SUBMISSION OF FORM – I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC)

For

M/s. S.BALARAMA RAJU & OTHERS (Construction of High-Rise Residential Apartments) Site Address: Sy.No.3/2C/2E/2, Narayanapuram, Ward No. 19, Municipal Corporation, ,

May’ 2019

Submitted to

STATE ENVIRONMETNAL IMPACT ASSESSMENT AUTHORITY (SEIAA) O/o. AP POLLUTION CONTROL BOARD, VIJAYAWADA

Prepared & Submitted by

Enviro House, Block –B, B-1, IDA, Auto Nagar, Visakhapatnam – 530 012 Ph: 0891-2755528, Telex: 0891-2755529, E-mail: [email protected] Cell: 9440338628 QCI No – 151 & Recognized by MOE&F, New .

FORM 1

(I) Basic Information Sl.No. Item Details 1. Name of the project(s) M/s. S.Balarama Raju & Others 2. S.No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage to be Construction of Residential High-rise handled/command area/lease area/number of building in an area of 2.336 Acres wells to be drilled. Total Built up Area – 47702.24 Sq.mts. The total number of flats are 216 in number with Cellar +Stilt + G + Upper 8 floors in Block – A, B, C & D and 1 amenity block with Cellar +Stilt + G + Upper 4 floors in Block – E (Amenity) 4. New/Expansion/Modernization New Construction of Residential High-rise Building with 216 flats with five blocks i.e Block A, B,C,D,E . ABCD blocks are residential with cellar + stilt+ Ground floor + upper 8 floors. Block E Amenity block consists of Cellar + Stilt +G +Upper 4 floors. 5. Existing Capacity/Area etc. NIL .It is a new project for construction of high rise building in an area of 2.336 Acres 6. Category of Project i.e. ‘A’ or ‘B’ Category – B, B2. As the built up area is less than 1,50,000 sq.mts we are applying for Environmental Clearance 7. Does it attract the general condition? If yes, No. The proposed project does not attract please specify. any general conditions specified in EIA Notification 2006 and its amendments such as Protected area under Wild Life Protection Act 1972, Critically Polluted areas as per CPCB , Notified Eco sensitive area, Inter state boundaries. 8. Does it attract the specific condition? If yes, No. The proposed project is not located please specify. within Industrial Estate / Complex/Export processing zone / SEZ etc and does not come under items 4(d),4(f),5(e),5(f). The proposal is for Construction of High rise building. 9. Location Plot/Survey/Khasra No. Sy. No: 3/2C/2E/2, Village Narayanapuram, Ward No. 19, Tehsil Tirupati Municipal Corporation District Chittoor district State Andhra Pradesh 10. Nearest Railway Station/Airport along with Tirupati Railway Station at 1.96 kms distance in kms. at 12.09 Kms 11. Nearest Town, City, District Headquarters along Within Narayanapuram with distance in kms. Tirupati town at a distance of 2.03 kms 12. Village Panchayats, Zilla Parishad, Municipal Tirupati Municipal Corporation Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s. S. Balarama Raju & Others Managing Partner 14. Registered Address D.No. 7-86, Padmavathipuram, Tiruchanoor, Tirupati (Urban), Chittoor District, Andhra Pradesh - 517503 15. Address for correspondence: Name S. Balarama Raju & Others Designation (Owner/Partner /CEO) Managing Partner Pin code 517503 E-mail [email protected] Telephone No. 9849677227 Fax No. 16. Details of Alternative Sites examined, if any. No alternate site is examined as the Location of these sites should be shown on a topo proposed site satisfies all the criteria sheet. required for residential building such as transport , road ways, availability of hospitals, colleges etc. 17. Interlinked Projects No 18. Whether separate application of interlinked NA project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, 1980? No ii. The Wildlife (Protection) Act, 1972? No iii. The C.R.Z. Notification, 1991? No 22. Whether there is any Government Order/Policy Applied for providing bulk water system relevant /relating to the site? to Tirupati Municipal Corporation and permission for Air Authority of India. 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? Nil a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project.

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Details thereof (with approximate quantities /rates, wherever possible) Yes/No with source of information data 1.1 Permanent or temporary change in Yes The land earmarked for Construction of land use, land cover or topography Residential High-Rise Building with a site including increase in intensity of land area of about 9453.48 Sq.mts and the total use (with respect to local land use built up area is 47702.24 Sq.mts. This plan) land is sufficient for construction of Residential and associated other utilities. A total of 9453.48 Sq.mts of land is available and is sufficient for the construction activity. Total Built up area = 47702.24 Sq.mts Before Construction Present land in barren. During Operation High rise building residential apartments with 216 flats and amenity block thus resulting in change in land use as the barren land is changed to residential area. 1.2 Clearance of existing land, vegetation Yes During Construction and buildings? The land is barren land. No building existing in this land for clearance. Small shrubs are present which will be cleared while construction. During Operation Greenbelt will be developed within the apartment premises. Greenbelt area is allocated within the proposed site. 1.3 Creation of new land uses? Yes The barren land will be transformed to residential area with 216 flats and an amenity block. 1.4 Pre-Construction investigations e.g. Yes For the total area of 9453.48 Sq.mts bore houses, soil testing? already ground water and soil testing carried. 1.5 Construction works? Yes The present proposal is to construct 216 flats in 4 blocks and an amenity block. Other structures, water storage tanks, DG set room, Sewage Treatment Plant etc. Detailed in Conceptual Plan. 1.6 Demolition works? No The site is leveled one and does not contain any temporary / permanent structures. Therefore no demolition work will be carried. 1.7 Temporary sites used for construction Yes Temporary structures within site for works Or housing of construction construction workers in order to rest other workers? sanitary facilities will be provided. 1.8 Above ground buildings, structures or Yes Buildings: earthworks including linear structures,  Residential Building with 216 flats cut and fill or excavations  Amenity block  Sewage Treatment Plant  Water Storage Tank  DG Set Room 1.9 Underground works including mining No No mining or tunneling activity will be or tunneling? carried out as it is construction of high rise building. 1.10 Reclamation works? No No reclamation work

1.11 Dredging? No Not applicable

1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No It is construction of high rise building. processes? 1.14 Facilities for storage of goods or Yes Cement storage, Sand, iron bars, bricks materials? etc. Building materials storage 1.15 Facilities for treatment or disposal of Yes Sewage: solid waste or liquid effluents? The waste water generated from the proposed project will be in the form of sanitary waste water only which will be routed to sewage treatment plant and thereby reuse, firefighting and if surplus to local municipal sewerage network. Waste water Generation – 148.5 KLD Treatment in Sewage treatment plant of 200 KLD and the treated water will be disposed in drains and used for greenbelt. Solid waste  Solid waste – 600 kg/day DISPOSAL: The segregated waste will be disposed to the local municipal dump yard. 1.16 Facilities for long term housing of Yes Housing facility with electricity and water Operational workers? facility will be provided for watchman. 1.17 New road, rail or sea traffic during No The site is well connected to roadway. No Construction or operation? new road, rail or sea traffic is envisaged during construction or operation phase. 1.18 New road, rail, air waterborne or other No Not applicable. transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No No transport routes will be changed. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not required to divert transmission lines / pipelines? pipelines. 1.21 Impoundment, damming, culverting, No Not applicable realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No stream crossings present. 1.23 Abstraction or transfers of water form No Municipal water will be used to meet the ground or surface waters? water requirements of 165.0 KLD for domestic purpose. 1.24 Changes in water bodies or the land No No change in water bodies and no surface affecting drainage or run-off? changes occur in drainage pattern. As the proposed unit is Construction of Apartment it does not emit any process effluent. 1.25 Transport of personnel or materials Yes During construction activity, private for construction, operation or tippers will be used for supply of metal, decommissioning? sand, cement and iron. 1.26 Long-term dismantling or No No dismantling work will be carried in the decommissioning or restoration project as it is construction of Residential works? project. 1.27 Ongoing activity during No No decommissioning activity proposed. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes There would be a marginal influx of Temporarily or permanently? people since the project consists of residing flats. 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No No native species will be destroyed. As diversity? the proposed project will be constructed in barren land. Therefore no chance of loss of native species or generic diversity occurs. After construction native species will be planted within the proposed project location. 1.31 Any other actions? Yes The Residential project proposed to develop green belt all along the sides of boundary wall.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities / rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The present status of land is barren and agricultural land (ha) non-agricultural. 2.2 Water (expected source & competing Yes During construction users) unit: KLD Domestic & construction–100.0 m3/day

During operation Domestic – 165.0 m3/day 2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, Yes Stone aggregates – 7000 m3 (foundation aggregates, sand / soil (expected work) source – MT) Sand – 25000 cum Brick – 2.5 Lakhs Cement Concrete – 2500 Cubic meters Steel – 2000 MT 2.5 Forests and timber (source – MT) Yes The timber that is required is procured from the approved local contractors. 2.6 Energy including electricity and fuels Yes Electricity will be supplied by (source, competing users) Unit: fuel APTRANSCO. Incase of power failure (MT), energy (MW) 2 x 150 KVA and 2 x 100 KVA DG Sets are proposed to be installed. Diesel for DG Sets – 150 Litres/Day 2.7 Any other natural resources (use No No other natural sources other than the appropriate standard units) above mentioned will be used.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 3.1 Use of substances or materials, which Yes HSD will be used in DG Sets . Used oil are hazardous (as per MSIHC rules) to generated from the DG Sets will be human health or the environment collected securely and disposed to (flora, fauna, and water supplies) authorized agencies 3.2 Changes in occurrence of disease or No There is no possibility for occurrence of affect disease vectors (e.g. insect or disease vectors as there are no water water borne diseases) bodies or stagnant water. Note: As per the studies / literature available, no such diseases were occurred from similar type of units. 3.3 Affect the welfare of people e.g., by Yes Living conditions will escalate therefore changing living conditions? welfare of the people will be on positive side. 3.4 Vulnerable groups of people who No -- could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes? No --

4. Production of solid wastes during construction or operation or commissioning (MT/month)

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes Yes Top soil excavated during construction will be used for green belt and to cover the low lying areas. 4.2 Municipal waste (domestic and or Yes Solid waste – 600 kg/day commercial wastes) STP Sludge – 15.0 Kgs/day Used Batteries – 02 Nos. Used Lubricant – 100 Lt/year Waste Oil – 100 LPA Disposal: The segregated waste will be disposed to the local municipal dump yard. 4.3 Hazardous wastes (as per Hazardous Yes Waste oil will be generated from the Waste Management Rules) generators and will be disposed to authorized recyclers. 4.4 Other industrial process wastes No Since it is construction project, no process/industrial activity involved. 4.5 Surplus product No Not applicable. 4.6 Sewage sludge or other sludge from Yes Sludge (15.0 kgs/day) generated from effluent treatment sewage treatment plant will be disposed to municipal dump yard. 4.7 Construction or demolition wastes No There is no demolition and as such the construction debris does not arise. 4.8 Redundant machinery or equipment No No redundant machinery would be available for disposal. 4.9 Contaminated soils or other materials No No soil / material will be contaminated. 4.10 Agricultural wastes No No agricultural waste will be generated. 4.11 Other solid wastes No Not applicable.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No. Details thereof (with approximate quantities /rates, wherever possible) Information/Checklist confirmation Yes/No with source of information data 5.1 Emissions from combustion of fossil Yes It is proposed to Construct High-Rise fuels from stationary or mobile Residential Apartments and does not sources involve any manufacturing process. Emissions will be generated from the DG Set which is acoustic enclosed. 5.2 Emissions from production processes No This is not a manufacturing facility. Hence no emissions from production process. 5.3 Emissions from materials handling Yes The transportation of construction including storage materials will be taken with due care to safeguard against dust emissions by e or transport coverage as well as by sprinkling water during construction phase. 5.4 Emissions from construction activities Yes The only emission from construction including plant and equipment activities is of concrete miller. It will run on HSD. Remaining all the equipment like vibrator, etc, will operate on power. 5.5 Dust or odours from handling of Yes Dust will arise from construction materials including construction materials. Proper care will be taken materials, sewage and waste during handling of material. During unloading of metal, water will be sprayed. Emissions will be controlled positively. 5.6 Emissions from incineration of waste No No incinerator proposed.

5.7 Emissions from burning of waste in No No open air burning. open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Nil

6. Generation of Noise and Vibration, and Emissions of Light and Heat: Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes The DG sets will be established with engines, ventilation plant, crushers acoustic enclosed and the buildings are also being constructed with noise absorbing materials. DG set will be operated only during power interruption and as a stand by unit in emergency. No crushers or ventilators are proposed. 6.2 From industrial or similar processes No It is proposed to Construct Residential High-Rise Apartments and does not involve any manufacturing process. 6.3 From construction or demolition No There is no demolition proposed in the site and is no possibility of noise development. 6.4 From blasting or piling No No blasting or piling operation required. 6.5 From construction or operational No -- traffic 6.6 From lighting or cooling systems Yes The lighting and cooling systems are designed as per the notification of the National Building code. 6.7 From any other sources No Not applicable.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 7.1 From handling, storage, use or Yes Used oil and HSD for DG Set will be spillage of hazardous materials stored securely. Used oil will be disposed to authorized agencies. 7.2 From discharge of sewage or other Yes The domestic wastewater will be routed effluents to water or the land to sewage treatment plant of 200 KLD (expected mode and place of capacity and will be reused/drains/toilet discharge) flushing. 7.3 By deposition of pollutants emitted to No No deposition of pollutant emitted to air air into the land or into water into the land or into water is envisaged. 7.4 From any other sources? No Nil 7.5 Is there a risk of long term build up of No No pollutants will be built up in the pollutants in the environment from environment. Therefore no risk from any these sources? source.

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc Yes Small quantity of HSD will be stored in from storage, handling, use or the site for running the DG/concrete production of hazardous substances mixer during construction. The HSD will be stored in a secured place. 8.2 From any other causes No ---- 8.3 Could the project be affected by Yes The project will be designed under natural disasters causing earthquake resistance and other NBC environmental damage (e.g. floods, design practices followed for earthquakes, landslides, cloudburst construction activity. etc)

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 9.1 Lead to development of supporting No No supply or ancillary units required for utilities, ancillary development or this project. The required material will development stimulated by the project be purchased directly from vendors. which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, Waste or waste water treatment, etc.) • Housing development • Extractive industries • Supply industries • Other 9.2 Lead to after-use of the site, which No No impact will occur. could have an impact on the (Based on literature / standby of existing environment plants) 9.3 Set a precedent for later developments No No such cases. 9.4 Have cumulative effects due to No No cumulative effects will occur. proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity Name/ Aerial distance (within 15 km.) S.No. Area Identity Proposed project location boundary 1 Areas protected under international No None within 15 km radius. conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive Yes Korramenugunta at 0.64 kms for ecological reasons - Wetlands, Tank at 0.5 kms watercourses or other water bodies, River at 1.86 kms coastal zone, biospheres, mountains, Mangalam Cheruvu at 2.06 kms forests Peruru Cheruvu at 7.54 kms Tirupathi Extension RF at 2.74 kms Doranakambala RF at 9.23 kms 3 Areas used by protected, important or Yes Sri Venkateswara National Park at 7.73 sensitive species of flora or fauna for kms breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground Yes Swarnamukhi River at 1.86 kms waters 5 State, National boundaries No None within 15 kms radius

6 Routes or facilities used by the public Yes Road at 4.50 kms for access to recreation or other tourist, pilgrim areas 7 Defense installations No None within 15 km Aerial distance from proposed site. 8 Densely populated or built-up area Yes Within Narayanapuram 9 Areas occupied by sensitive man- Yes Hospitals and schools are located in made land uses Narayanapuram (Hospitals, schools, places of worship, community facilities) 10 Areas containing important, high Yes Tirumala at a distance of 11.86 kms quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No None within 15 km aerial distance from environmental damage. proposed site. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard No The site falls in Seismic Zone –III. which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding for extreme or adverse climatic conditions)

STANDARD TEMPLATE FOR EVALUATION OF PROJECT

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES:-

S.No Information required Information to be furnished by the proponents 1 Name of the project or activity M/s. S. Balarama Raju & Others 2 Name of the organization/owner. M/s. S. Balarama Raju & Others Managing partners: S.Balarama Raju S.Sivachandra Raju S.Rajeswari 3 Address for communication S.Balarama Raju Managing Partner D.No. 7-86, Padmavathipuram, Tiruchanoor, Tirupati (Urban), Chittoor District, Andhra Pradesh - 517503 4 Telephone numbers [email protected] 5 Email ID of the organization or contact person 9849677227 6 Location of the Proposed project or activity M/s. S. Balarama Raju & Others Sy No. 3/2C/2E/2, Narayanapuram, Ward No. 19, Tirupathi Municipal Corporation, Chittoor District, Andhra Pradesh.

7 Appraisal Category (B2 or B1) B2 8 Nearest habitation and distance from the project or Within Narayanapuram activity 9 Installed capacity / Production Capacities Construction of Residential High- Rise building in an area of 9453.48 Sq.mts Total Built-up area is 47702.24 Sq.mts The total units under the proposed housing project would be 216 no. flats which comprise of Residential Apartments with Cellar +Stilt + G + Upper 8 floors in Block – A, B, C & D and 1 amenity block with Cellar +Stilt + G + Upper 4 floors in Block – E (Amenity) 10 Specify the Fuel (Coal / CNG / biomass/Others) Diesel for Generators of capacity 2 and quantity required x 150 KVA & 2 x 100 KVA 11 Details of Land use/Land Cover The project involves construction of Residential apartments. Brief details enclosed in conceptual plan. 12 Occupancy, ownership of the land in which the Own land activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department) 13 If it is a Forest land, the following details shall be No forest area covers under the furnished: proposed site area. (Whether it is a Reserved forest / Protected forest/Demarcated forest/ National Parks/Sanctuaries/any land in possession of Forest Department.) (The village map with Sy. No. indicating nearest forest boundary line from the site shall be enclosed) 14 Total investment of the project/activity. Rs.75.0 Crores a. Funds allocated for EMP (capital cost and Rs.264.5 Lakhs recurring cost per annum) 15 Brief description of the project with special The applicants intend to construct reference to specific pollution and its control 216 nos. of residential flats. Brief measures. details enclosed in conceptual plan. 16 Compliance report on the following : i. Status of compliance of the conditions and Not applicable environmental safeguards stipulated in the earlier clearance letters.

ii. Details of the court cases, if any, pending in Nil any Court of Law against the project as well as any directions passed by the Court relating to the project directly or indirectly. iii. Details of the notices, if any, given to the Nil project under Section 5 of the Environmental (Protection) Act, 1986 and Section 18 of the Air (Prevention & Control of Pollution) Act, 1981.

17 Whether the project attracts the provisions laid No under the OM dt. 16.11.2012 issued by the MoE&F, GOI, w.r.t. violation of EIA Notification, 2006 and its amendments thereof? (Yes/No) Present stage and status of the project: Construction not yet started 18 Name of the Consultant: SV Enviro Labs & Consultants, Auto Nagar, Visakhapatnam

FORM – IA FOR CONSTRUCTION PROJECTS

FORM- 1A

1. LAND ENVIRONMENT S.No. ITEM COMPLIANCE 1.1 Will the existing land use get significantly The land earmarked for Construction of altered from the project that is not Residential High-Rise Building project consistent with the surroundings? with a site area of about 9453.48 Sq. m and (Proposed land use must conform to the the total built up area is 47702.24 Sq.m. approved Master Plan / Development Plan This land is sufficient for construction of of the area. Change of land use if any and Residential and associated other utilities. the statutory approval from the competent A total of 9453.48 Sq. m of land is authority be submitted). Attach Maps of (i) available and is sufficient for the site location, (ii) surrounding features of construction activity. the proposed site (within 500 meters) and Total Built up area = 47702.24 Sq.m (iii) the site (indicating levels & contours) Further the above land is barren land. After to appropriate scales. If not available attach construction the land use and land cover only conceptual plans. will be changed. 1.2 List out all the major project requirements Area statement in terms of the land area, built up area, Total site Area = 9453.48 Sq.mts water consumption, power requirement, Total Built up area = 47702.24 sq.mts connectivity, community facilities, parking Tot Lot area = 178.90 sq.mts needs etc. No. of flats – 216 Flats Utilities 1. Water supply: Required water of about 100.0 KLD during construction activity from private tankers/Municipal supply and about 165.0 KLD during operation time will be met from the Municipal supply. 2. The required power will be met from APTRANSCO. The connectivity is from nearby transformer. 3. Adequate site has been provided for Sewage treatment plant, road network and DG room. 4. Light motor vehicles / car parking will be provided. 1.3 What are the likely impacts of the proposed There is no impact on the various facilities activity on the existing facilities adjacent to adjacent to the site. the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology). 1.4 Will there be any significant land The land is essentially a leveled ground, disturbance resulting in erosion, subsidence free from erosion or subsidence. & instability? (Details of soil type, slope The terrain is highly stable and does not analysis, vulnerability to subsidence, have possibility of erosion, subsidence or seismicity etc may be given). instability including vulnerability to city. 1.5 Will the proposal involve alteration of There is no alteration of natural drainage natural drainage systems? (Give details on systems. a contour map showing the natural drainage near the proposed project site) 1.6 What are the quantities of earthwork No fill material from out side involved in the construction activity- The excavated earth will be used for filling cutting, filling, reclamation etc. (Give the basement. details of the quantities of earthwork involved, transport of fill materials from outside the site etc.) 1.7 Give details regarding water supply, waste The water for construction will be received handling etc during the construction period. from private tankers/Municipal supply. 1.8 Will the low lying areas & wetlands get Low lying areas and wetlands do not exist. altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris & waste The construction waste will be disposed off during construction cause health hazard? through authorized dealers. (Give quantities of various types of wastes generated during construction including the construction labour and the means of disposal)

2. WATER ENVIRONMENT S.No. ITEM COMPLIANCE 2.1 Give the total quantity of water During construction requirement for the proposed project with Domestic & construction - 100.0 m3/day the breakup of requirements for various During operation uses. How will the water requirement Domestic – 165.0 m3/day met? State the sources & quantities and furnish a water balance statement. 2.2 What is the capacity (dependable flow or The source of water during construction is yield) of the proposed source of water? Private tankers/Municipal supply and during operation is Municipal supply. 2.3 What is the quality of water required, in The parameters are well within the case, the supply is not from a municipal permissible limits for Municipal supply source? (Provide physical, chemical, water. biological characteristics with class of water quality) 2.4 How much of the water requirement can 100% of the waste water will be treated at be met from the recycling of treated the Sewage treatment plant and 40% will be wastewater? (Give the details of used for green belt development/drains and quantities, sources and usage) recirculation. Water source: Municipal 2.5 Will there be diversion of water from There is no diversion of water from other other users? (Please assess the impacts of users. the project on other existing uses and quantities of consumption) 2.6 What is the incremental pollution load The characteristics of the treated sewage from wastewater generated from the will meet the on land for plantation limits as proposed activity? (Give details of the below: quantities and composition of wastewater Parameter Raw Treated generated from the proposed activity) pH 6.8-7.2 7.5-7.8 BOD 200-250 < 30 COD 400-450 < 50 TSS 200-300 <10 TDS 1200-1400 < 1200 All values expressed in mg/l except pH. 2.7 Give details of the water requirements Rain water harvesting will be implemented met from water harvesting? Furnish from rooftops, channeled to the harvesting details of the facilities created. pits through appropriate piping systems. The storm water drains also would have recharging pits along the length of the drains for recharging the ground water. 2.8 What would be the impact of the land use There is no impact of the land use change changes occurring due to the proposed on the runoff characteristics. Care has been project on the runoff characteristics taken to ensure that the built up area is as (quantitative as well as qualitative) of the per the specifications of the Municipal area in the post construction phase on a regulatory authorities and no way has it long term basis? Would it aggravate the affected the surface runoff characteristics. problems of flooding or water logging in any way? 2.9 What are the impacts of the proposal on There will not be any impact on ground the ground water? (Will there be tapping water. of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) 2.10 What precautions/measures are taken to The runoff from the construction activities prevent the run-off from construction are routed through water drainage network. activities polluting land & aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts) 2.11 How is the storm water from within the The runoff from the construction activities site managed?(State the provisions made are routed through water drainage network to avoid flooding of the area, details of and disposed through water disposal the drainage facilities provided along with system. a site layout indication contour levels) 2.12 Will the deployment of construction Local manpower will be utilized for the labourers particularly in the peak period construction work. Therefore no temporary lead to unsanitary conditions around the site used for construction works. project site (Justify with proper explanation) 2.13 What on-site facilities are provided for The sewage that collected from the flats will the collection, treatment & safe disposal be routed to sewage treatment plant and of sewage? (Give details of the quantities further to Municipal sewerage network. of wastewater generation, treatment Wastewater generated from the facilities capacities with technology & facilities for which will be reused for Green belt recycling and disposal) development/toilet flushing/drains. 2.14 Give details of dual plumbing system if A separate line will be installed in the water treated waste used is used for flushing of closet for operating with treated sewage. toilets or any other use.

3. VEGETATION S.No. ITEM COMPLIANCE 3.1 Is there any threat of the project to the There is no threat to bio-diversity due to biodiversity? (Give a description of the the project as the site is devoid of local ecosystem with it’s unique features, vegetation. The land is a degraded and if any) unutilized land which does not consists of any specific/unique features of the eco- system. 3.2 Will the construction involve extensive The proposed site is devoid of vegetation clearing or modification of vegetation? and is a barren land. Hence, there are no (Provide a detailed account of the trees & such impacts on native species and on vegetation affected by the project) genetic diversity. 3.3 What are the measures proposed to be It is proposed to develop plantation along taken to minimize the likely impacts on the boundary walls. important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale)

4. FAUNA

S.No. ITEM COMPLIANCE 4.1 Is there likely to be any displacement of The project area does not have any fauna fauna- both terrestrial and aquatic or both terrestrial and aquatic. There is no creation of barriers for their movement? reporting of wild life. As such there is no Provide the details. impact on terrestrial & aquatic fauna. There are no water bodies in the site. 4.2 Any direct or indirect impacts on the There is no impact on the avifauna. avifauna of the area? Provide details. 4.3 Prescribe measures such as corridors, fish There is no such activity and as such these ladders etc to mitigate adverse impacts on are not provided. fauna

5. AIR ENVIRONMENT S.No. ITEM COMPLIANCE 5.1 Will the project increase atmospheric There is no source for emissions as this is concentration of gases & result in heat not a processing industry. islands? (Give details of background air The emissions expected are from diesel quality levels with predicted values based generators only. The generator will be on dispersion models taking into account operated whenever power fails and will be the increased traffic generation as a result run on HSD. of the proposed constructions) 5.2 What are the impacts on generation of There will not be any generation of dust, smoke, odorous fumes or other hazardous gases. hazardous gases? Give details in relation to all the meteorological parameters. 5.3 Will the proposal create shortage of There is no shortage of parking place. parking space for vehicles? Furnish details Adequate space has been provided for of the present level of transport parking lot exclusively for the usage of infrastructure and measures proposed for the proposed housing project site during improvement including the traffic construction as well as in operation phase. management at the entry & exit to the project site. 5.4 Provide details of the movement patterns The internal roads would have pedestrian with internal roads, bicycle tracks, pathways with adequacy to meet the pedestrian pathways, footpaths etc., with requirement of the residential population. areas under each category. 5.5 Will there be significant increase in traffic There will be a marginal increase of noise & vibrations? Give details of the traffic noise, but measures have been sources and the measures proposed for proposed for mitigation of this noise mitigation of the above. through an extensive plantation along the boundary wall. 5.6 What will be the impact of DG sets & The DG set will be housed in an acoustic other equipment on noise levels & enclosed room to reduce the noise levels vibration in & ambient air quality around and it will be mounted on anti-vibration the project site? Provide details. mounting pads to reduce vibration levels.

6. AESTHETICS

S.No. ITEM COMPLIANCE 6.1 Will the proposed constructions in any Care has been taken to improve the way result in the obstruction of a view, Aesthetics, particularly in respect of scenic amenity or landscapes? Are these landscape and there is no obstruction considerations taken into account by the created. proponents? 6.2 Will there be any adverse impacts from The impact of the proposed construction new constructions on the existing activity on the surroundings will be structures? What are the considerations minimum. taken into account? 6.3 Whether there are any local considerations Not applicable of urban form & urban design influencing the design criteria? They may be explicitly spelt out. 6.4 Are there any anthropological or There are no sites of archeological archaeological sites or art facts nearby? importance within and around the site. State if any other significant features in the vicinity of the proposed site have been considered.

7. SOCIO-ECONOMIC ASPECTS S.No. ITEM COMPLIANCE 7.1 Will the proposal result in any changes to There will not be any changes to the the demographic structure of local demographic structure of local population? Provide the details. populations, as it is a residential apartment and the socio economic power of the surroundings will increase. 7.2 Give details of the existing social Majority of the people are marginal infrastructure around the proposed project. workers. 7.3 Will the project cause adverse effects on There are no sacred sites or of cultural local communities, disturbance to sacred value sites within 10 km radius of the sites or other cultural values? What are the proposed apartments. safeguards proposed?

8. BUILDING MATERIALS

S.No. ITEM COMPLIANCE 8.1 May involve the use of building materials The construction materials like cement, with high-embodied energy. Are the bricks, concrete and sand will be procured construction materials produced with from local authorized vendors. energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) 8.2 Transport and handling of materials during The material will be transported through construction may result in pollution, noise covered trucks and water sprinkling will & public nuisance. What measures are be taken to suppress the dust arise from taken to minimize the impacts? construction materials. 8.3 Are recycled materials used in roads and Usage of fly ash for road development structures? State the extent of savings from the local power plants is being achieved? envisaged. 8.4 Give details of the methods of collection, 600 Kg/day of garbage will be generated segregation & disposal of the garbage The waste will be disposed to local generated during the operation phases of municipal dump yard after segregation. the project.

9. ENERGY CONSERVATION S.No. ITEM COMPLIANCE 9.1 Give details of the power requirements, The proposed project will receive power source of supply, backup source etc. What for its utilities from APTRANSCO and is the energy consumption assumed per during power failure 2 x 150KVA & 2 x square foot of built-up area? How have 100 KVA sets will be used. you tried to minimize energy consumption? 9.2 What type of, and capacity of, power back- DG sets will be kept as standby to up to you plan to provide? overcome the power failure if any. 9.3 What are the characteristics of the glass Type of glass: High Efficiency Low e- you plan to use? Provide specifications of Glass(Solar screen 2000 VEI-2TM) with its characteristics related to both short specifications: wave and long wave radiation? Glass Thickness-0.25 Inches Visible Transmittance(%Daylight)-70 U-factor(Winter)-0.29 Solar Heat Gain Coefficient(SHGC)- 0.37 9.4 What passive solar architectural features Passive features include special glass are being used in the building? Illustrate panels for absorption of solar radiation. the applications made in the proposed project. 9.5 Does the layout of streets & buildings Solar energy system is considered for maximise the potential for solar energy common areas. devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. 9.6 Is shading effectively used to reduce External shading is being provided in the cooling/heating loads? What principles design. have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected? 9.7 Do the structures use energy-efficient ENERGY CONSERVATION space conditioning, lighting and Double Glazing mechanical systems? Provide technical It is decided to use double glazing to details. Provide details of the transformers reduce the heat transmission through the and motor efficiencies, lighting intensity glass. and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. 9.8 What are the likely effects of the building Proper measures will be taken for activity in altering the micro-climates? emission control as well as Provide a self assessment on the likely environmental greening programme. impacts of the proposed construction on creation of heat island & inversion effects? 9.9 What are the thermal characteristics of the The exposed roots will be insulated with building envelope? (a) roof; (b) external under deck insulation. Stilt areas in the walls; and (c) fenestration? Give details of basement and staircase are mechanically the material used and the U-values or the R ventilated and with fire escape systems. values of the individual components. 9.10 What precautions & safety measures are Firefighting equipment proposed against fire hazards? Furnish  Sand buckets details of emergency plans.  Fire alarm  Fire escape (Stair case)  Smoke detectors  Automatic water sprinklers 9.11 If you are using glass as wall material No provides details and specifications including emissivity and thermal characteristics. 9.12 What is the rate of air infiltration into the No air infiltration into the building. building? Provide details of how you are mitigating the effects of infiltration. 9.13 To what extent the non-conventional Solar energy will be used for street energy technologies are utilized in the common facility lightings & for hot overall energy consumption? Provide water. details of the renewable energy technologies used.

(III) ENVIRONMENTAL MANAGEMENT PLAN

S.No. ITEM COMPLIANCE 1 The Environment Management Plan would Environmental Management Plan will consist of all mitigation measures for each be implemented during the construction item wise activity to be undertaken during phase as well as during operational the construction, operation and the entire phase. life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.