INTRODUCTORY SECTION INTRODUCTORY SECTION

Plaza on the . Several bridge projects on the System continue. On the , a bridge replacement and ramp construction project has started, along with the raising of a bridge. Additional joint bridge projects with the ODOT are underway, one on the H. E. Bailey Turnpike and another on the Indian Nation Turnpike. Partnerships assist the OTA in completing needed improvements in a timely and cost efficient manner. Other bridge projects at various stages are those on the Cimarron, H. E. Bailey, Indian Nation and Will Rogers Turnpikes.

The OTA is in the process of updating or replacing maintenance and toll plaza facilities on the Turnpike System. Two new salt storage facilities were constructed, one on the Indian Nation Turnpike and the other on the . Projects for additional salt storage facilities and maintenance equipment storage facilities on the System are scheduled within the next five years. Two projects under design on the Cimarron and Muskogee Turnpikes are joint maintenance and Highway Patrol (OHP) facilities. Toll side gate improvements were completed on the Turner Turnpike at Wellston. A project to upgrade the toll plaza at Eufaula on the Indian Nation Turnpike will begin in 2015.

The OTA has begun a Systemwide upgrade of service plazas. In late December 2014, the Vinita service plaza on the was reopened for customers. A resolution was adopted to rename the newly renovated plaza to the Will Rogers Archway. The Will Rogers Archway houses a mini-museum of the history of Will Rogers and his influence in Oklahoma. In partnership with the Oklahoma Tourism Department, the OTA has included a video wall in the facility to highlight Oklahoma’s tourism destination locations. The Will Rogers Archway offers both McDonald’s and Subway restaurants. Additionally, a new service plaza site at McAlester on the Indian Nation Turnpike was opened in late December 2014. The new facility provides a highly functional and convenient service plaza for patrons and offers both food and fuel vendors. Similar service plazas are located on the H. E. Bailey Turnpike at the Chickasha Service Plaza, on the Muskogee Turnpike at the Muskogee Service Plaza and on the Cimarron Turnpike at the Lone Chimney Service Plaza. A project to redesign the Stroud Service Plaza is programmed in the five-year Capital Plan, as well as an upgrade to the Walters Service Plaza on the H. E. Bailey Turnpike.

Other major initiatives include patronage safety projects. Over the last several years signing projects have been completed on the Cherokee, Cimarron, Indian Nation and Muskogee Turnpikes. The signing program is used to update regulatory, warning and information signs that are faded or have poor reflectivity. These signs are informative, aesthetically pleasing and conform to national standards. Also, in conjunction with the ODOT, dynamic message signs were erected. Dynamic message signs are permanent, changeable message structures that provide notice to the motoring public of roadway conditions and potential hazards affecting public safety, such as roadway and lane closures, accidents, snow and ice conditions and roadway obstructions. Restriping projects on segments of roadway were completed on the Cimarron and Will Rogers Turnpikes. For 2015, similar projects are scheduled on the H. E. Bailey, Indian Nation and Muskogee Turnpikes. Positive barrier projects totaling 146 miles have been completed on the Cimarron, Creek, H. E. Bailey, Indian Nation and John Kilpatrick Turnpikes. Additional positive barrier projects to protect the traveling public are scheduled within the next five years. Over-height detection equipment was installed on the west end of the Turner Turnpike to improve safety and reduce bridge damage by alerting carriers of over-height loads.

The OTA Maintenance Division, with the assistance of inmate labor and contractors, provides a vital role for the Turnpike System. Maintenance crews perform roadway, bridge and right-of-way repairs on the Turnpike System. Right-of-way projects include fence, drainage and slope repairs, as well as herbicide treatment, mowing and planting of wildflowers and trees. OTA maintenance crews make various roadway, bridge and right-of-way repairs throughout the Turnpike System. In 2014, OTA maintenance crews also painted the exterior faces on numerous turnpike-under bridges along the Turner Turnpike. This practice is to be continued on other turnpikes during 2015. Maintenance crews are always ready, prepared and work tirelessly to clear the Turnpike System when winter weather arrives. To assist in these efforts, new salt barns have recently been constructed at various locations on the Turnpike System, with the most recent being added on the Cimarron and Indian Nation Turnpikes. New specialized snow and ice removal equipment was also purchased in 2014 and deployed to expedite removal efforts.

The OTA provides a special convenience through its PIKEPASS system for travelers desiring free-flow travel. The PIKEPASS system is the OTA’s automated electronic toll collection system which allows travelers to travel at highway speeds through designated lanes without stopping to pay tolls. A PIKEPASS transponder is applied to the windshield of the customer’s vehicle. The transponder emits a radio frequency that is recognized by a positioned reader, and data is captured and transmitted via the electronic toll collection system. The information is then translated into the appropriate toll collection transactions for each customer’s individual account. The electronic PIKEPASS system eases congestion around the plazas, improves safety and enhances driver satisfaction. PIKEPASS customers enjoy a 5% average savings off the cash toll price for using their transponders and are eligible for an additional 5% reward for participating in the volume discount program with 20 or more qualifying toll transactions in a month. The discount is calculated for each transponder independently, and the account must remain positive for discounts to apply.

6