Environmental Impact Statement BULGA OPTIMISATION PROJECT APRIL 2013 xs ra a Volume 6A APPENDIX 13a Part 1 Bulga Optimisation Project Aboriginal Cultural Heritage Assessment Final Report, April 2013 Bulga Optimisation Project Final Aboriginal Cultural Heritage Assessment Prepared by Connect for Effect Pty Limited on behalf of Bulga Coal Management Pty Limited Connect for Effect Pty Ltd 116 Serrata Circuit Banksia Village Forest Lake Queensland 4078 Ph.: 07 3333 2283 Email:
[email protected] Website: www.connectforeffect.com.au Connect For Effect Pty Ltd Job NoCFE11 Final Aboriginal Cultural Heritage Assessment /Report No1/Final April 2013 Page i Bulga Optimisation Project Final Aboriginal Cultural Heritage Assessment Disclaimer Every reasonable effort has been made to ensure the content of this this document is correct at the time of its preparation on 18 April 2013. Connect for Effect Pty Ltd, its agents and employees, do not accept any responsibility and shall have no liability, consequential or otherwise, of any kind, arising from the use of or reliance on any of the information contained herein. COPYRIGHT Copyright of the drawings, information and data recorded in this document (i.e. all information) is the property of Connect for Effect Pty Ltd. This document and all information contained herein are solely for the use of the authorised recipient. This document may not be used, copied or reproduced in whole or part thereof for any purpose other than that for which it was supplied by Connect for Effect Pty Ltd unless written permission is granted by Connect for Effect Pty Ltd and is duly attributed. This report has been prepared in accordance with Clause 80C of the National Parks and Wildlife Regulation 2009.