1974 California State Water Project Annual Report 1974 Department of Water Resources

Follow this and additional works at: http://digitalcommons.law.ggu.edu/caldocs_agencies Part of the Water Law Commons

Recommended Citation Department of Water Resources, "California State Water Project Annual Report 1974" (1974). California Agencies. Paper 215. http://digitalcommons.law.ggu.edu/caldocs_agencies/215

This Cal State Document is brought to you for free and open access by the California Documents at GGU Law Digital Commons. It has been accepted for inclusion in California Agencies by an authorized administrator of GGU Law Digital Commons. For more information, please contact [email protected]. Co ifornio State Water Project Annuo Report 1974

STATE OF CALIFORNIA The Resources Agency Department of Water Resources

The Department of Water Resources is responsible for protectin::J and conserving California's water resources, for planning to meet

California's water needs from all available sources 1 and for pro­ viding for public safety in relation to water resources. One of the Department's major responsibilities is the planning, construc­ tion, and operation of the State Water Project, a multipurpose project to develop certain of the State's water resources for water supply, hydroelectric power production, flood control, and recreation purposes.

EDMUND G. BROWN JR., Governor, State of California CLAIRE T. DEDRICK, Secretary for Resources, The Resources Agency RONALD B. ROBIE, Director, Department of Water Resources

I

Contents

History: '1951 to 1974 ...... 5 ights of 1974 ...... 6 ...... 7 Deliveries ...... 8 ...... 10 Pumping Plants...... 12 Operations ...... 14 Plants...... 15 ...... 16 ...... 18 ...... 19 ...... 20 ...... 22

December 31 1 1974 ...... 24

3 Co ifornio State Water Project

Water, Flood Control, Hydroelectric Power and Recreation for Californians

The State Water Project is a "multiple-purpose" project-one which provides for not only water supply but for a myriad of other uses, such as flood control; hydroelectric power; irrigation, mu­ nicipal and industrial uses; recreation; water quality improvement; and fish and wildlife protection. The Project originates in the northeastern part of California with the Upper Feather lakes, which offer water recreation and fishery enhancement and provide water for municipal and irrigation purposes. Oroville , the key water conservation facility of the Project, ~Antelope Lake controls flood waters, conserves water for release I 1964 Lake Dav1s' \.Frenchman lake downstream, supplies energy for power generation and provides a multitude of recreation opportunities at . lak~g::.,ue - 1961 From Oroville, the water travels through natural channels until 1967 it reaches the Sacramento-San Joaquin Delta. Through the North Bay , water is delivered to Napa County. The , one of the first operational units of the Project, conveys water for municipal and industrial uses in the southern San Francisco Bay Area. stores water for flood control, recreation OSACRAMENTO J and regulation of Aqueduct flow. 1968r ""-"-···· The is one of the most spectacular features of the Project. Its main line extends 444 miles from the Delta to Riverside County in . In its initial stretch, the California Aqueduct carries water south along the western edge of the where much of it is used to irrigate farmlands. By the time the remaining water reaches the southern end of the Valley, it has traveled approximately 300 miles and been elevated nearly 1200 feet. The water then is raised almost 2000 additional feet in a single lift to the first tunnel of the Tehachapi Crossing to bring water to Southern California. On the south side of the , the Aqueduct splits into two branches. The East Branch serves the Antelope Valley and parts of San Bernardino, Riverside, Orange and San Diego counties. The West Branch serves the Los Angeles Basin and the southern coastal areas. In addition to facilities which provide water for municipal and industrial use and for power generation, the West Branch has two lakes, Castaic and Pyramid. The East Branch facilities provide power generation and water for municipal and industrial uses. This branch also has two lakes, Silverwood and Perris. The Project is not subsidized by the taxpayers. All costs are paid-with interest-by Project beneficiaries.

LakePerns 1973 95

Bucket wheel excavator Earth mover 1962 water deliveries were made from facilities in the San Francisco Area work started on Dam since Father Junipero Serra came to what now Cali- on the Feather River work started on San Luis Joint-Use and founded Mission San de Alcala, have in the San realized that water would have to be conserved areas of water 1963 Work started on the California and moved to areas of water need. Court decisions validated prototype water mid-1930s it was clear that local water alone contract and reaffirmed the State's authority to issue take care of local needs and that a statewide water enue bonds to finance the was needed. 1964 First flood operation when com- for the con- saved Yuba City and other downstream areas. servation and use of water could be and so 1965 Work on the Crossinq. with start of for the State Water Project were drawn to include Porter recreation as a major purpose, with flood control and hydro- Contract electric for payment to the State of 50,000 With long-term contracts

program completed with 31 costs allocated to water conservation water deliveries in Feather River area, H the north San Francisco area, San 1969 Oroville-Thermalito Power began full opera- Lake Oroville and San Luis filled for the first 1957 Pacific Rail- time . . all features of the San Luis facilities in operation all features of South Bay in operation first access site along California Aqueduct. 1970 started on Perris the southern terminus of the California pleted

Pearblossom and A. D. Edmondston operation . . Silverwood and Castaic Lakes Dam construction started. and San Bernardino tunnels Act which powerplants stdfted generating electric enhancement of and wildlife power ... first repayment of principal on Revenue Bonds. Frenchman Dam and Lake­ 1973 Santa Ana Valley Pipeline completed to . with the provisions of the Davis- Perris Dam Dedication, signaling delivery of Project water to its most southerly point ... first repayment of principal on Project 5 obligation bonds. Highights of 1974

Alessdndro lsldnd Boating at Pyramid Lake Ldke Perris

The California State Water Project moved another step closer to guaranteed by the utilities and banked an additional completion in 1974 with the filling of Lake Perris and Pyramid Lake. worth of energy. Both of these Project reservoirs were also opened for recreational The second of six 200,000 kilowatt use during the year. Of all the major Project lakes only Castaic the Castaic Powerplant, bringing the Lake has not been filled. 450,000 kW. During 1974, the Project transported a total of 2,446,607 acre­ At Lake Perris, a boat-in facility on Alessandro Island was com­ feet of water. (An acre-foot of water is 325,900 gallons.) Deliv­ pleted in February, as was the Dam, while a beach drainage modi­ eries to water contracting agencies totaled 1,324,860 fication was completed in April. was completed in an increase of 30 percent over '1973 deliveries. The Project also March. moved 1,121,747 acre-feet of federal water A draft environmental impact report (EIR) on the Project's Delta through the joint facilities in the San Joaquin Valley. facilities, the proposed Peripheral , was published in August, Water contractor deliveries and the percent of the total deliv­ and a series of public hearings were held to receive public com­ eries included: the San Joaquin Valley 895,375 acre-feet (68 ments. percent); San Francisco Bay area 97,122 acre-feet The Department participated in a feasibility study of a proposed Feather River area 17,258 acre-feet (1 percent); San Joaquin Nuclear Project in Kern County. The project is being California 315,105 acre-feet (24 percent). managed by the Los Angeles Department of Water and Power and Of the total deliveries to State Water Project includes other California utilities. If such a plant is built, the 865,000 acre-feet were delivered for agricultural use. ment of Water Resources would own 10 percent of the increase of 180,000 acre-feet over 1973 deliveries. plant and 10 percent of the power generated. This would provide this agricultural use was in the South San Joaquin Valley. a portion of the power required for future operation of the State irrigated with Project water totaled 290,000, an increase of Water Project. A Department decision on project participation acres. The gross value of the crops raised, principally cotton, ex­ will not be made before mid-1976. ceeded $100 million. During 1974, the Department prepared plans and specifications A near-record water year in the Feather River drainage area for 68 contracts including procurement, construction, and furnish­ resulted in the production of a record amount of ing and installation contracts. The Department awarded 61 con­ power at the Edward Hyatt-Thermalito complex power tracts totaling $10.9 million. Construction expenditures for 1974 This generation of 4.1 billion kilowatthours (kWh) of totaled $19.7 million. All work needed to bring the East Branch of was almost 2 billion kWh more than the long term average. As a the Aqueduct to full capacity by 1, 1976, was under contract result, the State earned $3.3 million more than the $16.15 million by the end of 1974.

6 ons

Casbsic Powerpldnt Castelic Visitors Center Switchydrd dt Oroville

the State Water Project has been built and is operat­ Also scheduled for the future, depending on the desires of the ing along its entire north-south length, extensive work still remains local purchasers, are extending the North Bay to be done to bring it to its -full operating capacity. Solano County and extending the Coastal Branch With energy availability and costs becoming increasingly 1980s to San Luis Obispo and Santa Barbara counties. Additions niRcant, Project plans for hydroelectric power include the are being built in 1975 to bring the East Branch of the Project to lation of additional generators at the Castaic Powerplant to full capacity. its installed capacity to 1,250 megawatts by 19781 completing The Department is undertaking a new planning installation of the second 60-megawatt unit at Devil Canyon Power­ duce an Action Water Plan for the next 25 plant in 19751 construction of a 157-megawatt power plant above "The California Water Plan Pyramid Lake by 1981 i and construction of a 15-megawatt Cotton­ include studies on providing new water wood Powerplant on the East Branch of the California Aqueduct eeL The report will define water needs by areas 1982. sources available to meet the needs. The plan is to serve as a total Department is investigating a wide range of alternatives in water management plan rather than only a for water seeking power sources to operate the Project. These include menL Emphasis will be given to solutions stressing conservation developing California geothermal participation in California existing water supplies. thermal plants powered by nuclear fuel, gas, oil or other fuels, Among future plans is the use of water to purchase of power from California utilities or from the Pacific Southern California ground water basins on a Northwest, participation in out-of-state coal-fired provide carryover storage and energy ment of more hydroelectric power in California, withdrawing emphasis will be placed on water conservation some Project-generated power to reserve it for Project use. tractors to the end of reducing Project demand and energy needs.

7

1- w w !!.. I w a: 100 .- .i ~ 8 !!svv 0., ; 500 "' ;;!i 4h' ~ 6 ... I II :i :I: - 1-

1962 1963 1964 1965 1966 1961 1968 1969 1970 1911 1912 1913 1974 YEAR YEAR

1

the The State paid 55 United States 45 percent, by the Department

and

9 Major Project Reservoirs

Frenchmdn lake Antelope lake LC!ke Davis

Lu!s Reservoir Pyramid

SHORELINE SURFACE AREA MAXIMUM LENGTH OF HEIGHT Of DEPTH DAM DAM Kilo~ Miles meters Acres meters Feet Meters Feet Meters Feet Meters Frenchman Lake ...... 2"1 34 1,580 6 101 31 720 219 139 42 Antelope Lake ...... 15 24 931 4 62 19 ,320 402 120 37 ...... 32 51 4,026 16 108 33 800 244 132 Lake Oroville ...... 1 269 15,805 64 690 210 6,920 2,109 770 235 Lake Del Valle ...... 16 26 \060 4 141 880 235 72

10 FRENCHMAN LAKE On Little Last Chance Creek in Plumas County, seven miles north of Chilcoot.

ANTELOPE Remotest of the Feather lakes, on Indian Creek in Plumas 41 miles northeast of Ouincy.

LAKE On Little Grizzly Creek in Plumas five miles north of Portola.

LAKE OROVILLE of the in Butte County four of the city of Oroville.

Oroville Dam and lake Del Valle LAKE

SAN A major storage facility for the California 12 miles west of Los Banos in Merced

PYRAMID In the mountains of northern Los six miles southeast of Caswell, west of Saugus.

CASTAIC LAKE Terminus of the west branch in northern Los Angeles County, 12 miles northwest of Saugus.

SILVERWOOD LAKE On a fork of the in western San Bernardino County, nine miles east of Cajon, 28 Lake Perris miles south of Victorville.

Terminus of the east branch, 15 miles southeast of Riverside in Riverside County.

SHORELINE SURFACE AREA MAXIMUM LENGTH OF HEIGHT OF Square DEPTH DAM DAM Kilo- Kilo- Miles meters Acres meters Feet Meters Feet Meters Feet Meters San Luis...... 65 105 1 51 274 84 18,600 5,669 385 117 Silverwood ...... 13 21 976 4 166 51 2,230 680 249 76 Lake 10 16 9 107 11 128 39 Pyramid ...... 21 34 1,358 5 307 94 1/090 332 400 122 Castaic Lake...... 2,230 9 330 101 4,900 1A94 435 133

11 DellJ Peril las Hill Buend Vistu

While many people State Water Project the water to both the San Bay extends more than 600 miles north south the San few that for 360 those miles northern California water has to be

shows above level. and Thermalito hydroelectric to generate power and is The Oso on the West Branch, lifts 40 feet above level as it reenters n, than 3,300 feet sea level before starts downward flow Feather River to wind its way to the into Pyramid and Castaic lakes in Los County. At the Delta the start of the fornia Aqueduct Portion the water above

Edward Hyatt Pumping· Power Thermo lito Pump-Power Wheeler Pearblossom

I Silverwood Lake ill

A;02 Jl 448 137 3,000 166 38 1 7;1

I. 327 iil,OOO,OOO 5 11 205 02 233 l i 8 158 '187 115.96 16') 39.08 2,000 231 70 BBSl 55 17 12.74 wer I developrnent. Cb .:::..- Perr~s~ 0 Cb (/)

..... Cb .:!

Sea Level '13 Power Operations

sllll - 1111 POWER GENERATED' POWER CONSUMED by PROJECT PUMPING OPERATION ,., e> 411111111 c~ w 7ii .g 311111111 1J .!l w 0 ,.,"' "0 g~ ffi " 0 - --- Year Year

x Oroville+ Devil Canyon+ States share of Castaic and San Luis

dependent

the the ~ it, is the I herrral ito C ,., - "UIItf'INe I'LANT ll"'WI!:III P ~ !"'WfiiiPLANT complex produced LAS PERILLAS PP c energy produced in stedm

14 Thermal ito San Luis Devil Canyon Devil Canyon Switchyard

POWER PLANTS ELECTRIC POWER MAXIMUM FLOW GEN­ AVERAGE Cubic ERATOR ANNUAL MAXIMUM DROP Gallons Meters OUTPUT ENERGY OUTPUT* Feet Meters Per Second Per Second Kilowatts Kilowatthours pumping increases water over the ...... 676 206 1 412.02 678)50 2A75,ooo,ooo wi II consume ing generation of additional ito ...... 102 31 126/112 478.56 119,600 383,000,000 sources mentioned in future plans is (State .. 327 100 50)29 192.04 222,100 170,000,000* Canyon ...... 1 8 432 33.98 119)00 1,003,000,000* (State 324 87.56 214,000 1 A57,ooo,ooo* -- PUMPED *With full project development During daytime and early evening hours \Called on- peak hours) more electricity is needed and is worth more money. PUMPING CYCLE GENERATING CYCLE In contrast, during and weekend periods off-peak hours) less electricity is used and therefore the excess available is worth less. Taking of these differences, some of the Project's hydroelectric plants have been built as both generating and pump­ ing plants. During on-peak periods water drops from the main reservoir, through a generating plant and is stored in a small reser­ voir. During off-peak periods the water is back uphill into the main reservoir. This manner of operating a hydroelectric plant is called pumped storage. While it does consume more energy than it produces, operating in this manner assures a high, firm capability re- gardless of the natural water supply, and the between power cost and power revenue is financially advantaqeous.

15 Recreation

;;rReCldtng

THERMAUTO .FOREBA?LAKE OROVILLE ~n ~r) 1 THERMAUTO AFTER y 0 .

RECREATION STATE WATER PROJECT

~~!'_!IJ.~~ 6 FISHING SITES .. FISHING, PICNICKING, BOATING :'J SWIM M lNG C) CAMPING 0 HUNTING IN SEASON BIKE WAY

16 and anglers and boaters lined for hours in advance for a chance at by the State Department of Fish and of cooperation. and Ocean built the facilities, the of Parks and the recreation the US Forest the recreation facilities is surrounded by

National Forest!. By the of 19741 Pyramid had

Visitors with its 47-foot viewing tower1 interpretive slides films about the Project and the construction of Dam 1 was completed in May. Visitors centers are to be completed in 1975 at Lake Perris and at Castaic Lake.

17 Water Use

Alameda County Residents receive Row crops in the vicinity of San Jose Near San Jose, the Santa Clara ter- Project water from Patterson Reser­ grow with help from Project water. facilities of the South Bay Aque­ voir through the Alameda County duct provide Project water to the Water District, a contractor for south San Francisco Bay area. The ect water. aqueduct began delivering water in 1962.

In the San Joaquin Valley, long The Napa County Flood Control and Nearly a third of a million acres of straight irrigation ditches carry Water Conservation District receives crops in the south San Joaquin Valley ect water to thirsty crops. its Project water from this turnout on were irrigated by Project water in the North Bay Aqueduct, 1974. began delivery in 1968.

18 Davis- G runsky

The Davis-Grunsky Act was passed by the Legislature in 1959 Of the original $130 million, $102 million was committed or and funded when the people voted for the State Water Project in earmarked for projects and administration costs by the end of 1974. order to help local public agencies in need of financial aid for Formal applications were pending for about $15 million more. water development, for water-related recreation facilities, and for Active preliminary requests for $11 million were on hand. There­ fish and wildlife enhancement programs. fore, at the close of 1974 approved projects and applications to­ Funds for the program come from the $1,750 million Burns-Porter talled about $128 million, leaving over $2 million in available funds. Act monies which fund construction of the State Water In Total disbursements to local agencies were $85 million. $130 million was reserved for Davis-Grunsky Act grants and During 197 4 the Department of Water Resources, with the con­ loans. currence of the California Water Commission, approved the fol­ Grants are made to local agencies for the part of construction lowing loans for construction of water supply and distribution cost of an eligible dam and reservoir project allocated to recreation systems: or enhancement of fish and wildlife. Funds are also available to Humboldt Bay Municipal Water District, Improve­ cover the cost of initial water supply and sanitary facilities needed ment District "A". $100,000 for public recreation use at and reservoirs. Westwood Community Services District. 1,067,000 Loans are made to local agencies to enable them to build water American Canyon County Water District. 2,050,000 supply and water distribution systems. The loans assist financially when other reasonable sources of financing are not available. During the year the following projects, on which Davis-Grunsky Loans and grants have been made for projects in 34 loans and a grant were were completed: These projects are located throughout the State from areas Calaveras Public District Water Supply Project of the Oregon border to south of San Diego. Through uecemoer Fieldbrook Community District Water Distribution 31, 1974, 40 communities have received approval of construction ect loans for water supply development. These water supplies serve Sonoma County Water Agency, recreation at Santa Rosa Reservoir about 80,000 persons. Both the loan and grant aspects of the Davis-Grunsky program During 1974, over 3 million people recreation at fulfill the conceot of the California Water Plan---the water ects constructed by 27 local had received be put to beneficia I use. Grunsky grants. With full about 7.7 million people a great deal to will enjoy these facilities each year. in communities which could not In addition to the construction loans and 9 agencies have received loans to prepare feasibility reports must accompany applications for Davis-Grunsky funds.

The City of system Trinity Counly Wdterworks No. 1 provides a systrm the water needed by the community cf Hayfork through Davis-Grunsky funds.

19 Project inonci

Sources of Operating Income 1962 -

,.,,. ... u,.n,>n''" Receipts Payments by Water Customers 65.9°'0

State Government

Total Operating s790,836,000

Sources of Project Operating 1974 Water Supply Contractors-· Operations and Maintenance ...... Capital Cost Repayments ...... Construction Funds Applied to Interest...... Federal Government (San Luis ...... State Government (Recreation) ...... Power Sales......

Tota I Sources ......

20 Application of Project Income 1962- 1974

Water Operations of downtown Los Angeles. This power is used to pump Project Payments of Principal 15.9 o,o water to six water agencies in Southern California. The agencies in and lntrest on turn have contracted to reimburse the State for their portion of the Bonds 73.7°'0 annual debt service on the revenue bonds plus estimated annual Power Operations operation and maintenance costs of the power facilities. 1.1 o,o The two issues of revenue bonds have provided $345 million for power plant construction. In all, some $2.7 billion has been raised for Project construction. Reserves 9.3o'o In addition to the $1.55 billion derived from general obligation bonds and the $345 million from revenue bonds, $413 million has come from State advances, $66 million from advances made by water contractors and others, $73 million from federal flood control grants and $23 million from other sources. Payments from the State's water service contractors amounted to $93 million during 1974. All payments were current at year's end; there were no delinquencies. This is another indication of the financial viability of Project financing. In total, the contractors had paid the State $513 million at year's end. Of this amount $408 million was for capital cost and $105 million was for operating expense. Income from investments rose to $16 million in 1974. State Gen­ eral Fund reimbursements of $5 million were received in payment of Project costs allocated to recreation. Reflecting completion of the basic project needed to transport surplus northern water to San Francisco Bay communities, the south Total Operating Expenditures San Joaquin Valley area and Southern California, construction expenditures declined to $35 million, the lowest annual amount since 1962. Operation and maintenance expenses meanwhile rose s790,836,000 to $34 million. This new high reflects the shift of responsibility from construction to operational status of the Project. Davis-Grunsky loans, grants and administrative costs totaled $3 Application of Project Operating Funds: 1974 million. Water Plant Operations ...... Project power generation totaled over 4.6 billion kilowatthours. $30,089,697 The bulk of this power was produced at the Oroville-Thermalito Power Plant Operations ...... 2,470,030 Complex and generated revenues of $23 million. The power pro­ Debt Service ...... 90,137,167 duced at other plants was used in operating the Project's pumps. Reserves Operations and Maintenance...... 3,0'11,000 Replacement...... ,113,253 Debt Service ...... 10,519,391

Tota I Applications ...... 37,340,538

21 I ~ l() 0

U) Q2 ~ --I Dc (]) Q_ X I I I 0 I -Q_ u0 0-i 0-i Water Users 14%

I r

wo• ~

100• r

0 1960 61 62 63 64 65 66 67 68 69 70 71 72 73 74 YEAR

23 Boonce Sheet December 3ll974

Assets Liabilities

Capitaliution Property, Plant and Equipment. $2,234,577,209 Funded Long-Term Debt

Long-Term Assets General Obligation Bonds. $1/540,800,000 Funds Held by Revenue Bond Trustee .. 36,390,530 Oroville Power Revenue Bonds .. 239,530,000 Long Term Receivable-Energy Adjustment .. 12,610,060 Devil Canyon-Castaic Revenue Bonds. 139,165,000 Loans for Local Water Projects ... 28,231,046 State Advances. 246,217,359 116,766,185 Investments in Mobile Equipment. 5,624,924 Net Grants in Aid of Construction .. Accumulated Net Revenue .. 193,684,64 7 82,856/560 2,476,163,191 Current Assets Cash .... 1/178/633 Current Liabilities Long-Term Debt Due Within One Year ... 6,475,000 Investments .. 42,391,003 Contract Retentions. 854,843 Funds Held by Revenue Bond Trustee. 7/899,145 Accrued Interest: Accrued Interest Receivable. 6,579,910 General Obligation Bonds .. 14,996,147 Oroville Power Revenue Bonds ... 3,233,035 Accounts Receivable ... 28,013,108 Accounts Payable. 1,658,522 Loans Receivable 2,173/538 Due to Other State Funds ... Due from Other State Funds .. . 1,6o3m2 Unearned Income ... 9,278 Stores Inventories...... 707,913 27/226/825 190,546,272 Advances for Construction .. 17,386,304 OTHER ASSETS ..... 17,196,123 Reserve for Plant Replacements. 4,399,844

$2,525/176/164 $2/525,176,164

24