Vostochny-Ural Terminal Limited Liability Company Vostochny-Ural Terminal LLC is a special purpose bulk cargo handling terminal, established in 1998 on the basis of former chip wood handling complex belonged to port Vostochny.

3rd stage of Production Syntal plant Transshipping Complex–3

VNT Kamensky cape Vrangel Bay Brick yard

Fire station Container terminal

Petrovsky cape

Vostochny-Ural Terminal

Vostochny–Ural Terminal Vostochny–Ural Terminal LLC in transport hub - Vostochnaya

Petrovsky cape Lighthouse Beregovoy

Kamensky cape settlement Project of terminal “Sever’ by Dalport and Summa Group Project of railway station of General companies. Projected volume – Purpose Production Transshipping Complex up to 19 mln tons. by Dalport and Summa Group companies

Nakhodka

Project of Coal terminal by Vostochny port OJSC, 3rd stage of Production Transshipping Complex–3

Production Transshipping Complex–3 Vostochny port OJSC Handling volume – 14 mln tons

Production Transshipping Complex–1 Наши контакты: Vostochny port OJSC Contacts: Project of coal terminal by Volume of transshipments – 3 mln tons Kapstroy and Transstroy companies

VNT

Port railway station ThankСпасибо you Nakhodka -Vostochnaya

Maly port – 2.5 mln tons Lesnoy port – 0.3 mln tons Lesnoy port LLC

(Bulk Cargo Terminal LLC) for coal handling Projected volume – up to 2 mln tons.

Project of oil terminal by Rosneft

Eastern Stevedoring Company (LLC)

Dry dock

Reequiped berth of Vostochnaya Stevedoring Company () for coal handling. Projected volume – up to 1 mln tons.

Vostochny–Ural Terminal LLC  Fertilizer was the major cargo of the Terminal from 1998 till 2012.  Starting with 2012 the Terminal is engaged in handling of coal arriving in wagons by railroad.

Main coal consuming countries in 2013

Japan South Korea China Terminal equipment: 1. Own railway lines Total mileage of railway lines is more than 3,800 meters

2. Berth for vessels loading

Berth length is 218 meters, maximum draft is 11.0 meters. It can handle vessels with deadweight up to 45 th. tons. 3. Two ship loaders Handling capacity of each ship loader is 500 tons/hour

4. Covered warehouses for cargo storage Total capacity of covered warehouses is 160000 mt Coal is stored in covered warehouse Two open coal stockyards of total capacity of 90 000 mt

Total stockyards terminal capacity is 250 000 mt 5. Automated conveyor equipment with magnetic separators

100 % coal cleaning from metal is guaranteed We take care of our conveyor equipment and keep your belt conveyors safe! 6. Mobile reloading equipment:

The terminal use: 1.Wheeled bucket loaders – 6 pcs.; 2.Multihandlers «Sennebogen» – 6 pcs.; 3.Tracked bulldozers – 2 pcs.; as well as other handling equipment 7. Two screening and crushing machines

Coal crushing Coal cleaning from metal Terminal handling process

Warehouses for cargo storage Coal loading on the vessel

Vostochny-Ural Terminal Limited Liability Company

Tel/fax: +7 (4236)665385; E-mail: [email protected] 30 A Vnutriportovaya Str., Nakhodka city, Primorsky region, Russian Federation, 692941.

THANK YOU!