Acronyms and Abbreviations
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2009-64
Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2009-64 Amtrak (ATK) Fairbury, NE December 9, 2009 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2009-64 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. Amtrak [ATK ] ATK 114102 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident No. N/A N/A N/A 3.Name of Railroad Operating Train #3 3a. Alphabetic Code 3b. Railroad Accident/Incident No. N/A N/A N/A 4.Name of Railroad Responsible for Track Maintenance: 4a. Alphabetic Code 4b. Railroad Accident/Incident No. Norfolk Southern Corp. [NS ] NS 114102 5. U.S. DOT_AAR Grade Crossing Identification Number 6. Date of Accident/Incident 7. Time of Accident/Incident 735236Y Month 12 Day 09 Year 2009 05:18: AM PM 8. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other Code (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 07 9. Cars Carrying 10. HAZMAT Cars 11. -
Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-94
Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-94 Canadian Pacific (CP) River JCT, MN December 17, 2008 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2008-94 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. SOO Line RR Co. [SOO ] SOO 209549 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident No. SOO Line RR Co. [SOO ] SOO 209549 3.Name of Railroad Operating Train #3 3a. Alphabetic Code 3b. Railroad Accident/Incident No. N/A N/A N/A 4.Name of Railroad Responsible for Track Maintenance: 4a. Alphabetic Code 4b. Railroad Accident/Incident No. SOO Line RR Co. [SOO ] SOO 209549 5. U.S. DOT_AAR Grade Crossing Identification Number 6. Date of Accident/Incident 7. Time of Accident/Incident Month 12 Day 17 Year 2008 04:48:00 AM PM 8. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other Code (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 04 9. -
NTSB Hearing Jeff Young Asst
NTSB Hearing Jeff Young Asst. Vice President – Transportation Systems March 4, 2009 1 Topics to Address • Current Train Control Systems • Concerns with Existing Systems • How does PTC Address Concerns with Existing Systems • UP PTC Pilot Locations • PTC Challenges • PTC Implementation Plan • PTC Project Timeline 2 Dark Territory Track Warrant Control Track Warrant Authority Limits AMTK • Main Track Not Signaled • Movement Authority Conveyed By Track Warrant or Direct Traffic Control permit •2. [X] Proceed From (Station or Location) To (Station or Location) On Main Track Spokane Subdivision •8. [X] Hold Main Track At Last Named Point • Train separation provided by train dispatcher and train crew 3 Automatic Block System (ABS) Track Warrant Control Track Warrant Authority Limits AMTK • Main Track Signaled for Movement in Both Directions • Movement Authority Conveyed By Track Warrant or Direct Traffic Control permit •2. [X] Proceed From ( Station or Location) To ( Station or Location ) On Main Track Spokane Subdivision •8. [X] Hold Main Track At Last Named Point • Train separation provided by train dispatcher, train crew and signal system 4 Automatic Block Signal (ABS) Current Of Traffic Field Signal Indication • Two Main tracks with an assigned direction of movement • Movement authority is conveyed by signal system • The tracks are only signaled for movement in the assigned direction • Train separation provided by train crew and signal system 5 Centralized Traffic Control (CTC) Field Signal Indication • One or More Main Tracks Signaled -
UPRR - General Code of Operating Rules
Union Pacific Rules UPRR - General Code of Operating Rules Seventh Edition Effective April 1, 2020 Includes Updates as of September 28, 2021 PB-20280 1.0: GENERAL RESPONSIBILITIES 2.0: RAILROAD RADIO AND COMMUNICATION RULES 3.0: Section Reserved 4.0: TIMETABLES 5.0: SIGNALS AND THEIR USE 6.0: MOVEMENT OF TRAINS AND ENGINES 7.0: SWITCHING 8.0: SWITCHES 9.0: BLOCK SYSTEM RULES 10.0: RULES APPLICABLE ONLY IN CENTRALIZED TRAFFIC CONTROL (CTC) 11.0: RULES APPLICABLE IN ACS, ATC AND ATS TERRITORIES 12.0: RULES APPLICABLE ONLY IN AUTOMATIC TRAIN STOP SYSTEM (ATS) TERRITORY 13.0: RULES APPLICABLE ONLY IN AUTOMATIC CAB SIGNAL SYSTEM (ACS) TERRITORY 14.0: RULES APPLICABLE ONLY WITHIN TRACK WARRANT CONTROL (TWC) LIMITS 15.0: TRACK BULLETIN RULES 16.0: RULES APPLICABLE ONLY IN DIRECT TRAFFIC CONTROL (DTC) LIMITS 17.0: RULES APPLICABLE ONLY IN AUTOMATIC TRAIN CONTROL (ATC) TERRITORY 18.0: RULES APPLICABLE ONLY IN POSITIVE TRAIN CONTROL (PTC) TERRITORY GLOSSARY: Glossary For business purposes only. Unauthorized access, use, distribution, or modification of Union Pacific computer systems or their content is prohibited by law. Union Pacific Rules UPRR - General Code of Operating Rules 1.0: GENERAL RESPONSIBILITIES 1.1: Safety 1.1.1: Maintaining a Safe Course 1.1.2: Alert and Attentive 1.1.3: Accidents, Injuries, and Defects 1.1.4: Condition of Equipment and Tools 1.2: Personal Injuries and Accidents 1.2.1: Care for Injured 1.2.2: Witnesses 1.2.3: Equipment Inspection 1.2.4: Mechanical Inspection 1.2.5: Reporting 1.2.6: Statements 1.2.7: Furnishing Information -
Ortungsanforderungen Und Ortungsmöglichkeiten Bei Sekundärbahnen
Fakultät Verkehrswissenschaften „Friedrich List“ Professur für Verkehrssicherungstechnik Diplomarbeit Ortungsanforderungen und Ortungsmöglichkeiten bei Sekundärbahnen eingereicht von Fabian Kirschbauer geb. am 21.01.1991 in Straubing Prüfer: Prof. Dr.-Ing. Jochen Trinckauf Dr.-Ing. Ulrich Maschek Betreuer: Dr.-Ing. Michael Kunze (CERSS) Dipl.-Ing. Martin Sommer (CERSS) Dresden, den 15. Juli 2016 .......................................... Unterschrift des Studenten Autorenreferat Autorenreferat Die Sicherung von Zugfahrten erfolgt bei Eisenbahnen durch verschiedene Systeme der Sicherungstechnik. Die Ausrüstungsstandards, und damit auch die Ortungslösungen, orientieren sich an den Bedürfnissen des Kernnetzes und sind auf Bahnen untergeordne- ter Bedeutung, sog. Sekundärbahnen, hauptsächlich aus wirtschaftlichen Gründen nicht tragfähig. Steigende Anforderungen an die Sicherheit und der weiter zunehmende Kos- tendruck werden für diese Bahnen eine Ablösung der bisherigen Betriebsweise mit Hil- fe neuer technischer Möglichkeiten erfordern. Die vorliegende Arbeit soll Anforderun- gen an Ortungslösungen für Sekundärbahnen auf Grundlage bereits bestehender Umset- zungen identifizieren. Die Ergebnisse sollen die Basis für eine bedarfsgerechte Weiter- entwicklung bisheriger Techniken zur Sicherung von Zugfahrten auf Sekundärbahnen bilden. Bibliografischer Nachweis Fabian Kirschbauer Ortungsanforderungen und Ortungsmöglichkeiten bei Sekundärbahnen Technische Universität Dresden, Fakultät Verkehrswissenschaften „Friedrich List“, Professur für Verkehrssicherungstechnik -
Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-19
Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-19 New Orleans Public Belt RR (NOPB) New Orleans, LA February 12, 2008 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2008-19 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. New Orleans Public Belt RR [NOPB] NOPB P8576 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident No. New Orleans Public Belt RR [NOPB] NOPB P8576 3.Name of Railroad Operating Train #3 3a. Alphabetic Code 3b. Railroad Accident/Incident No. N/A N/A N/A 4.Name of Railroad Responsible for Track Maintenance: 4a. Alphabetic Code 4b. Railroad Accident/Incident No. New Orleans Public Belt RR [NOPB] NOPB P8576 5. U.S. DOT_AAR Grade Crossing Identification Number 6. Date of Accident/Incident 7. Time of Accident/Incident 464686V Month 02 Day 12 Year 2008 07:43:13 AM PM 8. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other Code (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. -
Signaling Your Layout Brian Keay ([email protected])
Signaling Your Layout Brian Keay ([email protected]) CAN THESE SIGNALS WORK LIKE THE REAL HOW DO I GO ABOUT ONES? SETTING UP SIGNALS WOW! THE YELLOW ONES ON MY LAYOUT? LOOK AT ALL THE LOOK REAL! DIFFERENT TYPES OF SIGNALS! YIKES!!! COST?!! DO I HAVE TO TAKE OUT A SECOND MORTGAGE ON MY HOUSE? WHERE CAN I BUY CANADIAN LOOKING SIGNALS? Signaling Your Layout Brian Keay ([email protected]) Topics Include: 1. Prototype Signals; 2. Prototype Signal Systems; 3. How signaling systems work; 4. Signaling the WLX; 5. Signals in Action; 6. Dispatching from a computer screen; 7. Cost; 8. Questions. Signaling Your Layout References a) Railroad Modeling University: http://www.rr-cirkits.com/Clinics/Clinics.html b) North American Signaling: http://www.lundsten.dk/us_signaling/index.html c) Useful signal websites: http://broadway.pennsyrr.com/Rail/Signal/learning_the_aspects.html http://www.sh1.org/eisenbahn/sac.htm http://www.alkrug.vcn.com/rrfacts/signals/signals.htm d) Railway Signal: http://regle105.quebectrain.com/# e) History, Signaling and engineering http://mysite.du.edu/~jcalvert/railway/railhom.htm#ssec f) Canadian Rail Operating Rules (CROR) – Dec 26, 2013 https://www.tc.gc.ca/media/documents/railsafety/TC-O-0167-english.pdf Signaling Videos Signaling Videos a) 1948: https://www.youtube.com/watch?v=d2jbS0cpq8s https://www.youtube.com/watch?v=3Sow8O1_ZNA Track warrants, highballs, semaphores, interlocking towers, etc. b) British Rail Signals and Track Warrant Methods: https://www.youtube.com/watch?v=qpYkuBvmmak c) How to Read Canadian Railroad -
A PROACTIVE APPROACH to TRAIN CONTROL a Dissertation
A PROACTIVE APPROACH TO TRAIN CONTROL A Dissertation Submitted to The Temple University Graduate Board In Partial Fulfillment of the Requirements for the Degree DOCTOR OF PHILOSOPHY By David F. Thurston May, 2012 Examining Committee Members: Dr. Joseph Picone – Examining Committee Chair Dr. Iyad Obied, Electrical and Computer Engineering Dr. Saroj Biswas, Electrical and Computer Engineering Dr. Christopher Barkan, Railroad Engineering Department – University of Illinois Dr. Vallorie Peridier, Mechanical Engineering – External Examiner © By David Thurston 2012 All rights reserved ii ABSTRACT A PROACTIVE APPROACH TO TRAIN CONTROL By David F. Thurston Doctor of Philosophy Temple University, 2012 Major Advisor: Dr. Iyad Obeid The main objective in optimizing train control is to eliminate the waste associated with classical design where train separation is determined through the use of “worst case” assumptions to calculate Safe Braking Distances that are invariant to the system. In fact, the worst case approach has been in place since the beginning of train control systems. Worst case takes the most conservative approach to the determination of train stopping distance, which is the basis for design and capacity of all train control systems. This leads to stopping distances that could be far more than actually required under the circumstances at the time the train is attempting to brake. A new train control system is proposed that utilizes information about the train and the conditions ahead to optimize and minimize the Safe Braking Distance. Two methods are proposed to reduce safe braking distance while maintaining an appropriate level of safety for the system. The first introduces a statistical method that quantifies a braking distance with various hazards levels and picks a level that meets the safety iii criteria of the system. -
Copyrighted Material
Subject Index ACC, see Adaptive Cruise Control reliable, 70 evaluation repetitive, 69 communication failure, 216 coexistence, 266 controller, 217 compliance, 107 sensor robustness, 216 CSMA, 66, 240 ADA, see Advanced Driver Assistance DHCP, 76 cooperative FTP, 163 ACC controller, 224 geocast, 12, 15, 17, 18, 20, 78 safety margin, 177 geographical addressing, 185 SUMMITS, 208 HTTP, 163 IEEE 1609.0, 159 Balise, see also European Train Control IEEE 1609.1, 158, 174 System, 84 IEEE 1609.2, 106, 109, 159, 174 IEEE 1609.3, 159, 174 CDN, see Content Distribution Network, 265 IEEE 1609.4, 62, 65, 159, 174 Collision avoidance IEEE 1609.5, 159 Adaptive Cruise Control, 217, 218 IEEE 802.11p, 240 cooperative, 119, 150 IEEE 802.11 Positive Train Control, 135 SyncScan, 237 Communication ACK, 233 application basic access procedure, 233 voice communication, 33 DeuceScan, 238 public safety DIFS, 233 failure, 33 http://www.pbookshop.comfast handover support, 228, 231–238, first responder, 30 240 GPS, 31 OpportunisticScanning, 238 history, 30–31 Post Transmission Backoff, see PTB inter-agency, 33 PTB, 233 9/11, 31, 33 COPYRIGHTED MATERIALTBTT, 233, 237 Wi-Fi locator, 31 TSF, 232 traffic class IEEE 802.11n, 178 WiMAX, 184 IGMP, 194 Communication protocol IP, 18, 155, 163, 266 anonymous gossip, 70 IPv6, 175, 186–187 Application Sub Layer, 162 6lowpan, 197 ARIB STD-T88, 162 uIPv6, 197 automotive message set, 159, 168 ISA-SP100.11a, 196 broadcast, 17, 18, 66, 85, 88, 158, 180, MANET, 65, 76 220 MEXT, 176 Vehicular Networking Edited by Marc Emmelmann, Bernd Bochow, -
C3RS Transportation Report Form
DO NOT REPORT TRAIN ACCIDENTS OR CRIMINAL ACTIVITIES ON THIS FORM. ACCIDENTS AND CRIMINAL ACTIVITIES ARE NOT INCLUDED IN THE C3RS PROGRAM AND SHOULD NOT BE SUBMITTED TO NASA. ALL IDENTITIES CONTAINED IN THIS REPORT WILL BE REMOVED TO ASSURE COMPLETE REPORTER ANONYMITY. IDENTIFICATION STRIP: Please fill in all blanks to ensure return of ID strip to you. (SPACE BELOW RESERVED FOR NASA DATE/TIME STAMP) NO RECORD WILL BE KEPT OF YOUR IDENTITY. TYPE OF EVENT/SITUATION ___________________________________________ INVOLVED CO-WORKERS _____________________________________________ ____________________________________________________________________ EVENT LOCATION TELEPHONE NUMBERS where we may reach you for further details of this occurrence Subdivision ___________________________________ PRIMARY Area ______ No. ________________ Hours ____________ O H O M O W Facility ____________________________________ ALTERNATE Area ______ No. ________________ Hours ____________ O H O M O W Milepost _____________ State _______________ NAME _________________________________________________________ Nearest Station _______________________________ ADDRESS ______________________________________________________ CARRIER RAILROAD ________________________ ______________________________________________________________ DATE OF OCCURRENCE ______________________ (MM/DD/YYYY) CITY __________________________ STATE _______ ZIP ______________ LOCAL TIME (24 hr. clock) ____________________ (HH:MM) PLEASE FILL IN APPROPRIATE SPACES AND CHECK ALL ITEMS WHICH APPLY TO THIS EVENT -
Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2005-106 Norfolk Souther
Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2005-106 Norfolk Southern (NS) Canton, Ohio December 6, 2005 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2005-106 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. Norfolk Southern Corp. [NS ] NS 023235 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident N/A N/A N/A 3.Name of Railroad Responsible for Track Maintenance: 3a. Alphabetic Code 3b. Railroad Accident/Incident No. Norfolk Southern Corp. [NS ] NS 023235 4. U.S. DOT_AAR Grade Crossing Identification Number 5. Date of Accident/Incident 6. Time of Accident/Incident Month Day Year 12 06 2005 11:15:00 AM PM 7. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 08 8. Cars Carrying 9. HAZMAT Cars 10. Cars Releasing 11. People 12. Division HAZMAT Damaged/Derailed HAZMAT Evacuated 1 0 0 0 Pittsburgh 13. Nearest City/Town 14. -
Design and Analysis of Optimization Algorithms for Railway Traffic Control System
International Conference on Interllectual Property Rights, 20/02/2021 Design and Analysis of Optimization Algorithms for Railway Traffic Control System Muhammed Yaseen1, Nabeel Latheef2, Dr. Dhanya Job3 1U.G.Scholar Department Of Computer Science, Santhigiri College of Computer Sciences Vazhithala, [email protected] 2U.G.Scholar Department Of Computer Science, Santhigiri College of Computer Sciences Vazhithala, [email protected] 3Head of Department Department Of Computer Science, Santhigiri College of Computer Sciences Vazhithala, [email protected] Abstract- An optimization algorithm is a procedure which is executed iteratively by comparing various solutions till an optimum or satisfactory solution is found. Trains moving on the opposite directions on the same trach cannot pass each other without special infrastructure such as sliding and switches that allow one of the trains to move out of the way. Railway traffic control system optimization is carried out to avoid traffic congestion on the railways and to ensure timely travel of passengers and delivery of goods on time. There are many types of traffic control systems available today. Centralized Traffic Control (CTC) and Total Traffic Control System (TTC, PTC, PRC, ARC) are the most widely used techniques today. Centralized Traffic Control Device monitors the trains in the line sections from a central traffic control point to control all the trains at once. The operational status is displayed in real time, enabling accurate decisions and prompt instructions to be made at times of timetable disruptions so that normal operations can be resumed as soon as possible. The Total Traffic Control Systems automates the regular route control of trains according to the timetable and the distribution of passenger information in order to simplify traffic control operations.