APPENDIX S1 HERITAGE ASSESSMENT FOR BIRD IN HAND GOLD PROJECT BIRD IN HAND GOLD PROJECT MINING LEASE PROPOSAL MC 4473 ABN | 66 122 765 708 Unit 7 / 202-208 Glen Osmond Road | Fullarton SA 5063 REPORT ON THE BIRD-IN-HAND HERITAGE ASSESSMENT FOR A MINING LEASE APPLICATION Prepared for Terramin Australia Limited on Instructions from Mr Matthew Daniel, Environment & Community Superintendent By Dr Philip A. Clarke BSc, BA, MA. Qual., PhD
[email protected] c/- 17 Duke Street, Beulah Park, SA, 5067 Mb: 0448812494 26th May 2016 CONTENTS Abstract 4 The Brief 4 Methods 5 Disclaimer 5 Part 1: Aboriginal Inhabitants of the Woodside Area 8 Territories 8 Foraging 13 Trade 17 Camps 19 Mythology 22 Aboriginal post-European settlement history 24 Part 2: European History of the Bird-in-Hand Mine 29 Woodside Goldfield 29 The Bird-in-Hand Mine 32 Reefton Heights and surrounding farms 40 Other mines in the Bird-in-Hand Group 46 Recent exploration 49 Executive Summary 51 References 53 Author’s Background 59 CONFIDENTIAL REPORT FOR TERRAMIN AUSTRALIA LTD Page 2 FIGURES Figure 1: Location of the Terramin exploration tenements (Terramin, 2016). 6 Figure 2: Mineral claim area, enclosed within the yellow boundary, showing 7 the extent of the planned underground works (Terramin, 2016). Figure 3: Aboriginal territories (after Tindale, 1974 and Berndt et al., 1993). 10 Figure 4: Cross section from Saint Vincent Gulf to the Murray River 17 showing Aboriginal environment use (Tindale, 1974, Fig.20, p.61). Figure 5: Plan of a Peramangk campsite (Tindale, 1974, Fig.17, p.56).