Bergen Project Arna Introduction to the Arna – Bergen project Arna – Bergen development (UAB) ORGANISATION • Construction client organisation UAB (Arna – Bergen development) • Reporting to Construction Projects East Major Projects • Construction client organisation 45 people • Location: Nygårdstangen in Bergen city centre and Arna SCOPE OF PROJECT • Arna – Fløen 960242 • Bergen Station – Fløen 960128 Double track Arna – Bergen Station New Ulriken Tunnel (7.8 km) Arna Station upgrade Technical railway infrastructure Infrastructure in current Ulriken Tunnel New signalling system Infrastructure in Fløen STATUS OF ONGOING WORK • UUT 21 contract New Ulriken Tunnel in progress Tunnel boring with TBM in progress JVSS Skanska Strabag • Preparatory contract UBF 32 Preparatory work (Bergen – Fløen) out for pricing Work to start at end of March 2016 • Preparatory contract UUT 15 Preparatory work Arna to be sent out in March 2016 Work to start at end of August 2016 STATUS • Bergen – Fløen to undergo KS2 quality-control process • The project team is working on the planning, design and contract strategy CURRENT BERGEN – ARNA SYSTEM • Overhead contact line system of varying age and quality • Overhead contact line system at Bergen Station is complex (multiple junctions/tracks, connections) The oldest system is from the 1950s, partially modernised in the 1990s. • Developed gradually • Complex configuration • Old train heating posts from the 1950s (fed from the overhead contact line system) • Point heaters • The signalling system's relay system, built in 1972, is in the attic at Bergen Station (and in the cellar in Arna Station). • Lighting system for the station area • Earthing system SCOPE OF WORK BERGEN – FLØEN Development and modification of the overhead contact line system (not everything is to be replaced), System 20 3 high-voltage transformers Bergen, fed from BKK Train heating posts (x 10) Point heaters Upgrade of lighting system Upgrade of earthing installation Interlocking system Telecom system Upgrade of technical building, Fløen New technical building, Bergen Station SCOPE OF WORK ARNA – FLØEN Approx. 11 km of new overhead contact line system, System 20 Modifications to overhead contact line system, Arna Station No AT to be constructed (exemption from Technical Regulations) Point heaters New lighting system Upgrade of earthing installation Interlocking system 10 technical buildings (1 in the station, 9 in cross- cut between old and new tunnels) Telecom system Interface with Arna converter station (power supply to overhead contact line) SCHEDULE • Works: Bergen – Fløen To take place 2017 – 2021 Arna – Fløen To take place 2017 – 2021 • Procurements, estimated issue dates, respectively: End 2016 / early 2017 and End 2017 / early 2018 Planning separate Market Day in Bergen when these have been finalised STATUS • The project (Arna – Fløen & Bergen – Fløen) is to undergo the KS2 quality-assurance process • Future progress on the project depends on political decisions and whether the project is included in the 2017 national budget • Final decisions have not been made with regard to the procurement schedule and division into contracts. CONTACT • Stian Ekornaas • Head of strategy and contracts • Arna – Bergen development • Tel. +47 94501346 • [email protected] .
Recommended publications
  • Norway Norway: Oslo, Bergen and the Fjords THIS MONTH
    FEBRUARY 2017 | Our 39th Year AndrewHarper.com TRAVELING THE WORLD IN SEARCH OF TRULY ENCHANTING PLACES © MMUENZL/ADOBE © / PICTURESQUE CITIES, SENSATIONAL SCENERY, STELLAR SEAFOOD COVER PHOTOGRAPH Seven Sisters Waterfall on Geirangerfjord, Norway Norway: Oslo, Bergen and the Fjords THIS MONTH orway is one of the most peaceful beginning of the oil boom in the 1970s, the A NORWEGIAN JOURNEY and hospitable countries in the Norwegians have developed a discerning On a two-week trip by car, train and ferry, Nworld. There are two primary taste for luxury and comfort, which is I visited the country’s two major cities and travel experiences: The first is a cruise complemented by the purity and simplic- then headed north to Alesund, the gateway to along its island-dotted, fjord-indented ity of Scandinavian design. Norway’s most spectacular fjord district. ..... 1-7 coastline. The second is the one that I We began our journey in Oslo, the Online: Traditional foods; Touring itinerary made last summer: a two-week mix of country’s capital and largest city, then land- and sea-based adventures. The trip traveled to Bergen by train, visited NEW YORK NEWS allowed us to take our time and to chat that city and the surrounding region, Hotel debuts, notable new restaurants and the with the friendly locals — almost all of continued north from Bergen to Alesund city’s passion for food halls. ...................... 8-11 whom speak perfect English — as well as via an overnight voyage on the famous Online: Ethnic food shops to get off the beaten track to view land- Hurtigruten shipping and cruise line and scapes of unique and unmarred beauty.
    [Show full text]
  • Extreme Precipitation Assessment in Western Norway
    Hydrol. Earth Syst. Sci. Discuss., 6, 7539–7579, 2009 Hydrology and www.hydrol-earth-syst-sci-discuss.net/6/7539/2009/ Earth System HESSD © Author(s) 2009. This work is distributed under Sciences 6, 7539–7579, 2009 the Creative Commons Attribution 3.0 License. Discussions This discussion paper is/has been under review for the journal Hydrology and Earth Extreme precipitation System Sciences (HESS). Please refer to the corresponding final paper in HESS assessment in if available. Western Norway G. N. Caroletti and I. Barstad Future extreme precipitation assessment Title Page in Western Norway – using a linear model Abstract Introduction approach Conclusions References Tables Figures G. N. Caroletti1,2 and I. Barstad1 1Bjerknes Centre for Climate Research, Bergen, Allegata 55, 5007 Bergen, Norway J I 2Geophysical Institute, University of Bergen, Allegata 70, 5007 Bergen, Norway J I Received: 24 November 2009 – Accepted: 26 November 2009 Back Close – Published: 18 December 2009 Correspondence to: G. N. Caroletti ([email protected]) Full Screen / Esc Published by Copernicus Publications on behalf of the European Geosciences Union. Printer-friendly Version Interactive Discussion 7539 Abstract HESSD The need for local assessments of precipitation has grown in recent years due to the increase in precipitation extremes and the widespread awareness about findings of the 6, 7539–7579, 2009 IPCC 2003 Report on climate change. General circulation models, the most commonly 5 used tool for climate predictions, show an increase in precipitation due to an increase Extreme precipitation in greenhouse gases (Cubash and Meehl, 2001). It is suggested that changes in ex- assessment in treme precipitation are easier to detect and attribute to global warming than changes in Western Norway mean annual precipitation (Groisman et al., 2005).
    [Show full text]
  • Future Extreme Precipitation Assessment in Western Norway – Using a Linear Model Approach
    Hydrol. Earth Syst. Sci. Discuss., 6, 7539–7579, 2009 Hydrology and www.hydrol-earth-syst-sci-discuss.net/6/7539/2009/ Earth System © Author(s) 2009. This work is distributed under Sciences the Creative Commons Attribution 3.0 License. Discussions This discussion paper is/has been under review for the journal Hydrology and Earth System Sciences (HESS). Please refer to the corresponding final paper in HESS if available. Future extreme precipitation assessment in Western Norway – using a linear model approach G. N. Caroletti1,2 and I. Barstad1 1Bjerknes Centre for Climate Research, Bergen, Allegata 55, 5007 Bergen, Norway 2Geophysical Institute, University of Bergen, Allegata 70, 5007 Bergen, Norway Received: 24 November 2009 – Accepted: 26 November 2009 – Published: 18 December 2009 Correspondence to: G. N. Caroletti ([email protected]) Published by Copernicus Publications on behalf of the European Geosciences Union. 7539 Abstract The need for local assessments of precipitation has grown in recent years due to the increase in precipitation extremes and the widespread awareness about findings of the IPCC 2003 Report on climate change. General circulation models, the most commonly 5 used tool for climate predictions, show an increase in precipitation due to an increase in greenhouse gases (Cubash and Meehl, 2001). It is suggested that changes in ex- treme precipitation are easier to detect and attribute to global warming than changes in mean annual precipitation (Groisman et al., 2005). However, because of their coarse resolution, the global models are not suited to local assessments. Thus, downscaling 10 of data is required. A Linear Model (Smith and Barstad, 2004) is used to dynamically downscale oro- graphic precipitation over Western Norway from twelve General Circulation Model sim- ulations based on the A1B emissions scenario (IPCC, 2003).
    [Show full text]
  • Representing the SPANISH RAILWAY INDUSTRY
    Mafex corporate magazine Spanish Railway Association Issue 20. September 2019 MAFEX Anniversary years representing the SPANISH RAILWAY INDUSTRY SPECIAL INNOVATION DESTINATION Special feature on the Mafex 7th Mafex will spearhead the European Nordic countries invest in railway International Railway Convention. Project entitled H2020 RailActivation. innovation. IN DEPT MAFEX ◗ Table of Contents MAFEX 15TH ANNIVERSARY / EDITORIAL Mafex reaches 15 years of intense 05 activity as a benchmark association for an innovative, cutting-edge industry 06 / MAFEX INFORMS with an increasingly marked presence ANNUAL PARTNERS’ MEETING: throughout the world. MAFEX EXPANDS THE NUMBER OF ASSOCIATES AND BOLSTERS ITS BALANCE APPRAISAL OF THE 7TH ACTIVITIES FOR 2019 INTERNATIONAL RAILWAY CONVENTION The Association informed the Annual Once again, the industry welcomed this Partners’ Meeting of the progress made biennial event in a very positive manner in the previous year, the incorporation which brought together delegates from 30 of new companies and the evolution of countries and more than 120 senior official activities for the 2019-2020 timeframe. from Spanish companies and bodies. MEMBERS NEWS MAFEX UNVEILS THE 26 / RAILACTIVACTION PROJECT The RailActivation project was unveiled at the Kick-Off Meeting of the 38 / DESTINATION European Commission. SCANDINAVIAN COUNTRIES Denmark, Norway and Sweden have MAFEX PARTICIPTES IN THE investment plans underway to modernise ENTREPRENEURIAL ENCOUNTER the railway network and digitise services. With the Minister of Infrastructure The three countries advance towards an Development of the United Arab innovative transport model. Emirates, Abdullah Belhaif Alnuami held in the office of CEOE. 61 / INTERVIEW Jan Schneider-Tilli, AGREEMENT BETWEEN BCIE AND Programme Director of Banedanmark. MAFEX To promote and support internationalisation in the Spanish railway sector.
    [Show full text]
  • Jernbaneverket
    On track in 2008 A brief look at the activities of Jernbaneverket Director General Elisabeth Enger is preparing for record railway investments and recruiting more and more young people to Jernbaneverket, the Norwegian National Rail Administration ALL ABoard! 155 years of Norwegian Contents railway history All aboard! 155 years of Norwegian railway history 2 1854 Norway’s first railway line opens, linking Kristiania As Jernbaneverket’s new Director General, I see a high level of commitment to Key figures 2 (now Oslo) with Eidsvoll. the railways – both among our employees and others. Many people would like 1890-1910 Railway lines totalling 1 419 km are built in Norway. All aboard! 3 to see increased investment in the railway, which is why the strong political will 1909 The Bergen line is completed at a cost equivalent to This is Jernbaneverket 4 the entire national budget. to achieve a more robust railway system is both gratifying and inspirational. 2008 in brief 6 1938 The Sørland line to Kristiansand opens. Increased demand for both passenger and freight transport is extremely positive Working for Jernbaneverket 8 1940-1945 The German occupation forces take control of NSB, because it is happening despite the fact that we have been unable to offer our Norwegian State Railways. Restrictions on fuel Construction 14 loyal customers the product they deserve. Higher funding levels are now providing consumption give the railway a near-monopoly on Secure wireless communication 18 transport. The railway network is extended by grounds for new optimism and – slowly but surely – we will improve quality, cut Think green – think train 20 450 km using prisoners of war as forced labour.
    [Show full text]
  • Northern Lights & Nordic Fjords
    Call: 0844 3350 197 Full Itinerary NORTHERN LIGHTS & NORDIC FJORDS TALK TO OUR WELL TRAVELLED TEAM OF EXPERTS 0844 3350 197 Monday to Friday 09:00 - 18:00 GMT JOURNEY SNAPSHOT ACTIVITY LEVEL: FLIGHT INFORMATION: Flights from London Heathrow Airport [LHR] to Level 2 arrive in Bergen Airport [BGO] on Day 1 and DESTINATION: depart from Tromsø Airport [TOS] to London Heathrow Airport [LHR] on Day 9 Northern Lights & Nordic Fjords PICKUP LOCATION: DURATION: Bergen Airport [BGO] 9 days / 8 nights © The Big Journey Company2020 - 2021.All rights reserved. Holiday tours are operated by The Big Journey Company Limited. Registered in England. Registered office: Marron Bank, Branthwaite, Cumbria, CA14 4SZ. Registered number: 6532140. The Big Journey Company Limited is a member of The Travel Trust Association member number U5675 and holds an Air Travel Organiser’s License number T7282. Call: 0844 3350 197 OVERVIEW 04 - 12 Feb 2022 - SOLD OUT Enjoy Norway's spectacular fjords and mountain landscapes by train and by boat, before chasing the elusive Northern Lights! Have you ever dreamed of seeing the Aurora Borealis or sailing down a spectacular Norwegian fjord? Join us on this trip of a lifetime to Norway and make those dream come true! This escorted journey starts in the coastal town of Bergen - gateway to the fjords. It then heads inland by train to Voss and then on to a fjord cruise to Flåm. Your winter adventure continues onboard the scenic Flåm Railway to Oslo, Norway's capital, passing through wild and beautiful mountain scenery with frozen waterfalls and steep mountain sides.
    [Show full text]
  • Bergen Line Projects – UVM
    Bergen Line Projects – UVM Torbjørn Søderholm, railway engineering project manager Brit Borsheim Henriksen, contract consultant Contractor Day, Bane NOR Energi, April 2019 PROJECT PORTFOLIO • UAF – Arna Fløen development • NBF – Nygårdstangen Bergen Fløen • UAS – E16/Voss Line Arna Stanghelle 3 Arna-Fløen Main facts • Cost: 4.4 billion • Time: 2014-2022 • Planning phase: Construction phase Arna-Fløen • Double track on the section from Arna station to Fløen by building a new, parallel tunnel through Ulriken. • 7.8 km tunnel, 7 km of which will be bored using a tunnel drilling machine, with fixed track. • Extensive refurbishment of Arna station in two construction phases. • 2 new, parallel railway bridges in Fløen. • Upgrading of existing Ulriken tunnel. • Major requirements for coordination during the construction period due to operations on existing track. • The track from Bergen station to Arna's northern Europe's busiest single track. When the double track is complete, it will be possible to double the frequency of train services on the section. 5 Arna Fløen development K04 station Arna Fløen development UUT21 UUT25 UUT31 Railway UUT23 Existing New Ulriken UUT41 Signal Arna Station engineering Ulriken tunnel tunnel Existing Ulriken tunnel New Ulriken tunnel Fløen 6 UUT 31 Railway engineering • Multidisciplinary railway engineering contract • Track/points • Overhead line • Electrical, high-voltage installations • Electrical, low-voltage installations • Telecoms installations 7 Low-voltage system work scope • Low-voltage system scope •
    [Show full text]
  • May 2019 Inter City Railway Society Founded 1973
    TTRRAA CCKKSS Inter City Railway Society – May 2019 Inter City Railway Society founded 1973 www.intercityrailwaysociety.org Volume 47 No.4 Issue 552 May 2019 The content of the magazine is the copyright of the Society No part of this magazine may be reproduced without prior permission of the copyright holder President: Simon Mutten - [email protected] (01603 715701) Coppercoin, 12 Blofield Corner Rd, Blofield, Norwich, Norfolk NR13 4RT Treasurer: Peter Britcliffe - [email protected] (01429 234180) 9 Voltigeur Drive, Hart, Hartlepool TS27 3BS Membership Sec: Colin Pottle - [email protected] (01933 272262) 166 Midland Road, Wellingborough, Northants NN8 1NG Mob (07840 401045) Secretary: Christine Field - [email protected] contact details as below for Trevor Chairman: filled by senior officials as required for meetings Magazine: Editor: Trevor Roots - [email protected] (01466 760724) Mill of Botary, Cairnie, Huntly, Aberdeenshire AB54 4UD Mob (07765 337700) Sightings: James Holloway - [email protected] (0121 744 2351) 246 Longmore Road, Shirley, Solihull B90 3ES Photo Database: Colin Pottle Books: Publications Manager: Trevor Roots - [email protected] Publications Team: Trevor Roots / Eddie Rathmill Website / IT: Website Manager: Trevor Roots - [email protected] contact details as above Social Media: Gareth Patterson Yahoo Administrator: Steve Revill Sales Manager: Christine Field contact details
    [Show full text]
  • Arna-Bergen Double Track May 2016
    Arna-Bergen double track May 2016 Kontakt oss Contact:Jernbaneverkets enheter er lokalisert på flere steder i landet. HeadFor nærmere Project Managerinformasjon besøk våre nettsider Hans-Egileller ring vårt Larsen landsdekkende sentralbord: E-mail: [email protected] 05280Phone: +47 474 76 616 Fra utlandet (+47) 22 45 50 00 Communications Advisor PostadresseIngvild Eikeland Jernbaneverket, Postboks 4350, 2308 Hamar E-postE-mail: [email protected]@jbv.no Phone: +47 982 49 707 Jernbaneverkets kundesenter kan kontaktes på: E-postVisiting [email protected] adresses: SMS/MMSBergen: Lungegårdskaien Send kodeord JBV36, 5015 til 26112 Bergen SosialeArna: Ådnavegen medier Twitter 56, 5260 og IndreFacebook Arna www.jernbaneverket.nowww.jernbaneverket.no/arna-bergen Project background The section between Arna and Bergen is very heavily trafficked. The current single track has insufficient capacity, and track doubling of this section will improve the situation for goods and passenger services. The biggest part of the section passes through a tunnel under Mount Ulriken. Jernbaneverket is now constructing a new, parallel tunnel in order to increase capacity. The double track will also permit faster speeds and improve traffic management flexibility. Photos and illustrations: Front page: Jernbaneverket and Norconsult, p. 2 Tolstrups 3D studio, p. 4-5 Jernbaneverket, p. 6-7 Herrenknecht, p. 8 Norconsult and p. 12, 13 and 15 Jernbaneverket. 3 Arna Station with the two tunnel portals in the background. The new tunnel is to the left. This is a preliminary illustration which may not be an accurate representation of the finished result. New Ulriken Tunnel Starting from the Arna side of Ulriken, tunnel construction is carried out using both conventional blasting and a tunnel boring machine (TBM).
    [Show full text]
  • Donkey 151 December 2015.Indd
    Edition Contents: The D Train Project Multi-Modal in Bergen A Connecticut Yankee in December 2015 King Arthur’s Court The Magazine of the Marlow & District Railway Society President: Sir William McAlpine Bt Vice-President: Mark Hopwood Chairman: Tim Speechley. 5 Sunningdale Close, Booker, High Wycombe HP12 4EN Tel.: 01494 638090 email: [email protected] Vice-Chairman Mike Hyde. 11 Forty Green Drive, Marlow, Bucks., SL7 2JX. Tel.: 01628 485474 email: [email protected] Treasurer: Peter Robins. 1 Chalklands, Bourne End, Bucks., SL8 5TQ. Tel.: 01628 527870 email: [email protected] Secretary: Vincent Caldwell. Moses Plat Farm, Speen, Princes Risborough, HP27 0SD. Tel.: 01494 488283 email: [email protected] Webmaster: Dave Woodhead. 7 Larkspur Close, Wokingham, Berks., RG41 3NA Tel.: 0118 979 1621 email: [email protected] Outings Organiser: Julian Heard. 58 Chalklands, Bourne End, Bucks., SL8 5TJ. Tel.: 01628 527005 email: [email protected] Archivist: Malcolm Margetts. 4 Lodge Close, Marlow, Bucks., SL7 1RB. Tel.: 01628 486433 email: [email protected] Brian Hopkinson. 158 Marlow Bottom, Marlow, SL7 3PP Tel.: 01628 298520 email: [email protected] Donkey Editor: Mike Walker, Solgarth, Marlow Road, Little Marlow, Marlow, Bucks., SL7 3RS. Tel.: 01628 483899 email: [email protected] Website: www.mdrs.org.uk The contents of the Marlow Donkey represent the views of the authors and do not necessarily reflect the position of the Society TIMETABLE - Forthcoming meetings Page 2 CHAIRMAN'S NOTES Tim Speechley 2 SOCIETY & LOCAL NEWS 3 A TRAIN OF AUTUMNAL EVENTS Mike Walker 5 THE D TRAIN PROJECT John Fowler 7 MULTI-MODAL IN BERGEN Tim Edmonds 9 OLD GERTY David Gardner 13 A CONNECTICUT YANKEE IN KING ARTHUR’s COURT Don Woodworth 15 TESTING TIMES AT BICESTER 19 FRONT COVER PHOTOGRAPHS Top: 86220 The Round Table on an up train for London away from Cambridge at 14:05 on 24th January 1989.
    [Show full text]
  • An Assessment of Future Extreme Precipitation in Western Norway Using a Linear Model
    Hydrol. Earth Syst. Sci., 14, 2329–2341, 2010 www.hydrol-earth-syst-sci.net/14/2329/2010/ Hydrology and doi:10.5194/hess-14-2329-2010 Earth System © Author(s) 2010. CC Attribution 3.0 License. Sciences An assessment of future extreme precipitation in western Norway using a linear model G. N. Caroletti1,2 and I. Barstad1,3 1Bjerknes Centre for Climate Research, Bergen, Allegata 55, 5007 Bergen, Norway 2Geophysical Institute, University of Bergen, Allegata 70, 5007 Bergen, Norway 3Uni Research AS, Thormhlensgt. 55, 5008 Bergen, Norway Received: 24 November 2009 – Published in Hydrol. Earth Syst. Sci. Discuss.: 18 December 2009 Revised: 29 October 2010 – Accepted: 9 November 2010 – Published: 26 November 2010 Abstract. A Linear Model (Smith and Barstad, 2004) 1 Introduction was used to dynamically downscale Orographic Precipita- tion over western Norway from twelve General Circulation Precipitation strongly and visibly influences human life and Model simulations. The GCM simulations come from the has always been a primary subject of meteorological stud- A1B emissions scenario in IPCC’s 2007 AR4 report. An ies. Precipitation results from a chain of different physical assessment of the changes to future Orographic Precipita- processes. When a precipitation event takes place, it is often tion (time periods: 2046–2065 and 2081–2100) versus the difficult to identify the following: (i) which processes are at historical control period (1971–2000) was performed. Re- work, (ii) the temporal and (iii) spatial scales at which these sults showed increases in the number of Orographic Precip- processes work, and (iv) how large a part each of them plays itation days and in Orographic Precipitation intensity.
    [Show full text]
  • Now's Your Chance!
    On Track for More Snapshots of Jernbaneverket’s activities in 2007 Work for Jernbaneverket? Now’s your chance! Norwegian railway Contents history – a brief outline Norwegian railway history – a brief outline 2 1854 Norway’s first railway line opens, linking Kristiania Key figures 2 (now Oslo) with Eidsvoll. Introduction 3 1890-1910 Railway lines totalling 1 419 km are built in Norway. 1909 The Oslo–Bergen line is completed, at a cost About Jernbaneverket 4 equivalent to the entire national budget. 2007 on the railways 6 1938 The Sørland line to Kristiansand opens. Working for Jernbaneverket 7 1940-1945 The German occupation forces are in control Engineering projects 11 of Norwegian railways. Restrictions on energy Secure wireless communication 16 consumption mean that rail has a near monopoly on Environment 19 transport. The network is expanded by 450 km using prisoners of war as forced labour. Valuable assets 22 1952 In a drive to end steam train operation, the govern- Jernbaneverket and the customer 26 ment makes funding available to electrify the Safety 30 network. On track for traffic growth 34 1969/70 The 1952 electrification plan is completed. Staff benefits 39 1996 Norwegian State Railways (NSB) is split into a train Contact details 40 operating company, NSB BA, and an infrastructure manager, Jernbaneverket. The Norwegian Railway Inspectorate (Statens jerbanetilsyn) is also established. 1999 Norway’s first high-speed line, from Oslo to Garder- moen airport, enters service with great success. 2000 The tragic accident at Åsta, Norway’s third major rail accident in 50 years, overshadows the start of the new millennium on the railways.
    [Show full text]