Wing February 2000

Total Page:16

File Type:pdf, Size:1020Kb

Wing February 2000 THE RAISBECK WING Winter 2000 Volume 7, Number 10 Editor Susan Stahl CEOs Message A very interesting comment from a Chal- “We’ve needed more luggage space on ev- lenger 601 operator recently got me to ery airplane we’ve ever operated. There just thinking. It was during our ongoing 601/ never seems to be enough!” he exclaimed. 604 operator survey concerning their need for increased luggage space. Why is this comment important? Well, in my view there’s only one thing better than opti- mum, and that’s 25% over optimum. James D. Raisbeck That’s why we’re having so much success Yes, it never seems there’s enough. Do you with the wing lockers on the King Air fleet, agree? E-mail me at [email protected] the aft fuselage locker for the Learjet 31/35/ 36 family, and why we are about to launch the aft fuselage locker program for the Chal- lengers. It’s also why Purdue University is under a research grant from us, exploring the feasibility of the aft fuselage locker on the Gulfstream family. Learjet 31 Aft Fuselage Locker Whats New at Raisbeck Business Jet Solutions Standardizes performance and technical support.” on Lear Locker Raisbeck Commercial Air Group now has 100 Boeing 727 Stage 3 kits in the air, with Business Jet Solutions, headquartered in orders, contracts and options for an addi- Dallas-Ft. Worth, has ordered its 25th Lear tional 38 Stage 3 kits in 2000. Aft Fuselage Locker. BJS has made a commitment to the locker as part of its Pro Pilot Names James Raisbeck Entre- overall goal to meet charter customers’ preneur of the Year needs. The locker is used for skis, engine Business Jet Solutions Learjet 31 Aft Fuselage Locker covers, flight manuals, and crew luggage. Heavy Gross Weight kit installations for Pan Professional Pilot Magazine presented American Airways. Each kit retails for James Raisbeck with the award as Entre- Pan American Airways Purchases $1,295,000. Mr. Allen Hines, Vice-President preneur of the Year for 1999. James was Raisbeck Stage 3 for its Boeing 727s of Operations, commented, “ We were look- recognized for his contributions to enhance ing for an economical, long-term Stage 3 the performance and utility of in-service air- In early January, Raisbeck Commercial Air compliance solution.” Raisbeck provided craft. The awards dinner took place on group completed the first of 7 Stage 3 the solution and backed it up with timely March 8 in Alexandria, VA. eatured Operator Glenn Bjorkman, Chief Pilot BB-1367 Glenn Bjorkman has been chief pilot for the Glenn’s first flight with the air- same private operator in Santa Barbara, Cali- craft, he nearly aborted the take- fornia, for 15 years. He has been flying King off because the aircraft was Airs for over 12 years, starting with an E90 slow to accelerate. He later and working his way up to B200s. realized that the aircraft was be- having “sluggishly” because it “Our last King Air was Raisbeck-equipped, was not yet Raisbeck- and the owner insisted upon installing equipped! Raisbeck for the B200 we purchased in Super King Air B200 BB-1367 flying over lettuce 1999,” states Glenn. Glenn notes that they require fields near Monterey, California Raisbeck for safety reasons and to get bet- The aircraft was purchased without ter climb performance in and out of high help to keep the tail from wagging in turbu- Raisbeck Performance Systems. During altitude airports such as Gardiner, Mon- lent conditions, adding to passenger com- tana, on the north side of Yellowstone. The fort.” local airfield has an elevation of 5286’ and a runway length of 3345’. BB-1367 is maintained in Salinas at Advancetech Aircraft Maintenance Inc., one “We wouldn’t land there without Raisbeck. of Raisbeck’s 2 dealers in Northern Califor- We are able to get our passengers closer nia. For more details about Raisbeck Sys- to their destination, saving them hours of tems contact: driving time, thanks to the improved run- Bruce Pittenger, President way performance we get with the En- Advancetech Aircraft Maintenance Inc. hanced Performance Package.” Salinas Municipal Airport Salinas, California Raisbeck dealer Bruce Pittenger (l) with mainte- They are also a big believer in the Raisbeck Tel. 831-422-2142 nance customer, Chief Pilot Glenn Bjorkman (r). Dual Aft Body Strakes. Glenn says, “They [email protected] Challenger Aft uselage Locker Report Raisbeck Engineering, in a cooperative Comments? [email protected] The Challenger locker is being designed marketing program with Bombardier Aero- with computer support from CATIA, to be space, continues to develop its aft fuse- compatible with Bombardier’s engineering lage baggage locker concept for the Chal- and manufacturing specifications. lenger 601/604 series aircraft. The preferred design (see photo) was se- Initial responses from Challenger opera- lected for its excellent predicted perfor- tors interviewed at the 1999 NBAA in At- mance characteristics. The next step is to lanta have been mostly positive, and the flight test its aerodynamic shape to confirm next step in the program has been imple- flight characteristics, including drag reduc- Challenger 601/604 Locker design concept mented - a comprehensive market survey tion. to learn more about the operator needs. • All external to the aft fuselage Should all design parameters be met, and Current expected features of the Raisbeck • Built in 3 sections with access to all with sufficient owner/operator interest, cer- Aft Fuselage Locker for the Challenger: inspection panels tification and production will proceed. The • 50 cu. ft. usable interior volume • 264 lb. empty weight increase locker then would be offered as a factory • 650 lb. cargo capacity • Compensating airplane drag completion center option on new 604s, and • Heated with light pressurization reduction of 3% to 6% as a retrofit to 601s and 604s already in op- eration. Technical Corner Lear Aft uselage Locker Update The Aft Fuselage Locker, first introduced acteristics and improves climb and cruise in 1995, has become an accepted stan- performance. dard for the Learjet 30-series. Over 90% of all new production 31As are outfitted with Overnight package service operator Airnet the locker. Raisbeck Engineering is filling is pleased with the block fuelsavings they orders for 4-6 lockers per month. get on the LAX- Columbus route with their Raisbeck-equipped Lear 35. Loading skis into the Lear Locker As of January, 2000, 115 lockers have been installed. The 100th installation took place Daniel LaFrance of Bombardier Aviation Contact Mo Lizarr, Lear Program Man- at Bombardier Aerospace’s Tucson Services advises, “The added space pro- ager, for service and technical assistance Completion Center last autumn. vided by the locker improves the operational (206-723-2000) [email protected] fexibility of all Lear 31s and 35/36s.” The locker is easily accessible from out- The locker can be purchased at Bombar- side the aircraft, and holds up to 300 lb. of Raisbeck design improvements, covered by dier Aviation Services, West Star Aviation, such items as baggage, skis, golf clubs, Service Bulletins, include: Galvin Flying Services, Bizjet, Jetcorp, and and engine covers. The aerodynamic de- • New seal to prevent leaking Lider Taxi Aereo in Brazil. The locker re- sign improves the aircraft handling char- • Light switch mechanism in tailcone tails for $73,500 plus paint and installation. Meet the Raisbeck Team Tom Halvorson - Vice President Sales Tom Halvorson, Vice-President Sales, nesota, Tom worked with his father in the lis. He has an ATP license, is a jet-rated joined Raisbeck Engineering in 1996, and Christmas tree business, which required pilot and has logged over 8,000 career is now responsible for Learjet and King Air they fly the company airplane to remote ar- hours. product sales. He works closely with over eas of Northern Minnesota to oversee the 100 Raisbeck dealers worldwide to help harvest of 1,000,000 trees per year. Tom and his wife, Rosemary, have 5 grown them promote Raisbeck products. children and 5 grandchildren. They enjoy It was during this time that Tom’s associa- family ski vacations, hiking, and tennis. Tom officially joined Raisbeck after a 15- tion with Bombardier began. Bombardier year career at Western Aircraft as Vice Presi- manufactured a lightweight tractor that was dent Business Development and Company ideal for harvesting trees in the marshy ter- President. He has been instrumental in rain. Tom became a dealer for the crawler marketing Raisbeck’s systems since 1981. tractors, and, when, in 1960, Bombardier developed the Ski-Doo, Tom’s company Tom has been involved in aviation since grew to become Bombardier’s largest world- his childhood in Duluth, Minnesota. Tom’s wide distributor. father, a World War II pilot, purchased the family’s first airplane shortly after he returned Tom’s company operated business aircraft, from the war. Tom, his sister, and his mother which led to the establishment of Halvair, a all learned how to fly and obtained pilot’s Fixed Base Operator headquartered in licenses. Duluth. In 1974 Tom founded Mesaba Air- lines, a regional airline with scheduled ser- Tom Halvorson After graduating from the University of Min- vice between Grand Rapids and Minneapo- eatured Raisbeck Learjet Dealer West Star Aviation Founded in 1987, West Star Aviation of 24 mechanics with over 200 years of cu- We are pleased to be a Raisbeck dealer Grand Junction, Colorado, has established mulative experience working on Learjets. because the aft fuselage locker helped to itself as a first class multi-service aircraft extend the life of the ‘baggage-challenged’ maintenance organization. West Star, with Greg Laabs comments “we are also posi- Learjet. We have already installed six lock- 240 employees, specializes in airframe re- tioned for total restoration of aging aircraft, ers, with a seventh to be installed shortly.
Recommended publications
  • Bombardier Learjet 35A
    Contact Pilot Maintenance Us Fact Sheet Fact Sheet Share Next Bombardier Learjet 35A Professional Pilot and Technician Training Programs Updated 10/16 Contact Pilot Maintenance Us Fact Sheet Fact Sheet Share Prev Next FlightSafety offers comprehensive, professional training on Bombardier’s full line of business aircraft, including the Learjet 35A. Our highly qualified and experienced instructors, advanced-technology flight simulators and integrated training systems help ensure proficiency and safety. Pilot training for the Learjet 35A is available at FlightSafety’s Learning Centers in Atlanta, Georgia and Tucson, Arizona. Maintenance technicians train for the Learjet 35A at our Tucson Learning Center. Innovation With One Purpose: Training Corporate Aviation Professionals for Safety and Proficiency FlightSafety International is the world’s leading aviation training organization. The leader in experience. The leader in technological innovation. The leader in global reach. FlightSafety serves the world’s aviation community providing total aviation training for pilots, maintenance technicians and other aviation professionals. We serve business, commercial, general and military aviation with training for virtually Experienced all fixed-wing aircraft and helicopters. We live, breathe and ThinkSafety. Instructors, FlightSafety provides training for the Bombardier Global series, Bombardier Challenger and Bombardier Learjet. Superior We offer business aviation pilots and maintenance technicians of Bombardier aircraft the resources to achieve proficiency
    [Show full text]
  • Investigating Optimal Replacement of Aging Air Force Systems
    R Investigating Optimal Replacement of Aging Air Force Systems Edward G. Keating, Matthew Dixon Prepared for the United States Air Force Project AIR FORCE Approved for public release; distribution unlimited The research reported here was sponsored by the United States Air Force under Contract F49642-01-C-0003. Further information may be obtained from the Strategic Planning Division, Directorate of Plans, Hq USAF. Library of Congress Cataloging-in-Publication Data Keating, Edward G. (Edward Geoffrey), 1965- Investigating optimal replacement of aging Air Force systems / Edward G. Keating, Matthew C. Dixon. p. cm. Includes bibliographical references. “MR-1763.” ISBN 0-8330-3483-9 (pbk. : alk. paper) 1. United States. Air Force—Procurement—Mathematical models. 2. KC–135 (Tanker aircraft) 3. Lear jet aircraft. 4. Jet transports—United States—Maintenance and repair— Mathematical models. I. Dixon, Matthew C. II. Title. UG1123.K43223 2003 358.4'1621—dc22 2003020469 RAND is a nonprofit institution that helps improve policy and decisionmaking through research and analysis. RAND® is a registered trademark. RAND’s publications do not necessarily reflect the opinions or policies of its research sponsors. © Copyright 2003 RAND All rights reserved. No part of this book may be reproduced in any form by any electronic or mechanical means (including photocopying, recording, or information storage and retrieval) without permission in writing from RAND. Published 2003 by RAND 1700 Main Street, P.O. Box 2138, Santa Monica, CA 90407-2138 1200 South Hayes Street, Arlington, VA 22202-5050 201 North Craig Street, Suite 202, Pittsburgh, PA 15213-1516 RAND URL: http://www.rand.org/ To order RAND documents or to obtain additional information, contact Distribution Services: Telephone: (310) 451-7002; Fax: (310) 451-6915; Email: [email protected] iii Preface Whether to maintain or replace an aging system is a common decision.
    [Show full text]
  • National Transportation Safety Board
    National Transportation Safety Board Airport Runway Accidents, Serious Incidents, Recommendations, and Statistics Deadliest Runway Accidents ● Tenerife, Canary Islands, March 27, 1977 (583 fatalities). The world’s deadliest runway accident occurred on March 27, 1977, when Pan Am (PAA) flight 1736, a Boeing 747, and KLM4805, a Boeing 747, collided on runway 12 at Tenerife, Canary Islands, killing 583 passengers and crew. KLM4805 departed runway 12 without a takeoff clearance colliding with PAA1736 that was taxiing on the same runway during instrument meteorological conditions. The Spanish government determined the cause was: “The KLM aircraft had taken off without take-off clearance, in the absolute conviction that this clearance had been obtained, which was the result of a misunderstanding between the tower and the KLM aircraft. This misunderstanding had arisen from the mutual use of usual terminology which, however, gave rise to misinterpretation. In combination with a number of other coinciding circumstances, the premature take-off of the KLM aircraft resulted in a collision with the Pan Am aircraft, because the latter was still on the runway since it had missed the correct intersection.” ● Lexington, Kentucky, August 27, 2006 (49 fatalities). The deadliest runway accident in the United States occurred on August 27, 2006, at about 0606 eastern daylight time when Comair flight 5191, a Bombardier CL-600-2B19, N431CA, crashed during takeoff from Blue Grass Airport, Lexington, Kentucky. The flight crew was instructed to take off from runway 22 but instead lined up the airplane on runway 26 and began the takeoff roll. The airplane ran off the end of the runway and impacted the airport perimeter fence, trees, and terrain.
    [Show full text]
  • Aircraft Tire Data
    Aircraft tire Engineering Data Introduction Michelin manufactures a wide variety of sizes and types of tires to the exacting standards of the aircraft industry. The information included in this Data Book has been put together as an engineering and technical reference to support the users of Michelin tires. The data is, to the best of our knowledge, accurate and complete at the time of publication. To be as useful a reference tool as possible, we have chosen to include data on as many industry tire sizes as possible. Particular sizes may not be currently available from Michelin. It is advised that all critical data be verified with your Michelin representative prior to making final tire selections. The data contained herein should be used in conjunction with the various standards ; T&RA1, ETRTO2, MIL-PRF- 50413, AIR 8505 - A4 or with the airframer specifications or military design drawings. For those instances where a contradiction exists between T&RA and ETRTO, the T&RA standard has been referenced. In some cases, a tire is used for both civil and military applications. In most cases they follow the same standard. Where they do not, data for both tires are listed and identified. The aircraft application information provided in the tables is based on the most current information supplied by airframe manufacturers and/or contained in published documents. It is intended for use as general reference only. Your requirements may vary depending on the actual configuration of your aircraft. Accordingly, inquiries regarding specific models of aircraft should be directed to the applicable airframe manufacturer.
    [Show full text]
  • Convention News
    DAY 2 May 22, 2019 EBACE PUBLICATIONS Convention News The static display at EBACE 2019 features the Junkers F 13, which first flew almost 100 years ago. Contrasting with the vintage single are the most modern of business aircraft, with engines, aerodynamics, and avionics beyond the wildest dreams of early pilots. Aircraft Bombardier updates Challenger 350 › page 8 INTOSH c DAVID M DAVID Final Flights Aviation champion Niki Lauda dies › page 10 Electric, vertical technologies Turboprops Daher TBM 940 gets poised to shape bizav’s future EASA nod › page 17 by Amy Laboda Powerplants The focus of this year’s EBACE is aimed Khan took a solid look toward the future. In making commitments to focus on a way GE embarks on bizav squarely at the future, but not one that is far the 11 months since heading the association, to build business aviation, all the while on the horizon. Speakers at yesterday’s open- he’s seen just how quickly new technologies showing sustainability on a global level and engine journey › page 18 ing session talked about products already in such as electric propulsion, blockchain, sus- raising awareness of how business aviation the production and certification processes, tainable aviation biofuels, and alternative helps global commerce on a societal level. Finance available technologies that are being ported forms of aerial mobility are quickening the He highlighted the importance of getting into aviation, and problems that have nearly pace of innovation in business aviation. policy makers onboard, which was why Global Jet Capital sees arrived on the doorstep. “These are providing us with new avenues EBAA invited Grant Shapps MP, chair of the page 22 Fortunately, the tone was optimistic, and for driving business growth, but we still face UK All Party Parliamentary Group (APPG) uptick › the mood of the speakers—from the wel- many hurdles,” Khan said.
    [Show full text]
  • Centennial of Flight Is Backdrop to Upbeat NBAA'03
    20 Aviation International News • www.ainonline.com November 2003 Centennial of flight is backdrop to upbeat NBAA’03 Eager to leave the economic downturn of the past three years in its wake, business aviation looked hopefully toward a brand-new day at last month’s NBAA Convention in Orlando. N I A B R E G O R by Stephen Pope ters expansive enough to handle business avia- took to the air on April 30 this year and has different from the $31 million G400/GIV, but The 2003 NBAA tion’s biggest annual event). Then there is flown more than 100 hours. The three other Gulfstream has made subtle changes. The EBACE at the Geneva Palexpo, Switzerland. airplanes involved in the G450 certification G450’s fuselage is 12 inches longer than the Convention cele- LABACE, the Latin American business avia- program have logged more than 200 hours G400’s. All of its extra length is in the nose. tion show in São Paulo, Brazil, which is young thus far. FAA certification is expected in the Inside, the relocated door and modified brated the centen- with just one event so far, might shape up to be third quarter of next year, followed by JAA avionics cabinets on both sides of the aisle business aviation’s third big annual event. approval in the fourth quarter and entry into have opened access to the G450’s cabin. nial of manned NBAA’s big bash is by far the most heavily service in the second quarter of 2005. In the cockpit, the Gulfstream/Honeywell attended by potential business jet buyers and On the outside the $33 million (typical PlaneView integrated avionics system, devel- powered flight with the media, and it gets nearly all the debuts.
    [Show full text]
  • Aircraft Library 
    Interagency Aviation Training Aircraft Library Disclaimer: The information provided in the Aircraft Library is intended to provide basic information for mission planning purposes and should NOT be used for flight planning. Due to variances in Make and Model, along with aircraft configuration and performance variability, it is necessary acquire the specific technical information for an aircraft from the operator when planning a flight. Revised: June 2021 Interagency Aviation Training—Aircraft Library This document includes information on Fixed-Wing aircraft (small, large, air tankers) and Rotor-Wing aircraft/Helicopters (Type 1, 2, 3) to assist in aviation mission planning. Click on any Make/Model listed in the different categories to view information about that aircraft. Fixed-Wing Aircraft - SMALL Make /Model High Low Single Multi Fleet Vendor Passenger Wing Wing engine engine seats Aero Commander XX XX XX 5 500 / 680 FL Aero Commander XX XX XX 7 680V / 690 American Champion X XX XX 1 8GCBC Scout American Rockwell XX XX 0 OV-10 Bronco Aviat A1 Husky XX XX X XX 1 Beechcraft A36/A36TC XX XX XX 6 B36TC Bonanza Beechcraft C99 XX XX XX 19 Beechcraft XX XX XX 7 90/100 King Air Beechcraft 200 XX XX XX XX 7 Super King Air Britten-Norman X X X 9 BN-2 Islander Cessna 172 XX XX XX 3 Skyhawk Cessna 180 XX XX XX 3 Skywagon Cessna 182 XX XX XX XX 3 Skylane Cessna 185 XX XX XX XX 4 Skywagon Cessna 205/206 XX XX XX XX 5 Stationair Cessna 207 Skywagon/ XX XX XX 6 Stationair Cessna/Texron XX XX XX 7 - 10 208 Caravan Cessna 210 X X x 5 Centurion Fixed-Wing Aircraft - SMALL—cont’d.
    [Show full text]
  • St. Mary's Airport Planning and Rsa Practicability Study
    ST. MARY’S AIRPORT PLANNING AND RSA PRACTICABILITY STUDY Project Number Z605630000 AIP Number 3-02-0017-XXX-201X AVIATION ACTIVITY FORECAST Prepared For: State of Alaska Department of Transportation and Public Facilities Prepared By: HDL Engineering Consultants, LLC 3335 Arctic Boulevard Anchorage, Alaska 99503 August 2018 Table of Contents 1.0 Introduction ......................................................................................................... 1 2.0 Population ........................................................................................................... 3 2.1 Demographic Characteristics ..................................................................... 4 3.0 Geographic Attributes ........................................................................................ 4 3.1 Air Freight Hub ........................................................................................... 5 3.2 River Freight Hub ....................................................................................... 7 4.0 Economic Characteristics.................................................................................. 7 5.0 Aviation Activity ................................................................................................. 8 6.0 Aircraft Operations ............................................................................................. 9 7.0 Passenger Enplanements ................................................................................ 11 8.0 Air Cargo ..........................................................................................................
    [Show full text]
  • List of Avionics Design and Modification
    List of Avionics Design and Modification - Aerovation’s Past Performance 15-Oct-2017, Rev IR Aerovation, Inc. 7005 S. Plumer Ave Tucson, AZ 85756 - USA Tel. (520) 308-6409 Fax (520) 844-8785 www.AerovationInc.com This document may contain commercial or financial information, or trade secrets, of Aerovation, Inc., which are confidential and exempt from disclosure to the public under the Freedom of Information Act, 5 U.S.C. 552(b)(4), and unlawful disclosure thereof is a violation of the Trade Secrets Act, 18 U.S.C. 1905 Public disclosure of any such information or trade secrets shall not be made without the prior written permission of Aerovation, Inc List of Avionics Project Company Project Year Aircraft Basic Description AAC 707-18740 1990 Boeing 707 FLt Dir, FMS, Airdata, Satphone 727-23-20095 1989 Boeing 727 EFIS 727-76OXY 1989 Boeing 727 EFIS 727-22362 1994 Boeing 727 EFIS 727-SN18998 1999 Boeing 727 Nav/Comm, FMS 727-SN19394 1998 Boeing 727 Airdata system 727-SN22362 2000 Boeing 727 TCAS 737-UJL 1992 Boeing 737 DMEs, Transponders, INS, No. 1&2 HF ALATHER 1997 Boeing 727-100 EFIS AMC727 1995 Boeing 727 EFIS B727-100-EGPWS 2001 Boeing 727 EGPWS B727-200_SN21474 2003 Boeing 727 ELT, ECS, IFE B737-200 2001 Boeing 737 EFIS, FMS B757 2003 Boeing 757 EGPWS B757 2005 Boeing 757 EGPWS B767 2002 Boeing 767 Interior, Emer Lts, PA B757 1992 Boeing 757 IFE FORBES727 1993 Boeing 727 EFIS LIMITED 1997 Undisclosed Autopilot Interface NASA-P3BN426NA 1991 Lockheed-Martin P3-B EFIS SPECIALCB 1990 Boeing 707 EFIS SPECIALEFIS 1990 Boeing 727 EFIS (EDZ-805)
    [Show full text]
  • Fsd Mar93.Pdf
    During Adverse Conditions, Decelerating to Stop Demands More from Crew and Aircraft Hydroplaning, gusting cross winds and mechanical failures are only a few of the factors that contribute to runway overrun accidents and incidents after landing or rejecting a takeoff. Improvements in tire design, runway construction and aircraft systems reduce risks, but crew training remains the most important tool to stop safely. by Jack L. King Aviation Consultant Decelerating an aircraft to a stop on a runway traction during wet-weather operations and can become significantly more critical in ad- the use of anti-skid braking devices, coupled verse conditions, such as heavy rain in mar- with high-pressure tires, has reduced greatly ginal visibility with gusting cross winds. Add the risk of hydroplaning. Still, accident and the surprise of a malfunction, which requires incident statistics confirm that several major a high-speed rejected takeoff (RTO) or a con- runway overrun accidents each year are caused trolled stop after a touchdown on a slightly by unsuccessful braking involving either a high- flooded runway, and a flight crew is challenged speed landing or an RTO on a wet runway to prevent an off-runway excursion. surface; the factors involved in decelerating to a controlled stop are very similar in these Research findings and technological advances two situations. in recent years have helped alleviate, but not eliminate, the hazards associated with takeoff Overrun Accidents and landing in adverse weather. The U.S. Na- tional Aeronautics and Space Administration Continue to Occur (NASA) and the U.S. Federal Aviation Admin- istration (FAA) conducted specialized tests on A recent Boeing Company study reported that tire spin-up speeds after touchdown rather than during 30 years of jet transport service there spin-down speeds in rollout that confirm that have been 48 runway overrun accidents with hydroplaning occurs at substantially lower more than 400 fatalities resulting from RTOs speeds than noted previously.
    [Show full text]
  • Gallery of USAF Weapons Note: Inventory Numbers Are Total Active Inventory Figures As of Sept
    Gallery of USAF Weapons Note: Inventory numbers are total active inventory figures as of Sept. 30, 2015. By Aaron M. U. Church, Senior Editor ■ 2016 USAF Almanac BOMBER AIRCRAFT B-1 Lancer Brief: Long-range bomber capable of penetrating enemy defenses and de- livering the largest weapon load of any aircraft in the inventory. COMMENTARY The B-1A was initially proposed as replacement for the B-52, and four proto- types were developed and tested before program cancellation in 1977. The program was revived in 1981 as B-1B. The vastly upgraded aircraft added 74,000 lb of usable payload, improved radar, and reduced radar cross section, but cut maximum speed to Mach 1.2. The B-1B first saw combat in Iraq during Desert Fox in December 1998. Its three internal weapons bays accommodate a substantial payload of weapons, including a mix of different weapons in each bay. Lancer production totaled 100 aircraft. The bomber’s blended wing/ body configuration, variable-geometry design, and turbofan engines provide long range and loiter time. The B-1B has been upgraded with GPS, smart weapons, and mission systems. Offensive avionics include SAR for tracking, B-2A Spirit (SSgt. Jeremy M. Wilson) targeting, and engaging moving vehicles and terrain following. GPS-aided INS lets aircrews autonomously navigate without ground-based navigation aids Dimensions: Span 137 ft (spread forward) to 79 ft (swept aft), length 146 and precisely engage targets. Sniper pod was added in 2008. The ongoing ft, height 34 ft. integrated battle station modifications is the most comprehensive refresh in Weight: Max T-O 477,000 lb.
    [Show full text]
  • Facility Requirements
    KNOX COUNTY REGIONAL AIRPORT MASTER PLAN UPDATE January 2015 CHAPTER FOUR – FACILITY REQUIREMENTS CHAPTER FOUR – FACILITY REQUIREMENTS INTRODUCTION The facility needs and direction for the future of Knox County Regional Airport are based on the existing facilities, forecast aviation activity, and Knox County’s strategic vision and goals for the future of the Airport. It should be noted that the facility recommendations in this section are not an absolute design requirement, but are rather options to resolve various types of facility or operational inadequacies, or to make improvements as demand warrants. The airside and landside capacity needs are determined by comparing the capacity of existing facilities to forecasted demand. Additional facilities are recommended in cases where demand exceeds capacity. The timeframe for assessing development needs are broken down into three periods addressed earlier in Chapter 3; these are the short-term (0 to 5 years); intermediate term (6-10) years; and long-term (11-20 years). Critical capacity and safety issues are addressed first, followed by other less critical development needs. The airport’s geometric standards are addressed first, followed by the airside, the landside, and then other general requirements not directly related to the first three. GEOMETRIC STANDARDS The existing airport design is based on Airport Design Group (ADG) III, which as noted in Chapter 2 was the standard up until about 3-4 years ago when it reverted to ADG-II. However, as noted in Chapter 3, the ADG will change back to Group III sometime in the next 5-10 years. This back and forth change is somewhat problematic because getting the design group right is essential when planning future infrastructure.
    [Show full text]