North West Region Dunbar

CARPENTARIA MORNINGTON SHIRE SHIRE COUNCIL DOOMADGEE COUNCIL ABORIGINAL SHIRE COUNCIL Karumba

Burketown Normanton

BURKE SHIRE COUNCIL 0 100 Km

Gregory

MOUNT ISA Camooweal CITY COUNCIL MCKINLAY SHIRE RICHMOND SHIRE COUNCIL COUNCIL

Julia Creek Cloncurry Richmond MOUNT ISA Torrens Creek Legend Hughenden

National road network FLINDERS SHIRE State strategic road network COUNCIL CLONCURRY State regional and other district road SHIRE COUNCIL Kynuna National rail network Dajarra Other railway Local government boundary

Regional contacts

Region Office Street address Postal address Telephone Fax

North West Cloncurry 16-22 Ramsay Street, Cloncurry Qld, 4824 PO BOX 338, Cloncurry Qld 4824 (07) 4769 3203 (07) 4769 3211 Regional profile

Overview • resealing sections of the Flinders Highway, Landsborough • undertake planning for upgrade works on various roads Highway and Cloncurry–Dajarra Road as part of the reseal in the North West to improve access and assist in the North West Region covers an area of approximately 308,044km2, program, funded by the Queensland Government development of the region or around 18% of Queensland. It extends from the Gulf of Carpentaria in the north to Kynuna in the south, and from Torrens • regrading and floodway improvements on various sections of • undertake the Urban Access Link Study to Creek in the east to the Northern Territory border in the west. Cloncurry–Dajarra Road, 17.2km west of Cloncurry as part of improve access management of the Barkly Highway through the Queensland Government’s Safer Roads Sooner Program. the urban areas of Mount Isa It has a population of approximately 35,135 or about 1% of Queensland’s total population. In 2012-13 we plan to: • develop a business case to widen and rehabilitate the between Kynuna and Cloncurry The region looks after 3574km of state-controlled roads, including • complete the new Karumba Point boat ramp 1024km of the National Network. The region includes the local • develop a project proposal to reconstruct 4km of the Gilliat governments of Flinders, Richmond, McKinlay, Carpentaria, Burke, • seal the remaining gravel sections of Wills Developmental Channels Floodway. Cloncurry and Mornington shire councils, Doomadgee Aboriginal Road between Gregory and , including the Shire Council and Mount Isa City Council. Doomadgee turn-out

• complete the reconstruction of key sections of Kennedy Regional program highlights Developmental Road between Hughenden and Winton as part of the Natural Disaster Relief and Recovery In 2011-12 we completed: Arrangements (NDRRA) program, jointly funded by the Australian Government and Queensland Government. • reconstruction of flood-damaged roads throughout the North West as part of the Natural Disaster Relief and Recovery Arrangements (NDRRA), jointly funded by the Australian Future plans Government and Queensland Government We are continuing to plan for the future transport requirements of • flood mitigation works on Diamantina Developmental Road residents in the North West Region. between Mount Isa and Dajarra In 2012-13 we will: • rehabilitation of 4.6km of the Flinders Highway, 16km west of Richmond • continue working on the Connecting North West Queensland 2031: An Integrated Regional Transport Plan for the North • widening, repairing and strengthening various sections of West Queensland Regional Plan the Flinders Highway between Julia Creek and Cloncurry, 40km west of Julia Creek • undertake planning to develop a road flood immunity strategy for the North West Mineral Province

North West | Regional profile Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 139 North West | Regional profile Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 140 National Network

Contributions Estimated Approved Indicative Indicative Local Project Commonwealth Australian Queensland expenditure 2014-15 to Project name/Location Location description total cost 2012-13 2013-14 Beyond Work description government number (1) number Government Government June 2012 2015-16

$’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000

Cloncurry 219/13H/651 Landsborough Highway (Kynuna - Sections : 146.60 - 161.80km 1,406 1,406 1,000 406 Rehabilitate pavement Cloncurry)

219/13H/703 Landsborough Highway (Kynuna - Sections : 141.90 - 169.18km 2,852 2,852 2,852 Reseal - bitumen chip Cloncurry)

219/14E/431 Flinders Highway (Julia Creek - Cloncurry) Ramsay Street (136.16 - 136.83km) 768 768 624 144 Undertake landscaping activities

219/14E/651 Flinders Highway (Julia Creek - Cloncurry) Sections : 124.01 - 133.95km 1,604 1,604 1,445 159 Rehabilitate pavement

219/14E/703 Flinders Highway (Julia Creek - Cloncurry) Sections : 85.01 - 123.02km 2,023 2,023 2,023 Reseal - bitumen chip

219/15A/802 Barkly Highway (Cloncurry - Mount Isa) 74.65km 800 800 800 Rehabilitate bridge/s and culvert/s

Subtotal: Cloncurry 6,384

Flinders 227/14B/651 Flinders Highway (Charters Towers - Sections : 139.74 - 247.31km 3,396 3,396 50 3,346 Rehabilitate pavement Hughenden)

227/14C/651 Flinders Highway (Hughenden - Richmond) Sections : 0 - 91.70km 6,562 6,562 97 6,465 Rehabilitate pavement

227/14C/67H Flinders Highway (Hughenden - Richmond) Sections : 0 - 91.57km 7,197 7,197 6,720 477 Rehabilitate pavement

Subtotal: Flinders 10,288

McKinlay 244/13H/651 Landsborough Highway (Kynuna - Sections : 28.50 - 116.00km 5,492 5,492 5,000 492 Rehabilitate pavement Cloncurry)

244/14D/651 Flinders Highway (Richmond - Julia Creek) Sections : 86.16 - 149.31km 2,073 2,073 1,475 598 Rehabilitate pavement

244/14E/2 Flinders Highway (Julia Creek - Cloncurry) Sections : 35.94 - 39.50km 4,701 4,701 4,194 507 Rehabilitate and widen

244/14E/651 Flinders Highway (Julia Creek - Cloncurry) Sections : 0 - 85.01km 1,238 1,238 427 811 Rehabilitate pavement

Subtotal: McKinlay 2,408

Mount Isa 246/15B/57H Barkly Highway (Mount Isa - Camooweal) Sections : 0 - 181.00km 3,084 3,084 2,432 652 Rehabilitate and overlay (>75mm)

246/15C/57H Barkly Highway (Camooweal - Border) Sections : 0 - 13.16km 2,984 2,984 2,824 160 Rehabilitate and overlay (>75mm)

Subtotal: Mount Isa 812

Richmond 257/14D/651 Flinders Highway (Richmond - Julia Creek) Sections : 71.70 - 86.40km 3,004 3,004 2,573 431 Rehabilitate pavement

257/14D/804 Flinders Highway (Richmond - Julia Creek) Sections : 26.40 - 36.40km 6,050 6,050 4,100 1,676 274 Overlay pavement (>75mm)

257/14D/806 Flinders Highway (Richmond - Julia Creek) 33.42 - 35.12km 1,000 1,000 128 872 Rehabilitate and overlay (>75mm)

Subtotal: Richmond 2,979 274

North West | National Network Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 141 North West | National Network Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 142

Contributions Estimated Approved Indicative Indicative Local Project Commonwealth Australian Queensland expenditure 2014-15 to Project name/Location Location description total cost 2012-13 2013-14 Beyond Work description government number (1) number Government Government June 2012 2015-16

$’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000

Various local R09/R002/409 State-controlled road network Various locations 650 650 650 Manage traffic management governments devices including traffic management centres

Subtotal: Various local governments 650

Other works Corridor and Minor Safety Enhancements 5 100 105

Corridor, Roadway and Structures Management 273 273

NDRRA Rehabilitation and Replacement 656 656

Project Initiation 568 568

Rehabilitation 2 115 117

Routine Maintenance 2,873 2,873

Traffic Management Enhancements

Subtotal: Other works 4,592

Total: North West National network 28,113 274

Australian Government contributions 7

Queensland Government contributions 28,106 274

Total : Contributions 28,113 274

Endnotes

(1) For other Australian Government funded projects, see the Statewide commitments section or the relevant region’s National Network, State Network and Local Network tables. State Network

(3) (4) Estimated Approved Indicative Indicative Local Project expenditure 2014-15 to Category (2) Project name/Location Location description total cost 2012-13 2013-14 Beyond Work description government number (1) June 2012 2015-16

$’000 $’000 $’000 $’000 $’000 $’000

Burke 213/6801/651 LRRS Gregory Downs - Camooweal Road Sections : 21.82 - 41.35km 1,110 917 193 Rehabilitate pavement

213/6801/67H LRRS Gregory Downs - Camooweal Road Sections : 3.32 - 41.11km 1,949 1,832 117 Undertake routine maintenance

213/78A/2(5) SR (Julia Creek - Doomadgee turn-out - Burketown 2,000 126 1,874 Pave and seal Burketown)

213/78A/4(6) SR Wills Developmental Road (Julia Creek - Sections : 398.89 - 470.82km 8,500 2,015 6,485 Pave and seal Burketown)

213/78A/6 SR Wills Developmental Road (Julia Creek - Sections : 401.20 - 483.95km 4,000 845 3,155 Pave and seal Burketown)

213/78A/651 SR Wills Developmental Road (Julia Creek - Sections : 401.19 - 483.89km 28,167 2,801 23,137 2,229 Rehabilitate pavement Burketown)

213/78A/67H SR Wills Developmental Road (Julia Creek - Sections : 321.02 - 498.32km 13,025 11,283 968 774 Rehabilitate pavement Burketown)

Subtotal: Burke 34,181 4,877

Carpentaria 215/78A/650 SR Wills Developmental Road (Julia Creek - Sections : 278.80 - 309.90km 3,603 2,950 652 Rehabilitate pavement Burketown)

215/84A/651 SR Karumba Developmental Road Sections : 0.80 - 33.45km 2,599 2,236 363 Rehabilitate pavement

215/89A/651 SR (Cloncurry - Sections : 230.19 - 327.70km 6,508 96 6,412 Rehabilitate pavement Normanton)

215/89A/67H SR Burke Developmental Road (Cloncurry - Sections : 195.35 - 378.27km 2,697 1,929 767 Rehabilitate pavement Normanton)

215/89A/805 SR Burke Developmental Road (Cloncurry - Sections : 308.49 - 323.10km 813 813 Rehabilitate and overlay (>75mm) Normanton)

31/89A/310 SR Burke Developmental Road (Cloncurry - Sections : 363.20 - 368.35km 3,003 2,707 296 Widen pavement Normanton)

215/89B/2 SR Burke Developmental Road (Normanton - 2.52 - 5.08km 4,312 3,307 1,005 Upgrade floodway/s Dimbulah)

215/89B/57H LRRS Burke Developmental Road (Normanton - Sections : 30.36 - 303.38km 6,663 6,148 515 Rehabilitate pavement Dimbulah)

215/89B/651 LRRS Burke Developmental Road (Normanton - Sections : 1.19 - 29.55km 2,834 2,204 630 Rehabilitate pavement Dimbulah)

215/89B/652 LRRS Burke Developmental Road (Normanton - Sections : 62.55 - 302.26km 7,177 5,274 1,903 Rehabilitate pavement Dimbulah)

31/89B/29 LRRS Burke Developmental Road (Normanton - 69.86 - 70.40km 1,420 1,078 342 Form and improve drainage Dimbulah)

215/92A/651 SR (Normanton - Croydon) Sections : 0.16 - 45.80km 3,069 2,582 487 Rehabilitate pavement

Subtotal: Carpentaria 15,670 1,465

North West | State Network Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 143 North West | State Network Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 144

(3) (4) Estimated Approved Indicative Indicative Local Project expenditure 2014-15 to Category (2) Project name/Location Location description total cost 2012-13 2013-14 Beyond Work description government number (1) June 2012 2015-16

$’000 $’000 $’000 $’000 $’000 $’000

Cloncurry 219/7708/3(5) LRRS Cloncurry - Dajarra Road Sections : 2.45 - 161.35km 1,000 250 750 Widen and seal

36/7708/46 LRRS Cloncurry - Dajarra Road 62.28 - 68.40km 978 737 241 Reshape and seal

219/78A/481 LRRS Wills Developmental Road (Julia Creek - 186.81 - 234.00km 526 526 Remove and replace deficient grids Burketown)

219/78A/57H LRRS Wills Developmental Road (Julia Creek - Sections : 148.00 - 232.80km 7,765 5,307 2,458 Rehabilitate pavement Burketown)

219/78A/651 LRRS Wills Developmental Road (Julia Creek - Sections : 232.70 - 276.80km 5,625 3,222 2,403 Rehabilitate pavement Burketown)

219/78A/67H SR Wills Developmental Road (Julia Creek - Sections : 252.00 - 260.00km 4,299 3,362 937 Rehabilitate and overlay (>75mm) Burketown)

219/89A/57H SR Burke Developmental Road (Cloncurry - Sections : 0 - 196.00km 1,248 1,091 157 Rehabilitate and overlay (>75mm) Normanton)

219/89A/651 SR Burke Developmental Road (Cloncurry - Sections : 9.40 - 194.00km 2,975 2,681 295 Rehabilitate pavement Normanton)

219/89A/703 SR Burke Developmental Road (Cloncurry - Sections : 0 - 195.35km 5,350 5,350 Reseal - bitumen chip Normanton)

219/93E/650 SR Diamantina Developmental Road (Boulia - Sections : 89.07 - 148.40km 1,246 747 498 Rehabilitate pavement Dajarra)

219/93F/800 SR Diamantina Developmental Road (Dajarra - 2.60km 800 800 Rehabilitate bridge/s and culvert/s Mount Isa)

Subtotal: Cloncurry 14,664 498

Flinders 227/5701/651 LRRS Hughenden - Muttaburra Road Sections : 0 - 159.20km 5,207 77 5,130 Rehabilitate pavement

227/5703/651 LRRS Aramac - Torrens Creek Road Sections : 125.08 - 246.27km 2,296 34 2,262 Rehabilitate pavement

55/5703/15 LRRS Aramac - Torrens Creek Road 125.08 - 246.78km 901 802 99 Form

55/5703/16 LRRS Aramac - Torrens Creek Road Sections : 125.08 - 146.00km 6,189 5,241 948 Construct to sealed standard

227/99B/2(6) SR Kennedy Developmental Road (The Lynd - Sections : 188.94 - 195.24km 10,210 4,859 2,361 2,990 Construct to sealed standard Hughenden)

227/99B/651 SR Kennedy Developmental Road (The Lynd - Sections : 92.51 - 255.34km 6,498 96 6,402 Rehabilitate pavement Hughenden)

227/99B/67H SR Kennedy Developmental Road (The Lynd - Sections : 92.50 - 255.30km 1,372 1,227 145 Re-sheet unsealed road Hughenden)

227/99C/1 SR Kennedy Developmental Road (Hughenden - Sections : 49.50 - 89.20km 23,000 18,773 4,227 Construct to new sealed two lane standard Winton)

227/99C/57H SR Kennedy Developmental Road (Hughenden - Sections : 2.50 - 117.06km 18,000 14,282 3,718 Rehabilitate and overlay (>75mm) Winton)

Subtotal: Flinders 17,843 10,439

McKinlay 244/5807/651 LRRS Julia Creek - Kynuna Road Sections : 0 - 112.37km 5,691 3,027 2,664 Rehabilitate pavement

244/78A/651 LRRS Wills Developmental Road (Julia Creek - Sections : 0 - 148.33km 4,880 4,094 786 Rehabilitate pavement Burketown)

79/78A/308 LRRS Wills Developmental Road (Julia Creek - Sections : 17.43 - 19.10km 520 320 200 Widen pavement Burketown)

Subtotal: McKinlay 3,650 (3) (4) Estimated Approved Indicative Indicative Local Project expenditure 2014-15 to Category (2) Project name/Location Location description total cost 2012-13 2013-14 Beyond Work description government number (1) June 2012 2015-16

$’000 $’000 $’000 $’000 $’000 $’000

Richmond 257/5803/651 LRRS Richmond - Winton Road Sections : 7.63 - 36.80km 5,038 1,592 3,446 Rehabilitate pavement

Subtotal: Richmond 3,446

Various local R09/R001/651 SN State-controlled road network Various locations 2,682 1,279 639 764 Undertake ineligible NDRRA capital governments activities

R09/R001/819 SN State-controlled road network Various locations 467 156 311 Rehabilitate bridge/s and culvert/s

Subtotal: Various local governments 1,590 639 764

Other works Construction Works 9 812 2,000

Corridor and Minor Safety Enhancements 655 1,119 2,000

Corridor, Roadway and Structures Management 237 565 1,198

NDRRA Operational 779

NDRRA Rehabilitation and Replacement 865 4,895

Programmed Maintenance 12,669 24,557

Project Initiation 55

Rehabilitation 322 1,071 4,183

Routine Maintenance 8,106 11,534 22,356

Traffic Management Enhancements 48 50 106

Traffic Operations 390 1,140 2,059

Subtotal: Other works 11,466 33,855 58,459

Total: North West State network 102,510 51,773 59,223

North West | State Network Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 145 North West | State Network Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 146

Endnotes

(1) For other Queensland Government funded projects, see the Statewide commitments section or the relevant region’s National Network, State Network and Local Network tables.

(2) BW - Busways; CW - Cycleway; HR - Heavy Rail; LR - Light Rail; LRRS - Local Roads of Regional Significance; MBI - Maritime Boating Infrastructure; MNA - Maritime Navigation Aids; MVTS - Maritime Vessel Traffic Service; MM - Multi-modal; OBI - Other Bus Infrastructure; SN - State Network; SR - State Regional; SS - State Strategic.

(3) In some instances, projects may include limited funding for planning activities. This does not guarantee continued funding for construction.

(4) Allocations for projects scheduled to commence in 2013-14 and beyond are indicative, for planning purposes. Priorities may be re-evaluated annually on a needs basis, according to available funds. The majority of funding in 2012-13 and beyond will be held at a regional level until works have been prioritised.

(5) Funded by the Queensland Government’s Safer Roads Sooner program.

(6) State-funded arrangements for the Regional Safety and Development Program have changed, with only projects in delivery remaining fully funded. Local Network

(3) Contributions Estimated Approved Indicative Indicative Local Project Local Queensland Australian expenditure 2014-15 to Category (2) Project name/Location Location description total cost 2012-13 2013-14 Beyond Work description government number (1) government Government Government June 2012 2015-16

$’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000

Mount Isa 246/LGSS/1(4) LGRD Isa Street Various locations 1,050 525 525 75 225 225 Replace bridge/s

Subtotal: Mount Isa 225 225

Other works Local Government Transport Development(5) 2,599 2,981 4,009

Subtotal: Other works 2,599 2,981 4,009

Total: North West Local network 2,824 3,206 4,009

Endnotes

(1) For other Queensland Government funded projects, see the Statewide commitments section or the relevant region’s National Network, State Network and Local Network tables.

(2) LGAC - Local Government Roads Alliance Capability; LGAR - Local Government Passenger Transport; LGCW - Local Government Cycleway; LGBI - Local Government Bus Infrastructure; LGRD - Local Government Road; MBI - Marine Boating Infrastructure.

(3) Allocations have been rounded to the nearest thousand dollars.

(4) State-funded arrangements for the Regional Safety and Development Program have changed, with only projects in delivery remaining fully funded.

(5) This bulk figure includes the indicative Transport Infrastructure Development Scheme (TIDS) allocation for this region. The statewide TIDS program (excluding specials) has been reduced from $63.3 million per annum to $40 million per annum. The department will work with local governments to revise their program of works to the final budget allocation.

North West | Local Network Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 147 North West | Local Network Queensland Transport and Roads Investment Program 2012-13 to 2015-16 | Page 148