residence and the residence vacancy of houses will be offered, 3 months before demolishing the house, information about the house will be paid of and help in finding the house and during movement. The owner of the for the house as well as for the loss of rent for a period of 6 month at the monetary compensation of telephone line, rate of RMB300 per month. Compensation will also be made for the damage and allowances for movement, transition and installation of water and cable TV and other facilities this provided. As this family has a residence in the urban area, they may use power supplies will be in the urban area to sum of compensation money to continue doing business or purchase houses let out.

PAGE 136 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

6.7.4 RESETTLEMENT OF RURAL RESIDENTS persons For constructing this project, four rural residential houses will be demolished. The displace houses and may receive compensation at the rate of RMB270/m2 for brick+concrete structure RMB180/m2 for earth+wood structure houses. and The Changtu River improvement component will affect one family, whose land will be acquired doing small house demolished. The family includes two adults and one child. They make a living by business business in a rented shop in the urban area. Currently their income comes mainly from little reliance on land. As the project-executing agency will pay them compensation for and has they house site at the space rate of 3Om3 per person at the price of RMB150/m2, the compensation into the receive will enable them to buy new or second-hand houses in the city. So after moving will city, their living standard will not degrade and their work, livelihood and their child's schooling acquisition. become even more convenient. The other three families will not be affected by land to be demolished, Chen Honglin's family has another house measuring about Except the one by 500m2 in floor space nearby. Though consultation, the family is willing to get resettlement they monetary compensation. Chen Jianming's family includes two adults and one child and currently make a living by working for others. Through consultation, they are willing to get resettled by monetary compensation. With this sum of money they can purchase a new or second-hand family house in the city at a cheap price. Tan Chunpo's family consists of four members. The a living by working for others. After their house is demolished, they are willing to get makes to resettled by receiving monetary compensation. Similarly, they can use this sum of money getting purchase a new or second-hand house in the urban area. As this family has difficulty to employed in the city, they will be provided with assistance such as giving free technical training standard the two labourers in the family so that they can find jobs in the city. In this way their living can be restored to at least the former level. in Wulong From TABLE 6-25, it can be seen that the residential centres now being developed residential County seat can provide houses of various spaces and internal structure types. These also an centres are normally complete with facilities and convenient transport system. There are local law ample supply of second-hand houses in the city, most of which are house buildings of houses are courts, banks, power supply company, Xinhua book store and other institutions. These are good in quality and structure and are located in areas with convenient transportation. They still after available in different internal structures for the resettled persons to choose from. Therefore, in living moving into the city, the resettled residents will expect a considerable improvement standard and quality.

TABLE 6-25 AVAILABILITY OF RESETTLEMENT HOUSES of Type Structure Total spDaceof Facilities and Average Name selling price Status S/N residenbal Of Developer Location residential environment 2 ) ____ centre. area type centre (in) eninet (RMBIm ContyCResettlement Wuxian Complete with water, 500 Completed 1 area 1 construct.ion Rd. Various 1.2 power and gas area______commission . supplies with water, 2 YixmnPark 1 Gas supply FurongRd Xi Various 1.8 Completepower and gas 450 Completec 2Park Yixin I company company ~~~~~~~~ ~ ~~~~supplies_____ County law Jianshe Complete with water, Completec 1 court house Zhong Various 0.2 power and gas 350 building Rd supplies Construction Furn 450 3 Second-hand 3 bank house urong Various 06 houses buildig Dn d Xinhua bookstore Jianshe l4 hhouse Zhong Various 03 350 ______C.nNRlilAbuilding Rd.4______

PAGE 137 SOGREAH CONSULTANTS-23500321 .R4 - AuGuST 2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

aliesadAverage Name of Type Total space of Location Sructue residential selling pnce Status S/N residential Of Developer 2 environment 2Wk centre area type centre (in County Jianshe Complete with water, Ren rate RMB100- Completed 1 construction Zhong Various 0.5 power and gas commission Rd supplies 350 /month Ren rate Choueasrn Farming Jianshe RMB100- 2 equipment Zhong /month bureau house Rd. 200 ______~building __

6.7.5 RESETTLEMENT OF ENTERPRISES

2 The project will affect three enterprises with 2,045 m of houses to be demolished. the monetary 6-26 for the resettlement of the affected enterprises. After receiving See TABLE concrete the enterprises may decide whether or not to reconstruct their houses. The compensation, The tobacco has not been in operation for years and reconstruction is out of the question. slab yard houses into plant may use the compensation fund to renovate the existing empty re-drying The material dormitory for the migrant workers and therefore reconstruction is unnecessary. another site provided free recovery company may use the compensation fund to rebuild houses on get compensation for the planning department of the local government. These enterprises will by not only for the economic losses caused by resettlement because they will receive compensation recovery company in loss of houses but also for the loss of land. Resettlement of the material early reconstruction and another place will be arranged as early as possible to enable rehabilitation.

TABLE 6-26 RESETTLEMENT OF ENTERPRISES Form of Compensa.on resettiement . (RMB10,000) SIN Enterprise Address Severity of impact One drying plant will be demolished completely. As the site will be flooded each inoperation for Monetary 1 Civil public Riverside Rd. year, the plant has not been 16 facilities company years. Since the company has other compensation businesses, the project will have no major impact on it. 13 Matenal recovery S.Brdgehead Part of the temporary office and one material- Reconstructon 2 and rcompany of bridge #1 stacking yard will be demolished.

Tobacco re-drying Group 4, One temporary dormitory will be demolished, Monetary L plant Township which isused for three months of a year. compensation

6.7.6 RESETTLEMENT OF SHOPS

of RMB45,000. The project will affect 12 persons in 2 shops. They will receive a compensation the shops to temporarily Both shops are run on rent. Since the construction of the project will cause of the project, provide the stop operation, the demolisher will, three months before construction similar rate of rent and help renters with other houses including shops in similar location and at of the two shops will be paid them find the houses and arrange operation. Moreover, the owner The duration of compensation compensation for rent losses of one year at the rate of RMB20, 000. impact. is 10 months in principle but may be adjusted according to the actual time of

PAGE 138 SOGREAH CONSULTANTS-23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

for the resettled There are many shops by Fuzian Road, Furong Road and Jiangshe Dong Road to that of the existing ship-owners to choose from. The annual rent rate of these shops is similar to move before which is about RMB20, 000. The demolisher should help the renters ones, movement allowance *construction so as not to affect their business operation and should pay them at the rate of RMB1 5/mi.

6.7.7 REHABILITATION OF VULNERABLE GROUPS by the project. while The project office has also surveyed the vulnerable groups to be affected affect 11 families of the conducting the socio-economic survey (See next Table). This project will 2 families consisting vulnerable group, which include 4 families having handicapped person(s), of these families will be mainly of women and 5 families consisting of old people living alone. All earned from alienating affected by land acquisition. Their source of income includes rental money paid by the out collectively owned land paid to each family member and the compensation or letting two amounts is about township government and village leadership. The total sum of the to be acquired by the RMB200/month. From the finding of the survey, it can be seen that the land farmland in the land- project from the vulnerable group is not significant in space and, since the is already subject to the acquisition area will be flooded each year and original yield of the farmland of the affected people. impact of flood, land acquisition actually has no major impact on the income

TABLE 6-27 BASIC FACTS ABOUT VULNERABLE GROUPS condition Name Address Classification Family will be acquired. Ran Wufen Group 1,Zhongduiba Village Handicapped Not yet 0.2 mu of farmland Major source of income: farming (the farmland being rented to other people, who pay agriculture tax for him and pay him rent; son's wage income (from driving motor triccle) be acquired. Li Yongbi Group 2,Zhongduiba Village Old people living alone About 0.1 mu of land will Source of income: farming be acquired. Dong Yaqin Handicapped About 0.3 mu of land will Source of income: husband's wage by working outside be acquired. Zheng Guoying Group 1,Zitong Village Consisting mainly of women About 0.2 mu of land will Source of income: receiving wage by working outside Wu Dengbi by the village, Group 1,Huangjin Aged As the land to be acquired isowned Lei Suying affected. Lei Zhangxiang Aged everybody will be Li Lailu Old and handicapped land to be acquired island for growing flowers. Chen Huaijin . Group 2,BaiyangVillage Aged The Su Sshunliang Group 5,BaiyangVillage Old and handicapped Chen Shiliang Aged Some of them will be For this project, the vulnerable group will be affected by land acquisition. resettled by changing status. will be included Those people of the vulnerable group who would like to have their status changed social security system. The qualified ones may enjoy the basic urban endowment in the urban support medical insurance, unemployment insurance and minimum subsistence insurance, subsidy per person/month). On the other hand, the land compensation and resettlement (RMB115 will take care be paid to their children or the public welfare bureau or rest house and the latter may with vocational of them in their daily lives. Meanwhile the labourers in their families will be provided better chance of training and information and instructions on employment so that they have employment.

PAGE 139 SOGREAH CONSULTA14TS-23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

money and resettlement For those vulnerable people not to change status, the land compensation for arranging their livelihood. subsidy may be paid to their children who take the responsibility to help them develop agricultural Meanwhile, free technical training will be offered to their children production so that they can get more income.

ATTACHMENTS 6.7.8 REHABILITATION OF AFFECTED INFRASTRUCTURE AND GROUND owners after 'The affected infrastructure and ground attachments will be restored by their respective by the project owner. Of these facilities, the cell phone relay tower, high being compensated for before power lines and other special faculties will be built in other locations and low voltage and operation of the demolishing the existing ones so as not to affect the livelihood of the residents enterprises, institutions, and shops nearby.

6.8 PROJECT IN JIANGJIN CITY use, acquire 12.36 mu of land for permanent use and 101.71 mu for temporary The project will production. affecting 279 people in 79 households and 19 people need to be resettled by

6.8.1 REHABILITATION OF PERMANENTLY LAND ACQUISITION

6.8.1.1 ANALYSIS OF IMPACT

12.36 mu of land for permanent use, affecting 126 persons in 39 This project will acquire the per- in 4 villages. As the total space of land to be acquired is relatively small with households no significant impact capital space of land decreasing only by 0.001 mu, land acquisition will have on the villagers (See TABLE 6-28).

TABLE 6-28 IMPACT OF LAND ACQUISITION of No. of Lad Per-capita Per-capita Sum total of land No.of No. pLrandnt space of space Of cmesto No. of No. ofpersons to be landatr and resettlementsubsidy Village Group householdsaffected affectedpersons resettledproduction by pcquiredt acqacqusitedondlandbfr a lIon

11 28 4 2.55 0.670 0.669 23392 Hailuo 2 0.664 23392 Taping 8 14 49 5 3.16 0.665 11 37 6 3.65 0.722 0.721 23392 Guohu 1 0.880 23392 Luopan 6 3 12 4 3.0 0.881 Luopan Village is to the field survey, of the affected villagers, Gong Yong's family in According The four-member the most by land acquisition with 1.2 mu of farmland to be acquired. affected RMB1,500. The male has a total space of farmland of 3.68 mu with a monthly income of family a relatively stable income labourers of the family often go out to work as migrant workers and get labourers stay at home farming. There is still a space of 2.48 mu of farmland annually. The female by As the yield of land in the area is poor, they are willing to get resettled left after acquisition. family in monetary compensation rather than reallocation of land. Yuan Zhongwen's receiving of land acquired. The Village receives the least impact of land acquisition with only 0.03 mu Taping income of RMB1,200. four-member family has a total space of farmland of 1.85 mu with a monthly 'Land acquisition will produce no impact on their living standard.

PAGE 140 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Also according to the survey, a majority of villagers in these two villages are working locally or elsewhere as migrant workers. Land acquisition actually has no practical impact on their income.

6.8.1.2 REHABILITATION OF INCOME

1 Resettlement plan Unsatisfied with the low yield of farmland, the villagers affected by permanent land acquisition are unwilling to get resettled by relocation of land. A consensus has been reached through consultation that they will be resettled by receiving monetary compensation. According to the rates of compensation, the two villages will get a total amount of RMB310,000 as land compensation and resettlement subsidy. At the consent of a majority of 2/3 of the affected villagers, the land compensation and resettlement subsidy will be paid to the affected labourers according to the space of land acquired. Thus, each of the affected labourers can get a total of RMB16,379 with the land compensation and resettlement subsidy putting together. Each mu can be compensated RMB 25,184. Based on the current deposit interest rate 2.79% above 5 years, excluding tax on interest rate 20%, the real deposit rate is 2.232%. If the affected deposit the compensation RMB25, 184 in the bank for 50 years, they will get about RMB837 each year, which is more than their current yearly net income RMB492 from cultivated land. After receiving the compensation money, they may grow cash crops on the remaining space of farmland and enlarge the scale of animal husbandry. Therefore, it is quite possible that their livelihood can be restored to the former level. 2. Livelihood support The following arrangements will be made to resettle the labourers in the affected villages: (1) The local government agencies will discuss with the nearby enterprises to persuade them to give priority to employing the affected villagers. There are seyeral major enterprises in the affected area such as Tiantian Printing Co. Ltd. which generates an annual output of RMB10 million, Jingu Xinxing Machinery Plant, which runs import and output business in container connecting bolts, and a liquor production and sales base. Now the Shuangfu Industrial Park Area is acquisition shape, where 25 enterprises has moved in, introducing a total investment of RMB430 million. Of these enterprises, Chongqing Meike Motor Technology Co. Ltd. with a total investment of RMB200 million is now clearing the site for constructing its houses, Chongqing Ruili Machine Manufacturing Co. Ltd. has already been in operation, Chongqing Changgu Industrial & Trading Co. is now constructing its workshops, etc. After the water supply project is completed, more and more enterprises will be attracted into the industrial park area. Doubtlessly this will promote employment in the project area. The affected local villagers may take part in the construction of these enterprises. Unskilled villagers will be provided with vocational training. It is found from the survey that the average income level of the ordinary workers in the local enterprises is within RMB500-600. As the enterprises grow in business, the farmers working in these enterprises can expect a growth in income. (2) With the execution of the water supply project, the constructor will give priority to employing the local labourers to take part in the civil works. As most of the villagers have worked in construction companies as masons, carriers, reinforcement bar binders, they are highly experienced in doing such specialized jobs. (3) A monitoring mechanism will be established to ensure that the resettled persons get properly resettled and compensated so that their production and livelihood will not be lower than the level before resettlement.

SOGREAH CONSULTANTS - 23500321 .R4 - AUGUST2004 PAGE 141 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

6.8.2 REHABILITATION OF TEMPORARY LAND OCCUPATION

The project will take 101.7 mu of land for temporary use, affecting 10 villages in one township. Through consultation with the local villagers, it is agreed that compensation for temporary occupation of land will be made in such as way that the loss of yield in one farming season will be compensated for as if it were in two farming seasons at the rate of RMB900 per mu for loss of crops and RMB1, 200 for loss of fishes. Since the land temporarily acquired will undergone operations such as trench excavation, pipe laying and backfilling, it is known that the constructor will carry out the excavating and backfilling operations section by section along the alignment and each section of land will be restored in no longer than one month. This arrangement will reduce the impact of temporary occupation of land to a minimum. To sum up, after receiving compensation, the livelihood of the residents in the villages will not be adversely affected and can even restore to the level before land acquisition.

6.8.3 REHABILITATION OF VULNERABLE GROUPS

The project will affect four handicapped people in four families located respectively in Halloo, Gaohu and Guanghua Villages. According to the survey, Chen Jiezhong's family in Hailuo Village has 1.41 mu of farmland of which 0.3 mu will be permanently acquired and family's average monthly income is RMB800. Song Jieren's family in Gaohu Village has 1.9 mu of farmland of which 0.2 mu will be permanently acquired and the family's average monthly income is RMB500. Li Jun's family in Hailuo Village has 2 mu of farmland of which 0.1 mu will be temporarily acquired and the family's average monthly income is RMB1,000. Wang Zhouliang's family in Guanghua Village has 1.1 mu of farmland of which 0.4 mu will be temporarily acquired and the family's average monthly income is RMB1,200. All of them have a stable income from working as migrant workers and only a small part of their farmland will be acquired. Therefore land acquisition will virtually has little impact on them. After being properly compensated, their livelihood will restore to the level before land acquisition. The two handicapped people's families affected by permanent land acquisition will not only receive monetary compensation and resettlement subsidy but also be given priority in having the healthy members of the families settled. For the other two handicapped people's families affected by temporary occupation of land, the local govemment will consult the constructor to have their land restored first and pay them the crop compensation. in time. As each of these families also includes normal members, they will take case of the handicapped ones in the family. According to the Official Document No. JCN(2003)173, these handicapped people will be exempted from the agriculture tax, which will further relieve them of financial burden. After receiving the monetary compensation duly paid to them, they can expect that their living standard will be restored to the level before land acquisition. Generally speaking, all measures possible will be acquired to help and support the impoverished vulnerable group so that their livelihood is restored to the former level and gradually becomes well off.

6.8.4 REHABILITATION OF INFRASTUCTURE AND GROUND ATTACHMENTS

The project will temporarily take 1,680 m2 of the section between Wenjiadian and Huangjiayuanzi on the Jin-Ma highway route from July 1, 2004. According to the actual condition, the temporary passageway will be constructed separately in half the width to avoid blocking the traffic. Construction will begin five days after acquisition the land and be completed and traffic restored in two days' time. Meanwhile, compensation will be paid to the highway management agency according to Article IlIl: "Rates of compensation for Highway Assets in Chongqing" of Annex 1 of Chongqing Municipal Communication Commission's Official Document No. YJW(2000)325.

SOGREAH CONSULTANTS-23500321.R4 -AUGUST2004 PAGE 142 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

The three power line poles affected by the Level II pressurizing pump station will be moved slightly off the construction site. Thus before constructing the pump station, the switching off and on of power will be so timed as to avoid the peak hours of power consumption by the local residents. Any arrangement regarding the use of power will be duly announced to the local residents so as to minimize the impact caused by switching off of power. After the power line poles are resettled, construction of the pump station will have no impact on the local residents' livelihood as due to the interruption of power supply. For the 855 fruit trees affected by the project, their owners will be compensated at the rate of RMB45 per piece according to the standard set.

6.9 PROJECT IN BEIBEI DISTRICT

The project will take 23.2 mu of land for permanently use and 8.1 mu of land for temporary use, affecting 64 persons in 19 villages and 24 persons need to be reseKtled by production.

6.9.1 REHABILITATION OF PERMANENT LAND OCCUPATION

6.9.1.1 ANALYSIS OF IMPACT

The project will permanently take 23.2 mu of land including 19.9 mu of farmland and 3.3 mu of state-owned land. Of the total space of land acquired, the water purification plant component will take 17.8 mu and the high-elevation water tank component will take 2.1 mu. This will affect 50 people in two groups of two villages in Dongyang Township, Beibei District and 24 people need to be resettled by production.

TABLE 6-29 ANALYSIS OF IMPACT CAUSED BY LAND ACQUISITION

of Total space Spae f Per-capita Total of land

Jingtan Lijiaping 242 146 1 0.6 17.8 17.8 12 45 21 0.53 529550 Dongyang Tangka 220 170 0.8 21 21 2 S 3 0.76 4641 0

From TABLE 6-29, the project will take 17.8 mu of farmland in Jingtan Village's Lijiaping Group. The group has 146 mu of farmeand and a population of 242 persons in 80 families. Before land acquisition the per-capita space of farmsand is 0.6 mu and it becomes 0.53 mu after land acquisition. Land acquisition will actually affect 45 persons in 12 families including 21 labourers. The per-capita income of the village was RMuJB2, 360 in 2003.

SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 PAGE 143 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

It is obvious that the project will take a small space of farmland and affect a small number of people and families. This means each affected family still has sufficient farmland to cultivate. According to the survey, the family affected most seriously by land acquisition has only 0.3 mu of farmland acquired and they still have 0.8 mu left. The fact is that the major income of that family is from secondary and tertiary industries and farming accounts for only an insignificant part of the total income. As for other families, the land acquired accounts for even a smaller part of the total space. It is known from the survey that since there are many non-agricultural job opportunities, very few young labourers are engaged in farming and most of them work, run business or do other things in the city. Obviously, as the major source of income of the affected labourers is the secondary and tertiary industries, land acquisition will cause no significant impact on them in terms of income. 6.9.1.2 REHABILITATION OF INCOME

(1) Resettlement plan Through discussions with Dongyang Township government, project owner, Jingtan Village committee and affected villagers, it is agreed that all the farmers affected by land acquisition will be resettled by receiving monetary compensation and the land compensation and resettlement subsidy will be paid to the affected farmers. The affected two villages can receive a total amount of RMB580,000 as land compensation and resettlement subsidy. Each mu can be compensated RMB22,100-29,750. Based on the current deposit interest rate 2.79% above 5 years, excluding tax on interest rate 20%, the real deposit rate is 2.232%. If the affected deposit the compensation RMB22, 100-29,750 in the bank for 50 years, they will get about RMB734-988 each year, which is more than their current yearly net income RMB550 from cultivated land.

(2) Livelihood support G As most of the villagers in the project area work, run business or do other things in the city, the resettlement subsidy will be paid to the affected labourers themselves. This sum of money will enable them to continue their present careers. The public welfare bureau will employ technical personnel to train the surplus labourers and arrange them to work in the nearby enterprises. The jobs available to them are mostly unskilled workers, security guards, banisters, housekeepers, and cleaners with a wage level of RMB400-600 per month. See next TABLE 6-30 for the basic facts about the candidate enterprises.

TABLE 6-30 BASIC FACTS ABOUT ENTERPRISES Basic fact S/N Enterprise Ownership No of employeesMonthly wage level space (mu Revenue Status No.eploees f (RMB) Floor_sace_(mu (RMB10,000) Sau I Beibei Silkworm State-run 350 850 800 200 good Chongqing Beibei 2 Glassware and State-run 1500 1000 200 1145 good _ Instruments Plant\ Chongqing 3 Pharmaceutical State-run 2000 1200 650 3455 good Factory #5 500 1000 60 267 good 4 FZhengchuanGlassState-run _ Factory ______

() The project after complete will provide the affected labourers (about 20 of them) with the following jobs: pipeline repairers, water gauge reading recorders, operators, security guards, and cleaners. These jobs require no special skill and provide the workers with a monthly wage of about RMB300-500.

SOGREAH CONSULTANTS-23500321.R4 -AUGUST2004 PAGE 144 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

(I The village committee will use the land compensation to construct infrastructure, restructure the village's agricultural production, and improve the re-cultivation index of farmland to restore the yield to the former level. The ultimate goal of restoring production and improving the livelihood of the affected persons can be achieved by taking the measures described above to increase the yield of the diminished farmland and encourage the affected villagers to work outside. Beibei Silkworm Breeding Farm has 800 mu of state-owned land. As there is no building to be demolished, the project will have no significant impact on the farm except for a number of mulberry trees. The project owner will help the farm to restore production by relocating the affected mulberry trees or make compensation for the loss at the specified standard. Through consultation with Beibei District National Land Administration Bureau and the breeding farm, the project owner will compensate the enterprise for the land acquired at the rate of RMB120,000 per mu and RMB36 per square meter as land alienation fee.

6.9.2 REHABILITATION OF TEMPORARY LAND OCCUPATION

The project will take 8.1 mu of land for temporary use in two villages, which will receive crop compensation at the specified rate of RMB1, 100 per mu. The project will temporarily occupy the land for three 3 months (or one quarter and any occupation longer than one quarter to be regarded as two quarters). If the occupation causes the loss of yield in one quarter, the damage is about RMB1, 000 per mu, which means that the compensation is more than the actual loss and therefore the villagers' livelihood will not be affected by temporary occupation of land. The temporarily acquired land will be restored by the constructor as initially agreed upon between the affected villages and the project-executing agency. And the village and group organize to check and accept.

6.9.3 REHABILITATION OF INFRASTRUCTURE AND GROUND ATTACHMENTS

Rehabilitation of demolished facilities must be planned and arranged in advance and carried out in a safe, efficient, timely and accurate manner to minimize adverse impact on the residents living nearby. The resettlement and reconstruction of power poles and lines will be carried out according to the agreement signed three months before commencement of project construction between the project owner and the power line owner. As the resettlement and reconstruction of power lines will cause a certain impact on the enterprises and residents around the project area, the project owner will in consultation with the power line owner have the standby power poles and lines erected before moving the existing ones so as to mitigate the impact. The project owner will prepay to the power line owner part of the cost of resettlement and reconstruction work and final settlement of the cost will be made by the two parties at the replacement price. The power line owner will do his best to finish the resettlement and reconstruction before commencement of project construction to minimize impact. The price quoted by the power line owner takes effect after being appraised by a disinterested assessment agency. The affected tractor trails will be reconstructed by the project owner before project construction. New passageways will be constructed to replace the existing ones, which should be convenient to the pedestrians so as not to affect the daily life of the villagers. Other affected ground attachments will be compensated for by the project owner and restored by their respective owners. Compensation for such ground attachments will be based on the policies described above, in consideration of the local situation and in compliance with the World Bank requirements.

SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 PAGE 145 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

6.10 INTEGRATION WITH HOST RESIDENTS

The residents affected by the project will get resettled in three ways, purchasing uniformly constructed resettlement houses at a lowered price, building their own houses on sites provided free by the project owner, and purchasing commercial houses. In the former two cases, the resettled persons move into the same place and will mingle with one another fairly easily because they are urban or rural residents from the same district, county or city and have similar production and living customs and social and cultural background. For those who purchase commercial houses in the city, they will give due consideration to the need of work and daily life as well as social relations. The affected urban residents who purchase houses in places familiar to them will have little problem in integrating with other residents in the area. For the affected rural residents, they will also be able to mingle with other residents in the residential area fairly easily because they come from suburban areas close to the city and most of them have worked in the city and are not unfamiliar with the urban environment. Through the above analysis, it can be concluded that the residents affected by the project will have no problem in integration with other residents when they move into the resettlement area.

PAGE 146 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

7 PUBLIC PARTICIPATION

7.1 STRATEGY FOR PUBLIC PARTICIPATION

In compliance with the resettlement policies, laws and regulations issued by the central government, Chongqing municipal government and local governments of districts, cities and counties involved, in order to protect the legal rights and interests of the resettled persons and entities, minimize dissatisfactions and disputes, and develop better policies regarding resettlement and practical measures as well as resettlement plan in consideration of the nature of the project, great importance will be attached to the participation of the resettled persons in the whole process of policy making, plan development and execution of the project. When conducting the feasible study of the project at the preparation stage, the project office has for several times solicited the city, district and county governments, local people's congresses, political consultant conferences, NGOs, affected residents in the project areas and village committees involved in land acquisition for their comments and suggestions on resettlement. In August 2003, the project office founded a working team to conduct a quantitative survey on material impacts of land acquisition and resettlement. All representatives of the affected by the project participated in the survey. The project office has also solicited the village committees and resettled person's representatives for comments and held extensive consultations with them. The survey covered the local socio-economic situation the project-affected areas and psychological reaction of the public. The survey included door-by-door visits to the local residents to get an understanding of their attitudes toward resettlement and the project. The extensive concrete information obtained from the survey helps to lay a solid foundation for developing the resettlement plan. In the future, the following procedures and methods will be employed to encourage public participation and consultation: (1) Direct participation of the resettled persons in resettlement activities Delegates will be elected proportionally from the resettled residents to collect public comments and requirements and suggests in collaboration with the village committee and give regular briefings.

(2) Consultations between the project owner and the resettled persons on ways of resettlement (3) Holding consultative meetings. Consultative meetings attended by delegates from the resettled residents, village committees and women (accounting for at least 30% of the total number of delegates) will be held six months before land acquisition to brief them on the latest developments and hear their comments and suggestions. (4) Holding public conferences Public conferences will be held three moths before land acquisition and execution of the resettlement plan to continue to explain to them the related policies, applicable regulations, rates of compensation and resettlement plans so that they are informed in advance and have enough time to make arrangement. (5) Publicizing policies regarding land acquisition on the media (6) Issuing public notices on land acquisition

SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 PAGE 147 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

of land The notice will mainly include information on brief introduction to the project, scope acquisition, resettlement policies (including rates of compensation), institutions in charge of etc. resettlement, resettled rights and obligations, complaints and claims, monitoring and evolution, (7) Publicizing the resettlement plan The resettlement plan reviewed and approved by the World Bank will be placed in the municipal public resettlement office and public libraries before the assessment of the project is made and can get announcements will be issued on major local newspapers so that the resettled and NGOs reference to the resettlement plan. (8) Resettlement information booklet Before the project is executed, the resettlement office will distribute the resettlement booklets village among the affected villages. The affected residents will then obtain the booklets from the committee, which contains detail on project profile, project impacts, polices on compensation, project executing institution, channel to lodge complaints, etc.

7.2 PUBLIC OPINION SURVEY

The In December 2003, the project office carried out a survey of public opinions and suggestions. 11% said survey showed that of the 400 families surveyed, 89% said they knew about the project, thought they did not know or knew little about it; 79% expressed approval of the project and 13% to the the project makes no difference to them; 85% and 77% believed that the project is beneficial that country and public and 78% believed that the project is beneficial to individuals; 65% believed it environmental pollution (or shortage of water) would cause economic damages and 89% thought would degrade the quality of livelihood; 78% thought the project would affect the investment that environment while 71% believed it would affect the image of the city; 96% were of the opinion the deteriorated environment (or shortage of water) would bring about serious or very serious impact on their livelihood and work; 100% believed that the project would improve the living they environment; 82% believed that the project would cause adverse impact on them; 89% said they knew or partly knew about the policies regarding land acquisition and resettlement; 88% said process knew they could lodge complaint if their legal rights and interests should be violated in the of resettlement. See TABLE 7-1 for the findings of the public opinion survey.

PAGE 148 SOGREAH CONSULTANTS- 23500321 R4 -AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 7-1 SURVEY OF PUBLIC OPINIONS AND PSYCHOLOGICAL REACTIONS

S/N Question asked Answer _-Fin Finding Do you know that the project will be (1) Yes 89 8 3 1 constructed? (2) Not quite (3) No Are you in favour of the project? (1) Yes 79 6 13 2 (2) No (3) It doesn't matter _ _ Who do you think the project will The country? (1) Yes (2) No 85 benefit (multipie choice is allowed)? The public? (1) Yes (2) No 67 The individual?? (1) Yes (2) No 78 What do you think is the possible (1) Economic damage 65 89 78 71 4 result of environmental pollution (or (2) Degradation of living standard shortage of water)? (3) Deteriorating investment environment (4) Damaging image of city Has the detenorated environment (1) No impact 3 21 76 (or water shortage) any impact on (2) Yes, but not serious your life and work? If yes, how (3) Yes, serious serious it is? (4) Yes, very serious What benefits do you think the (1) Improved living environment 100 72 56 51 6 project will bring you? (2) Improved working environment (3) Increased job opportunity (4) Improved physical and mental health What adverse impacts do you think (1) No adverse impact 82 12 23 12 5 the project will have on you? (2) Inconvenience to travel 7 (3) Economic damage due to resettlement (4) Possible reduction in income due to land acquisition (5) Other adverse impacts Do you know about policies (1) Yes 81 8 11 8 regarding compensation and (2) Yes, somewhat resettlement? (3) No Do you know you can lodge (1) Yes 88 12 complaint if your legal rights and (2) No 9 interests should be violated in the process of land acquisition and resettlement? I

7.3 PUBLIC PARTICIPATION PROCESS AND OPENNESS OF POLICIES

From March 2003 up to now, the project office for each component has sent personnel on several occasions to the affected rural (urban) townships, villages and groups to hold consultative meetings with the village leaders and resettled representatives and explain to them the necessity of constructing the project and the relevant policies regarding resettlement. Compensation rates and specific measures for resettlement were discussed and the residents' opinions heard at these meetings. See the next two Tables for detail.

SOGREAH CONSULTANTS-23500321.R4 -AUGUST2004 PAGE 149 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 7.2 PROCESS OF ENSURING AFFECTED PEOPLE' PARTICIPATION

Remarks Prqecl Date Locaton Partiapant Topic

Project in Mar. 4, 2003 Affected area, Leaders of project Setting guidelines for of Tongliang construction site construction directorate, conducting the survey the project, County leaders and residents of material impacts of affected townships and socio-economic situation and villages, workers of defining scope of the affected enterprises and area institutions, surveyors, and project designer (for several times)

Oct. 11, 2003 Office of project Project construction Discussing policies regarding construction directorate, land and compensation and resettlement directorate, housing bureau, leaders plan affected area and residents of affected villages and project designer (for several times)

Mar. 4, 2004 Affected area and Consultants for WB- Discussing compensation office of project assisted projects, policies and resettlement and construction representative of municipal income rehabilitation plans directorate project office, protect construction directorate, leaders of affected villages and project designer

May 2004 Office of project Project construction Discussing issues conceming construction directorate and affected implementation of resettlement directorate and residents policies and plan affected area or not the Project in Mar. 2003 Mingguang Farrners working on the Discussing whether Dazu County Village construction site of the project should be constructed proposed sewage and asking for further treatment plant comments on land acquisition

Mar. 2003 Yongyi, Villagers and members of Discussing whether or not the Xingguang, village committee project should be constructed Yujian and and asking for further Longdong comments on land acquisition Villages

Jul. 2003 Mingguang Villagers and members of Announcing land acquisition Village village committee and resettlement plan and asking for villagers' opinions

Aug. 2003 Mingguang Families to be resettled Announcing land acquisition Village and resettlement plan and possible rates of compensation and asking for villagers' opinions

Sep. 10, 2003 Project area Farmers whose land is to Announcing land acquisition be acquired and resettlement plan and asking for villagers' opinions

150 SOGREAH CONSULTANTS- 23500321 .R4 -AUGUST2004 PAGE CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Project in Mar. 4, 2003 Affected area and Leaders of project Setting guidelines for Changshou office of district construction directorate, conducting the survey of District planning leaders and residents of material impacts of the project, commission affected townships and socio-economic situation and villages, workers of defining scope of the affected enterprises and area institutions, surveyors, and project designer

Oct. 11, 2003 Office of Project construction Discussing policies regarding Changshou directorate, land and compensation and resettlement Infrastructure housing bureau, leaders plan Construction Co. and residents of affected Ltd. And affected villages and project area designer (for several times)

Mar. 4, 2003 Office of Consultants for WB- Discussing compensation Changshou assisted projects, policies and resettlement and Infrastructure representative of municipal income rehabilitation plans Construction Co. project office, project Ltd. And affected construction directorate, area leaders of affected villages and project designer

May 2004 Office of Project construction Discussing issues concerning Changshou directorate and affected implementation of resettlement Infrastructure residents policies and plan Construction Co. Ltd. And affected area

Water supply Dec. 2003 Group 5, Li Chengpu, Xu Discussing issues about land project in Huangjiao Village guangquan and group acquisition for constructing Bishan leader Zhang Qiancengyan Water Plant County Dec. 2003 Xiangjiawan Leader and group leaders Discussing land acquisition for of Wuli Village constructing pressurizing pump station

Feb. 2004 Qianceng and Party Secretary Zhang, Discussing further Wuti Villages Village Leader Li, etc. arrangements for land acquisition

Mar. 2004 Qianceng and Li Chengpu, group Discussing compensation for Wuli Villages members, etc. crop losses

Binan River Mar. 4, 2003 Affected area and Leaders of protect Setting guidelines for improvement office of county construction directorate, conducting the survey of project water leaders and residents of material impacts of the project, conservancy affected townships and socio-economic situation and bureau villages, workers of defining scope of the affected enterprises and area institutions, surveyors, and project designer

Oct. 11, 2003 Office of county Project construction Discussing policies regarding water directorate, land and compensation and resettlement conservancy housing bureau, leaders plan bureau - and residents of affected villages and project designer (for several times)

SOGREAH CONSULTANTS- 23500321.R4 -AUGUST 2004 PAGE 151 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Mar. 4, 2004 Affected area and Consultants for WB- Discussing compensation office of county assisted projects, policies and resettlement and water representative of municipal income rehabilitation plans conservancy project office, project bureau construction directorate, leaders of affected villages and project designer conceming May 2004 Office of county Project construction Discussing issues water directorate and affected implementation of resettlement conservancy residents policies and plan bureau and affected area Setting guidelines for Project in Mar. 4, 2003 Affected area and Leaders of project conducting the survey of Wuiong office of construction directorate, materal impacts of the project, County embankment leaders and residents of engineering affected townships and socio-economic situation and company villages, workers of defining scope of the affected enterprises and area institutions, surveyors, and project designer regarding Oct. 11, 2003 Affected area and Project construction Discussing policies office of directorate, land and compensation and resettlement embankment housing bureau, leaders plan engineering and residents of affected company villages and project designer (for several times)

Mar. 4, 2004 Construction sites Consultants for WB- Discussing compensation of embankment assisted projects, policies and resettlement and project and representative of municipal income rehabilitation plans Changtou River project office, project improvement construction directorate, project leaders of affected villages and project designer concerning May 2004 Affected area and Project construction Discussing issues embankment directorate and affected implementation of resettlement engineering residents policies and pian company room Representatives of Briefing on applicable policies, To collect Project in Aug. 2003 Conference information of Jiangjin City affected residents, land defining scope of resettlement Jiangjin City necessary for Resettlement administration bureau, and asking for comments developing Office resettlement office and project office resettlement plan Preliminary Office of Representatives of Discussing specific land Aug. 2003 consensus Shuangfu affected residents, leader acquisition policies and reached after Township of land acquisition and compensation rates discussion government resettlement office Jiangjin Representatives of Discussing specific methods Agreement Aug. 2003 Office of after Tap Water affected residents, and for making compensation and reached City discussion Supply Co. company leader resettlement arrangements

PAGE 152 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Aug. 2003 Degan Township Leaders of Jiangjin City Announcing monetary Agreement Land Tap Water Supply Co. and resettlement plan and reached after Administration city land administration discussing with villagers the consultation Department department, method of compensation to be representatives of affected used residents and some of the villagers

Project in Sep. 11, 2003 Affected area Representatives of Design Discussing guidelines for Identifying Beibei institute of Chongqing conducting socio-economic impact of District University, project office survey and defining scope of project on local and affected residents impact socio-economic situation

Jan. 2, 2004 Project office, Project office and affected Discussing compensation and Preliminary national land people resettlement polices and consultation for resource preliminary plans preparing administration resettlement bureau and plan affected area

Feb. 3, 2004 Project office and Leader of project office Discussing compensation Further affected area and affected people policies and resettlement and consultation on income rehabilitation plans compensation policies and resettlement and income rehabilitation plans

TABLE 7-3 POLICY OPENNESS ASSURING PROCESS

Project Document Media and language used Dateio Remarks

Introductive description of projects Tongliang County TV Station and Tongliang 2002 requiring land acquisition Daily Newspaper; Chinese language

General information on land Tongliang County TV Station and Tongliang 2003 acquisition Daily Newspaper; Chinese language Tongliang County government's Tongliang County TV Station and Tongliang Project in Policies regarding house demolition Daily Newspaper; Chinese language 2003 Tongliang and resettlement County Distributed to village committees; Chinese Resettlement booklet lagaeAugust 2004

Notice on publicizing resettlement Publicized on cable TV or local newspaper, August2004 plan Chinese language

libraries; Chinese and August 2004 Resettlement plan EnglishProject office,languages public

Par of design Project in Dazu Introductive description of projects Oral briefing, holding villager representative Mar to Oct involving land and County requiring land acquisition meetings 2003 acquisition resettlement

General information on land Oral briefing Mar to Oct acquisition 2003

SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 PAGE 153 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

and language used Date of Remarks Project Document Media publication Affected Chongqing Municipal government's 2003 families policies regarding house demolition Printed matters and resettlement August 2004 Resettlement booklet Printed matters August 2004 Notice on publicizing resettlement Prnted matters plan August 2004 Resettlement plan Printed matters Changshou District TV Station and Introductivdescriptio ofpro Chinese 2002 Introductive description of projects Changshou Daily Newspaper; requiring land acquisition language

information on land Changshou District TV Station and General Changshou Daily Newspaper; Chinese 2003 acquisitionacquisition ~~language and Changshou District govemment's Changshou District TV Station Project in Daily Newspaper; Chinese 2003 Changshou policies regarding house demolition Changshou District and resettlement language Distributed to village committees; Chinese August 2004 Resettlement booklet language newspaper, August 2004 Notice on publicizing resettlement Publicized on cable TV or local plan Chinese language

Project office, public libraries; Chinese and August 2004 Resettlement plan English languages

Chongqing Municipal government's 'Measures for land administration Hang up on bulletin boards; Chinese Oct. 2003 Bicheng and compensation" and Bishan Township County government's 'Regulation language regarding land acquisition and resettlement" boards; Chinese Bicheng it.. Hang up on bulletin Feb. 2004 Township Water supply Notice on scope of land acquisition language project in bulletin boards; Chinese August 2004 Bishan County Resettlement booklet Hang up on language language August 2004 Notice on publicizing resettlement Distributed to villages; Chinese plan Projectoffice,publiclibraris;Chinse andProject office August 2004 and public Resettlement plan English languages Englishlanguages ~~~~~~~~~libraries TV Station and Bishan Daily 2002 Binan River Introductive description of projects Bishan County Chinese language improvement requiring land acquisition Newspaper; project Bishan Daily 2003 p General information on land Bishan County TV Station and acquisition Newspaper; Chinese language Bishan County TV Station and Bishan Daily Bishan County government's 2003 house demolition Newspaper; Chinese language Policies regarding . and resettlement

PAGE 154 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Project Document Media and language used publication Remarks

committees: Chinese August 2004 ResettlementResefflemei bookletlanguageAust20booklet Distributed to village

Notice on publicizing resettlement Publicized on cable TV or local newspaper, August 2004 plan Chinese language

Project office, public libraries; Chinese and August 2004 Resettlement plan English languages

Introductive description of projects Wulong County TV Station and Wulong 2002 requirng land acquisition Daily Newspaper; Chinese language General information on land Wulong County TV Station and Wulong 2003 acquisition Daily Newspaper; Chinese language

Wulong County government's Wulong County TV Station and Wulong 20 Policies regarding house demolition Daily Newspaper; Chinese language 2003 Project in and resettlement Wuilong County Distributed to village committees; Chinese August 2004 Resettlement booklet language

Notice on publicizing resettlement Publicized on cable TV or local newspaper, plan Chinese language August 2004

Resettlement plan Project office, public libraries; Chinese and August 2004 English languages

Chongqing Municipal government's 'Measures for land administration and compensation" and Jiangjin Hang up on bulletin boards; Chinese Jul. 2003 Shuangfu City government's 'Regulation language Township regarding land acquisition and resettlement" . , Hang up on bulletin boards: Chinese _Shuangfu Project in Notice on scope of land acquisition language 2003 Township Jiangjin City l Twh booklet Distributed to affected families; Chinese August 2004 Resettlement language

Notice on publicizing resettlement Hang up on bulletin boards; Chinese August 2004 plan language

plan Project office; Chinese and English August 2004 Project office Resettlement languages

Introductive description of projects Chongqing Municipal TV Station and Inrequiring landacqisition ofpoj Chongqing Daily Newspaper; Chinese Dec. 2002 Affected area requiring land acquisition language

_Project in Beibei Resettlement booklet Distributed to village committees; Chinese August 2004 District lnug Notice on publicizing resettlement Publicized on cable TV or local newspaper, August 2004 plan Chinese language

Resettlementplan ~Project office and project office; Chinese Aust20 .Resettlement plan and English languages August 2004

SOGREAH CONSULTANTS-23500321.R4 - AUGUST2004 PAGE 155 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

8 PROCEDURE FOR COMPLAINTS will always be in developing or in implementing the resettlement plan, great importance Either A complaint-filing on the participation of the affected individuals as well as organizations. placed for the affected people mechanism has been established, which provides the following procedure to use to lodge their complaints. may Stage 1: If the affected person objects the resettlement plan, he or she complaint orally or in writing to the township government, file his or her the neighbourhood committee or village committee. The latter should handle case within one week.

he or Stage 2: If the affected person is still unsatisfied with the result of Stage 1, she may, upon receiving the resolution, appeal to the district, county or city WB- assisted project office or Chongqing municipal WB-assisted project office, which should resolve the case within one week.

or Stage 3: If the affected person is still unsatisfied with the result of Stage 2, he she may, upon receiving the resolution, appeal to the district, county or city national land resource department (supervision and arbitration agency for land acquisition) or house demolition and resettlement office for administrative arbitration, which should arbitrate the case within ten days.

Stage 4: If the affected person is still unsatisfied with the administrative arbitration made in Stage 3, he or she may, upon receiving the arbitration, bring a lawsuit to a civil law court in case of objection to any aspect of the resettlement plan. _

plan, including the The resettled person may file lawsuits regarding any aspect of the resettlement rates of compensation. will be informed of the above procedure through meetings or by other means The resettled person will also be made so that he or she knows it is his or her right to file complaints. Publicizing efforts media to promote public awareness and the complaints and suggestions about through the mass agencies at all the resettlement work will be sorted out and submitted to the resettlement administrative levels for prompt study or and solution.

PAGE 156 SOGREAH CONSULTANTS-23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

9 ORGANIZATIONAL ARRANGEMENT

9.1 AGENCIES IN CONNECTION WITH RESETTLEMENT ACTION it is carried out To develop this "Resettlement Action Plan for Affected people' and ensure be formed and produces the expected result, a full top-to-bottom organization must smoothly of the resettlement during executing the project to coordinate and supervise the implementation plan. * Chongqing Municipal Leading Group (CMLG) for Executing WB-assisted Projects * Chongqing PMO * Project Designers * Independent external monitoring and evaluation (M&E) agencies * Owners of projects in respective districts, counties and cities * District, county or city PMOs * District, county or city national land administration bureau and resettlement office * Rural or urban township working group for resettlement * Village committees (VCs) and villager groups (VGs)

9.2 ORGANIZATIONAL CONSTRUCTIONS AND RESPONSIBILITIES

9.2.1 CHONGQING MUNICIPAL LEADING GROUP FOR EXECUTING WB-ASSISTED PROJECTS

smooth execution of the WB-assisted projects in Chongqing, the municipal To ensure the to found government has authorized Chongqing Municipal Development and Reform Commission this leading group.

9.2.2 CHONGQING PMO Municipal The office is located in CPMO. The member of the office includes Chongqing and Reform Commission, Chongqing PMO, Chongqing Municipal Construction Development Municipal Commission, Congaing Municipal Land and Housing Administration Bureau, Chongqing Planning Bureau, and Chongqing Municipal Labour Administration Bureau. action The office performs the following functions: provide guidance in developing the resettlement affected by each of the WB-assisted project; provide guidance in developing the plan for persons actual condition- resettlement plan for persons affected by each component according to the guidance in identifying and making resettlement compensations; monitor and provide policy reports on supervise the implementation of the resettlement plan; furnish periodic monitoring implementing the resettlement plan.

PAGE 157 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

9.2.3 DISTRICT, COUNTY OR CITY PMO projects executed in each of the ensure systematic proceeding of the resettlement work for To their respective organizations to districts, counties or cities, the local governments has founded take charge of the resettlement work. leader of the district, county or city The district, county or city PMOs is headed by the responsible and housing administration bureau, government and staffed by the leaders of local national land water conservation bureau and other agencies. Its major function environmental protection bureau, coordinate work the control of the work on land acquisition and resettlement, is to strengthen and supervise the process of between agencies in charge of land acquisition and resettlement, land acquisition and resettlement. Its major functions include: and assist the designer in * Authorize the designer to define the scope of affected area conducting socio-economic surveys; Plan for Affected people" and * Provide assistance in developing the "Resettlement Action supervise the work on resettlement; * Hold public consultations and publicize policies regarding resettlement; * Manage and supervise the resettlement fund; for training; * Dispatch township and village resettlement managing personnel departments or agencies in * Direct, coordinate and supervise the activities of the associated land acquisition and resettlement: the resettlement plan; * Address issues and problems arising from the process of implementing * Provide assistance in external monitoring; periodically to the municipal * Prepare progress report and submit internal monitoring reports office for WB-assisted projects.

9.2.4 DISTRICT, COUNTY OR CITY PROJECT OWNER agency for each project in the respective districts, cities and counties is the executive The owner of special-duty personnel to constructing the project and shall, in resettlement activities, designate supervise and manage the process. Its major responsibility includes * Request the designer to develop the resettlement action plan; * Participate in resettlement surveys; * Confirm the resettlement action plan; * Conduct the resettlement action or have it conducted; * Supervise and manage the resettlement action; * Appropriate funds; city or county WB-assisted * Report periodically the progress of resettlement to the district, project office and furnish internal monitoring reports.

PAGE 158 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

9.2.5 DISTRICT, COUNTY OR CITY RESETTLEMENT-EXECUTING ANGENCY

The resettlement-executing agency performs the resettlement work in two ways: firstly, the owner entrusts the resettlement work to the district, city or county land administration bureau and demolisher; secondly, the owner's land acquisition and house demolition department carries out the resettlement plan. Of the eight loan saving projects, seven are to be carried out using the first method. The resettlement-executing agency in Dazu is project owner itself. See Table 9-1 for detail. * Participate in the preparation of the resettlement action plan; * Implement the resettlement action plan approved by the World Bank; * Secure formalities for land acquisition and house demolition; * Promote public awareness of resettlement policies for the project; * Organize public participation; * Sign land acquisition and house demolition contracts with the affected persons, and the copies of the contract must be submitted to project owner and county PMOs; * Implement the resettlement action plan and the detailed income restoration plan must be submitted to project owner and county PMOs; * Appropriate resettlement funds and the payment receipts must be submitted to project owner and county PMOs; * Handle the affected persons' complaints and grievances in resettlement; * Prepare the internal monitoring report and submit it periodically to the project owner.

9.2.6 RURAL OR URBAN TOWNSHIP RESETTLEMENT WORKING GROUP

The working group is headed by the responsible leader of the township where the project is based and staffed by the leaders of the township land administration office, planning office and villages. Its major role includes the following: * Participate in the project survey and provide assistance in developing the "Resettlement Action Plan"; * Organize public participation in the project survey and promote public awareness of the resettlement policies; * Carry out, inspect, monitor and record the resettlement activities within the township and assist in securing the necessary formalities for resettlement; * Participate in the monitoring on land acquisition, demolition of houses and attachments and resettlement and reconstruction of houses; * Provide assistance in managing the compensation fund; * Coordinate and handle issues and problems arising in actual work; * Direct the resettled comments and suggestions to the superior agencies; * Provide help for the families having problems;

PAGE 159 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

agencies concerned on the * Report to the district, county or city resettlement leading group and work of land acquisition and resettlement.

9.2.7 VILLAGE COMMITTEE AND VILLAGER GROUP

and villager group, whose The working group consists of the major leader of the village committee functions include the following: * Participate in the socio-economic and project impact survey; regarding land * Organize public consultations and promote public awareness of polices acquisition and resettlement; * Select the resettlement area and allocate houses sites to the resettled; of production; * Reallocate farmland and organize resettlement activities such as rehabilitation * Manage and distribution resettlement funds; * Direct the resettled comments and suggestions to the superior agencies; * Report on the progress of resettlement activities; * Offer help to the families having problems;

9.2.8 PROJECT DESIGNER Design Institute and The designers of the projects are respectively the following: Huadong (responsible for the projects in Tongliang County, Changshou District, Chongqing Jianghe Centre Dazu and Wulong County), Huabei Design Institute (responsible for the project in Bishan County for the Bicheng County), 's Architecture Design Institute (responsible supply project in Bishan County and the project in Beibei District), and Chongqing Township water City). The major Xinshidai Engineering Consultants Co. Ltd. (responsible for the project in Jiangjin role of the project designer includes the following: requirement; * Provide the design of each component of the project according to the contract * Define the scope of land acquisition and house demolition.

9.2.9 INDEPENDENT EXTERNAL MONITORING AND ASSESSMENT AGENCY by competitive The independent external monitoring and assessment agency will be determined bidding. The agency performs the following major functions: present a monitoring * Observe all aspects of the resettlement plan and its implementation and statement to the World Bank through the project resettlement office (This and assessment monitoring and responsibility will be detailed in sections regarding independent external assessment; and processing. * Offer technical consultations to the project resettlement office in data survey

PAGE 160 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

9.3 ORGANIZATION CHART

Chongqing Municipal Leading Group for Executing WB- assisted Projects

Chongqing PMO j

District, county or city PMOs

District, county or District, county orI city offices for city national land District, county or city Project designer management of administration p o house demolition agency

.______Infrastructure Households independent

or urban S1GEA C _SLNS-23500321 .R4 AUGUST2004PA1Rural | 1f1~~~rL 0 AL 0 :

SOGRAHCNSULANT- -AGUT204PC, groupsR 8 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

9.4 QUALIFICATIONS AND STAFFING OF AGENCIES

and resettlement and See TABLE 9-1 for the staffing of agencies involved in project execution TABLE 9-2 for information about project-executing agencies.

TABLE 9-1 STAFFING OF AGENCIES INVOLVED INPROJECT EXECUTION AND RESETTLEMENT

Number of Number of Equipment Project resettlement full-time Type of personnel agencies workers Project in Tongliang Government officials, public officers, Projuc in Tongtiang 7 13 economic management personnel, County technical personnel Government officials, public officers, Project in Dazu County 9 46 economic management personnel, technical personnel Projectin Changshou Government officials, public officers, ProDect In Changshou 8 8 economic management personnel, Distnct technical personnel officials, public officers, Fully equipped, Bicheng Township economicGovernment management personnel, having two Bicheng Township and one project in 9 technical personnel, financial workers, computer water supply copying machine Bishan County architects officers, Binan River Government officials, public improvement project in 6 27 economic management personnel, Bishan County technical personnel Government officials, public officers, Project in Wulong 7 21 economic management personnel, County technical personnel Government officials, public officers, personnel, Project in Jiangjin City 8 17 economic management technical personnel Government officials, public officers, personnel, Project in Beibei District 10 12 economic management technical personnel

Total 64 151

PAGE 162 SOGREAH CONSULTANTS- 23500321 R4 -AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 9-2 EXECUTING AGENCIES FOR EACH PROJECT Telephone Pro'ect Executing agency Responsible person 45633123 Bachuan and Huaiyuan Rivers environment Land acquisition office of Tongliang Lei Chan improvement, Tongliang county County Land Administration Bureau Li Wei 43640686 Laixi River environment improvement, Dazu Dazu Jinkai Ltd County River environment improvement, Land acquisition affair center of Taohuaxi ChangshouDistrictChangshou District Land He Xicheng 40230469 Changshou District Administration Bureau water supply system, Land renovation center of Bishan H Jinwei 41439799 Bicheng Township w Bishan County County Land Administration Bureau u 41439799 Binan River environment improvement, Bishan Land renovation center of Bishan Hu Jinwei County County Land Administration Bureau Land acquisition office of Wulong Dai Hongjun Zhou 77729568 Riverside environment improvement, Wulong County Land Administration Bureau County House demolition office of Wulong County Construction Commission Xinlin 77729019 47534197 Shuangfu Township water supply system, Land acquisition office of Jiangjin Zhan.xiano Jianglin City City Land Administration Bureau ______4753419 Dongyang Township water supply system, Land acquisition office of Dongyang Land Administration Liqing 68893094 Beibei District Bureau

9.5 MEASURES TO STRENGTHEN CAPABILITIES OF AGENCIES

project office will take To ensure the effective implementation of the resettlement action plan, the the following measures to heighten the capabilities of the involved agencies: technical the staff qualifications: The staffs of organization at each level consist of * Increase and personnel and managerial personnel who must be adequately skilled in technology management.

* Strengthen staff training: v Since March 2003, Chongqing Municipal Office for Executing World Bank-assisted working Projects has, for several times, invited experts to train the major staff members in skills, including the study of the World Bank's operational policy OP4.12 regarding land involuntary resettlement and relevant national and local laws and regulations on house acquisition and resettlement, methods and content of socioeconomic surveys, reconstruction and income rehabilitation, etc. studying the World v The project office will continue to train the resettlement workers in Bank's guidelines on involuntary resettlement and laws and regulations on land acquisition of and resettlement, performance and management of resettlement, rehabilitation production and living standard and monitoring and evaluation of resettlement actions. conducted and The district, county or city office for executing WB-assisted projects has X skills will continue to conduct training of the rural or urban resettlement workers in working to improve their capability of handling policy-related affairs.

* Support will be provided in finance and equipment to improve working efficiency; rules will be * Work responsibilities will be assigned in a rational manner and award and penalty formulated to improve the initiatives of the resettlement workers-

PAGE 163 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

and prompt solution to * The reporting system will be strengthened to ensure internal monitoring problems; system will be * The external monitoring and assessment mechanism and early warning established.

PAGE 164 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

10 IMPLEMENTATION TIMETABLE

10.1 PROGRESS OF RESETTLEMENT AND PROJECT CONSTRUCTION

within According to the project progress schedule, the project will be completed in separate stages be. well the period from 2004 to 2006. The progress of land acquisition and resettlement will work on scheduled so that it will be immediately followed by project construction. The major plan of land acquisition and resettlement will be carried out from 2004 and completed in 2006. The following principles are followed when making the process schedule: the The work on land acquisition and house demolition will be completed within 3 months before land is used for project construction, the actual starting date depending on the progress of the resettlement work. Sufficient time must be allowed for house demolition and resident resettlement before starting project construction.

10.2 KEY TASKS TO BE PERFORMED IN PERMANENT ACQUISITION OF LAND

According to the project construction and land use approval documents, the local national land administration bureau and village committees in the approved land use area to be informed that all the registered permanent rural residences within the land-acquisition area are to be frozen and no more construction licenses are to be issued and procedures for house reconstruction and renovation, transactions, exchange of ownership, and rent are to be stopped; Workers to be sent to the site to investigate and check the quantity of land acquisition within the affected area including the number of rural households, persons, floor spaces and ground attachments; Application for use of land for construction to be submitted to the district, county or city land administration agency according to the project approval document, approved plan, findings of survey, and plan view of acquired land, land acquisition plan, land use plan, etc.;

Public announcements to be made of the land acquisition and resettlement plans, policies, procedures, resettlement compensation rates, land acquisition area, and usage of land acquired to put the whole process under the monitoring of the masses;

Written agreements to be signed with the villages and resident groups within the land acquisition period regarding the form and amount of compensation, resettlement of labourers, resettlement transition period, and compensation made during the transition period, and efforts to be made to promote mobilization for land acquisition.

10.3 KEY TASKS TO BE PERFORMED FOR URBAN HOUSE DEMOLITION AND RESIDENT RESETTLEMENT

According to the project construction and land use approval documents, the local public security bureau, housing administration bureau, urban construction bureau, industrial and commercial administration bureau, and neighbourhood service office in the approved land acquisition area to be informed that all the registered permanent rural residences within the land-acquisition area are to be frozen and no more construction licenses are to be issued and procedures for house reconstructionr and renovation, transactions, exchange of ownership, and rent are to be stopped;

SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 PAGE 165 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

and persons and the record made According to the number of frozen permanent urban residences sent to the site to investigate and available by the housing administrative bureau, workers to be type of ownership, structure of check these data including the number of households, persons, houses, floor spaces and attachments; city land administration for house demolition to be submitted to the district, county or Application survey, and plan to the project approval document, approved plan, findings of agency according plan, etc.; view of the individual resettlement houses, resettlement plan, land use to be made of the house demolition and resident resettlement plans, Public announcements rates, house procedures, drawings of resettlement houses, resettlement compensation policies, put the whole process under demolition area, time limit of demolition and usage of land acquired to the monitoring of the masses; purchase cheap resettlement Written agreements to be signed with the resettled who are willing to limit of house demolition regarding the form and amount of compensation, houses within the time period, and and locations of the resettlement houses, resettlement transition floor spaces be made to promote the compensation made during the transition period, and efforts to for those who prefer purchasing commercial houses or second- mobilization for land acquisition; the house information about the market supply of houses to be provided by hand houses, purchase tax-exemption demolisher who are also to provide the resettled residents with house certificates issued by the local taxation bureau; to be signed with them, After the resettled residents have moved out, supplementary agreements sequence of movement and payment of the purchase price of houses, and according to the time resettlement the number of floor, direction and door number of the house; all the to determine and notary agency; agreements endorsed by the house demolition and resettlement agency The resettled residents to move into their new homes.

AND RESIDENT 10.4 KEY TASKS TO BE PERFORMED FOR RURAL HOUSE DEMOLITION RESETTLEMENT the local public security According to the project construction and land use approval documents, administration bureau, urban construction bureau, industrial and commercial bureau, housing land acquisition area to administration bureau, and neighbourhood service office in the approved permanent rural residences within the land-acquisition area are be informed that all the registered for house and no more construction licenses are to be issued and procedures to be frozen rent are to be stopped; reconstruction and renovation, transactions, exchange of ownership, and permanent urban residences and persons and the record made According to the number of frozen and the housing administrative bureau, workers to be sent to the site to investigate available by of ownership, structure of check these data including the number of households, persons, type houses, floor spaces and attachments; to be submitted to the district, county or city land administration Application for house demolition and plan to the project approval document, approved plan, findings of survey, agency according etc.; view of the individual resettlement houses, resettlement plan, land use plan, to be made of the house demolition and resident resettlement plans, Public announcements rates, house procedures, drawings of resettlement houses, resettlement compensation policies, put the whole process under demolition area, time limit of demolition and usage of land acquired to the monitoring of the masses;

PAGE 166 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

cheap resettlement to be signed with the resettled who are willing to purchase Written agreements compensation, limit of house demolition regarding the form and amount of houses within the time transition period, and and locations of the resettlement houses, resettlement floor spaces made to promote the made during the transition period, and efforts to be compensation commercial houses or second- mobilization for land acquisition; for those who prefer purchasing houses to be provided by the house hand houses, information about the market supply of with house purchase tax-exemption demolisher who are also to provide the resettled residents certificates issued by the local taxation bureau; to be signed with them, the resettled residents have moved out, supplementary agreements After of the purchase price of houses, according to the time sequence of movement and payment and of the house; all the resettlement determine the number of floor, direction and door number to agency and notary agency; agreements endorsed by the house demolition and resettlement The resettled residents to move into their new homes.

OF ENTERPRISES AND 10.5 KEY TASKS TO BE PERFORMED IN RESETTLEMENT INSTITUTIONS public security construction and land use approval documents, the local According to the project and commercial administration bureau, urban construction bureau, industrial bureau, housing land use area to be bureau, and neighbourhood service office in the approved administration and procedures for house that no more construction licenses are to be issued informed and rent are to be stopped; reconstruction and renovation, transactions, exchange of ownership, administrative bureau, workers to the ownership record made available by the housing According condition of the enterprises sent to the site to investigate and check the houses and operating to be including the number of enterprises institutions within the designated project construction area, and of houses, floor spaces, number of or institutions, employees, ownership type of houses, structure profit and average annual income of large-size production equipment, annual output value, annual employees; house demolition and for house demolition to be submitted to the municipal Application approved plan, findings of resettlement agency according to the project approval document, survey, and resettlement plan; policies, procedures, resettlement Public announcements to be made of the resettlement plans, demolition and usage of land acquired to compensation rates, house demolition area, time limit of put the whole process under the monitoring of the masses; within the house to be signed with the affected enterprises or institutions Written agreements location of the and resettlement period regarding the form and amount of compensation, demolition made during the transition resettlement houses, resettlement transition period, and compensation period, and efforts to be made to promote mobilization for resettlement; their new houses; The resettled enterprises or institutions to construct or purchase houses. The resettled enterprises or institutions to move into their new

SHOPS 10.6 KEY TASKS TO BE PERFORMED IN RELATION OF public security construction and land use approval documents, the local According to the project and commercial administration bureau, urban construction bureau, industrial bureau, housing land use area to be bureau, and neighbourhood service office in the approved administration issued and procedures for house informed that no more construction licenses are to be ownership, and rent are to be stopped; reconstruction and renovation, transactions, exchange of

PAGE 167 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

According to the number of shops frozen and ownership record made available by the housing bureau, workers to be sent to the site to investigate and check the actual data administrative spaces, including the number of employees, ownership type of houses, structure of houses, floor attachments and annual income from operation; and Application for house demolition to be submitted to the municipal house demolition according to the project approval document, approved plan, findings of resettlement agency etc.; survey, and plan view of the individual resettlement houses, resettlement plan, land use plan, of the Public announcements to be made of the resettlement plans, policies, procedures, drawings houses, resettlement compensation rates, house demolition area, time limit of resettlement of the demolition and usage of land acquired to put the whole process under the monitoring masses; and Written agreements to be signed with the resettled shop owners within the house demolition regarding the form and amount of compensation, location of the resettlement resettlement period and houses, resettlement transition period, and compensation made during the transition period, efforts to be made to promote mobilization for resettlement; The resettled shops to resume operation in their new houses.

10.7 KEY RESETTLEMENT TASKS AND TIMETABLE

10.7.1 PRINCIPLES FOR MAKING THE RESETTLEMENT TIMETABLE in * The scope of land acquisition and house demolition and resettlement is to be determined with the design drawings of each individual component, which must be accordance and accomplished before the material measurement and calculation work for land acquisition house demolition is started. measurement and calculation work is to be done jointly by the resettlement * The material on agency and displace persons according to the redline map before signing the agreement compensation. to * The resettlement agency should hold a mobilization meeting attended by the resettled anhounce the policies regarding land acquisition, house demolition and resettlement, compensation and resettlement plan before signing the compensation agreement. The formal notice on land acquisition and house demolition is to be issued after the mobilization meeting. and resettled residents should sign the agreement on compensation and * The demolisher on resettlement after the material measurement and calculation is carried out and the notice land acquisition and house demolition issued. moving. * The allowance during the transition period should be allocated to the resettled before * New infrastructure is to be constructed before the existing one is demolished. * The compensation is to be settled and paid after the agreement is signed before moving. * The resettlement work is to conduct in a manner satisfactory to the resettled.

PAGE 168 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

ACQUISITION, HOUSE DEMOLITION 10.7.2 GENERAL PROGRESS SCHEDULE FOR LAND AND RESETTLEMENT AND RESIDENT RESETTLEMENT for and in accordance with the progress of preparation The general progress schedule is developed implementation of resettlement activities. See "Schedule of implementation" on the next page.

PAGE 169 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 *CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 10-1 SCHEDULE OF IMPLEMENTATION

2003 2004 200 -I6 00 SIN Task Description 01 Q3 1Q4 01 0Q203 0Q4lQl Q2 10IQ30Q0lIQ2L0j30 01 Q ____ ~~~~~~~~~~~~~~~~~QlT2 1 Prophase Work of Land Reqtisition I j 2- PMO Collect-s Related Staff 3 Confirming the Land Requisition And House Demolition Scope 4 socioeconomic Preliminary Survey and Training l 6 -- Preparing for Land Requisition and Demolition survey 7 Measuring and Calculating Material Object of Land Requisition and Demolition i 8 Consulting Resettlement Policy and Program 9 Formulating Resettlement Action Plan 10 Land Requisition and House DL-molition I1 Holding the Mobilizing Meeting and Publishing Policy 12 Publishing the Notice of Land requisition and Demolition 13 Consulting And Signing The Compensation And Resettlement Agreement 14 Settling And Pa54ng Compensations 1-i5 Construction Of The Resettlement Houses L16 Residents?Move And Resettlement 17 Infrastructure Reconstruction h1 8 Monitoring and Evaluating 1,9 Monitoring and Evaluation

PAGE 170 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

11 EXPENSES AND BUDGETS

11.1 EXPENSES

The overall budget includes the compensation for permanent and temporary land acquisition, compensation for demolition of the urban and rural residential houses, compensation for affected enterprises, institutes and shops, and compensation for the affected infrastructure and ground attachments, of which the compulsory fees and taxes are to be calculated according to the following criteria: the planning and design fee accounting for 2% of the total amount of the above items, the management fee 3%, cost of technology training 0.5% of the part applicable to the rural area, monitoring and evaluation fee 2%, and contingency fee 10% of all the expenses, compulsory fees and taxes (including the eight basic costs, plan and design fee, management fee, technical training fee and monitoring fee). The total resettlement budget for constructing the projects is RMB103 million, including RMB38.862million in making compensation for permanent acquisition of land, accounting for 38%, RMB9.817 million in making compensation for demolishing urban and rural residential houses, accounting for 10%, RMB16.993 million in making compensation for the affected enterprises and institutions, accounting for 17%, RMB3.512 million in making compensation for the affected shops, accounting for 3% of the total budget. The total resettlement expense will be included in the cost of the whole project package. The major source of fund includes the developer own fund and loans secured by the local governments. The budget for each individual project is as shown in Table 8.

SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 PAGE 171 CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

TABLE 11 -1 PLANNED OVERALL BUDGET FOR RESETTLEMENT

Project inTongliang Project inDazu Projectn Water supply project Binan River Project inWulong Proect in PrO;ectin S/N Project County County Changshou inBishan County Project County Jianglin City BeibelDistrict Tot District ______

4 ~ ~ r3342391.56i I28 2899 38W 70)4.3 36399857.8 1.1 Farmland 5001230.0 5416620.0 1404471.6 11320060.5 9070280.0 246954.2 597850.0 Farmland 5001230.0 ~~~~~~~3342391,5

1.2 ForestIand 562686.3 562686.3 1.3 Garden 126228.0 126228.0 1.4 Fishpond 87854.0 30200.0 723927.5 841981.5 1.5 Nursery garden 79152.0 79152.0 1.6 Riverside shallow land 146002.5 3000.0 149002.5 1.7 Wasteland 44675.5 184000.0 228675.5 _ 18 Sjaje-owned land 475120 8 475120 8 20 TemPOrarylandccupation .540000 , 49680.0 .. 2112500 *. 49Jp56.00.OO,sirEf, 4Z500.0 ; J2; 52Ag . 8910.0.604448.0 Cropcompensation 0.0 540408.0 Farmland 54000.0 49680.0 211250.0 48396.0 65000.0 42500.0 60672.0 8910.0 11060.0 Fishpond 560.0 10500.0 44520.0 Nursery garden . . 44520.0 8460 0 Olhers 8460.0 Cojmpnsauon fordenrrlihion of, 30 227697.5 3405642 4 . 0.0 O04 . 175808 0 .0- , 00 3809147.9 arban resieu lumes _ - -. _ 1 -4s1 _ . : L *1 M . 3.1 House compensation 0.0 0.0 0.0 Brick+COncrejestructure 125848.0 1155901.3 171000.0 1452749.3 Brick+wood structure 87209.5 1692823.2 0.0 1780032.7 Simple structure 0.0 412517.9 0.0 412517.9 3.2 Ground attachment compensation 0.0 0.0 4948.0 Telephone 790.0 4000.0 158.0 7850.0 Cable TV 1550.0 6000.0 300.0 3.3 Other compensations 0.0 0.0 0.0

SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 PAGE 172 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

inWulong Projecl in Project in Project inDazu Project in Water supply projecl BinanRiver Project S/N ProjeCt Project inTongliang County Jiangjin City 3eibei Disrict ot County County CDisirk inBishan County Project 250.0 22250.0 Movement allowance 2000.0 20000.0 1800.0 99000.0 7800 0 89400.0 Transition allowance 100.0 5600.0 Water and power supply 5000 compensation 400.0 22400.0 2000.0 20000.0 Bounty 1800.0 1800.0 Compensation for loss of rent O O 6008510 8 . 2734084 8_ 00 1697084 5 326132 0 O O 40 C7mpencano fordem1111in otrur i 8359 .5433736 -; - . _ 9 . . hoDuses .- . -,0 4 . _ . _residenh 0.0 0.0 4.1 House compensation 446674.5 213300.0 '1934580 3 162126.8 190034.4 922444.6 Brick+concrete siructure 1033103 3 98538.0 0,0 _ 202254.9 96194.2 636116.2 Brick+wood structure 0131586.0 0.0 81186.0 50400.0 Earth+wood structure 113639 2 15176.0 93000.0 0.0 Simple structure 1718.2 3745.0 1020600.0 900000.0 54000.0 House site 307800.0 213900.0 4 2 00 00 3 Ground attachment compensation 0.0 4 632.0 10592 0 1520.0 4648.0 2686.0 Telephone 1106.0 53510.0 28000.0 18000.0 1200.0 Cable TV 4030.0 2280.0 0.0 0.0 0.0 44 Other compensations 0 12000.0 1000.0 . 48200 5200.0 7600.0 22400.0 Movement allowance 126000 0 56700.0 30000.0 3600.0 Transition allowance 17100.0 18600.0 3000.0 400.0 12200.0 Water and power supply 13000 1900.0 5600.0 compensation 0 12000.0 1600.0 48800 Bounty 5200 0 7600.0 22400.0 811891.0- 0...- .. 142004035 ..r t. 953321.7. . 290OOO0 ,0 O941j980.0mr0 50 Relocaioiir4lenterprls -3:1;.':1232i08 0.0 . 0.0 5.1 House compensation 704520.0 476000.0 1219526.0 Brick4concrete structure house 39006.0 137000.0 558980 4 Brick+wood structure house 421980.4 122760.0 _ _148700.7 Earth+wood structure house 0.0 25940.7 154800.0 0.0 154800.0 Simple structure house 0 0 127000.0 11094000.0 230000.0 2900000.0 7834000.0 5.2 Enterprise landprice 3000.0

D A . f -'nr,r AUI..L,.....,- 'AA...... )nnA CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

5111inPrqec Tongliang Project Project inDazu Project in Water supply project BinanRiver Project inWulong Project in Project in Jiangjin City Beibei District t SINProject ProjectjintTCounlyCounty CountyCoena Changshou~~~~~~~~~~ inBishan County Project County ~~DistrictTt 5.3 Ground attachment compensation 0,0 0.0 Telephone 160.0 790.0 316.0 1266.0 Cable TV 0.0 240.0 2400.0 300.0 2940.0 117856.0 5.4 Facility compensation 50000.0 3856.0 60000.0 4000.0 777733.2 5.5 Financial subsidy 28368,0 239245.2 473520 0 36600.0 56 Relocation allowance 2836.8 31899.4 59190.0 30675.0 124601.2 20-. 00, J OiSt .0.. 2792698 4 6.013i!^ 4, sRewawn of ins6u6s r - , 110700.4arWpAI 0 . 00 0 -LA2Vfl. i° 6.1 House compensation 0.0 Brick+concrele structure house 0.0 1744200.0 1744200.0 Brick+wood structure house 9929.2 9929 2 62 House site land price 0.0 375000.0 375000.0 0 6.3 Ground attachment compensation 0.0 0.0 0 Telephone 0.0 632.0 316.0 948.0 3000.0 Cable TV 0.0 2400.0 600 0 50000 0 64 Facility compensalion 0.0 50000.0 0 65 Financial subsidy 0.0 540000.0 540000 696212 6.6 Relocation allowance 7712 68850.0 0.0 .. .0 35124931 70 -RelcaRonofshops - -;, 152315.2 .eiigrF,.o,33144446 :0a0.00. 457 .3 X 71 House compensation 0.0 0.0 Brick4concrete siructure house 36421.0 1602136.8 0.0 1638557.8 Brick4wood structure house 41933.4 720579 6 0.0 762513.0 Simple structure house 1443.2 681830.4 683273.6 7.2 Ground attachment compensation 0.0 3036.0 Telephone 316.0 2720 0 Cable TV 620.0 4080.0 4700.0 7.3 Financial subsidy 63256.0 209599.2 33333.3 306188.5 7.4 Facility compensation 2000.0 65552.0 4000.0 71552.0 7.5 Relocation allowance 6325.6 27946.6 _ = _ 8400.0 42672.2 5 : 298060.8 e, <-8.0ii U. i GnuuGmndatachmenW 3 j&i 20bh a 4830D j 1081,5t5^ i 7 A ~- iStss

174 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 PAGE CHONGOING MUNICIPALITY - I HE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

in Project in Dazu Project in Waler supply prqect Binan River Project InWulong Project Project inTongliang Project in Beibei District Changshou inBishan County Project County Jiangjin Cit SIN |Projecd County County 72771066.8 11551418.8 1606258.5 26876312.0 11304181.6 577813.2 1114720.8 Totalof Items 1-8 7906678.1 11833683.7 11556.3 22294.4 1455421.3 236673.7 231028.4 32125.2 537526.2 226083.6 9.0 Cost of planning anddesign 158133.6 1455421.3__ 23663551.5 Costol implementationand ~ ~ 33441.6 2183132.0 346542.6 48187.8 806289.4 339125.4 17334 4 10.0 Cost of implementation and 237200.3 management _._355010.5 __. 49133.0 2889.1 55736 235483.8 34112.4 20673.1 42358.1 8031.3 72713.3 11.0 Cost ot technical training (in rural _23__ __ _483______8_ 20673______1______area) 22294.4 1455421.3 231028.4 32125.2 537526 2 226083.6 11556.3 12.0 Cost of supervision and monitorng 15813.6 1214460.7 62114 9 1198325 1810052.5 849425.B 1268271.5 1240237.6 172672.8 2883036.7 13.0 Basic reserve fund 78______0052_____ 2136317.5 335~~~~~~~~~262970. _____5_ Tao 0 1301252 5 17377002 7 2306296.1 791553.6 4729919 3 2482378.7 276338 140 Tax 2136317.5 36443323 2 .15841446.7 95902 1 . 1 261949 B 10328f580 6 t . .- J594890W9 269095k4 To_al__ _I_I_ 1 480001,2 .- 173039331

PAGE 175 SOGREAH CONSULTANTS-23500321 R4 -AuGuST 2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

11.2 YEARLY INVESTMENT PLAN

The yearly investment plan is developed according to the project execution progress schedule. See TABLE 1 1-2 for detail.

TABLE 11 2 YEARLY INVESTMENT PLAN

Unit: RMB 10,000 Project 2004 2005 Total Project inTongliang County 5740000.6 5740000.6 11480001.2 Project inDazu County 8651966.6 8651966.6 17300933.2 Project inChangshou District 7974455.0 7974455.0 5948909.9 Water supply project inBishan County 1345477.2 1345477.2 2690954.4 Binan River Project inBishan County 18221661.6 18221661.6. 36443323.2 Project inWulong County 7920723.4 7920723.4 15841446.7 Project inJiangjin City 479801.1 479801.1 959602.1 Project inBeibei District 1309704.9 1309704.9 2619409.8 Grand total 51643790.3 51643790.3 103287580.6 Ratio (%) 50 50 100

11.3 SOURCE OF FUND

The total resettlement expenses for the projects are included in the total project cost and the source of fund is from issuing national bond and loans provided by the involved district, county or city government.

SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 PAGE 176 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

11.4 FUND FLOW AND ALLOCATION PLAN

11.4.1 FUND FLOW

The fund circulation process chart is as shown in below.

District, county or city project owner

District, county or city land and housing administration agency

C~~~~~~~~~~~~C En 0.)~~~~~~~~~~0C C:~~~~~~~'

Households Vilae

Fig. 1 Resettlement fund flow

11.4.2 ALLOCATION PLAN owner to the land acquisition and house demolition is paid by the project The compensation for subsidy agency, which in turn pays the land compensation and resettlement resettlement-executing the affected households. The affected villages. The crop compensation is paid directly to to the The house compensation village committee distributes the money in different ways of resettlement. owner of the house according by the resettlement-executing agency in separate times to the is paid and enterprises is paid by the to the agreement signed. The compensation for the institutions institutions and enterprises and the resettlement-executing agency directly to the owners of such infrastructures. Those copies of compensation for infrastructures directly to the owners of such the project owner and county PMOs compensation contracts and payment receipts must be kept in at the same time

PAGE 177 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 I

i i

i i

I

I Project inTongliang County Flood-preventing Componet treatment plant Total embanlkmentembanment projectrojec Sewage Compensation Total amount standard Quantity Amount Quantity Amount Total Total SIN Item Unit (RMB/unit) quantty Permanent land compensation 1 104.03 3224930.00 161.33 5001230.00 cultivated land mu 31000.00 57.30 1776300.00 1.1 562686.30 10334.00 4.50 46503.00 49.95 516183.30 54.45 1.2 woodland mu 0.20 7536.00 3.35 126228.00 plot mu 37680.00 3.15 118692.00 1.3 garden 87854,00 40300.00 0.00 2.18 87854.00 2.18 1.4 pound mu 1.5 tree nursery mu 1.6 overflow land mu 1.7 wasteland mu 1.8 State-owned land mu temporary land compensation _ 2 54000.00 2500.00 0.63 1575.00 20.97 52425.00 21.60 2.1 compensation for the young mu cultivated land mu . pound mu tree nursery mu other land mu

3 urban house compensation 3.1 house compensation 2 125848.00 314.62 125848.00 brick-concrete structure m 400.00 314.62 2 87209.50 249.17 87209.50 brick-wood structure m 350.00 249.17 2 0.00 0.00 0.00 simply build m 3.2 compensation for attachment within houses 790.00 5.00 790.00 telephone set 158.00 5.00 1550.00 5.00 1550.00 cable television home 310.00 5.00 0.00 0.00 0.00 3.3 other compensation home 2000.00 5.00 2000.00 moving subsidy home 400.00 5.00 26.00 7800.00 26.00 7800.00 allowance for temporary resettlement 300.00 500.00 5.00 500.00 for water and electricity establishment home 100.00 5.00 allowance 5.00 2000.00 rewards person 400.00 5.00 2000.00 . allowance for rent fee home _

l, A t3 i I i

i

I CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

12 MONITORING AND EVALUATION are carried out In order to ensure that land acquisition, resettlement and other related activities smoothly at the planed progress and achieve the best result, internal and external monitoring and assessment must be effected before, during and after the execution of the resettlement action.

12.1 INTERNAL MONITORING

Chongqing Municipal Office for Projects Utilizing World Bank Loans will establish an internal monitoring mechanism to supervise the resettlement activities and will build jointly with the district, county or city project office a basic database for land acquisition and resettlement, which serves as the base for making the resettlement plan and monitoring all the resettlement households so that the whole process of resettlement from the preparation to implementation is placed under internal monitoring and control.

12.1.1 EXECUTING PROCEDURE

During the execution period, the district, county or city project office and executing agency collect information about resettlement according to the samples acquired from monitoring and transmits the record of current activities promptly to the municipal project office to ensure continuous monitoring of the executing process. The municipal project office then conducts periodic inspection of the executing process. In the above monitoring mechanism, information registers of a designated format will be used to keep a continuous flow of information from the villages and rural or urban townships to the district, county or city project office and the municipal project office.

12.1.2 CONTENT OF MONITORING

* Resettlement progress; * Quantity of land acquisition and house demolition as compared with there resettlement plan; * Implementation of resettlement compensation rates and resettlement policies; * Resettlement house reconstruction; * Rehabilitation of income; * Appropriation and use of resettlement fund; * Capability and operating efficiency of district, county or city resettlement office; * Record of handling complaints and grievances.

12.1.3 INTERNAL MONITORING REPORT

The report will be made in a format meeting the World Bank requirement and printed and distributed to the executing agencies. The report normally includes the following two parts:

SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 PAGE 179 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

funds and first part is a description of the resettlement progress, availability of compensation The encountered during other aspects of the work, including the situation, problems and difficulties execution and methods and measures to be used to solve them. in the past three months. The second part is a tabular form chiefly used to sum up the statistics and compensation payment The form is a record of data about land acquisition, house demolition with the planned quantity. and shows a comparison between the actually accomplished quantities Tables 12.1 and 12.2 are examples of the report form.

TABLE 12.1 LAND ACQUISITION AND RESETTLEMENT PROGRESS FORM Agency: date: Data authenticity by: Furnishing 'ty completed inpresen Cumulative qty .f of completioi Item Unit 'lanned qty quarter completed atio . Payment of fund Private house rebuilding_ Moving into new houses _ Demolition of old houses __._ Land acquisition __. Land reallocation . Resettlement of labourers Prepared by: Leader's signature: Agency's seal:

ACQUISITION & RESETTLEMENT TABLE 12.2 STATISTIC FORM SHOWING USE OF COMPENSATION FOR LAND day: Data authenticity by: Finishing (RMB) Remarks User Purpose - Beneficiary Amount

project office will During the executing period of the plan, the district, county or city WB-assisted it to the municipal project prepare one internal monitoring report every three months and submit World Bank. office for preparing a year-end summary statement to be submitted to the

12.2 INDEPENDENT EXTERNAL MONITORING

12.2.1 EXTERNAL MONITORING AGENCY

independent monitoring and The project office will employ through competitive bidding an for the project. The assessment agency to supervise the execution of the resettlement action experienced in resettlement monitoring and assessment team consists of a board of experts highly and sociology.

PAGE 180 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

12.2.2 PROCEDURE AND CONTENT OF MONITORING

* Prepare a monitoring working program * Develop a information system software for resettlement monitoring residents * Prepare survey guidelines, forms and record cards for typical * Design the sample survey plan 20% of affected enterprises and * Ratio of sample: 10% of resettled residents, 20% of shops, and institutions * Basic survey conducted by the of the rural households affected by land acquisition will be * Basic survey standard (level of agency to obtain basic information about their production and living monitoring and assessment. livelihood, production and income) necessary for performing monitoring * Establish the monitoring and assessment information system of data for supervising and The information system includes databases for various types * analysis and tracking. assessing the resettlement action, which are useful for computer-aided * Monitoring and assessment surveys development situation of the * Local socioeconomic survey: to investigate into the socioeconomic project area to find out the capability * Monitoring and assessment of the resettlement executing agencies: and efficiency of such agencies of typical resettled residents: to supervise the payment of the * Monitoring and assessment houses, compensation to the urban resettled residents, the supply of resettlement resettlement construction of residents, income rehabilitation, quality of resettlement, house movement etc. progress, payment of compensation, quality of houses constructed, shops, supply of of typical shops: to supervise the payment of compensation for * Monitoring employees' income resettlement houses, progress of movement, production rehabilitation, rehabilitation, quality of resettlement the payment of compensation, * Monitoring of typical enterprises and institutions: to supervise of movement, production land acquisition on new sites, house construction, progress rehabilitation, employees' income rehabilitation, quality of resettlement function rehabilitation of public * Public facilities: to supervise the payment of compensation, facilities and progress of reconstruction activities during developing and * Public participation: by supervising the public participation executing the resettlement plan to assess the result of such activities to supervise and asses the * Resettled residents' complain filing and appealing process: operating mechanism and efficiency * Sort out the monitoring data and build up the database * Make comparison and analysis

PAGE 181 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

a year * Prepare one monitoring and assessment report every half * Conduct the basic survey in December 2004; February 2006; * Produce the first report in August 2005 and the second in period from August 2006 to August * Submit assessment reports (Issue 3 to Issue 5) in the same 2007.

12.3 MONITORING AND ASSESSMENT INDICATORS domestic product, Engel coefficient, Socio-economic indicators: average per-capita income, gross and employment rate efficiency Agencies: staffing, staff qualifications, rules, equipment, working and space of resettlement houses, Resettled urban residents: availability of compensation, location satisfaction with resettlement houses, change of location, change of Shops: availability of compensation, location of business of employees' salary level, change of environment, average working time of employees, change revenue, satisfaction with resettlement new site, progress of land and institutions: availability of compensation, location of Enterprises change of employees' salary level, acquisition on new site, average working time of employees, change of revenue, satisfaction with resettlement rate Infrastructure: availability of compensation, function rehabilitation

12.4 POST ASSESSMENT on the basis of monitoring and project is completed, post assessment will be conducted After the to evaluate the successful already made and using the relevant theory and method assessment shops, enterprises and and lessons to be learnt in the resettlement of residents, experience The post assessment provide experience to be used in later resettlement activities. institutions and agency authorized by performed by the independent external monitoring and assessment will be a working program and set office. The authorized monitoring agency then will develop the project a socio-economic survey, assessment indicator system for the post assessment, conduct up an for Executing the Urbanization prepare the "Statement of Post Assessment of Resettlement and to be presented to the World and Environmental Improvement Loan-saving Project in Chongqing" Bank.

PAGE 182 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

13 ENTITLEMENT MATRIX Rate of compensation Type of Affected person Policy impact Tongliang County: RMB 30,000/mu for farmland, Permanent Village and * In the case of acquiring farmland, compensation will be RMB36,000/mu for garden land, RMB10,334/mu land resident made depending on the original purpose for which the for forestland (including crop compensation), acquisition group land is used. The compensation includes the for land, resettlement, ground attachments RMB39,000/mu for fish pond; compensation village, compensation for ground attachments and Dazu County: RMB40,800/mu in Yongyi and crops. The Village, crops belongs to their owner. RMB33825/mu in Xingguang ,Yujian and * The payment of land compensation and resettlement RMB21450/mu in Mingguang should be made according to the actual Longdong Villages subsidy RMB28,000/mu for conditions of each district, county or city. In Tongliang Changshou District: County, Changshou District, Bishan County, *Wulong farmland and RMB36,400/mu for fish pond; in Bishan County: County and Jiangjin District, the land compensation and Water supply project resettlement subsidy will be paid fully to the status- RMB38,675/mu for farmland and RMB19,338/mu In Dazu County, the land will be for wasteland in Group 3 of Huangjiao Village, changed persons. 5 of and the land compensation and resettlement RMB42,500/mu for farmland in Group reallocated for farmland subsidy will be divided equally among the villagers. Huangjiao Village, RMB31,943/mu in Group 6 of * The land compensation and resettlement subsidy will be and RMB15,972/mu for wasteland according to the number of agrarian population Wuli Village; calculated in Bishan to be resettled, that is calculated by dividing the sum of Binan River improvement project farmland, the space of farmland acquired and 50% of the space of County: RMB34,850/mu for RMB17,425/mu other non-farmland with the per-capita space of farmland RMB45,305/mu for fish pond, and before land acquisition. for riverside shallow land; for farmland * In the case of acquiring farmland, land and resettlement Wulong County: RMB45,000/mu compensation to be paid at the rate of 10 to 30 times as and RMB22,500/mu for wasteland; much as the average annual yield of the farmland in the Jiangjin City: RMB23,392/mu for farmland; 750/mu for farmland in past three years. Beibei District: RMB29, RMB22, 100/mu for farmland, * In the case of acquiring garden land, the land and Jingtan Village and resettlement compensation to be paid at the rate of 1.2 in Dongyang Village. times as much as the compensation rate for farmland. * In the case of acquiring fish pond, the land and resettlement compensation to be paid at the rate of 1.3 times as much as the compensation rate for farmland. * In the case of acquiring forestland, the compensation for land, resettlement and forest is to be paid to the owner and the vegetation rehabilitation subsidy to the local forestation bureau. * In the case of acquiring non-farmland (such as wasteland, collective owned riverside shallow land, etc.), the land compensation and resettlement subsidy are to be paid at the rate of 1/2 of the rate of compensation for farmland. * In the case of acquiring state-owned riverside shallow land, compensation is made for the crops on it only. * If the land compensation and resettlement subsidy paid as specified above cannot enable the farmers to be resettled to live at the level before land acquisition, the amount of resettlement subsidy may be increased as approved by the provincial people's govemment. However the total amount of land compensation and resettlement subsidy should not exceed 30 times as much as the annual yield of the land acquired. * Inthe case of acquiring state-owned land that needs to be compensated for, compensation will be made by the project owner in consultation with the local government, land administration bureau and affected persons. * In the case of acquiring the land owned by enterprises and institutions, compensation will be made at the replacement price. * In the case of temDorarv occuDvino of land, if the imoact

PAGE 183 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Type of Affected person Policy Rate of compensation impact has not yet affected one growing season, compensation for loss of crops will be made as if one growing season were affected; if the impact has affected one year of growing, compensation for loss of crops will be made as if two and half growing seasons were affected; if the impact has affected half a year of growing, compensation will be made as if yield of the land in one year were lost. The compensation will be paid directly to the farmers affected by land occupation and should not be lower than the loss caused to the farmers. For the rehabilitation of temporarily occupied land, in Dazu County, the land will be smoothed by the construction team. The compacted land by engineering machinery will also be loosened and flattened by the construction team. The project-executing agency will pay the land re-cultivation subsidy to each village with which to improve the land itself. In other districts, counties or cities, the constructor will re-cultivate the farmland acquired after construction is completed and return it to the village and the village committee will accept the re- cultivated land in collaboration with the related agencies. Affected * To be paid compensation for loss of crops. Project in Tongliang: RMB1,000/mu for land, farmer 0 To be paid compensation for labour resettlement. farmland, RMB1,680/mu for garden . To be given the opportunity for labour resettlement. RMB1,300/mu for fish pond; Project in Dazu: RMB1,200/mu for farmland; Project in Changshou County: RMB1,000/mu for farmland, RMB1,350/mufor fish pond; Water supply project in Bishan County: RMB 1,200 /mu for farmland; Binan river improvement project in Bishan County: RMB1,000 /m for farmland, RMB1,400/mu for fish pond, RMB 600/mu for riverside shallow land; Project in Wulong County: RMB1,000/mu for farmland, RMB500/mu for wasteland; Project in Jiangjin City: RMB 1, 200 /mu for farmland; Project in Beibei District: RMB1, 100 /mu for farmland. Labourer * Farmers whose land is permanently acquired shall be reasonably compensated at the rate of RMB21,450-45,000/mu. The affected persons may choose from the following three alternatives for production resettlement: 1) Reallocation of farmland, by which the farmland is reallocated among the villages and the land compensation and resettlement subsidy received after reallocation are divided equally among villagers. Dazu County will adopt method. 2) Monetary compensation: by which farmers in villages where the per-capita space of farmland after land acquisition is more than 0.5 mu are resettled by monetary compensation, that is, the land compensation and resettlement subsidy are paid to the affected persons depending on the space of land taken. 3) Change of status by which farmers in villages where the per-capita space of farmland is less than 0.5mu are resettled by having their status as agricultural population changed into non-agTicultural population. These people will thus receive a sum of RMB1.6 as land compensation and resettlement subsidy. After the number of status-changed . persons is decided, the farmland given up by them may be reallocated amona villaoers remainino in the villaae

SOGREAH CONSULTANTS- 23500321. R4 -AUGUST2004 PAGE 184 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Rate of compensation Policy Type of Affected pmon

depending on their willingness. acquisition * The status-changed farmers affected by land be resettled by monetary compensation, insurance, may by security support, etc 1) Monetary compensation, social subsidy are which the land compensation and resettlement to make a paid to the status-changed persons to allow them endowment living; 2) Resettlement by basic social by which those who are above 16 years of age insurance, by but have not yet reached the age of retirement specified urban the state government may, by presenting their resident register and ID card, apply for the basic endowment insurance insurance for urban workers at the local social Those who have secured this type of insurance and agency. may have actually paid the premium for 15 years and longer basis receive endowrnent insurance money on a monthly and 55 after they have reached the age of 60 years for men security years for women. 3) Resettlement by social by which those status-changed persons may apply support, if the for the minimum urban resident subsistence allowance income of them and their family members living average level together is lower than the minimum local subsistence of urban residents. The level of the allowance is determined to the cost of clothing, food and shelter necessary according and in to maintain a decent life for a local urban resident gas) and consideration of the cost of water and fuel (coal or schooling of their young children. The prevailing compulsory in the standard of urban minimum subsistence allowance affected localities are respectively: RMB185/person/month County, in Beibei District, RMB145/month in Jiangjin District, Tongliang County and Bishan County, Changshou and RMB115/person/month in Wulong County RMB130/person/month in Dazu County. government will * For those farmers losing farmland, the local to provide establish a complete labour service system to them. The relevant labour service agency for assistance land the affected people will be founded one month before to help the resettled person get employed acquisition for through all possible channels. Such help includes, giving the status-changed persons free access to example, local job market, collecting job information from the the month sources and providing it to the displace persons one before land acquisition and then publishing such information once a month afterwards, providing free vocational training mainly to the status-changed persons (Such training is to the demand of the local job market. For instance, oriented of County, the training is oriented to the acquisition in Dazu to metalworking skills, and in Bishan County, it is oriented labour the acquisition of shoe-making skills, etc.) The being service agency will also consult the enterprises them with constructed or seeking expansion and provide certain preferential incentive policies (such as being exempted from part of tax if they employ the status-changed to get persons) in order to make it easier for these persons employed. is exempted from Other a Compensation for land and resettlement any tax and legal fee persons in The demolisher should assist the resettled * residence securing related formalities for transferring certificates and changing schools for their children.

PAGE 185 SOGREAH CONSULIANTS- 23500321 R4 - AUGUCT2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Rate of compensation Type of Affected person Policy impact Tongliang, Changshou, Bishan and Wulong: Temporary Affected * Receive compensation at the rate of 2.5 times as much as RMB2500 /mu land households the annual yield of the land if the occupation lasts for one year, or Dazu: RMB1,800 /mu occupation /mu for farmland and * Receive compensation at the rate of one year's yield of Bishan: RMB1,200 the land if the occupation takes half a year, or RMB1,400/mu for fish pond /mu for farmland and * Receive compensation at the rate of one quarter's yield of Jiangjin: RMB1,200 the land if the occupation takes not yet a quarter. RMB1,500/mu for fish pond Beibei: RMB1100/mu County (including land price): Owners * The owners will receive house compensation at the Tongliang Urban RMB400Im2 for brick+concrete structure houses, residential replacement price. 2 land RMB350/m for brick+wood structure houses; houses * After receiving the house compensation (including . price), the resettled persons may choose to be resettled Telephone line: RMB158/household; in different ways at their own option. These arrangements Cable TV: RMB310/household; 00/household; include purchasing cheap uniformly built resettlement Water and power facilities: RMB1 houses, purchasing commercial houses or second-hand Movement allowance: RMB400/household; RMB300/person houses and renting cheap-rent houses provided by the Movement transition allowance: government. Bounty: RMB400/household land price): * The resettled person may choose to buy resettlement Dazu County (including 2 structure houses, houses provided by the govemment at a reduced price. RMB341/m for brick+concrete 2 houses and They may buy such houses at the price equivalent to the RMB310/m for brick+wood structure 2 houses; compensation and at the space standard of 17-18 m2 per RMB276/m for simple structure person. For limitation of design, the excessive space is to Telephone line: RMBBO/household; be purchased at a rate 50% as much as the construction Cable TV: RMB120/household; cost if it is not more than 5m2 and if the space is in excess Water and power facilities: RMB100/household; of 5M2 but less than the space of the former house Movement allowance: RMB400/household; RMB300/person; demolished, it is may be purchased at the combination Movement transition allowance: price (construction cost plus land price). Any part Bounty: RMB400/household price): exceeding the space of the former house demolished is to Wulong County (including land 2 structure houses; be purchased at the price of commercial houses. At the RMB450/m for brick+concrete same time, the demolisher is responsible for smoothing the Telephone line: RMB158/household; ground and providing water and power supplies to the affected Cable TV: RMB300/household; households. Water and power facilities: RMB100/household families who are not willing to purchase houses Movement allowance: RMB250/household; * For RMB300/person; provided at a preferential price or built their own houses Movement transition allowance: on sites provided free, they might use the compensation Bounty: RMB400/household; money received to purchase commercial apartments in Allowance for rent: RMB300/month the city. If the resettled persons choose to get monetary purchase commercial houses, they compensation and 2 may buy them at the space rate of 17-18m and will be exempted from all taxes involved in purchasing houses. * Those who are unable to purchase commercial houses or resettlement houses after receiving the compensation will be provided with cheap-rent houses by the government. * The owner will receive compensation for loss of attachments to the house. * The resettled persons who choose to rent houses should be provided with information about the availability of rental houses and assisted in finding houses suiting their needs and should be paid allowance for movement during resettlement. * Receive transition and resettlement allowances. * The resettled persons will be exempted from any tax and fees during the rehabilitation period. * The demolisher should assist the resettled persons in securing formalities for transferring their residence certificates and changing schools for their children. * Illegal buildings and temporary structures not demolished in time shall be compensated for at the displacement price.

PAGE 186 SOGREAH CONSULTANTS-23500321 .R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Rate of compensation Type of Affected person Policy impact Afce esnPlc RMB220/m2 for brick+concrete structure houses, the replacement price. 2 and residential the resettled RMB206/m for brick+wood structure houses, * After receiving the house compensation, 2 houses houses or RMB55/m for simple structure houses: land price: persons may choose to build their own 2 houses or second-hand houses. In RMB180/m ; purchase resettlement RMB158/household; case, the resettlement agency shall pay Telephone line: the former 0/household; to the owner of the house demolished and Cable TV: RMB31 compensation and power facilities: RMB1 00/household; same time provide him free of charge with a house Water at the allowance: RMB400/household, latter two cases, the resettlement agency shall Movement site. In the transition allowance: RMB300/person; the affected household compensation not only for the Movement pay Bounty money: RMB400/household house demolished but also the house site taken. local Dazu County: * For those who choose to build their own houses, the sites at RMB226/m2 for brick+concrete structure houses, government shall provide free of charge house 2 2 is RMB205/m for brick+wood structure houses and the space rate of 30m per person. The demolisher 2 RMB70/m for simple structure houses; land price: responsible for smoothing the ground and providing water RMB115/m2; and power supplies to the affected households. The Telephone line: RMB80/household; resettled persons may choose to build multi-story houses Cable TV: RMB120/household; with the ground floor used as a shop for business. It is Water and power facilities: RMB100/household; known through survey that the resettled persons can Movement allowance: RMB400/household; perfectly build houses of the same area as their former Movement transition allowance: RMB300/person; houses in the resettlement area with the compensation Bounty: RMB400/household/household money received. District: person may choose to buy resettlement Changshou * The resettled 2 brick+concrete structure houses, by the govemment at a reduced price. RMB215/m for houses provided for brick+wood structure houses, buy such houses at the price equivalent to the RMB19o/m2 They may simple structure houses; land price: and at the space standard of 17-18 m2 per RMB50/m 2for compensation 2; For limitation of design, the excessive space is to RMB300/m person. line: RMB83/household; purchased at a rate 50% as much as the construction Telephone be 2 RMB500/household; is not more than 5m and if the space is in excess Cable TV: cost if it power facilities: RMB100/household 2 but less than the space of the former house Water and of 5m allowance: RMB400/household; demolished, it is may be purchased at the combination Movement Movement transition allowance: RMB300/person; price (construction cost plus land price). Any part Bounty: RMB400/household exceeding the space of the former house demolished is to At the Bishan County: be purchased at the price of commercial houses. 2 the RMB270/m for brck+concrete structure houses, same time, the demolisher is responsible for smoothing 2 affected RMB220/m for brick+wood structure houses, ground and providing water and power supplies to the 2 2 RMB300/m for land, and RMB150/m for simple households. structure houses; For families who are not willing to purchase houses * Telephone line: RMB158/household; provided at a preferential price or built their own houses free, they might use the compensation Cable TV: RMB600/household; on sites provided facilities: RMB100/household to purchase commercial apartments in Water and power money received allowance: RMB400/household; resettled persons choose to get monetary Movement the city. If the allowance: RMB300/person and purchase commercial houses, they will movement transition compensation RMB400/household be exempted from all taxes involved in purchasing bounty: Wulong County: houses. 2 houses or RMB270/m for brick+concrete structure houses * Those who are unable to purchase commercial 2 will and RMB180/m for earth+wood structure houses, resettlement houses after receiving the compensation 2 and RMB150/m for land; be provided with cheap-rent houses by the government. Telephone line: RMB158/household; The owner will receive compensation for loss of * Cable TV: RMB300/household; attachments to the house. Water and power facilities: RMB100/household The resettled persons who choose to rent houses should * Movement allowance: RMB250/household; be provided with information about the availability of movement transition allowance: RMB300/person, rental houses and assisted in finding houses suiting their bounty: RMB400/household needs and should be paid allowance for movement during resettlement. * Receive transition and resettlement allowances. and * The resettled persons will be exempted from any tax fees during the rehabilitation period. in * The demolisher should assist the resettled persons securing formalities for transferring their residence certificates and changing schools for their children. * Illecal buildinos and temoorarv structures not demolished

PAGE 187 SOGREAH CO14SULIANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Rate of compensation Type of Affected person Policy impact 0 Illegal buildings and temporary structures not demolished in time shall be compensated for at the displacement price. the price of a Tongliang County: Enterprses Owners * Receive house compensation at the rate of 2 the monetary RMB220/m for brick+concrete structure houses, and displacement house. After receiving 2 RMB206/m for brick+wood structure houses and institutions compensation, the affected enterprises and institutions rebuild them 55/m 2 for simple structure houses; may choose not to rebuild the houses or to 2 site provided by the govemment free of charge. Land price: RMB15/m ; on the RMB50,000 for the * Receive compensation for facilities, financial subsidy and Compensation for facilities: fish breeding centre and RMB1,000 for each shop; movement allowance. 2 exempted Financial subsidy: RMB160/m and movement * The affected enterprises and institutions are 2 from any tax during resettlement and rehabilitation. allowance: RMB16/m Dazu County: RMB226/m for brick+concrete structure houses, affected RMB205/M2 for brick+wood structure houses * The nghts and interests of workers in the 2 enterprses and institutions should not be affected dunrng Land price: RMB1 15/M Cable TV: resettlement, including salaries, medical care and social Telephone line: RMB80/household; security, dividend and bounty, etc. RMB120/household enterprises and institutions will Compensation for facilities: RMB1,928/household; * Workers in the affected move9/ent not lose their jobs due to resettlement. financial subsidyl RMB160/M2; mvmn * Illegal buildings and temporary structures not demolished finoancial suBsid: m B1'm; in time shall be compensated for at the displacement alloanCe: ~~~~~~~~~~BishanCounty:2 structure houses, price. phce. RMB380/m for brick+concrete RMB330/m2 for brick+wood structure houses and RMB150/m2 for simple structure houses; 2 Land price: RMB600/m ; Compensation for facilities: RMB10,000/enterprise; 2 Financial subsidy: RMB120/M ; 2 Movement allowance: RMB15/m Wulong County: RMB250/m2 for brick+concrete structure houses, RMB200/M2 for brick+wood structure houses; land price: RMB150/m2; Telephone line: RMB158/household; Cable TV: RMB300/household; for facilities: RMB50,000; Compensation 2 Financial subsidy: RMB120/M and movement allowance: RMB15/M2 in Bishan County: * Receive compensation for acquired land at the rated of Binan River Project replacement price. RMB200,000/mu Wulong: RMB100,000/mu Changshou: RMB200,000/mu The shop owners, upon receiving the house Tongliang County: Shops Owners * 2 structure houses, compensation at the price of replacement houses, may RMB220/m for brick+concrete 2 houses and choose to build shops themselves or purchase shops.. RMB206/m for brick+wood structure 2 houses; * Receive compensation for loss of rent at the rate of rents RMB55/m for simple structure of similar shops in the same location and time of Telephone line: RMB158/household; compensation is dependent on the actual impact. Cable TV: RMB310/household; Compensation for facilities: RMB50,000/unit * Receive facility compensation, financial subsidy and 2 subsidy: RMB160/m ; movement allowance. Financial 2 * The shop owners are exempted from any tax during Movement allowance: RMB16/m resettlement and rehabilitation. Dazu County: RMB1 980/M2 for brick+concrete structure houses, 2 for brick+wood structure houses RMB1,780/M structure houses The rights and interests of employees in the affected and RMB1,280/M2 for simple * Cable TV: shops should not be affected during resettlement, Telephone line: RMB801household; including salaries, medical- care and social security, RMB120/household; Compensation for facilities: RMB1,928/household; dividend and bounty, etc. 2 * Employees in the affected shops will not lose their jobs Financial subsidy: RMB120/m

PAGE 188 SOGREAH CONSULTANTS-23500321.R4 -AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Rate of compensation Affected person Policy Type of 2 impact Movement allowance: RMB16/m due to resettlement. County: and temporary structures not demolished Wulong . Illegal buildings Each shop will receive a mount of RMB2C shall be compensated for at the displacement in time 000/year in compensation for loss of rent. price. Telephone line: RMB158/household; Cable TV: RMB300/household Wulong County: RMB2,000/household of shops will be resettled in the following two 2 Tenants * Tenants Wulong County: RMB151m ways: (1) the demolisher provides them with houses including shops of the same lever of rent in the same the location to help them find the place of business; (2) of demolisher compensates the shop tenants for loss income (including the employees' salary) due to the of discontinuation of operation during the period temporary impact. * Receive movement allowance. described above, the vulnerable Vulnerable Owners * Except the policies groups shall enjoy the following preferential policies. groups and According to their desire, the land compensation fees * Civil sum of compensation may either be given to Bureau of County or county (village) rest Administration or home or their children, then the Administration Bureau looking rest home or their children will be responsible for after them in their old age. by the * For the vulnerable group people affected demolished house, those who are difficult in residence, for some mode of assistance shall be provided to them, same instance the supply of cheap-rent house. At the family time, training will be delivered to labour force in the various of such vulnerable group people. Information on will be opportunities for job and guidance in this regard more provided to them, thus enabling them to have opportunities for finding a job. build house * For the vulnerable group people who will the resettlement executor shall help them themselves, of during the house building. Meanwhile, training free of agricultural technique will delivered to their children charge so as to help them in developing agricultural to increase income from agriculture. production by For the family of such vulnerable group people affected * them temporary land acquisition, priority shall be given to for restoring their land. to During the project construction, priority shall be given * them children of such vulnerable group family in recruiting to do some job with low technical requirement. at the replacement price. Infrastructure Owner * Receive full compensation and ground attachments

PAGE 189 2004 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST I APPENDIX 1 I LIST OF PROJECT IMPACTS I~~~~ ~~~~~~~~~~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ of land I Impact caused b)ypermanent acquisition Affected po n6ttroo Table Rtitrl land RiversOtde Otder r I o,r Total Fnranlart Gaden Fish pond Rirseryrsh amilie Rir I..at Village Group Subtotal Fotestlaird garden tShallowsWPtln Cor-rynctylCt Coropotet __tnshltp ti S/NProject 127 _ 62 248 9 022__ 12 66.12 42 02 23 Yandu 66 24 96 2R 5_____ 29.84 24.6 5 24 4 IS Laudcang 29.84 ______Flood-peveanting Bachua 3 33 3.33 66 Yueyang 3.33 47 188 218______in enrttatikment 31.56 18 98 ______Protject 5054 50.54 18 ______land Tiy5rie 2.52 I 83 2 48 Tongliang ~~53~~~6 6 53 1 27 98 0lrghliag Enterperse land 48 34 3 35 33.5 t 5 27 Bacnchrar Yueyang 8 3 3 15 82 sageme1plant 89 29.95 29 95 23,8 61 118 planl Bachilall Yutyan Servagetreatment 56 76 56 76 56.76 _ Mlirgguang I 19_ Sersagetreatment plant -Longshur _664 _1965 164 125 __ 41 23443 13 12.5 12 5 ______.Xingganng Is 18 18- 11 DtGaza Yangyt I 35 35 rc R .takimr,mn LInsu 3 35 tO 7 mt,ty Daza ~~~~~~~~~~Lorrgdong _ 3 Rrverhank ______4 3.1 3 1 3.1 168 118 ______~Yajian 35 ______1134 ______42 12 50 113.4 113.4 0 Duzotrot Yni,___ 38 34.38 17 Xrglrua 34.38 34 24 .______D l 0 8 ______6 1337 12.9 __ 1 Hunolrrua 137 - - 6 12 _ _ - 23 16 8.1 81 __ _ 6 aping 8 1 Fergcreng itQ~~~~~~~~~~~Mdo 1 i hlangihu Changshou IraripSIron .angsoa 14 5 145 0 Enterprise or 5 0_45 _ 41 66 insttutinon larrd I14_I 41 66 0 30 6 State-orsoed land L6 6 3 ___ 40 116 3 6 1 6.1 42571. Ocheng Hoangitao 217 217 21.7 sttpply platcergtanrtete 2 64 "ale, 4pntBishan Pln 0 86 _ 6 921 9 21 8 35 pump Bichenon Wuli 15 329 27 _ hlta PacrSmt7ng 1 320.7 tntr 27 89 35 120 85 f ~~~~~~~~~~~~~~~statilGuanyrn 33 29 33.29 12 __ 492 __ _ tO09 76 5(14 50 4 _ 27 Hunalong _ 03 72 29.1 815.6 48 172 M2 29 1 ______Shibna _ 0.5 __ 88 5 88.5 88 ______22 90 68 Rictretre Xrrtta 1.5 62.5 61 12 50s2 62 5 _ .angyu _ 74 5 Bslharn 30 30 30 35 120 Ountarg 1 5 _ 82 43.82 42.32 Wuli 43 ______3 17 _ _ _ _ .r9 17 0 __ _ _ 160 27 larid ______Enterprise = 182 160 265 0 = 61 201 Sltate-Orntcdland " ______564 564 56 4 1 20 66 58 Zongdur 1 ______262 2682262 ______27 93 85 6nn mI1\ul 2622 3 38 7 6 Zttoagrise land5 383 38 2 t4 5roxemcnt495te-oulle 95 lal4 95 12 2 2 m z 195 1795 1.95 l Xrangkorr ______W 21 lodr-pui,icron 66 17 IS ______33 ___ 23 36 2 2825 8.25 8.25 _ ___ enlartiroertnt Don_Y__6 Baryaong 18.75 18375 49 42 Proeict to WI&ng ~ ~~~~~~318275 16 6 1c,ig Count) 58 23.58 23.58 ______5 23 I27 ______0 d1.27 18633 __t erprs la 21 laird 1863 0 8 8 26 ______DSle_ontred 86 82 8 8 ______30 Z_rongdai I _ __ _ _ 3 __ Rie______C_hmtgt 2 12 12 9 I I 28 4 mnrnt ______rrrr~~~1npo%ro 2.55 ______2 2.55 2.55 __4__49____ pumpIatluo 3.16 37 8 Ptessunzing I 3 16 3.16 _ __ I op Struanglo Taping __ _ _ ~ rssroa 365 0 65 __ _ _3 p ~~ ~ tto I 365 3 12 4 Protecti ______onlrn 7 I J,..ianogjn __ 3 High,,levionwate Luopan 6s 1 3 Jangto, ettv ltr-leatnk rstt Shuangfun 12 45 21 178 Jingtan Wumauzu 178 17.8 WVntr-purifrcation planit Dongyang w~ater I 2.12 8 Projectin He~ High-elevation Tangkan 2.1 2 tank Dongyang Dongyang 8 eiltei Distract ebe 3 3 0 picup Dongyang ltateoned 44643 890 31472 1), Water source 188 II 1046 I~503775 11493I1 1049847154 15 13 Table 2 Impact caused by temporary taking of land Affected population Land temporarily taken Rural/Urbanl Fish pond ser ga Other Families Persons Village Total Fa rmland Paddy Field Dry field Pro ject County/C ity Component township S/Nx y g2 4 Ludong 2.94 2.94 Y r__ 10 37 12.27 12 27 Flood-prevention 13achuan Yandu 3 II1 5.45 ______project Tiyujie 5 45 I I Project in Tongliang Dongfang 0.31 031 'Tongliang __ 16 2 1County 16 2 _ Enterprise land _ I 2 Yueyang 0 63 0 63 Sewage treatment Bachuan ______I_ I__ la ______7 ______p nit _ _3 5 __ _ _ _ 5 Minguang 17 4.5 _ __4 Xingguang 4 5 ______Project In Dazu Riverbank 10 41 4.5 _ 4.5 Daz Rimprvmankt Logslsui Yongyi 9 2 Prouectvi 8 ~~Longdong____2 ~~~~~~~~~ ~~~8 13 County improvement 5 6 2 ______Yujian ____5 6 ___ .______14 50 27 17 27 17 . _ Duzhou 2 I I _____I Duzhou l-ongmiao 12 43 .-Duzou Benigiao23.38 23.38 4_4 16 68 _ _ FXinghua 8.68 8 3 Projeci in Chingshou C 18 ______I 18 1 14 45 District '~~~"Kejiaping 32 19 32 1 Feigclheng Baiyang 19 8 23 Huangjin______3 77 3.77 10 32 land 10 32 State-orvioed 0.4 17 65 Bich Chuanxin 31 1 30 7 stipply project B.I Water supply =_= 6 21 4 Water 9 63 9.63 = pipeline Huangjiao 2 in Bishan Counity ______11 2.11 _ _ Guanyin 2 2 5 3 51 _ Hualong 3 51 4 13 33 4 33 _ Shibao 4 3 9 Blinao River 6.32 _ _ Bichenig Xinta 6.32 2 5 5 Iinpiovemneit project Bishan 4.46 . Yangyu 4 46 2 IIIsaii 2 14 2.14 _ _ Outang 2 5 313 313 _ Wuli 6 19 Zhongduiba 6 6 8 4 _____2 Flood-preventin~~~~~' Huanigjin 4 = = 7 20 Baiyang 7 7 Wtilolig embankment Xiangkou 6 Prolect Iin Wuilong ei_bakmen 13 Counts State-o wned 13 _ land ______6 3 69 2 Hailuo 3 69 3 2 45 I Taping 2.45 ______4.61 4 18 14.71 1.95 7295 0.2 Gaohu 4 17 0.2 67 5.5 3 _ Changling 15 4 12 4 2 1.9 0.2 3 Dayan 8 1 ___ supply 9 38 Project in Jisngiin .. Water 4.48 1 15.52 4.85 Shuangfu Tubao 24.85 0.5 10 95 5 19 City Jiangli, pipeline netwvork 16 . _ 4.55 7 Huanmuyuan 2 I 3 Sanhe 2 5 0.6 0.5 2 Poshi 4.8 3 7 0.3 1 7 26 Guanghua 5.67 5.37 1.12 2 6 _____ 1.72 1.2 ______Zhongdu 4 04 1 ~~ ~ ~ ~ ~ ______Dongyang 5 14 Project in Bibei Water pipeline I 4 41 _ construction 8 District 7.4 37.1 46.57 190 665 366.76 189.43 20.05 66.21 Total to be affected 3 Houses and attachlments of rural residents Table 2 Attachimienit to house Floor s ace of house (i ) Tap B+C B+W E+W Simple Componlent Families Persons Telephoe CableTV water S/N Project structure stucture structure structure 5 6 6 31 492.7 409.53 83.17 Flood-preveting 409_53 _83_7 __6 Project in Tobigling emilbaikment 31 .24 2 7 7 26 1221.37 699.22 490.91 Counity Sewage treatment plant 3 3 3 8 180 180 Sewage treatmenit plant 3 16 16 16 2 Project in DaZL County 660.86 469.24 53.5 improvement 16 54 1183.6 2___Project in Dazu Couli Riverbank 303.52 56 56 56 189 7941.94 4290.44 3347.98 Project3 in Chaugshlou 1 District 30 447.9 541.24 1550 17 Biiaii River 30 100 4193.49 1654.35 4 i nt rojet iiiproveileiit projiectII 280 3 3 9 790 510 Flood-preveting 3 Project inlWulonlg embanikmiient 1 3 280 280 County Chanigtu River 3 2 improvem ent 122 19 ______821.24 1938.26 103 420 1 6283.1 8684.4 4839.2 Grand total 122 to be affected Table 4 Houses and attachments of urban residents 2 Floor space of house (in ) Attachment to house Component Families Persons S/N Project Cable TV Natural gas Tap water Total truB+C B+W Simple- Telephone structure structure structure 249.17 5 5 plant 5 26 563.79 314.62 I Project in Tongliang Sewage treatment . County 1494.63 50 50 50 50 60 298 10345.09 3389.74 5460.72 2 Project in Dazu County ivement 1 6 380 380 in Wulong Flood-preventing Project I I I_I County embankment 56 ,50 50 11288.88 4084.36 5709.89 1494.63 56 Grand total 66 330 Table 5 Affected enterprises

Total floor space of house (112) Attaciliielit to hose Affecred of enterprise Severity of impact elephone Cable rv Project Component StN Name person s Total Btmc B +W E+W Siiple strllctrue structure structutre structure

Ocupying 2.52 mu of familand and 1.83 mu of forest, 2.18 mu of fish pond being left unused (not good for Center use for poor quality of water), Project in Flood-preventinigFil Breeding r accountiig for 10% of total area Tongliang Comtm' e1i nhanlcknentI owned; 3 guard houses to be demolished (hut not be rebuilt as there 177. 3 177. 3 are additional guard houses) 41 17 580. 86 580. 86 Grease ReFinery To be demolished PIroject in Dazu Riverbank 2 85 1286. 3 126. 5 1 1 Factory To be demolished 21 1412. County improvenilerit 3 Post & Telecom Equipimient 1.4 mu of land to be permanently causing no impact 4 Shizitan Power Plant acquisitioned only, to the operation of tie enterprise 0 0 3.5 mu to be pennanenitly acquisitioned P'roject in Companiy only, causing n1o impact to the Changshou 5 Guangrun operation of the compauny 0 0 District 9.6 mu to be permanently acquisitioned to the 6 Yufa Companiy only, causilng no impact operation of the compayl)l 0 0 l______1 completely 10 600 6()01600 7 Xinma Concrete Slab Pre-castinig Yard To be demolished I0g 1 Mill Workshops to be demolished includi 700 700 _____1 R Bishani Cotton pumnp houise .1 0 0 Fuji Maciniiiery Plant Part of enclosure wall around pumnp 9 (hongqing 68 68 ____ liouse to be demiolishied 1 Binan Riser Coman" Timber market to be demolishied as it is improvement 10 _islian Fariiw Supplies 25 1500 1 0 p a temporary buildiig 3 1525 10Bsa angupesC 220 1 1 completely 16 681 461 l Concrete Slab Pee-castinig Plant To be demolishied 0 Part of enclosure wall and warehouse 1 1 0 372 ___ 372 12 Datonig Machiniery, Planti to be demiolishied 2 Concrete Slab Pre-casting Yard of 400m of space to be acquisitioned, on the operation o 13 Puiblic Facility Conipany causing no impact _ 380 1 _ the pre-casting yard 0 380 450m2 of houses and space to be

demnolished and acquisitioned arid Projct'Atoli i Flod-pevening 14 Material Recycling Company operation to be discontinued at tinie oF Project in \A'ul(ig Flood-preventitig 14 Material Recycling 305 2 I relocation 8 305 Coulntv embanckmenit Temporary houses built as workers' dormitory in production season and to danugerous, 15 Tobacco Re-drying Plant be demolished as being causing no impact to the operation o 20 1360 1 1360 1_lll t he plant - l ______l ______l______')"')O011 ' r.i I"O 0 Table 6 Affect institutions to hose Affected Total floor space of house (nin) Attachment Simple of impact persons B±C B+W Component S/N Name of enterprise Severity Project TV Total structrue structure structure Telephone Cable Part of offices to be demolished Bachuan Townshiip and relocated, causing no ~~~~~~~~~~~~048. 20 48. 2 Project in Tongliang Flood-preventing -1 1 ~ ~ impact on office work as there County embankment Enterprises Office are other premises Multi-functional building 00 4500 4 . 2 Chongqing Shuren (including classrooms and 70 4500. dormitory) to be relocated Binai River College project BsatPbi 0 0 improvemlenit newv office building 0 90. 00 90 _____ rojishWelfare Bureau Not in the 4 4 70 4638.2 4590 48.2 0 Grand total I able 7 Allecletl sh1ops Area of lhouscs to he dermolishied (III- Ara B+ Simple Owner Severity of impact Afpected S/N Description Location people Ttl B+C B+W Siniple Project C(onpolleut Totlal structure structrue structure

completely 3 165. 55 165. 55 Yicunn Villal Dong WeiqUn to be demolished I icycle repair sho ishe, Ludong 8 203. 56 26. 21 Project in Flood-prevetitig to be demolisihed completely 1 229. store Sishe, Yanducun Village Liu Wenqing VIolgliang County emibankment 2 Grocery 63 12. 63 be demolishied completely 8 42. #57 Wujin Street Yao Shangihai to 3 Small shop 35. 91 35. 91 to be demolishied completely 5 #49 Wujin Street Yan Liizliong 4 Small shop 3 32. 12 32. 12 Luo Fangneng to be demolishied compictely Small shop #43 Wujin Street 5 5 15. 51 15. 51 Ruixianig to be demolishied completel) Small shop Wujih Street Chen 6 5 11. 73 14. 73 Zhou Liangrong to be demolished completely 7 Small shop #139 Chaoyang Street completely 4 32. 65 32. 65 Chaoyang Street She Wehilm to be demolishied 8 Small shop #141 68. 76 be demolished completelf 5 68. 76 #143 Chaoyanig Street Ott Zhimbig to 9 Small shop 6 41. 01 11.01 Street Xe Dean to be demolishied comilpletel! 10 Smliall shop #145 Chaoyaug 16. 69 36. 67 be demolished completel) 5 83. 36 #147 Chaoyanig Street Luo Xiaofang to 11 Small shop 27 38 27 to be demolished completel) 1 38. shop #149 Chaoyarig Street Guo Linjiu 12 Small 4 74. 76 11 31 30. 45 Chen Xingyong to be detsiolisihed completely 13 Smsall shop #151 Chaoyang Street completely 5 71. 36 71. 36 Chaoyang Street Xe Junilua to be demolished 14 Small shop #153-1 18. 81 demolished completel '1 48. 84 #155 Cliaoyaig Street Luo Ruixi tobe 15 Small shop 92 73. 92 to be demolished completelk 7 73. siop #153 Cliaoyang Street Tang Chengguan 16 Smiall 5 32. 67 32. 67 Ma Li to be demolished completely Small shop Chaoyang Streetl 55-1# 17 1 .19 81 19. 81 lang Guanihi to be demolished compltelt 18 Small shop. #I Wujii Street completel) 5 27. 62 27. 62 Street TIang Guangui to be demolished Rliverhanik 19 Small shop #1 Wujini 35. 57 I roect in Da7u to be demolishied completcly 4 35. 57 Small shop #9 Wujin Street Yin Guolin (County inproivemnent 20 13. 3 13. 3 Shijin to be demolished completely 3 Small shop #11 Wuijin Street Yang 21 7 83. 31 83. 31 Guowen to be demolishied coilplctelN Small shop #15 aid #17 Wnjin Street Cheni 22 1 36. 26 lh. 26 Gu Mingzlsong to be demolishied conpletcl! 23 Small shop #23 Wujin Street 93. 81 to be demolished conipletel 5 93. 81 slop #25 Wujini Street Gu Ziyii 24 Small 6 32. 01 32. 01 Fangguan to be demnolislsed cornpletelk Small shop #47-1 Wujin Strect Zhao 25 8 61. 95 61. 95 Chel Ruixianig to be demolisihed completeI 26 Small shop #51 Wujin Street 89. 91 to be demolishied completely 5 89. 91 shop #115 Chaoyanig Street Cheln Dailin 27 Small 1 78. 7 78 7 Chen Bing to be deniolisihed corispletelk 28 Small shop #117 Chlaoyang Street 40. 26 completely 40. 26 #121 Chaoyang Street Zhatig Xuemne to be detiiolislsed 29 Small shop 73 36. 73 to be demiiolished comilpletel) 5 36. shop #123 Cbaoyatig Street PatnNenglsua 30 Small 85. 25 85. 25 Guoan to be demolished completel! I Small shsop #125 Clhaoyang Street Dai 31 3 39. 6 39. 6 Zliou Xiaodong to be demolished completely 32 Small shop 1#27 Chaoyang Street 35. 6 demolished completely 5 35. 6 #129 Chaoyanig Street Petig Hlongzhlu to be 33 Small shiop 4 50. 05 50. 05 Wang Shuzlionig to be demolished completely 34 Small shop #131 Chaoyanig Street 56. 72 densolished completel) 5 56. 72 Chaoyanig Street Zlsou Xiangqinig to be 35 Small shop #133 93. 64 93. 64 llu Xihua to be demolishied completely 4 36 Small siop Cltaoyaig Streetl37# 6 Luoyingshan to be discontinued during coi 37 Luoyingshan Baisunxi Coalnmmie Coall"tne Project in Wulong Flood-preventig Maritime affairs 6 embankment Maritime affairs office to be discontitnued during co County 38 office Baisilixi 180 2142.01 971. 71 608. 38 558. 92 Grand total T1able 8 Affected Persons Project in Jiangjin City Project in BibiDitrcBeibei District Water supply project in Bishan r Project inn Wulonguln CountCuny PrjetinJinli CtyPojcti Project in Togliang Project- Countyin Dazu County Project in County project~ ~roet Project In __ PI peie Water- High- Water Totat Water Flood- Chagtu Rive Prsuiig High. PI Ftood- Sewage Sessage Riverbank- Changshou Wae rsuiig lvto puiicto eeairin pickup Pipetine District Supt prvnigmpm Component preventing treatment tramnt station water tank plant iwatertask source pump station pipeline embankment imprv embankment plant plant imprvment plant 2 _90 162 38 36 3 12 7:1 69 46 22 194 I louseholds affected 35 1:17 61 45 5 1142 700 492 112 114 12 146 .547 118 :164 277 146 64 land Persons affected :1 141i 441 1013 15 4 21 1: 25.5 194 45 9 483 acquisition Persons rerettled bv 82 22h 82 productionI 5 1511 15 410 54 2:1 I5 _ _ _ Tenpodrary Hlouseholds affected I I 21 ______14 66. laind__ 47 153. 87 182 _ 86 41 occupationt Persolns affected 2 5:i Demolition 66

titl 0 _ _ _ of urban Households affected 5 ______30_:1:81 residential _ _ _ _ 6 ___ 248 0 lhouses Persons affected 26 122 Demiolition Mtt 3 7 6f 3 Iti 56 ofrural Households affected ______42t) residential 9 3 i 189 _ loo houses Persons affected 26 :II 8 I5 2 3 6 3 Rtelocation Hlouseliolds affected () ______I 18 of__ 0 .11 28 Persons affected 0 4 I :18 .1 enterprises 2 1ouseliolds afTected 0 Relocation 70 _7tt Lnstuutions IPersons affected () 1) 0 22 Households affected 0t 2 34 18tt Dciolitiorn . 12 0 -t I64 0 oftshops Persoois affected :16 3 41( 12 2 (t 5 12(i8 46 22 23 2:39 181 39 alfected 48 15' 64 1701 179 0O 5ti Ilouseholds 5 0 It 0 (' .t6 3 0 () 0 8 49 15 Units affected 0 4 0 114 12 153 45 5 ( 14 146 64 86 9412 594 115 2011 n76 126 I )()5 648 t; l Total Persons affected 15 4 () 21 :I o 0 45 u 0 48t 441 1():1 resettled by 82 226 82 255 194 Persons ______prod uiction ______affected 122 Households :1() 3 1 bN both land 7 i 3 16 56 acquisition anid _ Of ihich house denrolition 42't Persons alTected by 3 189 9 both land acquisition 26 :11 8 54 and house demolition 2 ( 5 11 46 Fotal of 178 3R 36 3 40 12 154 123 46 22 23 209 households Households affected 41 1.53 61 and people 0 14 4525 actually ______585 112 114 12 153 45 5 951 459 146 64 86 842 affected Persons affected 174 645 118

1 5* . 17 45 1814 Table 9 Vulnerable group affected by the project

Family including Family consisting Family consiting of old Total handicapped person mainly of women people living alone S/N Project Component Impoverished family Person Family Per-son Family Person Family Person Family Person Family

Project in _ 3 Tongliang County 3 3 Sewage treatment 3 3 2 Project in Dazu plant County Riverbank 3 9 6 13 26 99 improvement 15 75 2 2 1 2 4 3 5 3 Project in I Changshou District 2 :3 2 :3 4 Bishani Water Qiancengyan water plant Supply Project 5 5 3 3 2 2 5 Binan River Project Flood-preventmng 11 11 2 2 4 4 5 5 6 Fl lProject Embanket Pressurizing 2 2 2 ______2 Proeci Jingin station

Projc 7Citn Water delivery CitY and distribution 2 2 2 2 ______pipelines 13 17 27 57 133 Tlotal 15 75 18 18 7 Table 10 Ground attachments and public facilities to be affected Project in Binan River Project in Wulong County Project in Jiangjin City Project in Beibei District Du County WateriCanshou supply project in improvemcnt ______County County __u_tyBisan_ ot__ t project______County Dazu total lienli Unit Flood- Chagtu g Water Water High- Water Flood- Water bk Qiancengyan Water supply R pverre p ation p ipe ne pun ficaton elevation pickup Riveampnm water plnant piWpelisne poreventing poreventing platment n unpsainnetwork plant water tank source embankment plant Ipoenn ae ln ieieeiaketimproe

High- voltage 1.55 4 . 9.55 power I ine KM 4 .

Low- 3.07 1.05 2 power line KM 0.02 Telephone optical 330 ______330 cable M Cell phione I I relay towe Piece Water

supply _ 230 230 pipeline M

Pumip 6 3 station Piece 3 200 60 260 Water pipe M 800 1970 Power wire M 1170

8 4 31 1 3 Power pole Piece _ 6 12

Natural gas 352 232 _ pipeline M 120 .

1024 17 360 35 Bamboo Piece 112 500

553 1500 65 790 5 3897 Fruit tree Piece 984

40 80 3729 94 754 2000 . copse Piece 260 501

Young fruit 1484 288 tree Piece _ 820 376

. 1100 Young tree Piece. 1100

Mulberry 1700 5878 14 2777 . tree Piece 440 947 in WaeBupypoet Iiniaf River Project in Jiangjiii City Project in Beibei District ProjectinTongiang Prject in Project sup pprovementnty isan Project in Wulong County Tongliang Projetounl Changshou ______Project in ishaii County project ______County' Dazu CouityCoun ty total High - Water Changtu Pressurizing Water Water Itemn Uniit Watersupply Flood- Flood- Water Riverbank Qiancengyan Rivero limp station pipeline putriPcation elevation pickurp water planWt pipeline poreventing nietwsork plant scater tanik souirceI poreventing treatment inprivebnent ieieebnnet iissprovenment emibankmn lt plant Impoeetwtrpat lluangjue 13 13 tree Piece Cetitury- 1I old tree Piece Air dryinig - 3446 2 1383 1738 ground M 325 64 39 5 1 Well Piece 9 346.2 260 74.2 \Vater tank M' 12 = 75.4 2 49.4 Toilet M 26 219 42 toilet M2 177 Enclosure 2760 1725 wall M2 1035 109.7 47.7 24 38 WVaste pit M3 95 81 14 Grave Piece _ 4946 4846 90 10 Groutid M 2 227 Embankmle 36 180 II nt M I Stonie- 2 _ _3892 paved road M 3892 3 3 Wharf Piece 0.95 = 2.68 1.73 Road KM 60 2762 452 1750 500 trail M 3 Small 3 bridge Piece

CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

APPENDIX 2 STANDARDS OF COMPENSATION FOR LAND ACQUISITION AND RESETTLEMENT INTHE AFFECTED DISTRICTS, COUNTIES AND CITIES

1. Tongliang County

Rate of compensation for land acquisition and resettlement and Per- Average annual yield Sum total of land and Sum total of land inpast 3 Multiple of Multiple of reseTtlement resettlement capita of farmland per mu space of years (RMB/mu) land resettlement Total compensations per compensations of farmla d (RMB) farmland Bcu compensation compensation multiple persona (RMB) Other (mu) Bachuan Other pensation Bachuan Other Bachuan Township townships (mu Township townships Township townships <16000 <14660 >1.0 1200 1100 8 5.33 13.33 16000 14660 16000 14660 1.0 1200 1100 8 5.33 13.33 16000 14660 17400 15950 0.9 1200 1100 8 6.5 14.5 15660 14360 19200 17600 0.8 1200 1100 8 8 16 15360 14080 21600 19800 0.7 1200 1100 8 10 18 15120 13860 25080 22990 0.6 1200 1100 8 12.9 20.9 15050 13800 ¢30000 127500 •0.5 1200 1100 8 17 25 15000 13750

method if the The land and resettlement compensations are calculated by the interpolation Note: farmland is space of farmland is in between data listed. If the per-capita space of per-capita for each status- less than 0.5mu, the sum total of land and resettlement compensations Bachuan Township changed person is calculated as: RMB15, 000 if less than RMB15, 000 in and RMB1 3, 750 if Less than RMB1 3, 750 in other townships.

PAGE 1 SOGREAH CONSULTANTS- 23500321 R4 -AUGUST 2004 I

.. I

ii i i

i CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Standard compensation for crops Unit: RMB/mu Standard Type of crop Bachuan Township Other townships

Vegetable 1000-1300 900-1200 (including com ercial crops) From planting to head- 600-800 500-700 Paddy rice sprouting Grain From head-sprouting to 800-1000 700-900 harvesting Wheat, com, sweet potato, etc. 500-800 400-700 Paddy field (including unplanted dry field) 200 200 Stretch of fruit trees, nursery gardens, flower 1680 1540 beds, etc. Note: The compensation for crops grown in seed-breeding fields designated by the government may be 30% higher than the rate of compensation for grains. The rate of compensation for special-purpose fish ponds (including the loss of fishes) is the same as that for vegetables. Vegetables grown in vegetable-growing areas designated by the government are compensated for at the same level as vegetables in general. lntercrops are compensated for as a single type of crop. No separate compensation will be made for separately grown trees after the compensation calculated according to the rate listed in the table above is made for crops.

2. Dazu County

Rate of compensation for land acquisition and resettlement Averageannual Sum total of land and

space of yield of farmland in Multiple of land Multiple of Total resationt fparman (mu past 3 years compensation reeteetmuftiple compensations per farmland (mu) (RMB/mu) compensation mu of farmland ______~~~~~~~~~(RMB) Above 1.0 1650 6 4 10 16500 1.0 1650 6 4 10 16500 0.9 1650 6.5 5 11.5 18975 0.8 1650 7 6 13 21450 0.7 1650 7.5 7.5 15 24750 0.6 1650 8 9.5 17.5 28875 0.5 1650 8.5 12 20.5 33825 0.4 1700 9 15 24 40800 0.3 1800 10 20 30 54000 Less than 0.3 1800 10 20 30 54000 the Note: The land and resettlement compensations are calculated by the interpolation method if per-capita space of farmland is in between data listed. By this designed and calculated method, if the resettlement-compensations for each status-changed person is below the present standard, the sum total of land and resettlement compensations for each status- changed person is calculated as: RMB16200 for standard I1 RMB15120 for standard II RMB 14040 for standardlil.

PAGE 2 SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Rate of compensation for crops

Unit: RMB/mu

Type of crops Standard Grain 1000 Vegetable 1200

Notes: The compensation for crops grown on seed-breeding fields designated by the government may be 20% higher than the rate of compensation for grains. The rate of compensation for special- purpose fish ponds (including the loss of fishes) is one to two times of the rate of economic crops.

3. Changshou District

Rate of compensation for land acquisition and resettlement

Sum tot5alctof tSum total of Average annual of land and Per-capita in 8 Mutperslfarmmand95 of mulement resettlement space of yield of fearmln in omutplensaoflnd resettlement Total multiple compensations compensations farmland0.5Bthepast 3erse compensatbper mu of 0.8 at the average7 6 13~~~~Su BuppesoatotaiRMB of farmlandland and-m Uni:(RMB) AbovelV.0 6 4 10 To0be 1.0 6 4 10 To be calculated as 0.9 To be calculated 6.5 5 11.5 calculated at the total sum 0.8 at the average 7- 6 123 the of the per-mu 0.7 annual yield of 75751 5 corresponding land and 0.6 the farmland in 8 9.5 17.5 m.ultiple listed resettlement 0.5 the past three 8.5 12 20.5 plus the compensation 0.4 years legally 9 15 24 average divided by the 0.3 rpreatte I0230 annual yield number of repored atteo0203 of the status- acustimeof farmland in changed Below 0.3 mu aqiton10 I 20 30 the past three people per I ~~~~~~ ~~~yearsmu of

Rate of compensation for crops Unit: RMB/mu

Note: Vegetables refer to those grown in the vegetable areas designated by the local people's government. The compensation for crops grown on seed-breeding fields designated by the

SOGREAH CONSULTANTS-23500321 .R4 -AUGUST 2004 PAGE 3 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGOQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

government may be 30% higher than the rate of compensation for grains. The rate of compensation for special-purpose fish ponds (including the loss of fishes) is the same as that for vegetables.

4. Bishan County

Rate of compensation for land and resettlement

Averagannal eSum total of land Sum total of land Average annual Per-capita . Multiple of Total and resettlement and resettlement I yield of farmland space of Multple of land resettlement Total compensations compensations Area Type Yin past 3 years fa(mland compensaion compensation multple per persona per mu of (RMB/mu) (mu) (RMB) farmland (RMB)

1700 lOand 6 4 10 17000 17000 Bicheng, ______above Qinggang, 1700 0.9 6.5 5 11.5 19550 17595 Dingjia, 1700 0.8 7 6 13 22100 17680 Laifeng, 1700 0.7 7.5 7.5 15 25500 17850 Shizi, 1700 0.6 8 9.5 17.5 29750 17850 Puyuan 1700 0.5 8.5 12 20.5 34850 17425 1700 0.4 10 15 25 42500 17000

Rate of compensation for crops

Type of crop Compensation (RMB/mu) Remarks Vegetable 1400 Compensation for loss of fishes is Vegetable______1400______the same as that for vegetables Compensation for grain crops Grains 1200 grown in the seed-breeding area to be 30% higher

SOGREAH CONSULTANTS-23500321 .R4 - AUGUST2004 PAGE 4 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

5. Wulong County

Rate of compensation for land and resettlement 4erage annual Sum total of land ~~~~~Sumtotal of land and Per-capita Averdo ageln i lanuaiftpeo Multiple of Total Sumdtotaleoflamnd resettlement space of yilstof fars n Mucpe of iand resettlement multiple compensations per omu o farnda M farmland (mu) paRMBar copesaio compensation persona (RMB) muoffrmlan

Above 1.0 1300 6 4 10 13000 13000 1.0 1300 6 4 10 13000 13000 0.9 1300 6.5 5 11.5 13455 14950 0.8 1300 7 6 13 13520 16900 0.7 1300 7.5 7.5 15 13650 19500 0.6 1300 8 9.5 17.5 13650 22750 0.5 1300 8.5 12 20.5 13325 26650 0.4 1400 9 15 24 13440 33600 0.3 1500 10 20 30 13500 45000 Less than 0.3 1500 10 20 30 13500 45000

Note: The land and resettlement compensations are calculated by the interpolation method if the per-capita space of farmland is in between data listed. If the per-capita space of farmland is less than 0.5mu, the average land and resettlement compensations for each status-changed person are calculated as RMB13, 500 if less than RMB13, 500.

Rate of compensation for crops

Unit: RMB/mu

Type of crop Standard Standard I Standard II Standard IlIl Vegetables (including 10-208010 0-0 commercial 1000-1200 800-1000 600-800 corps) Grains 800-1000 600-800 500-600 Note: The compensation for crops grown on seed-breeding fields designated by the county government may be 30% higher than the rate of compensation for grains. The rate of compensation for special-purpose fish ponds (including the loss of fishes) is 0.5- 1 time as much as that for vegetables.

SOGREAH CONSULTANTS- 23500321 .R4 - AUGUST2004 PAGE 5 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

6. Jiangjin City

Rate of compensation for land and resettlement of TotalAvrg space of fvearmlandnupastl yiearso Multiple of land Multiple Per-capita amount in past 3 years compensation resettlement muftiple Total amount /person farmland (mu) fariland(RMB/mu) compensation 10 15000 15000 1.0 1500 6 4 Above 4 10 15000 15000 1.0 1500 6 4.5 11 16500 14860 0.9 1500 6.5 5 12 19200 15360 0.8 1600 7 6 13.5 21600 15130 0.7 1600 7.5 7.74 15.74 25184 15110 0.6 1600 8 10 19 30400 15200 0.5 1600 9 14.5 23.5 40000 16000 Below 0.4 1700 9

interpolation method if the and resettlement compensations are calculated by the Note: The land space of farmland is less space of farmland is in between data listed; If the per-capita per-capita for each status-changed person is than 0.5mu, the average land and resettlement compensations calculated as RMB16,000 if less than RMB16,000.

Rate of compensation for crops Standard Type of crop IlIl Type I Type II Type 1000 Vegetables 1300 1200 800 Grains 1000 900

is as follows: Applicable areas of Differentiation of standards of compensation for crops Note: where the township government is Standard Type l: Part of Jijiang Township and Degan Township, Type Il: Shuangshi Neighborhood of Jijiang Township, Heai located; Applicable areas of Standard Youxi, Degan Township, and part of Shuangxi, Xiangtang, and Shengquan Neighborhoods of Jiaci, Baisha, Longmentan, Lishi, Caijia, Xianfeng, Rentuo, Wutan, Shimen, Shima, Yongxing, (not where the respective township governments are located Dushi and Luohuang Townships, areas of where the township governments are not located).Applicable including neighborhoods and neighborhoods of the ll: Rural and urban townships except the above areas Standard Type for special-purpose fish where Standard Type II is applicable. The rate of compensation areas vegetables. Vegetables refer to those ponds (including the loss of fishes) is the same as that for grown in the vegetable areas designated by the local government.

PAGE 6 SOGREAH CONSULTANTS- 23500321.R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

7. Beibei District

Rate of compensation for land and resettlement Sum total of land and resettlement Per-capita Average annual yield Muftiple of land Multiple of Total Sum total of land and copnainresettlement mutperesettlement compensations romensettlsermentf space of of farmland inpast 3 per mu of fammand(muyers RMBmu)comensboncompensation mulbiple per persona (RMB) compensations(RMB)fanld RB farmland (mu) years (RMBImu) compensationpeprsn 21000 Above 1.0 1700 6 4 10 21000 21000 1.0 1700 6 4 10 21000 24150 0.9 1700 6.5 5 11.5 21735 27300 0.8 1700 7 6 13 21840 31500 0.7 1700 7.5 7.5 15 22050 36750 0.6 1700 8 9.5 17.5 22050 43050 0.5 1700 8.5 12 20.5 21525 52800 0.4 1700 9 15 24 21120 69000 0.3 1700 10 20 30 20700 69000 Below 0.3 1700 10 20 30 20700 method if the Note: The land and resettlement compensations are calculated by the interpolation less space of farmland is in between data listed. If the per-capita space of farmland is per-capita person than 0.3mu, the sum total of land and resettlement compensations for each status-changed is calculated as RMB20, 700 if less than RMB20, 700.

Standard compensation for crops Unit: RMB/mu Standard Type of crops Type I Type II Type IlIl Vegetables (including 1300-1600 1200-1500 1100-1400 commercial crops) government Note: The compensation for crops grown on seed-breeding fields designated by the for special- may be 30% higher than the rate of compensation for grains. The rate of compensation purpose fish ponds (including the loss of fishes) is the same as that for vegetables.

PAGE 7 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 CHONGOING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

Rate of compensation for structures in affected districts, counties and cities Material Unit Unit price (RMB) Remarks Description Type I Type II Type III Retaining walls and 35-50 30-45 25-40 Retaining walls for improving enclosure Shaped stone, rubble, 3 25-40 20-35 15-30 collective-owned fields and walls (incl. brck, earth m 30-45 25-40 20-35 house foundations not to be Fishpond 4-6 3-5 2-4 compensated for embankment) Pedestrian passages not be Cement concrete compensated for; cement pavement, macadam 50-60 40-55 35-50 pavement thickness above 10 (incl. Shaped stone) 2 cm to be compensated for as Roads pavement, earth-bond m 30-40 25-35 20-30 cement pavement roads and pavement, unpaved 12-14 11-13 10-12 pavement thickness below 10 earthen road (tractor cm as earth-bond macadam .road roads Brick, roof tile Place 4000-5000 3500-4500 3000-4000 Dilapidated ones not to be and__lime_kilns___I compensated for Shaped stone, 0-0 2-20105 Wells to be compensated for Wells cement, simple, m3 20-30 15-25 10-20 according to capacity rather pumping well 8-0 150-250 100-200 han material To be removed as notified by Single, double place 180-200 170-190 160-180 land acquisition agency or Grave Grave Single,doubleplace 280-300 270-290 260-280 otherwise to be treated as belonging to nobody Threshing grounds refers to Stone slab, cement, 5-6 4-5 3-4 regularly formed ground Threshing concrete m2 8-10 7-9 6-8 surfaces. Scattered irregular ground 4-5 3-4 2-3 flat surfaces, whether covered 1 2 2 2 with concrete or earth, will not be compensated for. Indoor waste pits and dove's Shaped stone, 25-35 20-30 . 15-25 nestle-shape waste pits built by Waste pi'ts, chsldsoe 3 810 68 farmers are not to be water tanks concrledtoe,cemnt -5 2-4 1-3 compensated for. No separate compensation will be paid for materials of waste pits. Water Shaped stone, brick, 3 40-50 30-40 25-35 Artificially constructed conduits conduits concrete m 20-25 15-20 10-15 by villagers Power line Round concrete poles 80-90 75-85 70-80 poles more than (or less piece 40-50 35-45 30-40 Power line poles constructed than) 9m high by collectives below rural o For outdoor lighting 1 1 1 township level. Power line and operating power m 2 2 2 supply 2 m 2 2 2 Not including civil pipeline Water pipes Outdoor tap water pipe networks Steel-framed Steel bars and plastic mu 3000-3500 2500-3000 2000-2500 green houses films I I I 2 Note: Gas pits in normal operation are to be compensated for at a rate of RMB1 0/m higher than that for waste pits. Structures compensated for are to be at the disposal of the land acquisition agency.

SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 PAGE 8 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

or cities Rates of compensation oar sp rsely grown trees in affected districts, counties Remarks Section size Unit Unit price RMB) Description Type I Type II Type IlIl Regardless of species, trees 1 m above the ransplanting grafted piece 0.8-1 0.7-0. 9 0.6-0.8 are measured (if the height is not yet 1 Doung trees piece 18-20 17-19 16-18 ground to branch origin, the trunk at lDia. 24 cm lincl. 2 cm) pieece 17-9m branch origin is to be Fruit trees eia.u4-7cm (dieto piece 20-30 19-25 18-20 piece 30-50 25-45 20-40 measured). For trees more than hereunder) diameter, the rate of Dia. 710-1 cm piece 50-80 45-75 40-70 16 cm in 10-13piece cm 0-110 75-105 70-100 compensation increases by Dia. for each 2 cm increase Dia. 13-16 cm piece 80-110 75-105 70-100 RMB20 ,in diameter. more than 16 pieces may Bewly N pbanted and not piece 2-3 1.5-2.5 1.0-2.0 Trees fruets cluste 25-40 20-35 15-30 be put into the corresponding Ba)ntre et bearing size of diameter. (musa) trees- pie cluste 35-50 30-45 25-40 10-15 piece pic 152.0. 0812 For trees more than 4 cm in Young trees newly the rate of planted piece 1.5-2 1.0-1.5 0.8-1.2 diameter, 6-10 545-95 549 compensation. Increases by Grapes Dia. 1-2 cm piece for each 1 cm increase Dia. 2-3 cm pee 120 95991 RMB5 Dia. 3-4 cm piece 10-20 9-5.19 9-18 in diameter. more than 10 cm in Below dia. 2 cm piece 1.5-2 1.2-1.7 1-1.5 For trees rate of compensation Dia. 2-5 cm piece 2-5 1.7-4.5 1.3-4 diameter, Mulberry increased by RMB5 for Dia. 5-8 cm piece 5-10 . 4.5-9.5 4-9 to be trees 1 cm increase in diameter. Dia. 8-10 cm piece 10-20 9.5-19 9-18 each of trunk is measured Below dia.3 cm piece 1.5-2 1.3-1.8 1-1.6 Diameter 1.8-4.5 1.6-4 1.5 m from ground. For trees Dia. 3-5 cm piece 2-5 20 cm in diameter, 5-10 cm piece 5-9 4.5-8 4-7 more than Miscellaneous Dia. of compensation is trees Dia.10-15 cm piece 9-18 8-15 7-13 rate 13-23 increased by RMB5 for each 1 Dia. 15-20 cm piece 18-30 15-26 cm increase in diameter. These include walnut, chestnut, palm, olive, honey locust trees, For trees more than 16 cm Below Dia.5 cm piece 7-12 6.5-11 6-10 etc. rate of 5-10 cm piece 12-20 11-19 10-18 in diameter, Dry fruittrees Dia. is increased by Dia. 10-15 cm piece 20-30 19-29 18-28 compensation RMB1O for each 1 cm increase in diameter. Small cluster (containing 10-30 Clusters containing more than Miscellaneous less than 20 pieces) 20-40 15-35 cluste 30-50 25-45 20-40 40 pieces may be put into the bamboo Big cluster (containing size of diameter. 21-40 pieces) corresponding of-trunk 1.2m from Below dia. 5 cm piece 7-9 6-8 5-7 Diameter Dia. 5-10 cm piece 9-15 8-14 7-13 Giant bamboo as true. Above dia. 10 cm piece 15-25 14-24 13-23 ground is regarded less than 20 pieces) cluste 8-13 7-12 6-11 Clusters containing Fern leaf 20-30 or more than 50 pieces may be hedge B ices) cluste 13 7-12 6-11 cluster 10-20 9-19 8-18 put into corresponding size bamboo Big cluster (containing ______30-50 pieces)_ 0.3 Evergreen In clusters cluster 0.5 0.4 flowers are not to be Wooden flower piece 3 2 1.5 Potted Flower trees for. Yerba flower piece 0.5 0.2 0.1 compensated agency or individual. Note: Trees after compensation are to be at the disposal of the land acquisition

PAGE 9 SOGREAH CONSULTANTS-23500321,R4 -AUGUST2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

APPENDIX 3 LIST OF BUDGETS FOR LAND ACQUISITION AND RESETTLEMENT

PAGE 10 SOGREAH CONSULTANTS- 23500321 .R4 -AUGUST2004 I

i

i

I I I Project in Tongliang County Componet Flood-preventing embankment project Sewage treatment plant Total Compensation Total Amount Quantity Amount Toti Total amount S/N Item Unit standard Quantity (RMB/unit) quantity 4 rural house compensation 4.1 house compensation . 2 8298.40 736.94 162126.80 brick-concrete structure m 220.00 699.22 153828.40 37.72 2 981.82 202254.92 brick-wood structure m 206.00 490.91 101127.46 490.91 101127.46 earth-wood structure m 2 31.24 1718.20 simply build m 55.00 31.24 1718,20 0.00 2 140400.00 930.00 167400.00 1710.00 307800.00 4.2 house land m 180.00 780.00 0.00 0.00 0.00 0.00 4.3 compensation for attachment within houses 790.00 7.00 1106.00 telephone set 158.00 2.00 316.00 5.00 1860.00 13.00 4030.00 cable television home 310.00 7.00 2170.00 6.00 0.00 0.00 0.00 other compensation home 0.00 4.4 13.00 5200.00 moving subsidy home 400.00 7.00 2800.00 6.00 2400.00 31.00 9300,00 57.00 17100.00 allowance for temporary resettlement person 300.00 26.00 7800.00 700.00 6.00 600.00 13.00 1300.00 allowance for water and electricity establishment home 100.00 7.00 2400.00 13.00 5200.00 rewards home 400.00 7.00 2800.00 6.00 5 enterprises compensation 5.1 house compensation 2 177.30 39006.00 177.30 39006.00 brick-concrete structure m 220.00 0.00 brick-wood structure m2 2 0.00 0.00 0.00 earth-wood structure m 0.00 0.00 0.00 0.00 simply build 0.00 200.00 3000.00 3000.00 5.2 house sites m2 15.00 I 0.00 0.00 0.00 0.00 5.3 compensation for attachment within houses telephone home 0.00 0.00 0.00 cable television home 0.00 0.00 1.00 50000.00 1.00 50000.00 5.4 moving and installing allowance for equipment home 50000.00 177.30 28368.00 177.30 28368.00 5.5 compensation for loss m2 160.00 0.00 2 0.00 177.30 2836.80 177.30 2836.80 5.6 moving fee m 16.00 . 6 institutions compensaton _ 6.1 house compensation l~~~~~~~~~~~~~~~~~~ )2,, A3g - THE WORLD BANK CHONGQING MUNICIPALITY URBAN ENVIRONMENT PROJECT CHONGOING PLAN RESETTLEMENT ACTION

in December 2004; Conduct the baseline survey second in February 2006; in August 2005 and the Produce the first report 2006 to AL the same period from August (Issue 3 to Issue 5) in Submit assessment reports 2007.

-I l

23500321 R4 - AUGUST2004 SOGREAH CONSUL1ANTS- Project in Dazu County Sewage treatment plant Riverbank improvement Total Componet

Compensation Total amount standard Quantity Amount Quantity Amount Total quantity S/N Item Unit (RMB/unit) 1 Permanent land compensation 56.76 1285614.00 68.60 2056777.50 125.36 3342391.50 1.1 cultivated land mu 1.2 woodland mu garden plot mu 1.3 _ _ _ 1.4 pound mu 1.5 tree nursery mu 1.6 overflow land mu . 1.7 wasteland mu 1.8 State-owned land mu 2 temporary land compensation 0.00 27.60 49680.00 27.60 49680.00 2 1 compensation for the young mu 1800.00 cultivated land mu pound mu tree nursery mu other land mu

3 urban house compensation 3.1 house compensation 2 3389.74 1155901.34 3389.74 1155901.34 brick-concrete structure m 341.00 0.00 5460.72 1692823.20 5460.72 1692823.20 brick-wood structure m7 310.00 0.00 2 1494 63 412517.88 1494.63 412517.88 simply build m 276.00 0.00 3.2 compensation for attachment within houses 50.00 4000.00 50.00 4000.00 telephone set 80.00 0.00 50.00 6000.00 50.00 6000.00 cable television home 120.00 0.00 3.3 other compensation home 50.00 20000.00 50.00 20000.00 moving subsidy home 400.00 0.00 0.00 298.00 89400.00 298.00 89400.00 allowance for temporary resettlement 300.00 0.00 50.00 5000.00 50.00 5000.00 allowance for water and electricity establishment home 100.00 50.00 20000.00 50.00 20000.00 rewards person 400.00 0.00 allowance for rent fee home

P, 3f3 Project in Dazu County Sewage treatment plant Riverbank improvement Total Componet

Compensation Amount Quantity Amount Total quantity Total amount S/N Item Unit standard Quantity ______.______(R MM Blun/unit) t) ______6.00 1800.00 0.00 6.00 4 rural house compensation 300.00 4.1 house compensation 2 660.86 149354.36 840.86 190034.36 brick-concrete structure m 226.00 180.00 40680.00 2 96194.20 469.24 96194.20 brick-wood structure m 205.00 0.00 469.24 2 0.00 0.00 earth-wood structure m 0.00 2 53.50 3745.00 simply build m 70.00 0.00 53.50 3745.00 2 27600.00 1620.00 186300.00 1860.00 213900.00 4.2 house land m 115.00 240.00 4.3 compensation for attachment within housesI 1280.00 16.00 1520.00 telephone set 80.00 3.00 240.00 16.00 1920.00 16.00 2280.00 cable television home 120.00 3.00 360.00 16.00 4.4 other compensation home 6400.00 16.00 7600.00 moving subsidy home 400.00 3.00 1200.00 16.00 54M00 16200.00 54.00 18600.00 allowance for temporary resettlement person 300.00 8.00 2400.00 16.00 1600.00 16.00 1900.00 allowance for water and electricity establishment home 100.00 3.00 300.00 6400.00 16.00 7600.00 rewards home 400.00 3.00 1200.00 16.00 5 enterprises compensation . 5.1 house compensation . brick-concrete structure m_ 2 421980.42 1867.17 421980.42 brick-wood structure . m 226.00 0.00 1867.17 25940.70 126.54 25940.70 earth-wood structure m2 205.00 0.00 126.54 simply build 2000.00 230000.00 230000.00 5.2 house sites m2 115.00 5.3 compensation for attachment within houses 160.00 _160.00 telephone home 80.00 2.00 240.00 240.00 cable television home 120.00 2.00 0.00 2.00 3856.00 2.00 3856.00 5.4 moving and installing allowance for equipment home 1928.00 2 0.00 1993.71 239245.20 1993.71 239245.20 5.5 compensation for loss m 120.00 2 0.00 1993.71 31899.36 1993.71 31899.36 5.6 moving fee m 16.00 6 institufons compensaton 6.1 house compensation _ - f2, A 3 iit Project in Dazu County Total Componet Sewage treatment plant Riverbank improvement

Compensation Amount Total quantity Total amount S/N Item Unit standard Quantity Amount Quantity (RMB/unit) 2 brick-concrete structure m brick-wood structure m2 6.2 house sites m2 6.3 compensation for attachment within houses telephone set cable television home 6.4 moving and installing allowance for equipment unit 6.5 compensation for loss m7 6.6 moving fee m7 7 shops compensationr 7.1 house compensation 2 1602136.80 brick-concrete structure m 1980.00 0.00 809.16 1602136.80 809.16 2 720579.60 brick-wood structure m 1780.00 0.00 404.82 720579.60 404.82 2 681830.40 simply build m 1280.00 0.00 532.68 681830.40 532.68 7.2 compensation for attachment within houses telephone home 80.00 34.00 2720.00 2720.00 4080.00 cable television home 120.00 34.00 4080.00 1746.66 209599.20 7.3 compensation for loss 120.00 0.00 1746.66 209599.20 65552.00 34.00 65552.00 7.4 moving and installing allowance for equipment home 1928.00 0.00 34.00 2 1746.66 27946.56 7.5 moving fee m 16.00 0.00 1746.66 27946.56 224830.00 8 compensaton for Infrastructures and other attachments 224830.00 11833683.72 sum of 1-8 _ 1359594.00 10474089.72 9 planning and design fee RMB 0.02 27191.88 209481.79 0.00 236673.67 0.00 355010.51 10 management fee RMB 0.03 40787.82 314222.69 13875.16 0.00 20673.13 11 technology training costs RMB 0.01 6797.97 0.00 236673.67 12 monitoring and evaluation RMB 0.02 27191.88 209481.79 1268271.47 13 Contingencies RMB 0.10 146156.36 1122115.12 _ 3352946.96 14 tax mu _ 1511757.19 1841189.77 total 0.18 3119477.10 14184456.04 17303933.14

3 3 9 Project in Changshou District Componet

Compensation standard Quantity Amount SIN Item Unit (RMBlunit) 1 Permanent land compensation 186.78 5416620.00 1.1 cultivated land mu 29000.00 1.2 woodland mu 1.3 garden plot mu 37750.00 0.80 30200.00 1.4 pound mu 1.5 tree nursery mu 1.6 overflow land mu 1.7 wasteland mu 1.8 State-owned land mu 2 temporary land cornpensaton 2500.00 84.50 211250.00 2.1 compensation for the young mu cultivated land mu pound mu tree nursery mu other land mu

3 urban house compensaUon 3.1 house compensation 2_. brick-concrete structure m_2 brick-wood structure m2 simply build m 3.2 compensation for attachment within houses telephone set cable television home 3.3 other compensation home moving subsidy home allowance for temporary resettlement allowance for water and electricity establishment home rewards person allowance for rent fee home

1% i, t3 9, Project in Changshou District Componet

Compensation Quantity Amount S/N Item Unit standard (RMB/unit) rural house compensation _ 1800.00 4.1 house cornpensation 2 922444.60 brick-concrete structure m 215.00 4290.44 2 brick-wood structure m 190.00 3347.98 636116.20 earth-wood structure m2 2 . simply build m 50.00 303.52 15176.00 2 180.00 5670.00 1020600.00 4.2 house land m 4.3 compensation for attachment within houses telephone set 83.00 56.00 4648.00 28000.00 cable television home 500.00 56.00 4.4 other compensation home .__ moving subsidy home 400.00 56.00 22400.00 56700.00 allowance for temporary resettlement person 300.00 189.00 56.00 5600.00 allowance for water and electricity establishment home 100.00 rewards home 400.00 56.00 22400.00 5 enterprises compensation 5.1 house compensation brick-concrete structure m? 2 brick-wood structure m earth-wood structure m2 ______simply build 14.50 2900000.00 5.2 house sites m2 2000000.00 5.3 compensation for attachment within houses telephone home cable television home 5.4 moving and installing allowance for equipment home 5.5 compensation for loss m2 5.6 moving fee m 6 institutions compensation _ _ 6.1 house compensation __ 1 g ~~~~~~~~~~~~~~~~~~~~~2, t3E in Changshou District Componet Project

Compensation Quantity Amount S/N Item Unit standard (RMB/unit) brick-concrete structure 2 2 brick-wood structure m 6.2 house sites m2 6.3 compensation for attachment within houses telephone set cable television home 6.4 moving and installing allowance for equipment unit 6.5 compensation for loss m2 6.6 moving fee m2 7 shops compensation 220.00 7.1 house compensation . brick-concrete structure m2 2 brick-wood structure m simply build m2 7.2 compensation for attachment within houses telephone home cable television home 7.3 compensation for loss 7.4 moving and installing allowance for equipment home 7.5 moving fee m 259264.00 8 compensaUon for Infrastructures and other attachments 11551418.80 sum of 1-8 231028.38 9 planning and design fee RMB 0.02 346542.56 10 management fee RMB 0.03 42358.09 11 technology training costs RMB 0.01 231028.38 12 monitoring and evaluation RMB 0.02 1240237.62 13 Contingencies RMB 0.10 2306296.10 14 tax mu 12255.00 total _ 12255.18 15948909.93

%3, t3 Bishan Bicheng Town Water Supply pipeline Total Qiancengyan water planl Pressurizing pump station Water supply Componet

Compensation amount Amount Quantity Amount Total quantity Total Unit standard Quantity Amount Quantity S/N Item ______(RMB/unit) land compensation 1Permanent 276744.05 0.00 0.00 34.55 1404471.55 mu 26.20 1127727.50 8.35 1.1 cultivated land mu 1.2 woodland 1.3 garden plot mu 1.4 pound mu_ mu 1.5 tree nursery overflow land mu 2.46 44675.49 1.6 30940.00 0.86 13735.49 0.00 0.00 mu _ 1.60 1.7 wasteland 1.8 State-owned land mu land compensation 2 temporary 40.33 48396.00 40.33 48396.00 mu 1200.00 2.1 compensation for the young 0.40 560.00 0.40 560.00 cultivated land mu 1400.00 pound mu tree nursery mu other land mu .

3 urban house compensation compensation _ 3.1 house . brick-concrete structure m2 brick-wood structure - m2 2 simply build m._ 3.2 compensation for attachment within houses telephone set. cable television home 3.3 other compensation home moving subsidy home allowance for temporary resettlement home allowance for water and electricity establishment rewards person . allowance for rent fee home .

Of1, A 3 Bishan Bicheng Town Water Supply Total Qiancengyan water planl Pressurizing pump station Water supply pipeline Componet

Compensation Amount Total quantity Total amount standard Quantity Amount Quantity Amount Quantity SIN Item Unit (RMB/unit) . - 4 rural house compensation _ . - 4.1 house compensation brick-concrete structure m2 2 . brick-wood structure m = earth-wood structure m7 m7 l_____ simply build m7 4.2 house land 4.3 compensation for attachment within houses telephone set homeI cable television . . - 4.4 other compensation home moving subsidy home allowance for temporary resettlement person allowance for water and electricity establishment home rewards home . . 5 enterprises compensation . 5.1 house compensation 2 brick-concrete structure m7 brick-wood structure m2 earth-wood structure m_ . simply build m2 5.2 house sites 5.3 compensation for attachment within houses ._ telephone home cable television home . 5.4 moving and installing allowance for equipment home 5.5 compensation for loss m_2 2 _ _ 5.6 moving fee m = 6 institutions compensation 6.1 house compensation _ M 2 TA A 3 -if Bishan Bicheng Town Water Supply Total Pressurizing pump station Water supply pipeline Componet Qiancengyan water plan

Compensation Amount Total quantity Total amount Quantity Amount Quantity Amount Quantity Item Unit standard . SIN (RMB/unit) 2 brick-concrete structure m brick-wood structure m2 m2 6.2 house sites houses 6.3 compensation for attachment within telephone set cable television home unit . 6.4 moving and installing allowance for equipment 2 compensation for loss m 6.5 2 6.6 moving fee m2 shops compensation 1980.00 0.00 7 0.00 165.55 36421.00 165.55 36421.00 7,1 house compensation brick-concrete structure m2 brick-wood structure m2 simply build m_2 7.2 compensation for attachment within houses telephone home cable television home _ 7.3 compensation for loss home moving and installing allowance for equipment 7.4 2 fee m 108155.50 7.5 moving 0.00 0.00 51995.00 attachments I _56160.50 1606258.54 8 compensation for Infrastructures and other 290479.54 100951.00 1214828.00 32125.17 sum of 1-8 5809.59 2019.02 RMB 0.02 24296.56 48187.76 9 planning and design fee 8714.39 3028.53 RMB 0.03 36444.84 8031.29 10 management fee 1452.40 504.76 0.01 6074.14 training costs RMB 2019.02 32125.17 1i technology 24296.56 5809.59 RMB 0.02 172672.79 12 monitoring and evaluation 31226.55 10852.23 0.10 130594.01 Contingencies RMB 489.56 _ 791553.63 13 598708.38 192355.69 mu 2690954.35 14 tax 535847.75 119864.12 . 2035242.49 l______total 3 . A 3 XI Binan River Improvement Project Componet

Compensation standard Quantity Amount S/N Item Unit (RMB/unit) 1 Permanent land compensation 36050.00 314.01 11320060.50 1.1 cultivated land mu 1.2 woodland mu mu 1.3 garden plot 46705.00 15.50 723927.50 1.4 pound mu mu 1.5 tree nursery 18025.00 8.10 146002.50 1.6 overflow land mu mu 1.7 wasteland mu 1.8 State-owned land 2 temporary land compensation _ 2500.00 26.00 65000.00 2.1 compensation for the young mu cultivated land mu pound mu tree nursery mu other land mu

3 urban house compensation 3.1 house compensation brick-concrete structure m2 2 brick-wood structure m2 2 simply build m 3.2 compensation for attachment within houses telephone set cable television home _ home 3.3 other compensation . moving subsidy home allowance for temporary resettlement allowance for water and electricity establishment home . rewards person allowance for rent fee home Binan River Improvement Project Componet Compensation Unit standard Quantity Amount SIN Item (RMB/unit)

4 rural house compensation 4.1 house compensation 2 1654.35 446674.50 brick-concrete structure m 270.00 447.90 98538.00 brick-wood structure m7 220.00 2 541.24 81186.00 earth-wood structure m 150.00 2 1550.00 93000.00 simply build m 60.00 m2 300.00 3000.00 900000.00 4.2 house land compensation for attachment within houses 4.3 17.00 2686.00 telephone set 158.00 30.00 18000.00 cable television home 600.00 other, compensation home 4.4 30.00 12000.00 moving subsidy home 400.00 300.00 100.00 30000.00 allowance for temporary resettlement person 100.00 30.00 3000.00 allowance for water and electricity establishment home 30.00 12000.00 rewards home 400.00 5 enterprises compensation 5.1 house compensation 2 1854.00 704520.00 brick-concrete structure m 380.00 2 372.00 122760.00 brick-wood structure m 330.00 2 earth-wood structure m 1720.00 154800.00 simply build 90.00 m2 200000.00 39.17 7834000.00 5.2 house sites 5.3 compensation for attachment within houses 5.00 790.00 telephone home 158.00 4.00 2400.00 cable television home 600.00 home 10000.00 6.00 60000.00 5.4 moving and installing allowance for equipment m2 120.00 3946.00 473520.00 5.5 compensation for loss m2 15.00 3946.00 59190.00 5.6 moving fee 6 institubons compensation 6.1 house compensation 2 XI,3gi Project Componet Binan River Improvement

Compensation Amount S/N Item Unit standard Quantity ______(RMB/unit)_ 2 brick-concrete structure m 380.00 4590,00 1744200.00 2 brick-wood structure m 0.00 2 6.2 house sites m 300.00 1250.00 375000.00 0.00 6.3 compensation for attachment within houses telephone set 158.00 4.00 632.00 cable television home 600.00 4.00 2400.00 50000.00 6.4 moving and installing allowance for equipment unit 50000.00 1.00 2 540000.00 6.5 compensation for loss m 120.00 4500.00 2 6.6 moving fee m 15.00 4590.00 68850.00 7 shops compensation 809.16 7.1 house compensation 809.16 1602136.80 brick-concrete structure m2 brick-wood structure m7 simply build m2 7.2 compensation for attachment within houses telephone home cable television home 7.3 compensation for loss 7.4 moving and installing allowance for equipment home 7.5 moving fee m2 731175.00 8 compensation for Infrastructures and other attachments . 26876312.00 sum of 1-8 537526.24 9 planning and design fee RMB 0.02 806289.36 10 management fee RMB 0.03 72713.30 11 technology training costs RMB 0.01 . 537526.24 12 monitoring and evaluation RMB 0.01 2883036.71 13 Contingencies RMB 0.10 4729919.34 14 tax mu total . _ 36443323.19

%3 A, 3A Project in Wulong County

. Total lood-preventing embankme hangtu River Improveme Componet Compensation Amount Total quantity Total amount Unit standard Quantity Amount Quantity S/N Item (RMB/unit) 1 Permanent land compensation 197.18 9070280.00 mu 46000.00 188.18 8656280.00 9.00 414000.00 1.1 cultivated land . 1.2 woodland mu mu 1.3 garden plot mu 1.4 pound __ nursery mu 1.5 tree 3000.00 3.00 3000.00 mu 1000.00 _ 0.00 3.00 1.6 overflow land 184000.00 8.00 184000.00 mu 23000.00 0.00 8.00 1.7 wasteland State-owned land mu 1.8 . temporary land compensation 2 0.00 17.00 42500.00 mu 2500.00 17.00 42500.00 2.1 compensation for the young cultivated land mu pound mu tree nursery mu other land mu

compensation 3 urban house _ _ 3.1 house compensation 171000.00 2 380.00 171000.00 0.00 380.00 brick-concrete structure m 450.00 0.00 0.00 0.00 m2 0.00 brick-wood structure 0.00 2 0.00 0.00 0.00 simply build m 0.00 0.00 0.00 _0.00 3.2 compensation for attachment within houses 0.00 1.00 158.00 set 158.00 1.00 158.00 telephone 0.00 1.00 300.00 home 300.00 1.00 300.00 *______cable television 0.00 0.00 0.00 home 0.00 3.3 other compensation 0.00 1.00 250.00 250.00 1.00 250.00 moving subsidy home ______0.00 6.00 1800.00 300.00 6.00 1800.00 *______allowance for temporary resettlement 0.00 1.00 100.00 home 100.00 1.00 100.00 allowance for water and electricity establishment 0.00 1.00 400.00 person 400.00 1.00 400.00 rewards 0.00 6.00 1800.00 300.00 6.00 1800.00 allowance for rent fee home * ]I , ~3 Proje in Wulong County

Componet Cood-preventing embankme hangtu River Improveme Total

Compensation quantity Total amount S/N Item Unit standard Quantity Amount Quantity Amount Total (RMB/unit) 1800.00 4 rural house compensation 4.1 house compensation 2 brick-concrete structure m 270.00 510.00 137700.00 280.00 75600.00 790.00 213300.00 brick-wood structure m2 0.00 0.00 0.00 0.00 2 earth-wood structure m 180.00 280.00 50400.00 0.00 280.00 50400.00 simply build m72 0.00 0.00 0.00 0.00 2 4.2 house land m 150.00 270.00 40500.00 90:00 13500.00 360.00 54000.00 0.00 4.3 compensation for attachment within houses _ 0.00 0.00 0.00 telephone set 158.00 3.00 474.00 1.00 158.00 4.00 632.00 cable television home 300.00 3.00 900.00 1.00 300.00 4.00 1200.00 0.00 0.00 4.4 other compensation home 0.00 0.00 moving subsidy home 250.00 3.00 750.00 1.00 250.00 4.00 1000.00 allowance for temporary resettlement person 300.00 9.00 2700.00 3.00 900.00 12.00 3600.00 400.00 allowance for water and electricity establishment home 100.00 3.00 300.00 1.00 100.00 4.00 rewards home 400.00 3.00 1200.00 1.00 400.00 4.00 1600.00 5 enterprises compensation 5.1 house compensation _ 2 brick-concrete structure m 350.00 1360.00 476000.00 0.00 1360.00 476000.00 brick-wood structure m2 2 earth-wood structure m 200.00 685.00 137000.00 0.00 685.00 137000.00 simply build 0.00 0.00 0.00 0.00 1.27 .127000.00 5.2 house sites m2 100000.00 1.27 127000.00 0.00 5.3 compensation for attachment within houses telephone home 158.00 2.00 316.00 2.00 316.00 cable television home 300.00 1.00 300.00 1.00 300.00 2.00 4000.00 5.4 moving and installing allowance for equipment home 2000.00 2.00 4000.00 0.00 2 5.5 compensation for loss m 120.00 305.00 36600.00 0.00 305.00 36600.00 2 30675.00 5.6 moving fee m 15.00 2045.00 30675.00 0.00 2045.00 6 institutions compensation 6.1 house compensation _ . $2 , 3 Project inWulong County Total lood-preventing embankme hangtu River Improveme Componet Compensation Amount Total quantity Total amount Unit standard Quantity Amount Quantity S/N Item (RMB/unit)

brick-concrete structure m2 ______brick-wood structure m2 6.2 house sites m2 . 6.3 compensation for attachment within houses telephone set home cable television . - 6.4 moving and installing allowance for equipment unit 6.5 compensation for loss m2 2 6.6 moving fee m 7 shops compensation 7.1 house compensation 1602136.80 2 0.00 0.00 0.00 0.00 brick-concrete structure m 0.00 2 0.00 0.00 0.00 brick-wood structure m simply build m72 houses 7 2 compensation for attachment within 2.00 316.00 home 158.00 2.00 316.00 telephone 2.00 600.00 home 300.00 2.00 600.00 cable television 33333.34 2.00 33333.34 0.00 2.00 compensation for loss . 16666.67/t- 7.3 4000.00 0.00 2.00 4000.00 allowance for equipment home 2000.00 2.00 7.4 moving and installing 8400.00 2 560,00 8400.00 0.00 560.00 moving fee m 15.00 7.5 443428.75 200492.50 643921.25 8 compensation for Infrastructures and other attachments 10411481.08 892700.50 11304181.58 sum of 1-8 208229.62 17854.01 226083.63 planning and design fee RMB 0.02 9 312344.43 0.00 26781.02 339125.45 management fee RMB 0.03 10 45671.16 3461.85 49133.02 technology training costs RMB 0.01 11 208229.62 17854.01 226083.63 and evaluation RMB 0.02 12 monitoring 95865.14 1214460.73 RMB 0.10 1118595.59 13 Contingencies 136715.00 2482378.70 mu 2345663.70 14 tax 14650215.22 1191231.53 15841446.74 total T 3 -;,,ft 3W in Jiangjin City ______~~~~~~~Project Total pump statio igh-elevation water tan Water supply pipeline Componet _ressurizing Compensation Quantity Amount Total quantity Total amount Unit standard Quantity Amount Quantity Amount S/N Item (RMB/unit)

1 Permanent land compensaton 0.00 0.00 9.36 246954.24 mu 26384.00 6.36 167802.24 3.00 79152.00 1.1 cultivated land 1.2 woodland mu . - mu 1.3 garden plot . mu 1.4 pound 3.00 79152.00 3.00 79152.00 . 1.5 tree nursery mu 26384.00 mu 1.6 overflow land mu 1.7 wasteland 1.8 State-owned land mu 2 temporary land compensation 60672.00 . 50.56 60672.00 50.56 for the young mu 1200.00 2.1 compensation 7.00 10500.00 7.00 10500.00 mu 1500.00 0.00 cultivated land 44520.00 37.10 44520.00 1200.00 0.00 37.10 pound mu 8460.00 0.00 7.05 8460.00 7.05 tree nursery mu 1200.00 other land mu .

. 3 urban house compensation 2 3.1 house compensation brick-concrete structure m 2 brick-wood structure m simply build m72 3.2 compensation for attachment within houses telephone set cable television home home 3.3 other compensation moving subsidy home allowance for temporary resettlement . . _ allowance for water and electricity establishment home rewards person _ allowance for rent fee home I_I_I

1 3 A in Jiangjin City ______I______Project Total pump statio igh-elevation water tan Water supply pipeline Componet |ressurizing Compensation Quantity Amount Total quantity Total amount Unit standard Quantity Amount Quantity Amount SIN Item ______(RMB/unit)

4 rural house compensation_ house compensation 4.1 2 brick-concrete structure m brick-wood structure m 2 earth-wood structure m2 _ simply build m7_ _ land m2 4.2 house . 4.3 compensation for attachment within houses . telephone set cable television home I _ _ 4.4 other compensation home moving subsidy home person allowance for temporary resettlement home allowance for water and electricity establishment rewards home 5 enterprises compensation 5.1 house compensation 2 structure m2 brick-concrete . brick-wood structure 2 m2 earth-wood structure . simply build . 5.2 house sites m2 5.3 compensation for attachment within houses telephone home . cable television home home . moving and installing allowance for equipment 5.4 2 5.5 compensation for loss m 5.6 moving fee m2 6 institutions compensaton 6.1 house compensation 2 , 3 7 Project in Jiangjin City, Total pump statio ligh-elevation water tan Water supply pipeline Componet ~~~~~~~~~~~~~~~~~~~~~~~ressurizing

Compensation Amount Total quantity Total amount standard Quantity Amount Quantity Amount Quantity SIN Item Unit _ (RMB/unit)__ brick-concrete structure m72 brick-wood structure m2 6.2 house sites m 6.3 compensation for attachment within houses telephone set cable television home . _ 6.4 moving and installing allowance for equipment unit 6.5 compensation for loss 2 6.6 moving fee m2 7 shops compensation. 7.1 house compensation brick-concrete structure m2 brick-wood structure m72. simply build m72 7.2 compensation for attachment within houses telephone home cable television home. 7.3 compensation for loss 7.4 moving and installing allowance for equipment home m2 7.5 moving fee 127555.00 4155.00 0.00 0.00 123400.00 Infrastructures and other aHtachments _ 8 compensation for 247552.00 577813.24 =251109.24 79152.00 sum of 1-8 4951.04 11556.26 RMB 0.02 5022.18 1583.04 9 planning and design fee 17334.40 7533.28 2374.56 7426.56 management fee RMB 0.03 10 395.76 1237.76 2889.07 training costs RMB 0.01 1255.55 11 technology 4951.04 _11556.26 RMB 0.02 5022.18 1583.04 12 monitoring and evaluation 62114.92 26994.24 8508.84 26611.84 _. Contingencies RMB 0.10 13 66791.52 i1156.92 276337.98 tax mu 208389.54 14 160388.76 293887.1695621 total =505326.22

%3 t3A Project in Beibei District Total Componet Water-purification plant Water pickup source iigh-elevation water tan Pipeline network

Compensation Amount Total quantity Total amount S/N . Item Unit standard Quantity Amount Quantity Amount Quantity Amount Quantity (RMB/unit) I Permanent land compensation 19.90 597850.00 1.1 cultivated land mu 17.80 549130.00 2.10 48720.00 1.2 woodland mu . _ 1.3 garden plot mu 1.4 pound mu 1.5 tree nursery mu . 1.6 overflow land mu 1.7 wasteland mu . . 6.60 475120.80 1.8 State-owned land mu 6.60 475120.80 2 temporary land compensation _ 2.1 compensation for the young mu . . _ cultivated land mu . pound mu tree nursery mu other land mu

3 urban house compensation 3.1 house compensation brick-concrete structure m2 brick-wood structure m_2 simply build m_2 3.2 compensation for attachment within houses . . telephone set cable television home 3.3 other compensation home moving subsidy . home allowance for temporary resettlement _ . . ._ allowance for water and electricity establishment home rewards person . allowance for rent fee home 4 rural house compensation ._.... 4.1 house compensation _ brick-concrete structure m2

_ ~~~~~~~~~~~~~~~~~~~~~~~1 oiAi aH Project in Beibei District

Water-purification plant Water pickup source iigh-elevation water tan Pipeline network Total

Compensation S/N Item Unit standard Quantity Amount Quantity Amount Quantity Amount Quantity Amount Total quantity Total amount (RMB/unit) _ brick-wood structure m_2 2 earth-wood structure m_ simply build m72 4.2 house land m2 = = = 4 3 compensation for attachment within houses l ______telephone set cable television home 4.4 other compensation home moving subsidy home _ . allowance for temporary resettlement person allowance for water and electricity establishment home rewards home 5 enterprises compensation . 5.1 house compensation _ brick-concrete structure m2 _ brick-wood structure m2 2 earth-wood structure m7 _ simply build _ _ 5.2 house sites m2 5.3 compensation for attachment within houses i - telephone home cable television home _ 5.4 moving and installing allowance for equipment home 5.5 compensation for loss 2 = 5.6 moving fee m2 6 institutions compensation 6.1 house compensation = brick-concrete structure m2 brick-wood structure m2 6.2 house sites m2 = . ... 6.3 compensation for attachment within houses telephone set . .

2 Off-. t3 - Project in Beibei District Water pickup source ligh-elevation water tan Pipeline network Total Componet Water-puification plant

Compensation Amount Quantity Amount Quantity Amount Total quantity Total amount S/N Item Unit standard Quantity Amount Quantity (RMB/unit) cable television home 6.4 moving and installing allowance for equipment unit 2 6.5 compensation for loss m 2 . 6.6 moving fee m 0.00 0.00 7 shops compensafion 0.00 0.00 0.00 0.00 7.1 house compensation 0.00 0.00 2 brick-concrete structure m _ 2 brick-wood structure m 2 simply build m . 7.2 compensation for attachment within houses telephone home cable television home . 7.3 compensation for loss - _ 7.4 moving and installing allowance for equipment home 7.5 moving fee m2 24600.00 5260.00 0.00 0.00 32840.00 8 compensation for Infrastructures and other attachments 2980.00 499720.80 53980.00 . 8910.00 1114720.80 sum of 1-8 552110.00 1079.60 178.20 22294.42 9 planning and design fee RMB 0.02 11042.20 9994.42 14991.62 1619.40 267.30 33441.62 10 management fee RMB 0.03 16563.30 . 2498.60 269.90 44.55 - 5573.60 11 technology training costs RMB 0.01 2760.55 _ 9994.42 1079.60 178.20 22294.42 12 monitoring and evaluation RMB 0.02 11042.20 53719.99 5802.85 957.83 119832.49 13 Contingencies RMB 0.10 59351.83 19123.63 134715.84 89.10 1301252.49 14 tax mu 1147323.92 198547.19 10625.18 2619409.84 total 1800194.00 610043.48

T,3 A),, A i i

I i

i

A 4 1 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

APPENDIX 4 GENERAL LAYOUT OF PROJECT COMPONENTS

PAGE 11 SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 I I

i i

i I

I I I Legend

I-' D Interceptore

developed area C- -\.---~>_ 'Current. >

,. - River Embankment

FIGURE 1. BACHUAN & HUAIYUAN RIVERS IMPROVEMENT GENERAL LAYOUT

PEOPLE'S REPUBLIC OF CHINA CHONGQING URBAN ENVIRONMENT PROJECT JUNE 2004 THE WORLD BANK LOAN SAVINGS COMPONENTS 235 00321

TONGLIANG - BACHUAN & HUAIYUAN RIVERS IMPROVEMENT SOGREAH GENERAL LAYOUTNGENERALLAYOUT~ ~ ~ ~~IGREN~ N

Al

>'" 'f

1 t TreatmentSewage Plant Legend

y gC/jY .< | C ! 5 "_e~~~~~~~~~~~SmcTratmnt Plmnt

Main lntrception Pipe

c5oondaryPip.aork of Phas. I

coSdord R P. oowrk of Ph.1 I1I

Saoti-n ( ~ F Monit.red

lonitoroin PointtI - 4 Vl of Envirwental ttoipw

FIGURE 2. SEWAGE TREATMENT PLANT & NETWORK GENERAL LAYOUT

PEOPLE'S REPUBLIC OF CHINA CHONGQING URBAN ENVIRONMENT PROJECT JUNE 2004 THE WORLD BANK LOAN SAVINGS COMPONENTS 235 00321

TONGLIANG - BACHUAN & HUAIYUAN RIVERS IMPROVEMENT

( SOGREAH SEWAGE TREATMENT PLANT 8 NETWORK GENERAL LAYOUT

rALI~ FIUR _ .

br;t$ i %jNotSG

lt,,~~- tq wJ 1 1l, C#A - / J i

.I!1,- ,,-j bre A

II

HUAY4JAg 4e

FIGURE 3. RIVER EMBANKMENT GENERAL LAYOUT

JUNE 2004 PEOPLE's REPUBLIC OF CHINA CHONGQING URBAN ENVIRONMENT PROJECT 235 00321 THE WORLD BANK LOAN SAVINGS COMPONENTS

'~~SOGREAH TON GLIANG - BACHUAN & HUAIYUAN RIVERS IMPROVEMENT RIVER EMBANKMENT GENERAL LAYOUT FGR 0 44- 0~~~~~~~~~~~~

.--'---- I-

E

t~~~~~~4 *S 4$ 32 +a.

,X, .~- I s--~~~~~~~~~~~

D_J ~~~~~Ie%@'

FIGURE 1. LAIxI RIVER ENVIRONMENT IMPROVEMENT GENERAL LAYOUT PROJECT JUNE 2004 REPUBLIC OF CHINA CHONGQING URBAN ENVIRONMENT PEOPLE'S COMPONENTS 235 00321 THE WORLD BANK LOAN SAVINGS

ENVIRONMENT IMPROVEMENT -.

-7 ~ ~ ~ ~

FIGURE 2. LONGSHui RIVER EMBANKMENT GENERAL LAYOUT

PEOPLE'S REPUBLIC OF CHINA CHONGQING URBAN ENVIRONMENT PROJECT JUNE 2004 THE WORLD BANK LOAN SAVINGS COMPONENTS 23500321

f'C~OGREAH DAZU - LAIXI RIVER ENVIRONMENT IMPROVEMENT LONGSHUI RIVER EMBANKMENT GENERAL LAYOUT FIGURE N°2 Guotanxi WWTP(constructed)

Legend River Embankment Wastewater collection network Q WWTP

LAYOUT FIGURE 1. TAOHUA RIVER ENVIRONMENT IMPROVEMENT GENERAL

CHONGQING URBAN ENVIRONMENT PROJECT JUNE 2004 PEOPLE'S REPUBLIC OF CHINA 235 00321 THE WORLD BANK LOAN SAVINGS COMPONENTS

CHANGSHOU - TAOHUA RIVER ENVIRONMENT IMPROVEMENT SOGREAH GENERAL LAYOUT FIGURE N°1 T~~~~

qrl+

In -0100 200 300 400M

Ift -0..

Changliang Highway Bridge

k-. Taodong Bridge .

~8-''Taohualiting , , _

| t , see, , \ z;U -C-. IA U*_ Ui i t.} }. t"

t - W XF7^-v g ; 4' ' | -J F

FIGURE 2. RIVER EMBANKMENT GENERAL LAYOUT

PEOPLE'S REPUBLIC OF CHINA CHONGQING URBAN ENVIRONMENT PROJECT JUNE 2004 THE WORLD BANK LOAN SAVINGS COMPONENTS 235 00321

.ffi~SOG H CHANGSHOU - TAOHUA RIVER ENVIRONMENT IMPROVEMENT SOGREAH RIVER EMBANKMENT GENERAL LAYOUT FIGURE N°2 i s Grade li llain wrep ripeer jpeEEr drainage

r n Grade 11 Main Sewage Pipe To Sewage tratment

FIGURE 3. SEWAGE NETWORK GENERAL LAYOUT INTAOHUA NEW URBAN AREA JUNE 2004 OF CHINA CHONGQING URBAN ENVIRONMENT PROJECT PEOPLE'S REPUBLIC 23500321 THE WORLD BANK LOAN SAVINGS COMPONENTS

- TAOHUA RIVER ENVIRONMENT IMPROVEMENT IrSOGREAH CHANGSHOU 0 SOG E S NETWAH FIGURE N 3 .\-.~v/- . SEWAGE NETWORK GENERAL LAYOUT - I

~~I I

FIGURE 1. WUJIANG RIVER IMPROVEMENT GENERAL LAYOUT

. ~~~~~PEOPLE'SREPUBLIC OF CHINA CHONGQING URBAN ENVIRONMENT PROJECT JUNE 2004 THE WORLD BANK LOAN SAVINGS COMPONENTS 235 00321

04 ~~~~~~WULONG - WUJIANG RIVER IMPROVEMENT GEEA AOTFIGURE N°1 SOGRkEAH GENERAL.LAYOU 'y-4~~~~~~

FIUR RVREBNKETGNRLAYU1.

-~~~~~~~~~~~~~~~~~~~.

ENVIRONMENT PROJECT JUNE 2004_ REPUBLIC OF CHINA CHONGQING URBAN PEOPLE'S COMPONENTS 235 00321 THE WORLD BANK LOAN SAVINGS IMPROVEMENT fflF ~~~~BISHAN -BINAN RIVER ENVIRONMENT SOGREAH ~~RIVER EMBANKMENT GENERAL LAYOUT FGR ° . #v. ^ - Xrl%%)njinh.e 1 S§j *b ~~~~~~~~~~~~~r

0~~ I '~~~1---- -'1-6

l Se F g ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~lou

.0 Ws ~ ~ Popsd T

* -Prpseteae < _ B a d Q u p~~~~~~~~~~~~acupr

-< { j 1 Zr > > r;4 { ^1Reservoir where

<, ,,,, w 1s* *.- -Q^'*+ ~~~~forbackcup water

AP. ; _( - r , F4h"- _s )2 t} 19 " - -_ Proposed raw

* ~~~-' S>g ;XX v ; x ~~~~~~route

rt< ^ =fh^._t 4 i ExistingWrP

- js °b tJ-iN ;!46g - NUO water distribution r\¢TtTE i<,''vz 5tH - ~~~Exitstingjttreabtejd !~~~~~~~~~~~Lgn >~~r wa'te di*Pupstribtion

FIGURE 1. BICHENG TOWN WATER SUPPLY GENERAL LAYOUT

PEOPLE'S REPUBLIC OF CHINA CHONGQING URBAN ENVIRONMENT PROJECT JUNE 2004 THE WORLD BANK LOAN SAVINGS COMPONENTS 23500321

< ~~~~~~BISHAN- BICHENG TOWN WATER SUPPLY

OGREAH ~~~~~~GENERAL LAYOUT FIGURE N°1 . T.*wIn _I

wv -ii . - S /.~~~~~~~~~~~~~~~~~~~~~~~~eSJ A R,IS<{PU"p. - -4 1fi. ''"'4'~~~~~~~~~~~~~~~~~~~~~~~~~~~~~hpp

Ovtylwpp tow"w)~ ~ ~ ~ ~ ~ ~

FIGURE 1. DONGYANG TOWN WATER SUPPLY GENERAL LAYOUT

ENVIRONMENT PROJECT JUNE 2004 PEOPLE'S REPUBLIC OF CHINA CHONGQING URBAN COMPONENTS 235 00321 THE WORLD BANK LOAN SAVINGS

BEIBEI - DONGYANG TOWN WATER SUPPLY SOGREAH GENERAL LAYOUT FIGURE NO1 ID~~~~~~~~~~~~~~~

dh-~ ~ ~ ~ ~ ~ ~~ F vv ~ ~

_ _ ~~List o f struclunrl 1~ ~~~~~~~~~~~~~~~- I -Ti- *.nrc -

_* %.a.. , c... t b.a.i

P.. §__., ...... ~ . _= =

FIGUJRE 2. WATER TREATMENT PLANT GENERAL LAYOUT

PEOPLE'S REPUBLIC OF CHINA CHONGQING URBAN ENVIRONMENT PROJECT JUNE 2004 THE WORLD BANK LOAN SAVINGS COMPONENTS 235 00321

2< BEIBEI- DONGYANG TOWN WATER SUPPLY FIGUREWATER 2. TREATMENT PLANT GENERAL LAYOUT PEOPLE'SCHONGQINGREPUBLIC OFCHINA URBAN ENVIRONMENT PROJECT JUNE 2004~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ - -~~~~~~~~~~~~~~~g -

secondary boostingr- pump ra,

! f~~~~~. %

. ; ~~ : ^jmm legend - .\ r~~~;:& aasFelevated water tank secondarY boosting pum | usanH road station at Shengquan Optiofn2 anrila &7 . --=1 l*0I1Y- Option 1 for water ; transportation pipe s J UhttX-: Option 2 for water piPe primary boosting pu transportation supply pipe station at jiujiaw n diarietarof water Opton 1&2I ___ intermediate boosting pump station

.{' '' ::12 *r water plant ,-4.:, . 9^r:g a F -~ tS'.nYangtse River

ef'teriaiker ~oPr ' %^Note\X< Opt i on 2 i s the i- Degang town-uio' j recommended option

- ZftM9 i2 wg}i{47 I#*T9 P W

FIGURE 1. SHUANGFU TOWN WATER SUPPLY GENERAL LAYOUT

ENVIRONMENT PROJECT JUNE 2004 PEOPLE'S REPUBLIC OF CHINA CHONGQING URBAN COMPONENTS - 235 00321 THE WORLD BANK LOAN SAVINGS WATER SUPPLY -Ae-99-mi JIANGJIN - SHUANGFU TowN FIGURE N°1 SOGREAH GENERAL LAYOUT CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

APPENDIX 5 OUTLINE OF INDEPENDENT MONITORING AND EVALUATION ON RESETTLEMENT

1. Objectives of M&E According to the requirements of World Bank OP4.12 Involuntary Resettlement, appendix 3 Involuntary Resettlement Monitoring and Evaluation Technical Guide of technical files NO.80 Involuntary Resettlement and Rehabilitation in Development Project-- Policy Guide to World Bank Assisted Project and Resettlement Monitoring and Evaluation Operational Guide of China Loan Project of World Bank, independent monitoring and evaluation on reseKtlement of Chongqing Urban Environment Saving Loan Project was carried out, through checking the process, fund, management of residential house demolition and resettlement, enterprises and institutions relocation, shop resettlement, follow and evaluate on resettlement of the project. While reports are submitted to World Bank, PMO and, related superior departments regularly (twice a year), information and suggestions are provided, which is the reference to decision of related departments. Through independent monitoring and evaluation, World Bank and project superior departments can have a well know about whether land acquisition and resettlement is achieved on schedule and with stipulated quality, and problems will be brought forward, and suggestion for improvement will be put forward.

2. Contents of Resettlement Monitoring and Evaluation

(1) M&E on Progress of Land Acquisition and House Demolition

Including: Oprogress of land acquisition; ()progress of temporary land occupation; (a)progress of project affects. (2) M&E on Progress of residential houses demolition and resettlement

Including: (Oprogress of house demolition and compensation; i2)construction progress of house for resettlement; ®Progress of movement and resettlement.

(3) M&E on Progress of enterprises and institutions demolition and resettlement

Including: Oprogress of enterprises and institutions demolition and compensation; (Oreconstruction progress; ()Progress of movement and resettlement

(4) M&E on Progress of shops demolition and resettlement

Including: Oprogress of shops demolition and compensation; (2progress of shops resettlement; ®) Progress of movement and resettlement. (5) M&E on Fund Fulfilment and Utilization

Including: (I Fulfilment condition of fund transfer; (Z Utilization condition of fund (plan and actual).

(6) M&E on production rehabilitation of shops and enterprises (7) M&E on the resettlement management and implementation agencies capacity (8) M&E on participation and grievance appeal redress

SOGREAH CONSULTANTS- 23500321 R4 - AUGUST2004 PAGE 12 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGOING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

3.1ndependent Monitoring Institute monitoring and employ through competitive bidding an independent The project office will for the project. The to supervise the execution of the resettlement action assessment agency highly experienced in resettlement monitoring and assessment team consists of a board of experts and sociology.

4. Organization and Division of Resettlement M&E survey, data monitoring institute are entrusted to be responsible for specific (1) The independent and examine the results. collection of M&E by CPMO, then calculate and analysis it, will form Resettlement M&E Group of Chongqing Urban (2) The independent monitoring institute officer of Project, whose task is that, under the directions of project Environment Saving Loan M&E outline, establish carry out M&E on resettlement, and take charge of compiling World Bank, analysis, and take charge in compiling monitoring site, and preside over on-spot survey and inside resettlement M&E reports. of staff and transportation etc. during (3) The independent monitoring institute provides cooperation resettlement M&E group carries out on-spot survey.

5. Resettlement M&E Methodology analysis and experts comprehensive (1) The method of combination of on-spot survey, calculating evaluation is adopted. survey on method of combination of spot and side is employed. Comprehensive (2) The survey is conducted. Sampling survey on process, fund and institute and management etc of resettlement the resettled households is conducted. survey on stochastic sampling etc is adopted in survey, and spot follow-up (3) Method of classified conducted. Sampling proportion: resettled households, shops, enterprises and institutions is typical and institutions demolished. 10% demolished households, 20% shops, 20% enterprises and documents etc are employed in (4) Methods of survey sheet, interview, inquiring files comprehensive survey. kinescope and practicality etc should (5) Besides letter data, information such as pictures, records, be collected.

6.Schedule of Independent M&E on Resettlement bidding an independent monitoring August 2004, Chongqing PMO will employ through competitive and evaluation agency set up independent resettlement M&E September 2004, the independent monitoring institute will group, and compile work outline. including, compiling survey 2004, do independent resettlement M&E preparation well, October tasks and choose monitoring sites. outline and sheet, set up monitoring system, and nail down

PAGE 13 SOGREAH CONSULTANTS-23500321.R4 -AUGUST 2004 CHONGQING MUNICIPALITY - THE WORLD BANK CHONGQING URBAN ENVIRONMENT PROJECT RESETTLEMENT ACTION PLAN

I Conduct the baseline survey in December 2004;

Produce the first report in August 2005 and the second in February 2006; 14 Submit assessment reports (Issue 3 to Issue 5) in the same period from August 2006 to August 2007.