BIHAR STATE ROAD DEVELOPMENT CORPORATION LIMITED (A Government of Bihar Undertaking)

Total Page:16

File Type:pdf, Size:1020Kb

BIHAR STATE ROAD DEVELOPMENT CORPORATION LIMITED (A Government of Bihar Undertaking) BIHAR STATE ROAD DEVELOPMENT CORPORATION LIMITED (A Government of Bihar Undertaking) Ref. No. : RFP/NGO/BSHP-II (B-S) Date: 22.09.2009 REQUEST FOR PROPOSALS FROM NGOs FOR IMPLEMENTATION OF RESETTLEMENT PLAN FOR BIHTA-SARMERA ROAD (SH-78) UNDER BIHAR STATE HIGHWAYS PROJECT-II Bihar State Road Development Corporation Ltd (BSRDC) invites Request For Proposal (RFP) in the prescribed format for the services of eligible NGOs for the implementation of Resettlement Plan (RP) of Bihta-Sarmera Road (SH-78). In addition to this advertisement, the RFP is also being issued to the NGOs whose list is available with Bihar State Road Development Corporation Ltd. The detailed design of alignment of Bihta-Sarmera Road (SH-78) has been completed and Technically Sanctioned and accordingly Resettlement Plan (RP) for the project road is prepared. The RFP must reach at the address mentioned below latest by 15.00 Hrs on 14.10.2009. Only Technical Bids shall be opened at 16.00 Hrs. on 14.10.2009 in the office of Bihar State Road Development Corporation Limited in presence of NGOs or their authorized representative. For detail RFP, Contact at the following address or download the documents from the website www.rcd.bih.nic.in/www.bsrdcl.bih.nic.in. For more information please contact Mr. Suryamani Singh, DGM (Tech.) on Mob. no.: 09431005703. Address for Communication: Bihar State Road Development Corporation Limited Central Mechanical Workshop Campus, Near Patna Airport, Sheikhpura Patna-800014 Tel:- 0612-222 6711 Fax:-0612-222 6723 Chief General Manager Bihar State Road Development Corporation Ltd. Patna QCBS Bihar State Road Development Corporation Ltd. (A GOVERNMENT OF BIHAR UNDERTAKING) REQUEST FOR PROPOSAL For Implementation of Resettlement Plan (RP) SH-78 (Bihta-Sarmera Road) For BIHAR STATE HIGHWAYS PROJECT-II Quality- and Cost- Based Selection (QCBS) September, 2009 CHIEF GENERAL MANAGER BIHAR STATE ROAD DEVELOPMENT CORPORATION LTD. CENTRAL MECHANICAL WORKSHOP, NEAR AIRPORT, PATNA SHEKHPURA, PATNA-800014 BIHAR A. CONTENTS Title Page No. Section 1. Letter of Invitation 2 Section 2. Information to Consultants 6 Data Sheet 18 Section 3. Technical Proposal - Standard Forms 21 Section 4. Financial Proposal - Standard Forms 31 Section 5. Terms of Reference 38 Draft contract agreement document 56 Page 1 of 87 SECTION 1. LETTER OF INVITATION To, M/s. …………………………… ………………………………… ………………………………… Dear Sir: 1. The Bihar State Road Development Corporation Ltd (BSRDC), A Government of Bihar Undertaking has undertaken the work of widening of existing State Highways from single lane carriage way into two-lane carriage way and strengthening of existing two-lane road. The Bihar State Highways Project (BSHP) aims to strengthen and rehabilitate the deteriorated state roads and upgrade some newly declared state roads to provide reliable road transport services in the state. One project road section consisting of 100 kilometers has been selected for which detailed design of alignment has been completed; and Resettlement Plans (RPs) for project road has been prepared based on the detailed design approved by BSRDC. The detail of the project road and Resettlement Package is listed in the Table: 1. Table: 1 Sl. Resettlement SH No. Name of District Likely Likely Length No. Pkg No. the Covered affected affected (in project structures* households Km.) Road * 1 1 SH-78 Bihta- 100 Patna 369 6880 Sarmera and Nalanda * The figures are indicative and liable to change after final verification. 2. The project road is single lane with 3.5 meter carriageway and at some places intermediate lane with 5.5 meter carriageway having a right of way (ROW) ranging from 07 to 14 meters. The existing ROW is encroached and squatted at various locations specifically in existing market places. At some places there are missing links which has been made part of the new alignment. Page 2 of 87 3. The widening of the road is proposed to be done on the new alignment. The existing available ROW is not sufficient to accommodate the widening proposal. Land Acquisition is being done for four laning keeping in view the widening of the road in future. The road is proposed to be constructed in two lanes initially. The two laning is proposed to be done on one side of center line and in the next phase the rest two lane will be done on the other side of the centre line. Sufficient consideration has been given at this stage of the project preparation to minimize the adverse impacts on the community in the project areas within the limitation of technical requirement. The Resettlement Plan (RP) is prepared based on detailed design of the alignment, to mitigate all such unavoidable negative impacts caused by the project and to restore affected person’s livelihoods. 4. Bihar State Road Development Corporation Ltd (BSRDC) invites the services of eligible NGOs hereafter referred to as “Consultants”, for the implementation of RP on the project road. The project road is stand alone package for implementation of RP as shown in Table 1. More details on the Services are provided in the attached Terms of Reference. 5. The RFP has been addressed to the consultants as per the list available with the BSRDC. This RFP Document is for the implementation of RP (Resettlement Plan) SH-78 (Bihta-Sarmera Road) Sl. Name / Address of the Firm Phone / Fax / E-mail No. 1. M/s. Lokarpit Tel.: 0522 3950 010 5/279, Viramkhand, Gomti Nagar, E-mail: [email protected] Lucknow-206010, Uttar Pradesh 2. M/s. Study Point Samiti (SPS) Tel.:0522 2209 765 “Saushi Complex” 3097143 20/A-3,Gokhale Marg Lucknow-226 001 Fax:0522 2209 995 U.P. E-mail: [email protected] 3. M/s. Sugam International Sansthan Tel.: 0522 23013 444 (SIS) Fax:22209 995/2209844 IInd Floor, Shaushil Complex E-mail: [email protected] Gokhale Marg, Lucknow-226 001,U.P. Page 3 of 87 4. M/s. Gramin Shaikshanik Evam Samajik Tel.: 0612 2281 431 Vikas Sansthan (GSSVSS) E-mail:[email protected] “ Narayan Niwas”, 1/23, Road No. 1 (Extn.) Rajvanshi Nagar, Patna-800 023, Bihar. 5. M/s. Consultants for Rural Area Tel.: 0651 2243 102 Development Linked Economy Fax: (CRADLE) E-mail: cradle [email protected] C/258, Road No. 1C, Ashok Nagar [email protected] Ranchi-834 002, Jharkhand. 6. M/s. Centre for Management & Social Tel.: 040 23737 571 Research Fax:040 66687015 Plot No. 101, Flat No. 302, E-mail: mail@cmsrindia. org R.R. Residency, Opp. GHMC Park, Website: cmsrindia. org Srinagar Colony, Hyderabad-500 073, A.P. 7. M/s. Advantage India Tel.: +91 (11) 32502362,26851895 C-17, 2nd floor, Green Park Extension, Fax: +91 (11) 46045978 New Delhi-110016. E-mail:[email protected] Website. advantageindia.org 8. M/s. The organization for Applied Tel.:011 30920 535 Socio-Economic Systems (OASES), 26490 617 5-l, IInd Floor, Shahpur Jat E-mail: [email protected] New Delhi-110 049. 9. M/s. Centre for Research and Capacity Tel.:0120 3945 349 Building (SAATH-CRCB Trust (JV) E-mail: [email protected] 305, Dhaulagir, Kaushambi, Ghaziabad- [email protected] 201 010, U.P. 10. M/s. Matra Bhumi Vikas Sansthan Tel.: 0522 2345 960 (MBVS) 385/22, Sector-22, Indira Mobile: 94155 80230 Nagar, Lucknow-16, U.P. E-mail: [email protected] 11. M/s. Development Management Trust Tel.:0120-4275492 A-81, Sector-65, Noida, Uttar Pradesh- Fax: 0120-4274192 201301 E-mail: [email protected] 12. M/s. Abhvyakti (Contact person: Ms. Tel.: Meenakshi Parimoo) Fax: Mobile: 9312029739 Email:[email protected] 13. M/s. Resouce Research Development Tel.:0654-263141 Society, Address: Prabhu Niwas Market Fax:06546-260174 (near Radheshyam and company,) Mobile: 09431141246 Anand Chouk, GGS Road, Hazaribagh, E-mail: neeraj_gtrip@rediffmila Jharkhand. Pin-825301 Contact Person: Neeraj Kumar Shrivastava. 14. Pragati Sansthan in JV with ACCCPL Tel: (0522) 4004999,4011116 24, Lohia, Sector-9, +91 9721833300, +91 94915583372 Indira Nagar, Lucknow -226016 Page 4 of 87 6. A firm will be selected under Quality and Cost Based Selection (QCBS 70:30) and procedures described in this RFP. 7. The RFP includes the following documents: Section 1 - Letter of Invitation Section 2 - Information to Consultants Section 3 - Technical Proposal - Standard Forms Section 4 - Financial Proposal - Standard Forms Section 5 - Terms of Reference Section 6 - Standard Form of Contract 8. Please inform us, upon receipt: - that you have received the letter of invitation; and - whether you will submit a proposal alone or in association as a Joint Venture confirming joint and several liability or as Sub-consultants. Yours sincerely, (D.N. Prasad) CHIEF GENERAL MANAGER BIHAR STATE ROAD DEVELOPMENT CORPORATION LTD. Page 5 of 87 SECTION- 2. INFORMATION TO CONSULTANTS 1. Introduction 1.1 The Client named in the “Data Sheet” will select a firm who have submitted their Proposal, in accordance with the method of selection indicated in the Data Sheet. 1.2 The consultants are invited to submit a Technical Proposal (essentially in hard bound form) and a Financial Proposal, or a Technical Proposal only, as specified in the Data Sheet the Proposal for consulting services required for the Assignment named in the Data Sheet. The Proposal will be the basis for contract negotiations and ultimately for a signed contract with the selected firm. 1.3 The Assignment shall be implemented in accordance with the phasing indicated in the Data Sheet. When the Assignment includes several phases, the performance of the contract under each phase must be to the client’s satisfaction before work begins on the next phase. 1.4 The Consultants must familiarize themselves with local conditions and take them into account in preparing their Proposals. To obtain first-hand information on the Assignment and on the local conditions, consultants are encouraged to pay a visit to the Client before submitting a Proposal, and to attend a pre-proposal conference if one is specified in the Data Sheet.
Recommended publications
  • Dispatch List 04-02-2017.Pdf
    Admit card Dispatch list for interview on dated 04.02.2017 Roll No. Name of Candidate Address Postal Receving VILL-MAHANANDPUR, P.O-LALBIGHA, P.S- 10001 DHARAMENDRA KUMAR SHEIKHOPURSARAI, DISTT-SHEIKHPURA 10002 GUDDU KUMAR VILL+PO+PS-SARMERA, NALANDA. VILL-MAHADEV BIGHA, PO-CHANDHARI, 10003 RAVINDRA KUMAR PS-ISLAMPUR, NALANDA. VILL-MAHADEV BIGHA, PO-CHANDHARI, 10004 DEEPAK KR. SAURAV PS-ISLAMPUR, NALANDA. VILL-NASARATPUR, PO-MAUR, PS- 10005 MUKESH KUMAR BARBIGHA, SHEIKHPURA. VILL-SHIDIH, PO-SARMERA, BARBIGHA, 10006 MUKESH KUMAR SHEIKHPURA. MAHTO KUNA, KHAND PAR, 10007 MADHU BARSA KUMARI SHEIKHPURA. VILL-LATAWAR, PO-BHADSENI, PS- 10008 JATA SHANKAR KUMAR HISUA, NAWADA. VILL-DAYALI BIGHA, PO-KEOTI, 10009 PRASHANT KUMAR BARBIGHA, SHEIKHPURA. VILL-MAHANAND PUR, LAL BIGHA, 10010 RAJU KUMAR SHEIKHPURA. VILL-BHAKHRI, PO-KATHAULI, PS- 10011 DHARMVEER KUMAR NOORSARAI, NALANDA. VILL+PO-SAMAS BUJURG, PS-BARBIGHA, 10012 DIPENDRA KUMAR SHEIKHPURA. 10013 ABHISHEK RAJ VILL+PO+PS-SARE, NALANDA. VILL-BABHAN BIGHA, PS+PO-BARBIGHA, 10014 DHARMENDRA KUMAR SHEIKHPURA. C/O LATE BALMIKI JHA, VILL- 10015 DEEPAK KUMAR BHADRATHI, KUSADHI, SHEIKHPURA. MOH-SHIVPURI, BARBIGHA, 10016 SANTOSH KUMAR SHEIKHPURA. VILL+PO-TEUS, PS-JAIRAMPUR, 10017 RAJEEV KUAMR SHEIKHPURA. VILL+PO-RAMPUR, SINDAY, BARBIGHA, 10018 AVINASH KUMAR SHEIKHPURA. VILL-SIHULI, PO-CHANDAURA, PS-VENA, 10019 MONU KUMAR NALANDA. C/O DR. NAND LAL SHARMA, VILL- 10020 NISHANT KUMAR MOHANPUR, PO-NALANDA. VILL-JAMALPUR, PO-LARI, PS-KURTHA, 10021 AJIT KUMAR ARWA. 10022 ASHOK KUMAR VILL+PO-ORO, PS-HISUA, NAWADA. VILL-JORARPUR, PO-DAILI, PS-HARNAUT, 10023 SANJEEV KUMAR NALANDA. VILL-AHIYAPUR, KUTAUT, BARBIGHA, 10024 KUNDAN KUMAR SHEIKHPURA. VILL-PURUSHOTAMPUR, PO-DEWARA, 10025 MANOJ KUMAR GHOSHI, JEHNABAD.
    [Show full text]
  • 41629-013: Bihar State Highways II Project
    Social Monitoring Report Project Number: 41629-013 / 44425-013 September 2019 Period: January 2018 – June 2018 IND: Bihar State Highway II Project SH – 78 Submitted by Bihar State Road Development Corporation Limited, Patna This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Bihar State Highway Project Phase – II CONTRACT PACKAGE NO.1& 2 (SH-78) (Bihta – Sarmera) Monitoring and Implementation of Resettlement Plan (RP) Semi Annual Report January 2018 - June 2018 Submitted By Egis International S.A in JV with Egis India Consulting Engineers Pvt. Ltd. Plot No.66, Sec.32 Gurgaon-122001 CONTENTS Abbreviation ................................................................................................................................................... 2 GLOSSARY ...................................................................................................................................................... 3 1. PROJECT BACKGROUND ........................................................................................................................... 4 2. PROJECT DESCRIPTION ..........................................................................................................................
    [Show full text]
  • Assessment of Ground Water Resources for Irrigation in Nalanda District of South Bihar, India
    Int.J.Curr.Microbiol.App.Sci (2018) 7(2): 1223-1232 International Journal of Current Microbiology and Applied Sciences ISSN: 2319-7706 Volume 7 Number 02 (2018) Journal homepage: http://www.ijcmas.com Original Research Article https://doi.org/10.20546/ijcmas.2018.702.150 Assessment of Ground Water Resources for Irrigation in Nalanda District of South Bihar, India Ravish Chandra*, S.K. Jain and A.K. Singh Dr. Rajendra Prasad Central Agricultural University, Pusa, Samastipur-848125, India *Corresponding author ABSTRACT Ground Water remains the lifeline of socioeconomic development in the Ganga Alluvial Plain (GAP) since the down of civilization in the Indian subcontinent. Assessment of groundwater resources yields knowledge necessary for their informed management and governance. Keeping the importance of the above points a study was conducted for assessment of ground water resources in Nalanda district of south Bihar. The aim for the assessment of groundwater in Nalanda district was to compute a complete evaluation of groundwater resources and produce information that can be incorporated for future requirement. The study was undertaken based on the K e yw or ds recommendation of groundwater estimation committee, 1997 (GEC-97). Methodology used the estimation of annual groundwater recharge from rainfall and other sources, Ganga alluvial including irrigation, water bodies and artificial recharge, determination of present plain, Ground water, GEC 97, status of groundwater utilization and categorization of assessment units based on the Watertable level of groundwater utilization and long-term water level trend. Water level Fluctuation fluctuation techniques and empirical norms were used for recharge estimation. The technique, data collected for investigation were water table fluctuation data, rainfall data Groundwater draft cropping pattern, number of groundwater structures, hydrogeology of area, specific Article Info yield, groundwater draft, pond area etc.
    [Show full text]
  • Sheikhpura District - 811 101 Bihar
    Bihar AIM for Seva San Francisco Bay Area’s Commitment to Bihar Sumitra Surma AIM for Seva Free Student Hostel for Boys Vivekanandapuram, Maur Village, Barbhiga Taluk, Sheikhpura District - 811 101 Bihar Sheikhpura District Know Barbigha Maur is a small hamlet in Barbigha taluk. Barbigha is a Literacy Rate nagar panchayat city in the district of Sheikhpura, Bihar. It 100 is located 17 km in the west from the district head quarter, Sheikhpura and 103.2 km from the state capital, Patna. 81.27% 80 Belaw (2 km), Pank (3 km), Jagdish Pur (3 km), Pinjhri 73.63% (7 km), Maldah (7 km) are the nearby villages to Barbigha. 65.12% 60 Barbigha is surrounded by Asthawan taluk in the west, Sarmera taluk and Bind taluk in the north and Sheikhopur 40 Sarai taluk in the south. Barbigha, Sheikhpura, Bihar Sharif, Warisaliganj are the 20 nearby cities to Barbigha. Total population - 46,075 Children between the age group of 0-6 years – 7,614 Average Sex Ratio of Barbhiga – 900 Literacy Male Female Know Sheikhpura Number of villages in Sheikhpura District : 91 Total population of Sheikhpura District : 636,342 Male population of Sheikhpura District : 329,743 Female population of Sheikhpura District : 306,599 The average literacy rate is 65.96% Your Impact Ajay Kumar, a 10-year-old boy who hails from Tilakpur recounts the hardships he faced back home. While his father works in a field, his mother stays at home and looks after the children. Ajay’s parents found it difficult to provide a stable and healthy environment for their children.
    [Show full text]
  • Demographic Features of Scheduled Caste Population in Nalanda District: a Geographical Study
    www.ijcrt.org © 2015 IJCRT | Volume 3, Issue 1 March 2015 | ISSN: 2320-2882 DEMOGRAPHIC FEATURES OF SCHEDULED CASTE POPULATION IN NALANDA DISTRICT: A GEOGRAPHICAL STUDY Dr. Pravin Kumar Prabhakar PGT, Govt. Senior Secondary School, Rajendra Nagar, Patna-16 Abstract : Demographic features of a region has great importance because the success of social economic and cultural development programme mostly depend on it. Scheduled caste constitute an important segment of population of Nalanda. This society has specific features in small scale region such as Nalanda district. Keywords : Attributes (features), micro level region, scheduled caste, demography. Study Area : Nalanda district stretches from 24°48' N to 25° 28' N latitude and 85° 11' E to 85° 56' E longitude and covers an area of 2355 sq. km. population is 28,77,65. The S.C. population of Nalanda district is 642207. This area is bounded on the North by Patna district, on the South by Nawada and Gaya district, on the East by Munger district and in the West by Jehanabad and Patna district. This district consists three sub-division 20 C.D. Blocks and 1036 Villages. This region has purely agricultural dominated economy, very few people engaged in secondary and tertiary activities. Research Methodology : This study has used secondary data that has been taken from DCH Nalanda 2011. The data has been analysed with mathematical calculation. This has been represented by pictorial diagram. Introduction : Demographic attributes or features of a region has great important because the success of social economic and cultural development programme depends on it. Demographic features of population includes, sex ratio, habitant place, literacy, language, religion, marital structure of the society.
    [Show full text]
  • Admit Card Dispatch List for Interview on Dated 08.01.2017
    Admit card Dispatch list for interview on dated 08.01.2017 Roll No. NAME OF CANDIDATE ADDRESS POSTAL RECEIVING VILL-BASUACHAK, P.O- 1751 RAJIV KUMAR MAHISONA, P.S+DISTT- LAKHISARAI MOH-SRIRAMNAGAR, WARD NO-12, P.O-MUZZAFARPUR, P.S- 1752 ADITYA KUMAR SINGH AHIYAPUR, DISTT- MUZAFFARPUR VILL-CHAKHANI, P.O- 1753 CHATTHU KUMAR RAJBATIYA, P.S-BAGHA, DISTT- WEST CHAMPARAN VILL+P.O-+P.S-CHANDI, DISTT- 1754 MO. SHAFFUDDIN BHOJPUR VILL+P.O-LANKA KACHUARA, 1755 CHANDAN KUMAR DISTT-PATNA VILL+P.O-GOPALPUR,DISTT- 1756 BINITA KUMARI PATNA PRESIDENT CHAMBER BIRCHAND PATEL PATH, P.S- 1757 SANTOSH KUMAR KOTWALI, P.O-G.P.O,DISTT- PATNA VILL-CHHITNAWAN, P.O- 1758 SHYAM BIHARI PASWAN DAUDPUR, P.S-MANER. DISTT- PATNA VILL-CHAMELICHAK, NAYA 1760 MD. AADIL HUSSAIN TOOLA, P.O+P.S-HABIBPUR, DISTT-BHAGALPUR C/O-KARU RAJAK, VILL- GORIYASI, P.S- 1761 SUNIL RAJAK PANCHRUKHIYA, P.S- SHAHKUND, DISTT- BHAGALPUR PURANI BAZAR,CHOOTI DARGHA,WARD NO-11, 1762 SANJIV KUMAR LOHARPATTI, DIST- LAKHISARAI MOH-DEVISARAI, P.O- 1763 SHAILENDRA KUMAR MAGHRA, P.S-DEEPNAGAR, DISTT-NALANDA MAHAJAN TOLI NO-1, MAHADEV ROAD WARD NO- 1764 RAJU KUMAR 22, P.O-NAWADA, P.S-ARA TOWN, DISTT-BHOJPUR VILL-KOHRAUL, P.O- 1765 RAJEEV RANJAN BAJITPUR, P.S-KARPI, DISTT- ARWAL VILL-BADI KHAGAUL, DEVI 1766 RANJAN RAJ ASHTHAN P.O+P.S-KAHUGAL, DISTT-PATNA AT-GORIYASI, P.O- PANCHRUKHI, P.S- 1767 RAJAN KUMAR SHAHKUND, DISTT- BHAGALPUR NEW FASHION TAILORS(LAKHANCHAND 1768 JULI KUMARI KHOTHI), B.N. RAY ROAD, MACHHLI GALI, KADAMKUAN , DISTT-PATNA VILL-KAPASI, P.O+P.S- 1769 SUMANT KUMAR KARANDEY, DISTT- SHEIKHPURA
    [Show full text]
  • District Profile Nalanda Introduction
    DISTRICT PROFILE NALANDA INTRODUCTION Nalanda district is a part of the Patna division Nalanda is famous all over the world for the ancient International Monastic University established in 5th century BC, which taught Vedas, Logic, Grammar, Medicine, Meta-Physics, Prose Composition and Rhetoric Nalanda district is popularly known as Biharsharif. The rivers Phalgu, and Mohane flows through the district of Nalanda. Agriculture is the main source of occupation Tourism plays an important role in the economy of Nalanda. HISTORICAL BACKGROUND The ancient university town of Bihar, goes back to the days of Buddha and Mahavira in the Sixth Century B.C. The town was home to Nalanda Mahavihara, a monastic university of international repute Both Buddha and Mahavira often stayed at Nalanda during the rainy season. Buddhist scriptures reveal that they once stayed at Nalanda at the same time, but there is no record of them meeting one another. It was a flourishing hub where the philosopher and alchemist, Nagarjuna, studied and taught in the Second Century A.D. However, excavations have not revealed anything to suggest that the site was occupied before the Gupta period (Fifth Century A.D.), the earliest finds being a copper plate of Samudragupta and a coin of Kumaragupta (414-455 A.D.). Fa-Hien who visited in the Fifth Century A.D. makes no mention of the massive monastic establishments at Nalanda. But Hiuen Tsang who came in A.D 637 during Harsha's reign (606-647 A.D.) refers to the great monastery that Harsha endowed with liberal grants. ADMINISTRATIVE Biharsharif town is the district headquarters.
    [Show full text]
  • Bihar Building New Avenues of Progress Bihar
    BIHAR BUILDING NEW AVENUES OF PROGRESS BIHAR Uttar Pradesh Jharkhand West Bengal In the State of Bihar, a popular destination for spiritual tourists from all over the world, the length of National Highways has been doubled in the past four years. Till 2014, the length of National Highways was 4,447 km. In 2018, the length of National Highways has reached 8,898 km. The number of National Highways have been increased to 102 in 2018. Road development works worth Rs. 20,000 Cr are progressing rapidly. In the next few years, investments worth Rs. 60,000 Cr will be made towards transforming the road sector in Bihar, and creating new socio-economic opportunities for the people. “When a network of good roads is created, the economy of the country also picks up pace. Roads are veins and arteries of the nation, which help to transform the pace of development and ensure that prosperity reaches the farthest corners of our nation.” NARENDRA MODI Prime Minister “In the past four years, we have expanded the length of Indian National Highways network to 1,26,350 km. The highway sector in the country has seen a 20% growth between 2014 and 2018. Tourist destinations have come closer. Border, tribal and backward areas are being connected seamlessly. Multimodal integration through road, rail and port connectivity is creating socio economic growth and new opportunities for the people. In the coming years, we have planned projects with investments worth over Rs 6 lakh crore, to further expand the world’s second largest road network.” NITIN GADKARI Union Minister,
    [Show full text]
  • 1 Bihar Sharif Rahui Circle Officer SUDARSAN SINGH 8544412695 [email protected]
    Mobile STD Sl No Sub Division Block Designation Name Office Email Number Code 1 Bihar Sharif Rahui Circle Officer SUDARSAN SINGH 8544412695 [email protected] 2 Bihar Sharif Bind Circle Officer AFZAL HUSSAIN 8544412692 [email protected] 3 Bihar Sharif Sarmera Circle Officer SUNIL KUMAR 8544412696 [email protected] 4 Bihar Sharif Biharsharif Circle Officer Yogendra Kumar 8544412691 [email protected] 5 Bihar Sharif Noorsarai Circle Officer Randhir lal 8544412694 [email protected] 6 Bihar Sharif Harnaut Circle Officer UMESH KUMAR 8544412693 [email protected] 7 Bihar Sharif Asthawan Circle Officer RAVISHANKAR PANDEY 8544412690 8 Hilsa Chandi Circle Officer Rajeev ranjan 8544412697 [email protected] 9 Hilsa Nagarnausa Circle Officer Kumar Vimal Prakash 8544412702 [email protected] 10 Hilsa Karaiparsurai Circle Officer arun kumar singh 8544412701 06111 261018 11 Hilsa Parwalpur Circle Officer SATYENDRA CHOUDHARY 8544412703 12 Hilsa Ekangarsarai Circle Officer nawal kant 8544412698 13 Hilsa Islampur Circle Officer vijay kumar 8544412700 06111 257733 [email protected] 14 Hilsa Tharthari Circle Officer RAM PREM ORAIV 9709850152 15 Hilsa Hilsa Circle Officer BIPIN BIHARI SINGH 8544412699 16 Rajgir Giriyak Circle Officer SANJAY KUMAR 8544412706 17 Rajgir Katrisarai Circle Officer ashvini kumar 8544412707 18 Rajgir Rajgir Circle Officer SATISH KUMAR 8544412708 19 Rajgir Ben Circle Officer SRIKANT PRASAD 8544412705 20 Rajgir Silao Circle Officer SALESH SINGH 0854412709 Sl No Sub Division Block Designation Name
    [Show full text]
  • Environmental Assessment Report IND: Bihar State Highways II Project
    Environmental Assessment Report Initial Environmental Examination for SH-78 (Bihta–Sarmera Subproject) Project Number: 41629 July 2010 IND: Bihar State Highways II Project Prepared by Bihar State Road Development Corporation for the Asian Development Bank (ADB). The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................... i 1. INTRODUCTION ....................................................................................................... 1 1.1. Project Background/Rationale........................................................................... 1 1.2. Project Preparatory Technical Assistance (PPTA) and Environmental Assessment................................................................................................................... 1 1.3. Purpose of the Study......................................................................................... 2 1.4. Extent of IEE ..................................................................................................... 2 1.5. IEE Content ....................................................................................................... 2 1.6. Methodology...................................................................................................... 3 1.6.1. Information/ data Sources
    [Show full text]
  • Town and Villages Directory, Patna District, Series-4, Bihar
    CENSUS 1971 PART X-A TOWN AND VILI.JAGE SERIES 4 DIHECI0R Y BIHAR DIS'l'RICT PA'T'NA CENSUS DISTRIC1' HANDBOOK B. L. DAS OF THE INDIAN ADMINISTRATIVE ~ERViCE D'irector of Ccrnu$ OPerations Bihar 1971 CENSUS PUBLICATIONS, BIHAR (All the Census Publications of this State will bear Series 4) PART I-A General Report (Report on data yielded from P.C.A. and Tables on Mother-tongue and Religion). PART I-B General Report (Detailed analysis of the Demographic, Social, Cultural and Migration pattern). PART I-C Subsidiary Tables PART II-A General Population Tables (Tables A-I, A-II, A-III and A-IV and P.C.A.) .• PART II-A­ General Population Tables (Table A-V) SUPPLEMENT PORTRAIT OF POPULATION PART II-B (i) Economic Tables (Tables B-I Part A and B-II) PART II-B (ii) Economic Tables (Tables B-1 Part B, B-III to B-V and B-VII to B-IX). PART II-B(iii} Economic Tables (Table B-VI) PART II-C (i) Social and Cultural Tables (Tables C-V, C-VII and C-VIII) PART II-C (ii) Social and Cultural Tables (Tables C-I to C-IV, C-VI and Fertility Tables). PART II-D Migration Tables PART III-A Report on Establishments and Subsidiary Tables on Establish- ment Tables.* PART III-B Establishment Tables* PART IV Housing Report and Tables· PART VI-A Town Directory PART VI-B Special Survey Reports on selected towns PART VI-C - Survey Rep~rts on selected villages PART VIII-A Administration Report on Enumeration:!: } For official use only PART VIII-B Administration Report on Tabulation PART IX Census Atlas PART IX-A Administrative Atias PART X-A District Census Handbook (Town and Village Directory}t PART X-B District Census Handbook (Village and Townwise Primary Census Abstract}.t PART X-C District Census Handbook (Analytical Report, Administrative Statistics and District Census Tables).
    [Show full text]
  • Admit Card Dispatch List for Interview on Dated 03-02-2017
    Admit Card Dispatch list for interview on dated 03-02-2017 Roll no. Name of Candidate Address Postal Receving VILL+PO-MAI, BHARAWAPAR, 9401 SUSHMA KUMARI HILSA, NALANDA. VILL-OLI BIGHA, PO-KACHARIYA, PS- 9402 MOHAN KUMAR CHANDI, NALANDA. VILL+PO+PS-PARWALPUR, 9403 NITISH KUMAR NALANDA. VILL-KRISHNAPUR, PO+PS-HILSA, 9404 NISHANT KUMAR NALANDA. VILL+PO_PS-PARWALPUR, 9405 VICKY KUMAR NALANDA. VILL-GANJPAR, PO+PS- 9406 RAJEEV KUMAR ATHMALGOLA, PATNA. VILL-GANDHI PUR, PO- 9407 PANKAJ KUMAR BARIYARPUR, MUNGER RAJEEV NAGAR, PO-KESHRI NAGAR, 9409 SAPNA KUMARI PATNA. VILL-CHANDI, PO+PS-CHANDI, 9410 JITENDRA KUMAR NALANDA. VILL-NONIYA BIGHA, PO-JUNIYAR, 9411 MATHUR KUMAR HILSA, NALANDA. BAGHA BAZAR, MARWARI 9412 PAPPU KUMAR DHARMSHALA ROAD, PO+PS- BAGHA, W. CHAMPARAN. NALA ROAD, AMRUDI GALI, PO- 9413 MUNNA KUMAR BANKIPUR, KADAMKUNA, PATNA. VILL-RAMJI CHAK, PO-BATA GANJ, 9414 REKHA VERMA DIGHA, PATNA. VILL-REGANIYADIH, PO-JARKHA, PS- 9415 KAMLESH KR. SIGORI, PATNA. AT+PO-PAKRA, PS-NAUGAGHIA, 9416 PEETAMBER KUMAR BHAGALPUR. VILL+PO-KATHARA, PS- 9417 RANJAN KR. SINGH SULTANGANJ, BHAGALPUR. AREA ADHIDARSHAN, TREE 9418 RANJEET KUMAR DESEASE DEPT., DALHAN, TSA DHOLI, MUZAFFARPUR. OLD BAZAR, MAHADEO MANDIR 9419 DEEPAK KUMAR GALI, PO-CHIEF PO, PS-NAGAR, MUZAFFARPUR. KALLU BARA, BARI BAZAR, 9420 RAHUL KR. BHARTI MUNGER. VILL-RAGHPUR, PO-DUMRI, PS- 9421 ANKUSH KUMAR JAMUI. VILL-MAGHAUL, PO-AMRAKH, 9422 SHIV SHANKAR KR. MUZAFFARPUR. BAJIDPUR, CHURCH ROAD, BARH, 9423 ARCHANA KUMARI PATNA. CHRIYAN TAND, RAM NAGAR 9424 ROHIT RAJ ROAD, PO-GPO, JAKANPUR, PATNA. VILL-BELA, P.O.-BELSIRA,P.S. 9426 SONALIKA KUMARI PHULLIDUMAR, DIST-BANKA VILL-RUPAS, P.O.-GYASPUR, 9428 DHANANJAY KUMAR P.S.SALIMPUR, PATNA VILL-RUSSALPUR., P.O.+P.S.- 9429 ANIL KUMAR NABGACHIYA, BHAGALPUR VILL-CHOTI LAGMA, P.O.- 9430 AKSHAY KUMAR SHIVKISHUN, P.S.DHARHARA, DIST- MUNGER NASRI GANJ, DANAPUR BLOK, P.O.- 9431 JAI SAGAR DIGHA, PATNA BIRLA MANDIR ROAD, IN FRONT OF 9432 DHEERAJ KUMAR GUPTA KHETAN MKT., PATNA.
    [Show full text]