Green Initiatives 1. LED lighting is completed at all Railway stations in Constituency. 2. Revival of Water bodies are completed with the cost of ` 2.24 . 3. 600 kWp solar panels are installed at Guntur station with the cost of `3.54 and 95 kWp Solar Panels are installed at Railway Station.

Passenger Train Services Details of New Trains/ Special Trains/ Provision of Stoppages/ Extension/ Increase in the frequency of Trains in Guntur Parliamentary Constituency Jurisdiction. Provision of Stoppage 7. Guntur to 9 special trains 1 . T r . N o . 1 2 7 9 6 / 1 2 7 9 5 S e c u n d e r a b a d – 8. Guntur to 4 special trains Vijayawada– Intercity Express 9. Guntur to 12 special trains stoppage at Guntur 10. Guntur to 2 special trains 2.Tr.No.17215/17216 Vijayawada– Dharmavaram– Guntur Parliamentary Constituency Vijayawada Tri‐weekly Express stoppage at Guntur 11. Guntur to Narasapur 21 special trains 3.Tr.No.22708/22707 – 12. Guntur to 12 special trains Shri Narendra Modi Tirupati Double Decker Tri‐Weekly Express 13. Guntur to 26 special trains Hon’ble Prime Minister stoppage at Tenali & New Guntur 14. Guntur to 1 special train 4.Tr.No.22801/22802 Visakhapatnam– 15. Guntur to Visakhapatnam 1 special train –Visakhapatnam Express (Weekly) stoppage at New Guntur & Tenali 16. Krishna Canal to 12 special trains 5. Tr.No.16864/16863 Mannargudi– 17. Krishna Canal to Narasapur 12 special trains (Weekly) Express stoppage at Tenali 18. Krishna Canal to Nizamabad 1 special train RAIL DEVELOPMENTAL WORKS 6.Tr.No.12796/12795 Secunderabad–Vijayawada 19. Krishna Canal to 22 special trains –Secunderabad Superfast Intercity Express 20. Krishna Canal to Secunderabad 2 special trains Guntur Parliamentary Constituency Jurisdiction stoppage at . 21. Tenali to Manuguru 12 special trains Increase in Frequency (Total 178 special Trains) 1.Tr.No.17225/17226 Vijayawada‐Hubli‐Vijayawada Amaravathi Tri‐Weekly Express to Daily Express. Extension of Train Services 2.Tr.No.12795/12796 Vijayawada–Lingampalli 1. Tr.No.17401/17402/17403/17404 / South Central Railway serving Express made as Daily Express. Narsapur – Tirupati up to Dharmavaram with new Tr.No.17245/17246/17247/17248. the entire state of , 3.Tr.No.17010/17009 Secunderabad – Express made as Daily Express. 2. Tr.No.12795/12796 Vijayawada – Secunderabad major portion of upto Lingampalli Running of Special Trains and considerable portion of 3. Tr.No.17243/17244 Rayagada – Vijayawada 1. Guntur to Visakhapatnam 19 special trains Express upto Guntur , Maharastra states 2. Guntur to 4 special trains 4. Tr.No.12733/12734 Tirupati – Secunderabad upto and small parts of Tamilnadu and SOUTH CENTRAL 3. Guntur to 1 special train Lingampalli Madhya Pradesh. 4. Guntur to Secunderabad 1 special train 5. Tr.No.17487/17488 Visakhapatnam – Tirupati upto 5. Guntur to Anakapalle 2 special trains The Rail developmental activities RAILWAY 6. Guntur to 2 special trains 6 . Tr . N o . 1 2 8 0 5 / 1 2 8 0 6 V i s a k h a p a t n a m – Secunderabad up to Lingampalli. in the jurisdiction of Guntur Parliamentary Constituency has Safety – The First Priority picked up its pace in the recent past in all spheres. Focused Safety is the priority on SCR, to ensure safety of the Rail users, Foot over Bridges (FoBs)/ Road attention has been given for under/over Bridges are constructed / proposed for construction at various stations/ locations in improvement in the thrust areas Guntur Parliamentary Constituency Jurisdiction. such as infrastructure, safety, Constructed FOBs Proposed FOBs security and Passenger Station Cost in ` Crore Station Cost in ` Crore amenities/ facilities. Some of the Krishna Canal 0.40 Tenali 3.20 major activities are showcased in Nambur 0.70 Guntur 5.96 this brochure. ASSEMBLY SEGMENTS Road Over / Under Bridges Passenger Amenities With a view to strengthen safety at Level Crossing gates and Provision of Passenger Amenities and facilities, and its improvements to avoid untoward incidents and also to provide seamless at Railway Stations is one of the most important aspect Railway Services. journey to road traffic, the following Road under /over Bridges (RuB/RoB) are constructed / proposed for Station Amenity Amount Status construction at different stations under Guntur Mangalagiri Toilets `17 lakh Constructed Mangalagiri Parliamentary constituency. Toilets Constructed Toilets `10 lakh In Progress Ponnuru Guntur Toilets `80 lakh Proposed Road Over Bridges Guntur Waiting Room `18 lakh Completed Tenali 1. ROB in lieu of level crossing No.2 at Guntur–Mangalgiri Tsunduru Booking Windows `0.5 lakh Completed with the cost of ` 50.72 crore is under progress. Guntur 2 Escalators `2 crore Provided Prathipadu 2. ROB in lieu of level crossing No.249 between Tenali 2 Escalators `2 crore Provided Vejandla–Guntur with the cost of ` 42.59 crore is under Guntur 4 Escalators `4 crore In Progress Guntur West progress. Guntur Circulating Area `3.80 crore In Progress 3. Proposed for ROB in lieu of level crossing No.6 between Guntur CIB & TIB Guntur East –Bandarupalli with an estimated cost of ` 25.69 crore. Nadikudi CIB & TIB `3.90 crore Provided 4. Proposed for ROB in lieu of level crossing No.40 between CIB & TIB Sattenapalli–Reddigudem with the cost of ` 22.79 crore. Guntur CIB & TIB `98 lakh In Progress 5. Proposed for ROB in lieu of level crossing No.14 between Replacement RAIL DEVELOPMENTAL WORKS Nambur–Mangalagiri with an estimated cost of ` 26.66 crore. Tenali Signages `5 lakh Provided 12 Stations Wi‐Fi Facility `20 lakh Provided Tenali 15 CCTV Cameras `0.27 crore Installed Guntur Parliamentary Constituency Jurisdiction Road Under Bridge Guntur 60 CCTV Cameras `1.56 crore Provided 1. Proposed for construction of Road Under Bridge in lieu of Guntur Lift `0.5 crore Provided level crossing No.312 in Guntur‐Nallapadu with an Infrastructural Development Guntur 3 WVMs ‐‐‐ Provided estimated cost of ` 15.65 crore ‐ Alignment to be finalised Tenali 4 WVMs ‐‐‐ Provided New Railway Line Works by State Govt. Tenali 3 ATVMs `6 lakh Provided 1. Proposed new Railway line between Vijayawada ‐ Guntur Via.Amaravathi for a distance of 106 Km is being executed in 3 2. Subway in lieu of Manned Level Crossing no. 296 between Nidubrolu 1 ATVM ‐‐‐ Provided sections viz., Errupalem‐Namburu (57 Km), Amaravathi‐Peddakurupadu (24 Km) and Sattenapalli‐Narasaraopeta (25 Km). The Stations in Nallapadu – Guntur CoTVM `9 lakh Provided estimated cost of the project is `2680 crore. Nandyal section with an estimated cost of ` 2.49 crore is Tenali CoTVM ‐‐‐ Provided Doubling Railway Line Works completed. Guntur DiGiPAY Station ‐‐‐ Enabled 3. Subway in lieu of Manned Level Crossing no. 294 between 1. Doubling with electrification of Guntur ‐ Tenali section for a distance of 25 Km is completed and commissioned. The cost of the Guntur Adarsh Station `2 crore Developed project is `197 crore. Nudurupadu – Satulur Stations in Nallapadu – Nandyal New Guntur Adarsh Station `30 lakh Developed section with an estimated cost of ` 2.49 crore is under 2. Doubling project from Guntur to Guntakal for a distance of 401 Km at an anticipated cost of `3631 crore is in progress. As part Guntur Concrete Apron `3 crore Provided progress. of the project, the sections of Pendekallu‐Dhone & Guntur‐Satulur for a distance of 55.89 Km are in fast progress. Tenali Concrete Apron `4.24 crore Provided 4. Proposed subway in lieu of Manned Level Crossing no. 237 3. Third Railway line work from Vijayawada to for a distance of 288 Km is in progress with an anticipated cost of `3246 Sangamjagarlamudi New Crossing Stn `3.69 crore Developed between SGM Jagarlamudi – Vejandla Stations in Tenali – crore. Nallapadu Adarsh Station `72 lakh Developed Guntur section with an estimated cost of ` 2.48 crore. Electrification Works Guntur New Stn Bldg `3.53 crore In Progress 5. Proposed subway in lieu of Manned Level Crossing no. 254 1. Electrification from Guntur to Guntakal for a distance of 426 Route Km is completed at a cost of `432 crore Guntur 6 Lifts `3 crore In Progress between Tenali – Stations in Tenali ‐ Repalle 2. Electrification from Pagidipalli to Nallapadu for a distance of 285 Route Km at the cost of `296 crore is completed Guntur 6 ATVMs `9 lakh Provided section with an estimated cost of ` 2.48 crore. 3. Proposed for electrification of Tenali‐Repalle for a distance of 34 Route Km at a cost of `26 crore Mangalagiri 2 ATVMs `3 lakh Provided 6. Proposed subway in lieu of Manned Level Crossing no. 309 Guntur Improved ‐‐‐ Provided between Nallapadu – Perecherla Stations in Nallapadu ‐ Tenali Illumination Nandyal section with an estimated cost of ` 2.49 crore. Krishna Canal Toilets `11 lakh In Progress 7. All unmanned level crossing gates in Guntur Parliamentary Guntur Station Building `1.66 crore Proposed Capacity Enhancement Constituency Jurisdiction are eliminated through Siripuram Station Building `0.33 crore Proposed Construction of RUB/LHS/Manning/closure 1. Intermediate Block Signal is being installed at Peddavadlapudi ‐ Krishna Canal with the cost of Rs 1.92 Cr and is Phirangipuram Station Building `0.33 crore Proposed targeted for completion before March’19. Tenali, Platform 2. Proposed for Intermediate Block signal between Guntur–Nallapadu with estimated cost of Rs 2.657 Cr. & Guntur Construction / Ext. `2.56 crore Completed 3. Proposed for Intermediate Block signal between Namburu –Mangalagiri with estimated cost of Rs 3.263 Cr. Guntur & Mangalagiri Platform Construction / Ext. `2.33 crore In Progress 4. As a part of pit line improvement Additional CAMTECH design pitlines (5.60 m) at Guntur station with the cost of Rs.6.73 Cr is Mangalagiri, completed. Bandarupalli, Platform 5. As a part of Yard remodeling Extention of shunting neck towards BDPL at Nallapadu is completed. Mandapadu, Duggirala, Construction / Ext. `9.81 crore Proposed & 6. As a part of Yard remodeling Development of loading/unloading platform including its approach road at Perecherla Nidubrolu for Road No.3 at Perecherla station is completed with the cost of Rs.29 . Nidubrolu, , Circulating Area 7. As a part of yard remodelling provision of Longer loop at Nidubrolu in Vijayawada ‐ Gudur section (295 km) with the Mangalagiri, Nambur Development `0.35 crore Completed cost of Rs.10 Cr is under progress and is targeted for completion before March 2019 Guntur Cover over Platform `1.95 crore In Progress PF‐1, 2 & 3, 6 & 7