Mining Plan for Rattewali Block Pkl-B-10 (Boulder, Gravel & Sand) MINING PLAN FOR RATTEWALI BLOCK PKL-B-10 (BOULDER, GRAVEL & SAND) INTRODUCTION M/s Tirupati Roadways, through it’s proprietor Shri Lakhmir Singh Sabharwal, #3, Sadashiv Properties, Katras Road, Bank More, Dhanbad (Jharkhand) was the highest bidder (11.725Crores) for the Boulder, gravel & sand quarries of Rattewali Block/PKL-B-10, District Panchkula for which e-auction was held on 24-25/05/2017 vide E-Auction Notice (DMG/HY/e- Auction/PKL/2015/2845. Letter of Intent has been issued by the Director General, Mines & Geology, Haryana vide Memo No. DMG/HY/Cont./Rattewali Block/PLK B 10/2017/2658, Dated Chandigarh the 16.06.2017 for Mining of Boulder, Gravel & sand (Minor Mineral) in revenue village of Rattewali over an area of 45.00 hectares in district Panchkula, Haryana for a period of 07 Years. Letter of Intent attached as Annexure No.1. The applicant is involved in the Mining business for last many years. The applicant can invest necessary funds for the scientific and systematic development of mines including land rejuvenation and progressive reclamation programme and other measures necessary to protect the quality of the environment and human health etc. The objective of preparation of this Mining Plan and Progressive Mine Closure Plan is to fulfill the conditions stipulated by the Department of Mines & Geology, Haryana required under Haryana Minor Mineral Concession Rules, 2012. The conditions which are related to the mining plan are reproduced here below. The period of contract shall commence w.e.f the date of grant of environmental clearance by competent authority as required under EIA notification dated 14.09.2006 and as amended from time to time by the MOEF, GoI or on expiry of a period of 12 months from the date of acceptance of highest bid/issuance of “Letter of Intent”,(LoI) whichever is earlier; The contractor shall also deposit/pay an additional amount equal to 10% of the due contract money along with instalments towards the ‘Mines and Minerals Development, Restoration and Rehabilitation Fund’; 1 MINING PLAN FOR RATTEWALI BLOCK PKL-B-10 (BOULDER, GRAVEL & SAND) The mining contractor shall got prepare a “Mining Plan” along with the Mine Closure Plan (Progressive & Final) from the Recognized Qualified Person as per chapter 10 of the “Haryana Minor Mineral Concession, Stocking, Transportation of Minerals and Prevention of Illegal Mining Rules, 2012” for mining area granted on contract. The contractor shall not commence mining operations in any area except in accordance with such Mining Plan duly approved by an officer authorized by the Director, Mines & Geology, in this behalf. Further, the actual mining will be allowed to be commenced only after prior Environmental Clearance is obtained by the LoI holder/mining contractor for the Mining blocks area from Competent Authority as required under notification dated 14/9/2006 issued by the MoEF & CC, GoI or as amended from time to time. The total mineral excavated and stacked by the concession holder within the area granted on mining contract shall not exceed two times of the average monthly production as per approved Mining Plan at any point of time. The Mining contractor shall not stock any mineral outside the concession area granted on mining contract, without obtaining a valid mineral dealer license as per provisions contained in Chapter 14 of the “Haryana Minor Mineral Concession, Stocking, Transportation of Minerals and Prevention of Illegal Mining Rules, 2012”. The contractor shall not carry out any mining operations in any reserved/protected forest or any area prohibited by any law in force in India, or prohibited by any authority without obtaining prior permission in writing from such authority or officer authorized in this behalf. In case of refusal of permission by such authority or officer authorized in this behalf, contractor(s) shall not be entitled to claim any relief in payment of contract money on this account. Following special conditions shall be applicable for excavation of minor mineral(s) from river beds in order to ensure safety of river-beds, structures and the adjoining areas: (i) No mining would be permissible in a river-bed up to a distance of five times of the span of a bridge on up-stream side and ten times the span of such bridge on 2 MINING PLAN FOR RATTEWALI BLOCK PKL-B-10 (BOULDER, GRAVEL & SAND) down-stream side, subject to a minimum of 250 meters on the up-stream side and 500 meters on the down-stream side; (ii) There shall be maintained an un-mined block of 50 meters width after every block of 1000 meters over which mining is undertaken or at such distance as may be directed by the Director or any officer authorized by him; (iii) The maximum depth of mining in the river-bed shall not exceed three meter from the un-mined bed level at any point in time with proper bench formation; (iv) Mining shall be restricted within the central 3/4th width of the river/ rivulet; (v) In case of areas permitted for excavation outside river/rivulets i.e. areas adjoining to rivers/rivulets, no mining shall be permissible in an area up to a width of 500 meters from the active edges of embankments in case of river Yamuna, 250 metres in case of Dangri, Markanda and Ghaggar and 100 meters on either side of all other rivers/ rivulets; (vi) Any other condition(s), as may be required by the Irrigation Department of the state from time to time for river-bed mining in consultation with the Mines & Geology Department, may be made applicable to the mining operations in river- beds. In respect of “Sand Units”, the contractor shall restrict the quarrying operations to maximum four villages of the Unit at any point of time during the subsistence of the contract. The contractor shall have a right to change the site at any time, during the subsistence of the contract, on settlement of compensation with the land owners of new site of the block from where he intend to extract sand but ceiling of maximum four villages shall be adhered to strictly and such change of site shall be intimated to the Director or any officer authorized by him in this behalf. 3 MINING PLAN FOR RATTEWALI BLOCK PKL-B-10 (BOULDER, GRAVEL & SAND) That no mining operation shall be allowed in the urbansizable zone of area notified by Town and Country Planning Department. Further, in case of the agriculture zone notified by Town and Country Planning Department mining shall be permissible only after obtaining prior permission from the competent authority. A safety margin of two meters (2m) shall be maintained above the ground water table while undertaking mining and no mining operations shall be permissible below this level unless a specific permission is obtained from the competent authority in this behalf. Further the depth of excavation of mineral shall not exceed nine meters (9m) at any point of time. The contractor shall not undertake any mining operations in the area granted on mining contract without obtaining requisite permission from the competent authority as required for undertaking mining operations under relevant laws. The contractor shall be under obligation to carryout mining in accordance with all other provisions applicable as per Mines Act, 1952, Mines and Minerals (Development and Regulation) Act, 1957, Indian Explosive Act, 1884, Forest (Conservation) Act, 1980 and Environment (Protection) Act, 1986 and the rules made there under Wild Life (Protection) Act, 1972, Water (Prevention and Control of Pollution) Act, 1974 and Air (Prevention and Control of Pollution) Act, 1981. 4 MINING PLAN FOR RATTEWALI BLOCK PKL-B-10 (BOULDER, GRAVEL & SAND) 1.0. GENERAL: a) Name and address of the Lessee/applicant: M/s Tirupati Roadways, through it’s proprietor Shri Lakhmir Singh Sabharwal,# 3, Sadashiv Properties, Katras Road, Bank More, Dhanbad (Jharkhand) b) Status of the Applicant;-The applicant is a Proprietorship firm. c) Name, Address and registration number of the RQP preparing the mining plan The applicant has assigned the work of preparation of mining plan to S.N.Sharma (Consent letter enclosed as annexure -I V and copy of RQP certificate as annexure-V) Regd. No RQP/DDN/0135/2001/A House No. 282 Sector 11-D Faridabad (Haryana) Mobile no.09560848579 Email- [email protected] 2.0 Details of the Mining lease a) Details of the land covered in the ‘Area’ notified by Government of Haryana are as under:-Mining Lease of Boulder, gravel & sand (Minor Mineral) over an area of 45.00 ha of Rattewali Block – PKL-B-10 is located in District –Panchkula Name & No. of Block Name of Quarries Area in hacts. Khasra Number Rattewali Block-PKL-B-10 Rattewali 45.00 141 mean b) Name of Mineral Boulder, Gravel & Sand (Minor Minerals) c) Description report of the mining lease/ quarry license with plan (copy of sanction order/ lease deed/ license) 5 MINING PLAN FOR RATTEWALI BLOCK PKL-B-10 (BOULDER, GRAVEL & SAND) Based on the details published vide Haryana Government Gazette notification issued by DMG, Haryana and the Khasra map submitted by the applicant, survey of the area was carried out along the course of the Dudhgarh kee Nadi which joins to Dangri Tributary (River) in the revenue village of Rattewali detailed above which flow from NE to SW. Workings will be restricted within the lease area. Mining activities will be carried out in a manner so that there is no obstruction to the movement of water flow, if any, during rainy season. Copy of Letter of Intent issued is enclosed as Annexure – I. d) Location map of the mining lease showing the details of the approach roads up to the mine is attached as Plate -01 Area lies between coordinates Latitudes N 30° 38’ 33” to N 30° 39’ 24.6” Longitudes E 76° 59’ 17.5” to E 76° 59’ 50 d) Key plan of the area Lease area is shown on the Key Plan.
Recommended publications
  • District Wise Skill Gap Study for the State of Haryana.Pdf
    District wise skill gap study for the State of Haryana Contents 1 Report Structure 4 2 Acknowledgement 5 3 Study Objectives 6 4 Approach and Methodology 7 5 Growth of Human Capital in Haryana 16 6 Labour Force Distribution in the State 45 7 Estimated labour force composition in 2017 & 2022 48 8 Migration Situation in the State 51 9 Incremental Manpower Requirements 53 10 Human Resource Development 61 11 Skill Training through Government Endowments 69 12 Estimated Training Capacity Gap in Haryana 71 13 Youth Aspirations in Haryana 74 14 Institutional Challenges in Skill Development 78 15 Workforce Related Issues faced by the industry 80 16 Institutional Recommendations for Skill Development in the State 81 17 District Wise Skill Gap Assessment 87 17.1. Skill Gap Assessment of Ambala District 87 17.2. Skill Gap Assessment of Bhiwani District 101 17.3. Skill Gap Assessment of Fatehabad District 115 17.4. Skill Gap Assessment of Faridabad District 129 2 17.5. Skill Gap Assessment of Gurgaon District 143 17.6. Skill Gap Assessment of Hisar District 158 17.7. Skill Gap Assessment of Jhajjar District 172 17.8. Skill Gap Assessment of Jind District 186 17.9. Skill Gap Assessment of Kaithal District 199 17.10. Skill Gap Assessment of Karnal District 213 17.11. Skill Gap Assessment of Kurukshetra District 227 17.12. Skill Gap Assessment of Mahendragarh District 242 17.13. Skill Gap Assessment of Mewat District 255 17.14. Skill Gap Assessment of Palwal District 268 17.15. Skill Gap Assessment of Panchkula District 280 17.16.
    [Show full text]
  • Flood Control Order- 2019
    1 FLOOD CONTROL ORDER- 2019 DISTRICT, PANCHKULA 2 Flood Control Order-2013 (First Edition) Flood Control Order-2014 (Second Edition) Flood Control Order-2015 (Third Edition) Flood Control Order-2016 (Fourth Edition) Flood Control Order-2017 (Fifth Edition) Flood Control Order-2018 (Sixth Edition) Flood Control Order-2019 (Seventh Edition) 3 Preface Disaster is a sudden calamitous event bringing a great damage, loss,distraction and devastation to life and property. The damage caused by disaster is immeasurable and varies with the geographical location, and type of earth surface/degree of vulnerability. This influence is the mental, socio-economic-political and cultural state of affected area. Disaster may cause a serious destruction of functioning of society causing widespread human, material or environmental losses which executed the ability of affected society to cope using its own resources. Flood is one of the major and natural disaster that can affect millions of people, human habitations and has potential to destruct flora and fauna. The district administration is bestowed with the nodal responsibility of implementing a major portion of alldisaster management activities. The increasingly shifting paradigm from a reactive response orientation to a proactive prevention mechanism has put the pressure to build a fool-proof system, including, within its ambit, the components of the prevention, mitigation, rescue, relief and rehabilitation. Flood Control Order of today marks a shift from a mereresponse-based approach to a more comprehensive preparedness, response and recovery in order to negate or minimize the effects of severe forms of hazards by preparing battle. Keeping in view the nodal role of the District Administration in Disaster Management, a preparation of Flood Control Order is imperative.
    [Show full text]
  • Indian Archaeology 1994-95 a Review
    INDIAN ARCHAEOLOGY 1994-95 — A REVIEW EDITED BY HARI MANJHI C. DORJE ARUNDHATI BANERJI PUBLISHED BY THE DIRECTOR GENERAL ARCHAEOLOGICAL SURVEY OF INDIA GOVERNMENT OF INDIA JANPATH, NEW DELHI 2000 front cover : Gudnapura, general view of remains of a brick temple-complex back cover : Kanaganahalli, drum-slab depicting empty throne and Buddhdpada flanked by chanri bearers and devotees © 2000 ARCHAEOLOGICAL SURVEY OF INDIA GOVERNMENT OF INDIA Price : Rs. 330.00 PRINTED AT M/S BENGAL OFFSET WORKS, 335, KHAJOOR ROAD, NEW DELHI - 110005 PREFACE In bringing out this annual Review after a brief gap of one month, I warmly acknowledge the contributions of all my colleagues in the Survey as also those in the State Departments, Universities and various other Institutions engaged in archaeological researches for supplying material with illustrations for inclusion in this issue. I am sure, that, with the co-operation of all the heads of respective departments, we will soon be able to further reduce the gap in the printing of the Review. If contributions are received in time in the required format and style, our task of expediting its publication will be much easier. The material incorporated herein covers a wide range of subjects comprising exploration and excavation, epigraphical discoveries, development of museums, radio-carbon dates, architectural survey of secular and religious buildings, structural/chemical conservation etc. During the period under review many new discoveries have been reported throughout the country. Among these the survey of buildings in and around Vrindavan associated with mythological tradition is particularly interesting. I would like to place on record my sincere thanks to my colleagues Shri Hari Manjhi, Shri C.
    [Show full text]
  • River Piracy Saraswati That Disappeared
    GENERAL I ARTICLE River Piracy Saraswati that Disappeared K S Valdiya The legendary river Saraswati, which flowed from the KSValdiya Himalaya and emptied finally into the Gulf of Kachchh, has is at Jawahadal Nehru vanished. Tectonic movements change river courses, behead Centre for Advanced streams and sometimes even make large rivers such as the Scientific Research, Bangalore. Saraswati disappear. Mighty River of Vedic Time There was this highly venerated river Saraswati flowing through Haryana, Marwar and Bahawalpur in Uttarapath and emptying itself in the GulfofKachchh, which has been described in glowing terms by the Rigveda. "Breaking through the mountain barrier", this "swift-flowing tempestuous river surpasses in majesty and might all other rivers" of the land of the pre-Mahabharat Vedic - Channel in Vedic time ---- Present channel Figure 1 (bottom leftJ ,­ Legendary Saraswati of the I I Vedic times was formed by ," ,I joining together of the \ Shatadru (SatlujJ and what \ I is today known as the \'" J Yamuna. The Aravall was r) ,..r not a highland but a thickly forested terrain sloping 150 km southwestwards. --------~-------- RESONANCE I May 1996 19 GENERAL I ARTICLE Figure 2 (bottom) Satel­ period. More than 1200 settlements, including many prosperous lite picture of the Haryana­ towns of the Harappan culture (4600 to 4100 years Before Pres ent Pun/ab region, showing the - BP) and ashrams ofrishis (sages) lay on the banks of this life-line disproportionately wide of the Vedic time. channels (with little or no water) abandoned by big rivers which have migrated Where has that great river gone? It is today represented by the to the east or west.
    [Show full text]
  • Ijmie Issn: 2249-0558
    June IJMIE Volume 2, Issue 6 ISSN: 2249-0558 2012 ___________________________________________________________ Mapping the Agricultural Geography: A District Wise Pattern in the South-Eastern Part of the Punjab Province in Colonial India Dr. Mahender Singh* __________________________________________________________ ABSTRACT: The South-Eastern part of the Punjab was somewhat backward during 1858-1947. This sub- region was also located away from the perennial rivers Punjab and the river Jamuna‘s course was along the eastern boundary of the state. The non-perennial river Ghaggar, which passed through the northern parts of this area, caused considerable yearly damage to agriculture. Rainfall was low and erratic, and in the peak period, July to September, there were often early local and wide spread floods. The soil was sandy and light in texture. Irrigation through wells was extremely limited. The paper brought out some important points into light also. A district wise pattern in this region was varied and Karnal district was so fortunate in agricultural pursuits. Hisar and Gurgaon districts were remained backward; the cultivated area was not increased; the cropping pattern was based on low value food cum fodder crops; irrigation was limited and success rate of maturity of crops was rather low as compared to the remaining area of this sub-region. When compared to the other parts of the Punjab province; the picture was depressive. Therefore, agriculture in the south- east Punjab was erratic, lopsided, uneven, unpredictable, and had no definite pattern because of the physical features and British agrarian policy. * Assistant Professor in History, Rayat College of Law, Railmajra, SBS Nagar. Punjab. A Monthly Double-Blind Peer Reviewed Refereed Open Access International e-Journal - Included in the International Serial Directories Indexed & Listed at: Ulrich's Periodicals Directory ©, U.S.A., Open J-Gage as well as in Cabell’s Directories of Publishing Opportunities, U.S.A.
    [Show full text]
  • Assorted Dimensions of Socio-Economic Factors of Haryana
    ISSN (Online) : 2348 - 2001 International Refereed Journal of Reviews and Research Volume 6 Issue 6 November 2018 International Manuscript ID : 23482001V6I6112018-08 (Approved and Registered with Govt. of India) Assorted Dimensions of Socio-Economic Factors of Haryana Nisha Research Scholar Department of Geography Sri Venkateshwara University, Uttar Pradesh, India Dr. Avneesh Kumar Assistant Professor Department of Geography Sri Venkateshwara University Uttar Pradesh, India Abstract It was carved out of the former state of East Punjab on 1 November 1966 on a linguistic basis. It is ranked 22nd in terms of area, with less than 1.4% (44,212 km2 or 17,070 sq mi) of India's land area. Chandigarh is the state capital, Faridabad in National Capital Region is the most populous city of the state, and Gurugram is a leading financial hub of the NCR, with major Fortune 500 companies located in it. Haryana has 6 administrative divisions, 22 districts, 72 sub-divisions, 93 revenue tehsils, 50 sub-tehsils, 140 community development blocks, 154 cities and towns, 6,848 villages, and 6222 villages panchayats. As the largest recipient of investment per capita since 2000 in India, and one of the wealthiest and most economically developed regions in South Asia, Registered with Council of Scientific and Industrial Research, Govt. of India URL: irjrr.com ISSN (Online) : 2348 - 2001 International Refereed Journal of Reviews and Research Volume 6 Issue 6 November 2018 International Manuscript ID : 23482001V6I6112018-08 (Approved and Registered with Govt. of India) Haryana has the fifth highest per capita income among Indian states and territories, more than double the national average for year 2018–19.
    [Show full text]
  • E2004 V9 Public Disclosure Authorized
    E2004 v9 Public Disclosure Authorized HARYANA POWER SYSTEM IMPROVEMENT PROJECT Public Disclosure Authorized (World Bank Funded) ENVIRONMENT MANAGEMENT PLAN - PACKAGE G6 March 2009 Rev 0 Public Disclosure Authorized Prepared for: Haryana Vidyut Prasaran Nigam Limited (HVPNL) Public Disclosure Authorized Prepared by: SMEC (India) Pvt. Ltd., Gurgaon Consultancy Service for Preparation of RRAP and EMP for World Bank Aided Project of HVPNL TABLE OF CONTENTS Sl No. Particulars Page No. 1.0 INTRODUCTION 1 - 2 1.1 General 1 1.2 Brief Profile of HVPNL 1 1.3 Project Objective 1 2.0 POLICY, LEGAL AND REGULATORY FRAMEWORK 3 - 10 2.1 Environmental and Social Policy & Procedures (ESPP) of HVPNL 3 2.2 Salient Features of the Forest (Conservation) Act, 1980 4 2.3 Salient Features of Environment (Protection) Act, 1986 7 2.4 Other Applicable Statutory Environmental Clearances 7 2.4.1 Declaration of eco-sensitive zones by Haryana Government 8 2.5 Project Categorisation 8 2.5.1 Categorisation Criteria of MoEF 8 2.5.2 Categorisation Criteria of World Bank 8 3.0 PROJECT SCOPE AND METHODOLOGY 11 - 12 3.1 Project Categorisation as per MoEF and World Bank 11 3.2 Scope of the Study 11 3.3 Methodology 11 4.0 PROJECT BASELINE ENVIRONMENT 13 – 18 4.1 Meteorology 13 4.2 Physical Environment 14 4.2.1 Land Resources 14 4.2.2 Ambient Air Quality 16 4.2.3 Water Resources 16 4.2.4 Noise Environment 17 4.3 Biological Environment 17 4.3.1 Flora 17 4.3.2 Fauna 17 4.4 Socio-economic Environment 17 5.0 DESCRIPTION OF SUB PROJECTS 19 - 40 5.1 The Sub Projects 19 5.1.1 Sub-Project 1 - 220 kV D/C Sector 72, Gurgaon to Rangla Rajpur (Firozpur Zirka) line 20 5.1.2 Sub-Project 2 - 220 kV D/C line from proposed 400 KV substation Nawada (Faridabad) to 22 Preliminary EMP – Package G6 Consultancy Service for Preparation of RRAP and EMP for World Bank Aided Project of HVPNL Sl No.
    [Show full text]
  • Deptt. of T. & C. Planning. Haryana
    NOTE :- THE PROVISIONS OF THE PUNJAB SCHEDULE ROADS AND CONTROLLED AREAS RESTRICTION UNREGULATED DEVELOPMENTACT,1963 AND ROLES FRAMED THERE UNDER (ACT NO. 41,1963) SHALL BE APPLICABLE TILL THE DE - NOTIFICATION OF THE ROAD AS SCHEDULE ROAD BY THE CONCERNED 45M. WIDE PERIPHERAL ROAD WITH 30 DEPARTMENT. HOWEVER, THE PROVISIONS OF ACT IBID SHALL NOT BE APPLICABLE ON THE STRUCTURES M. WIDE GREEN BELT OUTER SIDE. WHICH EXIST AT THE TIME OF DECLARATION OF CONTROLLED AREA AND SHOWN IN THE EXISTING LAND USE MAP PUBLISHED WITH THE DRAFT DEVELOPMENT PLAN . SR-33 EXISTING ROAD WITH 30 M. WIDE RESTRICTED/GREEN BELT ON BOTH SIDE. TO TRALOK PUR SR-33 EXISTING ROAD UNDER SUB- SECTION(7) OF SECTION (5) OF THE PUNJAB SCHEDULED CONTROLLED AREA NOTIFIED VIDE 30 M.WIDE SECTOR DIVIDING ROAD ROADS AND CONTROLLED AREAS RESTRICTION OF UNREGULATED HARYANA GOVT. GAZETTE NOTIFICATION EXISTING ROAD TO BE WIDENED UP DEVELOPMENT ACT 1963 (41 OF 1963) NO. CCP(NCR)/ PKL / R.R / CA / 2006 / 3047 DATED 04.10.2006, PUBLISHED ON 04.10.2006. TO 30M. EXISTING FEATURES: FROM RAMGARH V. MANAK. TABRA CONTROLLED AREA BOUNDARY V. NARAIN PUR H.B. NO - 244 H.B. NO - 207 VILLAGE ABADI / EXISTING ABADI TO BADHAUR RIVER CONTROLLED AREA NOTIFIED VIDE ROAD PROPOSED HARYANA GOVT. GAZETTE DANGRI RIVER NOTIFICATION NO. CCP(NCR)/ PKL / R.R / REVENUE RASTA CA / 2006 / 3047 DATED 04.10.2006, DENSITY (PERSONS PER HECTARE) 250 760 PUBLISHED ON 04.10.2006. SUB CODE 100 800 SECTOR NUMBER 1 FROM KHATAULI V. ALIPUR BANDH H.B. NO - 206 REVENUE BOUNDARY V.
    [Show full text]
  • Adv. No. 11/2019, Cat No. 16, Lower Division Clerk (Head Office Cadre), DHBVN, UHBVN & HVPNL DEPARTMENT, HARYANA Morning Session
    Adv. No. 11/2019, Cat No. 16, Lower Division Clerk (Head Office Cadre), DHBVN, UHBVN & HVPNL DEPARTMENT, HARYANA Morning Session Q1. A. B. C. D. Q2. A. B. C. D. Q3. B. A. C. D. Q4. A. B. C. D. Q5. A. B. C. D. March 02, 2020 Page 1 of 25 Adv. No. 11/2019, Cat No. 16, Lower Division Clerk (Head Office Cadre), DHBVN, UHBVN & HVPNL DEPARTMENT, HARYANA Morning Session Q6. A. B. C. D. Q7. A. B. C. D. Q8. A. B. C. D. Q9. A. B. C. D. Q10. A. B. C. D. March 02, 2020 Page 2 of 25 Adv. No. 11/2019, Cat No. 16, Lower Division Clerk (Head Office Cadre), DHBVN, UHBVN & HVPNL DEPARTMENT, HARYANA Morning Session Q11. What is the synonym of 'horrible'? A. Awful B. Agreeable C. Pleasant D. Worst Q12. What is the synonym of 'camouflage'? A. Rush B. Hide C. Accelerate D. Bustle Q13. What is the antonym of 'detest? A. Reject B. deny C. adjacent D. admire Q14. What is the antonym of 'rattle'? A. Abash B. Disconcert C. Discompose D. Antique Q15. 'Something that is very common, not unique.' Find the idiom related to following meaning. A. A dime a dozen B. Bite the bullet C. Don't judge a book by its cover D. Biting off more than you can chew Q16. 'The elephant in the room'. Find the meaning of this idiom in the given options. A. To fail in a spectacular manner B. An issue, person, or problem that someone is trying to avoid C.
    [Show full text]
  • Drainage System in Sutlej – Yamuna Divide During Harappan Age
    www.ijcrt.org © 2018 IJCRT | Volume 6, Issue 1 January 2018 | ISSN: 2320-2882 Drainage System In Sutlej – Yamuna Divide during Harappan Age Dr. Sunil Kumar Lecturer in History Abstract: Drainage system of Sutlej-Yamuna divide is important in Indian sub-continent because it has perennial river system during proto-historic times. This area is so cradle of Indian civilization. So this study throws light on this. The important rivers of this area was Saraswati, Yamuna, Drasdwati, the Nai Channels, Markanda. Some changes also occurred in these river channels during Harappan age. But with this these rivers channels give an new idea to the Indian Civilization. Keywords: Harappan, Sutlej-Yamuna Streams, Courses, Desert. Introduction: The drainage map provides a picture of a region apparently rich in rivers, but excepting the two bounding rivers, i.e. the Sutlej and the Yamuna none of the streams is perennial.1 The only river of any importance traversing the middle of the Divide is the Ghaggar, which though perennial in its upper course, becomes dry after flowing for only a short distance from the hills. All the other streams which flow in a southwesterly direction, although at present have broad sandy courses scarcely below the surface of the country, had even a hundred years ago a more permanent character and well defined banks. They must have therefore, flown for longer distances than they do now.2 The important streams from the west to the east are the Budki, Jainta Devi K. Rao, Patiali Rao, Sukhna Rao, Ghaggar, Dangri, Begna, Markanda, Chautang, Saraswati and Rakshi.
    [Show full text]
  • The Lost Saraswati River of Northwestern Indian Plains: Status and Way Forward
    524 Article 524 by H.S.Saini 1, Apurva Alok2, N.C. Pant2 The Lost Saraswati River of Northwestern Indian Plains: Status and way forward 1. Director (Retd.), Geological Survey of India. Faridabad, INDIA 2. Dept of Geology, University of Delhi, Delhi, INDIA. (Received : 4/1/2019; Revised accepted : 21/9/2019) https://doi.org/10.18814/epiiugs/2020/020034 Buried course of the desiccated river Saraswati/ have existed in the NW plains of India through the states of Punjab, Ghagghar-Hakara from Himalayan front to Arabian Sea Haryana, Rajasthan and Gujarat and parts of modern Pakistan during the Vedic period which supported and sustained a big Vedic / Indus / through the plains of NW India has been in discussion Harrapan civilization on its plains (Fig.1). Existence of the Saraswati and scientific investigations since ~140 years due to its River is one of the oldest debated issues in Indian Geology and importance in societal evolution and drainage archeology. The “lost river Saraswati” was first proposed by Oldham disorganization. Its plains were inhabited by the (1886) who traced a dry river bed in Rajasthan to the coast of Gujarat. Harappan/ Indus civilization (7000–1200BC) which The course showed several tributaries in Punjab plains between modern Ghagghar and Sutlej rivers which joined to form the main collapsed around 4-3 ka BP. Views, both, in favor and Saraswati river in northern Rajasthan. Similar course and few against a relation between collapse of civilization and landforms of dried up channels were observed in Punjab plains by drying up of the Saraswati river exist.
    [Show full text]
  • 1. EXECUTIVE SUMMARY M/S PINJORE ROYALTY COMPANY Is the Applicant of the Proposed Project
    1. EXECUTIVE SUMMARY M/S PINJORE ROYALTY COMPANY is the applicant of the proposed project. Letter of Intent has been issued by the Director, Mines & Geology Department, Govt. of Haryana, vide letter no. DMG/Hy/Cont/N.Pur Block/PKL B 19/2015/3677 Dated- 09.06.2015 to above mentioned lessee (Attached as Annexure-I). The mining lease area is situated on Dangri River Bed in Tehsil Raipur Rani, District Panchkula, Haryana. The lease area is 32.63 ha. Mining will be carried out by opencast Semi mechanized method of mining. The mineral will be loaded mechanically on dumpers or trucks. About 1468350 MTPA will be produced per annum. Cost of the proposed project is Rs 1.1 Crores 1.1 SALIENT FEATURES OF THE PROJECT Project Name Boulder, Gravel and Sand minor mineral “Narainpur Block/PKL B 19” Location of Mine Site Village – Narainpur Tehsil - Raipur Rani District - Panchkula State - Haryana Location Narainpur- Latitude : 30° 36' 24.26" , 30° 35' 56.74" N Longitude : 77° 1' 59.28" , 77° 2' 47.93" E Shahpur- Latitude : 30° 35' 49.02" , 30° 36' 28.60" N Longitude : 77° 1' 1.80" , 77° 1' 52.82" E Raipur Rani- Latitude : 30° 35' 44.62" , 30° 35' 42.43" N Longitude : 77° 0' 42.93" , 77° 0' 50.57" E Toposheet number H43L2 Minerals of mine Boulder ,gravel and sand Total Geological 1957800 MT (Proved, Probable and Possible) reserves Total Mineable 1427400 MT (Proved and Probable) reserves Life of mine Not Applicable Proposed production 1468350 MTPA. of mine Method of mining Opencast Semi-Mechanized Method No of working days 300 days Water demand Total water requirement is about 24.41 KLD Sources of water Water for dust suppression and plantation will be collected from nearby villages.