One River, Many Interests Living Lahn Thinking Together, Acting Together Lila – Living Lahn 2015–2025 More

Total Page:16

File Type:pdf, Size:1020Kb

One River, Many Interests Living Lahn Thinking Together, Acting Together Lila – Living Lahn 2015–2025 More Living Lahn Hessisches Ministerium LiLa – Living Lahn 2015–2025 The Lahn Concept für Umwelt, Klimaschutz, Landwirtschaft und An active dialogue to shape A multi-level task Verbraucherschutz An integrated EU-LIFE-Project for concrete the future of the Lahn measures and new perspectives One of the project’s main Tourism/ As rivers do not stick to to borders, diffe- Agriculture and Leisure Living Lahn – measures is the deve- Forestry Water Management rent public authorities like the German lopment of a concept Nature Traffi c/ Federal level and the Federal States of one river, many concerning the future conserva on Shipping Hessen and Rhineland-Palatinate are interests development of the Spa al working together within the project to Ci zens Lahn. This includes planning enhance the river and the quality of life Concepts and measures the use of the river Lahn along the Lahn. for a region worth living Energy Economy Within this project the German Federal as federal water- Coordinating beneficiary level and the Federal States of Hesse and way as well as the Anglers/ • Hessian Ministry for the Environment, numerous other utili- Cultural heritage Fishing Climate Protection, Agriculture and Rhineland-Palatinate are working together sations, the ecological Municipal planning ... and many more! Consumer Protection (HMUKLV) to develop and implement measures Associated beneficiaries upgrading and the flood that will enhance the ecological health • Governmental Authority of Gießen (RPGI) and connectivity of the river itself while control. • Ministry of the Environment, Energy, Nutrition and Forestry of Rhineland- simultaneously enriching the quality of The so-called ‘Lahn concept’ is being Palatinate (MUEEF) life along the river. The project is a contri- developed by the Waterways and Shipping • Directorate for Infrastructure and Approval bution for a sustainable future-orientated Office Koblenz in cooperation with all North (SGD Nord) development of the region. In order to • German Federal Institute of Hydrology (BfG) project partners and by carrying out an achieve these objects, various types of • Waterways and Shipping Office Koblenz activities as well as an overall concept active dialogue with stakeholders, (WSA Koblenz) administrations, citizens and other will be developed and implemented until representatives of the region. the year 2025. Hessisches Ministerium für Umwelt, Klimaschutz, Landwirtschaft und Verbraucherschutz More quality of life Thinking together, acting together along the Lahn How you can inform yourself Ecological improvements and get involved for the benefit of all Additional information can be found on The Lahn being shaped by many weirs Editor: Funded by the EU within the the project website: Hessian Ministry for the Environment, Climate Protection, framework of the EU-LIFE- along its course, one of the concrete mea- Agriculture and Consumer Protection (HMUKLV) Project: LiLa – Living Lahn Mainzer Straße 80, 65189 Wiesbaden River – one river, many sures to ecologically enhance the river is www.lila-livinglahn.de interests LIFE 14 IPE/DE/022 to restore the linear patency for fish and You can also become involved by joining to increase its structural diversity. This workshops, public events and surveys, does not only directly improve the water- tours and the “Lahn fairs”. bound habitats of numerous animal and plant species, but also creates opportuni- ties for hiking, cycling and water sports. Last update: 10/2017; Concept and design: www.nkomm.eu; Picture credits: Thomas Max Müller / pixelio.de: Title, p.1 + 2 up., Andreas Hartl (p.1, grayling), Others: RP Giessen, HMUKLV, WSA Koblenz, BfG Koblenz, WSA RP Giessen, HMUKLV, Others: Hartl (p.1, grayling), p.1 + 2 up., Andreas Title, Müller / pixelio.de: Thomas Max credits: Picture and design: www.nkomm.eu; 10/2017; Concept update: Last Project area Overview of the measures Many measures for the river Lahn From the Upper Lahn valley to the Protection measures for the population and its region mouth of the Lahn of grayling and gib North Rhine-Westphalia Period: 2016–2023 Investigation of the stock and habitat of grayling and gib; Prevention and combating Reintroduction of a regional gib of invasive species population Period: 2016–2020 Concept for preventing the spread of in- Hessia vasive plant species; „Gisselberger Spanne” Control measures in the rivers Perf and „Heuchelheimer Banane“ Kerkerbach and two renaturation areas Period: 2016–2017 Period: 2016–2017 Implementation of structural Connection of spawning waters improvements south of Marburg to the Lahn Ulmbach weir Information platform Weststadt Giessen Period: 2019–2022 Period: 2017 Restoration of the linear patency for fish Structural diversification of Installation of an information panel and PCB- and dioxin contamination and microbes at the weir in Ulmbach weir regulated river sections a telescope next to the re-naturalized The project area extends from Wallau in of the Gelbach Period: 2017–2021 areas in the western part of Gießen Period: 2017–2021 Concept to ecologically enhance weir the Upper Lahn valley down to Lahnstein, regulated river sections of the Lahn; Investigation on the origin of the con- Lahn-window Gießen where the Lahn flows into the Rhein. tamination, Evaluation of the results and Implementation of the measures at Period: 2016 the development of possible measures two weirs The measures foreseen will be imple- and their implementation including all Extension of the information offer at mented within a period of 10 years. parties concerned Transfer facility Limburg the Lahnfenster in the city of Gießen, Period: 2018–2020 Installation of a digital device to record They include for example the ecological Rhineland-Palatinate Reconstruction of the buildings that help the amount of fish upgrading of the lock island of Fürfurt, rowers and canoeists pass the weir an improvement of habitat conditions for Lahn meadow between Atzbach Lock island of Fürfurt and Heuchelheim migratory fish and also an optimization of Period: 2016–2022 Transfer facility Ahl Period: 2020–2023 the portage sites for rowers and canoeists Period: 2016–2018 Ecologically enhancement of the lock Structural improvements within the bird island in Fürfurt, Restoration of the linear reserve Lahnaue (Alluvial forest etc.) as well as the further equipment of the Reconstruction of the buildings that help patency and Improvement of the land- information offer at the “Lahnfenster” rowers and canoeists pass the weir scape diversity in Gießen. Reducing the risk of flooding Period: 2017/2018 Lahn Concept Fish Sluicing Lahnstein Period: 2016–2025 Period: 2016–2025 Additional retention areas next to the rivers Palmbach and Aar to reduce the Development concept for the future use LIFE – the EU’s environmental Fish sluicing management at the risk of flooding in Diez and the and maintenance of the Lahn, taking all barrage Lahnstein, creation of an surrounding area stakeholders and the public into account. funding programme additional facility for migratory fish The concept serving as blueprint for over the weir (temporary solution). Linear patency of backwaters other federal waterways of the same Period: 2016–2025 The project Lila – Living Lahn is funded by the EU’s environmental category. funding programme LIFE. This programme is the funding instrument Hessia of the EU Commission to support environmental action and projects throughout the European Union, as well as in specific neighbouring and candidate countries. Sediment management concept and monitoring Structural improvement of the river bank Turbine management system Ecological patency of the Lahn Period: 2016–2025 Period: 2017–2020 Period: 2017–2022 Period: 2016–2025 The specialty about integrated projects (IP) is that environmental LIFE 14 IPE/DE/022 Analysis of the current sediment quality Several small de-construction measures Eel protecting turbine concept for Studies and support for the WSV to and climate plans or strategies are implemented beyond administra- and creation of a cadaster as a basis for are carried out, like the removal of the hydroelectric power stations restore the linear patency of the Lahn tive borders at transnational level and on a large territorial scale, the development of a sediment manage- solid bank shorings and the strengthening ment concept and a simultaneous of alluvial forests while including the different stakeholders. monitoring.
Recommended publications
  • Chalet Valletta
    YOUR ALPINE RETREAT Personal copy for Andermatt fascinated me from the beginning. The rich On the sunny and tranquil banks of the River Reuss, over- history of this mountain village in the heart of Switzerland looking the impressive Urseren valley and only a few min- coupled with the charm and tranquillity of the region cre- utes’ walk from the village centre of Andermatt, your be- ated a very special appeal for me. spoke home will come to life. With the full exemption from the Lex Koller law, the opportunity as a non-Swiss The untouched natural beauty of this Alpine area is ex- citizen to purchase your chalet without any restrictions on tremely diverse. Not only the fantastic views, extensive buying or further reselling before 2030 becomes extreme- walking trails, numerous lakes and streams with pure ly attractive. Andermatt Swiss Alps will exceed all expecta- water quality, but also the beautiful flora and fauna give tions ensuring your very own “home away from home” the region an unparalleled attraction. With the expansion dream comes true. and modernization of the ski area, the new 18-hole golf course and many more leisure and entertainment options, Allow the following pages to inspire you as you envisage the picturesque mountain village is being transformed your personal chalet retreat in the Alps. Take time to im- into an attractive year-round destination. It’s the perfect merse yourself in a world that possibly lies much closer place to realise the chalet of your dreams. than you think. Samih Sawiris 1 2 primary source GERMANY Too good to be true? On the contrary: Andermatt’s post- Thanks to the exceptional location in the heart of Switzer- In the direcon of Munich card panorama is absolutely genuine.
    [Show full text]
  • Teilbearbeitungsgebiet 35 - Pfinz - Saalbach - Kraichbach
    Begleitdokumentation zum Bearbeitungsgebiet Oberrhein (BW) Teilbearbeitungsgebiet 35 - Pfinz - Saalbach - Kraichbach - Umsetzung der EG-Wasserrahmenrichtlinie (2000/60/EG) Stand: Dezember 2015 BEARBEITUNG Regierungspräsidium Karlsruhe Referat 52 Gewässer und Boden Markgrafenstr. 46 76247 Karlsruhe www.rp-karlsruhe.de unter fachlicher Beteiligung der Landratsämter Enzkreis, Karlsruhe, Rhein-Neckar-Kreis und der Stadtkreise Heidelberg, Karlsruhe, Mannheim und Pforzheim sowie unter Mitwirkung des Ministeriums für Umwelt, Klima und Energiewirtschaft Baden-Württemberg und der Landesanstalt für Umwelt, Messungen und Naturschutz Baden-Württemberg STAND Dezember 2015 2 Begleitdokumentation BG Oberrhein TBG 35 INHALTSVERZEICHNIS Einführung ............................................................................................................................. 5 Grundlagen und Ziele der Wasserrahmenrichtlinie ............................................................ 5 Gebietskulisse und Planungsebenen in Baden-Württemberg ............................................. 5 Vorgehensweise und Erarbeitungsprozess ........................................................................ 6 Information und Beteiligung der Öffentlichkeit .................................................................... 7 Aufbau und Zielsetzung des Begleitdokuments .................................................................. 7 1 Allgemeine Beschreibung ............................................................................................... 8 1.1 Oberflächengewässer
    [Show full text]
  • Collected Sequence of the Rhine and Nahe Terraces at Bingen
    Results of recent Terrace Research in the Middle Rhine Valley Fig. 1.: Downstream Correlation Diagram of River-Terraces in the Lower Nahe & Upper Middle Rhine Valley. Fig. 2 & Tab. 1: Collected Sequence of the Rhine and Nahe Terraces at Bingen-Trechtingshausen Downstream Correlation Diagram of River Terraces in the Lower Nahe & Upper Middle Rhine Valley correlated with Pollen Records and Marine Isotope Stages. Collected Terrace- MIS Elevation of Assumed Difference Incision at Lower Nahe Valley Upper Middle Rhine Valley Lower Lahn Valley Age Palaeomagnetic Marine Isotope Stages (MIS) Mean Temp.°C Sequence Base NW-European Age labels Terr. Base Mean in Age Collected 18 Nahe / Rhein LowerGÖRG Nahe(1984) Valley Upper PMiddleREUSS, BURGER & SRhineIEGLER (2015) Valley Lower ALahnNDRES & SEWERING Valley(1983); (Ma) Record (Ma) (δ OOcean‰) in July (Pollen) (m a.s.l.) Stages (Ma) Nahe / Nahe/Rhine Age Nahe/Rhine Sequence 5 4 0° 10° 20° SEWERING (1993) tRh 11.2 78 Rhine (No.) (m a.s.l.) (Ma) (Ma) Nahe/Rhine GÖRG (1984) PREUSS, BURGER & SIEGLER (2015) ANDRES & SEWERING (1983); 2 tRh 11.1 81 Weichselian (mm/a) 4 tRh 10 84 SEWERING (1993) 6 Eemian tNa 12. 1 75 0,00 0,01 0,30 tRh 9. 90 Saalian tNa 11.2 1-2 78 0,01 0,01 0,30 8 tRh 8.2 94 tNa 11.1 2 81 0,02 0,04 0,08 10 tRh 8.1 101 Holsteinian tNa 10. 4 84 0,06 0,08 0,08 12 tRh 7.4 108 Elsterian tRh 7.3 114 tNa 9. 6 90 0,14 0,11 0,04 Elevation m a.s.l.
    [Show full text]
  • Olympiatauben Mit Züchter 404.Xlsx
    regionareiseVver z-nr ReiseVereinigungen_na S_GSMT_name pr pkt t-nat t-ver t-jahr t-nr t-gescRegionalverbaende_name 404 10 5 6 Gießen Nord Göhler, E.+Th. 3 22640 6680 17 0097 Lahn-Sieg-Dill 404 10 5 6 Gießen Nord Göhler, E.+Th. 3 20314 6680 17 0181 Lahn-Sieg-Dill 404 10 6 11 Gießen Nord Kostka ,Bernhard 3 27048 6914 17 0103 Lahn-Sieg-Dill 404 10 6 11 Gießen Nord Kostka ,Bernhard 3 26817 6914 17 0101 Lahn-Sieg-Dill 404 10 6 11 Gießen Nord Kostka ,Bernhard 3 25402 6914 17 0157 Lahn-Sieg-Dill 404 10 6 11 Gießen Nord Kostka ,Bernhard 3 19550 6914 17 0134 Lahn-Sieg-Dill 404 10 12 3 Gießen Nord Schwarz, Klaus 3 25485 3725 17 0278 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 28582 4695 17 1313 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 28154 4695 17 1326 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 27608 6680 17 0388 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 27589 4695 17 1301 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 27580 4695 17 1374 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 26983 4695 17 1333 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 26748 4695 17 1025 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 26576 6680 17 0333 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 25652 4695 17 1316 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 25494 4695 17 1343 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 24906 4695 17 1321 Lahn-Sieg-Dill 404 10 16 1 Gießen Nord Jochum Benjamin 3 24721 0986 17 0116 Lahn-Sieg-Dill 404
    [Show full text]
  • Marble from the Lahn
    Marble from the Lahn A historical project on the quarrying of stone Quarrying is also part of mining. Stones, chalk, sand and gravel may at first glance seem less valuable, and quarries less interesting. However, these materials were and still are an essential component of our civilization. There would be no flour without millstones, no pottery without clay, no castles without stones, and no modern roads without road metal. This is why the department of mining history also deals with this important industry. Following on from the work of Christoph Bartels (slate villages) and Meinrad Pohl (millstones, tuff and trass from the volcanic eastern Eifel region), the plan is to investigate a further example from the industry within the framework of a dissertation project. This time the focus is on a type of stone which was used for building and decoration, the so-called “Nassau marble” or “Lahn marble”. From a geologist’s point of view this is a cuttable, polishable limestone, formed about 380 million years ago from a tropical reef. The deposits are part of the Rhenish Massif (Rheinisches Schiefergebirge) and extend over a strip approx. 60 km long on both sides of the Lahn. “Lahn marble” was quarried and processed from the 16th century (if not earlier) until the 1970s. Evidence of a highly developed “Lahn marble” industry can be found in a multitude of churches and palaces, public and private buildings, town squares and facades. The spectrum ranges from the mighty tombstones in the Mainz cathedral to the splendid Baroque staircase of the Würzburg Residenz and the sumptuous decoration of some of Wiesbaden’s villas and hotels.
    [Show full text]
  • Bad Schwalbach/An Der
    utloka.03 Samstag, 27. Februar 2021 BAD SCHWALBACH /ANDER AAR 15 AUFEINENBLICK Wegbereiter für die Energiewende Konzerte per Livestream HEIDENROD (red). Konzerte, bis zum Jazz und Percus- Manfred VogelkämpftimRheingau-Taunus an vielen Fronten für Erneuerbare Energien die per Livestream übertra- sion. Geplant sind weiterhin gen werden, sollen ab März mehrereVorträge zu Themen VonHannelore Wiedemann dächer im Kreis mit Fotovol- im gerade eingeweihten Ba- der Natur- und Heimatkunde taikanlagen bestücken. Als rockhaus in Laufenselden und zur Geschichte und Lite- RHEINGAU-TAUNUS. Wenn es Nächstes ist die Wiedbach- stattfinden. Der erste Termin ratur.ImKonzertraum im um dasThema Erneuerbare schule in Bad Schwalbach ist am 20.März. Barockhaus steht ein sehr Energien im Rheingau-Taunus dran, anschließend ist ein Veranstalter sind die Kul- guter Flügel zur Verfügung. geht,taucht seinName immer Projekt an der Schule in Wall- turvereinigung Heidenrod Das Barockhaus befindet wieder auf: ManfredVogel rabensteingeplant. (KVH) und Hausherr und sich in der Kastellstraße warzehnJahrelang Ge- Ein weiterer Bausteinfür die Kurator GerdRixmann. Die gegenüberder Apotheke.Die schäftsführer des kreiseigenen Energiewende liegtdem Pio- Konzerte sollen Musikern genauen Konzerte und Ter- Energie-Dienstleistungs-Zent- nier in Sachen Erneuerbare aus der Region Auftritte in mine werden rechtzeitig be- rums (edz). Jetzt hat der65- besondersamHerzen: dieGe- Corona-Zeiten ermöglichen kannt gegeben. Der Livestre- Jährige Platz für seinenNach- nossenschaftPro Regionale, und ein Beitrag zum kultu- am wirdkostenlos über die folger gemacht. Sein Engage- deren Aufsichtsrat Vogelfast rellen Leben sein. Website der Kulturvereini- ment fürdie „Erneuerbaren“ zehn Jahrelang angehörte. Im Im ersten Stock des Kultur- gungHeidenrod undYouTo u- endetdamit jedoch nicht. vergangenenJahrhat ihn die hauses befindet sich ein be per Link offeriert.
    [Show full text]
  • Sitzungsunterlagen
    Sitzungsunterlagen Sitzung des Bau- und Wirtschaftsausschusses 06.03.2018 Inhaltsverzeichnis Sitzungsdokumente 5 Tagesordnung (ö) 5 Vorlagendokumente 7 TOP Ö 2.1 Errichtung einer Stahlbeton-Fertiggarage, Flst.Nr. 9113, Fliederstr.4, OT 7 Berghausen Vorlage BV/040/2018 7 TOP Ö 2.2 Umbau eines Lager- und Nebengebäudes mit Umnutzung einer 9 Zwischenebene zu einer Außenterrasse, Flst.Nr. 164/3, Kirchhofstr. 11, OT Söllingen. Vorlage BV/041/2018 9 TOP Ö 2.3 Errichtung einer freistehenden beleuchteten Plakatanschlagtafel, Fl.St. 6161/4, 11 Jöhlinger Straße 57a, OT Berghausen Vorlage BV/042/2018 11 TOP Ö 4 Aufstellung des vorhabenbezogenen Bebauungsplans "Seniorenzentrum und 13 Wohnpark an der Pfinz", OT Berghausen mit Ortschaftsrat Berghausen Vorlage BV/044/2018 13 180221 VbB Berckmüller Areal Pfinztal Vorentwurf BV/044/2018 19 VbB-Berckmüller Areal-Berghausen-004 BV/044/2018 21 01.5 Lageplan 500 Präsentation BV/044/2018 39 01.2 Lageplan 500 Abstandsflächen BV/044/2018 41 01.1 Lageplan 500 BV/044/2018 43 180213 - 5001 Seniorenzentrum und Wohnpark an der Pfinz - Wendehammer Keplerstr 45 BV/044/2018 180213 - 5001 Seniorenzentrum und Wohnpark an der Pfinz - Renderings BV/044/2018 47 Auswertung KA-7524 BV/044/2018 53 1283 ASP Berckmüllerareal Berghausen Entwurf BV/044/2018 57 2017-02-10 Berckmüller-Areal Rahmenplan 1-500 BV/044/2018 73 621-4710-001 2017-12-13 Berckmüller-Areal BV/044/2018 75 TOP Ö 5 Umgestaltung der Wöschbacher Straße (K 3541 zwischen Einmündung 77 Breitenfeldstraße und Lerchenstraße - mit Ortschaftsrat Berghausen Vorlage BV/045/2018 77 Umgestaltung Wöschbacher Straße -Anlagen 1-3 BV/045/2018 79 3 4 PFINZTAL natürlich – liebenswert - modern Sitzung des Bau- und Wirtschaftsausschusses Termin: Dienstag, 06.03.2018, 18:00 Uhr Ort, Raum: Selmnitzsaal (Europaplatz), Karlsruher Straße 84, 76327 Pfinztal (Berghausen) Tagesordnung Öffentlicher Teil 1.
    [Show full text]
  • Der Aar-Höhenweg Hambach Lahn Gückingen
    Abfahrt Görgeshausen B 49 Diez Abfahrt Limburg Nord Der Aar-Höhenweg Hambach Lahn Gückingen 1| Grafenschloß Diez Abfahrt Heistenbach Limburg Süd B 417 Limburg Geschichte Aar Diez 137,063 Langenscheid Birlenbach 2|Burg Ardeck Holzheim Holzheim Brechen Oberbrechen Balduinstein B 417 und Natur hautnah Cramberg Flacht Scheidt B 54 Lahn Niederneisen Selters Oberneisen 3| Rundkirche Oberneisen Lohrheim Heringen Hahnstätten Kirberg Bad Camberg Kaltenholzhausen Schönborn Abfahrt 5| Römerquelle Zollhaus Bad Camberg 4| Naturerlebnispfad Johannis Brunnen Hahnstätten Zollhaus Burgschwalbach 6| Burg und Domäne Hohlenfels 9| Märchenwald Burgschwalbach Schiesheim 8| Burg Schwalbach 7| Schloß Katzenelnbogen Katzenelnbogen Rückershausen B 8 E1 – Europ. Fernwanderweg 10| Antonius-Sprudel Hausen Rückershausen Aarbergen Aar-Höhenweg Kettenbach 11| Walderlebnispfad Panrod Aartalradweg Berndroth B 417 Rettert Michelbach Holzhausen a.d. Haide Abfahrt Idstein Laufenselden Idstein Hohenstein 12| Hofgut Georgenthal B 275 13| Burg Hohenstein Breithardt B 260 14| Limesturm Orlen Ober- Burg Hohenstein Steckenroth seelbach Limes-Wanderweg Orlen Neuhof 16| Aar-Quelle Niedern- Taunusstein hausen Adolfseck 15| Justinus-Felsen Adolfseck Aar Bad Schwalbach Hahn Wehen 17| Pfarrkirche St. Ferrutius Der Aar-Höhenweg Bleidenstadt B 275 19| Schloss Wehen B 54 Infos Hettenhain B 417 Entdecken, erleben & erholen 18| Kurhaus Bad Schwalbach www.taunusstein.de Telefon 06128/241-0 Wiesbaden entlang der Aar www.bad-schwalbach.de Telefon 06124/502-433 o. -434 www.hohenstein-hessen.de
    [Show full text]
  • Radolfzeller
    WOCHENBLATT ONLINE UNTER WWW.WOCHENBLATT.NET RADOLFZELLER WOCHENBLATTUNABHÄNGIGE ZEITUNG FÜR DIE STADT UND DAS UMLAND KFG feierte Grundstein eines Adventskalender Mit 100-jähriges Hauses für die sucht kleine S. 5 Jubiläum S. 3 Gemeinde S. 4 Künstler S. 5 Stein am Rhein 12. OKTOBER 2011 WOCHE 41 RA/AUFLAGE 20.440 GESAMTAUFLAGE 88.175 SCHUTZGEBÜHR 1,20 € Die Stadt beleben helfen »seemaxx« feiert fünfjähriges Jubiläum Radolfzell (mk). Das Factory Outlet neingewachsen und helfe, vor allem Center (FOC) »seemaxx« feiert fünf- den Tagestourismus nach Radolfzell jähriges Jubiläum. Aus diesem An- zu locken – und genau deshalb soll lass sprachen Hesta-Geschäftsführer es auch erweitert werden. Seit 2009 Arnold Kannenberg, Centermanage- laufen die Planungen hierzu, sobald rin Tatjana Münch und Marketinglei- die entsprechenden Verfahren been- terin Stephanie Widmann vorab mit det sind, soll das Projekt angegangen dem WOCHENBLATT über Erreichtes werden. und Geplantes. Um den Erfolg mit den Kunden zu Wie Kannenberg betont, sieht sich teilen, findet am 26. Oktober die Ge- das »seemaxx« als ein Teil des touris- burtstagsfeier mit Late-Night-Shop- tischen und wirtschaftlichen Konzep- ping bis 21 Uhr statt. Mit Kuchen und tes für Radolfzell. Tourismus und Sekt können Besucher auf das Jubi- Wirtschaft müssten in einer Stadt wie läum anstoßen. Ferner werden die DARÜBER SPRICHT MAN Radolfzell Hand in Hand gehen, da- Stores einen einheitlichen Geburts- von ist Kannenberg überzeugt. Das tags-Rabatt von 20 Prozent bieten. FOC sei damit auch nie ein Konkur- Anlässlich des Jubiläums hat die rent zum Einzelhandel gewesen – das Hesta GmbH zum Malwettbewerb ergebe sich schon aus dem unter- aufgerufen. Kinder und Jugendliche schiedlichen Warenangebot – son- sind aufgefordert, das »seemaxx« Ju- dern einer von vielen Anziehungs- biläums-Maskottchen zu malen und punkten der Stadt, die gemeinsam ihr Kunstwerk unter Angabe von Al- Besucher nach Radolfzell locken ter und Anschrift per Post bis spätes- könnten.
    [Show full text]
  • Stocking Measures with Big Salmonids in the Rhine System 2017
    Stocking measures with big salmonids in the Rhine system 2017 Country/Water body Stocking smolt Kind and stage Number Origin Marking equivalent Switzerland Wiese Lp 3500 Petite Camargue B1K3 genetics Rhine Riehenteich Lp 1.000 Petite Camargue K1K2K4K4a genetics Birs Lp 4.000 Petite Camargue K1K2K4K4a genetics Arisdörferbach Lp 1.500 Petite Camargue F1 Wild genetics Hintere Frenke Lp 2.500 Petite Camargue K1K2K4K4a genetics Ergolz Lp 3.500 Petite Camargue K7C1 genetics Fluebach Harbotswil Lp 1.300 Petite Camargue K7C1 genetics Magdenerbach Lp 3.900 Petite Camargue K5 genetics Möhlinbach (Bachtele, Möhlin) Lp 600 Petite Camargue B7B8 genetics Möhlinbach (Möhlin / Zeiningen) Lp 2.000 Petite Camargue B7B8 genetics Möhlinbach (Zuzgen, Hellikon) Lp 3.500 Petite Camargue B7B8 genetics Etzgerbach Lp 4.500 Petite Camargue K5 genetics Rhine Lp 1.000 Petite Camargue B2K6 genetics Old Rhine Lp 2.500 Petite Camargue B2K6 genetics Bachtalbach Lp 1.000 Petite Camargue B2K6 genetics Inland canal Klingnau Lp 1.000 Petite Camargue B2K6 genetics Surb Lp 1.000 Petite Camargue B2K6 genetics Bünz Lp 1.000 Petite Camargue B2K6 genetics Sum 39.300 France L0 269.147 Allier 13457 Rhein (Alt-/Restrhein) L0 142.000 Rhine 7100 La 31.500 Rhine 3150 L0 5.000 Rhine 250 Doller La 21.900 Rhine 2190 L0 2.500 Rhine 125 Thur La 12.000 Rhine 1200 L0 2.500 Rhine 125 Lauch La 5.000 Rhine 500 Fecht und Zuflüsse L0 10.000 Rhine 500 La 39.000 Rhine 3900 L0 4.200 Rhine 210 Ill La 17.500 Rhine 1750 Giessen und Zuflüsse L0 10.000 Rhine 500 La 28.472 Rhine 2847 L0 10.500 Rhine 525
    [Show full text]
  • Sediment Management for a Living River - the Lahn River Case
    Sediment management for a living river - the Lahn River case Alexandra Brinke, Denise Spira, Michael Schleuter, Georg Reifferscheid, Peter Heininger & Ute Feiler Federal Institute of Hydrology, Germany „LiLa - Living Lahn“ SedNet 2017 Genua, .15 JUNE 2017 Starting point for LiLa North Rhine-Westphalia Hesse Rhineland- Palatinate Project Location Lahn River „LiLa - Living Lahn“ SedNet 2017 Genua, .15 JUNE 2017 Starting point for LiLa minor waterway that carries no freight today New National Navigation Concept „LiLa - Living Lahn“ SedNet 2017 Genua, .15 JUNE 2017 Starting point for LiLa Hesse Rhineland- Palatinate Ecological status under WFD ecological status and potential "unsatisfactory" or "bad” „LiLa - Living Lahn“ SedNet 2017 Genua, .15 JUNE 2017 Starting point for LiLa LiLa-Living Lahn “One river, many interests” „LiLa - Living Lahn“ SedNet 2017 Genua, .15 JUNE 2017 Starting point for LiLa Federal Authorities Integrated EU-LIFE-Project Hesse „LiLa-Living Lahn River“ Duration: 10 years (2015 bis 2025) Budget: 15.7 Mio. Euro (EU-Contribution 8.5 Mio. Euro) Rhineland-Palatinate „LiLa - Living Lahn“ SedNet 2017 Genua, .15 JUNE 2017 Main topics in LiLa… Ecological upgrading/ Development concept for Renaturalization measures the Lahn river (WFD and Natura 2000) Cross-administrative collaboration in regional projects „LiLa - Living Lahn“ SedNet 2017 Genua, .15 JUNE 2017 Main topics in LiLa… Ecological upgrading/ Renaturalization measures (WFD and Natura 2000) Ecological upgrading/Renaturalization measures in the context of WFD and Natura
    [Show full text]
  • NIET Teacher Handbook
    NIET Teacher Handbook niet.org EXPLANATION OF TAP’S TEACHING SKILLS, KNOWLEDGE AND RESPONSIBILITIES PERFORMANCE STANDARDS To measure teaching skills, knowledge and responsibilities, TAP has defined a set of professional indicators required of all TAP teachers. A comprehensive rubric has been developed to measure teachers’ performance in each of those indicators. It is essential that all teachers in a TAP school develop an in-depth understanding of teaching expectations as well as how teachers’ performance will be measured using these rubrics. This handbook serves as a guide for teachers implementing the TAP Teaching Standards. Teachers are encouraged to use this handbook as a guide towards understanding and implementing effective instructional practices. This handbook provides numerous examples of what each of these indicators looks and sounds like in the classroom. Understanding the indicators in isolation, however, does not guarantee that teachers will accurately and consistently implement them. Teachers also need to see what each indicator looks like in the context of their instructional practice in order to understand how they are accurately applied. While many instructional strategies may be considered “proven best practices,” it takes a high-quality implementation of these strategies in order for them to have a positive impact on student achievement. In the same way, application of the teaching indicators apart from a specific instructional purpose will not have a positive impact on student achievement. Only when teachers adeptly implement instructional strategies and apply the TAP Teaching Standards will student achievement gains be realized. TAP’s Teaching Skills, Knowledge and Responsibilities Performance Standardsare divided into four domains. Within each domain, performance indicators are listed with bulleted descriptors and a rubric specifying performance levels for measuring actual teacher performance.
    [Show full text]