Comprehensive Transportation Project List
Total Page:16
File Type:pdf, Size:1020Kb
Public 2009 Update to the Contra Costa Countywide Transportation Plan Review Draft B 30 January 2009 Comprehensive Transportation Project List As part of the 2009 Update, the Authority has identified a variety of projects and pro‐ grams designed to carry out the strategies in the Plan. These projects run the gamut of all transportation improvements: from the widening of freeways or the extension of BART to new bicycle trails and signal coordination. The following set of projects and programs—referred to as the Comprehensive Trans‐ portation Projects List—was generated from the Action Plans, the 2007 Contra Costa CMP, MTC’s 2030 Transportation Plan, and local staff input. Authority staff has put these projects into a computer database which can be queried and reorganized for a variety of purposes. This database was, for example, used to define the “project,” and alternatives to it, for the required CEQA analysis on the 2009 Update. The following tables are organized by RTPC and then by project type. They include a short description of the projects, the primary sponsor, project status, and estimated to‐ tal project cost. 2009 Update to the Contra Costa Countywide Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost Bicycle/Pedestrian 0554 I-680 Bikeway Signage I-680 Bikeway Signage: install signage for bicyclists in Contra Costa Not Begun $20,000.00 unincorporated portions of the I-680 Bikeway: Rudgear County Road to Danville Town Limits 0838 Richmond, Walnut Creek Develop a program design for a Bicycle Pavilion (a desig- BART Design and $479,000.00 & Pleasant Hill BART nated area for bike storage in lockers, racks and a bi- ROW Station Bicycle Pavilions cycle station with amenities such as seating, lighting and landscaping) and complete construction of the format at the Walnut Creek BART station. The program design will be used as the basis for initiating Bicycle Pavilions at the Pleasant Hill and Richmond BART stations. 0988 Countywide Curb Ramp Annual program to Install ADA-compliant curb ramps at Contra Costa Under Con- $500,000.00 Program locations throughout the unincorporated areas of the County struction County. Funded at $100,000 per year. Total cost shown is $500,000 for the next seven years. 1121 Bicycle Storage and Sig- Install 13 electronically-controlled bicycle parking mod- BART Not Begun $621,200.00 nage at Contra Costa ules (each containing 8 units) at six BART stations and BART Stations new bicycle and pedestrian signs at eight BARTs within Contra Costa. Bus 0486 AC Transit Vehicle Re- Vehicle Replacement Program: includes bus replacement AC Transit Unknown $139,225,000.00 program, ADA paratransit vehicle purchase and leasing, 2009 Update to the Countywide Comprehensive Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost placement Program non-revenue vehicle purchase and replacement, and electric hybrid bus demonstration 0488 AC Transit Information Information System: includes ADA hardware and soft- AC Transit Unknown $13,735,000.00 System ware and upgrade and replacement of data processing equipment 0507 CCCTA: Replace Buses Replacement buses: replace buses, flexvans and para- County Connection Unknown $27,752,000.00 transit vehicles 0850b Regional Express Bus Express bus service across the Richmond/San Rafael Not Yet Specified Unknown $5,200,000.00 Program: I-80/Richmond Bridge Transbay2 0851 Regional Express Bus Not Yet Specified Unknown $4,900,000.00 Program: I-680/Martinez to San Ramon 1109 Park-and-Ride Lots to RTP project: Various park-and-ride lots in Contra Costa Bus Transit Coor- Not Begun $20,000,000.00 Support Regional Express to support expanded express bus service. dinating Council Bus Service 0202bb Bus Transit Coordinating Reduce headways of routes serving school by 5% to bet- Bus Transit Coor- Unknown Council: Youth/School ter serve school districts. Maintain existing system. Add dinating Council transportation3 or revise routes to provide better connections. 0202c Bus Transit Coordinating In West, Central and East County, extend service hours Bus Transit Coor- Unknown Council: Expand evening to midnight of major trunkline routes. West Co. service dinating Council services includes restoration of AC Transit to pre-1996 levels Page 127 2009 Update to the Contra Costa Countywide Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost 0202d Bus Transit Coordinating Add new cross county bus services, and double service Bus Transit Coor- Unknown Council: Enhanced cross- of existing services. dinating Council county links 0202e Bus Transit Coordinating Double existing services and add new services from Bus Transit Coor- Unknown $75,000,000.00 Council: Express bus Concord, Martinez. Additional service TBD after as- dinating Council services sessment of needs 0202f Bus Transit Coordinating Expand existing services throughout the County Bus Transit Coor- Unknown Council: ADA paratransit dinating Council Freeway 0738 Caldecott Tunnel Fourth Construct a fourth (westbound) bore for the Caldecott Caltrans Not Begun $185,000,000.00 Bore Tunnel complex Intermodal/Park-and-Ride 0282a BART Countywide Improve access to BART stations including parking ex- BART Not Begun $295,000,000.00 Access Improvements pansion/shuttles/bike and pedestrian improvements. Projects which facilitate access to BART stations. Station access projects can include the addition of new or ex- panded intermodal facilities, bicycle access facilities, pe- destrian access facilities, accessibility/ADA access facili- ties, various signage programs (Pathfinder, Talking Signs, Real Time Travel Information), and the expansion of car parking facilities. Page 128 2009 Update to the Countywide Comprehensive Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost Maintenance 0806 Regional Trail Mainten- Repave and overlay pavement on Contra Costa Canal, East Bay Regional Not Begun $6,000,000.00 ance Lafayette-Moraga, Iron Horse, Delta-de Anza, and Marsh Park District Creek Trails 0989 Countywide Surface Perform road overlay or reconstruction on designated Contra Costa Under Con- $7,040,000.00 Treatment Projects roads through the unincorporated areas of the County. County struction 0990 Countywide Pavement Perform repairs and treatment on roads throughout the Contra Costa Under Con- $35,000,000.00 Management Project unincorporated areas of the County. County struction Operations 0318 Translink (Contra Costa Translink (Contra Costa share) MTC Design and $801,000.00 share) ROW 0320 TravInfo Enhancements TravInfo Enhancements MTC Design and $750,000.00 ROW 0323 Probe Vehicle and Corri- Probe Vehicle and Corridor Management System MTC Unknown $2,440,000.00 dor Management System 0504 BART Station Pathfinder BART pathfinder sign program: prepare an Access Guide BART Unknown $100,000.00 Program: Access Guide twice a year that provides information on available tran- sit services, any changes and updates, and bicycle and pedestrian facilities 0525 Market TDM incentive Market TDM incentive programs: Expand market for TRANSPAC Not Begun Page 129 2009 Update to the Contra Costa Countywide Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost Programs established TDM incentive programs 0991 Countywide Traffic Pro- This program provides for safety and efficient movement Contra Costa Under Con- $4,200,000.00 gram of vehicular and pedestrian traffic while preserving County struction neighborhood character and minimizing disruption to the residents. This includes Safety Investigation, Traffic Operation, Traffic Data & Records, and Traffic Signal & Traffic Management. 0992 Countywide Traffic Bet- This program provides the resources to install traffic Contra Costa Under Con- $700,000.00 terment: New Sign Pro- signs as the need arises. County struction gram 0993 Countywide Traffic Bet- This program provides the resources to install the ne- Contra Costa Under Con- $490,000.00 terment: New Striping cessary traffic striping projects as needed during the County struction Program year. 0036b Countywide TDM Pro- 1) Carpool/Vanpool program 2) County cost of region- Contra Costa Not Begun $26,600,000.00 gram (future programs) wide rideshare program (RIDES) 3) Residential and Commute Alterna- school programs 4) Traveler trip planning programs 5) tive Network Transit incentives and fare coordination programs 6) expand guaranteed ride home program Rail/Rapid Transit 0506 Capitol Corridor: Market Market Capitol Corridor service: Marketing of service Capitol Corridor Unknown Service from Martinez and Richmond Stations JPA 0790 Smart Growth Upgrades Upgrades to BART stations in Contra Costa, including BART Not Begun $300,000,000.00 Page 130 2009 Update to the Countywide Comprehensive Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost and Renovation at BART projects supporting the precepts of the Transportation Stations for Livable Communities program 0885 BART Renovation Pro- BART Unknown gram 0886 Seismic Retrofit Program- BART Unknown Contra Costa County share 1272 Station Capacity Projects Station capacity projects can include the addition of new BART $175,000,000.00 escalators, elevators,