Lao-Indochina Group Public

Total Page:16

File Type:pdf, Size:1020Kb

Lao-Indochina Group Public J u l y 1 5 , 2 0 1 3 Contact us Investors Update ASEAN Road, Sybounheuang Village, Chanthabuly District, Vientiane Capital, Lao P.D.R. Since the year 2003 I, Sengmali Sengvatthana, start-up a company Lao-Indochina Air Service, this P.O. Box: 7117 involved reserve and sale airline tickets for domestic and international flights. In year 2004 the Tel.: +856-21-262135 Fax: +856-21-265059 company expands its service to including import and export. Items for import and export including Email: [email protected] www.lao-indochina.com vehicles, parts, construction materials, food and drinks, and export agriculture products which are part of the expand services. Commercial & Marketing Department: With the understanding of high demand in China for products such as Tapioca for about 12 million tons Mrs. Sudsada PHAISOUKHA per year plus Laos has the land area good for growing cassava roots, has general labor, and working Tel.:+856-20-22235772 Email: [email protected] with Ministry Industrial and Commerce, Nayobai Bank, Lao Development Bank, and other government agencies, we can promote the plantation area to satisfy the need of such product. Cassava Planting Promotion Department: Our Plantation department is involving in the training of farmers in three less develop districts such as Tel.: +856-21-264598 Hom District, Sangthong District and Borlikanxay District plus other farmers from three provinces. The Tapioca Factory address: three provinces are: Vientiane Capital, Vientiane Province and Borlikhamxay Province. The focus of this 47km 13 South Road, Nasone Village, Pakngeum District, plantation development is the technical of plantation, to increase yield, and the funding for the project. Vientiane Capital, Lao P.D.R. Since 2005, for three years, in the beginning the company purchased dry cassava root for exporting Tel.: +856-21-922002 Fax: +856-21-922005 purpose. There issues were: higher transportation costs – we have no access to the sea also the complexity of purchasing slicing/drying cassava from customers due to the fact of difficulty of storage. With above reasons, the company decided to build tapioca factory – tapioca is easier to take care off. And also, this will increase employment for the local people. The factory began construction in 02/07/2007 at Nashawn Village, Pakngum District, Vientiane Capital. Most machinery is from China which was ready to produce tapioca flour on 19/06/2008. On that day, 19/06/2008, the factory officially opened and commences producing tapioca. The total registered capital of $5.5US millions. Until now we have total register capital of 100 billion kip ($12.5 million) for Lao-Indochina Group Company. Our company used 2+3 method to promote cassava plantation as following: Farmer : support land and labor Company: support land development cost, cassava variety with planting technical and purchase cassava root from farmer. Presently, the company has over 13,000 hectares signed agreements of land with farmers in three provinces. The capacity of the factory is 320 tons per day which represent about 1,000 – 1,200 tons of cassava roots. The company has high demand from China for tapioca. Presently, the company has exceptional result, which is shown in receiving GMP and ISO 9001:2008 standard from England. The product meets and exceeding standard of our customers in and outside the country (particularly China) and number one product in China with respect to Tapioca. The company is also involving environmental issue aspect. The company built 12 water reservoirs which are 250 meters long, 50 meters wide and eight meters deep for the waste water from the plant as part of water treatment before release back to the river. The company also signed an agreement with Bio-Gas Company from Thailand with fund from Finland, to construct Bio-Gas factory to produce bio- gas by the third quarter of 2012. Progress on the Offering Circular: LIG have submitted the Offering Circular on January 31st, 2012 having LXS as the financial advisor. LIG is the first company to submit an offering circular to SECO and is looking forward to be the first private company to be listed on LSX. Indicative T imef rame: LIG is expecting SECO approval soon and planning to launch the IPO shortly after. Prospect Investors: LIG is looking forward to have both domestic and international investors subscribing for the IPO. Use of Proceed: To expand its business, LIG requires an extensive source of fund to finance its growing contractual plantation area, where the capital market will well serve this purpose. Financial Highlight (2008 – 2010): LIG has been audited by Ernst and Young and some of the highlights as follows: Our tapioca sales double from year to year since 2008 In US dollars. LIG track record on its exceptional growth and return in investment. For further information, please contact: Nanthalath Thirakul Investors Relations 856-20-56110372 [email protected] Download LIG Profile ASEAN Road, Sybounheuang Village, Chanthabuly District, Vientiane Capital, Lao P.D.R. P.O. Box: 7117, Tel.: +856-21-262135 , Fax: +856-21-265059 Email: [email protected], www.lao-indochina.com .
Recommended publications
  • Resettlement and Ethnic Development Plan Nam Ngiep 1 Hydropower
    Resettlement and Ethnic Development Plan Project Number: 41924 June 2014 Document Stage: Final Nam Ngiep 1 Hydropower Project (Lao People’s Democratic Republic) Annex A Part 6 Prepared by Nam Ngiep 1 Power Company Ltd. for the Asian Development Bank The final report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Provincial level: Lao People’s Democratic Republic Peace Independence Democracy Unity Prosperity ***************** Minutes of meeting Nam Ngiep 1 Hydropower Project dated 28 April 2008 at Vientiane Province - Based on the announcement of the Head of the Office of the Ministry of Energy and 1 Mines number 453 / EM dated 19 April 2007 regarding to the survey to collect information on socioeconomic and environmental issues of Nam Ngiep 1 Hydropower Project. - Based on the proposal of the company (NCC) who is the person who surveyed the socio and environment of the project. At 8:00am on the morning of 28 April 2008 a meeting was held at the meeting room of the Thamphoxay Guest House, Viengkham District, Vientiane Province, co- chaired by Mr. Bounmee Phouthavong, Deputy Governor of Vientiane Province, and Mr.
    [Show full text]
  • National Integrated Water Resources Management Support Project (Cofinanced by the Government of Australia and the Spanish Cooperation Fund for Technical Assistance)
    Technical Assistance Consultant’s Report Project Number: 43114 August 2014 Lao People’s Democratic Republic: National Integrated Water Resources Management Support Project (Cofinanced by the Government of Australia and the Spanish Cooperation Fund for Technical Assistance) Prepared by: IDOM Ingenieria Y Consultoria S.A. (Vizcaya, Spain) in association with Lao Consulting Group Ltd. (Vientiane, Lao PDR) For: Ministry of Natural Resources and Environment Department of Water Resources Nam Ngum River Basin Committee Secretariat This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. NATIONAL INTEGRATED WATER RESOURCES MANAGEMENT SUPPORT PROGRAM ADB TA-7780 (LAO) PACKAGE 2: RIVER BASIN MANAGEMENT NIWRMSP - PACKAGE 2 FINAL REPORT August 2014 NIWRMSP - PACKAGE 2 FINAL REPORT National Integrated Water Resources Management Support Program ADB TA-7780 (LAO) Package 2 - River Basin Management CONTENTS EXECUTIVE SUMMARY IN ENGLISH ................................................................................................... S1 EXECUTIVE SUMMARY IN LAO ........................................................................................................... S4 1. BACKGROUND ............................................................................................................................... 1 2. RESOURCES ASSIGNED TO THE TECHNICAL ASSISTANCE .................................................. 2 3. WORK DEVELOPED AND OBJECTIVES
    [Show full text]
  • Vientiane Times City Authorities, JICA Confer on UNFPA to Employ New Strategy Development Planning for Helping Women, Girls
    th 40 Lao PDR 2/12/1975-2/12/2015 VientianeThe FirstTimes National English Language Newspaper WEDNESDAY DECEMBER 9, 2015 ISSUE 286 4500 kip Thai princess visits Laos to enhance Huaphan vehicle caravan ties, mutual understanding expected to grow Souknilundon a major historical role in the Times Reporters Southivongnorath struggle for the independence of the Lao people in the past. Her Royal Highness Princess A vehicle caravan travelling The caravan shall depart Maha Chakri Sirindhorn of to the northern provinces from Vientiane before passing through Thailand arrived in Vientiane December 11-15 this year should Xieng Khuang province on yesterday for a two-day double in size compared to the its way to Vienxay district of official visit to Laos, aimed previous year, according to the Huaphan province under the at enhancing bilateral ties Ministry of Information, Culture theme “Return to the Birthplace- between the two neighbours and Tourism yesterday. Glorification to the revolution and mutual understanding The ministry arranged a press of Laos” between the Lao and Thai conference to officially announce Running from December 11- peoples. the caravan to the public. The 15, the trip will start from That Her visit is in response main objective of the activity was Luang Esplanade in the capital to an invitation from Deputy to promote tourism sites among and head up through Xieng Prime Minister and Minister local people and foreign visitors Khuang on its way to Huaphan of Foreign Affairs Thongloun or foreign residents in Laos. province. Sisoulith, the Lao Ministry of They said it is also part of The caravan group will Foreign Affairs said in a press celebrating the 40th anniversary visit the Kaysone Phomvihane release.
    [Show full text]
  • I. INTRODUCTION 1.1 Background: 1.2 Flood Policy 1.2.1 Administrative Framework. 1.2.2 Government Policy
    I. INTRODUCTION 1.1 Background: Lao PDR is a landlocked country, which located in the Southeast Asia. The Country covers an area of 236,800 square km2 and has bordered with China, Myanmar, Thailand Vietnam and Cambodia. Lao PDR is also lying along middle part of the Mekong, which is the 12th longest river in the world. It flows through Lao territory almost 1,860 km. Climate is governed by Southeast monsoon in the period of May to the end of October. Some years Laos is affected from Typhoon, which is formed in the Pacific Ocean and move through South China Sea to the middle of Vietnam and hit to Luang Mountain and then move to the North of Lao. Lao PDR territory approximately 70% comprises of mountains and plateaus. 35% of water flow contributes of the whole Lower Mekong Basin runoff. Flood in Lao PDR is occurred year by year and depends on the natural phenomena. Usually, in late of May to the end of October, the Southwest monsoon comes from India through Myanmar to the Northern Lao and resulted long lasting and heavy rain. Other way is affect from Typhoon, which comes from Pacific Ocean through South China Sea to the middle part of Vietnam and Laos, this resulted also long lasting and heavy rain. Now the flood cycle is very short and effected to large area of the territory of Laos. Therefore, we should be found the reason to protect the flood in Laos. 1.2 Flood Policy 1.2.1 Administrative framework. The flood management and mitigation in Lao PDR at the time being is under the supervision of the Prime Minister’s Office, which comprises of different line Ministry and agency concerned such as: Ministry of Labor and Social welfare, Ministry of Agriculture and forestry, Ministry of Industry and Handicraft, and Ministry of Communication Transport Post and Construction.
    [Show full text]
  • Simulation of Supply/Demand Balance
    The Study on Power Network System Master Plan in Lao PDR Draft Final Report (Stage 3) Simulation of Supply/Demand Balance 17.1. Options for Power Development Plan up to 2030 In order to examine supply reliability and supply-demand balance based on the Lao PDR’s development situation, and considering the development status of the country’s power supply facilities and transmission facilities, a simulation is conducted for 2030. Laos’s power system is examined up to 2030 considering the demand situation in the domestic system and the expansion plans for transmission lines. The northern and central 1 areas are put together to form a Laos NC system, the central 2 a Laos C system, and the southern part an S system. Based on the results of the supply/demand balance simulations, we make recommendations for power plant expansion plans and transmission lines, and for interconnections with neighboring countries. Power Development Plan for Laos’ domestic system up to 2030 1. Power plants for analysis of supply/demand balance in Laos In examining the supply/demand balance for domestic demand in Laos up to 2030, we use the power plan approved by the MEM Minister (see Table 17.1-1). Table 17.1-1 Power Development Plan approved by minister of MEM, including existing plants No Power Plant MW Type COD Province Region 1 Nam Dong 1.00 Run of river 1970 Luangprabang NC 2 Nam Ngum 1 155.00 Reservoir 1971 Vientiane Pro NC 3 Nam Ko 1.50 Run of river 1996 Oudomxay NC 4 Nam Luek 60.00 Reservoir 2000 Saysomboun NC 5 Nam Mang 3 40.00 Reservoir 2004 Vientiane Pro
    [Show full text]
  • Lao-Indochina Group Public
    J u l y 1 5 , 2 0 1 3 Contact us Compay Profile ASEAN Road, Sybounheuang Village, Chanthabuly District, Vientiane Capital, Lao P.D.R. P.O. Box: 7117 Tel.: +856-21-262135 Fax: +856-21-265059 Email: [email protected] www.lao-indochina.com Commercial & Marketing Department: Mrs. Sudsada PHAISOUKHA Tel.:+856-20-22235772 Email: [email protected] Cassava Planting Promotion Department: Tel.: +856-21-264598 Tapioca Factory address: 47km 13 South Road, Nasone Since the year 2003 I, Sengmaly Sengvatthana, starting up a company Lao-Indochina Air Service, Village, Pakngeum District, Vientiane Capital, Lao P.D.R. which involved reserve and sale airline tickets for domestic and international flights. In year 2004 Tel.: +856-21-922002 Fax: +856-21-922005 the company expands its service to including import and export. Items for import and export including vehicles, parts, construction materials, food and drinks, and export agriculture products which are part of the expand services. With the understanding of high demand in China for products such as Tapioca about 12 million tons per year. Laos has the land area good for growing cassava roots, has general labor, and working with Ministry Industrial and Commerce, Nayobai Bank, Lao Development Bank, and other government agencies, we can promote the plantation area to satisfy the need of such product. Entities are the involved in training farmers with respect to plantation in three less develop districts such as Hom District, Sangthong District and Borlikanxay District. From this there other farmers from three provinces also involved in this plantation development. The three provinces are: Vientaine Capital, Vientaine Province and Borlikhamxay Province.
    [Show full text]
  • Microfinance in the Lao Pdr, 2009
    MICROFINANCE IN THE LAO PDR, 2009 EDITORIAL BOARD Mr. Souphith DARACHANTHARA Deputy Director General, National Economic Research Institute Survey Team Leader ‐ Analyst, Editor Mr. Phokhong THEPKAYSONE Director, Development Research Division Survey Team Leader Assistant ‐ Analyst Mr. Thanongsai SOUKKHAMTHAT Deputy Director, Development Research Division Project Coordinator ‐ Analyst Ms. Phoutthasone SINTHAVONG Ms. Dorkfa SIYOTHA Ms. Viengsavanh SOULIYA Mr. Bounmy SOUTPILA Survey and Research Team Members Prof. (em.) Dr. Hans Dieter Seibel Mr. Klaus Prochaska GIZ Project Director Editors CONTENTS Page FOREWORD………………………………………………………………………………………………………i ACKNOWLEDGEMENTS ....................................................................................... iii Chapter 1: Microfinance in the Lao PDR ............................................................. 1 1.1. Background and History of Microfinance in the Lao PDR ............................................................ 1 1.2. From Microcredit to Microfinance: the Terminology of an Emerging Sector .............................. 2 1.3. The Emergence of Village Fund Networks ................................................................................... 3 1.4. The Microfinance Working Group for Lao P.D.R……………………………………………………………………….4 1.5. The Regulatory Framework of Microfinance ............................................................................... 4 Chapter 2: Governmental and International Support Programs .................... 6 2.1. Government Programs and Projects…………………………………………………………………………………………6
    [Show full text]
  • 41924-014: Nam Ngiep 1 Hydropower Project
    Resettlement and Ethnic Development Plan Project Number: 41924 June 2014 Document Stage: Final Nam Ngiep 1 Hydropower Project (Lao People’s Democratic Republic) Main Report Prepared by Nam Ngiep 1 Power Company Ltd. for the Asian Development Bank The final report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Resettlement and Ethnic Development Plan for Nam Ngiep 1 Hydropower Project Updated Version, June 2014 REDP of The Nam Ngiep 1 Hydropower Project List of Contents EXECUTIVE SUMMARY .................................................................................................................................. VI LIST OF TABLES ......................................................................................................................................... XXIV LIST OF FIGURES ..................................................................................................................................... XXVIII ABBREVIATIONS .........................................................................................................................................
    [Show full text]
  • [Draft Implementing Decree for New FIL]
    Authentic in Lao Only LAO PEOPLE’S DEMOCRATIC REPUBLIC Peace Independence Democracy Unity Prosperity Prime Minister’s office No. 301/PM Vientiane Capital, dated 12 October 2005 Decree of the Prime Minister Regarding the Implementation of The Law on the Promotion of Foreign Investment - Pursuant to the Law on the Government of the Lao PDR No. 02/NA, dated 6 May 2003; - Pursuant to the Law on the Promotion of Foreign Investment No. 11/NA, dated 22 October 2004; - Referencing to the proposal of the President of the Committee for Planning and Investment. SECTION I General Provisions Article 1. Objective This Decree is set out to implement the Law on the Promotion of Foreign Investment correctly to the objectives and uniformly throughout the country on the principles, methods and measures regarding the promotion, protection, inspection, resolution of disputes, policies towards productive persons and measures against the violators. Article 2. Legal Guarantees The State provides legal guarantees to foreign investors who are established under the Law on the Promotion of Foreign Investment as follows: 2.1 administer by Law and regulation on the basis of equality and mutual interests; 2.2 undertake all of the State’s obligations under the laws, international treaties in which the State is a party, the Agreement Regarding the Page 1 of 61 Promotion and Protection of Foreign Investment and the agreements that the government has signed with the foreign investor; 2.3 do not interfere with the legally business operation of foreign investors. Article 3. Capital Contribution which is an Intellectual Property The State recognizes the shared capital contribution of the enterprises which is an intellectual property; the evaluation of the intellectual property value shall be determined in detail by the scope of rights, obligations and interest in the resolution of a shareholders’ meeting and the business joint venture agreement of the enterprise.
    [Show full text]
  • E-Directory LAO-CSO Eng.Pdf
    PREFACE With the need for better connected and coordinated actions among development stakeholders who are implementing development projects in Laos, this directory aims to provide stakeholders with access to information about the availability of Civil Society Organisations in Laos. It has been collected and developed to assist Non Profit Associations, International Non-Governmental Organizations, Donors, GoL and other stakeholders in Laos in their search for appropriate information and implementing partners. We hope that this publication can also assist development actors in building new, or strengthening existing relationship in support of their common development goals. This is the third version of the Directory of Lao CSOs produced following a widespread demand. The design has been adapted in response to feedback from the users of previous versions. Version three is more concise and the book is smaller in size to be handier to carry. All CSOs known to the Lao CSO Network have been invited to have their information included. Some organisations have chosen not to be included. For more information on a specific organisation, we invite you to contact directly the management team of the organisation. On-going and regular update of CSO information can be found though visiting the website and the PDF document can be free download on the website (www.laocs-kis.org). We would like to thank French Embassy for providing the necessary financial support for this publication. Our warm thanks to Lao CSOs Network for the data collection work and to CSOs who provided their organisational information for this directory. With further demand and continued input from the CSO community we hope to develop and expand this collection of information further in the future.
    [Show full text]
  • The First Quarter Report 2021 31 March 2021 Content
    The First Quarter Report 2021 31 March 2021 Content I. Overview of business of Company……………………………………………………….….1 1. Vision ……………………………...………………………………………………………….....…..1 2. Mission ……………………………………………………………………………………………....1 3. History of SOUVANNY……………………………………………………..……….……….…..1-2 II. Financial Status and Business Operation Result……………………………………….……...3 III. General Information and some important information about SVN……..………….…..4 IV. Securities and Shareholders 2021………………………………………………...…….....4 V. Organization Structure: Board of Directors, Managing Directors and the activities of the Board ……………………………………………………………………….…………….....5 1. Organization Chart of the Company………………………………………………………...5 2. The structure of SVN’s Board of Directors and their curriculum vitae…………………….6 2.1 Board of Directors of SVN ……………………………………………………………...6 2.2 Briefly Background of Board of Directors…………………………………………...6-10 2.3 The structure of SVN’s Executive Directors……………………………………….…….....11 3. The activities of SVN’s Board……………………………………………………………...12 1. The activities of SVN’s Board………………………...………………………………....12 2. The activities of Audit Committee…………………………………………...…………..12 VI. Corporate Social Responsibility…………………………………………………….……12 1 Tax Payment………………………………………………………………………………..12 2. Corporate Social Responsibility………………………………………………………...13-15 The First quarter Report 2021 I. Overview of business of Company. 1. Vision. Souvanny Home Center will become a leader in the development of modern trade centers on construction materials, home decoration, home appliances, and consumable goods in all sale channels to meet the customer’s needs in Lao PDR and connects to the ASEAN market. 2. Mission - Developing the import of construction materials, home furnishings, home appliances, and consumer goods from all areas with quality and reasonable prices to all customer groups, and all areas of Laos, contributing to be a part to drive the Lao economy. - Improving the Service and Handover in all sales channels both Offline and Online to be modernized.
    [Show full text]
  • The Nam Ngiep 1 Hydropower Plant Project, Lao PDR
    S. Chanthavong / GMSARN International Journal 11 (2017) 147 - 152 Participatory Negotiation in Decision-Making of Hmong Ethnic People: The Nam Ngiep 1 Hydropower Plant Project, Lao PDR Sypha Chanthavong Abstract— The Lao government emphasizes hydropower development as a priority as the economic benefits from hydropower development are very significant for the Lao economy. However, the hydropower decision-making process is a complex business, involving different layers and requiring multiple participants, influencing both society and the environment. Understanding the hydropower decision-making processes, in particular the participation of the Hmong ethnic in these negotiations has important implications. This paper will scrutinize how participatory negotiation practices affect the Hmong ethnic people in the decision-making process of the Nam Ngiep 1 Hydropower Project. Simultaneously, the question of how the Hmong ethnic people negotiate with powerful actors like the state and the project developer to protect their rights and benefits requires an answer. The results of the study find that Hmong affected by the Nam Ngiep 1 Hydropower Project use many negotiation tactics in order to protect their rights and benefits, such as identity, network, and historical memory. Moreover, Hmong also use oral and written negotiation forms to protect their rights and benefits. Keywords— Hydropower, Participatory Negotiation, Hmong, Nam Ngiep 1 Hydropower Project. This paper is divided into five parts, namely an 1. INTRODUCTION introduction, secondly, a focus on the benefits and costs of hydropower development in Laos; thirdly, The participation of ethnic people in the hydropower methodology; fourthly, the findings; and finally, the development decision-making process is required as this conclusion.
    [Show full text]