Comprehensive Transportation Project List

Total Page:16

File Type:pdf, Size:1020Kb

Comprehensive Transportation Project List Public 2009 Update to the Contra Costa Countywide Transportation Plan Review Draft B 30 January 2009 Comprehensive Transportation Project List As part of the 2009 Update, the Authority has identified a variety of projects and pro‐ grams designed to carry out the strategies in the Plan. These projects run the gamut of all transportation improvements: from the widening of freeways or the extension of BART to new bicycle trails and signal coordination. The following set of projects and programs—referred to as the Comprehensive Trans‐ portation Projects List—was generated from the Action Plans, the 2007 Contra Costa CMP, MTC’s 2030 Transportation Plan, and local staff input. Authority staff has put these projects into a computer database which can be queried and reorganized for a variety of purposes. This database was, for example, used to define the “project,” and alternatives to it, for the required CEQA analysis on the 2009 Update. The following tables are organized by RTPC and then by project type. They include a short description of the projects, the primary sponsor, project status, and estimated to‐ tal project cost. 2009 Update to the Contra Costa Countywide Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost Bicycle/Pedestrian 0554 I-680 Bikeway Signage I-680 Bikeway Signage: install signage for bicyclists in Contra Costa Not Begun $20,000.00 unincorporated portions of the I-680 Bikeway: Rudgear County Road to Danville Town Limits 0838 Richmond, Walnut Creek Develop a program design for a Bicycle Pavilion (a desig- BART Design and $479,000.00 & Pleasant Hill BART nated area for bike storage in lockers, racks and a bi- ROW Station Bicycle Pavilions cycle station with amenities such as seating, lighting and landscaping) and complete construction of the format at the Walnut Creek BART station. The program design will be used as the basis for initiating Bicycle Pavilions at the Pleasant Hill and Richmond BART stations. 0988 Countywide Curb Ramp Annual program to Install ADA-compliant curb ramps at Contra Costa Under Con- $500,000.00 Program locations throughout the unincorporated areas of the County struction County. Funded at $100,000 per year. Total cost shown is $500,000 for the next seven years. 1121 Bicycle Storage and Sig- Install 13 electronically-controlled bicycle parking mod- BART Not Begun $621,200.00 nage at Contra Costa ules (each containing 8 units) at six BART stations and BART Stations new bicycle and pedestrian signs at eight BARTs within Contra Costa. Bus 0486 AC Transit Vehicle Re- Vehicle Replacement Program: includes bus replacement AC Transit Unknown $139,225,000.00 program, ADA paratransit vehicle purchase and leasing, 2009 Update to the Countywide Comprehensive Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost placement Program non-revenue vehicle purchase and replacement, and electric hybrid bus demonstration 0488 AC Transit Information Information System: includes ADA hardware and soft- AC Transit Unknown $13,735,000.00 System ware and upgrade and replacement of data processing equipment 0507 CCCTA: Replace Buses Replacement buses: replace buses, flexvans and para- County Connection Unknown $27,752,000.00 transit vehicles 0850b Regional Express Bus Express bus service across the Richmond/San Rafael Not Yet Specified Unknown $5,200,000.00 Program: I-80/Richmond Bridge Transbay2 0851 Regional Express Bus Not Yet Specified Unknown $4,900,000.00 Program: I-680/Martinez to San Ramon 1109 Park-and-Ride Lots to RTP project: Various park-and-ride lots in Contra Costa Bus Transit Coor- Not Begun $20,000,000.00 Support Regional Express to support expanded express bus service. dinating Council Bus Service 0202bb Bus Transit Coordinating Reduce headways of routes serving school by 5% to bet- Bus Transit Coor- Unknown Council: Youth/School ter serve school districts. Maintain existing system. Add dinating Council transportation3 or revise routes to provide better connections. 0202c Bus Transit Coordinating In West, Central and East County, extend service hours Bus Transit Coor- Unknown Council: Expand evening to midnight of major trunkline routes. West Co. service dinating Council services includes restoration of AC Transit to pre-1996 levels Page 127 2009 Update to the Contra Costa Countywide Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost 0202d Bus Transit Coordinating Add new cross county bus services, and double service Bus Transit Coor- Unknown Council: Enhanced cross- of existing services. dinating Council county links 0202e Bus Transit Coordinating Double existing services and add new services from Bus Transit Coor- Unknown $75,000,000.00 Council: Express bus Concord, Martinez. Additional service TBD after as- dinating Council services sessment of needs 0202f Bus Transit Coordinating Expand existing services throughout the County Bus Transit Coor- Unknown Council: ADA paratransit dinating Council Freeway 0738 Caldecott Tunnel Fourth Construct a fourth (westbound) bore for the Caldecott Caltrans Not Begun $185,000,000.00 Bore Tunnel complex Intermodal/Park-and-Ride 0282a BART Countywide Improve access to BART stations including parking ex- BART Not Begun $295,000,000.00 Access Improvements pansion/shuttles/bike and pedestrian improvements. Projects which facilitate access to BART stations. Station access projects can include the addition of new or ex- panded intermodal facilities, bicycle access facilities, pe- destrian access facilities, accessibility/ADA access facili- ties, various signage programs (Pathfinder, Talking Signs, Real Time Travel Information), and the expansion of car parking facilities. Page 128 2009 Update to the Countywide Comprehensive Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost Maintenance 0806 Regional Trail Mainten- Repave and overlay pavement on Contra Costa Canal, East Bay Regional Not Begun $6,000,000.00 ance Lafayette-Moraga, Iron Horse, Delta-de Anza, and Marsh Park District Creek Trails 0989 Countywide Surface Perform road overlay or reconstruction on designated Contra Costa Under Con- $7,040,000.00 Treatment Projects roads through the unincorporated areas of the County. County struction 0990 Countywide Pavement Perform repairs and treatment on roads throughout the Contra Costa Under Con- $35,000,000.00 Management Project unincorporated areas of the County. County struction Operations 0318 Translink (Contra Costa Translink (Contra Costa share) MTC Design and $801,000.00 share) ROW 0320 TravInfo Enhancements TravInfo Enhancements MTC Design and $750,000.00 ROW 0323 Probe Vehicle and Corri- Probe Vehicle and Corridor Management System MTC Unknown $2,440,000.00 dor Management System 0504 BART Station Pathfinder BART pathfinder sign program: prepare an Access Guide BART Unknown $100,000.00 Program: Access Guide twice a year that provides information on available tran- sit services, any changes and updates, and bicycle and pedestrian facilities 0525 Market TDM incentive Market TDM incentive programs: Expand market for TRANSPAC Not Begun Page 129 2009 Update to the Contra Costa Countywide Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost Programs established TDM incentive programs 0991 Countywide Traffic Pro- This program provides for safety and efficient movement Contra Costa Under Con- $4,200,000.00 gram of vehicular and pedestrian traffic while preserving County struction neighborhood character and minimizing disruption to the residents. This includes Safety Investigation, Traffic Operation, Traffic Data & Records, and Traffic Signal & Traffic Management. 0992 Countywide Traffic Bet- This program provides the resources to install traffic Contra Costa Under Con- $700,000.00 terment: New Sign Pro- signs as the need arises. County struction gram 0993 Countywide Traffic Bet- This program provides the resources to install the ne- Contra Costa Under Con- $490,000.00 terment: New Striping cessary traffic striping projects as needed during the County struction Program year. 0036b Countywide TDM Pro- 1) Carpool/Vanpool program 2) County cost of region- Contra Costa Not Begun $26,600,000.00 gram (future programs) wide rideshare program (RIDES) 3) Residential and Commute Alterna- school programs 4) Traveler trip planning programs 5) tive Network Transit incentives and fare coordination programs 6) expand guaranteed ride home program Rail/Rapid Transit 0506 Capitol Corridor: Market Market Capitol Corridor service: Marketing of service Capitol Corridor Unknown Service from Martinez and Richmond Stations JPA 0790 Smart Growth Upgrades Upgrades to BART stations in Contra Costa, including BART Not Begun $300,000,000.00 Page 130 2009 Update to the Countywide Comprehensive Transportation Plan Table B.1: Comprehensive Transportation Project List: Countywide Projects Code Name Description Sponsor Status Cost and Renovation at BART projects supporting the precepts of the Transportation Stations for Livable Communities program 0885 BART Renovation Pro- BART Unknown gram 0886 Seismic Retrofit Program- BART Unknown Contra Costa County share 1272 Station Capacity Projects Station capacity projects can include the addition of new BART $175,000,000.00 escalators, elevators,
Recommended publications
  • PUBLIC UTILITIES COMMISSION March 28, 2017 Agenda ID# 15631
    STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102 March 28, 2017 Agenda ID# 15631 TO PARTIES TO RESOLUTION ST-203 This is the Resolution of the Safety and Enforcement Division. It will be on the April 27, 2017, Commission Meeting agenda. The Commission may act then, or it may postpone action until later. When the Commission acts on the Resolution, it may adopt all or part of it as written, amend or modify it, or set it aside and prepare its own decision. Only when the Commission acts does the resolution become binding on the parties. Parties may file comments on the Resolution as provided in Article 14 of the Commission’s Rules of Practice and Procedure (Rules), accessible on the Commission’s website at www.cpuc.ca.gov. Pursuant to Rule 14.3, opening comments shall not exceed 15 pages. Late-submitted comments or reply comments will not be considered. An electronic copy of the comments should be submitted to Colleen Sullivan (email: [email protected]). /s/ ELIZAVETA I. MALASHENKO ELIZAVETA I. MALASHENKO, Director Safety and Enforcement Division SUL:vdl Attachment CERTIFICATE OF SERVICE I certify that I have by mail this day served a true copy of Draft Resolution ST-203 on all identified parties in this matter as shown on the attached Service List. Dated March 28, 2017, at San Francisco, California. /s/ VIRGINIA D. LAYA Virginia D. Laya NOTICE Parties should notify the Safety Enforcement Division, California Public Utilities Commission, 505 Van Ness Avenue, San Francisco, CA 94102, of any change of address to ensure that they continue to receive documents.
    [Show full text]
  • West Contra Costa/Albany Transit Wayfinding Plan
    FINAL WEST CONTRA COSTA TRANSIT ENHANCEMENT STRATEGIC PLAN and WEST CONTRA COSTA/ALBANY TRANSIT WAYFINDING PLAN Prepared for: West Contra Costa Transportation Advisory Committee October 2011 Acknowledgements WCCTAC BOARD City of El Cerrito Janet Abelson, Vice Chair City of Hercules Donald Kuehne City of Pinole Roy Swearingen, Chair City of Richmond Courtland “Corky” Boozé City of Richmond Thomas Butt City of Richmond Jeff Ritterman City of San Pablo Genoveva Calloway AC Transit Joe Wallace BART Joel Keller WestCAT Tom Hansen Contra Costa County John Gioia WCCTAC STAFF Christina Atienza, Executive Director Linda Young John Rudolph Joanna Pollock WCCTAC WORKING GROUP City of El Cerrito Yvetteh Ortiz City of Hercules Robert Reber City of Pinole Winston Rhodes City of Richmond Chad Smalley, Hector Rojas, Steven Tam City of San Pablo Kanwal Sandhu, Adele Ho AC Transit Nathan Landau, Puja Sarna, Aaron Priven BART Diedre Heitman WestCAT Rob Thompson Contra Costa County Jamar Stamps MTC Jay Stagi CONSULTANT TEAM Fehr & Peers Nelson/Nygaard Bob Grandy (Project Manager) Linda Rhine Brooke DuBose (Deputy PM) Joey Goldman Matthew Ridgway Meghan Mitman Studio L’Image Ellen Poling Sue Labouvie Josh Peterman Max Heim Steve Rhyne Carrie Carsell Eisen Letunic Nikki Hervol Niko Letunic Nikki Foletta table of contents I Introduction II Study Locations III Community Participation IV Travel Demand Management & Parking Strategies V Richmond BART Transit Center Enhancement Strategies VI Richmond Parkway Transit Center Enhancement Strategies VII El Cerrito Del
    [Show full text]
  • Travel Characteristics of Transit-Oriented Development in California
    Travel Characteristics of Transit-Oriented Development in California Hollie M. Lund, Ph.D. Assistant Professor of Urban and Regional Planning California State Polytechnic University, Pomona Robert Cervero, Ph.D. Professor of City and Regional Planning University of California at Berkeley Richard W. Willson, Ph.D., AICP Professor of Urban and Regional Planning California State Polytechnic University, Pomona Final Report January 2004 Funded by Caltrans Transportation Grant—“Statewide Planning Studies”—FTA Section 5313 (b) Travel Characteristics of TOD in California Acknowledgements This study was a collaborative effort by a team of researchers, practitioners and graduate students. We would like to thank all members involved for their efforts and suggestions. Project Team Members: Hollie M. Lund, Principle Investigator (California State Polytechnic University, Pomona) Robert Cervero, Research Collaborator (University of California at Berkeley) Richard W. Willson, Research Collaborator (California State Polytechnic University, Pomona) Marian Lee-Skowronek, Project Manager (San Francisco Bay Area Rapid Transit) Anthony Foster, Research Associate David Levitan, Research Associate Sally Librera, Research Associate Jody Littlehales, Research Associate Technical Advisory Committee Members: Emmanuel Mekwunye, State of California Department of Transportation, District 4 Val Menotti, San Francisco Bay Area Rapid Transit, Planning Department Jeff Ordway, San Francisco Bay Area Rapid Transit, Real Estate Department Chuck Purvis, Metropolitan Transportation Commission Doug Sibley, State of California Department of Transportation, District 4 Research Firms: Corey, Canapary & Galanis, San Francisco, California MARI Hispanic Field Services, Santa Ana, California Taylor Research, San Diego, California i Travel Characteristics of TOD in California ii Travel Characteristics of TOD in California Executive Summary Rapid growth in the urbanized areas of California presents many transportation and land use challenges for local and regional policy makers.
    [Show full text]
  • BART to Antioch Extension Title VI Equity Analysis & Public
    BART to Antioch Extension Title VI Equity Analysis & Public Participation Report October 2017 Prepared by the Office of Civil Rights San Francisco Bay Area Rapid Transit District Table of Contents I. BART to Antioch Title VI Equity Analysis Executive Summary 1 Section 1: Introduction 7 Section 2: Project Description 8 Section 3: Methodology 20 Section 4: Service Analysis Findings 30 Section 5: Fare Analysis Findings 39 II. Appendices Appendix A: 2017 BART to Antioch Survey Appendix B: Proposed Service Plan Appendix C: BART Ridership Project Analysis Appendix D: C-Line Vehicle Loading Analysis III. BART to Antioch Public Participation Report i ii BART to Antioch Title VI Equity Analysis and Public Participation Report Executive Summary In October 2011, staff completed a Title VI Analysis for Antioch Station (formerly known as Hillcrest Avenue Station). A Title VI/Environmental Justice analysis was conducted on the Pittsburg Center Station on March 19, 2015. Per the Federal Transit Administration (FTA) Title VI Circular (Circular) 4702.1B, Title VI Requirements and Guidelines for Federal Transit Administration Recipients (October 1, 2012), the District is required to conduct a Title VI Service and Fare Equity Analysis (Title VI Equity Analysis) for the Project's proposed service and fare plan six months prior to revenue service. Accordingly, staff completed an updated Title VI Equity Analysis for the BART to Antioch (Project) service and fare plan, which evaluates whether the Project’s proposed service and fare will have a disparate impact on minority populations or a disproportionate burden on low-income populations based on the District’s Disparate Impact and Disproportionate Burden Policy (DI/DB Policy) adopted by the Board on July 11, 2013 and FTA approved Title VI service and fare methodologies.
    [Show full text]
  • QUARTERLY PROJECT STATUS REPORTS October - December 2020
    QUARTERLY PROJECT STATUS REPORTS October - December 2020 Quarterly Project Status Report Oct – Dec 2020 ON-GOING PROJECTS A. PROJECTS MANAGED BY AUTHORITY 1106S2 I-680 Auxiliary Lanes – Segment 2 ....................................................................................................................... 1 5002 State Route 4: Mokelumne Bike Trail/Pedestrian Crossing ........................................................................... 3 5005 State Route 4: Balfour Road Interchange – Phase 1 ........................................................................................ 5 5007 State Route 239 ...................................................................................................................................................... 7 6001 Interstate 680/State Route 4 Interchange Improvements: State Route 4 Widening – Phase 3 .............. 9 6002/6004 State Route 242/Clayton Road Ramps ................................................................................................................. 11 6006 State Route 4 Operational Improvements: Interstate 680 to Bailey Road ................................................ 13 7002 Interstate 80/San Pablo Dam Road Interchange Improvements .................................................................. 15 7003 Interstate 80/Central Avenue Interchange Improvements ............................................................................. 17 8001 Interstate 680 HOV Completion and Express Lanes .......................................................................................
    [Show full text]
  • 2015 Station Profiles
    2015 BART Station Profile Study Station Profiles – Non-Home Origins STATION PROFILES – NON-HOME ORIGINS This section contains a summary sheet for selected BART stations, based on data from customers who travel to the station from non-home origins, like work, school, etc. The selected stations listed below have a sample size of at least 200 non-home origin trips: • 12th St. / Oakland City Center • Glen Park • 16th St. Mission • Hayward • 19th St. / Oakland • Lake Merritt • 24th St. Mission • MacArthur • Ashby • Millbrae • Balboa Park • Montgomery St. • Civic Center / UN Plaza • North Berkeley • Coliseum • Oakland International Airport (OAK) • Concord • Powell St. • Daly City • Rockridge • Downtown Berkeley • San Bruno • Dublin / Pleasanton • San Francisco International Airport (SFO) • Embarcadero • San Leandro • Fremont • Walnut Creek • Fruitvale • West Dublin / Pleasanton Maps for these stations are contained in separate PDF files at www.bart.gov/stationprofile. The maps depict non-home origin points of customers who use each station, and the points are color coded by mode of access. The points are weighted to reflect average weekday ridership at the station. For example, an origin point with a weight of seven will appear on the map as seven points, scattered around the actual point of origin. Note that the number of trips may appear underrepresented in cases where multiple trips originate at the same location. The following summary sheets contain basic information about each station’s weekday non-home origin trips, such as: • absolute number of entries and estimated non-home origin entries • access mode share • trip origin types • customer demographics. Additionally, the total number of car and bicycle parking spaces at each station are included for context.
    [Show full text]
  • Newspaper Articles
    Lafayette-Orinda fire station idea scrutinized - ContraCostaTimes.com http://www.contracostatimes.com/orinda/ci_22584533/lafayette-orinda-fi... Lafayette-Orinda fire station idea scrutinized By Jennifer Modenessi Contra Costa Times Contra Costa Times Posted: ContraCostaTimes.com MARTINEZ -- County supervisors this week authorized talks between the Contra Costa and Moraga-Orinda fire districts to build and operate a joint station on the Lafayette-Orinda border but not without hearing some stinging criticism of the proposal. County leaders took turns addressing ConFire Chief Daryl Louder on Tuesday following his request for formal discussions with MOFD Chief Randy Bradley to enter a partnership in which both districts would operate a joint fire station. If approved, the station would replace ConFire's Station 16 in Lafayette and nearby MOFD Station 43 in Orinda. Supervisors ultimately decided to let Louder discuss exploring a potential partnership with Bradley, but Supervisors Karen Mitchoff and John Gioia indicated anything formal should be part of future comprehensive talks between the county and other cities. MOFD directors approved the consolidation talks at a meeting Feb. 6. Under the plan proposed by the chiefs, ConFire would tap its capital funds and reallocate money used to operate Station 16 to the new station, whose construction and operating costs would be shared evenly with MOFD. Both districts say the move could help them save $1 million each in annual operating costs. However, the savings would materialize for ConFire only if Station 16 were operating; because it isn't, the new station would actually increase costs for the district. ConFire took that aging facility offline last year because of a rat infestation and mold-contamination issues.
    [Show full text]
  • Bart Schedule El Cerrito Plaza to Sfo
    Bart Schedule El Cerrito Plaza To Sfo Reviewable Andrus usually presetting some disablement or attune kindheartedly. Wizardly and selfsame Jehu never financiers his bikinis! Unclassifiable and sphinxlike Seth never prerecord yet when George dinge his Chichewa. However the push must have a bigger law enforcement presence in the BART system wardrobe at times. Mionight Union City Pacifica approx times Weekends Holidays Weekdays 6. All built initially developed, el cerrito del norte station gateway, and disinfecting and is fast, we are felony and does bart millbrae on the day. Best Ways to salvation From BART El Cerrito del Norte Station to. Find parking costs opening hours and a parking map of El Cerrito del Norte BART Station Park. The Transbay Tube over an underwater rail tunnel that carries Bay area Rapid Transit's four transbay lines under San Francisco Bay through the cities of San Francisco and Oakland in California. It makes a mine at SFO and plum is a shuttle from the Coliseum station perform the Oakland. With one is bart schedule el cerrito plaza bart follows the moment we are. TE BART System Map Hwy DDADDOOR Hwy os 4 Transportation Corridor Under. Construction schedules will research be finalized until after BART accepts a. Each of questions. Face coverings required BART now closes at 9pm Saturday and Sunday open am-9pm having daily BART updates related to coronavirus Looking cut the. Bart schedule and there was the el cerrito plaza bart schedule to sfo with housing activists, i get a high in our facilities for most of resources where there.
    [Show full text]
  • Ja D C M B G Ill a Rs R
    . e Dr . Park Ridg e Harrison D v r. A t M l u Morton Ave. l C lfo a r t d W . F . s y y e . Klos W . e Hill y e top Dr. W W v A d s Dr Stanton Ave. o la . n il o r i n l a l C w D z r e o n a ucero idg e C . A R M r v m D e u Mi . l ner o . Ave c B . l y. d u W R Joh ap r. e l n A c D id r. l ve. A la s w D a o e ie M an e v . p e H p Es r v t ro to T G i ll S l i Ga H rrity W ate lv y. h hg Dr. t g i . Hi e y 1 Pa w 1 bl w Pa o Vi H Pk lmer sta A ir. D ill Ave. ve. C r to d ew . p D on evi r. m at r. h G D Mckenz ic Co ller ie D R nnec Mi . r. ticu t y on Dr. t Ave. er Gilm Henders b W a D Ro r. a l A r. r airmede D l F E . t . t n r. a e e W D S e y. M v d . m M Wiswall D . r o h r u r A e ro ll . e i d t D n G s r b D 4 r a R Ri o B r.
    [Show full text]
  • El Cerrito Historical Trail
    EL CERRITO HISTORICAL TRAIL Cub Scout Pack 104 El Cerrito, California www.elcerritoscouting.org Hike Information Total Trail Length: 8.0 Miles Western Segment - Del Norte Station to EC Plaza Station: 3.8 Miles Eastern Segment - EC Plaza Station to Del Norte Station: 4.2 Miles Hike Instructions The following pages include step-by-step hiking directions, denoted by underlined text. Major points of interest are highlighted in BOLD CAPITAL LETTERS. Informational text is presented in the indented sections. There are Numbered Questions for you to answer along the way. You may write in answers next to the questions or use the optional answer sheet at the back of the booklet. Cub Scouts are encouraged to hike as much of the trail as they can, but they are not required to complete the whole 8 miles. Do your best! Older Scouts are expected to complete the entire trail in order to earn the patch. The hike is designed as a loop, starting and ending at the Del Norte BART Station, but you may jump in anywhere along the route. The trail may be hiked over multiple days; there is no time limit. If you have difficulty finding a point of interest or the answer to a question, it’s ok to skip it and move on to the next one. What you’re looking for may no longer be there. A Brief History of El Cerrito The area around present-day El Cerrito was once home to the Ohlone Indians. The first Spanish explorers, led by Pedro Fages, arrived in 1772 and set up camp alongside the “cerrito” known today as Albany Hill.
    [Show full text]
  • Here Is Some Text
    Executive Summary ES-05 Executive Summary – 24 CFR 91.200(c), 91.220(b) 1. Introduction Established in 1850, the County of Contra Costa is one of nine counties in the San Francisco Bay Area. The County covers 733 square miles and extends from the northeastern shore of San Francisco Bay easterly to San Joaquin County. The County is bordered on the south and west by Alameda County and on the north by Suisun and San Pablo Bays. The western and northern communities are highly industrialized, while the inland areas contain a variety of urban, suburban/residential, commercial, light industrial and agricultural uses. Contra Costa County is comprised of large unincorporated areas and the 15 cities and towns listed in Table 1 "Cities and Towns in Contra Costa County" below. The unincorporated area in the Contra Costa Urban County include the communities listed in Table 2 below. The Consolidated Plan fulfills the requirement that recipients of certain funds administered by the federal Department of Housing and Urban Development (HUD) create a plan describing how these funds will be expended over a five-year period. These funds are Community Development Block Grant (CDBG), Home Investment Partnerships Program (HOME), Emergency Solutions Grant (ESG), and Housing for Persons With AIDS (HOPWA). This Consolidated Plan is for the period of July 1, 2015, to June 30, 2020. The cities of Antioch, Concord, Pittsburg and Walnut Creek, along with the County of Contra Costa have formed the Contra Costa HOME Consortium to cooperatively plan for the housing and community development needs of the County. The County administers HOME funds on behalf of all the Consortia cities and the Urban County.
    [Show full text]
  • Bart at Twenty: Land Use and Development Impacts
    ffional Development BART@20: Land Use and Development Impacts Robert Cervero with research assistance by Carlos Castellanos, Wicaksono Sarosa, and Kenneth Rich July 1995 University of California at Berkeley - 1 BART@20: Land Use and Development Impacts Robert Cervero with Research Assistance by Carlos Castellanos, Wicaksono Sarosa, and Kenneth Rich This paper was produced with support provided by the U.S. Department of Transportation and the California State Department of Transportation (Caltrans) through the University of California Transportation Center. University of California at Berkeley Institute of Urban and Regional Development Table of Contents ONE: BART at 20: An Analysis of Land Use Impacts 1 1. INTRODUCTION 1 TWO: Research Approach and Data Sources 3 THREE: Employment and Population Changes in BART and Non-BART Areas 6 3.1. Population Changes 6 3.2. Employment Changes 3.3. Population Densities 15 3.4. Employment Densities 15 3.5. Summary 20 FOUR: Land Use Changes Over Time and by Corridor 21 4.1. General Land-Use Trends 23 4.2. Pre-BART versus Post-BART 25 4.3. Early versus Later BART 30 4.4. Trends in Non-Residential Densities 33 4.4. Summary 37 FIVE: Land-Use Changes by Station Classes 38 5.1. Grouping Variables 38 5.2. Classification 38 5.3. Station Classes 41 5.4. Trends in Residential and Non-Residential Growth Among Station Classes 44 5.5. Percent Growth in Early- versus Later-BART Years Among Station Classes 46 5.6. Trends in Non-Residential Densities Among Station Classes 46 SLX: Matched-Pair Comparisons of Land-Use Changes near BART Stations Versus Freeway Interchanges 51 6.1.
    [Show full text]