Vostochny-Ural Terminal

Vostochny-Ural Terminal

Welcome ! Vostochny-Ural Terminal Limited Liability Company Vostochny-Ural Terminal LLC is a special purpose bulk cargo handling terminal, established in 1998 on the basis of former chip wood handling complex belonged to port Vostochny. 3rd stage of Production Syntal plant Transshipping Complex–3 VNT Kamensky cape Vrangel Bay Brick yard Fire station Container terminal Petrovsky cape Vostochny-Ural Terminal Vostochny–Ural Terminal Vostochny–Ural Terminal LLC in transport hub Nakhodka - Vostochnaya Petrovsky cape Lighthouse Beregovoy Kamensky cape settlement Project of terminal “Sever’ by Dalport and Summa Group Project of railway station of General companies. Projected volume – Purpose Production Transshipping Complex up to 19 mln tons. by Dalport and Summa Group companies Nakhodka Project of Coal terminal by Vostochny port OJSC, 3rd stage of Production Nakhodka bay Transshipping Complex–3 Production Transshipping Complex–3 Vostochny port OJSC Handling volume – 14 mln tons Production Transshipping Complex–1 Наши контакты: Vostochny port OJSC Contacts: Project of coal terminal by Volume of transshipments – 3 mln tons Kapstroy and Transstroy companies VNT Port railway station ThankСпасибо you Nakhodka -Vostochnaya Maly port – 2.5 mln tons Lesnoy port – 0.3 mln tons Lesnoy port LLC (Bulk Cargo Terminal LLC) for coal handling Projected volume – up to 2 mln tons. Project of oil terminal by Rosneft Eastern Stevedoring Company (LLC) Dry dock Reequiped berth of Vostochnaya Stevedoring Company (Global Ports) for coal handling. Projected volume – up to 1 mln tons. Vostochny–Ural Terminal LLC Fertilizer was the major cargo of the Terminal from 1998 till 2012. Starting with 2012 the Terminal is engaged in handling of coal arriving in wagons by railroad. Main coal consuming countries in 2013 Japan South Korea China Terminal equipment: 1. Own railway lines Total mileage of railway lines is more than 3,800 meters 2. Berth for vessels loading Berth length is 218 meters, maximum draft is 11.0 meters. It can handle vessels with deadweight up to 45 th. tons. 3. Two ship loaders Handling capacity of each ship loader is 500 tons/hour 4. Covered warehouses for cargo storage Total capacity of covered warehouses is 160000 mt Coal is stored in covered warehouse Two open coal stockyards of total capacity of 90 000 mt Total stockyards terminal capacity is 250 000 mt 5. Automated conveyor equipment with magnetic separators 100 % coal cleaning from metal is guaranteed We take care of our conveyor equipment and keep your belt conveyors safe! 6. Mobile reloading equipment: The terminal use: 1.Wheeled bucket loaders – 6 pcs.; 2.Multihandlers «Sennebogen» – 6 pcs.; 3.Tracked bulldozers – 2 pcs.; as well as other handling equipment 7. Two screening and crushing machines Coal crushing Coal cleaning from metal Terminal handling process Warehouses for cargo storage Coal loading on the vessel Vostochny-Ural Terminal Limited Liability Company Tel/fax: +7 (4236)665385; E-mail: [email protected] 30 A Vnutriportovaya Str., Nakhodka city, Primorsky region, Russian Federation, 692941. THANK YOU! .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us