Harrogate Borough Council Planning Committee – Agenda Item 6: List of Plans HARROGATE BOROUGH COUNCIL PLANNING COMMITTEE – AGENDA ITEM 6: LIST OF PLANS. DATE: 9 June 2015 PLAN: 04 CASE NUMBER: 15/01177/FUL GRID REF: EAST 428264 NORTH 465817 APPLICATION NO. 6.52.54.D.FUL DATE MADE VALID: 26.03.2015 TARGET DATE: 21.05.2015 REVISED TARGET: 12.06.2015 CASE OFFICER: Mrs Linda Drake WARD: Bishop Monkton VIEW PLANS AT: http://uniformonline.harrogate.gov.uk/online- applications/applicationDetails.do?activeTab=summary&keyVal=NL5UNAHYFZG00 APPLICANT: Mr Ronnie Spragg AGENT: Mr Stephen Courcier PROPOSAL: Erection of replacement dwelling (site area 0.14 ha) LOCATION: Home Cottage Ingerthorpe Grange Markington North Yorkshire HG3 3PD REPORT SITE AND PROPOSAL Home Cottage is a detached dwelling sited to the south-west of Ingerthorpe Grange, Markington. The existing dwelling is a single storey bungalow, constructed from stone with a slate roof. To the side is a former barn, now used for storage. To the rear there is a garden at a raised level. Parking lies to the front. The site is in a secluded location and surrounded by trees. Planning permission was granted in 2012 for a replacement dwelling on the site, comprising a living room, study and kitchen on the ground floor with two bedrooms within the roofspace, of traditional design. The dwelling would be on same site as the existing dwelling. This permission is still extant. This scheme for a replacement dwelling is marginally larger in footprint to the approved scheme. The proposed dwelling also includes a full first floor with a taller height overall. The siting of the dwelling on the site remains the same. MAIN ISSUES 1. Size of replacement dwelling 2. Design 3. Highways 4. Sustainable Construction 5. Open Space Provision RELEVANT SITE HISTORY 11/03574/CLEUD – Certificate of lawfulness for existing use of a dwelling built not in accordance with planning conditions of planning permission 6.52.54.A.PA. PERMITTED. 17.11.2011. 12/01255/HPC – Erection of single storey extensions to rear, front and both side of existing dwellinghouse, erection of rear dormer and front porch. CRHPC. 03.04.2012. 12/03566/FUL - Erection of replacement dwelling (Site Area 0.14ha). PERMITTED. 4.12.2012 CONSULTATIONS/NOTIFICATIONS NYCC Highways And Transportation No objection. DCS - Open Space No commuted sum required. EHO Contaminated Land No objection. DCS Arboricultural Officer No objection or comment. Parish Council MARKINGTON WITH WALLERTHWAITE PARISH COUNCIL Principal Ecologist Response awaited. Forestry Commission Response awaiting. RELEVANT PLANNING POLICY NPPF National Planning Policy Framework CSSG4 Core Strategy Policy SG4 Settlement Growth: Design and Impact CSC1 Core Strategy Policy C1: Inclusive communities CSEQ1 Core Strategy Policy EQ1: Reducing risks to the environment CSEQ2 Core Strategy Policy EQ2: The natural and built environment and green belt LPH20 Harrogate District Local Plan (2001, as altered 2004) Policy H20, Replacement Dwellings in the Countryside LPHD20 Harrogate District Local Plan (2001, as altered 2004) Policy HD20, Design of New Development and Redevelopment CSSG3 Core Strategy Policy SG3 Settlement Growth: Conservation of the countryside, including Green Belt APPLICATION PUBLICITY SITE NOTICE EXPIRY: 08.05.2015 PRESS NOTICE EXPIRY: REPRESENTATIONS MARKINGTON WITH WALLERTHWAITE PARISH COUNCIL - Supports the application. OTHER REPRESENTATIONS None received. VOLUNTARY NEIGHBOUR NOTIFICATION None. ASSESSMENT OF MAIN ISSUES 1. SIZE OF REPLACEMENT DWELLING - Saved Policy H20 of the Harrogate District Local Plan allows replacement dwellings, subject to satisfying all the criteria of the policy. As the proposed dwelling would be in the same location as the existing, thereby preventing the use of two properties on the site, is of an acceptable design and has satisfactory access, it meets criterion A, C, D and E. Criterion (B) states that the new dwelling should be no larger than the existing and the justification for the policy further clarifies this by stating that the proposed replacement should be of a similar size or smaller. The site is secluded and the existing dwelling is modest in size. The footprint of the proposed dwelling is marginally larger than the approved dwelling by 7.93 square metres and the ridge height would increase by 0.9m to 8.5m. The layout of the first floor remains the same (two bedrooms, each with en-suite). It is considered that current proposal would result in a dwelling with better proportions and appearance. Whilst the size of the replacement dwelling is larger than the dormer bungalow which is to be demolished, the main thrust of Policy H20 is to protect existing landscape character. In this regard the location of the house is a material consideration. The site is secluded and accessed via a private road. Local vernacular character is stone and slate. A larger dwelling on this site has already been approved and it is considered that the amendments to the proposal could be accommodated without causing harm to landscape character. Having regard to the above it can be concluded that the dwelling is generally compliant with the main thrust of Policy H20. The extant planning permission, the secluded location of the site and the appearance of the proposed dwelling are material considerations that outweigh the very specific requirements of Policy H20 with regard to the size of replacement dwellings in the countryside. 2. DESIGN - The design of the proposed dwelling shows a stone and slate dwelling which would be in keeping with the locality. The appearance of the dwelling is acceptable and complies with Saved Policies H20 and HD20 of the Harrogate District Local Plan and Policy SG4 of the Core Strategy for the Harrogate District Local Development Framework. 3. HIGHWAYS – As no change is proposed to the access to the site NYCC Highways have raised no objection. 4. SUSTAINABLE CONSTRUCTION – Core Strategy Policy EQ1 seeks to reduce risk to the environment and requires development to seek to minimise; energy and water consumption, the use of natural non-renewable resources, travel by car, flood risk and waste. Where residential development is proposed new dwellings were to meet the Code for Sustainable Homes and the Local Planning Authority required all new dwellings to meet Code Level 4. Recently however the Government removed the Code for Sustainable Homes from Development Management, however Core Strategy Policy EQ1 still applies and thus new dwellings must demonstrate at design stage and post construction stage that new dwellings can meet the energy and water efficiency requirement set out in outgoing Code 4 of the Code for Sustainable Homes. The applicant has submitted a Pre-Assessment Report advising the dwelling could meet Code Level 4 and thus the energy and water efficiency of Level 4 could be met; therefore if minded to approve the application an appropriately worded condition would be recommended. 5. OPEN SPACE PROVISION – The proposal is for a replacement dwelling and therefore no commuted sums for the Provision of Open Space Facilities and Provision of Village Halls is required under Policy C1 of the Core Strategy for the Harrogate District Local Development Framework. CONCLUSION The dwelling does not comply with Criterion (B) of Policy H20 as it is larger. However given the modest size of the existing dwelling it is considered that an exception can be made in this instance. If Criterion (B) were to be enforced it is considered that this would result in a small dwelling over which there would be increased pressure from the start to extend, which could result in a significantly larger dwelling on the site. It is therefore considered that the proposal does not conflict with Policy H20. The design of the dwelling is considered to be acceptable. The proposal is considered to comply with Saved Policies Policy C1 and HD20 of the Harrogate District Local Plan and Policy SG4 of the Core Strategy for the Harrogate District Local Development Framework. CASE OFFICER: Mrs Linda Drake RECOMMENDATION That the application be APPROVED subject to the following conditions:- 1 The development hereby permitted shall be begun on or before . 2 The development hereby permitted shall be carried out in strict accordance with the submitted plans: 3 Prior to the first occupation of the dwelling hereby permitted, information shall be provided to the Local Planning Authority to confirm that the energy and water efficiency has been achieved. 4 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that Order with or without modification), no extensions, garages, roof or dormer windows other than any expressly authorised by this permission shall be erected without the grant of further specific planning permission from the local planning authority. 5 Prior to the completion of the foundations a sample panel of the type of stone to be used showing the proposed coursing and pointing shall be erected on site for the written approval of the Local Planning Authority. 6 Prior to the completion of the walls a sample of the proposed roofing slate shall be submitted for the written approval of the Local Planning Authority. Reasons for Conditions:- 1 To ensure compliance with Sections 91-94 of the Town and Country Planning Act 1990. 2 For the avoidance of doubt and in the interest of proper planning. 3 To safeguard the environment and mitigate climate change in accordance with Harrogate District Core Strategy Policy EQ1 4 In order to protect the visual amenities of the surrounding area. 5 In order to ensure that the materials used conform to the amenity requirements of the locality. 6 In order to ensure that the materials used conform to the amenity requirements of the locality. .
Recommended publications
  • Annual Monitoring Report 2016
    Harrogate District Local Plan: Annual Monitoring Report 2016 December 2016 Harrogate District Local Plan: Annual Monitoring Report 2016 Harrogate Borough Council Contents 1 Introduction 2 2 Harrogate context 3 3 Links with other council strategies and objectives 4 4 Local Plan update and the Local Development Scheme 5 5 Neighbourhood Planning 9 6 Duty to co-operate 10 7 Community Infrastructure Levy 11 8 Housing 12 9 Jobs and Business 24 10 Travel 31 11 Environment and Quality of Life 32 12 Communities 36 Appendices Appendix 1 Shop Vacancies 38 2 Harrogate Borough Council Harrogate District Local Plan: Annual Monitoring Report 2016 1 Introduction 1 Introduction 1.1 The requirement to produce a Local Plan monitoring report is set out in the Planning and Compulsory Purchase Act 2004, as amended by the Localism Act 2011. The Town and Country Planning (Local Planning) (England) Regulations 2012 provides more detail about what an authority should include in its annual monitoring report (AMR). 1.2 The AMR must be made available for inspection and put on the council's website. The Harrogate District Local Plan AMR 2016 covers the period from 1 April 2015 to 31 March 2016, but also, where appropriate, includes details up to the time of publication. 1.3 This AMR contains details relating to: the progress made on documents included in the Local Development Scheme (LDS); progress with Neighbourhood Plans; co-operation with other local planning authorities; the community infrastructure levy; monitoring indicators; and the availability of a five year housing land supply. Harrogate District Local Plan: Annual Monitoring Report 2016 Harrogate Borough Council 3 Harrogate context 2 2 Harrogate context 2.1 Harrogate district (see picture 2.1) is part of the county of North Yorkshire and local government service delivery is split between Harrogate Borough Council and North Yorkshire County Council.
    [Show full text]
  • Site Assessment Volume 9
    Built and Natural Environment Site Assessments Volume 9: Ingerthorpe – Kirkby Malzeard October 2016 Harrogate District Draft Local Plan: Site Assessments Harrogate Borough Council Contents 1 Introduction 2 2 Policy Context 3 National Policy Context 3 Emerging Local Policy Context 5 3 Methodology 8 Landscape 8 Conservation and Design 13 Ecology 17 Land Drainage 20 4 Site Assessments 21 Ingerthorpe 23 Killinghall 26 Kirby Hill 103 Kirk Deighton 130 Kirk Hammerton 143 Kirkby Malzeard 181 2 Harrogate Borough Council Harrogate District Draft Local Plan: Site Assessments 1 Introduction 1 Introduction 1.1 The Harrogate District Local Plan will make allocations of land for housing, employment uses and a range of other uses where appropriate. The Built and Natural Environment Site Assessments document(s) has been prepared as part of the evidence base to support the Draft Local Plan and has been used to help inform the the choice of draft allocations for housing, employment and mixed use development.(1) This report looks at site options in: Ingerthorpe Killinghall Kirby Hill Kirk Deighton Kirk Hammerton Kirby Malzeard 1.2 Full details of how sites have been selected can be found in Appendices 7 and 8 of the Harrogate District Draft Sustainability Appraisal (October 2016).(2) 1.3 The council's consultancy team have undertaken studies of potential impacts of development on the following: Landscape; Conservation and design; Ecology; and Land Drainage 1 There are number of volumes of The Built and Natural Environment Site Assessment documents, each dealing with different settlements across the district. 2 For further details please visit www.harrogate.gov.uk/sa Harrogate District Draft Local Plan: Site Assessments Harrogate Borough Council 3 Policy Context 2 2 Policy Context National Policy Context Introduction 2.1 The government is committed to protecting and enhancing the quality of the environment.
    [Show full text]
  • Harrogate Landscape Character Assessment February 2004
    HARROGATE DISTRICT Landscape Character Assessment February 2004 T P Richards Dip T&RP, MRTPI, Head of Planning Services PLANNING DIVISION Department of Technical Services, Knapping Mount, West Grove Road, Harrogate HG1 2AE. www.harrogate.gov.uk/planning Contents Figures: 4 Harrogate District Land- scape Character Areas 23 1. Countryside Agency Character Areas in Harrogate District 7 4.1 Introduction 23 2 Harrogate District Soil Types 8 4.2 Historic Parks & Gardens 24 3 Harrogate District Topography 10 4.3 List of Character Areas 26 4 Harrogate District Landscape Character Areas 23 Appendices 1 Bibliography i Summary 2 2 Project for the review of the 1993 Landscape Appraisal for Harrogate District & Special 1 Introduction 3 Landscape Areas iii 3 Summary of the results of May 2 Overview of District 2003 meetings xiii Landscape Character 6 2.1 National & regional context 6 4 The biodiversity of Harrogate District xvii 2.2 Physical characteristics 6 5 The buildings of Harrogate 2.3 Human influences 11 District xxi 6 Soils in Harrogate District xxiii 3 Forces for Change and Generic Guidelines 13 Glossary xxv 3.1 Context 13 3.2 Built development 14 3.3 Infrastructure 16 3.4 Tourism, recreation & amenity 17 3.5 Quarrying & mineral extraction 19 3.6 Agriculture 20 3.7 Forestry & woodland 21 p. 1 Summary The Harrogate District Landscape Character Assessment provides a detailed breakdown of the District into 106 smaller Character Areas, each with their own distinct character and sense of place. These areas are described in detail with regard to geology, landform, drainage, land use, vegetation, wildlife, built form and communications.
    [Show full text]
  • MS Dep 1980/1 Archives of the Dean and Chapter Of
    Handlist 47 LEEDS UNIVERSITY LIBRARY Archives of the Dean and Chapter of Ripon MS Dep 1980/1 The greater part of their accumulated archives was very generously deposited recently in the Brotherton Library of the University of Leeds by the Dean and Chapter of Ripon. It is hoped that by this arrangement the material will be more conveniently accessible to the majority of researchers. A few items, however, remain at Ripon because they are currently in use or are on permanent display to visitors. The cathedral was a parish church before it was raised to its present status and the parish registers are deposited at the North Yorkshire County Record Office, Northallerton. This list includes both the material remaining at Ripon and that at Northallerton. The archives of the Dean and Chapter have been listed twice before. A summary list was prepared for the Pilgrim Trust in 1946. A much fuller list was compiled for the National Register of Archives (Historical Manuscripts Commission) and issued in 1959. Upon the archives being inspected after their arrival at Leeds it was immediately apparent that the collection contained even more than had been listed in 1959, and it was decided with the ready concurrence of the Commission, that a new listing would be essential. This new list has been designed to avoid as much confusion as possible. It follows the style and numeration of the 1959 list and new entries have been inserted as close as possible to suitable places within its original framework. Some documents had identifications unrelated to the serial numbers used in that list; they have now been numbered to correspond and the additional items have been given appropriate subdivisions within the original notation.
    [Show full text]
  • Cause Papers Project Standardization
    1 Cause Papers in the Diocesan Courts of the Archbishopric of York, 1300–1858 Editing and Standardisation in the Cause Papers Database The Cause Papers project provided an on-line searchable catalogue of more than 13,000 cause papers relating to cases heard between 1300 and 1858 in the Church Courts of the diocese of York, the original records for which are held at the Borthwick Institute for Archives at the University of York. The project aimed to pioneer a new standard of excellence in data accuracy and standardization. Cataloguing such a large and varied number of records posed numerous challenges in these areas, including the problem of how to incorporate spelling and language variations of surname and place names. The following document provides information on the methods used by the project team in compiling, editing and standardizing the data. It is split into the following sections:- 1) Information provided by the database 2) List of standard reference works used by the project team 3) List of types and sub-types of cases commonly used in the database 4) Standardization of Forenames 5) Standardization of Surnames – Part A 6) Standardization of Surnames – Part B 7) Problematic Place-names – Identification and Standardization Please note that this text is not intended as a guide to on-line catalogue. Users requiring assistance with searching the catalogue should consult the on-screen help text. 2 Editing and standardisation for the Cause Paper Database 1) Information provided by the database Owing to the volume and complexity of manuscript material involved, it was not possible to provide full transcriptions of the cause papers.
    [Show full text]
  • CHRISTMAS TREE BUSINESS and GROWING CROP Ingerthorpe Hall Farm, Markington, Harrogate, North Yorkshire
    Suite 8, Rectory House Thame Road, Haddenham Buckinghamshire HP17 8DA Tel: 01844 291384 Fax: 01844 299003 email: [email protected] CHRISTMAS TREE BUSINESS AND GROWING CROP Ingerthorpe Hall Farm, Markington, Harrogate, North Yorkshire Robin Trees based at Ingerthorpe Hall Farm, Markington,Harrogate provides a rare and exciting business opportunity. Started in 1982 and located on fertile arable land, this enterprise has achieved many years of successful sales. New and increased plantings of Nordmann, Fraser and Canaan fir are now reaching maturity, ready for marketing from Christmas 2015. FOR SALE BY PRIVATE TREATY www.johnclegg.co.uk CHRISTMAS TREE BUSINESS AND GROWING CROP Ripon 3 miles Harrogate 8 miles Leeds 24 miles York 27 miles (all distances are approximate) DIRECTIONS DESCRIPTION If using SatNav please enter HG3 3PF. Ingerthorpe Hall This Christmas tree business markets under the well Farm is located to the west of the A61, approximately established name of "Robin Trees", with a distinct and 3 miles south of Ripon and 8 miles north of Harrogate. seasonal trade mark. 0.7 miles north of Wormald Green, at the only crossroads on this section of the A61, beside the Cascade Garden Planting began in 1982 and from the outset emphasis was Centre, turn west towards Markington. After 0.75 miles placed on producing quality trees for both the potted and cut turn right at the mini crossroads signed "this lane closed to markets. In the early years Norway spruce predominated but articulated wagons". Continue along this lane for these have now been completely replaced with Nordmann, 0.33 miles, ignoring right exits, until you see a big Fraser and Canaan firs.
    [Show full text]
  • Harrogate Borough Council Planning Committee List Of
    HARROGATE BOROUGH COUNCIL PLANNING COMMITTEE LIST OF APPLICATIONS DETERMINED BY THE HEAD OF PLANNING SERVICES UNDER THE SCHEME OF DELEGATION CASE NUMBER: 10/02807/AMENDS WARD: Falls Within 2 Or More CASE OFFICER: Mr M Williams DATE VALID: 24.06.2010 GRID REF: E 431339 TARGET DATE: 22.07.2010 N 470923 DECISION DATE: 11.08.2010 APPLICATION NO: 6.500.255.AMENDS LOCATION: Various Sites Ripon North Yorkshire PROPOSAL: Application for a Non Material Amendment for various alterations in relation to planning permission 6.500.255.EIAMAJ - Construct a flood alleviation scheme in Ripon, which will include a flood storage embankment at Birkby Nab on the River Laver and flood defence walls and embankments in Ripon, Fisher Green and Little Studley. Alma Weir will also be replaced and 100m of riverbed lowered upstream of the weir. APPLICANT: Environment Agency APPROVED subject to the following conditions:- 1 The development hereby permitted shall be carried out in accordance with the following approved plans: WN/LRIP/3004 rev T1 WN/LRIP/3005 rev T1 WN/LRIP/3006 rev T1 WN/LRIP/3008 rev T1 WN/LRIP/3009 rev T1 WN/LRIP/3010A rev T1 WN/LRIP/3010B rev T0 WN/LRIP/3011A rev T1 WN/LRIP/3011B rev T0 WN/LRIP/30012 rev T1 WN/LRIP/3013 rev T1 WN/LRIP/3014 rev T1 WN/LRIP/3015 rev T1 1 WN/LRIP/3016 rev T1 WN/LRIP/3017 rev T1 WN/LRIP/3018 rev T1 WN/LRIP/3019 rev T1 Reasons for Conditions:- 1 For the avoidance of doubt CASE NUMBER: 10/03097/DISCON WARD: Falls Within 2 Or More CASE OFFICER: Mr M A Warden DATE VALID: 05.07.2010 GRID REF: E 431346 TARGET DATE: 30.08.2010 N 469795 DECISION DATE: 13.08.2010 APPLICATION NO: 6.500.175.B.DISCON LOCATION: Land Comprising Field East Of Greystone Primary School Harrogate Road Ripon North Yorkshire PROPOSAL: Application to approve details required under condition 3 of permission 6.500.175.B.OUTMAJ in relation to implementation.
    [Show full text]
  • 4 Safe Reuse of Municipal Wastewater and Sewage Sludge for Irrigation and Fertilization 28
    BIOPROS project - SRP Guidelines - Published: 2008 These guidelines were produced and published with funding from the European Commission within the Sixth Framework Programme (FP6) under the project “BIOPROS – Solutions for the safe application of wastewater and sludge for high efficient biomass production in Short- Rotation-Plantations” (Contract no. COLL-CT-2005-012429). For more information about the project and its results please visit the project website: www.biopros.info Note: This document reflects the views of the authors and not necessarily those of the European Commission and other participating organisations. The European Commission is not liable for any use that may be made of the information contained therein. - Page 2 of 155 - BIOPROS project - SRP Guidelines - Published: 2008 EDITORIAL BOARD Dr. Katrin Heinsoo Estonian University of Life Sciences Dr. Ioannis Dimitriou Swedish University of Agricultural Sciences Steffen Foellner ttz Bremerhaven Grit Buergow International Ecological Engineering Society (IEES), layout & technical editing, [email protected] Published by Ulster Farmers Union, 2008 www.ufuni.org Main responsible partners for guideline development (authors): Chapter 1 Steffen Foellner, ttz Bremerhaven, Germany Email: [email protected]; Phone: +49-471-9448 772 Chapter 2 Dr. Andrzej Klasa, University of Warmia and Mazury, Poland Email: [email protected]; Phone: +48-89-523 47 05 Chapter 3 Dr. Katrin Heinsoo, Estonian University of Life Sciences, Estonia Email: [email protected]; Phone: +372-7-477 172 Chapter 4 Dr. Ioannis Dimitriou, Swedish University of Agricultural Sciences, Sweden Email: [email protected]; Phone: +46-18-672 553 Chapter 5 Dr. Andrea Carboni, CRA - Research Institute for Industrial Crops, Italy Email: [email protected]; Phone: +39-051-631 68 26 Chapter 6 Dr.
    [Show full text]
  • Comparative Trials of Elite Swedish and UK Biomass Willow Varieties
    Aspects of Applied Biology 65, 2001 Biomass and Energy Crops II Comparative trials of elite Swedish and UK biomass willow varieties By K N LINDEGAARD, R I PARFITT, G DONALDSON and T HUNTER IACR-Long Ashton Research Station, Department of Agricultural Sciences, University of Bristol, Long Ashton, Bristol BS41 9AF, UK W M DAWSON and E G A FORBES Northern Ireland Horticultural and Plant Breeding Station, Department of Agriculture for N. Ireland, Loughgall, N. Ireland BT61 8JA, UK M M CARTER Ingerthorpe Hall Farm, Markington, Harrogate, North Yorkshire HG3 3PD, UK C C and J E WHINNEY Holdridge Farm, North Molton, North Devon, EX36 3HG, UK and S LARSSON Svalöf Weibull AB, Nilsson-Ehle Laboratory, S-268 81, Svalöv, Sweden Summary UK willow variety trials are planted at four sites at IACR-Long Ashton in Bristol, Markington in North Yorkshire, North Molton in Devon and Loughgall in County Armagh. The trials normally comprise between five and ten elite willow lines including two yield controls (L78183 and ‘Tora’). Between 1991-95, the trial design included 10 replicates of 10 plants (double rows of five) planted at a stocking rate of 20,000 cuttings per hectare. Subsequent trials included three replicates of each variety (52 plants per plot) in a randomised plot design. Typically, the duration of a trial is 6 years comprising an establishment year followed by a two-year harvest and a three-year harvest. ‘Ashton Stott’ has been found to be the most productive variety with a mean yield of 15.4 oven dry tonnes per hectare per year from 16 harvests.
    [Show full text]
  • ROYAL SCOTTISH FORESTRY SOCIETY Visit to BOLTON ABBEY Monday 13Th – Friday 17Th May, 1991
    ROYAL SCOTTISH FORESTRY SOCIETY Visit to BOLTON ABBEY Monday 13th – Friday 17th May, 1991. at the invitation of the Royal Sorestry Society of England, Wales & Northern Ireland by kind permission of The Duke of Devonshire. Agent: John M. Sheard, FRICS Forest Manager: John Cumberland, BSc., FICFor. SYNOPSIS In 1988, the RFS (EWNI) and the RSFS held a memorable, joint, three-day meeting based at Inverness. The RFS is glad to be able to reciprocate that kind gesture by its senior, northern counterpart and organise a similar event this May based at Harrogate, North Yorkshire. Whilst the joint excursion is officially only for the first three days, the RFS hopes that many RSFS members will stay on for the whole of the week which forms our 1991 Whole Society Meeting. The programme for the week is as follows: Sunday evening 12th May. Mr. Andy Neustein, Forestry Commission Conservator for Northern England, will give an introductory talk in the Crown Hotel, Harrogate, at 8.30 p.m . Monday 13th May. A whole-day excursion to Bolton Abbey in Wharfedale, will look at management of woodlands in the increasingly important context of conservation, landscape, and recreational pressures. There will be inputs from the North Yorks Dales National Parks, RSPB, and English Nature (ex Nature Conservancy Council). At 4 p.m. in Bolton Abbey Village Hall the RFS Annual General Meeting and RSFS Annual Business Meeting will be held. Tuesday 11th May. (Morning) Management of afforestation on water catchment areas and the whole theme of forests and water are very much in the public limelight.
    [Show full text]
  • Artwork 11/05
    WoodfuelWoodfuel heatingheating inin thethe NorthNorth ofof England:England: AA PracticalPractical GuideGuide Providing advice on • fuelling options • boiler systems • planning issues • who to contact Foreword Foreword Although everyone loves a log fire, it is less widely appreciated that wood is an environmentally and economically attractive option to fuel modern heating systems in sizeable public buildings. Wood chip is a cheaper fuel than most fossil- based resources and it contributes some 90% less CO2. Since heating consumes most of the energy used in buildings in the UK, introduction of a low carbon fuel for heating can significantly affect our region’s emissions. In addition these systems can use forestry products which results in well managed woodlands, energy crops that offer diversification opportunities for local farmers or waste-wood which would otherwise be landfilled. In recognition of the potential environmental benefits of wood-based heating and the opportunities it offers for sustainable development of the local economy, Government Office Yorkshire and Humberside initially approached the National Non-Food Crops Centre in January 2004 with a proposal to prepare practical advice on implementation of wood-based heating systems. Since the initial launch of this publication in May 2004 positive feedback has been received along with requests for incorporation of domestic scale advice, hence its inclusion in this second version. We have also been approached by a number of other Regions for similar publications and following specific requests from the North East and North West we have altered the focus of this version - which now provides advice for the ‘Northern Regions’. With the help of many local consultants, businesses and individuals within local and regional government, as well as the sponsorship of Government Office’s, RDAs and the Forestry Commission, we put together this booklet, which we hope will prove most valuable.
    [Show full text]
  • Knaresborough Post, 5 May 1888: ROUTE MARCH of the IST VOLUNTEER BATTALION (P.W.0.) WEST YORKSHIRE REGIMENT
    Knaresborough Post, 5 May 1888: ROUTE MARCH OF THE IST VOLUNTEER BATTALION (P.W.0.) WEST YORKSHIRE REGIMENT. SHAM FIGHT AT RISELEY HALL. On Saturday afternoon a very successful route march—concluding with a sham fight at Riseley Hall, near Ripon—was carried out by the companies forming the left half of the 1st Volunteer Battalion (Prince of Wales' Own) West Yorkshire Regiment, comprising the Harrogate, Knaresboro' and Ripon Companies, and the Boroughbridge and Pateley Bridge contingents, the former of which is attached to Knaresborough and the latter to Ripon. Lieut.-Col. Kearsley, commanding the Battalion, in issuing hie orders for the season, has arranged for a series of route marshes, to be carried out by the right half battalion, which has its headquarters at York and by the left half battalion, which includes the above companies. These route marches are not planned simply for pleasure or recreation, but are accompanied by instructive manoeuvres of a character calculated to impart agreeable variety to the ordinary round of company and battalion drill. A convenient centre in a particular district having been selected as a base of operations the companies from the surrounding district march thereto taking advantage on the route of practising signalling, and throwing out scouts by means of the cyclist section of the battalion, that of the left half consisting of 22 men of the Ripon and Harrogate companies, formed under the command of Lieut. Capes, of Harrogate. The converging point of Saturday's route march was Riseley Hall, the residence of Mr. T. Binns. through whose kindness access was obtained to grounds well adapted for military manoeuvres.
    [Show full text]