ASKAR OIL SERVICES (PVT) LTD APPLICABLE RETAIL PRICE of MS & HSD at PETROL PUMPS EFFECTIVE from 1St JULY-2021

Total Page:16

File Type:pdf, Size:1020Kb

ASKAR OIL SERVICES (PVT) LTD APPLICABLE RETAIL PRICE of MS & HSD at PETROL PUMPS EFFECTIVE from 1St JULY-2021 ASKAR OIL SERVICES (PVT) LTD APPLICABLE RETAIL PRICE OF MS & HSD AT PETROL PUMPS EFFECTIVE FROM 1st JULY-2021 Retail Price of Sr # Name of Civil District Province Petrol Pump City/Location S.F Amount HSD MS 1 ABBOTTABAD KP Sarfraz Filling Station (MSK) At 15 K.M From Jaika Gali ,On Barot Jhika Gali Road at Barot, 0.6851 114.68 113.38 2 ABBOTTABAD KP Kunhar Vally Filling Station At Village Boi, On Boi-Garhi Habib Ullah Road, 1.5119 115.50 114.20 At Mouza Khoda, On Rawalpindi – Hasanabdal – Peshawar Road National Highway (N-5), At 3 ATTOCK Punjab ALI F/S 0.3413 114.33 113.03 6.7 KM from Burhan Interchange, in Khasra No.398, Tehsil HASANABDAL District ATTOCK At Mouza & Village Lakar Mar, On Jand / Mukhad Road, Khasra No.4568, Khatooni No. 01, 4 ATTOCK Punjab KHATTAK P/S 0.3875 114.38 113.08 Khewat No 1811, Tehsil JAND District ATTOCK 5 ATTOCK Punjab PetrogasCNG Station GT Rd, Burhan 0.5096 114.50 113.20 6 BADIN Sind NADEEM & CO. At Badin Town, Plot No. 10-B, 10-C, At Deh Sonhar, On Golarchi Road, Taluka & Distt. Badin 1.1452 115.14 113.84 At Plot No.197/4, At Deh Barodari, in B/W 0-1 from Golarchi, On Golarchi – Garhore 7 BADIN Sind Seven Star P/S 1.0411 115.03 113.73 Sharif Road, Taluka Shaheed Fazil Rahu, District BADIN. At Deh & Tapo Walhar, in B/w 13 -14km, On Talhar / Badin Road, At Peeru Lashari, 8 BADIN Sind Al-Murtaza P/S 1.3014 115.29 113.99 Taluka Talhar, District Badin. 9 BADIN Sind Asfand P/S At Deh & Tapo Khoski, On Khoski - Mithi Road,Taluka Tando Bago, District BADIN. 1.6104 115.60 114.30 At Deh & Tapo Golarchi, On Badin - Sujawal Road, At Golarchi Town, in Block No. 15/3, Taluka 10 BADIN Sind K.D F/S 1.1452 115.14 113.84 Shaheed Fazil Rahu, District BADIN. 11 BAGH AJK MOAZAM F/S Mouza Kotariry Koflo, on Bagh- Forward Kuhuta Road, 14 km from Bagh, - 113.99 112.69 KM NO. 69/70 ON BAHAWALNAGAR FORT ABBAS ROAD AT CHAK NO. 124/6-R TEHSIL 12 BAHAWAL NAGAR Punjab AKHTAR PETROLEUM 0.6766 114.67 113.37 HAROONABAD DISTT BAHAWALNAGAR 13 BAHAWAL NAGAR Punjab New Kashmir Petroleum At Mouza Chak Zaman, On Bahawalpur – Bahawalnagar Sulemanki Road 0.6851 114.68 113.38 At Chak No.95/F, Near Passota Chowk in B/W K.M 0-1 From Passota Chowk to Dahranwala 14 BAHAWAL NAGAR Punjab Zulfiqar Ali F/S 0.7023 114.69 113.39 Road 15 BAHAWAL NAGAR Punjab Hamza Filling Station At Mouza Musa Bhota, in B/W K.M 5-6 From Bahawalnagar to Arifwala Road, 0.7589 114.75 113.45 At Mouza Shera Baghban Ottarr, in B/W 2-3 K.M From Bahawalnagar City, On Bahawalnagar 16 BAHAWAL NAGAR Punjab NEW KARMANWALA 0.7589 114.75 113.45 Jalwala Road, PLOT KHASRA NO. 552/1-5 KHEWAT NO. 262 KHATOONI NO. 455 IN KM NO. 6 FROM GIJIANI 17 BAHAWAL NAGAR Punjab RAJPUT FILLING STATION 0.8502 114.84 113.54 ADDA ON GIJIANI TO MAHARWALI DISTT BAHWALNAGAR 18 BAHAWAL NAGAR Punjab Joiya Filling Station Donga Bonga 0.9213 114.91 113.61 19 BAHAWAL NAGAR Punjab AL NOOR FILLING STATION At Mouza Mureed Wali. 6KM From Minchinabad, On Minchinabad - Mandi Sadiq Gang Road, 0.9776 114.97 113.67 20 BAHAWAL NAGAR Punjab Al-Massom Filling Station Fort abbas Road 1.0630 115.05 113.75 21 BAHAWAL NAGAR Punjab Junaid F/S Minchen abad - Dober Shakir Gang Road 1.2040 115.19 113.89 AT KHUSRA NO. 304/6 KILLA NO. 2 KHEWAT NO. 12 KHATOONI NO. 38/1, B/W KM NO. 6/7 22 BAHAWAL NAGAR Punjab PEER PATHAN PETROLEUM 1.2599 115.25 113.95 FROM ADDA BAREEKA MANDI SADIQ GUNJRD TEHSIL MINCHANABAD At Chak No.122/6-R, On Head 7/R to Faqeerwali Road, In Km No.11-12(11.4Km From Head 23 BAHAWAL NAGAR Punjab AL NAQEEB F/S 1.4229 115.41 114.11 7/R), Tehsil Haroonabad, Distt. Bahawalnagar At Mouza Hasilpur, On Hasilpur - Chak Kotara Form Road, 1.0km from Hasilpur - Main Vehari 24 BAHAWALPUR Punjab WAQAR PET SERVC 0.2776 114.27 112.97 Road, Tehsil Hasilpur, Distt. Bahawalpur PLOT KHASRA NO. 540/9 KILLA NO 12/2 KEWAT NO 37/34 KHATOONI NO 224 IN B/W KM NO 25 BAHAWALPUR Punjab GUJJAR P/S 0.3528 114.34 113.04 75/76 AT MOUZA LOOTHRAN TEHSIL KHAIRPUR TAMEWALI DISTT BAHAWALPUR 26 BAHAWALPUR Punjab Mushtaq Filling Station Bahawalpur Hasilpur Road 0.4016 114.39 113.09 27 BAHAWALPUR Punjab Al Makka Filling Station Jhangi wala 0.9685 114.96 113.66 28 BAHAWALPUR Punjab Majeed Filling Station Bahawalpur 0.9685 114.96 113.66 29 BAHAWALPUR Punjab Akbar Petroleum Uch Sharif 1.0158 115.01 113.71 30 BAHAWALPUR Punjab Chaudhary Filling Station At Mouza Phalia, 1.0 K.M from Hailan Chowk On Phalia- Dinga Road, 1.0867 115.08 113.78 31 BAHAWALPUR Punjab Umer Petroleum Khan Kha Sharif 1.0867 115.08 113.78 32 BAHAWALPUR Punjab Yaseen Filling Station Yazman Road 1.1339 115.12 113.82 33 BAHAWALPUR Punjab Nazir Filling Station Mandi Yazman 1.2756 115.27 113.97 34 BAHAWALPUR Punjab Al Makka Filling Station Mubarak pur 1.2756 115.27 113.97 At Chak No.46/DB, in B/W 13-14 K.M From Yazman Road, On Bahawalpur Yazman Road to 35 BAHAWALPUR Punjab Sajid Petroleum 1.2756 115.27 113.97 Kudwala Rest House Road, At Mouza Malkani Basti, On Muarak pur Kotla Musa-Khaiarpur-Uch Shareef Road in KM no:13- 36 BAHAWALPUR Punjab Al Hamza F/S 1.2843 115.27 113.97 14, At Chak No.137/DB, in B/W 12-13 K.M From Tailwala On Tailwal Khutri Banglow Road, Near 37 BAHAWALPUR Punjab Mian Petroleum 1.5119 115.50 114.20 Addar Chimian, On Bahawalpur to Hasilpur Road, In km No. 60-61 (at Khairpur tamewali), At Mouza Kharal, 38 BAHAWALPUR Punjab RAFIQUE PETROLEUM SERVICE 0.5096 114.50 113.20 Tehsil Khairpur Tamewali District Bahawalpur. On Khairpur Tamewali - Mailsi Link Canal - Haji jhok Road, In km No. 2-3 (2.9 km from Mailsi 39 BAHAWALPUR Punjab AL-AHMED P/S 0.6727 114.66 113.36 Link Canal Khairpur Tamewali), At Mouza Zorkot, Tehsil Khairpur District Bahawalpur. On Bahawalpur - Hasilpur Road, At Mouza Bhuraata, Tehsil Khairpur Tamewali District 40 BAHAWALPUR Punjab Arain F/S 0.5096 114.50 113.20 Bahawalpur. Page 1 of 10 ASKAR OIL SERVICES (PVT) LTD APPLICABLE RETAIL PRICE OF MS & HSD AT PETROL PUMPS EFFECTIVE FROM 1st JULY-2021 Retail Price of Sr # Name of Civil District Province Petrol Pump City/Location S.F Amount HSD MS 41 BANU KP Atta Muhammad At 22 K.M. New Mirzail Gate Bannu / Miran Shah Road,. 1.3229 115.31 114.01 42 BANU KP Dil Nawaz Filling Station Mouza Shin Kandi Sarai At K.M 8 Miran Shah Road, 1.3702 115.36 114.06 43 BATAGRAM KP Habib Ur Rehman At Mouza Kuzabanda. On Chatter Plain Road, 12KM from Distt. Head Quarter, 1.6536 115.64 114.34 SURVEY NO. 43 DEH DAULTPUR TAPA DAULTPUR, ON JOKHIA ROAD TALUKA KAZI AHMAD 44 BENAZIRABAD Sind SHAFQAT FILLING STATION 1.7932 115.78 114.48 DISTT SHAHEED BANAZIRABAD At Deh Shahpur, Tapo Doulat pur, in B/W 309 – 310-KM from Karachi, On National Highway (N- 45 BENAZIRABAD Sind SHERAZ F/S 1.9377 115.93 114.63 5) North Bound, Taluka DAULAT PUR, District SHAHEED BENAZIR ABAD (NAWABSHAH). At Mouza Dhandla, On Notak - Basti Mitthu Road, in B/W 11-12km(11.8km from Notak Adda), 46 BHAKKAR Punjab GILLANI F/S 0.8271 114.82 113.52 Tehsil & Distt. Bhakkar. 47 BHIMBER AJK CH.RIAZ AHMAD & SONS At Mouza Kasguma, On Bhimer – Chaksawari Road, Tehsil & District BHIMER. 0.2603 114.25 112.95 48 CHAKWAL Punjab Mughal Filling Station At Mouza Qum Kasar B/W K.M 61/62 on Rawat-Chakbeli-Dhudial Road, 0.4725 114.46 113.16 49 CHAKWAL Punjab JAWAD PETROLEUM SERVICES At Mouza Massawal. 1.5KM from Mehlhal Mughallan, 3KM From Main Chakwal Road. 0.4725 114.46 113.16 50 CHAKWAL Punjab Chaudhary Petroleum Svs THOHA BHUDUR DISTT CHAKWAL 0.7350 114.73 113.43 51 CHARSADA KP Aurengzab Filling Station K.M 11 From Char Sadda, Mardan Road, 0.3307 114.32 113.02 52 CHARSADA KP Bahar Filling Station 5-K.M From ShabKadar Chowk On Batagram Road, At Ghari Abdul Rehman, 0.3307 114.32 113.02 53 CHARSADA KP Ekhwan Filling Station At Choti On Peshawar / Charsada Road, 1.8-K.M From Bazi Khel Bridge, 0.3307 114.32 113.02 54 D.G.KHAN Punjab MOHSIN ATTA FILLING STATION At Mouza Chohratha in B/W 76-77 K.M From Tuansa On Tuansa Road 0.3066 114.30 113.00 55 D.G.KHAN Punjab Tahir Khan Filling Station Dagar Chit 0.5433 114.53 113.23 56 D.G.KHAN Punjab Sakhi Sultan Filling Station On National Highway (N-70) Sec: Bowatta-Multan in B/W 115-116 K.M At Mouza Sakhi Sarwar 0.5433 114.53 113.23 57 D.G.KHAN Punjab Shahwani Filling Station (N-55) NATIONAL HIGHWAY IN BETWEEN KM 785-786 MOUZA BOHAR DISTT. D.G KHAN 0.6142 114.60 113.30 58 D.G.KHAN Punjab Ramzan Petroleum Mouza Halla 0.6142 114.60 113.30 59 D.I.KHAN KP MALIK FILLING STATION At 5km From Gulfam Chowk, On Tichwara Road, 1.4733 115.46 114.16 At Porano Dero, in B/W K.M 0-1 From Phulji Station, On Phulji-Piyaro Goth Road, Taluka & 60 DADU Sind Muzamil P/S 0.6430 114.63 113.33 Distt.
Recommended publications
  • ASKAR OIL SERVICES (PVT) LTD APPLICABLE RETAIL PRICE of MS & HSD at PETROL PUMPS EFFECTIVE from 16Th MARCH-2021
    ASKAR OIL SERVICES (PVT) LTD APPLICABLE RETAIL PRICE OF MS & HSD AT PETROL PUMPS EFFECTIVE FROM 16th MARCH-2021 Retail Price of Sr # Name of Civil District Province Petrol Pump City/Location S.F Amount HSD MS 1 ABBOTTABAD KP Sarfraz Filling Station (MSK) At 15 K.M From Jaika Gali ,On Barot Jhika Gali Road at Barot, 0.6926 116.77 112.59 2 ABBOTTABAD KP Kunhar Vally Filling Station At Village Boi, On Boi-Garhi Habib Ullah Road, 1.5284 117.61 113.43 At Mouza Khoda, On Rawalpindi – Hasanabdal – Peshawar Road National Highway (N-5), At 3 ATTOCK Punjab ALI F/S 0.3450 116.43 112.25 6.7 KM from Burhan Interchange, in Khasra No.398, Tehsil HASANABDAL District ATTOCK At Mouza & Village Lakar Mar, On Jand / Mukhad Road, Khasra No.4568, Khatooni No. 01, 4 ATTOCK Punjab KHATTAK P/S 0.3918 116.47 112.29 Khewat No 1811, Tehsil JAND District ATTOCK 5 ATTOCK Punjab PetrogasCNG Station GT Rd, Burhan 0.5152 116.60 112.42 6 BADIN Sind NADEEM & CO. At Badin Town, Plot No. 10-B, 10-C, At Deh Sonhar, On Golarchi Road, Taluka & Distt. Badin 1.1577 117.24 113.06 At Plot No.197/4, At Deh Barodari, in B/W 0-1 from Golarchi, On Golarchi – Garhore 7 BADIN Sind Seven Star P/S 1.0525 117.13 112.95 Sharif Road, Taluka Shaheed Fazil Rahu, District BADIN. At Deh & Tapo Walhar, in B/w 13 -14km, On Talhar / Badin Road, At Peeru Lashari, 8 BADIN Sind Al-Murtaza P/S 1.3157 117.40 113.22 Taluka Talhar, District Badin.
    [Show full text]
  • Download 16.57 MB
    Environmental Monitoring Report Bi-annual Environmental Monitoring Report July 2015 Loan 3121-PAK: National Trade Corridor Highway Investment Program-Tranche II Prepared by National Highways Authority for the Asian Development Bank. NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report, "$" refers to US dollars. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Bi-annual Environmental Monitoring Report CONSTRUCTION OF HASSANABDAL (BURHAN)- HAVELIAN (SAMLAILA) EXPRESSWAY SECTION OF E-35 March-June 2015 Islamic Republic of Pakistan Financed by: Asian Development Bank and Government of the Pakistan Project Number: 3121-PAK Prepared by: Mr. Abdul Wakeel, Environmental Specialist Dohwa Engineering Co, LTD and Associated JVs Reviewed by: National Highway Authority, Head Quarter Islamabad For: National Highway Authority HQ Islamabad This report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. Asian Development
    [Show full text]
  • Burhan Interchange–Dingi)
    Resettlement Plan October 2013 PAK: National Trade Corridor Highway Investment Program – Tranche 2 (Burhan Interchange–Dingi) Prepared by National Highway Authority, Ministry of Communication, Islamic Republic of Pakistan for the Asian Development Bank (ADB). The land acquisition and resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. CURRENCY EQUIVALENTS (as of 26 October 2013 ) Currency Unit – Pakistan rupee/s (PRs) PRs1.00 = $0.00944 $1.00 = PRs 105.875 ABBREVIATIONS AD Assistant Director ADB Asian Development Bank APs Affected Persons COI Corridor of Impact CBO Community Based Organization DCR District Census Report DD Deputy Director DO(R) District Officer (Revenue) EDO Executive District Officer EIA Environmental Impact Assessment EMP Environmental Management Plan Ft. Feet GM General Manager GOP Government of Pakistan IP’s Indigenous People Km. Kilometers LAA Land Acquisition Act LAR Land Acquisition and Resettlement LARP Land Acquisition and Resettlement Plan E-35 Hassanabdal to Havelian Expressway (E-35) M&E Monitoring and Evaluation NESPAK National Engineering Services Pakistan (Pvt.) Ltd. MFF Multi-Tranche Financial Facility NTC National Trade Corridor NGO Non Governmental Organization NHA National Highway Authority PAPs Project Affected Persons PMU Project Management Unit ROW Right-of-Way R.ft. Running Feet S.ft. Square Feet SPS Safeguard Policy Statement Government of Pakistan Ministry of Communications National Highway Authority D.O. No. E---- 3SAmS/-CAL-s/Airiy dc)f gz-- FRAY W4MwAYS Dated a8- 10- Ro) Ministry of Communications Mr.Jia o Ning Transp rt Specialist, Pakistan Resident Mission, Asian Development Bank Islamabad.
    [Show full text]
  • February 16-29, 2020 August 16-31,2020
    FebruaryAugust 1166--3129,,2020 2020 1 Table of Contents 01: August 16, 2020………………….…….…………………….………..……………...03 02: August 17, 2020………………….…….…………………….………..……………...09 03: August 18, 2020………………….…….…………………….………..……………...11 04: August 19, 2020………………….…….…………………….………..……………...14 05: August 20, 2020………………….…….…………………….………..……………...20 06: August 21, 2020………………….…….…………………….………..……………...22 07: August 22, 2020………………….…….…………………….………..……………...27 08: August 23, 2020………………….…….…………………….………..……………...35 09: August 24, 2020………………….…….…………………….………..……………...36 10: August 25, 2020………………….…….…………………….………..……………...42 11: August 26, 2020………………….…….…………………….………..……………...45 12: August 27, 2020………………….…….…………………….………..……………...50 13: August 28, 2020………………….…….…………………….………..……………...53 14: August 29, 2020………………….…….…………………….………..……………...54 Data collected and compiled by Rabeeha Safdar, Mahnoor Raza, Muqaddas Sanaullah and Anosh Disclaimer: PICS reproduce the original text, facts and figures as appear in the newspapers and is not responsible for its accuracy 2 August 16, 2020 Business Recorder ML-1 project will prove to be a game changer, says Sheikh Rashid LAHORE: Federal Minister for Railways Sheikh Rashid Ahmad has said that Main Line-1 (ML- 1) project will prove to be a game changer for the country. While addressing a press conference here on Saturday at the Railways Headquarters, he said that a high-profile personality from China was expected to lay the foundation-stone of the project soon. He further said that the present railway tracks were laid in 1861 which would be replaced and upgraded under the ML-1 project agreement with the cooperation of China. He said that Pakistan was on the road to success and progress under the leadership of Prime Minister Imran Khan. He further said that credit of ML-1 project goes to Prime Minister Imran Khan and Chief of Army Staff General Qamar Javed Bajwa who kept the project on top priority during their visits to China.
    [Show full text]
  • COMMERCIAL GEOGRAPHY Course Code: 8595/1428
    BS/B.Com/ADC COMMERCIAL GEOGRAPHY Course Code: 8595/1428 Department of Commerce Faculty of Social Sciences & Humanities ALLAMA IQBAL OPEN UNIVERSITY Final: 9-4-2021 COMMERCIAL GEOGRAPHY LEVEL BA/ADC/BS Course Code: 8595/1428 Units: 1–9 DEPARTMENT OF COMMERCE FACULTY OF SOCIAL SCIENCES & HUMANITIES ALLAMA IQBAL OPEN UNIVERSITY ISLAMABAD (All rights Reserved with the Publisher) First Edition ...................................... 2021 Quantity ............................................ 5000 Price .................................................. Typeset by: ........................................ M. Hameed Zahid Printing Incharge ............................... Abdul Rehman Cheema Printer ............................................... AIOU-Printing Press, Sector H-8, Islamabad Publisher ........................................... Allama Iqbal Open University, H-8, Islamabad ii COURSE TEAM Dean Faculty of Social Sciences & Humanities: Prof. Dr. Syed Hasan Raza Chairman: Tanvir Ahmed Assistant Professor Department of Commerce Course Development Coordinator: Asia Batool Complied by: 1. Arfa 2. Asia Batool Reviewers: 1. Hussnu-Nul-Amin 2. Asia Batool Editor: Fazal Karim Typeset by: Muhammad Hameed Title Design: Mushtaq Hussain iii CONTENTS Page # Introduction ...................................................................................................... v Objectives ......................................................................................................... vi Unit 1: Introduction to Commercial Geography ..............................................
    [Show full text]
  • 40075-043: Hassanabdal-Havelian Expressway
    Environmental Monitoring Report Bi-Annual Environmental Monitoring Report (E-35, Hassanabdal – Havelian Expressway) (July – December 2016) PAK: National Trade Corridor Highway Investment Program (NTCHIP) – Tranche 3 (Package III) Prepared by National Highways Authority for the Asian Development Bank. NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report, "$" refers to US dollars. This Environmental Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Bi-Anual Report I&II Bi-Annual Environmental Monitoring Report July- December 2016 CONSTRUCTION OF HASSANABDAL-HAVELIAN SECTION, E-35 Package III - ICB E-35: SARAI SALEH TO SIMLAILA (Km 39+611 to Km 58+711) Islamic Republic of Pakistan Financed by: Asian Development Bank and Government of the Pakistan Project Number: 3197-PAK Prepared by: Shazia Shahid, Environmental Specialist (Dohwa Engineering Co, Ltd in association with M/s Engineering & Management Services Pakistan & M/s Prime Engineering & Testing Consultant) Reviewed by: National Highway Authority, Head Quarter Islamabad For: Asian Development Bank This report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents.
    [Show full text]
  • Final Land Use Plan of District Peshawar
    2017 Urban Policy and Planning Unit – Provincial Land Use Plan (PLUP) Planning and Development Department Government of Khyber Pakhtunkhwa Final Land Use Plan of District Peshawar IZHAR & ASSOCIATES CONSULTING Lalazar consultants Engineering services consultants Flat No. 306A, 3rd Floor, City Tower, Jamrud Road, Peshawar, Khyber Pakhtunkwa Telephone# +91 5853753 Mobile# 92-321-4469322 ACKNOWLEDGMENTS This document –Land Use Plan of District Peshawar, is a building block for preparing Provincial Land Use Strategy for Khyber Pakhtunkhwa. It was a gigantic task which not only integrated data base of all sectors and their existing issues but also contains important suggestions and recommendations for spatial, economic and social sector development. Our efforts could not fruition without the guidance of Mr. Israr-ul-Haq, Executive Director Urban Policy Unit KPK, who facilitated the Consultants in finalization of the plan and deserves special thanks. We are also grateful to Mr. Adnan Saleem, Senior Urban Planner Urban Policy Unit, and Mr. Afrasiyab Khattak, M&E Unit, for devoting their precious time in resolving different issues. Ms. Fareen Qazi, GIS specialist PLUP, was actively involved in this project right from the inception of this assignment and provided valuable inputs towards GIS mapping. We are also grateful to other PLUP staff especially Mr. Wajidullah Mohmand and Mr. Bilal Muhammad, Urban Planners who coordinated and facilitated consultants’ team and for their valuable comments which helped to enrich the District Land Use Plans. We also thank other officials of Urban Policy Unit, Planning and Development Department and various line departments for extending all cooperation and support for completion of this Final Land Use Plan for District Peshawar.
    [Show full text]
  • Proposed Land Use Plan of District Peshawar
    2019 Urban Policy and Planning Unit – Provincial Land Use Plan (PLUP) Planning and Development Department Government of Khyber Pakhtunkhwa Proposed Land Use Plan of District Peshawar MESSAGE FROM CHIEF SECRETARY i MESSAGE FROM SECRETARY PLANNING AND DEVELOPMENT ii ACKNOWLEDGEMENT This report– Land Use Plan of District Peshawar is a structure obstruct for planning Provincial Land Use Strategy for Khyber Pakhtunkhwa. It is an immense assignment which not just coordinated information base all sectors considered and their current issues yet, in addition, contains critical proposals and suggestions for spatial, monetary and social area advancement. We acknowledge the cooperation of the Project Manager (Spatial Planning & Coordination) Mr. Adnan Salim, Senior Urban Planner Urban Policy and Planning Unit for his ongoing input to the study process, review of report drafts, and support of and contribution to the consultation process. We also thank other officials of PLUP, Urban Policy Unit and various line departments for extending all cooperation and support for completion of this Land Use Plan for District Peshawar (2019-2039). Ms. Fareen Qazi, Deputy Manager GIS PLUP, is actively involved in this project right from the inception of this task and provided valuable inputs towards GIS mapping, review of different report drafts and preparation of different presentations. We are grateful to the efforts of all concerned officials of PLUP for their guidance in conducting Land Use Plan of Peshawar. We are also grateful to Plnr. Adnan Shaukat and Plnr. Muhammad Nazeef Pasha, Assistant-Spatial Planning and Mr. Nangraiz Khan, Map Cartographer for the abilities of work in imagery capturing, processing and field surveys for the data collection, gathering and preparation of the background report, and GIS work in proposals as well.
    [Show full text]
  • Hassanabdal – Havelian Expressway, Package – I, II & III)
    Environmental Impact Assessment Environmental Impact Assessment Report (E-35, Hassanabdal – Havelian Expressway, Package – I, II & III) March 2016 PAK: National Trade Corridor Highway Investment Program (NTCHIP) Tranche – II & III Prepared by National Highways Authority for the Asian Development Bank. NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report, "$" refers to US dollars. This Bi-annual environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environmental Impact Assessment March 2016 PAK: National Trade Corridor Highway Investment Program – Tranche II & III Revised/ updated March 2016 Prepared by National Highways Authority for the Asian Development Bank CURRENCY EQUIVALENTS (as of 22 March 2016) Currency uni – Pakistani Rupees (PRs) PRs1.00 = $0.00954 $1.00 = PRs104.724 LIST OF ABBREVIATIONS Abbreviation Description ADB Asian development Bank APHA American Public Health Association APs Affected Persons ASRs Air Sensitive Receivers ASTM American Society of Testing Materials AKM Avenue Kilometer BOD
    [Show full text]
  • Rehabilitation of Changla Gali- Makhniyal Road
    Public Disclosure Authorized KHYBER PAKHTUNKHWA INTEGRATED TOURISM DEVELOPMENT PROJECT CONSTRUCTION/ REHABILITATION OF CHANGLA GALI- MAKHNIYAL ROAD Public Disclosure Authorized Public Disclosure Authorized ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) AND Public Disclosure Authorized ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN (ESMP) FEBRUARY, 2019 ESIA & ESMP of Changla Gali-Makhniyal Road TABLE OF CONTENTS List of Abbreviation……………………..……………………………………………..viii Glossary……………………………………………………………………………..…..xi Executive Summary…………………………..………………………………………..xiv 1 INTRODUCTION .......................................................................................................... 1-1 1.1 PROJECT BACKGROUND ...................................................................................... 1-1 1.2 SAFEGUARD ASSESSMENT AND DOCUMENTS ...................................................... 1-3 1.3 OBJECTIVE OF ESIA ............................................................................................ 1-3 1.4 APPROACH & METHODOLOGY TO WORK ............................................................ 1-4 1.4.1 Approach ............................................................................................................ 1-4 1.4.2 Methodology ....................................................................................................... 1-4 1.5 STRUCTURE OF REPORT ....................................................................................... 1-6 1.6 ESIA TEAM ........................................................................................................
    [Show full text]
  • PAK: National Trade Corridor Highway Investment Program
    Due Diligence Report November 2013 PAK: National Trade Corridor Highway Investment Program Due Diligence Review of NTCHIP Tranche 2 Hassanabdal - Havelian Expressway, E 35, Package II Prepared by National Highway Authority, Ministry of Communication, Islamic Republic of Pakistan for the Asian Development Bank (ADB). This due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. CURRENCY EQUIVALENTS (as of 13 November 2013 ) Currency Unit – Pakistan rupee/s (PRs) PRs1.00 = $0.00929 $1.00 = PRs 107.54 ABBREVIATIONS ADB – Asian Development Bank APs – Affected persons BOR – Board of Revenue CAP – Corrective Action Plan DDR – Due Diligence Review DPAC – District Price Assessment Committee EA – Executing Agency GRM – Grievance Redress Mechanism IVSC – International Valuation Standards Committee IVS – International Valuation Standards IRP – ADB’s Involuntary Resettlement Policy IR – Involuntary Resettlement LAR – Land Acquisition and Resettlement LAA – Land Acquisition Act 1894 LAC – Land Acquisition Collector LARP – Land Acquisition and Resettlement Process LARF – Land Acquisition and resettlement Framework MFF – Multi-tranche Financing Facility NTCHIP – National Trade Corridor Highway Investment Program NHA – National Highway Authority RC – Replacement Cost RICS – Royal Institute of Chartered Surveyor A. Introduction 1. Project background: The National Trade Corridor Highway Investment Program (NTCHIP) of the Government of Pakistan is funded by the Asian Development Bank (ADB) through a Multi-tranche Financing Facility (MFF). The MFF consists of several tranches, each covering several subprojects. The on-going tranche 1 of the MFF comprises section 11 of Faisalabad to Khanewal Motorway Project (M4) in the Punjab province of Pakistan.
    [Show full text]
  • PAK: National Trade Corridor Highway Investment
    Environmental Impact Assessment October 2013 PAK: National Trade Corridor Highway Investment Program–Tranche 2 (Hasanabdal–Havelian Section) Prepared by National Highway Authority, Ministry of Communication, Islamic Republic of Pakistan for the Asian Development Bank. This is an updated version of the draft originally posted in March 2012 available on http://www.adb.org/projects/documents/national-highway-development-sector-investment- program-tranche-3 CURRENCY EQUIVALENTS (as of 26 October 2013 ) Currency Unit – Pakistan rupee/s (PRs) PRs1.00 = $0.00944 $1.00 = PRs 105.875 ABBREVIATIONS ASTM – American Society of Testing Materials APHA – American Public Health Association AKM – Avenue Kilometer BOD – Bio-chemical Oxygen Demand BDL – Below Detection Limit BHU – Basic Health Unit OC – Degree Centigrade CC – Construction Contractor CO – Carbon Monoxide COD – Chemical Oxygen Demand dB (A) – Decibel DCR – District Census Report DC – Design Consultant EA – Environmental Assessment EE – Environmental Engineer EIA – Environmental Impact Assessment EMP – Environmental Management Plan EPA – Environment Protection Agency EPD – Environment Protection Department EPO – Environmental Protection Ordinance ESR – Environmental Sensitive Receiver GHG – Green House Gases GOP – Government of Pakistan IEE – Initial Environmental Examination km – kilometer NEQS – National Environmental Quality Standards NESPAK – National Engineering Services Pakistan NHA – National Highways Authority NOx – Nitrogen Oxides NGO – Non Governmental Organization NSR – Noise Sensitive
    [Show full text]