World Bank Document ASCCDP: Resettlement Action Plan for Flood Mitigation Works Public Disclosure Authorized Amaravati Sustainable Capital City Development Project (ASCCDP) RevisedFinal Draft Resettlement Action Plan for Flood Mitigation Works Public Disclosure Authorized Andhra Pradesh Capital Region Development Authority Amaravati, Andhra Pradesh Public Disclosure Authorized August 2018 Public Disclosure Authorized Version 5.0 1 ASCCDP: Resettlement Action Plan for Flood Mitigation Works TABLE OF CONTENTS ACRONYMS ............................................................................................................................................... 3 EXECUTIVE SUMMARY .......................................................................................................................... 5 I. INTRODUCTION ................................................................................................................................... 9 Impacts .................................................................................................................................................. 12 II. SOCIAL IMPACT ASSESSMENT ..................................................................................................... 16 Magnitude of Social Impacts .............................................................................................................. 16 III. CONSULTATIONS / BASELINE SOCIO-ECONOMIC CHARACTERISTICS OF AFFECTED FAMILIES .................................................................................................................................................. 22 Introduction .......................................................................................................................................... 22 Focus Group Discussions .................................................................................................................... 25 IV. INSTITUTIONAL AND IMPLEMENTATION ARRANGEMENTS .......................................... 29 Institutional Arrangements ................................................................................................................ 29 Implementation Mechanism for LPS / LA / Negotiated Settlement Policy ............................... 29 Coordination with District Administration for Land Acquisition ................................................ 31 Project Implementation Unit .............................................................................................................. 33 V. MONITORING OF RAP DURING IMPLEMENTATION ............................................................ 46 ANNEXURES ........................................................................................................................................... 52 Annexure – 1 Land Pooling Scheme - Entitlement Matrix ................................................................. 52 Annexure – 2 Compensation and R&R Assistance under Land Acquisition Act ........................... 53 Annexure – 3 Negotiated Settlement Policy ........................................................................................ 55 Annexure – 4 Baseline Socio-Economic Data ....................................................................................... 57 Annexure – 5 Details of Public Consultations ..................................................................................... 72 Annexure – 6 Land Guideline Values in the Project Area ................................................................. 97 Annexure – 7 List of PAFs, PDFs – Flood Mitigation Works ............................................................ 98 Annexure – 8 Summary on LPS PAFs – Blue Network .................................................................... 103 Annexure – 9 Village-wise affected Encumbrance Details .............................................................. 106 Annexure - 10 Assistance to Landless Families ................................................................................. 110 2 ASCCDP: Resettlement Action Plan for Flood Mitigation Works ACRONYMS AP Andhra Pradesh APCRDA Andhra Pradesh Capital Region Development Authority APSSDC Andhra Pradesh State Skill Development Corporation ASCCDP Amaravati Sustainable Capital City Development Project CA Competent Authority RAP Resettlement Action Plan LPS Land Pooling Scheme RFCTLARR Right to Fair Compensation and Transparency in Land Acquisition and Resettlement and Rehabilitation LARR Land Acquisition, Resettlement and Rehabilitation SES Socio-Economic Survey RPF Resettlement Policy Framework GIS Geological Information Systems CPR Community Property Resources LPOC Land Pooling Ownership Certificate SIA Social Impact Assessment GP Gram Panchayat LAO Land Acquisition Officer PDF Project Displaced Family PAF Project Affected Family PAP Project Affected Person PWD Public Works Department IAY Indira Awaas Yojana SSR Standard Schedule of Rates FGD Focus Group Discussion CPIAL Consumer Price Index for Agricultural Labourers NGO Non-Government Organization GRM Grievance Redressal Mechanism MA&UD Municipal Administration & Urban Development TDR Transferrable Development Rights NTR Nandamuri Taraka Rama Rao (former Chief Minister of AP) U/s Under Section 3 ASCCDP: Resettlement Action Plan for Flood Mitigation Works 4 ASCCDP: Resettlement Action Plan for Flood Mitigation Works EXECUTIVE SUMMARY The Andhra Pradesh Reorganization Act 2014, which came into effect on June 2, 2014 provided for the reorganization of the then existing state of Andhra Pradesh. The development of a new Capital City – critical for administration, economic development, and cultural integration – is a priority for the residuary state of Andhra Pradesh. The State Cabinet meeting of September 1, 2014 passed a resolution ‗to locate the Capital City in a central place of the state, around Vijayawada, and to go for decentralized development of the state with 3 Mega Cities and 14 Smart Cities‘. The State Government identified the Capital City area between Vijayawada and Guntur cities on the Southern bank of River Krishna, upstream of the Prakasam Barrage. The Amaravati Capital City has an area of 217.23 sq.km and is spread across 25 villages in 3 mandals (Thulluru, Mangalagiri and Tadepalli) of Guntur district. The 25 villages in the Capital City area have a population of about 100,000 people. The nearest cities are Vijayawada at a distance of 30 km and Guntur at a distance of 18 km. The nearest railway station is KC Canal railway station near Tadepalli and the nearest airport is Gannavaram which is at a distance of 22 km. Amaravati is envisioned to be a ‗People‘s Capital‘ built around sustainability and livability principles. It aims to be at par with global standards and has developed a masterplan with the assistance of the Government of Singapore. The new capital will be a center of economic activity, will create a range of jobs and will provide affordable and quality housing. Sustainability, efficient management and optimum utilization of resources will form an important pillar of this new capital. The Project Development Objective of the World Bank supported Amaravati Sustainable Capital City Development Project (ASCCDP) is to provide select urban infrastructure in designated locations of Amaravati Capital City, and to support the initial development of its institutional and governance structure. The ASCCDP has five main components, as follows: (i) Basic Urban and Pro-poor Infrastructure Component, which will support the implementation of priority transport corridors and integration of 25 villages into the Amaravati Capital City development, by financing the construction of a priority road network and the upgrading of infrastructure in selected villages (e.g. water supply, sewage, village roads, and drainage); (ii) Green Climate Resilient Infrastructure, which will help build sustainability and climate resilience in Amaravati Capital City by supporting its integration with the natural surroundings, riverfront, and greenery; (iii) Citizen Benefit Sharing component, which will support government‘s efforts to implement benefit sharing measures for the residents of the capital city area, including but not limited to, training programs for farmers, landless families and other stakeholders, skill building programs, which will allow capital city residents to access jobs and new economic opportunities emerging in an urban context; (iv) Institutional and Fiscal Development, which will support government efforts to develop local government institutions and governance systems; and, (v) Project Management and Implementation Support. A Resettlement Policy Framework (RPF) was prepared to describe the principles, objectives and processes for preparation of specific resettlement plans that will be applicable to interventions financed by the World Bank project, once they are identified during project 5 ASCCDP: Resettlement Action Plan for Flood Mitigation Works preparation/implementation1. The RPF describes the principles and approach in avoiding, minimizing and mitigating adverse social impacts that may arise in implementation of proposed interventions financed by the World Bank. The RPF also provides process for consultations, impact assessment, census and socio-economic surveys, as well as for the preparation and implementation of mitigation plans. The RPF was prepared in line with the provisions of National laws, State laws and the World Bank‘s Involuntary Resettlement Policy (OP 4.12). The RPF was consulted and disclosed. It can be accessed at: https://crda.ap.gov.in/apcrdacommuni/media/asccdp/16082017/Amaravati%20RPF-
Recommended publications
  • Guntur District
    GOVERNMENT OF ANDHRA PRADESH ABSTRACT Lands- Guntur District- Alienation of land to an extent of Ac.45.98 cents., in Sy.Nos.1, 4, 6, 13 etc., at Sakhamuru Village, Thulluru Mandal in favour of the Commissioner, Andhra Pradesh Capital Region Development Authority (APCRDA) for construction of Capital City Development Project on free of cost, subject to certain conditions –Orders - Issued. REVENUE (ASSIGNMENT-IV) DEPARTMENT G.O.MS.No. 521 Dated: 15-11-2017 Read the following:- 1. From the Collector & District Magistrate, Guntur, Rc.No.E1/4245/2015/Sakhamuru/E1,dated 05.10.2017. 2. From the Chief Commissioner of Land Administration & Special Chief Secretary , Gollapudi, Vijayawada, Lr.No.Assn-I(1)/727/2017, dated :17.10.2017. O R D E R : The District Collector, Guntur in his letter 1st read above has submitted proposal for alienation of land to an extent of Ac.45.98 cents in Sy.Nos.1, 4, 6, 13 etc., at Sakhamuru Village, Thulluru Mandal, Guntur District classified as Assessed Waste Dry Land and other porambokes in favour of the Commissioner, Andhra Pradesh Capital Region Development Authority (APCRDA) for construction of Capital City Development Project on free of cost. 2. The Special Chief Secretary & Chief Commissioner of Land Administration, Vijayawada in his letter 2nd read above, has stated that the proposal of the Collector, Guntur has been placed before the Andhra Pradesh Land Management Authority in its meeting held on 16.10.2017 and the APLMA resolved to recommend to Government for alienation of land to an extent of Ac.45.98 cents in Sy.Nos.1, 4, 6, 13 etc., at Sakhamuru Village, Thulluru Mandal, Guntur District classified as Assessed Waste Dry Land and other porambokes in favour of the Commissioner, Andhra Pradesh Capital Region Development Authority (APCRDA) for construction of Capital City Development Project on free of cost as it is meant for public purpose, subject to certain conditions.
    [Show full text]
  • GOVERNMENT of ANDHRA PRADESH ABSTRACT Municipal
    GOVERNMENT OF ANDHRA PRADESH ABSTRACT Municipal Administration & Urban Development Department-Andhra Pradesh Capital Region Development Authority Act,2014 - Declaration of A.P. Capital City Area-Orders-Issued. MUNICIPAL ADMINISTRATION & URBAN DEVELOPMENT (M2) DEPARTMENT G.O.MS.No. 254 Dated: 30.12.2014 Read the following: 1. Andhra Pradesh Capital Region Development Authority Act, 2014 (Act.No.11 of 2014) 2. G.O.Ms.No.252, MA& UD Department, Dated: 30.12.2014 3. G.O.Ms.No.253, MA& UD Department, Dated: 30.12.2014 ***** ORDER: The Andhra Pradesh Capital Region Development Authority Act, 2014 has come into force with effect from 30th day of December, 2014 by virtue of notification published in the Extra-ordinary issue Andhra Pradesh Gazette, dated : 30-12-2014. 2. The Government have held detailed consultations with the experts of Urban Development, various public organizations and have considered the various aspects of public welfare and accessibility to all part of the state subsequent to such consultations, the Government have decided to locate capital city area within the capital region declared vide G.O 3rd read above. 3. The Government in exercise of powers under sub section 3 of section 3 of Andhra Pradesh Capital Region Development Authority Act, 2014 hereby notify the areas covering broadly an area of about 122 sq.kms as detailed in the schedule to the notification appended here to, as Andhra Pradesh Capital City area which is meant to development of the state capital under the provision of the Andhra Pradesh Region Development Authority Act, 2014. 4. The appended notification shall be published in the Extra-ordinary issue of Andhra Pradesh Gazettee dated:30-12-2014.
    [Show full text]
  • Before the National Green Tribunal Southern Bench at Chennai
    BEFORE THE NATIONAL GREEN TRIBUNAL SOUTHERN BENCH AT CHENNAI ORIGINAL APPLICATION No.91 of 2020 IN THE MATTER OF: Venkatapathi Raja Yenumula H. No.2-232, Kesavadasupalem RAZOLtJ Taluka, Sakhinetipalli Mandal, East Godavari District, Andhra Pradesh-533 252, Mobile No.9528345678 +44 7837 200953, Mail id: rajavr. smile@ gmail.com APPLICANT VERSUS 1. Union of India Through its Secretary, Ministry of Environment, Forest and C.C., Indira PriyadarshiniBhavan, Jorbagh, New Delhi- 110 003. Mail: Secy-moefnic.in Phone: 011-24695262, 24695265. 2. Union of India Through its Secretary, Ministry of Mines, SastryBhavan, New Delhi- i 10 001. Mail: secry-minesnic.in Phone: 011-23385173. 3. National Institute of Oceanography Rep. by its Regional Director, 176, Lawsons Bay Colony, Vishakhapatnam-530 017. Mail: gpsmurtinio.org Phone:89 12543525. 4. State of Andhra Pradesh Rep. by its Chief Secretary, Interim Government Complex, Velagapudi, Guntur District. Andhra Pradesh-522 503. Mail:csap.gov.in Phone: 08632444461. t ENV1RONMENTAL ENGINEER *.P POLLUTION CONTROL BOMN —ftegional OffIceKkKI.NADA 5. State of Andhra Pradesh Rep.by its Principal Secretary, Department of Mines and Geology, Interim Government Complex, Velagapudi, Guntur District. Andhra Pradesh-522 503. [email protected] Phone: 08662882170. 6. State of Andhra Pradesh Rep. by its Principal Secretary, Department of Agricultura and Animal Husbandry, Secretariat, Velagapudi, Guntur District, Andhra Pradesh-522 503. Mail: comagnic.in Phone: 88866 14898. 7. Andhra Pradesh Coastal Zone Management Authority Rep. by its Chairman, Chalamavari Street, Kastunbaipeta, Vijayawada-520 010. Mail:[email protected] Phone: 0866-2463200. 8. Central Pollution Control Board Though Member Secretary, PanveshBhawan, CBD-cum-Office Complex, East Arjun Nagar, Delhi- i 10 032.
    [Show full text]
  • Amaravati- Capital City of Andhra Pradesh, Covering an Area of 217.23 Sq
    eae ANDHRA PRADESH ANDHRA PRADESH POLLUTION CONTROL BOARD Phone: 23887500 PARYAVARAN BHAVAN, A -3. INDUSTRIAL ESTATES Website :www.appcb.ap.nie.in SANATHNAGAR, HYDERABAD - 500 018 'War REGD.POST WITH ACK.DUE CONSENT ORDER FOR ESTABLISHMENT Order No. 373 /APPCB/CFE/RO-GNT/H0/2015 Dt. 19.10.2015 Sub: APPCB — CFE — APCRDA & CA - Amaravati- Capital City of Andhra Pradesh, Covering an area of 217.23 Sq. Kms in Thulluru, Tadepalli and Mangalagiri Mandals of Guntur District - Consent for Establishment (CFE) of the Board under Sec.25 of Water (Prevention & Control of Pollution) Act, 1974 and Under Sec.21 of Air (Prevention & Control of Pollution) Act, 1981 - Issued - Reg. Ref: 1. EC order dt. 09.10.2015 issued by SEIAA, AP. CFE application received on 13.10.2015 R.O's inspection report dt. 14.10.2015. CFE Committee meeting held on 16.10.2015. In the reference 2nd cited, an application was submitted to the Board seeking Consent for Establishment (CFE) for Area development project with a project cost of Rs. 20,000 Crores. As per the application, the above project is to be located at 25 No. of villages in 3 Mandals of Guntur District and the project covering in an area of 217.23 Sq. Kms. The above site was inspected by Asst. Environmental Engineer, Regional Office, Guntur, A,P Pollution Control Board on 14.10.2015 and observed that the proposed development of Capital City for State of Andhra Pradesh is in an area of 217.23 Sq. Km covered by 25 No. of villages in 3 Mandals of Guntur District as detailed below: > Co-ordinates: North East 16°30'30"N 80°37'E South West 16°29'N 80°25'E North West 16°31'N 80°22'30" E South East 16°24'30"N 80°34' E > The proposed city covers the following Revenue villages of Guntur District.
    [Show full text]
  • GOVERNMENT of ANDHRA PRADESH ABSTRACT Office
    GOVERNMENT OF ANDHRA PRADESH ABSTRACT Office Procedure – Agriculture and Cooperation Department - Maintenance of Government Vehicles – Supply of diesel and other Lubricant oil etc., - Charges for the month of May, 2019 - Expenditure – Sanctioned – Orders – Issued. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - AGRICULTURE AND COOPERATION (OP.I) DEPARTMENT G.O.RT.No. 410 Dated: 01-07-2019 Read the following:- 1. G.O.Ms.No.613, G.A. (OP.II) Dept, dated 12.11.1990. 2. Bills received From M/s. Saileela Filling Station, Mandadam Thullur Mandal, Guntur District, dated 03.06.2019. *** O R D E R : Sanction is hereby accorded for payment of an amount of Rs.18,844/- (Rupees Eighteen Thousand Eight Hundred and Forty-four only) to M/s. Saileela Filling Station, Mandadam, Thullur Mandal, Guntur District towards the cost of Petrol, Diesel and other Lubricant oils supplied to the following vehicle of Agriculture and Cooperation Department for the month of May, 2019 for use of official purpose as per the orders issued in the G.O. 1st read above. The excess consumption of POL is ratified. I. AP 39 AB 0134: Car: Diesel: 260 Ltrs 2. The expenditure sanctioned above shall be debited to “3451 – Secretariat Economic Service –090-Secretariat – 18 – Agriculture and Cooperation Department – 240 - Petrol, Oil and Lubricants. 3. The Agriculture and Cooperation (OP.II/Claims) Department are requested to draw and credit for an amount of Rs.18,844/- (Rupees Eighteen Thousand Eight Hundred and Forty four only) in favour of M/s Saileela Filling Station, Mandadam, Thullur Mandal, Guntur District, Andhra Pradesh Account No.362605500026, ICICI Br.Thullur, IFSC Code ICIC0003626.
    [Show full text]
  • Assessment of Water Quality for Groundwater in Thullur Mandal, Guntur District, A.P, India
    April 2017, Volume 4, Issue 04 JETIR (ISSN-2349-5162) ASSESSMENT OF WATER QUALITY FOR GROUNDWATER IN THULLUR MANDAL, GUNTUR DISTRICT, A.P, INDIA 1P. Akhil Teja, 2V. Jaya Krishna, 3CH. Manikanta, 4M. Musalaiah 1, 2, 3 Final B.Tech Students, 4Assistant Professor, 1Department of Civil Engineering, 1MVR College of Engineering and Technology, Paritala, Andhra Pradesh, India Abstract— Groundwater is an essential and valuable natural source of water supply all over the world. To meet out the rising demand it is crucial to identify and recognize the fresh water resources and also to find out remedial methods for improvement of water quality. So, assessment of ground water quality has always been paramount in the field of environmental quality management. Physico-chemical parameters of groundwater quality based on physic-chemical parameters plays a prominent role in evaluating its suitability for drinking purpose. The present study deals with the determination of water quality index of Thullur mandal, Guntur district, Andhra Pradesh, in order to ascertain the quality of Groundwater for public consumption, recreation and other purposes. The samples were collected from all 19 villages of Thullur mandal. The samples were analyzed in the laboratory using standard APHA 1985 procedures. From the analyzed data, WQI has been calculated using Weighted Average method. The variations of water quality on different samples were also discussed. Index Terms— Groundwater, Water Quality Parameters, Sampling, Water Quality Standards, Water Quality. 1. INTRODUCTION Water is the most important natural resource, which forms the core of ecological system. Recently there has been overall development in various fields such as agriculture, industry and urbanization in India.
    [Show full text]
  • Agenda No. Name of the Industry Line of Activity 105.01 0.404 Ha. Black
    AGENDA ITEMS FOR THE 105th MEETING OF STATE LEVEL ENVIRONMENT IMPACT ASSESMENT AUTHORITY (SEIAA). A.P. TO BE HELD ON 01.06.2018 & 02.06.2018 AT VIJAYAWADA, A.P. Agenda Name of the Industry Line of Activity No. 105.01 0.404 Ha. Black Granite Mine of M/s. Sowdamini Granites at Sy. Black Granite Mine No: 106/2, Gurijepalli Village, Santhamaguluru Mandal, Prakasham District, Andhra Pradesh 105.02 0.817 Ha. of Black Granite Mine of M/s. Sowdamini Granites at Black Granite Mine Sy. No: 105/4A & 105/4B, Gurijepalli Village, Santhamaguluru Mandal, Prakasham District, Andhra Pradesh 105.03 6.870 Ha. Road Metal and Building Stone of Sri. L. Ramakrishna Road Metal and at Sy.No. 569/P of Somandepalli Village, Somandepalli Mandal, Building Stone Anantapur District, Andhra Pradesh 105.04 5.4 Ha. Road Metal and Building Stone of M/s. Siddartha Civil Road Metal and Works Pvt. Ltd. at Sy.No. 65 of Maruru Village, Rapthadu Building Stone Mandal, Anantapur District, Andhra Pradesh 105.05 17.80 Ha. Barytes and Dolomite Mine of Sri. V. Venkata Subbaiah Barytes and Dolomite at Sy. No. 480/1P, Gondipalli Village, Pendlimarri Mandal, YSR Mine Kadapa District, Andhra Pradesh 105.06 7.830 Ha.Colour Granite Mine of Sri. V. Gopala Krishnan at Colour Granite Mine Sy.No.29 Kondatemburu Village, Nandigam Mandal, Srikakulam District, Andhra Pradesh 105.07 Construction of Residential Building Project of M/s. K. R. Construction of Constructions at Sy.No:125/P Zone-II, East Point Colony, Near Residential Building VUDA Park, G.V.M.C.
    [Show full text]
  • World Bank Document
    Procurement Plan: Amaravati Sustainable Capital City Development Project (P159808) 1) Overall Procurement Risk for the Project: “Substantial” Public Disclosure Authorized 2) Procurement Methods Type of Procurement Method threshold (Million US$) Works International Open Procurement >40 National Open Procurement <40 National Request for Quotation <0.1 Goods and Non-Consulting Services International Open Procurement >3 National Open Procurement <3 National Request for Quotation <0.1 Consultant Firms CQS <0.3 LCS, FBS – in justified cases QCBS, QBS - in all other packages Single Source/Direct Contracting With prior agreement based on justification Public Disclosure Authorized Individual Consultants (IC) For PMU positions Above monetary thresholds are for providing general guidance. For approaching national or international market, main criterion will be availability of suppliers for intended goods, works or services in national market (or not). Procurement Plan will list market approach for each of the packages. 3) Review Arrangements: Type of Procurement Prior review threshold (Million US$) Works 10 Public Disclosure Authorized Goods and Non-Consulting 2 Services Consultant Firms 1 Single Source/Direct Contracting Justification will be reviewed at procurement plan stage Above monetary thresholds are based on current procurement risk rating (viz. Substantial) of the Project. These will be modified if procurement risk rating of the Project changes in future. If any procurement package has different risk rating than that for the Project, the review thresholds will be modified accordingly. Procurement Plan will list review requirements for each of the packages. 4) Procurement Schedule: available in STEP Public Disclosure Authorized Note: Bank financing for the packages in STEP would be available only after Bank approves the Project and the procurement falls under eligible expenditures, as finally agreed under the Project.
    [Show full text]
  • Handbook of Statistics Guntur District 2015 Andhra Pradesh.Pdf
    Sri. Kantilal Dande, I.A.S., District Collector & Magistrate, Guntur. PREFACE I am glad that the Hand Book of Statistics of Guntur District for the year 2014-15 is being released. In view of the rapid socio-economic development and progress being made at macro and micro levels the need for maintaining a Basic Information System and statistical infrastructure is very much essential. As such the present Hand Book gives the statistics on various aspects of socio-economic development under various sectors in the District. I hope this book will serve as a useful source of information for the Public, Administrators, Planners, Bankers, NGOs, Development Agencies and Research scholars for information and implementation of various developmental programmes, projects & schemes in the district. The data incorporated in this book has been collected from various Central / State Government Departments, Public Sector undertakings, Corporations and other agencies. I express my deep gratitude to all the officers of the concerned agencies in furnishing the data for this publication. I appreciate the efforts made by Chief Planning Officer and his staff for the excellent work done by them in bringing out this publication. Any suggestion for further improvement of this publication is most welcome. GUNTUR DISTRICT COLLECTOR Date: - 01-2016 GUNTUR DISTRICT HAND BOOK OF STATISTICS – 2015 CONTENTS Table No. ItemPage No. A. Salient Features of the District (1 to 2) i - ii A-1 Places of Tourist Importance iii B. Comparision of the District with the State 2012-13 iv-viii C. Administrative Divisions in the District – 2014 ix C-1 Municipal Information in the District-2014-15 x D.
    [Show full text]
  • World Bank Document
    A Public Disclosure Authorized Amaravati Sustainable Capital City Development Project (ASCCDP) RevisedFinal draft Resettlement Action Plan Public Disclosure Authorized for 10 Sub-Arterial Roads Public Disclosure Authorized Andhra Pradesh Capital Region Development Authority Amaravati, Andhra Pradesh Public Disclosure Authorized August2018 Ver. 5.0 TABLE OF CONTENTS ACRONYMS ............................................................................................................................................... 3 EXECUTIVE SUMMARY .......................................................................................................................... 4 I. INTRODUCTION ................................................................................................................................... 8 Amaravati Sustainable Capital City Development Project (ASCCDP) .......................................... 8 10 Sub-Arterial Roads .......................................................................................................................... 10 Impacts of 10 roads .............................................................................................................................. 12 II. SOCIAL IMPACT ASSESSMENT ..................................................................................................... 15 Magnitude of Social Impacts .............................................................................................................. 15 III. CONSULTATIONS / BASELINE SOCIO-ECONOMIC CHARACTERISTICS
    [Show full text]
  • Feasibility Study of the Development of New Capital City and Urban Infrastructure in Andhra Pradesh State, India Final Report
    Ministry of Economy, Trade and Industry Project to Promote Overseas Sales of Quality Energy Infrastructure Systems in Fiscal Year 2016 Feasibility Study of the Development of New Capital City and Urban Infrastructure in Andhra Pradesh State, India Final Report March 2017 Sumitomo Corporation Feasibility Study of the Development of New Capital City and Urban Infrastructure in Andhra Pradesh State, India Final Report Feasibility Study of the Development of New Capital City and Urban Infrastructure in Andhra Pradesh State, India Table of Contents 1 Introduction .............................................................................................................. 1-1 1.1 Project Background .................................................................................................. 1-1 1.2 Project Objectives ..................................................................................................... 1-1 1.3 Project Area .............................................................................................................. 1-2 2 Present Condition and Development Plan of New Capital City and Surrounding Cities .................................................................................................................................. 2-3 2.1 Present Condition...................................................................................................... 2-3 2.1.1 General Condition ..................................................................................................... 2-3 2.1.2 Infrastructure
    [Show full text]
  • APCRDA REGION LIST of UNAUTHORIZED BUILDINGS IDENTIFIED by APCRDA S.No Name of Owner / Builder Village and Mandal Location S.R.No /D.No
    AP CRDA., DIVISIONAL OFFICE IN ENTIRE APCRDA REGION LIST OF UNAUTHORIZED BUILDINGS IDENTIFIED BY APCRDA S.No Name of owner / Builder Village and Mandal Location S.R.No /D.No. Unauthorized floors Remarks 1 Vadlamude Padma Sekhar Gollapudi south side of bharati residency 550/1A Third floor Construction 2 Tummala Venkateswara Rao Guntupalli Guntupalli village 119/2 Construction of Flat Near Kondapalli panchayati 3 Karanam Sudheer Kumar Kondapalli 306/5 Third floor construction office 4 Karempudi anupama Gollapudi Plot no 8, Gollapudi(V) 559/2B Laying of Pillars in Third floor Kanagala Anuush Construction of Third Floor and 5 Gollapudi Gollapudi Gram Panchayati 559/1 Karampudi Venkat Leela Part of fourth floor 6 Karanam Anuradha Kondapalli Kondapalli (V) 306/5 Building Height Exceed 10 m 7 K.V.S Prasad Rao Gollapudi L.P No 78/82, Gollapudi (V) 495/4A, 5A Third floor construction 8 Koneru Radhika Gollapudi plot no 36, Gollapudi(v) 506/1 Third floor construction plot no 31/W, near Agriculture, 9 Royyuri Santhoshi Lavanya Gollapudi 506/1A7 Third floor construction Market Yard Gollapudi(V), near Agriculture 10 Smt. M.Nagapadma Gollapudi 503 Cellar.pillars on third floor Yard plot no 31/E, near Agriculture, 11 Royyuri Santhoshi Lavanya Gollapudi 506/1A7 Third floor construction Market Yard Sri. M.Samba Siva Rao, Opp D.No:13/64, Opp D.No:13/64, Nunna(V), Construction of building in 12 Near by Sai Baba Temple, Door No:13/64 Near by Sai Baba Temple, Vijayawada Rural Mandal Deviation to the Setbacks Nunna Village Nunna Village Sri.G.Praveen Reddy,
    [Show full text]