WUC 014 (2021) 9 June 2021 TO: All Tenderers Dear Sir / Madam

Total Page:16

File Type:pdf, Size:1020Kb

WUC 014 (2021) 9 June 2021 TO: All Tenderers Dear Sir / Madam Our Ref: WUC 014 (2021) 9 June 2021 TO: All Tenderers Dear Sir / Madam SUPPLY OF WATER TREATMENT CHEMICALS – TENDER NO WUC 014 (2021) ADDENDUM No. 1 The tenderer must note and take into account the amendments and/or additions to the Tender Documents contained in the addendum. This addendum shall form an integral part of the tender submission and should be returned with the tender submission. Clarification/Responses Question 1 The ITT of Equipment and Chemicals says the products should be British, BOBS, SABS compliant. My question is why is it limited to those only? It doesn't include ISO but that's the international standard that all these standards are derived from. Most of the international manufacturers use ISO. Response: The ITT for Supply of Water Treatment Chemicals requires certification for the following: Under Item 4.2.1 General Technical Specifications All Flocculants must be certified for use in drinking water by National Statutory Foundation (NSF International) or equivalent. Under Item 5.1.2 Tender Requirements ISO or relevant Certification of the Manufacturing facilities to a quality management system. Question 2 Kindly advise if all the depots where chemicals will be delivered are accessible by road tanker and also if there is enough storage for the required chemicals? Response: All the depots where chemicals will be delivered are accessible by road tanker and there is adequate storage for the required chemicals, taking note that the volumes indicated on the BOQ are stock required over a period of three (3) years. The plant will order volumes they are able to store on quarterly intervals respectively. Question 3 In Section 5.2.3 “only bidders who had passed the above stages will be required to submit samples of some or all of their proposed items” while Section 4.1 states “Tenderers are requested to submit clearly labelled samples of the flocculants tendered for with the official tender documents and securely packaged separately.” Please state the applicable clause Response: The applicable clause in the case of the above question is Section 5.2.3 “only bidders who had passed the above stages will be required to submit samples of some or all of their proposed items”, (clearly labelled samples of the flocculants tendered for) Question 4 Please share information of contact persons at each site for prior arrangements for Jar Tests/Raw Water Samples. Response: Bidders wishing to tender for Supply of Water Treatment Chemicals are advised as follows: • Provided below is a list of treatment plants and contact people • Tenderers are advised to bring their own water sampling containers • Samples are collected at the treatment plants and at the raw water inlets and not at the dams • Molatedi Raw Water to be collected at the Gaborone Waterworks Treatment Plant in Gaborone a) Contacts for contact persons for collection of raw water samples PLANT LOCATION OF CONTACT RAW WATER SOURCE CONTACT PERSON NAME TREATMENT PLANT MOBILE NUMBER Borolong Thamalakane River Maun Tiroyaone Sikhungu +267 73010782 Shakawe Okavango River Shakawe Tiroyaone Sikhungu +267 73010782 Gumare Okavango River Gumare Tiroyaone Sikhungu +267 73010782 Nokaneng Nokaneng BH 10242 Nokaneng Village Tiroyaone Sikhungu +267 73010782 Motopi Motopi River Motopi Village Tiroyaone Sikhungu +267 73010782 Lobatse Nnywane Dam Lobatse Amantle Diteko +267 73477733 Gaborone Gaborone Dam Gaborone Tebogo Kwape +267 73969686 Mmamashia Letsibogo, Dikgatlhong and Mmamashia Tebogo Kwape +267 73969686 Bokaa Dams Mabalane Molatedi Dam Mabalane Village Keneetswe Mosugelo +267 73327373 Mahalapye Letsibogo and Dikgatlhong Mahalapye Kutlo Tshabalala +267 76429569 Dams Palapye Letsibogo and Dikgatlhong Palapye Widzani Phena +267 73477736 Dams Lotsane Lotsane Dam Maunatlala Village Widzani Phena +267 73477736 Selibe Letsibogo Dam Selibe Phikwe Kaphepha Kaphepha +267 73970307 Phikwe Thune Thune Dam Mathathane Village Kaphepha Kaphepha +267 73970307 Shashe Shashe Dam Shashe Village Amogelang George +267 73212980 Ntimbale Ntimbale Dam Masingwaneng Village Lebogang Bareki +267 73326400 Kasane Chobe River Kasane Laone Montshiwa +267 73012437 Kazungula Chobe River Kazungula Laone Montshiwa +267 73012437 b) Map of Botswana attached for ease of reference Question 5 Do Jar tests have to be done on-site or samples can be arranged for then tests done off-site. Response: Samples can be collected from respective treatment plants as stipulated under Question 4, and jar tests can be carried out using equipments provided at the Mmamashia Laboratory in Gaborone. Requests to use the laboratory should be sent to [email protected] Question 6 When can bidders visit various sites to carry out jar tests or collect samples. Response: Bidders who wish to use the laboratory or visit the site are advised to send their requests to [email protected] Question 7 While awaiting clarification on bullet points 2 to 4 above, Jar test cannot be carried out, and in view of the vast area and distances to be covers for carrying out the Jar test, we hereby request for an extension of time on the closing date from 17 June 2021 to 01 July 2021 Response: Refer to response no. 11 below Question 8 Kindly advise which flocculant (either cationic or ionic) is used at Water Utilities Corporation? Response: The Corporation currently uses a range of cationic quaternary amine polymer, cationic polyelectrolyte consisting of a synergistic blend of inorganic and organic polymers. Question 9 With reference to above tender, page 7 of the document states that Jar test to be conducted on all water sources by tender in the presence of WUC. Please advise how exactly you want tenderer to achieve this as it is practically not possible to accomplish this in short period of time and not cost effective. Thus, disadvantaging new and medium to small players. Please advise on this clause. Response: The Tenderer shall carry out laboratory jar-tests on all raw water supplies in the presence of the Water Utilities Corporation, or other method deemed necessary by the Corporation to evaluate chemical optimum performance. It is, therefore, advised that this exercise is practical to achieve in the time allocated and it has been successfully accomplished in the past tenders. Samples can be collected from respective treatment plants as stipulated under Question 4, and jar tests can be carried out using equipments provided for at the Mmamashia Laboratory in Gaborone. Requests to use the laboratory will [email protected] Question 10 A key point here is that the tender stipulates that jar test work needs to be done on each site. Unfortunately, as you are aware that we do not manufacturer in Botswana, and having to get our supplier here during COVID-19 would be difficult as their company policy does not allow them to travel across borders at the moment because of COVID-19, how would we facilitate this test work? Response: The Tenderer shall carry out laboratory jar-tests on all raw water supplies at their expense and independent arrangement. The Corporation will facilitate that jar tests be carried out using equipments provided for at the Mmamashia Laboratory in Gaborone. 11. Tender closing date has been revised to 08 July 2021 at 1400hrs. 12. All other conditions remain the same. An acknowledgement form is included at the bottom of this addendum, which you are kindly requested to sign and return to [email protected] Yours faithfully Thank you, Z. Mmolawa SENIOR MANAGER – SUPPLY CHAIN cc: WRD .
Recommended publications
  • Environmental Hydrogeology of Lobatse South East District, Republic of Botswana
    Bundesanstalt für Geowissenschaften und Rohstoffe Geozentrum Hannover, Germany Environmental Hydrogeology of Lobatse South East District, Republic of Botswana by Katharina Beger, June 2001 Edited by Dr. H. Vogel Table of contents 1. Abstract.............................................................................................................................1 2. Acknowledgements ...........................................................................................................1 3. Introduction ......................................................................................................................2 3.1.1. Project objectives .............................................................................................2 3.1.2. Background......................................................................................................2 4. Geography and geology of the project area .....................................................................4 4.1.1. Geography .......................................................................................................4 4.1.1.1. Location ....................................................................................................5 4.1.1.2. Morphology ...............................................................................................5 4.1.1.3. Climate ......................................................................................................5 4.1.1.4. Settlement, infrastructure and land use .......................................................6
    [Show full text]
  • ANNEX 6 - Fisheries Management Framework
    "Strengthening Fisheries Management in ACP Countries" ANNEX 6 - Fisheries Management Framework Fish Stock Assessment in Major Dams in Botswana Project ref. N° SA-3.2- B15 Region: Southern Africa Country: Botswana November 2012 Assignment by: Project Funded by the European Union. “This publication has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of Prof Ian Cowx on behalf of Landell Mills and can in no way be taken to reflect the views of the European Union.” “The content of this document does not necessarily reflect the views of the concerned governments.” Fish Stock Assessment in Major Dams in Botswana Fish Stock Assessment in Major Dams in Botswana Project ref. N° SA-3.2- B15 Name of individual consultant Professor Ian Cowx Contents amendment record This report has been issued and amended as follows: Revision Description Date Signed 1 First draft 3/11/2012 2 Report 22/11/2012 Designed and produced at Landell Mills Ltd Task management & quality assurance by Charlotte Howell This report has been prepared with the financial support of the European Union. The contents of this publication are the sole responsibility of Landell Mills and can in no way be taken to reflect the views of the European Union. Project Funded by the European Union A project implemented by Landell Mills pg. 2 Fish Stock Assessment in Major Dams in Botswana Contents LIST OF ACRONYMS.......................................................................................................................... 4 1. BACKGROUND ............................................................................................................................ 6 2. BACKGROUND INFORMATION ON MAJOR DAMS IN BOTSWANA ............................. 8 3. STATUS OF THE FISHERIES IN THE MAJOR DAMS......................................................
    [Show full text]
  • Botswana Environment Statistics Water Digest 2018
    Botswana Environment Statistics Water Digest 2018 Private Bag 0024 Gaborone TOLL FREE NUMBER: 0800600200 Tel: ( +267) 367 1300 Fax: ( +267) 395 2201 E-mail: [email protected] Website: http://www.statsbots.org.bw Published by STATISTICS BOTSWANA Private Bag 0024, Gaborone Phone: 3671300 Fax: 3952201 Email: [email protected] Website: www.statsbots.org.bw Contact Unit: Environment Statistics Unit Phone: 367 1300 ISBN: 978-99968-482-3-0 (e-book) Copyright © Statistics Botswana 2020 No part of this information shall be reproduced, stored in a Retrieval system, or even transmitted in any form or by any means, whether electronically, mechanically, photocopying or otherwise, without the prior permission of Statistics Botswana. BOTSWANA ENVIRONMENT STATISTICS WATER DIGEST 2018 Statistics Botswana PREFACE This is Statistics Botswana’s annual Botswana Environment Statistics: Water Digest. It is the first solely water statistics annual digest. This Digest will provide data for use by decision-makers in water management and development and provide tools for the monitoring of trends in water statistics. The indicators in this report cover data on dam levels, water production, billed water consumption, non-revenue water, and water supplied to mines. It is envisaged that coverage of indicators will be expanded as more data becomes available. International standards and guidelines were followed in the compilation of this report. The United Nations Framework for the Development of Environment Statistics (UNFDES) and the United Nations International Recommendations for Water Statistics were particularly useful guidelines. The data collected herein will feed into the UN System of Environmental Economic Accounting (SEEA) for water and hence facilitate an informed management of water resources.
    [Show full text]
  • Botswana Environment Statistics Water Climate
    BOTSWANA ENVIRONMENT STATISTICS: WATER & CLIMATE DIGEST 2014 Published by Statistics Botswana Private Bag 0024, Gaborone Phone: 3671300 Email: [email protected] Contact Unit: Environment Statistics Unit Phone: 3671395 Copyright Reserved © 2015 Extracts may be published if Sources are duly acknowledged ISBN: 978-99968-429-8-6 PREFACE This is the first edition of the Botswana Environment: Water and Climate Digest, which eventually will be produced on a quarterly basis. The purpose of the Digest is to provide data for use by decision-makers in water management as well as for monitoring trends related to climate. The indicators in this report cover data on dam levels, water production, rainfall and temperature. The indicators will however be gradually expanded in subsequent editions as more data become available. In compiling this report, international standards and guidelines were followed, particularly the United Nations Framework for the Development of Environment Statistics (UNFDES) and the United Nations International Recommendations for Water Statistics. Eventually, the data collected through these methodologies would feed into the UN System of Environmental Economic Accounting (SEEA) for water and hence facilitate an informed management of water resources. The sustained production of the Water and Climate Digest would depend on the cooperation of relevant data providers to provide the necessary data. I therefore would like to extend by gratitude and appreciation to all stakeholders who assisted in the production of this digest, in particular the Water Utilities Corporation and the Department of Meteorological Services for availing the water and climate data as required. For more information and further enquiries, contact the Directorate of Stakeholder Relations at 3671300.
    [Show full text]
  • Botswana North-South Carrier Water Project Field Survey
    Botswana North-South Carrier Water Project Field Survey: July 2003 1. Project Profile & Japan’s ODA Loan Angola Zambia Botswana Zimbabwe Namibia Maun Francistown Ghanzi Palapye Mamuno Maharapye South Africa Gaborone Tshabong Project location map Mmamashia Water Treatment Works 1.1 Background Botswana is a landlocked country that is situated in the Kalahari Basin on the plains of southern Africa (average altitude: approximately 900 meters); it is bordered by the Republic of South Africa, Zimbabwe, Namibia, and Zambia. Its territory is generally flat and covers an area of 582 thousand square meters or approximately one-and-a-half times the size of Japan. It has a sub-tropical climate, with much of the country being arid or semi-arid. Annual rainfall averages 400mm nationwide, with southwestern regions seeing the least precipitation (250mm) and southeastern areas the most (600mm). Rainfall levels are seasonally affected and unstable. Botswana has few surface water resources in consequence of its topographical and geographical features and sources the majority of its water from groundwater fossil resources. At the time of appraisal, the water supply rate was 100 percent in urban areas centered around the capital, Gaborone, but in view of the fact that demand was growing at exponential rates, large-scale development of underground water was problematic and water resources around the capital had been developed, the country was considering water transmission from other regions. In addition, Gaborone was importing water on a regular basis from South Africa and the country harbored a long-cherished wish to develop independent national water resources. By contrast, the water supply rate in the regions was 50 percent and reliant on groundwater.
    [Show full text]
  • Stormwater Management in Gaborone a Minor Field Study of the Quality and Quantity of Water in Segoditshane River
    Stormwater management in Gaborone A Minor Field Study of the quality and quantity of water in Segoditshane River Elin Andersson & Hanna Palm Johansson Water and Environmental Engineering Department of Chemical Engineering Master Thesis 2015 Stormwater management in Gaborone A Minorstudy ofField the Studyquality of and the quantityquality and of waterquantity in inSegoditshane Segoditshane River River by Elin Andersson & Hanna Palm Johansson Master Thesis number: 2015-19 Water and Environmental Engineering Department of Chemical Engineering Lund University September 2015 Supervisor: Senior lecturer Karin Jönsson Co-supervisor: Dr. Phillimon Odirile & Dr. Veronica Obuseng Examiner: Dr. Åsa Davidsson Picture on front page: Segoditshane River. Photo by Hanna Palm Johansson and Elin Andersson Postal address Visiting address Telephone P.O. Box 124 Getingevägen 60 +46 46-222 82 85 SE-221 00 Lund, Sweden +46 46-222 00 00 Web address Telefax www.vateknik.lth.se +46 46-222 45 26 Minor Field Study This study has been carried out within the framework of the Minor Field Studies (MFS) Scholarship Programme, which is funded by the Swedish International Development Cooperation Agency, Sida. The MFS Scholarship Programme offers Swedish university students an opportunity to carry out two months’ field work in a developing country resulting in a graduation thesis work, a Master’s dissertation or a similar in-depth study. These studies are primarily conducted within subject areas that are important from an international development perspective and in a country supported by Swedish international development assistance. The main purpose of the MFS Programme is to enhance Swedish university students’ knowledge and understanding of developing countries and their problems.
    [Show full text]
  • A Case of Bobirwa Sub-District, Limpopo Basin and Botswana
    sustainability Article Effects of Droughts on Vegetation Condition and Ecosystem Service Delivery in Data-Poor Areas: A Case of Bobirwa Sub-District, Limpopo Basin and Botswana Ephias Mugari 1,* , Hillary Masundire 1 and Maitseo Bolaane 2 1 Biological Science Department, Faculty of Science, University of Botswana, Private Bag UB0022, Gaborone, Botswana; [email protected] 2 History Department, Faculty of Humanities, University of Botswana, Private Bag UB0022, Gaborone, Botswana; [email protected] * Correspondence: [email protected]; Tel.: +267-74417804 Received: 30 July 2020; Accepted: 29 September 2020; Published: 4 October 2020 Abstract: Understanding the effects of droughts on vegetation and ecosystem services (ES) is important for climate change adaptation. However, drought occurrence varies across space and time. We examined drought dynamics and impacts on vegetation and ES in the semi-arid Limpopo Basin of Botswana. Weather station precipitation, remotely sensed normalized difference vegetation index (NDVI) and participatory mapping exercises provided data for the analyses. Results show that between 1980 and 2015, rainfall anomaly indices of potential drought years ranged between 4.38 − and 0.12. The longest spell of below-average rainfall occurred between 1992 and 1996. On average, − drought events lasted for 1.9 years and recurred every 2.3 years. Although the overall drought frequency was 3.7 times in every 5 years, drought prevalence increased to 50%, 60% and 70% between 1981–1990, 1991–2000, and 2001–2010, respectively. The wet season average vegetation condition index between 2000 and 2015 revealed the occurrence of severe-to-extreme droughts in 2002–2003, 2005, 2008–2009 and 2012–2013 and light-to-moderate droughts in 2004, 2006–2007 and 2011, giving a drought prevalence of 73.3%.
    [Show full text]
  • Daily Hansard (Parliamentary Debates)
    HANSARDYOUR VOICE IN PARLIAMENT DAILY HANSARD (PARLIAMENTARY DEBATES) TTHEHE SECONDFIRST MEE MEETINGTING O FOF THE THE SECOND SECOND SESSIO SESSIONN OOFF THE ELEVENTH PARLIAMENT HANSARD NO. 181182 TUESDAY 1 MARCH 2016 DISCLAIMER Unofficial Hansard This transcript of Parliamentary proceedings is an unofficial version of the Hansard and may contain inaccuracies. It is hereby published for general purposes only. The final edited version of the Hansard will be published when available and can be obtained from the Assistant Clerk (Editorial). NATIONAL ASSEMBLY ENGLISH VERSION THE NATIONAL ASSEMBLY SPEAKER The Hon. Gladys K. T. Kokorwe MP. DEPUTY SPEAKER The Hon. Kagiso P. Molatlhegi, MP Gaborone South Clerk of the National Assembly - Ms B. N. Dithapo Deputy Clerk of the National Assembly - Dr R.D. Dingalo Ag. Learned Parliamentary Counsel - Mr S. Chikanda Assistant Clerk (E) - Mr R. Josiah CABINET His Excellency Lt. Gen. Dr. S. K. I. Khama PH, FOM, - President DCO, DSM, MP. His Honour M. E. K. Masisi, MP. (Moshupa-Manyana) - Vice President Minister of Foreign Affairs and International Hon. Dr. P. Venson-Moitoi, MP. (Serowe South) - Cooperation Minister of Local Government and Rural Hon. S. Tsogwane, MP. (Boteti North) - Development Minister of Infrastructure, Science and Hon. N. E. Molefhi, MP. (Selebi Phikwe East) - Technology Hon. S. Kgathi, MP. (Bobirwa) - Minister of Defence, Justice and Security Minister of Minerals, Energy and Water Hon. O. K. Mokaila, MP. (Specially Elected) - Resources Hon. P. M. Maele, MP. (Lerala - Maunatlala) - Minister of Lands and Housing Hon. E. J. Batshu, MP. (Nkange) - Minister of Labour and Home Affairs Hon. D. K. Makgato, MP. (Sefhare - Ramokgonami) - Minister of Health Hon.
    [Show full text]
  • E-Government and Democracy in Botswana: Observational and Experimental Evidence on the Effects of E-Government Usage on Political Attitudes
    A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Bante, Jana et al. Working Paper E-government and democracy in Botswana: Observational and experimental evidence on the effects of e-government usage on political attitudes Discussion Paper, No. 16/2021 Provided in Cooperation with: German Development Institute / Deutsches Institut für Entwicklungspolitik (DIE), Bonn Suggested Citation: Bante, Jana et al. (2021) : E-government and democracy in Botswana: Observational and experimental evidence on the effects of e-government usage on political attitudes, Discussion Paper, No. 16/2021, ISBN 978-3-96021-153-2, Deutsches Institut für Entwicklungspolitik (DIE), Bonn, http://dx.doi.org/10.23661/dp16.2021 This Version is available at: http://hdl.handle.net/10419/234177 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen die in der dort Content Licence (especially Creative Commons Licences), you genannten Lizenz gewährten Nutzungsrechte.
    [Show full text]
  • Availability and Trends of Water Supply Network in Sub-Sahara Botswana Agarwal A.1, Garg D.2, Nkhwanana N .3
    International Journal of Civil, Mechanical and Energy Science (IJCMES) [Vol-3, Issue-2, Mar-Apr, 2017] https://dx.doi.org/10.24001/ijcmes.3.2.4 ISSN: 2455-5304 Availability and trends of water supply Network in sub-Sahara Botswana Agarwal A.1, Garg D.2, Nkhwanana N .3 1Department of Mechanical engineering, University of Botswana, Botswana 2Department of Computer science, University of Botswana, Botswana 3Department of civil engineering, University of Botswana, Botswana Abstract— Water is an essential requirement for south-eastern Botswana. A country with a high reliance individuals and is one of the major keys of any financial on surface water, Gaborone is the same with, as of not improvement of the world social orders and a long ago, the majority of the city's water being manageable utilization of this asset is of most extreme preoccupied from the Gaborone Reservoir [1]. significance. Water shortage can have extraordinary Botswana's climate is semi-arid. Though it is hot and dry effects with respect to the economy, advancement and for much of the year, there is a rainy season, which runs national security of a nation and it is imperative to get a through the summer months. Rainfall tends to be erratic, handle on the reason for the issue keeping in mind the unpredictable and highly regional. Often a heavy end goal to explain it in the most productive way. By downpour may occur in one area while 10 or 15 breaking down information time arrangement for kilometres away there is no rain at all. Showers are often temperature, precipitation and utilization and followed by strong sunshine so that a good deal of the additionally playing out a spatial investigation over the rainfall does not penetrate the ground but is lost to catchment range it was conceivable to distinguish the evaporation and transpiration.
    [Show full text]
  • WI Afrwbirdcensen-FR 1998.Pdf
    AFRICAN WATERBIRD CENSUS COVERAGE Participating Countries, April 1997 - March 1998 COUVERTURE GEOGRAPHIQUE DES DENOMBREMENTS D’OISEAUX D’EAU EN AFRIQUE Pays participants, avril 1997 - mars 1998 Participating countries, April 1997 - March 1998 Pays participants, avril 1997 - mars 1998 1 INTRODUCTION This report This publication comprises results and overviews of wetland surveys and waterbird counts between April 1997 and March 1998, centred around the key months of July 1997 and January 1998. It is the eighth annual African Waterbird Census (AfWC) report and, like previous editions, is presented in both English and French. Copyright has been waived to encourage reproduction of reports and the practical use of data for wetland and waterbird conservation. The report is divided into five sub-regional sections, within which national overviews are followed by tables summarising waterbird data at the sub-regional level and potential Ramsar sites found to meet Ramsar criterion 3(c). A sub-regional summary discussion of the region’s results and other related topics is also presented. The final section provides additional information related to the AfWC, notably updates from the Conventions, Waterbird Specialist Groups and partners, lists of National Coordinators and waterbirds, and a bibliography. This year the report has been produced in Africa for the first time in our West Africa office in Dakar, Senegal. We do sincerely apologise to regular readers for our abnormal delay, which has resulted principally from this phase of relocation and the launch of new African projects, some bringing direct support to the AfWC. Participation and Coverage A record number of 30 countries participated, including Gabon once more and The Congo for the first time.
    [Show full text]
  • November 2019
    November 2019 Contributors Girma Ebrahim (IWMI) Fanilo Father (DWS-BW) Chipo Hlatywayo (ZINWA) Keodumetse Keetile (DWS-BW) Piet Kenabatho (University of Botswana) Jonathan Lautze (Project Leader, IWMI) Manuel Magombeyi (IWMI) Kwazi Majola (DWS-SA) Boitshoko Matlhakoane (University of Witwatersrand) Linda Modo (DWS-BW) Pako Mowaneng (University of Botswana) Percy Mugwangwavari (Department of Water Resources Planning and Management Ministry of Lands, Agriculture, Water, Climate and Rural Resettlement, Zimbabwe) Patience Mukuyu (IWMI) Brighton Munyai (SADC-GMI) Robert Mutepfa (Department of Water Resources Planning and Management Ministry of Lands, Agriculture, Water, Climate and Rural Resettlement, Zimbabwe) Elelwani Netshitanini (DWS-SA) Benjamin Ngoni (DWS-BW) Welcome Nyalungu (DWS-SA) Ben Nyikadzino (ZINWA) Paul Pavelic (IWMI) Alfred Petros (DWS-BW) Fhedzisani Ramusiya (DWS-SA) Farai Simba (University of Great Zimbabwe) Karen Villholth (IWMI) i Acronyms AfDB African Development Bank AGWNET Africa Groundwater Network AMD Acid mine drainage BIOPAMA Biodiversity and Protected Areas Management BCL Bamangwato Concessions Ltd CMA Catchment Management Agency DWA Department of Water Affairs DWS-BW Department of Water and Sanitation-Botswana DWS-SA Department of Water and Sanitation-South Africa DoH Department of Health DWAF Department of Water Affairs and Forestry EFR Environmental Flow Requirements ET Evapotranspiration EMA Environmental Management Agency FDC Flow Duration Curve FAO Food and Agricultural Organization GDE Groundwater Depended
    [Show full text]