2.2.33 North Binaka Airport

Airport Overview Airport Picture Description and Contacts of Key Companies Passenger and Cargo Performance Indicator Runways Helicopter Pad(s) Airport Infrastructure Details Airport Operating Details Customs Guidance Storage Facilities Airfield Costs NAVIGATION CHARGES FUEL SERVICES CHARGES CARGO TERMINAL CHARGES AIR-BRIDGE CHARGES Security

Airport Overview

Built in 1959 as a defence field, currently it serves as a domestic airport and can accommodate aircraft such as Bombardier CRJ1000 Nextgen ER.

Surrounded by hilly terrain, the aircrafts must take-off from runway 09 and land on the runway 27.

Airport Location and Contact

Country Indonesia

Province or District , Distrct

Nearest Town or City with Distance from Airport Gunungsitoli District - 19.5 Km

Airport’s Complete Name Binaka Airport

Latitude 01°0958N

Longitude 97°4216E

Elevation (ft and m) 20 ft / 6 m

IATA Code GNS

ICAO Code WIMB

Managing Company or Airport Authority Unit Penyelenggara Bandar Udara (UPBU) under Ministry of Transportation

Management Contact Person Susi

General Section

Mobile: 085260269626

Phone: 0639 – 8000003/8000005

Email: [email protected]

Open From (hours) 07:00 WIB

Open To (hours) 17:00 WIB

Airport Picture

Page 1 Description and Contacts of Key Companies

Airlines Destination Website

Garuda Indonesia https://www.garuda-indonesia.com/id/id/index.page

Page 2 www.lionair.co.id

Citilink www.aviastar.id

Aviastar Simeulue https://www.citilink.co.id/

Passenger and Cargo Performance Indicator

With the increased number of passengers, airlines and weight of aircrafts every year, it requires good quality of runway at the airport. Binaka airport continuously extending and widening the runway pavement in order to accommodate larger aircraft in the next three years.

Performance for 2018

Per Year Per Month Per Day

Total Aircraft Movements 2,805 234 8

Total Passengers Arrival : 145,273 Arrival : 12.106 Arrival : 398

Depart : 147,407 Depart : 12.284 Depart : 403

Total : 292,680 Total : 24,390 Total : 801

Total Capacity of the Airport (MT) 65,856

Current Activity of the Airport (MT) 49,212

Current use by Humanitarian Flights (UNHAS) N/A N/A N/A

Currently, the construction of the cargo terminal is almost completed and expected to be up and running by 2020.

Runways

Runway #1

Runway Dimensions 2,250 m x 30 m

Orientation PCN 27 F/C/Y/T

Surface Asphalt Hotmix (Flexible)

The quality of the runway based on 3S (Safety, Security & Service) + 1C (Compliance).

Helicopter Pad(s)

There is no specific helipad in the airport however, an open area nearby is available for helicopter landing.

Airport Infrastructure Details

Customs No JET A-1 fuel Yes

Immigration No AVGAS 100 No

Terminal Building Yes Single Point Refueling No

Passenger Terminal Yes Air Starter Units Yes

Cargo terminal Yes Ground Power (mobile) Yes

Pax Transport to Airfield No Ground Handling Services Yes

Control Tower Yes Latrine Servicing Yes

Weather Facilities Yes Fire Fighting Category (ICAO) Yes, Category 5

Catering Services Yes De-icing Equipment N/A

Base Operating Room No Parking Ramp Lighting Yes

Airport Radar Yes Approach & Runway Lights Yes

NDB Yes VOR Yes

ILS No

Airport Operating Details

Page 3 Operating Details

Maximum Sized Aircraft that can be Offloaded on Bulk Cargo Bombardier CRJ1000 Nextgen ER

Maximum Sized Aircraft that can be Offloaded on Pallet C130

Total Aircraft Parking Area (m²) Apron : 180 m x 80 m = 14.400 m²

Storage Area (m3 and MT) No

Handling Equipment

Elevators / Hi Loaders No Max Capacity (MT)

Max Height(m)

Loading Ramps No

Other Comments

Customs Guidance

Customs is not available in the airport (domestic flights only).

Storage Facilities

No storage facility available for general cargo within the airport compound.

Airfield Costs

Airport rates and charges of various services can be referred to the government regulation under PP.11 tahun 2015. The full regulation can be download here: http://jdih.dephub.go.id/assets/uudocs/pp/2015/PP_11_Tahun_20152.pdf

NAVIGATION CHARGES

Charges Aircraft Weight - MTOW (kg)

0 - 7,000 7,001 - 136,000 136,001 and over

Navigation (per journey) USD - $ https://www.ap1.co.id/en

Landing USD - $

Night Landing USD - $

Night Take-Off USD - $

Parking

Handling Charges

FUEL SERVICES CHARGES

No fuel depot/station in the airport.

Price per Litre USD - $

Jet A-1 Information on fuel service charges can be found at: http://aviation.pertamina.com/News.aspx?p=price

Avgas

CARGO TERMINAL CHARGES

PT. Gapura Angkasa is the main ground handling company operates in the airport.

Import Charges

Type of Charge Rate USD - $ per kg Comments

Handling Charge

Break Bulk Fee

Diplomatic Mail

Page 4 Strong Room – per consignment There is no significant cargo operations in this airport Cold Storage Fee

Delivery Outside Normal Working Hours

Preparation of substitute AOA – Invoice – Receipt

Storage per Day

Export

Handling Charges – Un-palletized Cargo

International Air Waybill

Local Air Waybill

Air Way Bill Amendment - Cancellation

Air Way Bill Documentation No significant cargo operations in this airport

Diplomatic Mail

Storage Charges per Day

AIR-BRIDGE CHARGES

Air bridge is not available.

Security

Airport security is available 24/7 for passengers inspections, goods and vehicles checking. Security Standard Operational Procedures (SOP) is in place.

Page 5