Govia Thameslink Railway (GTR) Hertfordshire County Council Environment, Planning & Transport Cabinet Panel

Total Page:16

File Type:pdf, Size:1020Kb

Govia Thameslink Railway (GTR) Hertfordshire County Council Environment, Planning & Transport Cabinet Panel Govia Thameslink Railway (GTR) Hertfordshire County Council Environment, Planning & Transport Cabinet Panel 8 December 2015 Andrew Sidgwick, Development Manager, Great Northern Larry Heyman, Development Manager, Thameslink Our contract is unique DfT receives all passenger revenue - we do not retain the fare income The franchise contract has 217 obligations that the DfT has set Key incentives around train performance, service quality (on trains and at stations) and revenue protection Penalised if we don’t meet operational targets Incentives around key project milestones Ancillary revenue opportunities e.g. advertising, commercial spaces Structured to meetManagement local needs team Passenger Service Director for each line of route Supported by Local Development Managers Our priorities Improve reliability Better information More capacity from new trains Effective major project delivery Investing in engaged and developed employees Achievements to date How are we doing – Great Northern? How are we doing - Thameslink? Our plans Infrastructure Customer Fleet information Customers experience Day to day Timetable management Driver training GTR / NR alliance Created in January 2015 Pivotal in successfully bringing key improvements ironed out issues in the December 2015 timetable, to provide a more reliable service for the entire network optimised the number of engineering access for NR to carry out maintenance, to reduce delays due to power and track failures one mobile maintenance train due to start on the South East Route proactive inspections continue at critical locations by combined teams Driver recruitment and training • Biggest recruitment and training programme in the UK Extra drivers needed for day-to-day operations without relying on rest days Have 30 more services to resource Huge training program for new fleets and services • What we have done to date Doubled the number of driver trainers with more to follow Tripled the number of courses being run annually with more to follow New training rooms available at Letchworth and Bedford First wave of drivers qualified since the start of the franchise & more currently in training • A rolling programme It takes over a year to train a driver. A minimum of 240 hours in practical training and 840 hours learning theory Driver recruitment and training • The rest day working need fluctuates depending on labour turnover, sickness levels as well as covering for holiday leave and high level of training • While we are recruiting and training new drivers (circa 100 newly qualified drivers to date), existing drivers retire and leave for personal reasons – ongoing programme • Training requirements will increase to meet the high level of change on the network: new routes around London Bridge new depots new timetable new trains • There is an ongoing impact on driver availability Improving customer information Planning At the station On the train -Departure screens - Website service -Front line team - Announcements updates -Help points - Screens - App - Twitter handles -Info screens - Twitter - Lines of route -Announcements - App Consistent and reliable communication is key when things don’t go to plan. Developing a customer centric team in our Service Delivery Centres: Social media team moved to Three Bridges SDC New customer ‘ambassadors’ being recruited GTR resource working with TfL from the new year TfL/GTR Alliance to deliver benefits that will improve customer experience e.g. interchange with Crossrail at Farringdon Improving our stations We are modernising stations to improve our customers’ experience, making it easier for them. We want our customers to have access to more modern technology, move in improved station environments, and seek support from fully skilled employees who are more readily available to meet their needs. What we have done so far : • Staffed 45 more stations from first to last trains (1 million annual footfall) 23 GN stations, and 22 TL stations • Safer stations through better ticketless travel initiative reduced from 2.6% in November 2014 to 1.95% in September 2015 • New gates being introduced at 21 stations to improve security 6 TL stations, 8 GN stations, and 7 Southern stations Once operational they will be manned and will support smart ticketing • Improved online retailing, and rolled out the Key smartcard • Staff receiving new information devices Able to access the latest travel information Improving services and capacity December 2015 – New timetable Moorgate operating hours extended to run until midnight at evenings and weekends (growing demand for leisure access to Old Street/Shoreditch area, interchange with LUL and London Overground services at H&I station) From 2016 – New Class 700 trains First part of 2016 - Class 377 introduction to replace the older class 317 and 321 units on the GN From 2016 – New Gatwick Express trains From May 2018 – New connections By end 2018 - New fleet to provide increased capacity on the Moorgate line Thameslink update • Three Class 700 are in the UK • Test running underway – overnight out of passenger service • Three Bridges depot is open • Cricklewood soon to be completed • Hornsey depot due to open in Summer 2016 • Consultation for December 2018 to follow Autumn / winter weather Leaves on line – driver training Station gritting GTR trains equipped with sand boxes On train heating Rail head treatment trains by Network Rail Joint plans with Network Rail for extreme weather Brighton line closure & communication 22:00 Christmas Eve to 04:00 Monday 4 January: NR renewal of junction to north of Purley station, plus track & bridge renewals. There will be no Thameslink trains between South Croydon and Redhill. A revised service will operate across our network - including: No Gatwick Express services - Thameslink services terminating at East Croydon - Southern services running to East Croydon or East Grinstead with connecting rail replacement buses Alternative train services to Gatwick Airport via Horsham from Victoria (c 90mins) Xmas / NY services Xmas / NY services Keeping you informed Several channels: • Stakeholder newsletter In-touch – issued periodically • By email – [email protected] • One to One meetings • Stakeholder Managers • Regular meet the manager sessions • Stakeholder extranet – Inside Track The Franchise Commitment The Franchisee shall use reasonable endeavours to procure long term funding from Network Rail to improve the facilities at St. Albans Station. The improvements to be made shall be determined by the Franchisee (in consultation with Network Rail and other relevant stakeholders including the Secretary of State) and may include some or all of the following: • optimising the use of the Ridgmont Road entrance so as to ease capacity pressure on the main station building; • providing a new dedicated cycle hub with bicycle repair shop, café and passenger facilities; • increasing the gateline and ticket purchasing facilities at the Ridgmont Road entrance; • providing a platform canopy link on platform 4 from the footbridge to the exit; • providing a larger capacity concourse in the main station building, • rationalising existing staff areas and providing increased ticket purchasing facilities; • providing full toilet provisions in the main station building; • rationalising and providing an appropriate mix of retail opportunities; and • providing a café to serve the new waiting area and both sides of the gateline. Progress to date We have identified a number of potential funding sources which could support the franchise agreement requirements for St Albans City Railway Station. We produced some early feasibility and outline costs to help us submit competitive and realistic funding applications. Our early proposals were shared with and supported by Anne Main MP, Cllr Chris White, Cllr Julian Daly and Les O’Leary (representing Ridgmont Road Residents Association and the Signal Box museum). Funding already secured £200k – National Stations Improvement Programme – GRIP1-3 works £150k – GTR Improving station facilities budget (Sheltered Facilities) Funding decisions awaited £5m Station Commercial Project Facility Fund (Conditional on achieving Return On Investment) £1m Growth Deal Funding (administered through the Hertfordshire LEP) c. £200k S106 funding for highways improvements (via Herts County Council) Next Steps • Funding Decision expected by Mid-Dec for SCPF scheme (£5m) • Funding Decision expected by 30th Jan 2016 for Growth Deal Fund (£1m) • Seek further funding opportunities to enhance the improvements across the station and surrounding areas. • If funding is successful a programme of works will be prepared to indicate scheme delivery. An outline timescale is as follows: - Obtaining relevant NR approvals – Jan-Oct 2016 - Phased delivery of works – Dec 2016 – May 2018 .
Recommended publications
  • Master Definitions Agreement Means This Master Definitions and Common Terms Agreement;
    Thameslink Rolling Stock Project Master Definitions and Common Terms Agreement CONFORMED COPY DATED 27 June 2013 THE SECRETARY OF STATE FOR TRANSPORT CROSS LONDON TRAINS LIMITED SIEMENS PLC FIRST CAPITAL CONNECT LIMITED MASTER DEFINITIONS AND COMMON TERMS AGREEMENT Freshfields Bruckhaus Deringer LLP 65 Fleet Street London EC4Y 1HS Thameslink Rolling Stock Project Master Definitions and Common Terms Agreement CONFORMED COPY CONTENTS CLAUSE PAGE 1. INTERPRETATION ................................................................................................ 1 2. COMMON TERMS.................................................................................................. 2 3. EXECUTION AND EFFECTIVENESS OF INITIAL CONTRACTS....................... 2 4. COUNTERPARTS................................................................................................... 2 5. SURVIVAL.............................................................................................................. 2 6. EXECUTION........................................................................................................... 2 7. GOVERNING LAW................................................................................................. 2 SCHEDULE 1 DEFINITIONS.............................................................................................. 3 SCHEDULE 2 COMMON TERMS .................................................................................. 141 SCHEDULE 3 INITIAL CONTRACTS...........................................................................
    [Show full text]
  • Destination London Bridge
    Design for a better future Cancer care and Destinationresearch London Bridge Redeveloping the iconic station and upgrading the railway A transport hub fit for 21st century London he city of London is in a constant state The tracks leading into the station needed to be reconfigured of evolution. Since Roman times, it has to streamline services, and the station itself, much of which st stretched and flexed, expanding out and then dates back to Victorian times, had to be remade fit for the 21 up to accommodate its ever-growing population. century. Dividing and multiplying so rapidly made the city fertile Despite its inherited haphazardness, the station has survived, ground for invention and innovation, and many technologies functioning as a critical connection point for generations have been pioneered here, including one of the world’s first of London communities, and providing a link to significant public railways and its first underground railway. Passenger landmarks like The Shard, Borough Market and London numbers on London’s rail network doubled in the last two Bridge itself. London Bridge Station deserved to be rebuilt decades, and with a customer-led drive to create a better in a fashion that reflected this status – transformed into a connected and smarter city, enhancing capacity and mobility destination in its own right. And, to minimise disruption for across this heritage network is a pressing need. its long-suffering loyal users, this five-year redevelopment had to take place while the station continued to operate. While major infrastructure programmes like Crossrail and HS2 are carving out new routes for rail, their predecessor, the WSP was there from the beginning, helping Network Rail to Thameslink Programme is enhancing some of London’s oldest deliver one of its largest and most complex projects.
    [Show full text]
  • Modernised Depot to Transform Great Northern Rail Services
    13 December 2016 Modernised depot to transform Great Northern rail services Great Northern passengers are set to see a transformation in rail services with the completion of an enlarged, modernised train depot in north London, which is now one of the biggest in the UK. The traincare centre at Hornsey in north London will house and maintain a £1bn- worth of new train fleets and make possible a new, high intensity Thameslink service from Great Northern stations across central London to London Bridge, Gatwick and beyond as part of the government-sponsored Thameslink Programme. Hornsey now boasts a new state-of-the-art maintenance building, built by Siemens using main contractor Volker-Fitzpatrick, large new sidings and improved servicing for the following additional modern trains which Great Northern’s parent company Govia Thameslink Railway (GTR) will run: • Class 387 trains for Great Northern services between London King’s Cross and Peterborough, Cambridge and King’s Lynn (entering service now) • Class 700 trains for new Thameslink services across London to the south from many Great Northern stations between the capital and Peterborough and Cambridge (trains arrive on Great Northern in 2017 and begin running as Thameslink in 2018) • Class 717 trains for Great Northern suburban services from Welwyn Garden City, Hertford and Stevenage to and from Moorgate in the City of London (arriving late 2018) All these trains will have air-conditioning, the latest passenger information systems, wheelchair accessible toilets and other features for passengers with disabilities. Hornsey will also become a centre of excellence for apprenticeship schemes run there by both GTR and Siemens.
    [Show full text]
  • November 2017 Inter City Railway Society Founded 1973
    TTRRAA CCKKSS Inter City Railway Society – November 2017 Inter City Railway Society founded 1973 www.intercityrailwaysociety.org Volume 45 No.8 Issue 536 Nov 2017 The content of the magazine is the copyright of the Society No part of this magazine may be reproduced without prior permission of the copyright holder President: Simon Mutten - [email protected] (01603 715701) Coppercoin, 12 Blofield Corner Rd, Blofield, Norwich, Norfolk NR13 4RT Treasurer: Peter Britcliffe - [email protected] (01429 234180) 9 Voltigeur Drive, Hart, Hartlepool TS27 3BS Membership Sec: Colin Pottle - [email protected] (01933 272262) 166 Midland Road, Wellingborough, Northants NN8 1NG Mob (07840 401045) Secretary: Christine Field - [email protected] contact details as below for Trevor Chairman: filled by senior officials as required for meetings Magazine: Editor: Trevor Roots - [email protected] (01466 760724) Mill of Botary, Cairnie, Huntly, Aberdeenshire AB54 4UD Mob (07765 337700) Sightings: James Holloway - [email protected] (0121 744 2351) 246 Longmore Road, Shirley, Solihull B90 3ES Photo Database: Colin Pottle Books: Publications Manager: Trevor Roots - [email protected] Publications Team: Trevor Roots / Eddie Rathmill Website / IT: Website Manager: Trevor Roots - [email protected] contact details as above Social Media: Gareth Patterson Yahoo Administrator: Steve Revill Sales Manager: Christine Field contact
    [Show full text]
  • Three Bridges Thameslink Depot
    www.sunvillerail.co.uk [email protected] 08448 099 301 PROJECT PROFILE: Three Bridges Thameslink depot PROJECT SPECIFICATIONS Status: COMPLETED Started: September 2014 Completed: September 2015 Project Duration: 1 Year Client: VolkaWessels UK Location: Three Bridges Depot Discipline: Project management, construction, signalling, walkways, cable management, route works. ABOUT THE PROJECT In September 2014 Sunville Rail Limited were appointed by Volka Rail to undertake the rail interface related civil works as part of the complete build and commission of a train care depot at Three Bridges near Crawley, West Sussex. PROJECT OVERVIEW This depot will service and maintain the new Siemens Thameslink rolling stock. Sunville Rail's experienced project management and multi skilled civils teams worked closely with Volka Rail to deliver all rail interface works. In addition to the general rail infrastructure challenges, SVR worked closely with the other multiple key non-rail suppliers to co-ordinate activities with minimal lost time. Sunville Rail's works included: · Project Management · Lighting Column bases · SSOW Planning · Location Case Bases and Hardstands · H/V Management · Handrail Installation · Signal Base construction · Concrete Walkway aprons · TISS Base Construction · Under Track Crossings · OLE Base Construction · Installation of Cable management sleepers · Shunt Signals · Substation High Voltage cable duct installation · Safe Cess Walkways · Troughing and GRP · Pedestrian Track Crossing Walkways · Geotextile Placement and Ballast Placement for new sidings www.sunvillerail.co.uk [email protected] 08448 099 301 PROJECT PROFILE: Three Bridges Thameslink depot The Three Bridges depot is split into east and west-side facilities either side of the London to Brighton mainline. works here included a five-road, 12-car maintenance building with associated stores, workshops and offices, train stabling and servicing roads.
    [Show full text]
  • Rail Accident Report
    Rail Accident Report Accident to a track worker near Redhill 24 June 2014 Report 06/2015 June 2015 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2015 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.gov.uk/raib DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Accident to a track worker near Redhill 24 June 2014 Contents Summary 5 Introduction 6 Preface 6 Key definitions 6 The accident 7 Summary of the accident 7 Context 7 The investigation 10 Sources of evidence 10 Key facts and analysis 11 Background information 11 Sequence of events 11 Identification of the immediate cause 14 Identification of causal factors 15 Factors associated with the emergency response 25 Observations 27 Previous
    [Show full text]
  • Govia Thameslink Railway
    Govia Thameslink Railway Annual stakeholder conference Wednesday 14 June 2017, etc. venues, Eastcheap, London Agenda 1000 - 1010 Introduction 1010 - 1025 Charles Horton, GTR Chief Executive Officer 1025 - 1055 Performance - Nick Brown GTR Chief Operating Officer & John Halsall, Network Rail Route Managing Director 1055 - 1115 Q&A 1 1115 - 1140 Coffee break 1140 - 1205 Fleet update with Q&A - Gerry McFadden GTR Engineering Director Thameslink readiness - Stuart Cheshire Passenger Services Director Thameslink/Great Northern & George 1205 - 1225 McInulty GTR Service Delivery Director 1225 - 1245 Group session 1245 - 1305 Q&A 2 1305 - 1400 Lunch Customer Experience Improvement, Kerri Ricketts, Head of Customer Experience & Angie Doll Passenger 1400 - 1425 Services Director Southern/Gatwick Express 1425 - 1430 Customer Experience & Transport Focus - Linda McCord Transport Focus 2018 timetable - Phil Hutchinson Head of Strategic Planning & Jane Cobb Timetable Consultation Project 1430 - 1450 Manager 1450 - 1505 Stakeholder Communications update - Gavin Bostock GTR Head of Public Affairs & CSR 1505 - 1530 Q&A 3 1530 - 1535 Final remarks and close 1535 - 1600 Market place stands GTR annual stakeholder conference Charles Horton, Chief Executive Officer Why franchise was set up Where we’ve progressed on the journey 2014 Franchise starts 2015 London Bridge blockade starts Three Bridges depot commissioned New C387s on TL & GX New BML timetable 2016 Start of C700s on TL Oyster extension to Gatwick Complete new fleet on GX New concourse at London Bridge
    [Show full text]
  • South East Route: Sussex Area Route Study September 2015 Contents September 2015 South East Route: Sussex Area Route Study 02
    Long Term Planning Process South East Route: Sussex Area Route Study September 2015 Contents September 2015 South East Route: Sussex Area Route Study 02 Foreword 03 Executive Summary 04 Chapter 1 – Background 16 Chapter 2 – Baseline 21 Chapter 3 – Future demand & resulting conditional outputs 34 Chapter 4 – Consultation responses 55 Chapter 5 – Control Period 6 priorities 63 Chapter 6 – Accommodating conditional outputs in 2043 101 Appendices 114 Glossary 182 Foreword September 2015 South East Route: Sussex Area Route Study 03 I am delighted to present the Sussex Route Study, which sets out the horizon to 2043, allowing sets of long term interventions to be strategic vision for the future of this vital part of the rail network presented alongside and consistent with a prioritised set of options over the next 30 years. for Control Period 6 (2019 – 2024). Each day this railway carries more than 60,000 people in the high On this route, developing options that can make a particular peak hour alone into Central London, with many thousands more contribution long term to improving performance as well as accessing key interchange points at East Croydon and Clapham meeting the capacity challenge is particularly important. Alongside Junction and travelling between regional centres on the route. this, the study has also considered the growing challenges of peak passenger volumes at stations, with a view to setting priorities and Working closely with industry stakeholders, Network Rail and train options for investment in CP6. operators have delivered significantly expanded capacity for passengers in recent years on the route, with Control Period 4 (2009 This study was published for Consultation in October 2014.
    [Show full text]
  • Company Update
    The High Voltage Network Provider COMPANY NEW ALL IN A DAYS UPDATE BEGINNINGS WORK Networks Rail Division’s Projects RJ Power Group in the Division in Focus Community See page 7 See pages 8 and 9 See page 16 P WER www.rjpowergroup.co.uk I’m delighted to welcome you to this latest edition This includes the completion of works at Dover Sea of Power World. A lot has happened since our last Wall, which arose on Christmas Eve 2015 when the newsletter, as the business has continued to perform sea wall and 250 metres of track between Dover strongly six months into our re-brand, with a number Priory and Folkestone Central collapsed. Our of new developments having taken place. works on behalf of BCM Construction Limited – Network Rail’s HV Feeder Framework Contractor Our Rail division has experienced unprecedented – assisted with the supply, management, possession growth and, with so much to tell, will be our main management, site works, installation, testing and focus for this latest edition. commissioning of new high voltage feeder and pilot cables. The scheme delivered on behalf of Network An award for our processes start things off, with Rail IP was completed three months early. This is our rail business achieving five stars in respect of one example of many successes and is testament to its recent RISQS audit, demonstrating our continual Operations Manager Owen Marsh and his delivery investment in both safety and compliance. Great teams for all their high quality work. work and thanks to all areas of our business, but in particular to our HSQE team.
    [Show full text]
  • Pressemitteilung Siemens AG Englisch
    Press London, October 9, 2017 All Aboard for the Whistle Stop Tour 2017 · Free public open day at Three Bridges Depot, Saturday 14 October 2017 Families, train enthusiasts and rail users are invited to visit Three Bridges traincare facility which is opening its doors to the public for the first time on Saturday 14 October as part of Rail Week 2017. The event is hosted by Siemens, in partnership with operator Govia Thameslink Railway (GTR) and Network Rail. Three Bridges opened two years ago and is one of the newest and largest train maintenance facilities in the country at 1.4 miles long with stabling capacity for 172 carriages. The site is home to the new Siemens Desiro City Class 700 fleet which is being introduced on the Thameslink route by Govia Thameslink Railway, as part of Network Rail’s Thameslink Programme. The fleet is manufactured and maintained by Siemens. Visitors to Three Bridges will be able to see the state-of-the-art trains close up, take a walk underneath a train in the maintenance pit, sit in a driver’s cab, watch a bogie removal demonstration, have an opportunity to go in the simulator and see what’s involved in keeping the trains safe, reliable and comfortable for the travelling public. You can also find out about careers within the rail industry and opportunities to join Siemens. Vernon Barker, Managing Director of Rail Systems at Siemens, said: “Siemens regularly opens one of its train maintenance sites to the public as part of our very popular ‘Whistle Stop Tour’ series to give adults and children a rare behind- the-scenes look at an operational rail depot and to inspire tomorrow’s rail engineers to join the industry.
    [Show full text]
  • CP5 Enhancements Delivery Plan
    CP5 Enhancements Delivery Plan June 2015 Contents – Introduction 3 – Changes to the plan 9 – List of Projects Rolled from CP4 10 – Summary 11 – England and Wales CP5 enhancement programme – England and Wales – funds 13 – England and Wales – projects – Cross route projects 38 – Electric spine 52 – Anglia 59 – Kent 68 – Sussex 75 – Wessex 77 – Western 92 – Wales 110 – LNE 113 – East Midlands 127 – LNW 130 – Scotland CP5 enhancement programme – Scotland – funds 141 – Scotland – projects 147 CP5 Enhancements Delivery Plan Introduction Purpose The CP5 Enhancements Delivery Plan sets out the outputs, scope and milestones that we are committed to deliver in CP5. It has an entry for every project and ring-fenced fund funded through PR13. It is used both by the regulator, to hold us to account, and by our customers and funders, to give them visibility of our plans. As well as describing our commitments through the periodic review, it also sets out the deliverables for other government sponsored enhancement schemes funded through the Investment Framework. The Office of Rail Regulation (ORR) published the Final Determination on 31 October 2013. Network Rail accepted the Final Determination on 7 February 2014. This document is part of Network Rail’s response to the Final Determination. We have continued to develop our plans for Control Period 5. As we have refined our plans, elements have changed and we set out the changes from the draft plan in the ‘changes to the plan’ chapter later in the document. Change control and updates This document will be updated on a quarterly basis to report progress and to update projects where appropriate.
    [Show full text]
  • Thameslink Programme Baseline Evaluation Report
    Thameslink Programme Evaluation: Baseline Report Department for Transport March 2018 Thameslink Programme Evaluation: Baseline Report Quality information AECOM ref. no.: 60518666 Prepared by Checked by Approved by Jameel Hayat Richard Redfern Richard Redfern AECOM AECOM AECOM March 2018 Final Report to DfT Prepared for: Department for Transport AECOM | Ipsos MORI 2/162 Thameslink Programme Evaluation: Baseline Report Prepared for: Department for Transport Prepared by: Jameel Hayat E: [email protected] AECOM Limited Aldgate Tower 2 Leman Street London E1 8FA aecom.com Prepared in association with: Ipsos MORI © 2018 AECOM Limited. All Rights Reserved. This document has been prepared by AECOM Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. Prepared for: Department for Transport AECOM | Ipsos MORI 3/162 Thameslink Programme Evaluation: Baseline Report Table of Contents Executive Summary .............................................................................................................. 9 1. Introduction ...............................................................................................................
    [Show full text]