District Profile - Kavrepalanchok (As of 10 May 2017) HRRP

Total Page:16

File Type:pdf, Size:1020Kb

District Profile - Kavrepalanchok (As of 10 May 2017) HRRP District Profile - Kavrepalanchok (as of 10 May 2017) HRRP This district profile outlines the current activities by partner organisations (POs) in post-earthquake recovery and reconstruction. It is based on 4W and secondary data collected from POs on their recent activities pertaining to housing sector. Further, it captures a wide range of planned, ongoing and completed activities within the HRRP framework. For additional information, please refer to the HRRP dashboard. FACTS AND FIGURES Population: 381,9371 75 VDCs and 5 municipalities Damage Status - Private Structures Type of housing walls Kavrepalanchok National Mud-bonded bricks/stone 82% 41% Cement-bonded bricks/stone 14% 29% Damage Grade (3-5) 77,963 Other 4% 30% Damage Grade (1-2) 20,056 % of households who own 91% 85% Total 98,0192 their housing unit (Census 2011)1 NEWS & UPDATES 1. A total of 1,900 beneficiaries as per District Technical Office (DTO/DLPIU) have received the Second Tranche in Kavre. 114 beneficiaries within the total were supported by Partner Organizations. 2. Lack of proper orientations to the government officials and limited coordination between DLPIU engineers and POs technical staffs are the major reconstruction issues raised in the district. A joint workshop with all the district authorities, local government authorities and technical persons was agreed upon as a probable solution in HRRP Coordination Meeting dated April 12, 2017. HRRP - Kavrepalanchok HRRP © PARTNERS SUMMARY AND HIGHLIGHTS3 Partner Organisation Implementing Partner(s) ADRA NA 2,110 ARSOW SHORT TRAINING 3,097 BC ARSOW CARITAS-N VOCATIONAL TRAINING 967 6,536 CDRA -C-GGC (Targets Achieved) CL VG Reached Remaining HELVETAS ALLIANCE-N,PTI,NETSA ,ANS,JAYAN HFH ASF 662 Demonstration Constructions in 29 VDCs LWF SJASK NAVJYOTI NC Helpdesk/Technical support center in 2 VDCs, covering 6 wards NCRS NN SAGARMATHA NRCS 5 VDCs with Household WASH Assistance NYF PIPALTAR PSD-N 60,721 beneficiaries enrolled, 89% ROTARY CC,CDRA 4 SABAL 60,063 beneficiaries received the 1st Tranche, 88% SP UNDP CTEVT 2,811 households provided with Housing Grants by POs NPR 19 partners 214 houses constructing directly through contractors This table indicates the partner organisations and their respective implementing partner(s) KEY CONTACTS DAO OFFICE DDC OFFICE NRA District Office DUDBC OFFICE Shiv Simkhada Komal Dhamal Dhruba Gaida Astha Lal Suwal Chief District Officer Local Development Officer District Focal Point Division Head Telephone: 011-490123 Telephone: 011-490246 Telephone: 011-491007 Telephone: 011-662842 Creation Date: 20 May 2017 Sources: 1. CENSUS 2011, 2. NRA, CBS, 3. HRRP 4W (10 May 2017), 4. NRA/MoFALD (20 May 2017) For further information, please contact: District Coordinator Reshma Shrestha [email protected] District Profile - Kavrepalanchok (as of 10 May 2017) HRRP The coverage of Technical Assistance (TA) is defined according to the 0 VDC with all 6 TA Activities presence (planned and on-going) of the following 6 activities and the VDCs 35 VDCs with no TA highlighted suggest the summation of the activities presented: a. Community/household orientation with more than 1 session 34 VDCs with no TA and b. Continuous Door to door technical assistance (Mobile Technical Support) more than 60% damage c. Short training for Masons (Target achieved) d. Vocation/on the job training for masons (Target achieved) e. Helpdesk/Technical Support Center f. Demonstration construction Disclaimer: The highlighted VDCs indicate that at least one of the aforementioned activities is being conducted/planned by partner organizations, irrespective of the methodology or household level coverage of the activity. For activity c and d, it is highlighted when there are more than 70% of masons trained accord- ing to the targets defined by NRA and field surveys. GairiBisounaDeupur BaluwapatiDeupur MahadevsthanMandan NayagaunDeupur ChandeniMandan JaisithokMandan Devitar TukuchaNala JyamdiMandan Nala(Ugrachandi) Saping BekhsimleDhartigaun Simthali RaviOpi Panchkhal N.P. NasikasthanSanga Banepa N.P. Dolalghat Bhumlutar UgrataraJanagal Choubas Sanowangthali MahendraJyoti Dhulikhel N.P. Falatebhumlu NagreGagarche Kharelthok SalleBhumlu RyaleBhir DhuseniSiwalaya SaradaBatase Patalekhet Koshidekha KolatiBhumlu MajhiFeda Panauti N.P. Gothpani Kushadevi SankhupatiChour PokhariChauri SimalchourSyampati Sarasyunkhark Birtadeurali Dapcha Kashikhand N.P. KalatiBhumidanda Baldthali KartikeDeurali ChalalGaneshsthan KanpurKalapani Saramthali BoldeFediche MadanKundari ChyasingKharka KatunjeBesi Dhunkharka PokhariNarayansthan ThuloParsel MahankalChaur KhaharePangu KuruwasChapakhori Kharpachok SikharAmbote Sisakhani Chyamrangbesi Mahadevtar Mangaltar Machchhegaun SipaliChilaune Falemetar Balting Bhimkhori Milche Saldhara Foksingtar Budhakhani Dandagaun Salmechakala(Taldhu) Gokule Ghartichhap BanakhuChor Coverage of TA Activities 1 2 3 4 Wards with no TA Creation Date: 20 May 2017 Sources: 1. CENSUS 2011, 2. NRA, CBS, 3. HRRP 4W (10 May 2017), 4. NRA/MoFALD (20 May 2017) For further information, please contact: District Coordinator Reshma Shrestha [email protected] I.
Recommended publications
  • Social Safeguard Due Diligence Report
    Rural Connectivity Improvement Project (RRP NEP 48218) Social Safeguard Due Diligence Report Project Number: 48218-003 July 2017 Nepal: Rural Connectivity Improvement Project Prepared by Department of Local Infrastructure Development and Agricultural Roads for the Asian Development Bank. This social safeguard due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. RURAL CONNECTIVITY IMPROVEMENT PROJECT NEPAL Social Safeguards Due Diligence Report July 2017 Prepared by PPTA Consultants On behalf of Department of Local Infrastructure Development and Agricultural Roads (DOLIDAR) Table of Contents Chapter 1 –Introduction .............................................................................................................. 1 1.1 Project Description .............................................................................................. 1 Chapter 2 - Due Diligence of Social Safeguards ........................................................................ 7 2.1 Methodology used to carry out the due diligence ...............................................
    [Show full text]
  • MCSP Annual Report
    MCSP Annual Report FY 2018 October 1, 2017– September 30, 2018 Submission Date: November 6th, 2018 Cooperative Agreement No. AID-OAA-A-14-00028 Activity Start Date and End Date: October 2016 – April 2019 Activity Manager: Pavani Ram AOR: Nahed Matta Submitted by: Adhish Dhungana, Manager- Maternal & Child Survival Program Save the Children| Airport Gate Area, Shambhu Marg Kathmandu, Nepal GPO Box: 3394 Telephone: +977-1-4468130/4464803 Email: [email protected] This document was produced for review by the United States Agency for International Development (USAID). Acronyms BEmONC Basic Emergency Obstetric and Neonatal Care CHD Child Health Division CMA Community Medical Assistant CRS Contraceptive Retail Sales CSD Curative Service Division DDA Department of Drug Administration DHO District Health Office DoHS Department of Health Services DIP Detail Implementation Plan ENAP Every Newborn Action Plan FB IMNCI Facility Based Integrated Management of Neonatal and Childhood Illness FHD Family Health Division GoN Government of Nepal IMNCI Integrated Management of Neonatal and Childhood Illness MCSP Maternal and Child Survival Program M&E Monitoring and Evaluation MEL Monitoring, Evaluation, and Learning MNH Maternal and Newborn Health MNHI Maternal and Newborn Health Integration MoHP Ministry of Health and Population NCDA Nepal Chemist and Druggist Association NHRC Nepal Health Research Council NYI Newborns and Young Infants PI Principle Investigator PSBI Possible Severe Bacterial Infection PSD Partner for Social Development Nepal SBA Skilled Birth Attendant SCI Save the Children International SDG Sustainable Development Goal SNL Saving the Newborn Lives TAG Technical Advisory Group ToR Terms of Reference USAID United States Agency for International Development WHO World Health Organization WIRB Western Institutional Review Board Contents Acronyms 2 FINANCIAL INFORMATION Error! Bookmark not defined.
    [Show full text]
  • Download Document
    Gold standard for the global goals Monitoring report June 2017, version 1 Page 1 of 40 Title of the project Smokeless Cook Stoves for Rural Districts of Nepal Gold Standard project id GS 1191 Version number of the monitoring report 3 Completion date of the monitoring report 15/06/2020 Date of project design certification 01/01/2014 Start date of crediting period 01/01/2013 Duration of this monitoring period Period 3 from 01/05/2018 to 31/07/2019 Duration of previous monitoring period Period 2 from 01/04/2014 to 25/04/2015 Project representative(s) Dr. Reinhard Hallermayer, “Die Ofenmacher e.V.”, Germany Anita Badal, Swastha Chulo Nepal Host Country Nepal Certification pathway (activity certification/impact certification) Impact Statements & Products (VER Project Certification) SDG Contributions targeted (as per 1 – Climate Action (SDG 13) approved PDD) 2 - Good health and well-being (SDG 3) 3 - Affordable and Clean Energy (SDG 7) 4 – Gender Equality (SDG 5) Gold Standard statement/product certification sought GS VER (GSVER/ADALYs/RECs etc.) Selected methodology(ies) AMS II. G., version 3 Estimated amount of annual average SDG 13: 7,648 tonnes CO2 certified SDG impact (as per approved PDD) SDG 3: 8,503 ICS SDG 7: 8,503 ICS SDG 5: 0 women Total amount of certified SDG impact (as SDG 13: 6,696 tonnes CO2 per approved methodology) achieved in this SDG 3: 8,537 ICS monitoring period SDG 7: 8,537 ICS SDG 5: 7 women Page 2 of 40 SECTION A. Description of project A.1. Purpose and general description of project The objective of the project is the installation of mud brick cook stoves in individual households in three rural districts of Nepal in order to substitute the traditional fireplaces for cooking without discharge of the smoke into the environment.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Map of Dolakha District Show Ing Proposed Vdcs for Survey
    Annex 3.6 Annex 3.6 Map of Dolakha district showing proposed VDCs for survey Source: NARMA Inception Report A - 53 Annex 3.7 Annex 3.7 Summary of Periodic District Development Plans Outlay Districts Period Vision Objectives Priorities (Rs in 'ooo) Kavrepalanchok 2000/01- Protection of natural Qualitative change in social condition (i) Development of physical 7,021,441 2006/07 resources, health, of people in general and backward class infrastructure; education; (ii) Children education, agriculture (children, women, Dalit, neglected and and women; (iii) Agriculture; (iv) and tourism down trodden) and remote area people Natural heritage; (v) Health services; development in particular; Increase in agricultural (vi) Institutional development and and industrial production; Tourism and development management; (vii) infrastructure development; Proper Tourism; (viii) Industrial management and utilization of natural development; (ix) Development of resources. backward class and region; (x) Sports and culture Sindhuli Mahottari Ramechhap 2000/01 – Sustainable social, Integrated development in (i) Physical infrastructure (road, 2,131,888 2006/07 economic and socio-economic aspects; Overall electricity, communication), sustainable development of district by mobilizing alternative energy, residence and town development (Able, local resources; Development of human development, industry, mining and Prosperous and resources and information system; tourism; (ii) Education, culture and Civilized Capacity enhancement of local bodies sports; (III) Drinking
    [Show full text]
  • 49215-001: Earthquake Emergency Assistance Project
    Environmental Assessment Document Initial Environmental Examination Loan: 3260 July 2017 Earthquake Emergency Assistance Project: Panchkhal-Melamchi Road Project Main report-I Prepared by the Government of Nepal The Environmental Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Government of Nepal Ministry of Physical Infrastructure and Transport Department of Roads Project Directorate (ADB) Earthquake Emergency Assistance Project (EEAP) (ADB LOAN No. 3260-NEP) INITIAL ENVIRONMENTAL EXAMINATION OF PANCHKHAL - MELAMCHI ROAD JUNE 2017 Prepared by MMM Group Limited Canada in association with ITECO Nepal (P) Ltd, Total Management Services Nepal and Material Test Pvt Ltd. for Department of Roads, Ministry of Physical Infrastructure and Transport for the Asian Development Bank. Earthquake Emergency Assistance Project (EEAP) ABBREVIATIONS AADT Average Annual Daily Traffic AC Asphalt Concrete ADB Asian Development Bank ADT Average Daily Traffic AP Affected People BOD Biological Oxygen Demand CBOs Community Based Organization CBS Central Bureau of Statistics CFUG Community Forest User Group CITIES Convention on International Trade in Endangered Species CO Carbon Monoxide COI Corridor of Impact DBST Double Bituminous Surface Treatment DDC District Development Committee DFID Department for International Development, UK DG Diesel Generating DHM Department of Hydrology and Metrology DNPWC Department of National
    [Show full text]
  • Japan International Cooperation Agency (JICA)
    Chapter 3 Project Evaluation and Recommendations 3-1 Project Effect It is appropriate to implement the Project under Japan's Grant Aid Assistance, because the Project will have the following effects: (1) Direct Effects 1) Improvement of Educational Environment By replacing deteriorated classrooms, which are danger in structure, with rainwater leakage, and/or insufficient natural lighting and ventilation, with new ones of better quality, the Project will contribute to improving the education environment, which will be effective for improving internal efficiency. Furthermore, provision of toilets and water-supply facilities will greatly encourage the attendance of female teachers and students. Present(※) After Project Completion Usable classrooms in Target Districts 19,177 classrooms 21,707 classrooms Number of Students accommodated in the 709,410 students 835,820 students usable classrooms ※ Including the classrooms to be constructed under BPEP-II by July 2004 2) Improvement of Teacher Training Environment By constructing exclusive facilities for Resource Centres, the Project will contribute to activating teacher training and information-sharing, which will lead to improved quality of education. (2) Indirect Effects 1) Enhancement of Community Participation to Education Community participation in overall primary school management activities will be enhanced through participation in this construction project and by receiving guidance on various educational matters from the government. 91 3-2 Recommendations For the effective implementation of the project, it is recommended that HMG of Nepal take the following actions: 1) Coordination with other donors As and when necessary for the effective implementation of the Project, the DOE should ensure effective coordination with the CIP donors in terms of the CIP components including the allocation of target districts.
    [Show full text]
  • VBST Short List
    1 आिेदकको दर्ा ा न륍बर नागररकर्ा न륍बर नाम थायी जि쥍ला गा.वि.स. बािुको नाम ईभेꅍट ID 10002 2632 SUMAN BHATTARAI KATHMANDU KATHMANDU M.N.P. KEDAR PRASAD BHATTARAI 136880 10003 28733 KABIN PRAJAPATI BHAKTAPUR BHAKTAPUR N.P. SITA RAM PRAJAPATI 136882 10008 271060/7240/5583 SUDESH MANANDHAR KATHMANDU KATHMANDU M.N.P. SHREE KRISHNA MANANDHAR 136890 10011 9135 SAMERRR NAKARMI KATHMANDU KATHMANDU M.N.P. BASANTA KUMAR NAKARMI 136943 10014 407/11592 NANI MAYA BASNET DOLAKHA BHIMESWOR N.P. SHREE YAGA BAHADUR BASNET136951 10015 62032/450 USHA ADHIJARI KAVRE PANCHKHAL BHOLA NATH ADHIKARI 136952 10017 411001/71853 MANASH THAPA GULMI TAMGHAS KASHER BAHADUR THAPA 136954 10018 44874 RAJ KUMAR LAMICHHANE PARBAT TILAHAR KRISHNA BAHADUR LAMICHHANE136957 10021 711034/173 KESHAB RAJ BHATTA BAJHANG BANJH JANAK LAL BHATTA 136964 10023 1581 MANDEEP SHRESTHA SIRAHA SIRAHA N.P. KUMAR MAN SHRESTHA 136969 2 आिेदकको दर्ा ा न륍बर नागररकर्ा न륍बर नाम थायी जि쥍ला गा.वि.स. बािुको नाम ईभेꅍट ID 10024 283027/3 SHREE KRISHNA GHARTI LALITPUR GODAWARI DURGA BAHADUR GHARTI 136971 10025 60-01-71-00189 CHANDRA KAMI JUMLA PATARASI JAYA LAL KAMI 136974 10026 151086/205 PRABIN YADAV DHANUSHA MARCHAIJHITAKAIYA JAYA NARAYAN YADAV 136976 10030 1012/81328 SABINA NAGARKOTI KATHMANDU DAANCHHI HARI KRISHNA NAGARKOTI 136984 10032 1039/16713 BIRENDRA PRASAD GUPTABARA KARAIYA SAMBHU SHA KANU 136988 10033 28-01-71-05846 SURESH JOSHI LALITPUR LALITPUR U.M.N.P. RAJU JOSHI 136990 10034 331071/6889 BIJAYA PRASAD YADAV BARA RAUWAHI RAM YAKWAL PRASAD YADAV 136993 10036 071024/932 DIPENDRA BHUJEL DHANKUTA TANKHUWA LOCHAN BAHADUR BHUJEL 136996 10037 28-01-067-01720 SABIN K.C.
    [Show full text]
  • Provincial Summary Report Province 3 GOVERNMENT of NEPAL
    National Economic Census 2018 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 Provincial Summary Report Provincial National Planning Commission Province 3 Province Central Bureau of Statistics Kathmandu, Nepal August 2019 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 National Planning Commission Central Bureau of Statistics Kathmandu, Nepal August 2019 Published by: Central Bureau of Statistics Address: Ramshahpath, Thapathali, Kathmandu, Nepal. Phone: +977-1-4100524, 4245947 Fax: +977-1-4227720 P.O. Box No: 11031 E-mail: [email protected] ISBN: 978-9937-0-6360-9 Contents Page Map of Administrative Area in Nepal by Province and District……………….………1 Figures at a Glance......…………………………………….............................................3 Number of Establishments and Persons Engaged by Province and District....................5 Brief Outline of National Economic Census 2018 (NEC2018) of Nepal........................7 Concepts and Definitions of NEC2018...........................................................................11 Map of Administrative Area in Province 3 by District and Municipality…...................17 Table 1. Number of Establishments and Persons Engaged by Sex and Local Unit……19 Table 2. Number of Establishments by Size of Persons Engaged and Local Unit….….27 Table 3. Number of Establishments by Section of Industrial Classification and Local Unit………………………………………………………………...34 Table 4. Number of Person Engaged by Section of Industrial Classification and Local Unit………………………………………………………………...48 Table 5. Number of Establishments and Person Engaged by Whether Registered or not at any Ministries or Agencies and Local Unit……………..………..…62 Table 6. Number of establishments by Working Hours per Day and Local Unit……...69 Table 7. Number of Establishments by Year of Starting the Business and Local Unit………………………………………………………………...77 Table 8.
    [Show full text]
  • 2015 Nepal Earthquake Response Project Putting Older People First
    2015 Nepal Earthquake Response Project PUTTING OLDER PEOPLE FIRST A Special newsletter produced by HelpAge to mark the first four months of the April 2015 Earthquake CONTENTS Message from the Regional Director Editorial 1. HelpAge International in Nepal - 2015 Nepal Earthquake 1-4 Response Project (i) Unconditional Cash Transfers (UCTs) (ii) Health Interventions (iii) Inclusion- Protection Programme 2. Confidence Re-Born 5 3. Reflections from the Field 6 4. Humanitarian stakeholders working for Older People and 7-8 Persons with Disabilities in earthquake-affected districts 5. A Special Appeal to Humanitarian Agencies 9-11 Message from the Regional Director It is my great pleasure to contribute a few words to this HelpAge International Nepal e-newsletter being published to mark the four-month anniversary of the earthquake of 25 April, 2015, focusing on ‘Putting Older People First in a Humanitarian Response’. Of the eight million people in the 14 most earthquake-affected districts1, an estimated 650,000 are Older People over 60 years of age2, and are among the most at risk population in immediate need of humanitarian assistance. When factoring-in long-standing social, cultural and gender inequalities, the level of vulnerability is even higher among the 163,043 earthquake-affected older women3. In response to the earthquake, HelpAge, in collaboration with the government and in partnership with local NGOs, is implementing cash transfers, transitional shelter, health and inclusion-protection activities targeting affected Older People and their families. Furthermore, an Age and Disability Task Force-Nepal (ADTF-N)4 has been formed to highlight the specific needs and vulnerabilities of Older People and Persons with Disabilities and to put them at the centre of the earthquake recovery, rehabilitation and reconstruction efforts.
    [Show full text]
  • TSLC PMT Result
    Page 62 of 132 Rank Token No SLC/SEE Reg No Name District Palika WardNo Father Mother Village PMTScore Gender TSLC 1 42060 7574O15075 SOBHA BOHARA BOHARA Darchula Rithachaupata 3 HARI SINGH BOHARA BIMA BOHARA AMKUR 890.1 Female 2 39231 7569013048 Sanju Singh Bajura Gotree 9 Gyanendra Singh Jansara Singh Manikanda 902.7 Male 3 40574 7559004049 LOGAJAN BHANDARI Humla ShreeNagar 1 Hari Bhandari Amani Bhandari Bhandari gau 907 Male 4 40374 6560016016 DHANRAJ TAMATA Mugu Dhainakot 8 Bali Tamata Puni kala Tamata Dalitbada 908.2 Male 5 36515 7569004014 BHUVAN BAHADUR BK Bajura Martadi 3 Karna bahadur bk Dhauli lawar Chaurata 908.5 Male 6 43877 6960005019 NANDA SINGH B K Mugu Kotdanda 9 Jaya bahadur tiruwa Muga tiruwa Luee kotdanda mugu 910.4 Male 7 40945 7535076072 Saroj raut kurmi Rautahat GarudaBairiya 7 biswanath raut pramila devi pipariya dostiya 911.3 Male 8 42712 7569023079 NISHA BUDHa Bajura Sappata 6 GAN BAHADUR BUDHA AABHARI BUDHA CHUDARI 911.4 Female 9 35970 7260012119 RAMU TAMATATA Mugu Seri 5 Padam Bahadur Tamata Manamata Tamata Bamkanda 912.6 Female 10 36673 7375025003 Akbar Od Baitadi Pancheswor 3 Ganesh ram od Kalawati od Kalauti 915.4 Male 11 40529 7335011133 PRAMOD KUMAR PANDIT Rautahat Dharhari 5 MISHRI PANDIT URMILA DEVI 915.8 Male 12 42683 7525055002 BIMALA RAI Nuwakot Madanpur 4 Man Bahadur Rai Gauri Maya Rai Ghodghad 915.9 Female 13 42758 7525055016 SABIN AALE MAGAR Nuwakot Madanpur 4 Raj Kumar Aale Magqar Devi Aale Magar Ghodghad 915.9 Male 14 42459 7217094014 SOBHA DHAKAL Dolakha GhangSukathokar 2 Bishnu Prasad Dhakal
    [Show full text]
  • Radio Namobudhha Radio Namobudhha
    RADIORADIO NAMOBUDHHANAMOBUDHHA Baseline Survey on Consciousness and Viewpoint of Listeners Kavre 2009 Research Team Khagendra Prasai Raghu Mainali Conducted by COMMUNITY RADIO SUPPORT CENTRE (CRSC) NEPAL FORUM OF ENVIRONMENTAL JOURNALISTS (NEFEJ) WITH SUPPORT FROM FREE VOICE THE NETHERLAND g]jfk; RADIO NAMOBUDHHA Baseline Survey on Consciousness and Viewpoint of Listeners Kavre 2009 Research Team Khagendra Prasai Raghu Mainali Conducted by COMMUNITY RADIO SUPPORT CENTRE NEPAL FORUM OF ENVIRONMENTAL JOURNALISTS (NEFEJ) WITH SUPPORT FROM FREE VOICE THE NETHERLAND From the publisher We are very much pleased to see Baseline Survey on Consciousness and Viewpoint of Listeners which was conducted by Community Radio Support Centre (CRSC) under Nepal forum of Environmental Journalists (NEFEJ) and developed for Radio Namobuddha of Kavre district. Baseline surveys are considered as the foundation for any plan or activities. It gives an idea how to implement the activities or plan in the best way possible. They also serve as measuring stick to gauge the progress achieved by comparing the previous and subsequent scenario. The principal purpose of the survey was “to identify the impact made by radio on local people, after meticulous analysis of the situation existing before and after the arrival of Radio Namobuddha.” The analysis so arrived at would shape the policy of the radio and focus on the desired areas accordingly. As a community, Radio Namobuddha has to be committed to fight out social injustice. It has to identify the areas where interventions are needed. We are very much confident that this baseline survey would give necessary inputs for Radio Namobuddha to design better and appropriate programs for social interventions for change.
    [Show full text]