Your Integrated Rollingstock Solutions Your Integrated Rollingstock Solutions

Total Page:16

File Type:pdf, Size:1020Kb

Your Integrated Rollingstock Solutions Your Integrated Rollingstock Solutions Your integrated rollingstock solutions Your integrated rollingstock solutions 520 million 1,270 bogies passenger journeys on our operated or maintained transport network each year (including our Keolis Downer Joint Venture) and 11,500 wheelsets 44 million overhauled by Downer each year kilometres travelled each year by our trains +50 % 1,298 more than 50% of Sydney’s train fleet train and maintained by Downer light rail cars 30,000 maintained by Downer across Australia signals captured every 10 minutes from a single train, using our TrainDNA data analytics platform Millennium and Waratah trains at Downer’s Auburn Maintenance Centre. 2 Australia’s About us Downer designs, builds and sustains assets, infrastructure and largest facilities and we are the leading provider of integrated services in provider Australia and New Zealand. of multi-modal transport At Downer, our customers are at the heart of everything we do. solutions including Yarra Trams Our Purpose is to create and sustain the modern environment by in Melbourne, G:link on the Gold building trusted relationships with our customers. Our Promise is to Coast and Newcastle’s integrated transport through our Keolis work closely with our customers to help them succeed, using world Downer Joint Venture leading insights and solutions. With a history dating back over 150 years, Downer is listed on the Australian Securities Exchange and New Zealand Stock Exchange as Downer EDI Limited (DOW). We are an ASX 100 company that also owns 88 per cent of Spotless Group Holdings Limited (SPO). Our passenger rail expertise Downer has over 100 years’ rail experience Our other rail transport and infrastructure providing end-to-end, innovative integrated capabilities include depot builds, signalling and transport solutions. We are a leading provider track and station works. of rollingstock asset management services in We set industry best practice with forward- Australia, with expertise in delivering whole of life looking technology solutions to deliver safe, asset management support to our customers. efficient and reliable services for the public Our capability spans all sectors, from rollingstock transport sector, and work closely with our to infrastructure, and every project phase, customers and global partners to deliver from design and manufacture to through-life- solutions that answer the evolving needs support, fleet maintenance, operations and of local communities. comprehensive overhaul of assets. Our business is founded on four Pillars and we demonstrate these in everything we do: Thought Safety Delivery Relationships leadership ero Harm is We build trust by We collaborate We remain at the embedded in delivering on our to build and forefront of our Downer’s culture promises with sustain enduring industry by employing and is fundamental excellence while relationships the best people and to the company’s focusing on safety, based on trust having the courage future success value for money and integrity to challenge the and efficiency status quo Your integrated 3 rollingstock solutions What we do Local expertise. World-class solutions. As Australia’s leading integrated service provider, Downer operates, maintains and delivers rollingstock across 13 sites nationally. We combine a long history of local knowledge and expertise with global partnerships to deliver world-class solutions to our customers. Leveraging our global supply chain, Downer has formed strategic joint ventures and relationships with leading technology and knowledge providers including Keolis, CRRC Changchun, Hitachi and Bombardier. The Keolis Downer joint venture is Australia’s largest private provider of multi-modal public transport solutions, including Melbourne’s tram system and Gold Coast light rail. NORTHERN TERRITORY QUEENSLAND Maryorogh WESTERN AUSTRALIA ol Coast SOUTH AUSTRALIA oergp Claiserook Cariff ecastle NEW SOUTH WALES Manrah Syney rn ACT LEGEND: VICTORIA Light Rail Operations eport Pakenha Service Delivery Centre Melorne Fleet Maintenance Centre ast Preston Project office TASMANIA 4 Your integrated rollingstock solutions Your integrated rollingstock solutions What we do Delivering end-to-end transport solutions Downer’s rail capability spans every sector and project phase, from design and build to through-life-support, refurbishment, overhaul and operations. With our wealth of experience and industry knowledge, we provide total rail solutions to our customers around Australia. Design and build Sydney’s Fleet Melbourne Metro Through key global partnerships with leading The Waratah fleet is the pride of Sydney’s Melbourne’s new fleet of metro trains is the rollingstock manufacturers, we have delivered network, delivering unprecedented reliability, largest single order of rollingstock in Victoria’s over 1,200 rail cars in the past ten years. Our availability, safety and comfort. It is Australia’s history. The Victorian Government’s investment business has capabilities in engineering design, largest single order of rollingstock. includes the delivery of 65 next-generation systems engineering and integration and Downer designed and manufactured the initial High Capacity Metro Trains, a state-of-the- manufacture and testing of rollingstock. art depot including train maintenance facility Downer is currently delivering some of the order of 78 trains in conjunction with CRRC Changchun, with through-life-support managed and stabling yard for 30 trains, a light service largest rollingstock projects in Australia, facility and two driver simulators. The project including the Sydney Growth Trains project in by Downer at the purpose built Auburn Maintenance Centre. is being delivered with over 60 per cent New South Wales, and the High Capacity Metro local content and will create over 1,100 new Trains project in Victoria. Downer has further delivered another 24 trains jobs. It is being delivered by the Evolution as part of the Sydney Growth Trains project, Depots Rail consortium comprising Downer, CRRC taking the fleet to 102 with future growth to Changchun and Plenary, with Downer also Downer has expertise in developing and 119 trains on the back of additional orders providing ongoing maintenance. upgrading state-of-the-art depots that include from the NSW Government in February 2019. maintenance and overhaul facilities, stabling Downer also maintains a further 35 four-car yards, and cleaning and bio wash facilities. Millennium train sets that were designed, built Transperth B-Series Trains Our depots provide the capacity, technology and commissioned almost two decades ago. and design to deliver major and mid-life A joint venture (JV) between Downer and refurbishments of rollingstock. We leverage Bombardier Transportation (known as EDI Rail the insights of our in-house operators and Bombardier Transportation Pty Ltd) delivered maintainers to design and deliver depots with 78 three-car B-Series trains for the Transperth efficient operations and maintenance practices network. The trains were designed in Australia in mind. and built at Downer’s historic Maryborough Service Delivery Centre in Queensland. The JV also holds the maintenance contract for Transperth’s A and B-Series trains until 2026. 5 Your integrated rollingstock solutions What we do Yarra Trams refurbishment Through-life-support Integrated Operations Centre Bogie Centre of Excellence Downer maintains nearly 1,300 train and light In May 2019, Downer launched our Integrated Our recently upgraded Cardiff Service rail cars across Australia, including more than Operations Centre (IOC), a hub of cutting-edge 50 per cent of the Sydney train fleet. We pride Delivery Centre is equipped with world-class technology, co-located staff and integrated rollingstock overhaul capabilities. ourselves in being an asset management systems. The IOC brings together critical partner of choice, delivering exceptional fleet The $38 million refurbishment includes the functions such as planning, engineering, Southern Hemisphere’s first purpose built eight reliability and availability for our customers. mobile response and procurement to enhance From our state-of-the-art maintenance centres, car train lift and a bogie centre of excellence, operational asset management. Based at our with the capacity to overhaul more 3,000 we manage all aspects of through-life-support, Auburn Maintenance Centre, the IOC provides from real-time condition monitoring to repairs. bogies and 23,000 wheelsets a year. Cardiff fleet monitoring and data-driven decision also has the capacity to support technology Refurbishment, upgrades making for our assets across Australia, upgrades, customer experience enhancements and overhauls improving response times, performance and and new fleet introduction. reliability for our fleets. From our four Service Delivery Centres across Australia we manage the overhaul, refurbishment, repair and manufacture of Rollingstock Additional Works rollingstock fleets for key customers including From Melbourne’s East Preston Tram Depot, Sydney Trains, Queensland Rail and Yarra Trams. Downer manages the structural refurbishment With unique capability to manage both the of Yarra Trams’ fleets. As part of the five year maintenance and overhaul of entire fleets, we project, over 85 per cent of Melbourne’s trams offer increased efficiencies to our customers, will undergo work including cleaning, window and peace of mind your assets are in the most replacement and repairs, as well as mechanical capable hands. and electrical overhaul for older fleets. We employ over 90 Victorians at our
Recommended publications
  • Kuranda Scenic Railway Brochure
    Kuranda Scenic Railway 2021 / 22 KURANDA Skyrail Kuranda RAILWAY STATION EXPERIENCE KURANDA SCENIC RAILWAY Terminal Port Douglas and Choose to experience your journey in either Heritage Class or Gold Class – both offering stunning views and old-time charm Koala Gardens Rainforestation Northern Beaches in refurbished wooden heritage carriages. As you reach Kuranda, spend your day strolling through the picturesque village and Australian Butterfly enjoy restaurants, shops, markets, and activities at your own pace, or combine your trip with a Kuranda day tour package. Sanctuary coral sea Birdworld Barron Skyrail Kuranda Markets Falls red Smithfield HERITAGE CLASS EXPERIENCE* GOLD CLASS EXPERIENCE* Stop peak Terminal Travel in the Kuranda Scenic Railway original timber carriages, Enjoy the comfort of Gold Class in carriages adorned in rob’s monument some of which are up to 100 years old, and experience the handcrafted Victorian inspired décor, club lounge style pioneering history as the train winds its way through World seating and personal onboard service. Heritage-listed rainforest. lake Your Gold Class journey includes: placid FRESHWATER Your Heritage Class journey includes: • Souvenir trip guide and gift pack falls lookout RAILWAY STATION Cairns • Souvenir trip guide available in nine languages • Audio commentary Airport • Audio commentary • Brief photographic stop at Barron Falls viewing platform • Brief photographic stop at Barron Falls viewing platform • Welcome drink^ and all-inclusive locally sourced appetisers stoney creek falls • Filtered
    [Show full text]
  • FREE OFF-PEAK SENIORS BUS and RAIL TRAVEL Easing the Cost of Living for Seniors
    FREE OFF-PEAK SENIORS BUS AND RAIL TRAVEL Easing the Cost of Living for Seniors A Tim Nicholls-led Liberal National Government will provide free off-peak public transport to passengers with a seniors go card. The Problem A senior go card holder regularly travelling from the Gold Coast to Brisbane saved up to $148 per We understand increases in the cost of living make year, while those regularly travelling from Enoggera, it hard for Queenslanders to make ends meet – Indooroopilly or Newstead to the Brisbane CBD saved especially those on fixed incomes like seniors and $41 per year. pensioners. In regional Queensland, for example, seniors who are Under Annastacia Palaszczuk’s watch, Labor has regular bus passengers travelling in Townsville saved increased car registration by double the inflation up to $66 a year. rate for three years in a row. If you have a 4-cylinder car that’s an increase of over $50! Our Real Plan In recent years the cost of public transport has also risen dramatically – when Annastacia Palaszczuk A Tim Nicholls-led LNP Government will make was the transport minister in the Bligh Labor off-peak bus and rail travel free for senior go card Government, bus and train fares went up 15% year holders. after year after year. A total of 45%. This will mean many of the 20 million senior public While the Palaszczuk Labor Government has transport trips made each year will be free. no plan to tackle the cost of living issues facing The LNP is committed to tackling the rising cost of Queenslanders, the LNP team has been listening and living.
    [Show full text]
  • Feasibility Study Feasibility - a Pre A
    i A PRE-FEASIBILITY STUDY 2012 JULY Prepared for Capricorn Enterprise Level 1, 130 Victoria Parade, Rockhampton, Q, 4700 P: (07) 4927 2055 | F: (07) 4922 2605 | www.capricornenterprise.com.au ABN 72 142 612 28110 Queensland Rail Travel Rail Centre 2, Level 2, 309 Edward Street, Brisbane, Q, 4700 P: (07) 3235 3647 | (07) 3235 1365 | queenslandrailtravel.com.au ABN 71 132 181 090 Prepared by Tanner Consulting 2B Denham Street, Rockhampton, Q, 4700 P: 4922 0911 | F: 4922 0955 | www.tannerconsulting.com.au ABN 23 047 923 373 Sub consultants: Daniel Williams, Director and Industrial Mathematics Consultant Mathops David French, Managing Director and Head of Financial Planning Capricorn Investment Partners Limited The information contained in this document produced by Tanner Consulting is solely for the use of the Client identified on the cover sheet for the purpose for which it has been prepared and Tanner Consulting undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of Tanner Consulting. Cover images sourced from Flickr. ii Quality Information Document: Final Report Reference: 114ab Date: 27 July 2012 Prepared by Tanner Consulting Project Manager Sam Willoughby Reviewed by Client Project Director Julie Tanner Revision Date Details Authorised Name Authorised Signature 1 28 May 2012 Director Julie Tanner 2 31 May 2012 Sub Consultant David French 3 31 May 2012 Sub consultant Daniel Williams 4 31 May 2012 Client review Neil Lethlean iii EXECUTIVE SUMMARY The Central Queensland area finds itself at the leading edge of an economic boom, driven by the separate products both related to the increased global need for energy sources.
    [Show full text]
  • 1800 Trains (872 467)
    Effective 16 December 2014 Route: Brisbane to Charleville Brisbane to Charleville Tues, Thur Distance: 777 kilometres Charleville to Brisbane Wed, Fri Duration: 17 hours Discover the pioneering spirit of Queensland’s outback onboard The Westlander, travelling from Brisbane across The Lounge the Great Dividing Range, through the rich farmlands of The Lounge lets you sit back and relax while the Darling Downs to Charleville. The Westlander plays a the scenery unfolds. Enjoy a tea or coffee vital role in connecting regional communities and has a from the self service area, or purchase a proud history with Queensland Rail Travel. light snack from the onboard staff or simply Follow the path of Queensland’s famed explorers onboard have a chat with fellow passengers. the The Westlander. Unwind, as you sit back relax and watch the striking scenery pass you by. The Westlander travels from Brisbane to Charleville twice Economy a week. An economical way to travel through Queensland’s outback landscapes and take in the passing scenery from your window. Onboard facilities Enjoy generous recline, a fold down table and foot rest. • Onboard lounge car serving light refreshments and alcoholic/non-alcoholic beverages. • Toilets located at the end of each carriage. Snack Pack A complimentary in-seat snack pack is • Self service area and snack packs are available. delivered at meal times throughout the journey (depending on journey travelled) Checked Luggage Example Breakfast - Cereal with Milk, juice and a piece of fruit. Economy: One 20KG item per customer Example Lunch/Dinner - Sandwich, small cake, juice and piece of fruit. One item of carry on hand luggage free of charge Accessibility Train 101 Access is limited due to narrow doors and aisleways.
    [Show full text]
  • Queensland Coastal Pass Effective from 1 January 2020
    Queensland Coastal Pass Effective from 1 January 2020 The Queensland Coastal Pass is the most flexible, easy and Queensland Coastal Pass benefits include: versatile way to discover the east coast of Queensland by rail. With unlimited stopovers in one direction between Brisbane • Unlimited stopovers in a single direction of travel and Cairns (or vice versa), it’s your ticket to the east coast’s (i.e. north or south) in economy seats most popular destinations. • Free travel on RailBus coach connections booked in No matter where you’re heading, your adventure begins the conjunction with a rail sector (for Hervey Bay and Airlie moment you board the train. Sit back, relax and watch the Beach) scenery go by, strike up a conversation with a fellow traveller, • Exceptional value for money or get up and enjoy a meal onboard as you look forward to • Freedom and flexibility —travel at your own pace and hop your next destination. on or off the train when and where you like Travel Pass Period Price $AUD 1 Month Pass $209.00 Cape York Peninsula Save with the Queensland Coastal Pass Cairns The Queensland Coastal Pass is available for travel in economy seats on the following Queensland Rail Travel Tully services: • Spirit of the Queensland (Premium Economy Seats) Townsville • Tilt Train (Economy Seats) • Spirit of the Outback (Economy Seats; between Brisbane Proserpine and Rockhampton only) Hughenden Mackay Pacific Ocean Upon payment of the applicable difference in fares pass holders may upgrade to: • Business Seats (Tilt Train only) Rockhampton • RailBeds (Spirit of Queensland only) Gladstone • First Class Sleeping Berths (Spirit of the Outback only) Bundaberg Important note: Maryborough In order for clients to use their travel pass, reservations are essential and can be made by contacting Queensland Rail Laidley Brisbane Travel on 1800 TRAINS (872 467) or +61 7 3606 6630.
    [Show full text]
  • Station Access Guide (SMS) Only: 0428 774 636 Effective February 2020 General: 13 16 17 TTY: 133 677
    queenslandrail.com.au For further information Accessibility Assistance Station Access Guide (SMS) only: 0428 774 636 Effective February 2020 General: 13 16 17 TTY: 133 677 Queensland Rail Limited ABN 71 132 181 090 Station listing Station legend Facilities andaccessibility Safety Hearing loops information customer Accessible train onanew Travelling atrain board to Using theramp point boarding Assisted stations Citytrain Accessing Introduction 10 9 6 5 4 3 3 2 1 1 South East Queensland train, busway and light rail network map Effective April 2018 8 Gympie North Sunshine Coast line Key 8 Traveston 8 Cooran 8 Pomona Ferny Grove and Beenleigh lines 8 Cooroy North 7 Eumundi Shorncliffe and Cleveland lines 7 Yandina 6 Airport and Gold Coast lines Nambour 6 Woombye Caboolture/Sunshine Coast 6 Palmwoods and Ipswich/Rosewood lines 5 Eudlo 5 Mooloolah Redcliffe Peninsula and Springfield lines 5 Landsborough Doomben line 5 Beerwah 4 Glasshouse Mountains Special event service only 4 Beerburrum Busway lines 4 Elimbah Caboolture line 3 Caboolture Redcliffe Peninsula line G:link light rail line 3 Morayfield Kippa-Ring 3 Rothwell 3 3 Burpengary Transfer to other train services Mango Hill East 3 3 Narangba Mango Hill 3 1 TransLink fare zones Murrumba Downs 3 3 Dakabin Kallangur 3 2/3 Transfer to busway services 3 Petrie 2 Lawnton Transfer to light rail service 2 Bray Park Special fares apply 2 Strathpine 2 Independent access 2 Bald Hills Shorncliffe line 2 Assisted access Carseldine Shorncliffe 2 2 2 Zillmere Sandgate 2 Ferny Grove 2 * King George Square busway station 2 2 Deagon 2 Ferny Grove line 1 Geebung Keperra Kedron Brook 2 2 North Boondall 2 ^ Queen Street bus station Grovely Sunshine 1/2 Boondall 2 1 Oxford Park 1 Royal Brisbane Women’s Hopital 1 Lutwyche irginia Nudgee 2 1 V Mitchelton Truro Street Banyo 2 There are many bus services scheduled to connect Gaythorne 1 1 Bindha 2 with train services at most train stations.
    [Show full text]
  • Traveltrain Renewal: Sunlander 14
    Traveltrain renewal: Sunlander 14 Report 8 : 2014–15 Queensland Audit Office Location Level 14, 53 Albert Street, Brisbane Qld 4000 PO Box 15396, City East Qld 4002 Telephone (07) 3149 6000 Email [email protected] Online www.qao.qld.gov.au © The State of Queensland. Queensland Audit Office (2014) Copyright protects this publication except for purposes permitted by the Copyright Act 1968. Reproduction by whatever means is prohibited without the prior written permission of the Auditor-General of Queensland. Reference to this document is permitted only with appropriate acknowledgement. Front cover image is an edited photograph of Queensland Parliament, taken by QAO. ISSN 1834-1128 Traveltrain renewal: Sunlander 14 Contents Summary ..................................................................................................................................... 1 Conclusions ....................................................................................................................... 2 Key findings ....................................................................................................................... 2 Traveltrain renewal program ............................................................................................. 5 Recommendations ............................................................................................................ 5 Reference to comments .................................................................................................... 5 1 Context ............................................................................................................................
    [Show full text]
  • Full Year Report 12 Months to 30 June 2012
    Full Year Report 12 months to 30 June 2012 Financial Performance $m FY121 FY111 Change (%) Total revenue2 8,524.6 6,960.9 22.5 EBITDA 593.7 502.7 18.1 EBIT 346.5 292.2 18.6 Net interest expense (69.0) (64.3) 7.3 Tax expense (82.1) (61.5) 33.5 Net profit after tax 195.3 166.4 17.4 ROFE3 17.7% 15.8% 1.9 1 Numbers are “underlying”, i.e. excluding Individually Significant Items 2 Total revenue is a non-statutory disclosure and includes revenue, other income and notional revenue from joint ventures and other alliances not proportionately consolidated. 3 ROFE = EBIT divided by average funds employed (AFE) (AFE = Average Opening and Closing Net Debt = Equity) Total Revenue2 ($m) EBIT1 ($m) 9000 360 8000 350 7000 340 330 6000 320 5000 310 4000 300 3000 290 2000 280 1000 270 0 260 FY10 FY11 FY12 FY10 FY11 FY12 EBITDA1 ($m) Work-in-hand ($b) 700 25 600 20 500 15 400 300 10 200 5 100 0 0 FY10 FY11 FY12 FY10 FY11 FY12 2 THE YEAR TO 30 JUNE 2012 Downer made significant progress during the 2012 financial year and the strength of the business is clear in the full year result. All Downer businesses continued to win new work and work-in-hand remains high at $20 billion. Downer’s portfolio structure is now well defined with the establishment of Downer Infrastructure in May 2012 (bringing together the Group’s infrastructure businesses in Australia and New Zealand) and the completion of the sale of CPG Asia for $147 million in April 2012.
    [Show full text]
  • Premium Economy Seat • Reclinable Travel Seat with 30° of Recline • Double Seat Configuration in the Direction of Travel
    Overview The information in this presentation has been designed to increase your knowledge of Queensland Rail Travel, and its train journeys. Whether your customers are a first time train traveller or an experienced train enthusiast, a Queensland Rail journey is the perfect way to create unforgettable memories. Network Map Step on board and travel in comfort to a range of destinations. Each journey will have you discovering Queensland from the rainforest to the reef and the city to the outback. Queensland Rail Travel is Australia’s most comprehensive rail network with five long distance services and two tourist trains. The Spirit of Queensland, contemporary and designed for relaxation, combines modern seating and entertainment options with the charm of long distance rail travel. Travelling between Brisbane and Cairns with five return services a week, the Spirit of Queensland redefines the modern rail travel experience with a comfortable and convenient way to access spectacular holiday destinations such as the Great Barrier Reef, the Whitsundays, Townsville, Cairns and everywhere in between.​ Frequency and Timetable Route: Brisbane to Cairns Distance: 1681 kms Departs Brisbane: Mon, Tues, Wed, Fri & Sat at 3:45pm Duration: 25 hrs Departs Cairns: Mon, Wed, Thu, Fri & Sun at 8:35am RailBed by Day RailBed by Night Class Option RailBed • A spacious seat by day with 35° of recline • Lie-flat bed at night with a thick mattress. • Linen provided including pillow, towel • Double or Single configuration facing the direction of travel. • Complimentary amenity pack with Queensland organic products • Reading light, footrest, drink holder, 240v power point • Overhead lockers, luggage racks provided • In-seat entertainment with on demand Movies, TV programs and music available on wide 18.5 inch screen Features • All-inclusive main meals served directly to your seat • Relax in the Club Car to stretch the legs or purchase refreshments along the way.
    [Show full text]
  • Rural and Regional Affairs and Transport References Committee
    The Senate Rural and Regional Affairs and Transport References Committee Australia's rail industry October 2017 © Commonwealth of Australia 2017 ISBN 978-1-76010-667-6 This document was prepared by the Senate Standing Committee on Rural and Regional Affairs and Transport and printed by the Senate Printing Unit, Department of the Senate, Parliament House, Canberra. This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Australia License. The details of this licence are available on the Creative Commons website: http://creativecommons.org/licenses/by-nc-nd/3.0/au/. Membership of the committee Members Senator Glenn Sterle, Chair Western Australia, ALP Senator Barry O'Sullivan, Deputy Chair Queensland, NATS Senator Chris Back (to 22 June 2017) Western Australia, LP Senator Slade Brockman (from 17 August 2017) Western Australia, LP Senator David Bushby (from 22 June 2017 to 17 August 2017) Tasmania, LP Senator Anthony Chisholm Queensland, ALP Senator Malarndirri McCarthy Northern Territory, ALP Senator Janet Rice Victoria, AG Substitute members for this inquiry Senator Kim Carr Victoria, ALP to replace Senator Malarndirri McCarthy iii Secretariat Dr Jane Thomson, Secretary Ms Sarah Redden, Principal Research Officer Ms Trish Carling, Senior Research Officer Ms Erin Pynor, Senior Research Officer Ms Leonie Lam, Research Officer (to 1 June 2017, from 25 August 2017) Ms Helen Ulcoq, Research Officer (from 3 July 2017) Mr Michael Fisher, Administrative Officer PO Box 6100 Parliament House Canberra ACT 2600 Ph: 02 6277 3511 Fax: 02 6277 5811 E-mail: [email protected] Internet: www.aph.gov.au/senate_rrat iv Table of contents Membership of the committee ........................................................................
    [Show full text]
  • Radical New Thoughts on Train Operation in Our Big
    AUSTRALASIAN TIMETABLE NEWS No. 239, July 2012 ISBN 1038-3697 RRP $4.95 Published by the Australian Association of Timetable Collectors www.aattc.org.au Graphic from the Premier’s and Minister’s “Sydney’s Rail Future” announcement, 20 June 2012. The differentiation between the proposed “Rapid transit system” and “Improved Sydney Train services” may not be clear in black and white. The “Rapid transit system”, ie, frequent single-deck trains, are the fuzzier lines to Cudgeong Road (NW line) Hurstville, Lidcombe via Bankstown and Liverpool via Bankstown. RADICAL NEW THOUGHTS ON TRAIN OPERATION IN OUR BIG CITIES Sydney: NW Railway – Private operation and stand-alone The North West Railway will be franchised for operation by a private operator. The existing Chatswood to Epping line will be transferred to the operator. The operation will be as a stand-alone line. Passengers will be required to change trains at Chatswood to access the CBD. When the second Harbour Crossing is built, trains will operate through to the City – however, this may be 20 years away. Services on the NW line will be operated by single deck trains. Services are expected to operate every five minutes. NSW Transport Minister Gladys Berejiklian says the timetable will be rewritten to increase trains from Chatswood to the City from 16 to 20 in the peak hour. She has outlined how the line will fit in with her 20-year plan for the rail network. She says she has had to revise her vision. "I assumed when I became Transport Minister that double decks were the way to go but expert advice, community input, industry input, demonstrates to me and also looking at what happens around the world, the best way to go for the north-west rail line is single deck," she said.
    [Show full text]
  • South East Queensland's Rail Horizon Foreword
    Department of Transport and Main Roads South East Queensland's Rail Horizon Foreword The Queensland Government is All levels of government must work We will roll out 75 new generation committed to revitalising and together to fund critical infrastructure six-car trains from late 2016 to transforming the South East projects such as Cross River Rail. We boost the number of trains by 30 per must deliver the right projects at the Queensland (SEQ) rail network cent, and timetable and signalling right time to ensure efficient use of so it can meet the challenges improvements will improve capacity public funds. and access by allowing more trains of a growing population and to move more quickly through the provide customers a high Investment in the rail network network. A taskforce is reviewing fare performing rail service. will give people better access to structures to improve affordability their places of work and connect and introducing practical measures Delivering an accessible, safe businesses and communities. It will to make public transport more and reliable transport system in support our economic growth and accessible for everyone. Queensland is a priority. By 2036, the generate jobs. population of SEQ is forecast to reach As demand continues to grow, there around 4.9 million people, placing South East Queensland’s (SEQ's) will come a time when new inner- increasing pressure on our transport Rail Horizon highlights the need for city capacity is needed. By around system, particularly in growth a better rail system to keep pace 2021 there will not be any capacity corridors and where the system with growth and provide a better to increase services on parts of converges in the Brisbane CBD.
    [Show full text]