Draft City List of Projects FY 2019-20
Total Page:16
File Type:pdf, Size:1020Kb
"DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1). August 2, 2019 Fiscal Year Proposed Est Senate Assembly City County Project Type Title Description Location Components Est Start Est Completion Intially Proposed Project Status Useful Life District District This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Broadway. Shore Line Dr to Otis Dr.; Broadway. Buena Vista Ave to Blanding Road Maintenance & (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurfacing and repair of Ave.; Grand St. Buena Vista Ave to Fortmann Way. Alameda Alameda 19/20 New Pavement Management Construction 06/2019 11/2019 20-30 9 18 Rehabilitation street pavement and restoration of flowlines of associated curb and gutter in order to (A) Park St. Santa Clara Ave to Buena Vista Ave.; San Antonio Ave. Chestnut St to extend the life of the street and (B) improve its ridability for cyclists and motorists. Park St. This project will include: Paving and/or Striping Installation (New Safety), Bicycle Lane Road Maintenance & Washington Avenue Pavement Albany Alameda 19/20 New Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Washington Avenue between San Pablo Avenue and Key Route Blvd in Albany Construction 10/2019 05/2020 10-20 9 15 Rehabilitation Restoration Project Improvement (New), ADA Curb Ramp Rehab/Repair (Existing) This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | FY 2018 Street Rehabilitation Project to reconstruct up to 0.81 miles of Berkeley Streets is Road Maintenance & Panoramic Way, from Canyon Road to the east City limit (entire street); Berkeley Alameda 17/18 In-Progress FY 2018 Street Rehabilitation continuing from its FY 2019 submission due to construction timing. Segments planned for Construction 04/2019 10/2019 20-30 9 15 Rehabilitation Prospect Street, from UC Berkeley Campus to Hillside Avenue pavement reconstruction funded from SB1 include: 0.68 miles of pavement along Panoramic Way; including replacement of storm drains, retaining walls and sidewalk. Reconstruction of 0.13 miles of pavement along Prospect Street; including replacement of sidewalk and installation of curb ramps and crosswalks. 6th Street from Allston Way to Dwight Way; Catalina Avenue from Colusa This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Avenue to The Alameda; Derby Street from San Pablo Avenue to Mabel Street; Road Maintenance & Berkeley Alameda 19/20 Carried Over FY 2019 Street Rehabilitation Rehab/Repair (Existing Safety) | FY 2019 Street Rehabilitation Project to overlay and Dwight Crescent from 6th Street to 7th Street; Highland Place from Ridge Road Construction 05/2019 11/2019 10-30 9 15 Rehabilitation reconstruct up to 1.01 miles of Berkeley streets. to Hearst Avenue; Ridge Road from La Loma Avenue to Highland Place; Station Place from Catalina Avenue to the south end of Station Place This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Complete Streets Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Berkeley Alameda 19/20 In-Progress Shattuck Avenue Reconfiguration Shattuck Avenue from Allston Way to University Avenue Construction 01/2019 09/2020 20-30 9 15 Components Striping Rehab/Repair (Existing Safety) | Reconfiguration of a three-block segment of Shattuck Avenue from Allston Way to University Avenue to improve pedestrian and bicycle safety, northbound circulation for motorists and transit vehicles, and the quality of public spaces in the Downtown core. Cedar St. from 6th St. to San Pablo Ave.; Center St. from Martin Luther King Jr. This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Way to Milvia St.; Center St. from Milvia St. to Shattuck Ave.; Rose St. from Le Road Maintenance & Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Roy Ave. to La Loma Ave.; Santa Fe Ave. from Gilman St. to Cornell Ave./Page Berkeley Alameda 19/20 New FY 2020 Street Rehabilitation Construction 05/2020 11/2020 10-20 9 15 Rehabilitation Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping St.; Shasta Rd. from Grizzly Peak Blvd. to Park Gate.; Shasta Rd. from Park Rehab/Repair (Existing Safety) Gate to east City limit (Golf Course).; Spinnaker Way from Breakwater Dr. to Marina Blvd.; Village Parkway from Kimball Avenue to Amador Valley Blvd; Amador Valley Blvd. westbound from Stagecoach Road to Dougherty Road; Village Parkway and Clark Avenue south of Dublin Blvd; Residential streets bound by Kimball Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Dublin Alameda 19/20 New Annual Street Resurfacing Project Avenue and Brighton Drive to the north, Amador Valley Blvd. to the south, Construction 06/2019 09/2019 7-10 7 16 Rehabilitation Rehab/Repair (Existing Safety) Village Parkway to the east, and San Ramon Road to the west; Residential streets bound by Fenwick Way to the north, W. Vomac Road to the south, San Ramon Road to the east, and Bloomington Way to the west. This project will include: Environmental Study/Documents, Preliminary Design | Design and Environmental review of the Iron Horse Trail bike and ped Bridge Crossing at Dublin Blvd. | Iron Horse Trail Bridge at Dublin Dublin Alameda 17/18 In-Progress Safety RMRA funding ($200,000) for this project was added mid-year through a budget change, On Iron Horse Trail crossing at Dublin Blvd intersection with Scarlet Drive Pre-Construction 06/2017 04/2020 30-50 7 16 Boulevard which reduced RMRA funding from $300,000 to $100,000 for another project, Tassajara Road Realignment & Widening (ST0116). This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of Way, Project Scope Development | Design of a 1.5-mile Between Fallon Road in the City of Dublin and North Canyons Parkway in City Dublin Alameda 19/20 In-Progress Other Dublin Boulevard Extension extension of Dublin Boulevard from Fallon Road to North Canyons Parkway in Livermore. Pre-Construction 06/2018 09/2021 30-50 7 16 of Livermore This is a new proposed project for FY 18/19 report. **The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019. "DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1). August 2, 2019 Fiscal Year Proposed Est Senate Assembly City County Project Type Title Description Location Components Est Start Est Completion Intially Proposed Project Status Useful Life District District This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Rehab/Repair Dublin Boulevard Improvements - (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New), Dublin Alameda 19/20 In-Progress Other Between Sierra Court and Dublin Court on Dublin Blvd. Construction 09/2018 07/2019 30-50 7 16 Sierra Court to Dublin Court Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of Dublin Boulevard from Sierra Court to Dublin Court. This is a new proposed project for FY 18/19 report. Citywide Signal Communications This project will include: Preliminary Design | Upgrade of the traffic signal communication Along Dublin Blvd. from the Civic Plaza/Sierra Court intersection to the San Pre-Construction & 07/2019 02/2020 Dublin Alameda 19/20 New Traffic Control Devices 10-20 7 16 Upgrade system and replace existing copper communication cables with fiber optic cables. Ramon Road intersection. Construction 04/2020 08/2021 This project will include: Environmental Study/Documents, Preliminary Design, Right of Way | Planning, right of way and environmental study, and design of Tassajara Road from North Tassajara Road Realignment & Tassajara Road between North Dublin Ranch Drive and the City and Contra Dublin Alameda 17/18 In-Progress Other Dublin Ranch Drive to the City and Contra Costa County limit. Pre-Construction 04/2017 10/2020 30-50 1 1 Widening Costa County limit. Funds from FY 19/20 will be used towards this project. 37th St(San Pablo Ave-City Limits); 47th St(Doyle St-San Pablo Ave); 53rd This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing St(Hollis-San Pablo Ave); 59th St(Horton St-Peladeau St); 62nd St(Overland Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Ave-Vallejo St); 63rd St(Overland Ave-Vallejo St); Doyle St(Ocean Ave-Powell Road Maintenance & 2020 Annual Street Rehabilitation Emeryville Alameda 19/20 New ADA Curb Ramp Installation (New), Bicycle Lane