Draft Siu Ho Wan Outline Zoning Plan No. S/I-Shw/1
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
E. Development Proposals in the Concept Plan E1. Cross-Boundary Transport Hub at Siu Ho
E. Development Proposals in the Concept Plan E1. Cross-boundary Transport Hub at Siu Ho Wan E2. Lantau Logistics Park at Siu Ho Wan and Possible Logistics Park Extension or Recreational Use E3. Leisure and Entertainment Node at Sunny Bay E4. Possible Theme Park or Recreational Use at Tung Chung East E5. Golf Course cum Resort at Tsing Chau Tsai East E6. Resort Facilities in South Lantau E7. Hotel Facilities E8. Museum of Lantau and Eco-Tour Centre E9. Facelift of Mui Wo E10. Preservation of Tai O Fishing Village E11. Cycle Track and Mountain Bike Trail Networks E12. Watersports Centres and Boardwalks in South Lantau E13. Eco-Trails and Heritage Trails E14. High-quality Camping Sites E15. Lantau North (Extension) Country Park E16. South West Lantau Marine Park E1. Cross-boundary Transport Hub at Siu Ho Wan Background Siu Ho Wan is strategically located close to the North Lantau Highway Connection (NLHC) of the Hong Kong-Zhuhai-Macao Bridge (HZMB) and has the potential to serve as a transport interchange for cross-boundary traffic. A possible location of the cross-boundary transport hub is at MTR Siu Ho Wan Depot. The depot occupies 30 ha of land, with flexibility built into the design for retrofitting development above the depot. MTR access to Siu Ho Wan on the Tung Chung Line could be provided by the construction of an additional station, subject to Government’s approval for the station and authorization under the relevant Ordinance. The cross-boundary transport hub has the potential to be a major transport interchange, providing park-and-ride facilities, a MTR station and a public transport interchange. -
Road P1 (Tai Ho – Sunny Bay Section), Lantau Project Profile
The Government of the Hong Kong Special Administrative Region Civil Engineering and Development Department Road P1 (Tai Ho – Sunny Bay Section), Lantau (prepared in accordance with the Environmental Impact Assessment Ordinance (Cap. 499)) Project Profile December 2020 Road P1 (Tai Ho – Sunny Bay Section) Project Profile CONTENTS 1. BASIC INFORMATION ......................................................................................... 1 1.1 Project Title ................................................................................................................ 1 1.2 Purpose and Nature of the Project .............................................................................. 1 1.3 Name of Project Proponent ........................................................................................ 2 1.4 Location and Scale of Project and History of Site ..................................................... 2 1.5 Number and Types of Designated Projects to be Covered by the Project Profile ...... 3 1.6 Name and Telephone Number of Contact Person ...................................................... 3 2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME ........ 5 2.1 Project Planning and Implementation ........................................................................ 5 2.2 Project Timetable ....................................................................................................... 5 2.3 Interactions with Other Projects ................................................................................. 5 3. POSSIBLE -
20170215-0223 Temporary Traffic and Transport Arrangements On
Transport Department Notice Temporary Traffic and Transport Arrangements on North Lantau Highway and Cheung Tung Road Notice is hereby given that to facilitate the road works of Tuen Mun – Chek Lap Kok Link – Southern Connection Viaduct Section, the following temporary traffic and transport arrangements will be implemented on Lantau Island during the time periods specified below: (A) Road / Lane Closure (i) North Lantau Highway Kowloon bound (a) A section of two traffic lanes of North Lantau Highway Kowloon bound from a point about 2200 metres east of its junction with Tung Chung Eastern Interchange to a point about 4000 metres east of the same junction will be temporarily closed to all vehicular traffic from 11.30 p.m. to 1.00 a.m. of the following day on 15, 19, 20 & 22 February 2017; (b) A section of two traffic lanes of North Lantau Highway Kowloon bound from a point about 2200 metres east of its junction with Tung Chung Eastern Interchange to a point about 2550 metres east of the same junction will be temporarily closed to all vehicular traffic from 1.00 a.m. to 5.30 a.m. on 16, 20, 21 & 23 February 2017; (c) A section of North Lantau Highway Kowloon bound from a point about 2550 metres east of its junction with Tung Chung Eastern Interchange (Emergency Opening E4 at central median near Tai Ho Wan) to a point about 3950 meters east of the same junction (Emergency Opening E6 at central median near Siu Ho Wan Depot) will be temporarily closed to all vehicular traffic from 1.00 a.m. -
District Profiles 地區概覽
Table 1: Selected Characteristics of District Council Districts, 2016 Highest Second Highest Third Highest Lowest 1. Population Sha Tin District Kwun Tong District Yuen Long District Islands District 659 794 648 541 614 178 156 801 2. Proportion of population of Chinese ethnicity (%) Wong Tai Sin District North District Kwun Tong District Wan Chai District 96.6 96.2 96.1 77.9 3. Proportion of never married population aged 15 and over (%) Central and Western Wan Chai District Wong Tai Sin District North District District 33.7 32.4 32.2 28.1 4. Median age Wan Chai District Wong Tai Sin District Sha Tin District Yuen Long District 44.9 44.6 44.2 42.1 5. Proportion of population aged 15 and over having attained post-secondary Central and Western Wan Chai District Eastern District Kwai Tsing District education (%) District 49.5 49.4 38.4 25.3 6. Proportion of persons attending full-time courses in educational Tuen Mun District Sham Shui Po District Tai Po District Yuen Long District institutions in Hong Kong with place of study in same district of residence 74.5 59.2 58.0 45.3 (1) (%) 7. Labour force participation rate (%) Wan Chai District Central and Western Sai Kung District North District District 67.4 65.5 62.8 58.1 8. Median monthly income from main employment of working population Central and Western Wan Chai District Sai Kung District Kwai Tsing District excluding unpaid family workers and foreign domestic helpers (HK$) District 20,800 20,000 18,000 14,000 9. -
Proposed Comprehensive Residential and Commercial Development Atop Siu Ho Wan Depot
13.8 21.4 ¹ D R o a d 7.4 ±Æ¤ Outfall 6.5 7.4 6.3 CUL M 6.4 W H 5.1 O ± u t Æ f a ¤ l l ¾É 7.5 5.5 le ne bb leli Ru Pip ¸H HWM 5.3 6.4 E ad 7.5 Ro 6.6 D ¹ 11.2 5.5 6.6 6.3 ± O le u b Æ ub 6.3 t R 6.4 10.6 f ¤ a l l H ®ü¤ô©â ¸ ªY¿D P N 6.3 5.8 r i Wate p y Salt ¾ CUL unny Ba -0.2 E S n l 10.3 g Statio e umpin É P l d i a n o E R e ¤Ñ CUL 9.6 10.2 D ¬ ¹ Antenna 5.3 À 6.5 5.6 Road j ¹D 2.1 ¤ ¤Ñ ¥_ L 5.7 Antenna p m 9.0 Ra 9.1 9.3 5.4 7.1 × 6.1 ± L 8.7 8.5 9.5 6.5 H 5.7 H ¥´´×®H·Ñ®ð½ T À u L n Ta Pang Po Offtake And Pigging Station G 8.7 n 8.5 e 8.1 5.8 l L 8.3 L 8.1 16.6 8.0 7.5 6.9 5.9 L 6.0 L 6.3 H 7.9 CUL 7.1 UL 7.3 C 11.7 26.2 s) s P FP e 6.3 24.5 r i ¾ xp p E L 6.6 l CUL e É rt L o l p 7.1 i 31.2 ir n (A e 6.8 TR M -0.1 SS 7.1 E CUL Y 6.0 A 6.1 HW G CUL ÷ I ¾ H ] ¡ U K A Å T L 17.7 7.1 ä NL 6.5 ´ LA 5.8 5.6 TH 2.6 6.3 R p O am 6.9 N R 5.6 6.6 le bb Ru CUL 4 P × F 6.4 11.7 ± 5.7 M W H H 7.1 22.1 ¸ L 5.5 L 6.3 6.2 ad ¬ CUL Ro À j 6.3 6.5 D ¤ 7.0 ¹ _ D ¥ A 28.5 O 6.2 R 20 13.1 NG TU L 6.3 G 7.1 7.2 6.2 N L EU 6.0 6.5 CH CUL 9.6 7.8 G 6.0 ª ¾ µ 6.1 33.0 R 25.0 L H L 13.2 7.5 7.9 R 8.3 5.9 5.8 31.8 18.0 6.2 M W H 0 4 6.3 8.3 G 6.3 L 6.6 le 5.9 L 6.3 bb Ru 0 H H 2 ¸ 7.0 ) ss re xp E ad rt 8.2 o po R ir A 5.9 G ( CUL TR 5.9 M L 6.6 L D 5.8 ¹ 6.3 7.0 0 Y CUL CUL 6 ÷ A 8.9 ¾ ] ¬ W ¡ H 6.4 K À G Å j I ä H ´ ¤ U A CUL ± 6.8 _ O 6.6 6.2 ¥ T u Æ N t A CUL f ¤ L 6.2 L a L l l H CUL RT O 6.0 N 40 50 20 9.4 42 10 2 6.4 6.5 15.2 4 13.7 7.2 L 6.2 L 6.3 9.7 d 7.3 oa R 6.6 9.3 23.6 6.2 6.3 6.0 D ¹ L 16.8 7.6 20 0 L 6 le bb Ru 0 4 M 6.4 24.4 W F H P H ¸ -
Jockey Club Age-Friendly City Project
Table of Content List of Tables .............................................................................................................................. i List of Figures .......................................................................................................................... iii Executive Summary ................................................................................................................. 1 1. Introduction ...................................................................................................................... 3 1.1 Overview and Trend of Hong Kong’s Ageing Population ................................ 3 1.2 Hong Kong’s Responses to Population Ageing .................................................. 4 1.3 History and Concepts of Active Ageing in Age-friendly City: Health, Participation and Security .............................................................................................. 5 1.4 Jockey Club Age-friendly City Project .............................................................. 6 2 Age-friendly City in Islands District .............................................................................. 7 2.1 Background and Characteristics of Islands District ......................................... 7 2.1.1 History and Development ........................................................................ 7 2.1.2 Characteristics of Islands District .......................................................... 8 2.2 Research Methods for Baseline Assessment ................................................... -
2. PROJECT DESCRIPTION 2.1 Project Location Siu Ho Wan 2.1.1 the Proposed Siu Ho Wan WTW Extension Is Within the Existing WTW Si
Agreement No. CE 75/2002 (WS) EIA Report Extension of Siu Ho Wan Water Treatment Works - Investigation 2. PROJECT DESCRIPTION 2.1 Project Location Siu Ho Wan 2.1.1 The proposed Siu Ho Wan WTW extension is within the existing WTW site boundary (location refers to Figure 2.1). The site area is approximately 5.8 hectares, located at the foot of the Tai Che Tung hill in an area designated for “Other Specified Uses” annotated (Water Treatment Works) on the Siu Ho Wan Layout Plan No. L/I-SHW/1, with a Sewage Treatment Plant to the west, North Lantau Service Road to the north and North Lantau Highway about 100 m away. The layout plan of the Siu Ho Wan WTW is shown in Figure 2.2. 2.1.2 A Siu Ho Wan Raw Water Booster Pumping Station is proposed. The proposed site and alternative site locations refer to Figure 2.1. Pui O 2.1.3 The existing Pui O Raw Water Pumping Station and Pui O No. 2 Raw Water Pumping Station are located next to the South Lantau Road, about 0.5 and 0.7 hectares in size, respectively. The demolition and reprovision of Pui O Raw Water Pumping Station and uprating of Pui O No. 2 Raw Water Pumping Station would take place within its existing boundary. The size of the existing Pui O Raw Water Pumping Station is 30.5m in length, 20m in width and 8m in height. The size of reprovisioned Pui O Raw Water Pumping Station is 32m in length and 16.5m in width. -
Lantau Development Work Plan
C&W DC No. 28/2015 Lantau Development Work Plan (2/2015) 2 Outline Planning Department 1. Lantau at Present 2. Development Potential of Lantau 3. Considerations for Developing Lantau 4. Major Infrastructure and Development Projects under Construction / Planning in Lantau 5. Vision、Strategic Positioning、Planning Themes Development Bureau 6. Lantau Development Advisory Committee Lantau at Present 4 Lantau at Present Area: Approx 147sq km (excluding nearby islands & airport) Approx 102sq km (about 70%) within country park area Population : Approx 110 500 (2013 estimate) Jobs: Approx 29 000 (plus approx 65 000 on Airport Island) Discovery Bay Tung Chung New Town Mui Wo Legend Country Park Population Concentration Area 5 Lantau at Present North: Strategic economic infrastructures and urban development East : Tourist hub South & West: Townships and rural areas Development Potential of Lantau 7 Development Potential of Lantau International Gateway Guangzhou International and regional Wuizhou transport hub (to Zhaoqing) Dongguan Converging point of traffic from Guangdong, Hong Kong, Macau Materialize “One-hour Foshan intercity traffic circle”」 Nansha Shenzhen Guangzhou Gongmun Qianhai Zhongshan Dongguan Shenzhen Zhuhai Lantau Hengqin Zhuahi Lantau 8 Development Potential of Lantau Potential for “bridgehead economy” at the Hong Kong Boundary Crossing Facilities Island of Hong Kong-Zhuhai-Macao Bridge (HZMB) Tuen Mun to Chek Lap Kok Link HZMB 9 Development Potential of Lantau Proximity to main urban areas Closer to the CBD on Hong Kong -
5 Air Quality Impacts
HZMB – HKBCF & HKLR EIA Report Contents Page 5 AIR QUALITY IMPACTS 1 5.1 Legislation and Standards 1 5.2 Ambient Air Quality Condition and Previous Monitoring Levels 2 5.3 Air Sensitive Receivers & Pollution Sources 4 5.4 Potential Concurrent Projects 8 5.5 Construction Dust Assessment 9 5.6 Operational Air Quality Assessment 16 5.7 Conclusion 28 Appendices Appendix 5A Calculation of Fugitive Dust Emission Factors Appendix 5B Locations and Details of Worksites for Fugitive Dust Assessment Appendix 5C Extent of Road not included in PATH Appendix 5D 2031 Emission Inventory Appendix 5E Airport Operation Information Appendix 5F-1 Key Assumptions for EmFAC Modelling Appendix 5F-2 Vehicle Emission Factors for 2031 (including composite vehicle emission factors for each road link) Appendix 5G Vehicle Emission at Kiosks, Loading / Unloading Bays Appendix 5H Vehicle Emission Factors for TMCLKL Appendix 5I Tunnel Emission Calculations Appendix 5J Cumulative Air Quality Impacts Figures Figure 5.1a Locations of Air Sensitive Receivers – Key Plan Figure 5.1b Locations of Air Sensitive Receivers – Sheet 1 Figure 5.1c Locations of Air Sensitive Receivers – Sheet 2 Figure 5.1d Locations of Air Sensitive Receivers – Sheet 3 Figure 5.2a Locations of Fugitive Dust Emission Sources Figure 5.2b Locations of Concrete Batching Plants Figure 5.3 Contours for Fugitive Dust Concentration Figure 5.4a Location of Operational Air Quality Emission Sources – Key Plan Figure 5.4b Location of Operational Air Quality Emission Sources – Sheet 1 Figure 5.4c Location of Operational -
MTR Corporation Limited Tung Chung Line Extension – Project Profile
MTR Corporation Limited Tung Chung Line Extension – Project Profile April 2020 Tung Chung Line Extension - Project Profile TABLE OF CONTENTS 1 BASIC INFORMATION ................................................................................................................ 1 Project Title ........................................................................................................................ 1 Purpose and Nature of the Project .................................................................................... 1 Name of the Project Proponent ......................................................................................... 1 Location and Scale of Project and History of Site ............................................................. 1 Number and Types of Designated Projects ....................................................................... 2 Name and Telephone Number of Contact Persons ........................................................... 2 2 OUTLINE OF PLANNING AND IMPLEMENTATON PROGRAMME .......................................... 3 Project Planning and Implementation ................................................................................ 3 Project Programme ............................................................................................................ 3 Project Interface ................................................................................................................. 3 3 POSSIBLE IMPACT ON THE ENVIRONMENT .......................................................................... -
Islands District Council Paper No. IDC 4/2019 Lantau Tomorrow Vision
Islands District Council Paper No. IDC 4/2019 Lantau Tomorrow Vision Purpose This paper aims to brief the Islands District Council on the Lantau Tomorrow Vision (the Vision) announced by the Government and the next step of work of the Development Bureau (DEVB). Lantau Tomorrow Vision Alleviating Land Shortage Problem 2. At present, Hong Kong is facing an acute problem of land shortage. According to the "Hong Kong 2030+: Towards a Planning Vision and Strategy Transcending 2030" (Hong Kong 2030+), it is broadly estimated that the housing demand between 2016 and 2046 is about one million units. The Government has been adopting a multi-pronged land supply strategy to increase land supply. For short-to-medium initiatives, through rezoning suitable sites for housing development and suitably increasing development density, Kai Tak development, railway property development, urban redevelopment projects etc., are expected to provide about 380 000 units. For medium-to-long term initiatives, new development areas (NDAs) and new town extension projects (including the Kwu Tung North and Fanling North NDAs, Tung Chung New Town Extension, Hung Shui Kiu NDA, and Yuen Long South Development), together with other potential railway property development projects may provide some 230 000 units. However, there is still a shortage of about 390 000 units to meet the anticipated housing demand. Apart from housing, we are also facing shortage of land to sustain our economic growth as well as land for the government, institution and community (GIC) facilities to meet the needs of the society arising from the increasing in and ageing of our population. -
The Kowloon Motor Bus Holdings Limited
GROUP PROFILE The Kowloon Motor Bus Holdings Limited ("the Company" and, together with its subsidiaries, "the Group") is Hong Kong's largest public transport company, in terms of passenger volume, serving over three million passenger trips daily. The Group comprises six divisions: Franchised Public Bus Operations, Non-Franchised Transport Operations, Mainland Operations, Media Sales Business, Property Holdings and Internal Financial Services. The Group's wholly owned flagship, The Kowloon Motor Bus Company (1933) Limited ("KMB"), was founded 69 years ago to provide franchised public bus services in Hong Kong. KMB's fleet of over 4,300 buses serves some 400 routes covering Kowloon, the New Territories and, through the cross-harbour tunnels, Hong Kong Island. Another wholly owned subsidiary, Long Win Bus Company Limited ("LWB") was established in 1996. With a fleet of 160 buses, LWB operates 15 routes plying between the New Territories and the Hong Kong International Airport and North Lantau. Of the Group's some 14,000 staff at the end of 2001, about 8,800 and 2,500 are bus captains and maintenance staff respectively. KMB is the first public bus company and the fourth corporation in Hong Kong that is ISO certified throughout its entire organisation. Through its wholly own subsidiary, Sun Bus Holdings Limited ("SBH"), the Group operates non-franchised bus services in Hong Kong. The Group also has two co-operative joint ventures in the Mainland that provide public bus services in Dalian and Tianjin. In striving to become a leading multi-media provider in the out-of-home media market, RoadShow Holdings Limited ("RoadShow") was established by the Group in 2000.