The energy sector of :

Vision, Action Plan and Investment Opportunities

AEMP Round 3 25 – 26 June, 2019

1 Section 1 Country Energy Sector Overview

2 I. Angola believes that access to electricity is key to economic growth and country development, benefiting the overall population's standard of living and welfare.

Electricity and Income Correlation Angola aims to double its electrification rate until 2025 and equal that of reference countries Electrification rate

100% Latin America and the Caribbean 90% Middle East and North Africa • 1900 KWh per capita • 2600 KWh per capita 80%

70%

60% World: 50% • 2900 KWh per capita Angola 2025 40% Increase electrification to 60% Source: World Bank, 30% 2010 Angola 2010: 20% Sub-Saharan Africa • 247 KWh per capita Legend: • 552 KWh per capita 10% The diameter indicates average GDP per energy consumption 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 capita ($) per capita 3 I. Long term Vision & Objectives Angola’s strategy to Light up and power Africa by 2025

• Electrification rate of 50% • Electrification rate of 60% • Up to US$ 3 billion of private investments • Up to US$ 9 billion of private Milestones mobilized. investments mobilized.

• Restructuring and strengthening power sector operations • Electrification (urban and rural) and grid expansion Policy • Tariff review and economic/financial sustainability • Use of renewable energy • Promotion of private capital and know/how • Increase generation capacity

Generation, Transmission & 2018 – 2022: US$ 13.6 billion budget 2022 – 2025: US$ 23.1 billion budget Distribution

Installed Capacity Target 7.5 GW Target for 2022 9.9 GW Target for 2025

Transmission & Distribution Angola Power Sector Long Term Vision 2025

Technical Assistance

2018 2019 2020 2021 2022 2023 2024 2025

4 I. Angola Energy Sector Action Plan

Key pillars

Ensure and Increase . Increase the electricity access rate from 30% to 60% Electricity Supply . Quadruple generation capacity from current ~2.000 MW to ~9.500 MW in 2025 . Extend more than 2.500 km of lines and substations in the transmission grid, and establish international interconnections . Rehabilitate distribution networks, adding more than 1,5 million consumers

Industry . Improve the efficiency of public companies Competitiveness . Implement a new market model that allows for cost reductions . Develop a new regulatory model encouraging efficiency

System . Reduce tariff subsidization Sustainability . Develop an optimal generation mix, making better use of Angola’s natural resources . Develop the capabilities of the local workforce

5 I. Angola Energy Sector Snapshot Potential 1.3 – 2.1 18.3 3.9 3.7 MWh/m2/year GW GW GW Average solar irradiance Hydro energy to be exploited Total wind energy potential Biomass and waste potential

• Angola has a solar potential of 17.3GW • 6.7 GW more of hydro are expected by distributed over 368 projects 2025. 604 MW, or 13 projects, have conditions for • This potential for electricity generation is • Angola’s Energy 2025 vision sets a target of quick grid connection . Several of these sites spread over 42 projects • PV systems are the most appropriate 100MW for small hydropower plants. are close to the main network which minimizes technology to harness the solar potential. • Planned investments until 2025 will technical restrictions or significant investments. • 3.3 GW of projects are forestry related. represent only 30% of utilization. Production Key Indicators

6,400 MW 82 MW 1650 Peak energy Total Installed Capacity Of supply is generated by IPPs 3.4 M Households without consumption power MW (reached in 2014) Electricity production by source (2014) Energy consumption per client (2014) Losses 14% Thermal Industry Residential 9% 47% 45% Average consumption Access Rate Hydro 36% Population electrified localities / 15.5% growth rate 53% Total Population (2008-2014) Services 32%

6 I. Angola Energy Programs, Policy & Reforms

Country generation programs/Expansion Energy Sector Stakeholders plans • The Ministry of Energy and Water of Angola (MINEA) • More than 6,000 km of very high voltage transmission • IRSEA – Regulator lines and over 40 substations are planned. • PRODEL – Generation Company • Plans exist to link the grids through a north-central • RNT – Transmission Company south backbone and expand the grid from 3,354 km • ENDE – Distribution Company to 16,350 km by 2025 and to connect to the Southern • GAMEK – Project Development Africa Power Pool (SAPP) through Namibia (ANNA) *On a local level, Provincial Governments (18 in total) have their and the Democratic Republic of Congo (Inga). own Directions of Energy and Water

Country’s Priorities Energy Policies and Reforms

The Angolan Government has an ambitious Action Plan • The AfDB jointly with JICA supported the Government for the period up to 2025 with around US $18 billion with US$ 1.2 billion through its Power Sector Reform worth of investments into renewables underway, and it Support Program to support the energy sector has a long-term vision for the power sector with a clear reforms undertaken by Angola between 2014 and roadmap to provide modern electricity services to 60% of 2017. the population by 2025. • Order no. 11/17: to review and extend the Angola’s National Vision of 2025 to 2050.

7 I. To successfully achieve the proposed goals in the energy sector a large amount of investment is necessary in generation assets and grid infrastructures.

Installed capacity Transmission grid # Consumers GW Kilometers Millions

12.0 7,000 3.5

9,9 GW 6,000 3.0 3.2 10.0 6,123 X 4,5 0.75 0.85 5,000 2.5 8.0 5,200 1.60 5,9 GW 4,000 2.0 X 3 6.0 0.75 X 1,8 3,000 1.5 3,354 1.6 1.37 4.0 2,0 GW 6.70 2,000 1.0 0.8 2.0 3.73 1,000 0.5 1.10 0.87 0.0 0 0.0 dez-13 dez-19 dez-25 2013 2019 2025 2013 2019 2025

Other Renewables Combined Cycle Conventional Thermal Hydro A significant investment extending The expected growth in generation is transmission lines to connect the new followed by the extension of the Quadrupling generation capacity is a key generation and unify the four distribution network and consumer pillar for electrification and supply security transmission systems base

Sources: Data 2012 – MINEA Expanded Council Board; Financial Reports ENE e EDEL; Estimated data PSEA, 2009, Data 2019 - MINEA

8 I. Angola is managing large, concurrent infrastructure developments, carefully planned to take advantage of Angola's unique national resources – natural gas, hydro, wind and solar

CONGO SIMPLIFICATION How to take advantage of Angolan North ZAIRE UIGE System natural resources

L. NORTE . Benefit from the hydro potential of East Kwanza river – Laúca and Caculo-Cabaça K. NORTE System SE. Capanda elevadora

BENGO SE. * L. SUL . Install combined cycle gas turbines, K. SUL partnering with Sonangol/ Angola LNG Center

System . National integration of transmission

HUAMBO systems

HUILA . International interconnection with Namibia and Congo South K. KUBANGO NAMIBE System . Rural electrification with distributed CUNENE renewables sources Grid connections

NAMIBIA until 2025

9 I. The Electricity Sector Transformation Program (PTSE) sought to improve efficiency by unbundling activities and a new market regulation that allows private participation.

Public Companies Restructuring Market and Regulation Models . Allow Private Generation

Value Chain Until 2015 Current Status . Establish a Single Buyer to purchase all energy generated Private Generation Investors Private Generation Investors . Power Purchase Agreements National Company negotiated by Single Buyers with generation companies Transmission Transmission National Company . Incentives and liberalization in generation and distribution, Distribution and Munici- with private players Customer palities Distribution Private Operations National Company Concessions . Tariff model design to promote

Regulator I R S E A energy efficiency to project Institiuto Regulador dos Serviços de Electricidade e de Água poorer consumers Engineering Office Engineering (for strategic projects) . Develop service quality improvement

10 Section 2 Investment Opportunities

11 II. Project #1: Hydroelectric Power Plant – CHICAPA II

IMPACT 31.2 20,800 1.25 CO2 kton/yr Households Emissions MW Electrified Savings

Deal Snapshot • Financing the construction and operation of the Hydroelectric Power Plant of Chicapa II, in Lunda Sul, which will increase the energy generation of Chicapa I, from 86.9 Chicapa River in Lunda Sul GWh/year to 135 GWh/year and improve the power supply to , a growing city, to local mining industries as well as support the expansion of the transport network in the Eastern Region. • Indicative Investment Amount: USD 180 million Alignment with Action Plan

• Expansion on Electricity Access on urban areas, capitals of Municipalities and rural areas; • Construction of the new water supply system from the river Chicapa, one of the weaker provinces in access to drinking water;

Chicapa I in Lunda Sul 12 II. Project #2: Hydroelectric Power Plant –

IMPACT 37.2 36 25,000 CO2 kton/yr Households Emissions MW Electrified Savings

Deal Snapshot • Financing the construction and operation of the Hydroelectric Power Plant of Luacano, which will benefit the municipalities of Lucano, Luau and those located at border ot the Upper Zambezi region; • Indicative Annual Production: 140.2 GWh • Indicative Investment amount: USD 390 million Location of the Hydroelectric Power Plant of Luacano (Google Earth) Alignment with Action Plan

• Increase generation capacity in the East System; • Rural electrification; • Link with the rehabilitation and expansion of water supply system in Luacano;

13 II. Project #3. Hydroelectric Power Plant – Vuka

IMPACT 43.6 29,000 1.2 CO2 kton/yr Households Emissions MW Electrified Savings

Deal Snapshot • Financing the construction and operation of the Hydroelectric Power Plant of Vuka, which will benefit the municipalities of Cuango e Luzamba, Cafunfo, Luremo, Xá Muteba, Capenda Camulemba. In the future will support and stabilize the connection in Very High Tension between the North and the East Systems; Indicative annual production: 209 GWh Cuango River • Indicative Investment Amount: USD 320 million

Alignment with Action Plan

• Increase generation capacity in the East System; • Interconnectivity of the transmission systems; • Rural Electrification.

14 II. Investment Opportunities in Solar Energy

IMPACT 100 66,000 21.9 CO2 kton/yr Households Emissions MW Electrified Savings

Capacity (in Annual Production

Region MW) (MWh/yr) Emission savings (CO2 ton/ yr) Central 30 57.51 36.61 South 70 136.33 86.79 Total 100 193.84 123.40

Alignment with Action Plan

• Expansion on Electricity Access on urban areas, capitals of Municipalities and rural areas; • Rural Electrification; • Priority projects include: (10 MW), Camongue (10 MW) and Caraculo (10 MW).

15 II. Investment Opportunities in Wind Energy

IMPACT 652 434,666 977.79 CO2 kton/yr Households Emissions MW Electrified Savings

Capacity (in Annual Production

Region MW) (MWh/yr) Emission savings (CO2 ton/ Yr) Central 168 414.62 263.95 North 134 373.63 237.86 South 350 747.69 475.98 Total 652 1535.94 977.79 Alignment with Action Plan

• Expansion on Electricity Access on urban areas, capitals of Municipalities and rural areas; • Rural Electrification; • Priority projects include: (78 MW) and (88 MW).

16 II. The social, economic and environmental sustainability is the third building block for development in the Angolan electricity sector.

. Establish new electricity market conditions . Reduce governmental tariff subsidization . Develop regulation capabilities to promote efficiency Economic . Management professionalization Sustainability

. Expand rural electrification, boosting growth and development in these regions . Ensure long-term sustainability and independence of local capabilities . Deliver results to society in the short term Social Sustainability

. Adopt a better installed capacity mix focused on Angola’s natural resources . Choose thermal powerplant technologies with reduced CO2 emissions . Develop pilot projects to expand renewable energies Environmental . Promote electricity efficiency with mass installation of prepayment meters Sustainability

17 Thank you for your attention.

18 III.

APPENDIX

19 III. Public Investment Programme For 2018-2022

Distribution & Rural Generation Transmission Electrification

• Rehabilitation and relocation • Laúca and Caculo Cabaça • Conversion to Pre-paid meters of Thermal plants; Hydro power evacuation and tele metering in MT • Optimization of thermal plants • Interconnection of North – universal • Installation of Ocean thermal Central grids Interconnection • Electrification of Provincial plants in the North, Centre and • Capacity building of RNT Capital cities South with reconversion to gas • Interconnection of South- • Rural and Municipal • New regulation Hydro at the Centarl grids Electrification (northern, East for 2025/2030 • Eastern grid connection at 220 central, southern and eastern • Rehabilitation of Large KV grids) hydropower Plants • Support to Municipal and rural • Rural Electrification with Electrification at 110 kv Renewable energy and Malanje

20 III. Projects Open For Private Investors’ Participation

Conventional Large & Medium- New & Renewable Municipal & Rural Areas Size Power Plants Energy Distribution

• NGCCPP 2 (750 MW); • Solar Energy Programme • Management Contracts for • NGCPP 2 (100 MW); (200MW); municipal networks connected • NGCPP Ocean Terminal • Hybrid solar-Diesel Power to the grid; 1 & 2 (750 MW) Plants (58 MW); • Licencing of Municipal off-grid • Large & Medium size Hydro - • Biomass Thermal Plants and networks and creation of River; Urban solid waste thermal managing entities through • Large & Medium size Hydro - plants (Luanda & Benguela); partnership; Queve River; • First Wind park in Angola • Rent of individual solar units • Medium Hydro in the East. (100 MW); for isolated areas. • Studies for the relaunching of the Mini-Hydro programme.

21 Soyo T 15MW Legenda: III. T M’Banza Congo Luachimo 800MW 400kV Maquela Zombo H 220kV 18.4MW 110kV Luapasso 60kV M. Kapary H 26MW 92+42MW T Térmica T Calonda H Hidráulica Boavista Uige E Eólica T Luo 22.8MW 172+105MW H H 42MW Camama T Pambos Sonhe 16MW Filda Chicapa II Morro Viana Chicapa I Bento N’Dalatando´ T Cacuso Malanje Saurimo Baia Catete 7.5MW Ramiros H Cambambe H Capanda Chiumbe-Dala H 2067MW 520MW H 12.4MW 260+700MW Laúca Gabela Léua Luena Wako Kungo T 7.5MW Cunje 20MW 60+30MW T Katchiongo T Quileva 50MW Alto Kuito Lobito H Catumbela T 10MW Catumbela Biópio Benfica Lomaum Caála T Gove H 18MW Benguela H H 60MW 14,4MW 24MW Cavaco Cacombo Matala H 75MW Saco Jamba Ya Oma H Namibe T Jamba 70MW 40,8MW H Tombwa 200MW Baynes

100MW E B. Tigres Sistema Eléctrico de Angola 22 minea