Launch Complex 39, Pads a and B
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
New Pad Constructed for Smaller Rocket Launches
PROGRAM HIGHLIGHTS • JULY 2015 At NASA’s Kennedy Space Center in Florida, the Ground Systems Development and Operations (GSDO) Program Office is leading the center’s transfor- mation from a historically government-only launch complex to a spaceport bustling with activity involving government and commercial vehicles alike. GSDO is tasked with developing and using the complex equipment required to safely handle a variety of rockets and spacecraft during assembly, transport and launch. For more information about GSDO accomplishments happening around the center, visit http://go.nasa.gov/groundsystems. New Pad Constructed for Smaller Rocket Launches NASA's Kennedy Space Center in Florida took another step forward in its transformation to a 21st century multi-user spaceport with the completion of the new Small Class Vehicle Launch Pad, designated 39C, in the Launch Pad 39B area. This designated pad to test smaller rockets will make it more affordable for smaller aerospace companies to develop and launch from the center, and to break into the commercial spaceflight market. Kennedy Director Bob Cabana and representatives from the Ground Systems Development and Operations (GSDO) Program and the Center Planning and Development (CPD) and Engineering Directorates marked the completion of the new pad during a ribbon-cutting ceremony July 17. NASA Kennedy Space Center Director Bob Cabana, center, helps cut the ribbon on the new Small Class Vehicle Launch Pad, designated 39C, at Kennedy Space Center in Florida. Also helping to cut the ribbon are, from left, Pat Simpkins, director, Engineering and Technology Directorate; Rich Koller, senior vice president of design firm Jones Edmunds; Scott Col- loredo, director, Center Planning and Development; and Michelle Shoultz, president of Frazier Engineering. -
1993 (179Kb Pdf)
February 4, 1993 KSC Contact: Bruce Buckingham KSC Release No. 10-93 Notice To Editors/News Directors: KSC NEWS CENTER OFFICE HOURS FOR PEGASUS ARRIVAL The NASA B-52 aircraft carrying the Orbital Sciences Cor- poration Pegasus rocket is scheduled to arrive at KSC on Sunday, Feb. 7, with launch targeted for Feb. 9. The aircraft is currently scheduled to depart Edwards Air Force Base, Calif., at about 10:00 a.m. EST on Sunday with a single refueling stopover planned at Sheppard AFB, Texas. If weather permits, arrival of the aircraft at KSC's Shuttle Landing Facility should be about 4:30 p.m. EST. Status updates regarding the cross-country flight will be made on KSC's codaphone over the weekend. This can be reached by calling 407/867-2525. Public Affairs officers will be in the KSC Press Site office by 9:30 a.m. Sunday in order to provide status updates by phone. The office, however, will not officially open until it is deter- mined the aircraft will in fact be arriving at KSC. If it is determined that the aircraft will be successful in completing the day-long trip to KSC on Sunday, the office will officially open at 3:00 p.m. In that event, media interested in viewing the B-52/Pegasus arrival should plan on calling the KSC news center at 407/867-2468 for departure times to the Shuttle Landing Facility. News media who do not possess current credentials must con- tact the Public Information Office before close of business Friday, Feb. -
Space Reporter's Handbook Mission Supplement
CBS News Space Reporter's Handbook - Mission Supplement Page 1 The CBS News Space Reporter's Handbook Mission Supplement Shuttle Mission STS-125: Hubble Space Telescope Servicing Mission 4 Written and Produced By William G. Harwood CBS News Space Analyst [email protected] CBS News 5/10/09 Page 2 CBS News Space Reporter's Handbook - Mission Supplement Revision History Editor's Note Mission-specific sections of the Space Reporter's Handbook are posted as flight data becomes available. Readers should check the CBS News "Space Place" web site in the weeks before a launch to download the latest edition: http://www.cbsnews.com/network/news/space/current.html DATE RELEASE NOTES 08/03/08 Initial STS-125 release 04/11/09 Updating to reflect may 12 launch; revised flight plan 04/15/09 Adding EVA breakdown; walkthrough 04/23/09 Updating for 5/11 launch target date 04/30/09 Adding STS-400 details from FRR briefing 05/04/09 Adding trajectory data; abort boundaries; STS-400 launch windows Introduction This document is an outgrowth of my original UPI Space Reporter's Handbook, prepared prior to STS-26 for United Press International and updated for several flights thereafter due to popular demand. The current version is prepared for CBS News. As with the original, the goal here is to provide useful information on U.S. and Russian space flights so reporters and producers will not be forced to rely on government or industry public affairs officers at times when it might be difficult to get timely responses. All of these data are available elsewhere, of course, but not necessarily in one place. -
Proposal to Construct and Operate a Satellite Launching Facility on Christmas Island
Environment Assessment Report PROPOSAL TO CONSTRUCT AND OPERATE A SATELLITE LAUNCHING FACILITY ON CHRISTMAS ISLAND Environment Assessment Branch 2 May 2000 Christmas Island Satellite Launch Facility Proposal Environment Assessment Report - Environment Assessment Branch – May 2000 3 Table of Contents 1 INTRODUCTION..............................................................................................6 1.1 GENERAL ...........................................................................................................6 1.2 ENVIRONMENT ASSESSMENT............................................................................7 1.3 THE ASSESSMENT PROCESS ...............................................................................7 1.4 MAJOR ISSUES RAISED DURING THE PUBLIC COMMENT PERIOD ON THE DRAFT EIS .................................................................................................................9 1.4.1 Socio-economic......................................................................................10 1.4.2 Biodiversity............................................................................................10 1.4.3 Roads and infrastructure .....................................................................11 1.4.4 Other.......................................................................................................12 2 NEED FOR THE PROJECT AND KEY ALTERNATIVES ......................14 2.1 NEED FOR THE PROJECT ..................................................................................14 2.2 KEY -
Out There Somewhere Could Be a PLANET LIKE OURS the Breakthroughs We’Ll Need to find Earth 2.0 Page 30
September 2014 Out there somewhere could be A PLANET LIKE OURS The breakthroughs we’ll need to find Earth 2.0 Page 30 Faster comms with lasers/16 Real fallout from Ukraine crisis/36 NASA Glenn chief talks tech/18 A PUBLICATION OF THE AMERICAN INSTITUTE OF AERONAUTICS AND ASTRONAUTICS Engineering the future Advanced Composites Research The Wizarding World of Harry Potter TM Bloodhound Supersonic Car Whether it’s the world’s fastest car With over 17,500 staff worldwide, and 2,800 in or the next generation of composite North America, we have the breadth and depth of capability to respond to the world’s most materials, Atkins is at the forefront of challenging engineering projects. engineering innovation. www.na.atkinsglobal.com September 2014 Page 30 DEPARTMENTS EDITOR’S NOTEBOOK 2 New strategy, new era LETTER TO THE EDITOR 3 Skeptical about the SABRE engine INTERNATIONAL BEAT 4 Now trending: passive radars IN BRIEF 8 A question mark in doomsday comms Page 12 THE VIEW FROM HERE 12 Surviving a bad day ENGINEERING NOTEBOOK 16 Demonstrating laser comms CONVERSATION 18 Optimist-in-chief TECH HISTORY 22 Reflecting on radars PROPULSION & ENERGY 2014 FORUM 26 Electric planes; additive manufacturing; best quotes Page 38 SPACE 2014 FORUM 28 Comet encounter; MILSATCOM; best quotes OUT OF THE PAST 44 CAREER OPPORTUNITIES 46 Page 16 FEATURES FINDING EARTH 2.0 30 Beaming home a photo of a planet like ours will require money, some luck and a giant telescope rich with technical advances. by Erik Schechter COLLATERAL DAMAGE 36 Page 22 The impact of the Russia-Ukrainian conflict extends beyond the here and now. -
View / Download
www.arianespace.com www.starsem.com www.avio Arianespace’s eighth launch of 2021 with the fifth Soyuz of the year will place its satellite passengers into low Earth orbit. The launcher will be carrying a total payload of approximately 5 518 kg. The launch will be performed from Baikonur, in Kazakhstan. MISSION DESCRIPTION 2 ONEWEB SATELLITES 3 Liftoff is planned on at exactly: SOYUZ LAUNCHER 4 06:23 p.m. Washington, D.C. time, 10:23 p.m. Universal time (UTC), LAUNCH CAMPAIGN 4 00:23 a.m. Paris time, FLIGHT SEQUENCES 5 01:23 a.m. Moscow time, 03:23 a.m. Baikonur Cosmodrome. STAKEHOLDERS OF A LAUNCH 6 The nominal duration of the mission (from liftoff to separation of the satellites) is: 3 hours and 45 minutes. Satellites: OneWeb satellite #255 to #288 Customer: OneWeb • Altitude at separation: 450 km Cyrielle BOUJU • Inclination: 84.7degrees [email protected] +33 (0)6 32 65 97 48 RUAG Space AB (Linköping, Sweden) is the prime contractor in charge of development and production of the dispenser system used on Flight ST34. It will carry the satellites during their flight to low Earth orbit and then release them into space. The dedicated dispenser is designed to Flight ST34, the 29th commercial mission from the Baikonur Cosmodrome in Kazakhstan performed by accommodate up to 36 spacecraft per launch, allowing Arianespace and its Starsem affiliate, will put 34 of OneWeb’s satellites bringing the total fleet to 288 satellites Arianespace to timely deliver the lion’s share of the initial into a near-polar orbit at an altitude of 450 kilometers. -
The International Space Station and the Space Shuttle
Order Code RL33568 The International Space Station and the Space Shuttle Updated November 9, 2007 Carl E. Behrens Specialist in Energy Policy Resources, Science, and Industry Division The International Space Station and the Space Shuttle Summary The International Space Station (ISS) program began in 1993, with Russia joining the United States, Europe, Japan, and Canada. Crews have occupied ISS on a 4-6 month rotating basis since November 2000. The U.S. Space Shuttle, which first flew in April 1981, has been the major vehicle taking crews and cargo back and forth to ISS, but the shuttle system has encountered difficulties since the Columbia disaster in 2003. Russian Soyuz spacecraft are also used to take crews to and from ISS, and Russian Progress spacecraft deliver cargo, but cannot return anything to Earth, since they are not designed to survive reentry into the Earth’s atmosphere. A Soyuz is always attached to the station as a lifeboat in case of an emergency. President Bush, prompted in part by the Columbia tragedy, made a major space policy address on January 14, 2004, directing NASA to focus its activities on returning humans to the Moon and someday sending them to Mars. Included in this “Vision for Space Exploration” is a plan to retire the space shuttle in 2010. The President said the United States would fulfill its commitments to its space station partners, but the details of how to accomplish that without the shuttle were not announced. The shuttle Discovery was launched on July 4, 2006, and returned safely to Earth on July 17. -
Year in Review 2013
SM_Dec_2013 cover Worldwide Satellite Magazine December 2013 SatMagazine 2013 YEAR IN REVIEW SatMagazine December 2013—Year In Review Publishing Operations Senior Contributors This Issue’s Authors Silvano Payne, Publisher + Writer Mike Antonovich, ATEME Mike Antonovich Robert Kubbernus Hartley G. Lesser, Editorial Director Tony Bardo, Hughes Eran Avni Dr. Ajey Lele Richard Dutchik Dave Bettinger Tom Leech Pattie Waldt, Executive Editor Chris Forrester, Broadgate Publications Don Buchman Hartley Lesser Jill Durfee, Sales Director, Editorial Assistant Karl Fuchs, iDirect Government Services Eyal Copitt Timothy Logue Simon Payne, Development Director Bob Gough, 21 Carrick Communications Rich Currier Jay Monroe Jos Heyman, TIROS Space Information Tommy Konkol Dybvad Tore Morten Olsen Donald McGee, Production Manager David Leichner, Gilat Satellite Networks Chris Forrester Kurt Peterhans Dan Makinster, Technical Advisor Giles Peeters, Track24 Defence Sima Fishman Jorge Potti Bert Sadtler, Boxwood Executive Search Simen K. Frostad Sally-Anne Ray David Gelerman Susan Sadaat Samer Halawi Bert Sadtler Jos Heyman Patrick Shay Jack Jacobs Mike Towner Casper Jensen Serge Van Herck Alexandre Joint Pattie Waldt Pradman Kaul Ali Zarkesh Published 11 times a year by SatNews Publishers 800 Siesta Way Sonoma, CA 95476 USA Phone: (707) 939-9306 Fax: (707) 838-9235 © 2013 SatNews Publishers We reserve the right to edit all submitted materials to meet our content guidelines, as well as for grammar or to move articles to an alternative issue to accommodate publication space requirements, or removed due to space restrictions. Submission of content does not constitute acceptance of said material by SatNews Publishers. Edited materials may, or may not, be returned to author and/or company for review prior to publication. -
Space Shuttle Discovery Launched on the First Post-Columbia Mission on July 26, 2005, 905 Days After the Accident
AFTERWORD Space shuttle Discovery launched on the first post-Columbia mission on July 26, 2005, 905 days after the accident. Coincidentally, the launch took place at 10:39 A.M. EDT, the same time as Columbia’s launch on its final flight. STS-114 was the culmination of a $1.4 billion effort to improve the shuttle, most notably the External Tank. The bipod foam was replaced with an electrical heater to prevent ice from forming. Marshall Space- flight Center External Tank manager Sandy Coleman promised that no foam larger than a marshmallow would fall off of the improved tank. In the 147-page press kit’s description of all of the improvements to the shuttle, KSC’s acceptance of the industry standard definition for FOD (Foreign Object Debris) is presented as a positive. In a spin doctor- ing attempt it’s described how new FOD procedures improve safety, and ignores that FOD rules existed until two years before the Columbia acci- dent when the rules were reduced in a conscious move to make more bonus money for the contractor. Over 100 tracking cameras viewed Discovery’s launch. The E208 camera in Cocoa Beach, the one that had been “soft focused” on STS- 107, was replaced with a state-of-the-art setup. Cameras were also mounted on Discovery’s External Tank and Solid Rocket Boosters, and The bipod fitting on STS-114, on the right, shows the most significant external change— there is no longer any foam on the bipod fitting. 428 AFTERWORD 429 two aircraft with high-definition cameras offered the unique perspective of a shuttle flying toward the viewer. -
7. Operations
7. Operations 7.1 Ground Operations The Exploration Systems Architecture Study (ESAS) team addressed the launch site integra- tion of the exploration systems. The team was fortunate to draw on expertise from members with historical and contemporary human space flight program experience including the Mercury, Gemini, Apollo, Skylab, Apollo Soyuz Test Project, Shuttle, and International Space Station (ISS) programs, as well as from members with ground operations experience reaching back to the Redstone, Jupiter, Pershing, and Titan launch vehicle programs. The team had a wealth of experience in both management and technical responsibilities and was able to draw on recent ground system concepts and other engineering products from the Orbital Space Plane (OSP) and Space Launch Initiative (SLI) programs, diverse X-vehicle projects, and leadership in NASA/Industry/Academia groups such as the Space Propulsion Synergy Team (SPST) and the Advanced Spaceport Technology Working Group (ASTWG). 7.1.1 Ground Operations Summary The physical and functional integration of the proposed exploration architecture elements will occur at the primary launch site at the NASA Kennedy Space Center (KSC). In order to support the ESAS recommendation of the use of a Shuttle-derived Cargo Launch Vehicle (CaLV) and a separate Crew Launch Vehicle (CLV) for lunar missions and the use of a CLV for ISS missions, KSC’s Launch Complex 39 facilities and ground equipment were selected for conversion. Ground-up replacement of the pads, assembly, refurbishment, and/or process- ing facilities was determined to be too costly and time-consuming to design, build, outfit, activate, and certify in a timely manner to support initial test flights leading to an operational CEV/CLV system by 2011. -
Molds Aboard the International Space Station
Mold Species in Dust from the International Space Station Identified and Quantified by Mold Specific Quantitative PCR Stephen J. Vesper a*, Wing Wongb C. Mike Kuoc, Duane L. Piersond a National Exposure Research Laboratory (NERL), United States (US) Environmental Protection Agency, Cincinnati, OH; b Enterprise Advisory Services Inc., Houston, TX c WYLE Laboratories Inc., Houston, TX d Johnson Space Center, National Aeronautics and Space Administration, Houston, TX *Corresponding Author: Stephen Vesper, US EPA, 26 West M.L. King Ave., M.L. 314, Cincinnati, Ohio 45268. Phone: 513-569-7367; email: [email protected] Abstract Dust was collected over a period of several weeks in 2007 from HEPA filters in the U.S. Laboratory Module of the International Space Station (ISS). The dust was returned on the Space Shuttle Atlantis, mixed, sieved, and the DNA was extracted. Using a DNA- based method called mold specific quantitative PCR (MSQPCR), 39 molds were measured in the dust. Potential opportunistic pathogens Aspergillus flavus and A. niger and potential moderate toxin producers Penicillium chrysogenum and P. brevicompactum were noteworthy. No cells of the potential opportunistic pathogens A. fumigatus, A. terreus, Fusarium solani or Candida albicans were detected. Keywords: International Space Station, mold specific quantitative PCR, Aspergillus 1 1. Introduction Since human space exploration began, microbes have traveled with us and are ubiquitous throughout the spacecraft. Previous studies have demonstrated that bacteria, including potential pathogens, were commonly isolated in the air, water, and on surfaces aboard the Mir Space Station [12] and the International Space Station (ISS) [1,6]. Biofilms were found in the water distribution lines on the Space Shuttle Discovery [5]. -
Orbiter Processing Facility
National Aeronautics and Space Administration Space Shuttle: Orbiter Processing From Landing To Launch he work of preparing a space shuttle for the same facilities. Inside is a description of an flight takes place primarily at the Launch orbiter processing flow; in this case, Discovery. Complex 39 Area. TThe process actually begins at the end of each acts Shuttle Landing Facility flight, with a landing at the center or, after landing At the end of its mission, the Space Shuttle f at an alternate site, the return of the orbiter atop a Discovery lands at the Shuttle Landing Facility on shuttle carrier aircraft. Kennedy’s Shuttle Landing one of two runway headings – Runway 15 extends Facility is the primary landing site. from the northwest to the southeast, and Runway There are now three orbiters in the shuttle 33 extends from the southeast to the northwest fleet: Discovery, Atlantis and Endeavour. Chal- – based on wind currents. lenger was destroyed in an accident in January After touchdown and wheelstop, the orbiter 1986. Columbia was lost during approach to land- convoy is deployed to the runway. The convoy ing in February 2003. consists of about 25 specially designed vehicles or Each orbiter is processed independently using units and a team of about 150 trained personnel, NASA some of whom assist the crew in disembarking from the orbiter. the orbiter and a “white room” is mated to the orbiter hatch. The The others quickly begin the processes necessary to “safe” the hatch is opened and a physician performs a brief preliminary orbiter and prepare it for towing to the Orbiter Processing Fa- medical examination of the crew members before they leave the cility.