Top Figures Gap Per District – Included Planned Emergency Shelter (Tarpaulins And/Or Tents) Household Kits (Excluding Tarpaulins) Tool Kits and Fixings 90.000

Total Page:16

File Type:pdf, Size:1020Kb

Top Figures Gap Per District – Included Planned Emergency Shelter (Tarpaulins And/Or Tents) Household Kits (Excluding Tarpaulins) Tool Kits and Fixings 90.000 Top Figures Gap per District – included planned Emergency Shelter (Tarpaulins and/or tents) Household kits (excluding tarpaulins) Tool kits and fixings 90.000 80.000 70.000 60.000 50.000 40.000 30.000 20.000 10.000 0 Distributed today vs Needs NEED HH with Emergency Shelter (Tarps or Tents) (Number of HHs) Household kits (excluding tarpaulins) Tool kits and fixings 70000 60000 50000 40000 30000 20000 10000 0 East Hub Dolkha Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 600,00 500,00 400,00 300,00 200,00 100,00 0,00 10.000,00 15.000,00 20.000,00 25.000,00 5.000,00 0,00 TBD Tarpaulin Kharpachok Kushadevi SankhupatiChour Bhumlutar Dhulikhel N.P. Tents Balting BekhsimleDhartigaun Birtadeurali tarpaulins) (excluding kits Household Choubas Distributed Kavre DaraunePokhari DhuseniSiwalaya Foksingtar Gokule JaisithokMandan KanpurKalapani KavreNityaChandeswor Kharelthok KuruwasChapakhori Mahadevtar MathurapatiFulbari NagreGagarche NayagaunDeupur fixings and kits Tool PokhariChauri RaviOpi SalleBhumlu Saping SarasyunKhark SimalchourSyampati SisaKhani UgrataraJanagal Okhalhunga Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 700,00 600,00 500,00 400,00 300,00 200,00 100,00 0,00 Ramechap Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 1.800,00 1.600,00 1.400,00 1.200,00 1.000,00 800,00 600,00 400,00 200,00 0,00 Sinshuli Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 700,00 600,00 500,00 400,00 300,00 200,00 100,00 0,00 Sindhupalchowk distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 40.000,00 35.000,00 30.000,00 25.000,00 20.000,00 15.000,00 10.000,00 5.000,00 0,00 West Hub Dhading Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 9.000,00 8.000,00 7.000,00 6.000,00 5.000,00 4.000,00 3.000,00 2.000,00 1.000,00 0,00 0,00 0,10 0,20 0,30 0,40 0,50 0,60 0,70 0,80 0,90 1,00 TBD Thumi Tarpaulin Ghyalchok Jaubari Takumajhalakuribot Taklung Kerabari Tents Lapu Ghyachok Finam Household kits (excluding tarpaulins) (excluding kits Household Ghairung Gorkha Distributed Deurali Lho Chhoprak Gumda Panchkhuwadeurali Gakhu Aarupokhari Baguwa Laprak Saurpani AaruArbang Gaikhur Darbhung Bhirkot Bihi fixings and kits Tool Chumchet Kashigaun Makaising Muchhok Palumtar Prok Sirdibas Uhya Gorkha Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 7.000,00 6.000,00 5.000,00 4.000,00 3.000,00 2.000,00 1.000,00 0,00 Nuwakot Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 1.600,00 1.400,00 1.200,00 1.000,00 800,00 600,00 400,00 200,00 0,00 Central Hub Baktapur distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 1,00 0,90 0,80 0,70 0,60 0,50 0,40 0,30 0,20 0,10 0,00 Kathmandu Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 10.000,00 9.000,00 8.000,00 7.000,00 6.000,00 5.000,00 4.000,00 3.000,00 2.000,00 1.000,00 0,00 Lalitpur Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 700,00 600,00 500,00 400,00 300,00 200,00 100,00 0,00 Rasuwa Distributed Tarpaulin Tents Household kits (excluding tarpaulins) Tool kits and fixings 450,00 400,00 350,00 300,00 250,00 200,00 150,00 100,00 50,00 0,00.
Recommended publications
  • Sustainable Tourism Enhancement in Nepal's Protected Areas Public Disclosure Authorized
    Sustainable Tourism Enhancement in Nepal's Protected Areas Public Disclosure Authorized Environmental and Social Management Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized National Trust for Nature Conservation GPO Box 3712, Khumaltar, Lalitpur, Nepal May 2020 Executive Summary 1. Description of the Project: Tourism is one of the major contributors to the sustainable economy of Nepal. The direct contribution of the tourism sector in the national GDP was at 4% in 2017 and is forecasted to rise by 3.8% per annum to reach 4.2% in 2028 (World Travel and Tourism Council, 2018). Despite tremendous growth potential in tourism sector, Nepal stands as a low-cost tourist destination with much lower daily tourist spending than the regional average. This is a high time for Nepal to think about and harness high value nature-based tourism. Nature based tourism is a key driver of Nepal's tourism, providing the sector both comparative and competitive advantages in the unique setting of rich topographic, biological and cultural diversity. In this context, the World Bank is supporting GoN to implement the project entitled “Sustainable Tourism Enhancement in Nepal’s Protected Areas (STENPA)". Project Destinations: The project focuses on areas with Nature-Based Tourism (NBT) potential with the aim of piloting a sustainable tourism approach that can be replicated across Nepal’s protected areas (PAs). The project destinations include PA at their core, nearby gateway cities and surrounding areas with NBT potential, and has identified six PAs as the initial project destinations (Bardia, Banke Shukla Phanta and Rara National Parks, and their buffer zones; and Annapurna and Manaslu conservation Areas).
    [Show full text]
  • Download Document
    Gold standard for the global goals Monitoring report June 2017, version 1 Page 1 of 40 Title of the project Smokeless Cook Stoves for Rural Districts of Nepal Gold Standard project id GS 1191 Version number of the monitoring report 3 Completion date of the monitoring report 15/06/2020 Date of project design certification 01/01/2014 Start date of crediting period 01/01/2013 Duration of this monitoring period Period 3 from 01/05/2018 to 31/07/2019 Duration of previous monitoring period Period 2 from 01/04/2014 to 25/04/2015 Project representative(s) Dr. Reinhard Hallermayer, “Die Ofenmacher e.V.”, Germany Anita Badal, Swastha Chulo Nepal Host Country Nepal Certification pathway (activity certification/impact certification) Impact Statements & Products (VER Project Certification) SDG Contributions targeted (as per 1 – Climate Action (SDG 13) approved PDD) 2 - Good health and well-being (SDG 3) 3 - Affordable and Clean Energy (SDG 7) 4 – Gender Equality (SDG 5) Gold Standard statement/product certification sought GS VER (GSVER/ADALYs/RECs etc.) Selected methodology(ies) AMS II. G., version 3 Estimated amount of annual average SDG 13: 7,648 tonnes CO2 certified SDG impact (as per approved PDD) SDG 3: 8,503 ICS SDG 7: 8,503 ICS SDG 5: 0 women Total amount of certified SDG impact (as SDG 13: 6,696 tonnes CO2 per approved methodology) achieved in this SDG 3: 8,537 ICS monitoring period SDG 7: 8,537 ICS SDG 5: 7 women Page 2 of 40 SECTION A. Description of project A.1. Purpose and general description of project The objective of the project is the installation of mud brick cook stoves in individual households in three rural districts of Nepal in order to substitute the traditional fireplaces for cooking without discharge of the smoke into the environment.
    [Show full text]
  • District Profile - Kavrepalanchok (As of 10 May 2017) HRRP
    District Profile - Kavrepalanchok (as of 10 May 2017) HRRP This district profile outlines the current activities by partner organisations (POs) in post-earthquake recovery and reconstruction. It is based on 4W and secondary data collected from POs on their recent activities pertaining to housing sector. Further, it captures a wide range of planned, ongoing and completed activities within the HRRP framework. For additional information, please refer to the HRRP dashboard. FACTS AND FIGURES Population: 381,9371 75 VDCs and 5 municipalities Damage Status - Private Structures Type of housing walls Kavrepalanchok National Mud-bonded bricks/stone 82% 41% Cement-bonded bricks/stone 14% 29% Damage Grade (3-5) 77,963 Other 4% 30% Damage Grade (1-2) 20,056 % of households who own 91% 85% Total 98,0192 their housing unit (Census 2011)1 NEWS & UPDATES 1. A total of 1,900 beneficiaries as per District Technical Office (DTO/DLPIU) have received the Second Tranche in Kavre. 114 beneficiaries within the total were supported by Partner Organizations. 2. Lack of proper orientations to the government officials and limited coordination between DLPIU engineers and POs technical staffs are the major reconstruction issues raised in the district. A joint workshop with all the district authorities, local government authorities and technical persons was agreed upon as a probable solution in HRRP Coordination Meeting dated April 12, 2017. HRRP - Kavrepalanchok HRRP © PARTNERS SUMMARY AND HIGHLIGHTS3 Partner Organisation Implementing Partner(s) ADRA NA 2,110 ARSOW
    [Show full text]
  • Final Baseline Report
    Final Baseline Report on Empowering women to access safe abortion service in Gorkha, Nepal Submitted to: Executive Director Population, Health and Development Group (PHD Group) Indraeni, Dhungakhani, Sanepa, Ring Road, Lalitpur Kathmandu +977-1-5184063 Submitted by Prof. Dr.GajaNandAgrawal – Team Leader Dr.Megha Raj Dhakal – Research Officer Qualitative Mr.PramijThapa – Research Officer Quantitative Metro Apartment, Kuleshwor Kathmandu, Nepal +977-015187341 Email:[email protected] December 20, 2018 i Acknowledgements We the research team comprising of Prof. Dr. Gaja Nand Agrawal – Team Leader, Dr. Megha Raj Dhakal – Research Officer Qualitative and Pramij Thapa – Research Officer Quantitative would like to express our sincere thanks to Dr. Yagya B. Karki, Project Team Leader, Empowering women to access safe abortion service in Gorkha, Nepal for his support and guidance for the successful completion of the baseline survey work. In the meantime we would also like to thank Mr. Khadaga B. Karki, Admin/Logistics Officer, PHD Group for his overall management when the field work was undertaken for data collection.We are grateful to Ms. Anchal Thapa, Project Assistant, PHD Group for refining the tools of the survey. We would also like to express our sincere thanks to Mr. Deepak Babu Kandel, Mayor, Palungtar Municipality, Mr. Raju Gurung, Mayor, Sirnachok rural municipality and Mr. Phadindra Dhital, Mayor, Ajirkot rural municipality for their for their valuable support and inputs while the baseline data was collected in their localities. Similarly, on behalf of PHD Group, we wish to thank local health facilities and the Family Welfare Division, Department of Health Services, Ministry of Health and Population, Teku, Kathmandu for their support in carrying out the baseline survey.
    [Show full text]
  • Nepal Earthquake District Profile - Gorkha OSOCC Assessment Cell 09.05.2015
    Nepal Earthquake District Profile - Gorkha OSOCC Assessment Cell 09.05.2015 This report is produced by the OSOCC Assessment Cell based on secondary data from multiple sources, including the Government of Nepal, UNDAC, United Nations Agencies, non-governmental organisation and media sources. I. Situation Overview Gorkha, with a population of more than 271,000, is one of the worst-affected districts.1 The epicenter of the earthquake was in Brapok, 15km from Gorkha town. As of 6 May, 412 people have been reported killed and 1,034 injured. In the southern part of the district, food has been provided, but field observations indicate that the food supplied might not be enough for the actual population in the area. Several VDCs in the mountainous areas of Gorkha are yet to be reached by humanitarian assistance. There are no roads in these northern areas, only footpaths. The level of destruction within the district and even within VDCs varies widely, as does the availability of food. A humanitarian hub has been set up at the Chief District Officer’s (CDO) premises in Gorkha town. Reported number of people in need (multiple sources) The figures featured in this map have been collected via multiple sources (district authorities, Red Cross, local NGO, media). Where multiple figures for the same location have been reported the highest one was taken. These figures are indicative and do not represent the overall number of people in need. 1 This is an updated version of the Gorkha District Profile that was published by ACAPS on 1 May 2015. As with other mountain areas of Nepal, Gorkha contains popular locations for foreign trekkers.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • CARE Nepal Save the Children UNDP World Vision International
    Volume III Recovery & Reconstruction Quarterly Bulletin| Gorkha September 2016 Volume III Asal Chhimekee Nepal UN Women WHO International Nepal Fellowship International Medical Corps Good Neighbors International Sajhedari Bikaas People In Need HRRP ECO- Nepal Updates United Vision Nepal Nepal Red Cross Society Oxfam Suaahara Catholic Relief Services UNICEF CARE Nepal Save the Children UNDP World Vision International Recovery & Reconstruction Quarterly Bulletin| Gorkha September 2016 Volume III July – September, 2016 Working VDC's: Shreenathkot, Aappipal, Ghairung, Bhumlichowk and Ghyalchowk, Gorkha Asal Chimekee Nepal is an organization which was registered as NGO in 2059 and was started by Pokhara Christian Community Kaski. It works in coordination with DDRC, related district government offices, like minded organizations, local communities and churches in Gorkha. The organization has been focusing on rehabilitation, reconstruction, livelihood & health support, disaster preparedness and strengthening local community together with the government bodies and local community. Some of the specific works of this organization are as follows: 1: Reconstructions of Health Post Buildings in Aappipal, Ghairung, Bhumlichowk & Ghyalchowk Except Aappipal healthpost, other health post reconstruction works has been completed and in the process on handover program to the local community within the 1st week of October, 2016 with necessary equipments and furnishing. The representatives of MoHP & DHO were also involved during the process of reconstruction. From the expert side, the technical consultant visited to healthpost construction site for monitoring and supervision of the constructional work. 2: Reconstruction of VDC building Shreentahkot VDC building reconstructions work has been started from 5th of Asoj, 2073. The reconstruction work was started formally by doing laystone foundation of the VDC building.
    [Show full text]
  • Japan International Cooperation Agency (JICA)
    Chapter 3 Project Evaluation and Recommendations 3-1 Project Effect It is appropriate to implement the Project under Japan's Grant Aid Assistance, because the Project will have the following effects: (1) Direct Effects 1) Improvement of Educational Environment By replacing deteriorated classrooms, which are danger in structure, with rainwater leakage, and/or insufficient natural lighting and ventilation, with new ones of better quality, the Project will contribute to improving the education environment, which will be effective for improving internal efficiency. Furthermore, provision of toilets and water-supply facilities will greatly encourage the attendance of female teachers and students. Present(※) After Project Completion Usable classrooms in Target Districts 19,177 classrooms 21,707 classrooms Number of Students accommodated in the 709,410 students 835,820 students usable classrooms ※ Including the classrooms to be constructed under BPEP-II by July 2004 2) Improvement of Teacher Training Environment By constructing exclusive facilities for Resource Centres, the Project will contribute to activating teacher training and information-sharing, which will lead to improved quality of education. (2) Indirect Effects 1) Enhancement of Community Participation to Education Community participation in overall primary school management activities will be enhanced through participation in this construction project and by receiving guidance on various educational matters from the government. 91 3-2 Recommendations For the effective implementation of the project, it is recommended that HMG of Nepal take the following actions: 1) Coordination with other donors As and when necessary for the effective implementation of the Project, the DOE should ensure effective coordination with the CIP donors in terms of the CIP components including the allocation of target districts.
    [Show full text]
  • VBST Short List
    1 आिेदकको दर्ा ा न륍बर नागररकर्ा न륍बर नाम थायी जि쥍ला गा.वि.स. बािुको नाम ईभेꅍट ID 10002 2632 SUMAN BHATTARAI KATHMANDU KATHMANDU M.N.P. KEDAR PRASAD BHATTARAI 136880 10003 28733 KABIN PRAJAPATI BHAKTAPUR BHAKTAPUR N.P. SITA RAM PRAJAPATI 136882 10008 271060/7240/5583 SUDESH MANANDHAR KATHMANDU KATHMANDU M.N.P. SHREE KRISHNA MANANDHAR 136890 10011 9135 SAMERRR NAKARMI KATHMANDU KATHMANDU M.N.P. BASANTA KUMAR NAKARMI 136943 10014 407/11592 NANI MAYA BASNET DOLAKHA BHIMESWOR N.P. SHREE YAGA BAHADUR BASNET136951 10015 62032/450 USHA ADHIJARI KAVRE PANCHKHAL BHOLA NATH ADHIKARI 136952 10017 411001/71853 MANASH THAPA GULMI TAMGHAS KASHER BAHADUR THAPA 136954 10018 44874 RAJ KUMAR LAMICHHANE PARBAT TILAHAR KRISHNA BAHADUR LAMICHHANE136957 10021 711034/173 KESHAB RAJ BHATTA BAJHANG BANJH JANAK LAL BHATTA 136964 10023 1581 MANDEEP SHRESTHA SIRAHA SIRAHA N.P. KUMAR MAN SHRESTHA 136969 2 आिेदकको दर्ा ा न륍बर नागररकर्ा न륍बर नाम थायी जि쥍ला गा.वि.स. बािुको नाम ईभेꅍट ID 10024 283027/3 SHREE KRISHNA GHARTI LALITPUR GODAWARI DURGA BAHADUR GHARTI 136971 10025 60-01-71-00189 CHANDRA KAMI JUMLA PATARASI JAYA LAL KAMI 136974 10026 151086/205 PRABIN YADAV DHANUSHA MARCHAIJHITAKAIYA JAYA NARAYAN YADAV 136976 10030 1012/81328 SABINA NAGARKOTI KATHMANDU DAANCHHI HARI KRISHNA NAGARKOTI 136984 10032 1039/16713 BIRENDRA PRASAD GUPTABARA KARAIYA SAMBHU SHA KANU 136988 10033 28-01-71-05846 SURESH JOSHI LALITPUR LALITPUR U.M.N.P. RAJU JOSHI 136990 10034 331071/6889 BIJAYA PRASAD YADAV BARA RAUWAHI RAM YAKWAL PRASAD YADAV 136993 10036 071024/932 DIPENDRA BHUJEL DHANKUTA TANKHUWA LOCHAN BAHADUR BHUJEL 136996 10037 28-01-067-01720 SABIN K.C.
    [Show full text]
  • Strengthening the Role of Civil Society and Women in Democracy And
    HARIYO BAN PROGRAM Monitoring and Evaluation Plan 25 November 2011 – 25 August 2016 (Cooperative Agreement No: AID-367-A-11-00003) Submitted to: UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT NEPAL MISSION Maharajgunj, Kathmandu, Nepal Submitted by: WWF in partnership with CARE, FECOFUN and NTNC P.O. Box 7660, Baluwatar, Kathmandu, Nepal First approved on April 18, 2013 Updated and approved on January 5, 2015 Updated and approved on July 31, 2015 Updated and approved on August 31, 2015 Updated and approved on January 19, 2016 January 19, 2016 Ms. Judy Oglethorpe Chief of Party, Hariyo Ban Program WWF Nepal Baluwatar, Kathmandu Subject: Approval for revised M&E Plan for the Hariyo Ban Program Reference: Cooperative Agreement # 367-A-11-00003 Dear Judy, This letter is in response to the updated Monitoring and Evaluation Plan (M&E Plan) for the Hariyo Program that you submitted to me on January 14, 2016. I would like to thank WWF and all consortium partners (CARE, NTNC, and FECOFUN) for submitting the updated M&E Plan. The revised M&E Plan is consistent with the approved Annual Work Plan and the Program Description of the Cooperative Agreement (CA). This updated M&E has added/revised/updated targets to systematically align additional earthquake recovery funding added into the award through 8th modification of Hariyo Ban award to WWF to address very unexpected and burning issues, primarily in four Hariyo Ban program districts (Gorkha, Dhading, Rasuwa and Nuwakot) and partly in other districts, due to recent earthquake and associated climatic/environmental challenges. This updated M&E Plan, including its added/revised/updated indicators and targets, will have very good programmatic meaning for the program’s overall performance monitoring process in the future.
    [Show full text]
  • NEPAL: Gorkha - Operational Presence Map [As of 14 July 2015]
    NEPAL: Gorkha - Operational Presence Map [as of 14 July 2015] 60 Samagaun Partners working in Gorkha Chhekampar 1-10 11-15 16-20 21-25 26-35 Lho Bihi Prok Chunchet Partners working in Nepal Sirdibas Health 26 Keroja Shelter and NFI Uhiya 23 Ghyachok Laprak WASH 18 Kharibot Warpak Gumda Kashigaun Protection 13 Lapu HansapurSimjung Muchchok Manbu Kerabari Sairpani Thumo Early Recovery 6 Jaubari Swara Thalajung Aaruaarbad Harmi ShrithankotTar k u k ot Amppipal ArupokhariAruchanaute Education 5 Palungtar Chhoprak Masel Tandrang Khoplang Tap le Gaikhur Dhawa Virkot PhinamAsrang Nutrition 1 Chyangling Borlang Bungkot Prithbinarayan Municipality Namjung DhuwakotDeurali Bakrang GhairungTan gli ch ok Tak lu ng Phujel Manakamana Makaising Darbung Mumlichok Ghyalchok IMPLEMENTING PARTNERS BY CLUSTER Early Recovery Education Health 6 partners 5 partners 26 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 Nutrition Protection Shelter and NFI 1 partners 13 partners 23 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 WASH 18 partners Want to find out the latest 3W products and other info on Nepal Earthquake response? visit the Humanitarian Response website at http:www.humanitarianresponse.info/en/op Nb of Note: organisations Implementing partners represent the organization on the ground, erations/nepal in the affected district doing operational work, such as send feedback to 1 >=5 distributing food, tents, water purification kits etc. [email protected] Creation date:23 July 2015 Glide number: EQ-2015-000048-NPL Sources: Cluster reporting The boundaries and names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations.
    [Show full text]
  • TSLC PMT Result
    Page 62 of 132 Rank Token No SLC/SEE Reg No Name District Palika WardNo Father Mother Village PMTScore Gender TSLC 1 42060 7574O15075 SOBHA BOHARA BOHARA Darchula Rithachaupata 3 HARI SINGH BOHARA BIMA BOHARA AMKUR 890.1 Female 2 39231 7569013048 Sanju Singh Bajura Gotree 9 Gyanendra Singh Jansara Singh Manikanda 902.7 Male 3 40574 7559004049 LOGAJAN BHANDARI Humla ShreeNagar 1 Hari Bhandari Amani Bhandari Bhandari gau 907 Male 4 40374 6560016016 DHANRAJ TAMATA Mugu Dhainakot 8 Bali Tamata Puni kala Tamata Dalitbada 908.2 Male 5 36515 7569004014 BHUVAN BAHADUR BK Bajura Martadi 3 Karna bahadur bk Dhauli lawar Chaurata 908.5 Male 6 43877 6960005019 NANDA SINGH B K Mugu Kotdanda 9 Jaya bahadur tiruwa Muga tiruwa Luee kotdanda mugu 910.4 Male 7 40945 7535076072 Saroj raut kurmi Rautahat GarudaBairiya 7 biswanath raut pramila devi pipariya dostiya 911.3 Male 8 42712 7569023079 NISHA BUDHa Bajura Sappata 6 GAN BAHADUR BUDHA AABHARI BUDHA CHUDARI 911.4 Female 9 35970 7260012119 RAMU TAMATATA Mugu Seri 5 Padam Bahadur Tamata Manamata Tamata Bamkanda 912.6 Female 10 36673 7375025003 Akbar Od Baitadi Pancheswor 3 Ganesh ram od Kalawati od Kalauti 915.4 Male 11 40529 7335011133 PRAMOD KUMAR PANDIT Rautahat Dharhari 5 MISHRI PANDIT URMILA DEVI 915.8 Male 12 42683 7525055002 BIMALA RAI Nuwakot Madanpur 4 Man Bahadur Rai Gauri Maya Rai Ghodghad 915.9 Female 13 42758 7525055016 SABIN AALE MAGAR Nuwakot Madanpur 4 Raj Kumar Aale Magqar Devi Aale Magar Ghodghad 915.9 Male 14 42459 7217094014 SOBHA DHAKAL Dolakha GhangSukathokar 2 Bishnu Prasad Dhakal
    [Show full text]