Business Review Property
32 CITIC Pacific Summary Financial Report 2009 Key operational highlights • Twin office towers of Shanghai Lu Jia Zui New Financial District Project topped out, one already sold • Ningbo Pacific Plaza office building completed • Construction of the infrastructure, two hotels and apartments at Hainan project progressing well • Strong residential sales in Shanghai, Wuxi, Yangzhou and Jiangyin
CITIC Pacific Summary Financial Report 2009 33 34 Business Review C I T I C P a c i f i c S u m m a r y F i n a n c i a l R e p o r t 2 0 0 9 Assets Property CITIC Pa Gross floorarea Capital Cash L i a b i l i t i e s
Assets
Profit TurnoverH K $ m i l l i o n Hong Mainland Hong Mainland Hong Mainland Chin Mainland
inflow
c o n t r i b u t i o n
e x p e n d i t u r e a
Kong Kong Kong
91% cific proper
from China China China
o p e r a t i o n s
Pr ties oper Pr oper ty ty 9% 26% Hong Kong Hong Kong 11,093 29,728 3,3813,620 7,158 1,647 2009 473 397 524 508 (33)% 259% 5,058 1,007
431 63% 4,391
11,121 2,7 14% 25,973
27% 0 8 Change2008 73% 9 (4)% 492 9 (19)% 490 8 109% 787 523
Chin Mainland a 0% 0%
Jiangsu Beijing Tianjin Yangzhou China Nanjing Jiangyin Yangtze Shanghai Chongqing Wuxi Shanghai River Suzhou Delta Guangzhou Anhui Hong Kong Hangzhou Hainan Shaoxing Zhejiang Ningbo Haikou
Boao Hainan Wanning Island
Sanya
Cities in which CITIC Pacific owns land
Profit contribution
Mainland China 14% 57% Property Property
43% Hong Kong
CITIC Pacific Summary Financial Report 2009 35 36 Business Review C I T I C P a c i f i c S u m m a r y F i n a n c i a l R e p o r t 2 0 0 9 In The• M a i n l a n d C h i n a Property t r a n s a c t i o n Strategic• property Co-operation• up economic Two of growth high-speed i n t e r c h a n g e s , with by CITIC mainland By gr
2009, mainland
P e n i n s u l a o n H a i n a n I s l a n d m a r k e t i n f o r m a t i o n a n d o t h e r r e s o u r c e s w e l l - p l a n n e d the oss floorarea(G Residential
factors l a r g e - s c a l e
Pacific
pace mainland
and the
market, 18%
5%
China, housing. De
volume
railway
property driving
u r b a n i s a t i o n . of China’s has
focus
secondary
velopment land 10% FA
r e s i d e n t i a l
properties f a c i l i t i e s . many
) the
with China
O
on lines supply the
rise property
ffice
government market
of Shanghai
CITIC
long-term over
67%
and
town property which
With
and
c o m m u n i t i e s in
50%. in urban
market Real excellent
centres
Retail the the mainland
are
and d e v e l o p m e n t To has
Estate c o n s t r u c t i o n provision
market t r a n s p o r t a t i o n s u b s t a n t i a l
are maintain
been
are major
locations
economic
supported China
Hotel/Reso on emerging
stepping is
of
future
cities 96% To a
a
in
saw tal grossfloorarea
key of
healthy
in
scale.
new
rt
in
focus facilities
projects.
the
and Yangtze These District New new project l a r g e - s c a l e c o m p r e h e n s i v e The Peninsula to island We projects coming : 5.3 million
The
a benefit
expect
main d e v e l o p m e n t
railway City
include as two
River project, in 4%
years.
m in
an Station
Shanghai 2 business on from
China the companies r e s i d e n t i a l
i n t e r n a t i o n a l transport
Delta Hainan
Shanghai’s
profit
the
the community
projects, to
of
g o v e r n m e n t ’ s
Sichuan area,
increase and of
our c o n t r i b u t i o n Island
system. d e v e l o p m e n t s
CITIC
will
Noble resort
tourism as Lu
which 33%
is
Beilu
share f a c i l i t i e s .
well Jia s u b s t a n t i a l l y
Pacific well In
Zhujiajiao
Manor project
vestment Zui
form
Station as
d e s t i n a t i o n . plan underway from
knowledge,
New
the
offering
16% in part
in to
51% our
Yangzhou
Financial Shenzhou
New
Shenzhou and promote
in
of
property
the and
the
Jiading
Town
city’s stands
the are
Development Properties
Approx. site area Approx. GFA Expected Project Usage Ownership (m2) (m2) completion Shanghai New Westgate Garden Residential, retail 100% Phase I 32,900 2,000 Completed Phase II 35,300 137,000 2015 Qingpu Residential Residential, 100% 796,800 545,000 In phases from Development hotel, retail 2009 onwards (approx. 31,000 m2 completed) Lu Jia Zui New Financial Office, hotel, 50% 249,400 847,000 2010 to 2018 District Project residential, retail Site at Sichuan Beilu Station of Metro Line Office, retail 100% 13,300 53,000 2012 No. 10, Hongkou No.10, Hainan Rd., Hongkou Office, retail 100% 16,400 66,000 After 2012 Site at Jiading New City Station of Office, hotel, 100% 156,000 538,000 In phases from Metro Line No. 11, Jiading residential, retail 2011 onwards Zhejiang Province Pacific Plaza, Ningbo Office, retail 100% 39,500 18,000 Completed Jiangsu Province Yangzhou Residential, retail 100% 328,600 359,000 In phases from 2009 onwards (approx. 90,000 m2 completed Jiangyin Residential, retail 70% 91,300 178,000 2010 to 2011 Binhu District, Wuxi Residential, retail 70% 1,479,000 249,000 In phases from 2010 onwards Hainan Province Shenzhou Peninsula Hotel, retail, 80% – 7,432,700 2,100,000 In phases from Wanning residential 99.9% 2010 onwards Total 10,671,200 5,092,000 GFA = gross floor area i.e. the total area of permitted construction above ground
Projected completion in the next five years
’000 m2
800
630 590 570
360
2010 2011 2012 2013 2014
Target completion from 2015 to 2018: 2.1 million m2
CITIC Pacific Summary Financial Report 2009 37 38 Business Review C I T I C P a c i f i c S u m m a r y F i n a n c i a l R e p o r t 2 0 0 9 Property Progress The E x p e c t e d Usage: c o m p l e t i oGross n : floorS i t earea: a r e a : SHANGHAI previously is the developed S h i p b u i l d i n g Grade-A With a being master prominent along Phase star attracting managed p a r t i c u l a r l y As Total O t h e r p h a s e s a p a r t m e n t s Hotel
Twin Phase I
hotel. the
the
Huangpu hotel site
riverside
office
last
&
the l developed financial
comprises
plan.
serviced of
office
with prime
by Huangpu
an
the
used towers by landmark
the
Once an
increasing
C o r p o r a t i o n ,
River
CITIC views
Lu serviced buildings,
Lu centre
i n t e r n a t i o n a l l y
d e v e l o p m e n t
as
Jia
in two L u J i a Z u i N e w F i n a n c i a l D i s t r i c t P r o j e c t
Jia completed, a
in
Pacific
phases
River.
shipyard Zui and
in Zui central
Grade-A of
a p a r t m e n t s , 2 0 1 0 – 2O 0 f 1 fi 8 c e , r847,000 e t a i l , hm o t e l a n d r e s i d e n t i al 249,400 m
the
number New
convenient China,
Financial retail Approx.
this and
under Lu
Shanghai. 847,000
Financial by 8 , 0 69% 584,000 0 , 0 2% 4Q 24% 200,000 6 , 0 31% 263,000
area
Jia renowned the
office project premises, 63,000
the Shanghai
of Shanghai
G r F c A r e Pe g n e t t a g e Ta 2 (m 2 Zui
a project District
financial China on
which c o m p r e h e n s i v e 2
of ) buildings transport
Financial
the
will District
Jointly
apartments
hotel State (and
will in south will
comprise Shipyard
i n s t i t u t i o n s
Pudong) total
be
become
and project,
links, District operator. 100%
shore
F cmlto Status completion GFA % 4Q 7%
a
Co., five it
and is
is
of a
be building; c o r p o r a t i o n quarter 2009 The that
sold 2 0 1 s 2 e Ba m e n t 2010 One
twin wish
and
to of Under under The
office
the to are
another 2010.
set that
other expected
towers
50% owned up
One
will
other tower
c o r p o r a t i o n .
their
tower, c o n s t r u c t i o n planning up
set tower
to
were to
and
to sold
regional up
end be
be subject
s u p e r s t r u c t u r e
has its
to sold topped
Jan completed
a h e a d q u a r t e r s
already single
soon
2010 h e a d q u a r t e r s
to
out
contract,
subject
c o r p o r a t i o n
been
in
in works
November
the
in to
sold
will
fourth the contract in
the
to soon
a
city.
SHANGHAI Qingpu Residential Project – Zhujiajiao New Town 100% owned
Site area: 796,800 m2 Gross floor area: 576,000 m2 Usage: Low density residential, retail and hotel Expected completion: In phases from 2009 onwards
Located at the junction of Shanghai, Zhejiang Province and Jiangsu Province, Qingpu District is the gateway to and focus of development in the western part of Shanghai.
Next to scenic Dadian and Dianshan lakes, the Zhujiajiao living environment in the core district of Zhujiajiao, with New Town project will take full advantage of the cultural villas, semi-detached houses, town houses, retail shops traditions and history of the area. It will create a unique and a hotel. Progress Sales up to end Jan 2010 Approx. Percentage Target Pre-sale Units Average price GFA (m2) of total GFA completion year sold GFA(m2) RMB/m2 Phase I 31,000 5% Completed 2007 61 9,800 8,400 Apartments & low-rise houses 2008 54 7,800 12,000 2009 85 11,300 10,800 Phase II 39,000 7% 2Q 2010 2009 347 35,600 10,300 Apartments & low-rise houses Phase III 74,000 13% 1H 2011 – – – – Apartments & low-rise houses Hotel 27,000 5% In phases – – – – from 2011 Other phases 405,000 70% Under planning Total 576,000 100% 547 64,500
From the first pre-sale in September 2007 to the end of January 2010, a total of 547 units (64,500 m2 GFA) were sold, of which 44,000m2 GFA were apartments and the remainder were low-rise houses with average selling prices of RMB8500/m2 and RMB14,200/m2 respectively.
SHANGHAI New Westgate Garden 100% owned
Phase I Located in the Huangpu District of Shanghai at Xizang Site area: 32,900 m2 Nanlu and Jianguo Donglu, this premium residential Gross floor area: 117,000 m2 development is within walking distance of the Lao Xi Usage: Residential Men subway station on the new Metro Line 8. Completed: June, 2006 It comprises residential towers and retail shops with Current Status: 99% sold a basement car park. Phase II Site area: 35,300 m2 Gross floor area: Approx. 137,000 m2 (subject to government authority approval) Usage: Residential and retail Expected completion: 2015 Current Status: Re-settlement in progress
CITIC Pacific Summary Financial Report 2009 39 40 Business Review C I T I C P a c i f i c S u m m a r y F i n a n c i a l R e p o r t 2 0 0 9 Property C u rE r x p e e c t e n d Usage: c t o m p l e t i S o n : t a t u s : Gross floorS i t earea: a r e a : SHANGHAIC u r r e n t sE t x a p e t c u t s : e d Usage: c o m p l e t i oGross n : floorS i t earea: a r e a : SHANGHAI The C u rE r x e p n eUsage: t c t s eGross t d a floor c tS i t o u earea: m a s r e p : a : lSHANGHAI e t i o n :
Station c o n s t r u c t i o n 2010. outlets, by advantages Located gateway such As as project new Putuo, its includes under
a c o m p l e t i o n . the the
base site
Metro as
The
trial
first
metro Changning,
is
Suzhou, of
will
is
in
the to
for
situated
Metro project, situated
operation northwest satellite
Line a
benefit
offered the Jiading
number and line
The
No.11,
Kunshan science
Line
and expected
J i a d i n g N e w C i t y S t a t i o n o f M e t r o L i n e N o . 1 1 N o . 1 0 , H a i n a n R o a d S i c h u a n B e i l u S t a t i o n o f M e t r o L i n e N o . 1 0 at comprising
city above Xuhui
first
from
by New the
at
Shanghai, of No.
the
which
of
Hongkou. I n p h a s e sO f fi f r c o e m , 2 r 0a e 1 p t p 1 a r i o l o x , nO . t w h a h 4 e r o 4 r d t 1 s e , p l h 0 0 a aP 0 s n h e d a s m s r e – e s I i d538,000 – e n a t p i p al r o xm . 9 7 , 0 0 0 m After 2012Office and66,000 retail m 2012Office and53,000 retail m C o n s t r u c t i o n i n p r o156,000 g r e m s s D e s i g n i n p r o g r e s s 16,400 m i n p r oB g r e a s s s e m e n t c o n13,300 s t m r u c t i o n the phase
n e i g h b o u r i n g and Jiading
the City and
Shanghai, and
10, the overall
end
to
automobile
which pedestrian
will
Station, Taicang
Sichuan Pudong
of
be office
of New Jiading
2 the 2 2
2
run g e o g r a p h i c a l o p e r a t i o n a l
2 2 2009.
is Jiading
Metro
buildings City through
was currently
in
New Beilu economic
District
Jiangsu i n d u s t r i e s . flow
Station
2 completed
Line,
District
is Metro
well generated Jiading, by 100% owned
and
is
under
which Province.
regions of mid 2 the
known
after
retail This the
and
The developed retail integrated city’s c o m p r e h e n s i v e centres, research Acquired east designed project
Jiading
side
metro shops
for
sports
districts of
in and
with this in
our New and lines December
phases,
developed
and thriving
Sichuan
an plan a
City
and in
hotel. 100% owned
i n t e r c h a n g e
r e c r e a t i o n a l the
of
Station other will
100% owned
2007,
r e s i d e n t i a l s u r r o u n d i n g district.
The Beilu
include as
public
a d e v e l o p m e n t
project, the
Station combined
hub parks
site
r e s i d e n c e s ,
transport, districts,
i n c o r p o r a t i n g
area.
is also project.
and
situated
landmark
being
scientific will
business
under
offices, It
be
will
on
the
the
a be
ZHEJIANG PROVINCE Ningbo Pacific Plaza 100% owned
Site area: 39,500 m2 Pacific Plaza is located in Jiangdong District of Ningbo, Gross floor area: 98,000 m2 the economic provincial capital of Zhejiang Province. Usage: Office and retail The site is close to Ningbo Eastern New City, the future Expected completion: October 2009 political and economic heart of Ningbo. In 2009, CITIC Current Status: Sale and leasing underway Pacific acquired the remaining 0.7% equity interest of the project company from the local joint venture partner.
Pacific Plaza comprises two Grade-A office towers and a shopping mall. Strata-title sales of one office tower and leasing of another office tower and its retail podium are currently underway.
Progress By the end of January 2010, the shopping mall (approx. 27,100m2 GFA) and 17% of the office space (approx. 3,500m2 GFA) were sold.
JIANGSU PROVINCE Wuxi Binhu District Residential Project 70% owned
Site area: 1,479,000 m2 property in the Binhu District of Wuxi. The site is located Gross floor area: 249,000 m2 in front of scenic Tai Lake and is about 15 minutes’ driving Usage: Residential and retail distance of the city centre. Developed in phases with Expected completion: In phases from 2010 onwards villas, town houses and low-rise and mid-rise residential buildings, the project will take advantage of picturesque CITIC Pacific, together with the Wuxi Guolian Group, is views of the landscape, golf course and Tai Lake. jointly developing this residential and commercial Progress Sales up to end Jan 2010 Approx. Percentage Target Pre-sale Units Average price GFA (m2) of total GFA completion year sold GFA(m2) RMB/m2 Phase I 157,000 63% 2Q 2010 In phases 381 69,000 17,300 Apartments & from 2009 low-rise houses Phase II 92,000 37% 3Q 2011 – – – – Apartments & low-rise houses Total 249,000 100% 381 69,000
From the first pre-sale in May 2009 to the end of January 2010, a total of 381 units (69,000 m2 GFA) were sold, of which 47,300 m2 GFA were apartments and the remainder were low-rise houses with average selling prices of RMB12,300/m2 and RMB28,200/m2 respectively.
CITIC Pacific Summary Financial Report 2009 41 42 Business Review C I T I C P a c i f i c S u m m a r y F i n a n c i a l R e p o r t 2 0 0 9 Property were Progress In Gross floorS i t earea: a r e a : J I A N G S U P R O V I N C E From Progress Located Gross floorS i t earea: a r e a : J I A N G S U P R O V I N C E From E x p e c t e d Usage: c o m p l e t i o n : E x p e c t e d Usage: c o m p l e t i o n : CITIC units Jiangyin designed (122,300 and into Retail ApartmentsPhase II A p a r t m e n t s O t h e r p h a s e s
Total
Total A p a r t m e n t s Phase I
Jiangyin,
n e i g h b o u r i n g a
in
sold
Pacific
the the r e s i d e n t i a l
low-rise,
in
X i n g c h e n g ’ s m
first first to
with
the
2
200 1 21/01 09 7 45,200 371 2009 2010/2011 21% 92,000 one
blend GFA) and 5,0 58% Under 255,000
pre-sale pre-sale
western
an
of mid-rise
the and
were
average
e n v i r o n m e n t h a r m o n i o u s l y the
Wuxi
GFA commercial old
437,000
A p p r o r x e r c . - g e Pe s e n a t t l Pr a e i g Un t e s Ta
f a s t e s t - g r o w i n g in in
part sold 178,000 m 437,000 m 2 0 1 0 – 2R 0 1 e 1 s i d e n t i a l a n d r e t a i l I n p h a s e sR f e r o m s 2 i 0 0 9 d o e n w a n r d t s i a l a n d r e t a i l 91,300 m 328,600 m 0 0 0 1 Cmltd 07 5 28,000 253 2007 Completed 21% 90,000
September December and
GFA steel (m
178,000
A p p r o x . r Pe r c g e e e n t - t Pr s a a g l e e i Ta Un t s Guolian 5 , 0 8% Mid 87% 154,000 selling
of
4 0 0 3 End 13% 24,000 with 2
of ) high-rise
the (m
mill Y a n g z h o u N o b l e M a n o r J i a n g y i n R e s i d e n t i a l P r o j e c t
of
2 2
with of) an
2 2
city
2 price
property.
Yangzhou.
Group
site
average 2008
2007
total
the centre,
buildings
total cities in of 100%
area’s
to the
are F completion GFA year sold GFA(m RMB8,400/m 100% to
G m F p A l co e a t l r i A d so o ( GF n m ye the
selling in the this
A c o - d e v e l o p i n g eastern
Jiangsu variety historical
end will
end project
price
be of
of city
planning of
January 2 provided.
Province, January .
has
r e s i d e n t i a l culture
of
centre of
RMB5,900/m
0 1 – – – – 2011 0 0 08 6 8,700 56 2008 2010
been the
00 500 3 21,200 2010 174 27,400 2009 In 231 2008
2010,
2010,
00 3 2,200 13 2010
09 7 105,900 670 2009
phases 100% owned
a
a
total
total
from 70% owned 2 .
of
of –
739
1,032 1,032 739
apartment
apartment
Sales Sales 116,800 122,300
up up
units
to to
units 2 2
– end end ) ) Average Average
(116,800
Jan Jan
2010 2010
m
RMB/m RMB/m 2
10,400 GFA) 8,400 6,2005,9005,900 7,800 6,100
5,600 price price –
2 2
HAINAN PROVINCE Wanning Shenzhou Peninsula 80%-99.9% owned
Site area: 7,432,700 m2 Gross floor area: 2,100,000 m2 Usage: Residential, hotel, retail and recreation Expected completion: In phases from 2010 onwards Current Status: Design and construction of Phase I (approx. 440,000 m2 GFA) in progress
CITIC Pacific is developing a resort project on the Shenzhou Peninsula of Hainan Island and is responsible for the project’s overall planning and infrastructure construction. This project will benefit from the Constructed by the Hainan provincial government, this government’s recent plan to promote the island as an new express railway is targeted for completion international tourism destination. in 2011. By then, the accessibility of the Shenzhou The project will also benefit from a new express railway Peninsula site will be significantly improved from line being built along the east coast of Hainan Island, Haikou and Sanya, both of which are regional hubs with which will connect the cities of Haikou and Sanya, and a international flights. railway station at Wanning city, which is approximately We recently sold the development rights of several lots six kilometres from the Shenzhou Peninsula site. (approx. 291,000m2 GFA) to a local developer.
The construction of roads and bridges is substantially completed, and development of the two hotels and Sunbury apartments of Phase I is in progress. The two hotels, which will be managed and operated by Starwood Hotels Group as a Sheraton hotel and Four Points by Sheraton hotel, are scheduled to open at the end of 2010. Pre-sale and target completion of Sunbury apartments are expected in 2010/2011 and the second half of 2011 respectively.
Investment Properties
Approx. GFA Project Usage Ownership (m2) CITIC Square, Shanghai Office, retail 100% 114,000 Royal Pavilion, Shanghai Serviced apartments 100% 35,000 New Westgate Garden, Retail Portion (phase I), Shanghai Retail 100% 23,000 Pacific Plaza, Ningbo, Zhejiang Province Office, retail 100% 49,000 Total 221,000 GFA = gross floor area
CITIC Pacific’s investment properties in mainland China continue to enjoy steady rental growth with an overall occupancy of about 93% if the newly completed Pacific Plaza in Ningbo is excluded.
CITIC Pacific Summary Financial Report 2009 43 44 Business Review Major• C I T I C P a c i f i c S u m m a r y F i n a n c i a l R e p o r t 2 0 0 9 Discovery D i s cD o v e e v r e y l o B p a m y e n t P r o p e r t i e s • 231,000Hong Kong large HKR Discovery Property By gr Commercial o c c u p a n c y o f a p p r o x i m a t e l y 8 4 % a s o f t h e e n d o f J a n u a r y 2 0 1 0 oss floorarea(G Residential
I n t e r n a t i o n a l
r e s i d e n t i a l
investment
11%
Bay, Bay
De m 7%
2 has
which velopmen o f g r o s s f l o o r a r e a t o b e d e v e l o p e d i n D i s c o v e r y B a y FA
Centre. d e v e l o p m e n t )
Ltd. evolved O ffice
is
Since properties
50%
82% The tI
into
its owned
portfolio
jointly
Retail launch a
fully
include
by
developed integrated
in CITIC
enjoys
1973, Hote
CITIC
Pacific, To 45% l
tal grossfloorarea a
with
stable Tower
is Industrial
a
rental (the suburban Situated the open : as course 0.5 million
Group’s
a income
Disney private
space
55% and
m on
2 m u l t i n a t i o n a l h e a d q u a r t e r s )
Theme
marina. with
beach, and the
coast
r e c r e a t i o n a l
an
Park, central
overall
of
Discovery northeast r e s i d e n t i a l
park, 6% and
and nv
DCH
scenic 39%
estmen leisure
Bay Lantau
community.
54%
is promenade,
facilities endowed
t Island 1%
next
such
with
golf
to
The current Yi Pak Bay development is located in the Superstructure works of Phase 14 (a mid-rise northern part of Discovery Bay. It has a gross floor area development of approximately 16,000m2 GFA ) is of approximately 218,000 m2, of which 91,000 m2 have in progress with completion scheduled for the second been developed as Siena One (Phase 11) and Siena Two half of 2010. Construction of Phase 15 (a low-rise (Phase 12). Chianti (Phase 13), which has a gross floor development of approximately 18,000m2 GFA) area of 50,000 m2, was 99% sold as of the end of commenced in December 2009, with scheduled January 2010. completion in the first half of 2011. Pre-sale of Phase 14 and Phase 15 is planned for 2010 and the second quarter of 2011 respectively.
Investment Properties
Approx. GFA Project Usage Ownership (m2) CITIC Tower Office, retail 40% 52,000 DCH Commercial Centre Office, retail 100% 36,000 Wyler Centre I Industrial 100% 37,000 Broadway Centre Industrial 100% 21,000 Yee Lim Industrial Centre, Block C Industrial 100% 30,000 111 Lee Nam Road Industrial 100% 60,000 Other Various 100% 49,000 Total 285,000 GFA = gross floor area