Submission Cover Sheets
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Noble Park Major Activity Centre
Noble Park Major Activity Centre Structure Plan, 2021 The City of Greater Dandenong respectfully acknowledges Aboriginal and Torres Strait Islander Peoples as the Traditional Custodians of the land. We recognise and respect their continuing connections to climate, culture and Country. Contents Executive summary ...............................................4 1 Introduction .........................................................8 1.1 Purpose of a Structure Plan ..............................9 1.2 Vision for Noble Park .......................................12 1.2.1 Climate Change Mitigation and Planning 12 1.2.2 Key outcomes of the Structure Plan .......12 1.3 Consultation on the Structure Plan ..................13 1.4 Context and history ..........................................13 1.4.1 ‘Village Character’ explanation ...............14 1.5 Noble Park today .............................................15 1.6 Noble Park in the future ...................................15 2 Structure Plan Boundary ..................................16 2.1 Setting the boundary .......................................16 3 Existing Planning Policy Context ...................18 3.1 State Policy Context ........................................18 3.1.1 Plan Melbourne .....................................18 3.2 Local Policy Context .......................................18 3.2.1 Noble Park Activity Centre Structure Plan, 2009 ......................................................18 4 Development demand .......................................19 4.1 Residential -
Submission Cover Sheets
Submission Cover Sheet North East Link Project EES IAC 402 Request to be heard?: No, but please email me th Full Name: Phil Turner Organisation: Maroondah City Council Affected property: Attachment 1: Maroondah_Coun Attachment 2: Maroondah_Coun Attachment 3: Comments: To the North East Link Inquiry & Advisory Committee (IAC) Maroondah Council provides the following submission to the IAC, in relation to the EES for the North East Link project. While Council formally supports the objectives of the NEL project, I advise that the support of Maroondah Council has been conditional on appropriate traffic considerations being made with regard to the impact of the project on the Eastlink tunnels, the Ringwood Bypass and by extension the Ringwood Metropolitan Activity Centre. Council previously commissioned a review by O’Brien Traffic that considered the project in the context of the tunnels and impacts on Ringwood, and it was determined that without ancillary works to take traffic pressure off the Eastlink tunnels and the Ringwood Bypass, the project would potentially fail and have a major detrimental impact on the viability of the Ringwood Metropolitan Activity Centre. The O’Brien Traffic report attached to this submission details the basis for those concerns. Council’s concerns were previously forwarded to NELA and Council officers have met with NELA officers on these matters, however, to date Council has not received an appropriate response that addresses these concerns, including within the ESS. In support of this submission, the following documents have also been uploaded: o A submission letter signed by Council’s Mayor Rob Steane documenting the history of Council’s dealings regarding NEL, and outlining Council’s concerns current with the project; o Council Report September 2018; o O’Brien Traffic Review dated 12 September 2017; o Council letter to NELA (26 February 2018) and NELA response (14 March 2018); o Correspondence from Council on Bypass concerns (including technical reports); and o Minutes from MCC / NELA meetings 6 April 2018 and 30 April 2018. -
Cycle Notes Widths of Off-Road Shared Use Paths
NO. 21 - JUNe 2010 Cycle Notes Widths of Off-Road Shared Use Paths Welcome to CYCLE NOTES No. 21. The purpose of CYCLE NOTES is to provide information on the design of bicycle facilities for engineers and planners. CYCLE NOTES should be read in conjunction with: Austroads Guides to Traffic Management and Road Design. Australian Standard 1742.9, Manual of Uniform Traffic Control Devices, Part 9 Bicycle Facilities. VicRoads Traffic Engineering Manual Volumes 1 and 2. Introduction Passings and Meetings The purpose of this edition of Cycle Notes is to provide When cyclists and pedestrians are using a shared path, guidance on the width of off-road shared use paths. In they will often “meet” other cyclists and pedestrians particular, it relates the widths of paths to the volume of travelling in the opposite direction or “pass” slower cyclists cyclists and pedestrians who use the path. and pedestrians travelling in the same direction. Guidance is also provided on the circumstances under Delayed Passings which consideration should be given to separating cyclists Delayed passings occur when faster cyclists must slow from pedestrians. down to pass other path users travelling in the same direction. This usually occurs when a “passing” happens Shared Use Paths at the same time as a “meeting” and there is insufficient Shared use paths are the most common form of off road room for the faster cyclist to pass the slower path users. path in Australia and are based on cyclists and pedestrians The number of delayed passings that occur along a path is sharing the path (Figure 1). -
285. La Trobe
In the matter of the NORTH EAST LINK PROJECT INQUIRY AND ADVISORY COMMITTEE SUBMISSIONS ON BEHALF OF LA TROBE UNIVERSITY THE PROJECT ................................................................................................................................... 2 FRAMEWORK FOR THE INQUIRY ............................................................................................... 3 The IAC’s Terms of Reference ................................................................................................. 3 The EES Scoping Requirements ............................................................................................... 4 The IAC’s report ....................................................................................................................... 6 EVIDENCE......................................................................................................................................... 6 LA TROBE UNIVERSITY IS A SIGNIFICANT ASSET TO THE REGION ................................. 8 The University is one of the north’s largest employers ............................................................ 8 The University has significant plans to become the University City of the Future .................. 8 Kingsbury Drive is of significance to the University and the region ....................................... 9 THE UNIVERSITY SUPPORTS THE PROJECT .......................................................................... 13 THE PROJECT’S TREATMENT OF PUBLIC TRANSPORT SHOULD BE IMPROVED .......... 14 Planning policy -
Koonung Creek Linear Park Management Plan 2011
Message from the Mayor Our vision is for a vibrant, safe and culturally diverse community that fosters participation, connectedness, harmony, social inclusion, health and wellbeing. Our parks and reserves are the 'green lungs' for the City and are areas for our enjoyment. When we visit our parks and reserves we feel a sense of wellbeing. We need to plan for them so they can be enjoyed today and be there tomorrow for our children. A well-designed, planned and managed urban green space provides significant aesthetic, social, psychological and environmental benefits for their users. The Koonung Creek Linear Park is enjoyed by many of those who live in Bulleen, Doncaster, Doncaster East and Donvale and our neighbouring municipalities as well. When we improve the access to our natural setting we are improving the quality of life in our neighbourhoods. We are fortunate to have this wonderful “green” environment accessible by so many of our residents to enjoy a walk, cycle and time in a natural setting. There are many benefits for people who visit green, open spaces including: an opportunity to increase physical activity; lower stress levels; experience changes of scenery; and, a place to wind down. I would like to thank the community for their contribution to the consultation process as it has greatly assisted us to identify the issues and opportunities which have shaped the development of the recommendations. GEOFF GOUGH Mayor Executive Summary The Koonung Creek Linear Park Management Plan has been prepared to continue to protect and enhance the environmental values of the Park balanced with the provision of recreational opportunities and experiences in a mix of urban and natural setting, including, walking, cycling, dog walking, commuting and nature appreciation. -
Domain Parklands Master Plan 2019-2039 a City That Cares for the Environment
DOMAIN PARKLANDS MASTER PLAN 2019-2039 A CITY THAT CARES FOR THE ENVIRONMENT Environmental sustainability is the basis of all Future Melbourne goals. It requires current generations to choose how they meet their needs without compromising the ability of future generations to be able to do the same. Acknowledgement of Traditional Owners The City of Melbourne respectfully acknowledges the Traditional Owners of the land, the Boon Wurrung and Woiwurrung (Wurundjeri) people of the Kulin Nation and pays respect to their Elders, past and present. For the Kulin Nation, Melbourne has always been an important meeting place for events of social, educational, sporting and cultural significance. Today we are proud to say that Melbourne is a significant gathering place for all Aboriginal and Torres Strait Islander peoples. melbourne.vic.gov.au CONTENTS A City That Cares For Its Environment 2 4. Master Plan Themes 23 1. Overview 5 4.1 Nurture a diverse landscape and parkland ecology 23 1.1 Why do we need a master plan? 6 4.2 Acknowledge history and cultural heritage 24 1.2 Vision 7 4.3 Support exceptional visitor experience 28 1.3 Domain Parklands Master Plan Snapshot 8 4.4 Improve people movement and access 32 1.4 Preparation of the master plan 9 4.5 Management and partnerships to build resilience 39 1.5 Community and Stakeholder engagement 10 5. Domain Parklands Precincts Plans 41 2. Domain Parklands 11 5.1 Precinct 1 - Alexandra and Queen Victoria Gardens 42 2.1 The history of the site 11 5.2 Precinct 2 - Kings Domain 43 2.2 The Domain Parklands today 12 5.3 Precinct 3 - Yarra Frontage and Government House 44 2.3 Strategic context and influences 12 5.4 Precinct 4 - Visitor Precinct 45 2.4 Landscape Characters 14 5.5 Precinct 5 - Kings Domain South 46 2.5 Land management and status 15 6. -
Surface Water Flooding – Presentation to NEL Panel Hearing, 8 Th August 2019 – Michael Cawood Cut Back Version Due to Time Constraints As Delivered at the Hearing
Surface Water Flooding – Presentation to NEL Panel Hearing, 8 th August 2019 – Michael Cawood Cut back version due to time constraints as delivered at the Hearing Slide #1 Mr Chairman, Members. Introduce self and principal area of expertise as per evidence. Earlier this year, I reported to Carey Baptist Grammar School on flood related matters and the North East Link Project. That report was subsequently incorporated into Carey’s submission to this Panel Hearing. I will be talking to that report. Slide #2 Carey’s Bulleen Sports Complex is located on the Yarra River and Koonung Creek floodplain at the top end of what is generally known as the Chandler basin. Use and development since the site was purchased in 1959 has been mindful of the flood risk. The proposed Project’s southern portal and associated infrastructure are also located within the Chandler basin a short distance upstream and a little further away from the Yarra River and from Koonung Creek than the Campus. To recap from Carey’s submission, there are a number of key flood related issues for the Bullen Campus. Key issue 1 is changes to the characteristics of Yarra River floods, particularly for those events that occur more frequently and are smaller than (i.e. are not as deep as) the 1% Annual Exceedance Probability Yarra River event; Key issue 2 is changes to the character of Koonung Creek and the resulting changes to flood characteristics in the reach between Bulleen Road and the Creek’s confluence with the Yarra River; Key issue 3 relates to relocation of the Campus access road to the north of its current location. -
Appendix K Transport Assessment Project Case Report
Appendix K Transport Assessment Project case report February 2018 K Contents Executive summary.................................................................................................................................... K-6 Overview K-6 Key findings ..................................................................................................................................... K-6 1 Introduction .................................................................................................................................... K-8 1.1 Study area ........................................................................................................................ K-8 1.2 Structure of this report .................................................................................................. K-11 2 North East Link .............................................................................................................................. K-12 2.1 Project Overview............................................................................................................ K-12 2.2 New link between the M3 and M80 .............................................................................. K-14 2.3 Eastern Freeway and the Doncaster Busway ................................................................ K-17 2.4 M80 and Greensborough Bypass upgrade .................................................................... K-21 2.5 Walking and cycling ...................................................................................................... -
North East Link Melways Map April 2019
d Cal Donnybr der Fwy ook R d enty R Pl d m R E y p w p H eha i n a L g b a l R n e d c Mickl e M Ridd f i e l le d R d R d Pascoe Vale Rd Yan Yean Rd Plenty Rd Craigieburn R d d t-Coimadai R s Res Gisbourne-Mel Hume Hwy Digger Sydney Rd d ean R t Some Melbourne on R rton R d an Y Y A new traffic light free connection for the Ring Road, Airport d 1 EPPING Hume Fwy Greensborough Bypass, Greensborough Road Dalton Rd M80 Ring Road Ryans Rd Tul lamarine Fwy d Melbourne Airport enty R Metrpolitan Ring Rd Pl Maroondah Hwy and North East Link. Camp Rd Melton Hwy Cal Camp Rd der Fwy S BUNDOORA ELTHAM y W oad dne es SYDENHAM t ern Fwy y R GLENROY d RESERVOIR tern Ring R Greensborough Road rebuilt on both sides of North East pass Essendon 2 1 es Airport gh By W ou W Murr bor ay Rd oad Bell St High St Greens Link for local, toll-free trips. R attle Main Rd d CityLink Settlement Rd k d ROSANNA e R ST ALBANS Buckl Mahoneys Rd ey St d e R r ation R St ges t T d S ena r Brunswick R St Geor ee d Through traffic on North East Link and Greensborough n mond C 3 o ia Hopkins R SUNSHINE t Hel R DONCASTER s D Eastern Fwy p St d BALWYN Eastern Fwy Road under Grimshaw Street to keep traffic flowing and 2 m e RINGWOOD FOOTSCRAY oondah Hwy Bal KEW K Mar lan R BOX HILL d St Helena Rd CBD y Rd RICHMOND erbur cut congestion in all directions. -
East-West Road Travel 32 L Investing in Transport - Overview
31 l east-west road travel 32 l investing in transport - overview Travel patterns in Melbourne are changing. More and more The EWLNA has found that: people are travelling to and from the central city during peak • There is substantial demand for cross city travel, with periods; more people are moving around the city outside these particularly strong growth in travel from the west to the east periods; and more people are making trips across the city. and south-east. The combined impact of these trips is higher traffi c volumes and greater congestion on roads in the city’s inner and middle • Transport options for travel across the city are seriously suburbs, as well as signifi cant bottlenecks on both the road and congested. rail networks. • While the Monash-CityLink-West Gate freeway upgrade will The EWLNA has found a strong and growing demand for relieve pressure along this corridor, the extra capacity being east-west road travel in Melbourne – a demand that existing provided on the route will be fully taken up during peak infrastructure will be unable to meet without a very substantial periods within a relatively short time. increase in congestion. • With the exception of the Monash-CityLink-West Gate Modelling undertaken for the EWLNA confi rms what every freeway, the east-west roads within the EWLNA Study Area person travelling across Melbourne knows: that the increasing are disconnected and poorly suited to effi ciently moving high demand for travel, the escalating urban freight task and the volumes of traffi c across the city. growing number of cars on Melbourne’s roads are generating • Congestion on key east-west routes – and the accompanying greater levels of congestion on major cross city routes. -
Diamond Valley Bushwalking Club Inc
DIAMOND VALLEY BUSHWALKING CLUB INC. VIC ASSOC No. A 0010907B WALKS PROGRAM J a n u a r y - J u n e 2 0 1 9 Note: This program does not include leader names and contacts. Members seeking the program including leader details should go to the Members Section on the website. January 2019 Revd. 12 Feb 2 Wed 6 Sun 9 Wed Walk: Start at Lysterfield Lake main car park. Follow Cassuarina Track through to Granite Track crossing Wellington Road up hill to Monbulk Creek Lookout, Dargon Homestead Site for lunch back via Granite Track visiting Boys Farm site on way back with variation of track return as voted on at the time. 12K approximately Easy/Medium walking on nice wide tracks. Meet Mullum Mullum car Park 8.00 for 8.15 departure. 12 Sat Winery Walk. Short 3 hour (9 kms) easy /medium walk through Panton Hill Bushland reserves ending up at Nillumbik Estate Winery for lunch. Maximum 20 people for lunch at $30 per head for pizza, nibbles and tea/coffee. Must purchase own wine/softdrink/beer etc. When booking state whether you are coming for walk only or for lunch as well. Prefer online bookings. Mel 264H6 16 Wed Ramble – Breakfast BBQ. 8.15am. Finns Reserve, near Wombat Bend Playspace. Bring everything! Orange juice & Champagne supplied. Ramble 5km. Weather dependent. Walk: Stiggants Reserve to Blue Tongue Bend. A favourite walk along the Yarra through Warrandyte State Park. Many scenic views of the river. E/M. 13 km. 20 Sun NB***Sunday Ramble. Herring Island, City of Melbourne. -
Moonee Ponds Creek Strategic Opportunities Plan
MOONEE PONDS CREEK STRATEGIC OPPORTUNITIES PLAN City of Melbourne Project Client: City of Melbourne Project Name: Moonee Ponds Strategic Opportunities Plan Project Number: 0650MEL Revision: Status: Date: by: Checked: A Draft 04.12.2017 MW CB B Draft 02.02.2018 MW CB C Draft 26.02.2018 MW CB D Draft WIP 02.05.2018 MW CB E Draft WIP 20.06.2018 MW CB F Draft WIP 22.06.2018 MW CB G Final 02.08.2018 MW CB H Final revision 1 10.09.2018 MW CB I Final revision 2 13.09.2018 MW CB J Final revision 3 14.09.2018 MW CB Studio: Melbourne Report Contact: Christian Borchert Consultants: Wave Consulting AUSTRALIA UNITED KINGDOM Melbourne Bristol Phone: +61 [0]3 9088 6500 Phone: +44 [0]7496 282281 Email: [email protected] Email: [email protected] Address: Level 4, 125 Flinders Lane, Melbourne Address: 77 Stokes Croft, Bristol VIC 3000, Australia. BS1 3RD, United Kingdom. Sydney CHINA Phone: +61 [0]2 9188 7500 Shenzhen Email: [email protected] Phone: +86 136 0260 5947 Address: 21c Whistler Street, Manly, Email: [email protected] NSW 2095, Australia. Address: 9D, 9th Floor, Shenzhen Zimao www.mcgregorcoxall.com Centre, 111 Taizi Road, Nanshan District, Shenzen 518000, China. 深圳市南山区太子路111号深圳自贸中心9楼9D, 518000 In collaboration with: DISCLAIMER This Study is for the confidential use only of the party to whom it is addressed (the client) for the specific purposes to which it refers. We disclaim any responsibility to any third party acting upon or using the whole or part of its contents or reference thereto that may be published in any document, statement or circular or in any communication with third parties without prior written approval of the form and content in which it will appear.