FY 2009 TIP for PA

Total Page:16

File Type:pdf, Size:1020Kb

FY 2009 TIP for PA DVRPC FY 2009-2012 Transportation Improvement Program for Pennsylvania Modified After June 2008 Adoption Final Version Modified After June 2008 Adoption Delaware Valley Regional Planning Commission DVRPC FY 2009 Transportation Improvement Program for Pennsylvania Modified After June 2008 Adoption Pennsylvania Highway Program Delaware Valley Regional Planning Commission DVRPC FY 2009-2012 TIP for PA Final Version Pennsylvania - Highway Program Bucks MPMS# 12923 Bristol Road Extension AQ Code 2020M US 202 to Park Avenue Major SOV Capacity Roadway New Capacity Subcorr(s): 8G Chalfont Borough; New Britain Borough; New Britain Township Let Date: - Provide a two lane extension of Bristol Road (approximately 2000 ft.) from US 202 to Park Avenue. When completed, this improvement will provide a two-lane bypass around Chalfont Borough which will eliminate trips on US 202 and turning movements at the US 202/PA 152 intersection. Project involves relocation of SEPTA siding track, a bridge across the wetlands, widen the intersection at Bristol road and US 202 to provide right and left turning lanes, provide maintenance of traffic during construction, redesign traffic signals and rail road crossing gates at US202 and Bristol road extension and coordinate with SEPTA. SAFETEA DEMO #500, PA ID# 334 - $1.6 Million SAFETEA DEMO #4775, PA ID# 585 - $400,000 TIP Program Years ($ 000) Later FYs Phase Fund FY2009 FY2010 FY2011 FY2012 UTL 581 900 PE 581 2,350 FD SXF 800 FD 581 200 UTL STP 4,000 UTL 581 1,000 ROW SXF 400 ROW STP 400 ROW 581 200 CON STP 6,400 CON 581 1,600 Fiscal Year Total 900 2,350 0 0 15,000 Total FY 09-12 3,250 9/30/2010 Page 1 DVRPC FY 2009-2012 TIP for PA Final Version Pennsylvania - Highway Program Bucks MPMS# 13014 Clay Ridge Road Bridge AQ Code S19 over Beaver Creek Not SOV Capacity Bridge Repair/Replacement Adding Subcorr(s): Tinicum Township Reconstruction of a reinforced concrete arch bridge located in Tinicum Township which was originally constructed in 1909. The bridge is 25 feet long and is identified as county bridge # 30. TIP Program Years ($ 000) Later FYs Phase Fund FY2009 FY2010 FY2011 FY2012 PE BOO 60 PE 183 11 PE LOCAL 4 FD BOO 120 FD 183 23 FD LOCAL 8 PE BOF 120 PE 183 23 PE LOCAL 8 Fiscal Year Total 226 151 0 0 0 Total FY 09-12 377 MPMS# 13167 Geigel Hill Road (Bridge) AQ Code 2020M Over Tinicum Creek Not SOV Capacity Bridge Repair/Replacement Adding Subcorr(s): Tinicum Township Let Date: - Replacement of existing pony truss bridge in Tinicum Township, Bucks County. The structure carries S.R. 1014 (Geigel Hill Rd.) over the Tinicum Creek and is located in the Ridge Valley Rural Historic District. Bridge is currently closed and is on the National Register. Proposed bridge will be a one lane 15 foot wide through girder on approximately the same alignment as the existing. The existing trusses will be attached as non structural members for an ornamental value. Bridge is programmed to be "turned-back" to the Township upon the completion of the project. Roadway reconstruction will be limited to the minimum necessary for transition onto the existing bridge, with little or no roadway profile changes anticipated, and a 400 foot maximum for the limits of construction. TIP Program Years ($ 000) Later FYs Phase Fund FY2009 FY2010 FY2011 FY2012 CON 916 1,996 Fiscal Year Total 0001,996 0 Total FY 09-12 1,996 9/30/2010 Page 2 DVRPC FY 2009-2012 TIP for PA Final Version Pennsylvania - Highway Program Bucks MPMS# 13236 Butler Avenue Bridge AQ Code S19 over West Branch of Neshaminy Creek Not SOV Capacity Bridge Repair/Replacement Adding Subcorr(s): 8G Chalfont Borough Let Date: - This project involves the replacement of the existing deteriorated bridge structure over the West Branch of Neshaminy Creek on Butler Avenue in Chalfont Borough, Bucks County. The overall limits are from north of Wilson Avenue to Main Street. Due to previous coordination, a temporary structure will be likely. The structure is on US Route 202 and PA Route 152 and lies between Limekiln Pike and Main Street. TIP Program Years ($ 000) Later FYs Phase Fund FY2009 FY2010 FY2011 FY2012 PE 185 60 UTL STP 160 UTL 185 40 ROW 916 300 FD 185 755 CON 916D 2,613 Fiscal Year Total 560 755 2,613 0 0 Total FY 09-12 3,928 9/30/2010 Page 3 DVRPC FY 2009-2012 TIP for PA Final Version Pennsylvania - Highway Program Bucks MPMS# 13240 Old Bethlehem Road (Bridge) AQ Code S19 Over Kimples Creek Not SOV Capacity Bridge Repair/Replacement Adding Subcorr(s): Haycock Township Let Date: - The project consists of replacing 16' wide weight restricted 13 ton posted bridge over Kimples Cree w ith a 28' wide bridge with two 11' lanes and 3' shoulders on new alignment. Due to the impacts on emergency services a temporary roadway and bridge would be required and due to the impacts of the temporary facilities on the wetlands constructing the bridge on a new alignment is the most feasible alternative. As part of the project a wetlands mitigation site will be constructed to mitigate the impacts to the existing wetlands. The existing bridge is posted for 13 tons, shows signs of rapid deterioration, is only 1 lane wide, and has only 111 feet of stopping sight distance. Additionally the horizontal alignment of Old Bethlehem Road north and south of the bridge consists of a series of sharp horizontal curves with substandard sight distance and radii. There is evidence of utility poles being struck. TIP Program Years ($ 000) Later FYs Phase Fund FY2009 FY2010 FY2011 FY2012 FD BOO 324 FD 185 81 CON BOO 1,600 CON 185 400 ROW BOO 258 ROW 185 65 CON BOO 1,142 CON 185 285 CON BOO 117 CON 185 29 Fiscal Year Total 405 2,000 1,750 146 0 Total FY 09-12 4,301 9/30/2010 Page 4 DVRPC FY 2009-2012 TIP for PA Final Version Pennsylvania - Highway Program Bucks MPMS# 13242 Pineville Road (Bridge) AQ Code S19 over Pidcock Creek Not SOV Capacity Bridge Repair/Replacement Adding Subcorr(s): Buckingham Township The project is necessary to bring the deteriorated existing bridge up to current PennDot design standards and to prolong the life of the bridge. The SR 2103 Section 01B bridge replacement project will replace the existing Pineville Road (SR 2103) bridge over Pidcock Creek. The existing reinforced concrete T-beam bridge carries a single lane of traffic. The existing bridge has two 24-feet spans and 14.7-feet curb-to-curb width. The structure is in poor condition with a 15-ton maximum legal load weight restriction. The new structure will be construction in the same location as the existing bridge on a modified roadway alignment designed to improve traffic safety. The new structure will be a one-span 38 feet long bridge with 28-feet curb-to-curb width. The existing bridge pier will be eliminated to improve hydraulic performance. The new bridge will accommodate two 10-feet wide travel lanes with minimum 2-feet wide shoulders. The new structure will be constructed using the ConSpan precast arch system. The approach roadways will be reconstructed on the modified alignment for an approximate distance of 350-feet at each end of the new structure, transitioning into the existing roadway. Pole mounted aerial utility lines will be relocated to the modified roadway alignment. TOLL CREDIT TIP Program Years ($ 000) Later FYs Phase Fund FY2009 FY2010 FY2011 FY2012 PE BOO 200 PE 185 50 FD BOO 160 FD 185 40 UTL BOO 40 UTL 185 10 FD BOO 80 FD 185 20 Fiscal Year Total 500 100 0 0 0 Total FY 09-12 600 9/30/2010 Page 5 DVRPC FY 2009-2012 TIP for PA Final Version Pennsylvania - Highway Program Bucks MPMS# 13248 Walnut Street (Bridge #13) AQ Code S19 Over Perkiomen Creek Not SOV Capacity Bridge Repair/Replacement Adding Subcorr(s): Perkasie Borough Let Date: - This narrow two lane bridge with no shoulders will be replaced in kind. The bicycle and pedestrian checklists will be incorporated into the project. TIP Program Years ($ 000) Later FYs Phase Fund FY2009 FY2010 FY2011 FY2012 CON BOO 4,000 FD 183 144 FD LOCAL 36 Fiscal Year Total 4,000 180 0 0 0 Total FY 09-12 4,180 MPMS# 13249 Stoney Bridge Road (Bridge) AQ Code S19 Over Deep Run Bridge Repair/Replacement Bedminster Township The existing two lane bridge with no shoulders will be replaced with a two lane bridge with shoulders. The bicycle and pedestrian checklists will be incorporated into the project. TIP Program Years ($ 000) Later FYs Phase Fund FY2009 FY2010 FY2011 FY2012 FD 183 80 Fiscal Year Total 08000 0 Total FY 09-12 80 9/30/2010 Page 6 DVRPC FY 2009-2012 TIP for PA Final Version Pennsylvania - Highway Program Bucks MPMS# 13296 Rickert Road (Bridge) AQ Code S19 over Morris Run Creek Not SOV Capacity Bridge Repair/Replacement Adding Subcorr(s): Hilltown Township Let Date: - The existing two lane bridge with no shoulders will be replaced with a two lane bridge with shoulders. The bicycle and pedestrian checklists will be incorporated into the project. TIP Program Years ($ 000) Later FYs Phase Fund FY2009 FY2010 FY2011 FY2012 ROW BOF 33 ROW 183 6 ROW LOCAL 2 CON 183 186 CON LOC 47 CON 183 238 CON LOC 59 Fiscal Year Total 41 233 0 297 0 Total FY 09-12 571 9/30/2010 Page 7 DVRPC FY 2009-2012 TIP for PA Final Version Pennsylvania - Highway Program Bucks MPMS# 13337 PA 611, Easton Road (Bridge) AQ Code S19 2 Bridges over Gallows Road Not SOV Capacity Bridge Repair/Replacement Adding Subcorr(s): Nockamixon Township Let Date: - This project includes the replacement and consolidation of the existing single-span bridges; reconfiguring the Easton Road/Old Easton Road/River Road triangle into a traditional three-leg (or T) intersection, abandoning Old Easton Road and removing the Old Easton Road bridge over Gallows Run, installation of new guide rail, end treatments and drainage improvements, widening of Easton Road (to provide for southbound left-turn standby lane) and providing appropriate mitigation.
Recommended publications
  • Ardmore and Gladwyne to Independence Mall
    A June 19, 2011®SEPT 44ective Eff Ardmore and Gladwyne to Independence Mall via Schuylkill Expressway Customer Service 215-580-7800 TDD/TTY 215-580-7853 www.septa.org Ridg y Rd 76 Oak Hill e A verl Roxborough a Apartments v W v 52 Henr Oakw ood y A ough A Oakw T v Gladwyne Dr er ood v xbor k Rd Ro ut La GreenMan Laa aln k Roc w Ha k Rd W 52 verington A yunk A Blac gys For Le d RighteRd r Hollo Roxborough Rd Flat Roc Sc d Rd huylkill Expwy Manayunk v Memorial Hospital s Mill Rd Conshohoc Penn Main St oungs For s La Y Valley d Rd 76 Shur 65 ken State Rd gys For Belmont Hills Ha Wissahickon Westminster Transportation Righter 52 Conshohoc Cemetery Center Mill v 1 Creek Rd s Mill Rd 125 R Limited 124 Old Gulph Rd Belmont A West Laurel v ken State Rd W 38 oodbine A eekda Hill Cemetery wr A W y Ser v Cherr Gypsy La yn Ma vice 1 y La Br v Glenn Rd Montgomer Br CYNWYD River v Meeting House La yn Ma Lower y Av STATION Bala City A Park Merion Iona A wr A Limited StopsCynwyd S. C. v Paoli/ H. S. ynnedale A v Thorndale Suburban W v v Bala A son A d A Square or Old Lancaster Rd Line NARBERTH v 40 v verf ument Rd Ander Ha Ford Rd BALA ken Mon 103 Rd Coulter WYNNEWOOD Windsor A STATION Conshohoc Llanfair ARDMORE Av STATION NARBERTH Merion 52nd Av STATION Ardmore STATION St Wynnewood W West Park 106 ynne 1 105 S.
    [Show full text]
  • Main Line Neighborhood Guide©
    Jennifer LeBow’s Main Line Neighborhood Guide© Jennifer LeBow’s Main Line Neighborhood Guide What areas does the Main Line include? Depending on whom you ask, the Main Line always includes the “lower Main Line,”, which is comprised of Ardmore, Bala Cynwyd, Bryn Mawr, Gladwyne, Haverford, Merion, Narberth, Penn Valley and Wynnewood. You may notice my guide has a little more information on the lower (eastern) Main Line as that’s where I grew up and where I chose to raise my own family, so it’s my “stomping grounds”. The upper Main Line lies directly to the west and includes Villanova, Radnor, Wayne, Devon, Berwyn, Paoli and Malvern. I know the neighborhoods, the schools, the shopping areas, the historically significant (or sometimes just quirky and interesting) places and buildings, the shortcuts (you’ll need to know these) and the important places to know about that guide books would never mention. Think of me as your resource for whatever you’re trying to find, from a reliable plumber to where to get your dog groomed. Click here for the Wikipedia description of the Main Line. Copyright Jennifer LeBow, jenniferlebow.com, [email protected], 610.308.5973 1 What does “The Main Line” refer to? The map shows the train stations, (circled in red along the Paoli local line) Villanova (left) and Overbrook (right) which is the last stop before down-town Philadelphia). While it takes about 35 minutes (in no traffic) to drive from Wayne to Overbrook, the train takes 25 minutes. Total distance is about 9 miles. There are also 5 stations just west of Wayne.
    [Show full text]
  • Alternatives to Business on I-76: SEPTA Rail Feeder Bus Study
    Alternative, to lu,e, on 1·76: SEPTA Rail reedel lUI Study Technical memorandum April 2009 The Delaware Valley Regional Planning Commission is dedicated to uniting the region's elected officials, planning professionals and the public with a common vision of making a great region even greater. Shaping the way we live, work and play, DVRPC builds consensus on improving transportation, promoting smart growth, protecting the environment and enhancing the economy. We serve a diverse region of nine counties: Bucks, Chester, Delaware, Montgomery and Philadelphia in Pennsylvania; and Burlington, Camden, Gloucester and Mercer in New Jersey. DVRPC is the federally designated Metropolitan Planning Organization for the Greater Philadelphia Region - leading the way to a better future. Our logo is adapted from the official DVRPC seal, and is designed as a stylized image of the Delaware Valley. The outer ring symbolizes the region as a whole while the diagonal bar signifies the Delaware River. The two adjoining crescents represent the Commonwealth of Pennsylvania and the State of New Jersey. DVRPC is funded by a variety of funding sources including federal grants from the U.S. Department of Transportation's Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), the Pennsylvania and New Jersey departments of transportation, as well as by DVRPC's state and local member governments. This report was primarily funded by the Pennsylvania Department of Transportation. The authors, however, are solely responsible for its findings and conclusions, which may not represent the official views or policies of the funding agencies. DVRPC fully complies with Title VI of the Civil Rights Act of 1964 and related statutes and regulations in all programs and activities.
    [Show full text]
  • Centennial District TROLLEY SERVICE CONCEPT EVALUATION
    Centennial District TROLLEY SERVICE CONCEPT EVALUATION OCTOBER 2019 MD dDELAWARE VALLEY DVR PC's vision for the Greater Philadelphia Region is a prosperous, innovative, equitable, e'J.,JffPC resilient, and sustainable region that increases PLANNING COMMISSION mobility choices by investing in a safe and modern transportation system; that protects and preserves our natural resources while creating healthy communities; and that fosters greater opportunities for all. DVRPC's mission is to achieve this vision by convening the widest array of partners to inform and facilitate data-driven decision-making. We are engaged across the region, and strive to be leaders and innovators, exploring new ideas and creating best practices. TITLE VI COMPLIANCE / DVRPC fully complies with Title VI of the Civil Rights Act of 7964, the Civil Rights Restoration Act of 7987, Executive Order 72898 on Environmental Justice, and related nondiscrimination mandates in all programs and activities. DVRPC's website, www.dvrpc.org, may be translated into multiple languages. Publications and other public documents can usually be made available in alternative languages and formats, if requested. DVRPC's public meetings are always held in ADA-accessible facilities, and held in transit-accessible locations whenever possible. Translation, interpretation, or other auxiliary services can be provided to individuals who submit a request at least seven days prior to a public meeting. Translation and interpretation services for DVRPC's projects, products, and planning processes are available, generally free of charge, by calling (275) 592-7800. All requests will be accommodated to the greatest extent possible. Any person who believes they have been aggrieved by an unlawful discriminatory practice by DVRPC under Title VI has a right to file a formal complaint.
    [Show full text]
  • State Transportation Commission 2015 Twelve Year Program Development Regional Results of the Survey and Public Feedback From
    State Transportation Commission 2015 Twelve Year Program Development Regional results of the survey and public feedback from August thru November 2013 Delaware Valley Regional Planning Commission (DVRPC) Version 01-2014 Delaware Valley Regional Planning Commission MPO Total Visitors 730 Mobility Concerns Traffic congestion is growing and resources are limited to build additional capacity. As a result, transportation agencies are exploring ways to manage demand, operate efficiently, and improve capacity. Using a scale of 1-5, for each mobility concern, please rank how important each mobility concern is to you, with one being ‘Not Important’ and 5 being ‘Very Important’. Passenger Ridership on the Keystone Corridor has doubled since 2000 making it !mtrak’s fourth-busiest route in the Rail nation. Rail infrastructure improvements are critical to timely service. Responded With an Average Rank of 4.35 Congestion Relieve traffic congestion by addressing bottlenecks and other traffic relief measures. Responded With an Average Rank of 4.26 Transit Implementing new technologies improves service. Responded With an Average Rank of 4.15 Signals Modernization of traffic signals streamlines traffic flow and reduces fuel costs for motorists. Responded With an Average Rank of 4.07 Incident This legislation would allow for the safe, quick clearance of traffic incidents from the roadway. Responded With an Average Rank of 3.59 Freight Rail $500 billion in goods and services travel through PA each year. That investment would grow with upgrades to accommodate intermodal changes such as emerging needs from the natural gas industry and double- stack train access to our ports. Responded With an Average Rank of 3.53 Real T ime This involves the use of dynamic message signs, PennDOT’s 511P!.com system and social media.
    [Show full text]
  • Township of Lower Merion
    TOWNSHIP OF LOWER MERION MONTGOMERY COUNTY, PENNSYLVANIA COMPREHENSIVE ANNUAL FINANCIAL REPORT For The Fiscal Year Ended December 31, 2012 Prepared by the Department of Finance TOWNSHIP OF LOWER MERION, PENNSYLVANIA Table of Contents Page Introductory Section: Letter of Transmittal i Certificate of Achievement xvi Organizational Chart xvii Board of Commissioners xviii Executive Officials and Staff xix Financial Section: Independent Auditors’ Report 1 Management’s Discussion and Analysis 3 Basic Financial Statements: Government-wide Financial Statements: Statement of Net Position 19 Statement of Activities 20 Fund Financial Statements: Balance Sheet – Governmental Funds 21 Statement of Revenues, Expenditures, and Changes in Fund Balances (Deficit) – Governmental Funds 22 Reconciliation of the Statement of Revenues, Expenditures, and Changes in Fund Balances (Deficit) of Governmental Funds to the Statement of Activities 23 Statement of Net Assets – Proprietary Funds 24 Statement of Revenues, Expenses, and Changes in Fund Net Position – Proprietary Funds 25 Statement of Cash Flows – Proprietary Funds 26 Statement of Fiduciary Net Position – Fiduciary Funds 28 Statement of Changes in Fiduciary Net Position – Fiduciary Funds 29 Notes to Basic Financial Statements 30 Required Supplementary Information: Schedule of Revenues, Expenditures, and Changes in Fund Balances – Budget and Actual (Budget Basis) – General Fund 66 Notes to Required Supplementary Information 67 Schedule of Funding Progress and Contributions from the Employer and Other Contributing
    [Show full text]
  • 75Th-Anniversary.Pdf
    SOUVENIR SUPPLEMENT ~ ain 1Cinc <ihroniclc THURSDAY, OCTOBER 8, 1970 1896 Commemorating The AfAtf N ·J973 1970 NARBERffl COMMUN!TY LU3RJ\!R Y Of The BOROUGH OF NARBERTH All That Is Good And Wholesome In The American Way Of Life Is Still To Be Found In NARBERTH, PA. THIS SUPPLEMENT SPONSORED BY THE MAYOR AND COUNCIL OF THE BOROUGH OF NARBERTH AND SUPPORTED BY THE TOWN'S CIVIC-MINDED BUSINESS FIRMS \/\(HOSE MESSAGES ARE CONTAINED HEREIN, ALONG WITH THE MESSAGES OF WELL-WISHERS FROM NEIGHBORING COMMUNITIES. PAGE TWO THE MAIN LINE CHRONICLE, NARBERTH 75TH ANNIVERSARY THURSDAY, OCTOBER 8, 1970 75 Years Of Mutual Cooperation And Good Will _ _..------:;-~.=-N berth Example ~Th Lower Menon- ar . o 5200) e rberth (0.52 squar~ mile, P3['square The Borough of ~!ded by Lower Merion ~!~er Merion is completely si:;~o. Narberth sec_eded fro:Uswarthmore se~­ miles, pop, 66,0 ab~ut the same_ time tt:e two muniidpah· 69 years ago ( field Township) b~t f ship in all that arated from Spr1:% an exemplary re a i~nsense, ties have en)OY mutual respect and goo wealthy neigh· time, based ~po~mired by its bi~, rei_uhd~rkes the most of Narberth is a d small town w ic .. on bor as a wel1-man9:ge the old American tr_ad1tl ~ount on the its limited a~~~~ 1feels fortu~ate th~~l:c~::d fire company ai/!tt~o;oroug~'s well-equ1p;::~erth derives the hut;~:yt· h eed arises. 1 ed Boroug . when t e n. t from its intensive ~ us without friction use and enJ~ym:nwn government functlon;he Narberth ele­ ground: T e oimum of performan?e.d f the quality and and with a max_ ticularly admire or hool 1s par mentary sc .
    [Show full text]
  • PHILADELPHIA's MAIN LINE MOVING MANUAL by Jennifer Lebow, Relocation Specialist
    PHILADELPHIA'S MAIN LINE MOVING MANUAL by Jennifer LeBow, relocation specialist WHAT THE NEIGHBORHOODS, SCHOOLS & COMMUTING TIMES ARE *REALLY* LIKE HOW THE HOME BUYING PROCESS WORKS HERE WHAT ELSE YOU NEED TO CONSIDER jenniferlebow.com - 610.308.5973 - [email protected] About moving to Philadelphia's Main Line Moving is stressful. There. I said it. Not only are there tons of things to remember and the logistics and timing/scheduling can be a nightmare, but there’s also all of the “unknowns”. If you’re moving somewhere you’ve never lived before and you don’t have a network there, it can be a major source of anxiety. Fear not, though! I have created this moving manual to demystify the process and make it easier and less stressful. While it is tailored to people relocating to the Main Line, which is the name for the western suburbs of Philadelphia, much of the information is translatable to other areas. I hope you find it useful. My name is Jennifer LeBow and I’m a real estate agent specializing in Main Line relocation. This manual is designed to help you develop a feel for Philadelphia’s Main Line and find a starting point for your home search. Looking at listings on line is a great place to begin, but can’t provide you with a sense of what the different communities “feel” like or help you understand why one might suit you better than another. That’s where I come in! I believe that "home" isn’t just your house, it’s your neighborhood, too, and I am passionately committed to helping you find a wonderful home, not just a nice house.
    [Show full text]
  • Public Workshop #2Presentation
    City Avenue Transportation Connectivity Plan Public Workshop July 30, 2013 Introduction TONIGHT’S WORKSHOP Introduction What we’ve heard from you Results of studies Transit Pedestrian Improvement concepts How can I participate? What is the Connectivity Plan? STUDY AREA CITY AVE. What is the Connectivity Plan? STUDY GOALS • Increase awareness of transit in the City Avenue District • Propose improvements to transit services and facilities • Recommend improved physical pedestrian connections to transit and businesses • Increase use of transit for travel to work destinations in the corridor • Promote walking and bicycling for local trips in the corridor ‒ Reduce auto dependence ‒ Reduce congestion ‒ Create a more desirable environment What we’ve heard from you PUBLIC MEETING #1 Public comments: “Train station at Bala is a critical feature for the community. It is a great marketing tool to have regional rail at your door.” “Increased transit and transit facilities are extremely important. Public transit acts as a hub of activity.” What we’ve heard from you WALKING TOUR Attended by staff from SEPTA, Lower Merion, CASSD, Philadelphia City Planning Commission, DVRPC Bala Station Overbrook Station City Ave. Results of studies EMPLOYEE SURVEY RESULTS Significant Findings: If you commute to work by bus, what improvements would be most helpful to you? 76% said “Being able to know when the next bus will arrive.” If you commute to work by car, please tell us if public transportation is available for your work trip. 33% said “Don’t know”. Survey also
    [Show full text]
  • Feasibility Study for the Parkside Cynwyd Trail in Lower Merion Township
    Feasibility Study for the Parkside Cynwyd Trail in Lower Merion Township June 2016 Background …………...………………………………. 1 Property Research …….………………………………. 1 Existing Conditions ……..……………….……………. 2 Recommendations …….………………………....……. 7 Best Practices……………………………….…....……. 9 Implementation Plan .………………………...……..... 15 Appendices A. Overview Plan B. Preliminary Cost Estimate C. Conceptual Plans D. Railroad Maps 1. Background Michael Baker International (Baker) was commissioned by Lower Merion Township to determine the feasibility of extending the Cynwyd Heritage Trail one-half mile eastward from its current trail-head at Cynwyd Station to City Avenue, along the SEPTA Cynwyd Line. This potential rail-with-trail facility, located in Lower Merion Township, Montgomery County, PA, is envisioned as a link in the proposed Parkside Cynwyd Trail. The Parkside Cynwyd Trail is in turn proposed to continue beneath the City Avenue bridge into Philadelphia. After a further distance of 1-¼ miles within the SEPTA right-of-way, Parkside Cynwyd Trail would connect with the network of existing shared-used paths in Fairmount Park in Philadelphia. The distance from the Cynwyd Station trail-head to City Avenue is approximately ½ mile (2500 feet). So that points within the corridor may be readily referenced, this study establishes a baseline located on the centerline of the existing railroad track (please refer to conceptual plan sheets included with Appendix C). 2. Property Research The Parkside Cynwyd Trail would be placed within railroad right-of-way owned by Southeastern Pennsylvania Transportation Authority. Thus this trail will not require the acquisition of right-of-way from nor negotiation of easements with private property owners. SEPTA made available a series of 1”=100 ft. scale drawings of the railroad corridor, detailing the location of rails, adjacent structures, and dimensioned right-of-way lines.1 As part of this Excerpt of 100‐scale railroad drawing with right‐of‐way highlighted 1 Scans of the railroad drawings are included in this report as Appendix D.
    [Show full text]
  • Cynwyd Heritage Trail Lower Merion Township
    2012 Land Development CYNWYD HeritaGE TRAIL Lower Merion Township The Cynwyd Heritage Trail, located in Lower Merion Planning Concept Township, received a 2012 Montgomery Award for an The Cynwyd Heritage Trail is approximately a 2-mile innovative planning concept, preservation of open space, multipurpose trail and linear park constructed along and outstanding collaboration. This successful project the former SEPTA Cynwyd regional rail line in Bala transformed an abandoned rail line into a contemporary Cynwyd. This innovative rails-to-trails project has linear park that connects the community with its heritage converted approximately 35 acres of vacant and and other natural and recreational resources. underutilized land into a popular linear park. The trail begins at the Cynwyd Station, the final stop on the active SEPTA regional rail Cynwyd line, and ends at Belmont Avenue near the Green Lane Bridge. Following a curvilinear alignment, the trail provides pedestrian and bike connections to neighborhoods, commercial areas, public parks, and institutional properties. The trail connects to 250 acres of existing public and private open space including Bala Park, Westminster Cemetery, and West Laurel Hill Cemetery. Completion of the trail was the first phase of a multiphase plan to connect this trail to the growing regional trail system. As future phases are completed, trail connections are proposed to the Schuylkill River Trail, Wissahickon Trail, East Coast Greenway, and other planned trail connections. Preliminary design is currently under way to utilize the Manayunk viaduct as a future connection to Manayunk and the Schuylkill River Trail. Design A key design feature of the trail is that it is actually two trails in one, offering multiple experiences for users.
    [Show full text]
  • TOWNSHIP of LOWER MERION BUILDING and PLANNING COMMITTEE Wednesday, November 29, 2017 6:00 PM (Approximately) 1. ZONING UPDATE 2
    TOWNSHIP OF LOWER MERION BUILDING AND PLANNING Wednesday, November 29, 2017 COMMITTEE 6:00 PM (Approximately) Chairperson: Elizabeth Rogan, Philip S. Rosenzweig (Co-Chairs) Vice Chairperson: Joshua L. Grimes, George T. Manos AGENDA 1. ZONING UPDATE 2. CONDITIONAL USE APPLICATION - 211 Belmont Avenue, Bala Cynwyd, CU# 3791C 3. PRELIMINARY LOT LINE CHANGE PLAN - 613 & 617 General Lafayette Road, Merion Station, SD# 3793, Ward 13 1 AGENDA ITEM INFORMATION ITEM: ZONING UPDATE The consultant team from DPZ will present a Retail Market Analysis prepared by Gibbs Planning Group and will provide a brief update on the Township-wide zoning project. PUBLIC COMMENT ATTACHMENTS: Description Type Issue Briefing Issue Briefing Retail Study Backup Material Comprehensive Plan Excerpts Resolution Comprehensive Plan Figures Backup Material 2 TOWNSHIP OF LOWER MERION Building & Planning Committee Issue Briefing Topic: Retail Market Analysis – Zoning Update Prepared by: Christopher Leswing, Director, Building & Planning Department Date: November 21, 2017 I. Action To Be Considered By The Board: Discuss the Retail Market Analysis prepared by Robert J. Gibbs of the Gibbs Planning Group, a subconsultant of DPZ for the zoning update. II. Why This Issue Requires Board Consideration: The Retail Market Analysis was not required by the Township as part of the zoning/land development code update. The Retail Market Analysis has been provided by DPZ as part of their internal analysis of existing Township codes and conditions for consistency with the commercial area vision, goals and recommendations contained within the Comprehensive Plan. The Retail Market Analysis confirms the commercial area findings of the Comprehensive Plan. Public presentation of these findings is an important milestone in the code update process and allows a focused discussion on potential commercial code modifications.
    [Show full text]