Draft City List of Projects FY 2019-20

Total Page:16

File Type:pdf, Size:1020Kb

Draft City List of Projects FY 2019-20 "DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1). August 2, 2019 Fiscal Year Proposed Est Senate Assembly City County Project Type Title Description Location Components Est Start Est Completion Intially Proposed Project Status Useful Life District District This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Broadway. Shore Line Dr to Otis Dr.; Broadway. Buena Vista Ave to Blanding Road Maintenance & (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurfacing and repair of Ave.; Grand St. Buena Vista Ave to Fortmann Way. Alameda Alameda 19/20 New Pavement Management Construction 06/2019 11/2019 20-30 9 18 Rehabilitation street pavement and restoration of flowlines of associated curb and gutter in order to (A) Park St. Santa Clara Ave to Buena Vista Ave.; San Antonio Ave. Chestnut St to extend the life of the street and (B) improve its ridability for cyclists and motorists. Park St. This project will include: Paving and/or Striping Installation (New Safety), Bicycle Lane Road Maintenance & Washington Avenue Pavement Albany Alameda 19/20 New Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Washington Avenue between San Pablo Avenue and Key Route Blvd in Albany Construction 10/2019 05/2020 10-20 9 15 Rehabilitation Restoration Project Improvement (New), ADA Curb Ramp Rehab/Repair (Existing) This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | FY 2018 Street Rehabilitation Project to reconstruct up to 0.81 miles of Berkeley Streets is Road Maintenance & Panoramic Way, from Canyon Road to the east City limit (entire street); Berkeley Alameda 17/18 In-Progress FY 2018 Street Rehabilitation continuing from its FY 2019 submission due to construction timing. Segments planned for Construction 04/2019 10/2019 20-30 9 15 Rehabilitation Prospect Street, from UC Berkeley Campus to Hillside Avenue pavement reconstruction funded from SB1 include: 0.68 miles of pavement along Panoramic Way; including replacement of storm drains, retaining walls and sidewalk. Reconstruction of 0.13 miles of pavement along Prospect Street; including replacement of sidewalk and installation of curb ramps and crosswalks. 6th Street from Allston Way to Dwight Way; Catalina Avenue from Colusa This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Avenue to The Alameda; Derby Street from San Pablo Avenue to Mabel Street; Road Maintenance & Berkeley Alameda 19/20 Carried Over FY 2019 Street Rehabilitation Rehab/Repair (Existing Safety) | FY 2019 Street Rehabilitation Project to overlay and Dwight Crescent from 6th Street to 7th Street; Highland Place from Ridge Road Construction 05/2019 11/2019 10-30 9 15 Rehabilitation reconstruct up to 1.01 miles of Berkeley streets. to Hearst Avenue; Ridge Road from La Loma Avenue to Highland Place; Station Place from Catalina Avenue to the south end of Station Place This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Complete Streets Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving and/or Berkeley Alameda 19/20 In-Progress Shattuck Avenue Reconfiguration Shattuck Avenue from Allston Way to University Avenue Construction 01/2019 09/2020 20-30 9 15 Components Striping Rehab/Repair (Existing Safety) | Reconfiguration of a three-block segment of Shattuck Avenue from Allston Way to University Avenue to improve pedestrian and bicycle safety, northbound circulation for motorists and transit vehicles, and the quality of public spaces in the Downtown core. Cedar St. from 6th St. to San Pablo Ave.; Center St. from Martin Luther King Jr. This project will include: Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Way to Milvia St.; Center St. from Milvia St. to Shattuck Ave.; Rose St. from Le Road Maintenance & Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Storm Drain and/or Culvert Roy Ave. to La Loma Ave.; Santa Fe Ave. from Gilman St. to Cornell Ave./Page Berkeley Alameda 19/20 New FY 2020 Street Rehabilitation Construction 05/2020 11/2020 10-20 9 15 Rehabilitation Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping St.; Shasta Rd. from Grizzly Peak Blvd. to Park Gate.; Shasta Rd. from Park Rehab/Repair (Existing Safety) Gate to east City limit (Golf Course).; Spinnaker Way from Breakwater Dr. to Marina Blvd.; Village Parkway from Kimball Avenue to Amador Valley Blvd; Amador Valley Blvd. westbound from Stagecoach Road to Dougherty Road; Village Parkway and Clark Avenue south of Dublin Blvd; Residential streets bound by Kimball Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Dublin Alameda 19/20 New Annual Street Resurfacing Project Avenue and Brighton Drive to the north, Amador Valley Blvd. to the south, Construction 06/2019 09/2019 7-10 7 16 Rehabilitation Rehab/Repair (Existing Safety) Village Parkway to the east, and San Ramon Road to the west; Residential streets bound by Fenwick Way to the north, W. Vomac Road to the south, San Ramon Road to the east, and Bloomington Way to the west. This project will include: Environmental Study/Documents, Preliminary Design | Design and Environmental review of the Iron Horse Trail bike and ped Bridge Crossing at Dublin Blvd. | Iron Horse Trail Bridge at Dublin Dublin Alameda 17/18 In-Progress Safety RMRA funding ($200,000) for this project was added mid-year through a budget change, On Iron Horse Trail crossing at Dublin Blvd intersection with Scarlet Drive Pre-Construction 06/2017 04/2020 30-50 7 16 Boulevard which reduced RMRA funding from $300,000 to $100,000 for another project, Tassajara Road Realignment & Widening (ST0116). This project will include: Cost Estimating, Feasibility Study, Environmental Study/Documents, Preliminary Design, Right of Way, Project Scope Development | Design of a 1.5-mile Between Fallon Road in the City of Dublin and North Canyons Parkway in City Dublin Alameda 19/20 In-Progress Other Dublin Boulevard Extension extension of Dublin Boulevard from Fallon Road to North Canyons Parkway in Livermore. Pre-Construction 06/2018 09/2021 30-50 7 16 of Livermore This is a new proposed project for FY 18/19 report. **The City of La Habra Heights' eligibility is noted as contingent upon the Commission’s receipt of their complete project list resolution submittal by August 13, 2019. "DRAFT" City Submitted - Fiscal Year 2019-20 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) adn 2034(a)(1). August 2, 2019 Fiscal Year Proposed Est Senate Assembly City County Project Type Title Description Location Components Est Start Est Completion Intially Proposed Project Status Useful Life District District This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Rehab/Repair Dublin Boulevard Improvements - (Existing), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Installation (New), Dublin Alameda 19/20 In-Progress Other Between Sierra Court and Dublin Court on Dublin Blvd. Construction 09/2018 07/2019 30-50 7 16 Sierra Court to Dublin Court Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Construction of Dublin Boulevard from Sierra Court to Dublin Court. This is a new proposed project for FY 18/19 report. Citywide Signal Communications This project will include: Preliminary Design | Upgrade of the traffic signal communication Along Dublin Blvd. from the Civic Plaza/Sierra Court intersection to the San Pre-Construction & 07/2019 02/2020 Dublin Alameda 19/20 New Traffic Control Devices 10-20 7 16 Upgrade system and replace existing copper communication cables with fiber optic cables. Ramon Road intersection. Construction 04/2020 08/2021 This project will include: Environmental Study/Documents, Preliminary Design, Right of Way | Planning, right of way and environmental study, and design of Tassajara Road from North Tassajara Road Realignment & Tassajara Road between North Dublin Ranch Drive and the City and Contra Dublin Alameda 17/18 In-Progress Other Dublin Ranch Drive to the City and Contra Costa County limit. Pre-Construction 04/2017 10/2020 30-50 1 1 Widening Costa County limit. Funds from FY 19/20 will be used towards this project. 37th St(San Pablo Ave-City Limits); 47th St(Doyle St-San Pablo Ave); 53rd This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing St(Hollis-San Pablo Ave); 59th St(Horton St-Peladeau St); 62nd St(Overland Safety), Paving and/or Striping Installation (New Safety), Pavement Rehab/Repair (Existing), Ave-Vallejo St); 63rd St(Overland Ave-Vallejo St); Doyle St(Ocean Ave-Powell Road Maintenance & 2020 Annual Street Rehabilitation Emeryville Alameda 19/20 New ADA Curb Ramp Installation (New), Bicycle Lane
Recommended publications
  • 1952 Threw Its Entire Resources Into the Bat­ Steep Slopes Above the Meyers Grade
    California Highways and Public Works Public Works Building Official lou'rnal of the Division of Highways, Twelfth and N Streets Department of Public Works, State of California Sacramento FRANK B. DURKEE GEORGE T. McCOY Director State Highway Engineer KENNETH C. ADAMS, Editor HELEN HALSTED, Associote Editor Published in the interest of highway development in Cali. fornia. Editors of newspopers and others are privileged to use matter contained herein. Cuts will be gladly loaned upon request. Address Communications to CALIFORNIA HIGHWAYS AND PUBLIC WORKS P. O. Box 1499 Sacramento, California Vol. 31 January-February Nos. 1,2 Page Typical Snow Battle Scene on U. S. 40 During Recent Record Storm. Photo by John Shaver, Photographic Section, M. R. Nickerson, ChieL Cover Epic Battle, II lustrated___________ _ _ By N. R. Bangert, Assistont Maintenance Engineer Man vs. Snow, Illustrated _ 8 By Art Hoppe, San Francisco Chronicle Sierra Crews Fight Drifts, Illustrated _ 11 By Jack Welter, San Froncisco Examiner Christm as Gift, Illustrated _ 13 By R. C. Kennedy, Secretary, California Highway Commission Ramona Freeway, III ustrated _ 17 By B. N. Frykland, Resident Engineer Santa Ana Freeway, Illustrated _ 20 By W. L. Fahey, District Engineer Ridge Route, lIIustrated____ _ _ 25 By C. P. Montgomery, District Construction Engineer U. S. 99 Job, II Iustrated _ 29 By W. M. Nett, Resident Engineer New State Highway Through Placerville, Illustrated _ 32 By Jerome F. Lipp, Right of Way Agent Bay Bridge Refi nancing 35 Street Sweepers, II lustrated__ 36 By Norman H. Heggie, Assistont Physical Testing Engineer New Index, 11,1 ustrated_______________ _ _ 40 By Richard H.
    [Show full text]
  • Barren Ridge FEIS-Volume IV Paleo Tech Rpt Final March
    March 2011 BARREN RIDGE RENEWABLE TRANSMISSION PROJECT Paleontological Resources Assessment Report PROJECT NUMBER: 115244 PROJECT CONTACT: MIKE STRAND EMAIL: [email protected] PHONE: 714-507-2710 POWER ENGINEERS, INC. PALEONTOLOGICAL RESOURCES ASSESSMENT REPORT Paleontological Resources Assessment Report PREPARED FOR: LOS ANGELES DEPARTMENT OF WATER AND POWER 111 NORTH HOPE STREET LOS ANGELES, CA 90012 PREPARED BY: POWER ENGINEERS, INC. 731 EAST BALL ROAD, SUITE 100 ANAHEIM, CA 92805 DEPARTMENT OF PALEOSERVICES SAN DIEGO NATURAL HISTORY MUSEUM PO BOX 121390 SAN DIEGO, CA 92112 ANA 032-030 (PER-02) LADWP (MARCH 2011) SB 115244 POWER ENGINEERS, INC. PALEONTOLOGICAL RESOURCES ASSESSMENT REPORT TABLE OF CONTENTS 1.0 INTRODUCTION ........................................................................................................................... 1 1.1 STUDY PERSONNEL ....................................................................................................................... 2 1.2 PROJECT DESCRIPTION .................................................................................................................. 2 1.2.1 Construction of New 230 kV Double-Circuit Transmission Line ........................................ 4 1.2.2 Addition of New 230 kV Circuit ......................................................................................... 14 1.2.3 Reconductoring of Existing Transmission Line .................................................................. 14 1.2.4 Construction of New Switching Station .............................................................................
    [Show full text]
  • Vascular Flora of the Liebre Mountains, Western Transverse Ranges, California Steve Boyd Rancho Santa Ana Botanic Garden
    Aliso: A Journal of Systematic and Evolutionary Botany Volume 18 | Issue 2 Article 15 1999 Vascular flora of the Liebre Mountains, western Transverse Ranges, California Steve Boyd Rancho Santa Ana Botanic Garden Follow this and additional works at: http://scholarship.claremont.edu/aliso Part of the Botany Commons Recommended Citation Boyd, Steve (1999) "Vascular flora of the Liebre Mountains, western Transverse Ranges, California," Aliso: A Journal of Systematic and Evolutionary Botany: Vol. 18: Iss. 2, Article 15. Available at: http://scholarship.claremont.edu/aliso/vol18/iss2/15 Aliso, 18(2), pp. 93-139 © 1999, by The Rancho Santa Ana Botanic Garden, Claremont, CA 91711-3157 VASCULAR FLORA OF THE LIEBRE MOUNTAINS, WESTERN TRANSVERSE RANGES, CALIFORNIA STEVE BOYD Rancho Santa Ana Botanic Garden 1500 N. College Avenue Claremont, Calif. 91711 ABSTRACT The Liebre Mountains form a discrete unit of the Transverse Ranges of southern California. Geo­ graphically, the range is transitional to the San Gabriel Mountains, Inner Coast Ranges, Tehachapi Mountains, and Mojave Desert. A total of 1010 vascular plant taxa was recorded from the range, representing 104 families and 400 genera. The ratio of native vs. nonnative elements of the flora is 4:1, similar to that documented in other areas of cismontane southern California. The range is note­ worthy for the diversity of Quercus and oak-dominated vegetation. A total of 32 sensitive plant taxa (rare, threatened or endangered) was recorded from the range. Key words: Liebre Mountains, Transverse Ranges, southern California, flora, sensitive plants. INTRODUCTION belt and Peirson's (1935) handbook of trees and shrubs. Published documentation of the San Bernar­ The Transverse Ranges are one of southern Califor­ dino Mountains is little better, limited to Parish's nia's most prominent physiographic features.
    [Show full text]
  • Lake Fire Incident Update
    LAKE FIRE INCIDENT UPDATE Date: 08/17/2020 Time: Evening Incident Information Line: (626) 574-5208 @Angeles_NF @AngelesNationalForest (323) 205-5263 @LACoFD_PIO @LACoFD Incident Media Line: (323) 347-4725 https://inciweb.nwcg.gov/incident/6953/ Current Situation: The Lake Fire is currently 19,026 acres with 38% containment and 4,570 structures remain threatened. Mandatory evacuations are in place. The fire is burning on the Angeles National Forest near Lake Hughes and moving northwest towards 100-year-old fuels consisting of Big Cone Douglas Fir, Oak and Gray pine. The Lake Fire remains over eight miles to the northeast of Interstate 5 and southtot of Highway 138. Firefighters are facing steep and rugged terrain, high temperatures, critically dry fuels and drought stressed trees. The Lake Fire started of unknown cause on August 12, 2020 and has burned for 6 days. There has been one reportable injury to date. The right flank of the fire, just west of Lake Hughes has held for several days. Some of the areas in denser vegetation require extensive mop up. The left flank in the area of Sawmill Mountain, Burnt Peak and Little Burnt Peak is presenting the most challenging fire behavior. Containment along Pine Mountain Road will continue to be threatened by spot fires. Crews will watch for fire whirls, or fire devils, a spinning vortex column of ascending hot air and gases rising from a fire. Tonight’s virtual public meeting was live streamed on the Angeles National Forest and Los Angeles County Fire Department Facebook and Instagram pages. Participants had the opportunity to ask questions through Facebook about the fire.
    [Show full text]
  • Board Agenda and Report Packet
    A Joint Powers Authority BOARD OF DIRECTORS MEETING AGENDA Monday, January 25, 2021 - 1:00 PM NCTC JPA Board Meeting Virtual Zoom Board Meeting Attendee Info: Join from a PC, Mac, iPad, iPhone or Android device: Please click this URL to join. Please click link below to Join Virtual Zoom Board Meeting – https://us02web.zoom.us/j/83120894191?pwd=TmpWVGlqMHRzU0hmWnlYZU1zSDdlZz09 Meeting ID: 831 2089 4191 Passcode: 949130 One tap mobile +16699009128,,83120894191#,,,,*949130# US (San Jose) +13462487799,,83120894191#,,,,*949130# US (Houston) Dial by your location +1 669 900 9128 US (San Jose) +1 346 248 7799 US (Houston) +1 253 215 8782 US (Tacoma) +1 646 558 8656 US (New York) +1 301 715 8592 US (Washington D.C) +1 312 626 6799 US (Chicago) Meeting ID: 831 2089 4191 Passcode: 949130 International numbers available: https://us02web.zoom.us/u/kbRWCbB1Ao North County Transportation Coalition JPA www.northcountytransportationcoalition.org 44933 N. Fern Avenue, c/o City of Lancaster, Lancaster CA 93534 Page 1 of 5 NCTC JPA BOARD OF DIRECTORS BOARD MEMBERS Chair, Supervisor Kathryn Barger, 5th Supervisorial District, County of Los Angeles Mark Pestrella, Director of Public Works, County of Los Angeles Victor Lindenheim, County of Los Angeles Austin Bishop, Council Member, City of Palmdale Laura Bettencourt, Council Member, City of Palmdale Bart Avery, City of Palmdale Marvin Crist, Vice Mayor, City of Lancaster Kenneth Mann, Council Member, City of Lancaster Jason Caudle, City Manager, City of Lancaster Marsha McLean, Council Member, City of Santa Clarita Robert Newman, Director of Public Works, City of Santa Clarita Vacant, City of Santa Clarita EX-OFFICIO BOARD MEMBERS Macy Neshati, Antelope Valley Transit Authority Adrian Aguilar, Santa Clarita Transit BOARD MEMBER ALTERNATES Dave Perry, County of Los Angeles Juan Carrillo, Council Member, City of Palmdale Mike Hennawy, City of Santa Clarita NCTC JPA STAFF Executive Director: Arthur V.
    [Show full text]
  • Santa Fe in Grapevine Canyon? an 1890 Plan to Enter Northern California Via Fort Tejon by Jack W.Kelly
    Santa Fe in Grapevine Canyon? An 1890 Plan to Enter Northern California via Fort Tejon By Jack W.Kelly he many stories about Santa Fe's on February 26, 1895. Construction south ation and by June, 1898 the 80.40 miles to efforts to achieve access to the Pa­ from Stockton commenced later that year Bakersfield had accomplished the creation T cific Ocean and Southern Pacific's and over 25 miles of track were in place of a competing railroad through the valley. strident efforts to deny Santa Fe that ac­ by December. By August 1896 the 123.44 The investors and shippers who owned cess have been told with so many different miles to Fresno were completed; by June, the SF&SJV Railway were not, and did not interpretations that, depending upon ones 1897 30.20 miles to Hanford were in oper- wish to be, railroad operators. Their rail- bias or loyalties, one may reach conflicting conclusions. However, there seems to be little disagreement about Southern Pacific's stranglehold on the San Joaquin Valley and the efforts of its captive customers to relieve themselves from "The Octopus," which held them captive. The recent (197 4) and perhaps most complete analysis of the Santa Fe is History ofthe Atchison, Topeka and Santa Fe Railway Company by Keith L. Bryant, Jr. Mr. Bry­ ant, a history professor, was given access to the files and corporate records of the Santa Fe. Beginning on page 173 he describes the frustrations of these captive customers and their decision to form The San Fran­ cisco Traffic Association in about 1891.
    [Show full text]
  • West Mojave Route Management Plan, Historic Properties Treatment Plan, Attachment 5: Historic Trails Context Study FINAL VERSION May 2019
    West Mojave Route Management Plan, Historic Properties Treatment Plan, Attachment 5: Historic Trails Context Study FINAL VERSION May 2019 Prepared for: United States Department of the Interior Bureau of Land Management California Desert District Office 22835 Calle San Juan de Los Lagos Moreno Valley, California 92553 Prepared by: Diane L. Winslow, M.A., RPA, Shannon Davis, M.A., RPH, Sherri Andrews, M.A., RPA, Marilyn Novell, M.S., and Lindsey E. Daub, M.A., RPA 2480 N. Decatur Blvd., Suite 125 Las Vegas, NV 89108 (702) 534-0375 ASM Project Number 29070 West Mojave Route Management Plan, Historic Properties Treatment Plan, Attachment 5: Historic Trails Context Study Prepared for: United States Department of the Interior Bureau of Land Management California Desert District Office 22835 Calle San Juan de Los Lagos Moreno Valley, California 92553 Prepared by: Diane L. Winslow, M.A., RPA, Shannon Davis, M.A., RPH, Sherri Andrews, M.A., RPA, Marilyn Novell, M.S., and Lindsey E. Daub, M.A., RPA ASM Affiliates, Inc. 2480 North Decatur Boulevard, Suite 125 Las Vegas, Nevada 89108 May 2019 PN 29070 Table of Contents TABLE OF CONTENTS Chapter Page MANAGEMENT SUMMARY ................................................................................. v 1. INTRODUCTION ............................................................................................. 1 2. LITERATURE REGARDING TRAILS, ROADS, AND HIGHWAYS ............... 7 3. DEFINING TRAILS, ROADS, AND HIGHWAYS ........................................... 9 4. PREHISTORIC, PROTO-HISTORIC, AND
    [Show full text]
  • A Trucker's Journey Over California's Infamous Ridge Route
    RUNNING THE A TRUCKER'S JOURNEY OVER CALIFORNIA'S INFAMOUS RIDGE ROUTE Story and photos by HARRISON IRVING SCOTT Editor's note: The following is a dramatized account of what a trip might have been like for a trucker in the early 1920s over the Ridge Route, California's first mountain highway. Author Harrison Scott used excerpts and photos from his book, "Ridge Route, The Road That · United California," to tell this tale. Scott was one of the speakers at the 2004 ATHS National Convention and Antique Truck Show in Fontana, Calif., this past May. To order the book, contact the author at 310-320-3205, The steep grade and many switchbacks of the Grapevine made it one of the most treacherous spots on the Ridge Route for many truckers. t was a hot summer afternoon that August in 1921 as the RUNNING THE old Teamster left the packing plant at Lindsey, Calif., with a heavy load of olives. He was heading south down the great San Joaquin Valley to Los Angeles. Checking his pocket watch, he hoped to get to Bakersfield and through town be- fore the evening traffic. He could then continue on to Greenfield, about another 10 miles south where it was easier to park a rig and grab a bite to eat. He thought to himself how only seven years ago he would have had to take the Midway Route due east from Bakersfield over to A TRUCKER'S JOURNEY Mojave, then cut back south taking one of the canyon passes to gain entrance to Los Angeles and southern California.
    [Show full text]
  • A Historical Context and Methodology for Evaluating Trails, Roads, and Highways in California
    A HISTORICAL CONTEXT AND METHODOLOGY FOR EVALUATING TRAILS, ROADS, AND HIGHWAYS IN CALIFORNIA Appendices C-K Appendix C. Timeline for Development of Engineering for Highways in California 1895-2009 ..1 Appendix D. Historic Roads and Highways in California .............................................................17 Appendix E. Designated California Legislature Roads in California ............................................22 Appendix F. Scenic Highways in California .................................................................................23 Appendix G. Interstate Highways throughout California ..............................................................24 Appendix H. California Tolls Roads and Turnpikes .....................................................................25 Appendix I. Oregon-California Trail Guidelines and Classification System ................................29 Appendix J. Evaluated Roads and Highways in California ...........................................................31 Appendix K. Caltrans Evaluated Roads and Highways ................................................................42 Appendix L. Highway Route Numbers and Date of Construction ................................................48 Prepared for: Cultural Studies Office Division of Environmental Analysis California Department of Transportation Sacramento 2016 http://www.dot.ca.gov/ser/guidance.htm#highway Appendix C Timeline for Development of Engineering for Highways in California 1895-2009 1895 The Bureau of Highways is created with the
    [Show full text]
  • California Highways and Public Works
    A low-profile batch plant has been installed on a San Diego Freeway con­ tract near Long Beach, consisting of two eight-cubic-yard mixers which will be charged through the use of belts. Production has not yet started, but it was reported that a similar unit was successful in another district. Also during the year a slip-form paving machine was used for the first time in this district on a freeway widening project. The machine is cur­ rently being used successfully on a Santa Ana Freeway contract, and the contractor plans to use it on a similar job in the near future. The construction industry is work­ ing to develop equipment capable of placing plastic strips to form the trans­ verse joints in concrete paving and thereby eliminate the need of sawing joints. A similar method of forming the longitudinal joints in multilane An interchange between the Golden State Freeway and the future Route 126 Freeway is under construc­ paving operations has been success­ tion at Castaic, on the Ridge Route north of San Fernando. The project is part of a program to improve fully used for some time. Transverse the Golden State (Interstate Route 5) .fo full freeway standards between San Fernando and the Kern county line. joints were placed in this manner on ' one section of the San Diego Freeway, and the finished product was of fairly good quality. Suppliers are continuing to develop techniques and equipment. Another experimental project was started to determine the value of ex­ pansive-type cement in the portland cement concrete pavement construc­ tion and to employ plastic sheeting as a curing agent.
    [Show full text]
  • Missouri Historical Review
    Historical The State Historical Society of Missouri COLUMBIA, MISSOURI BOARD OF EDITORS J LAWRENCE 0. CHRISTENSEN SUSAN M. HARTMANN University of Missouri-Rolla Ohio State University, Columbus WILLIAM E. FOLEY ALAN R. HAVIG Central Missouri State University, Stephens College, Warrensburg Columbia JEAN TYREE HAMILTON DAVID D. MARCH Marshall Kirksville ARVARH E. STRICKLAND University of Missouri-Columbia COVER DESCRIPTION: In January 1939 hundreds of south­ east Missouri sharecroppers moved their belongings onto the roadsides in protest of farm owners' practices. Amber Clifford examines this event and its aftermath in "To the Disinherited Belongs the Future" in this issue. [Cover illustration courtesy of Western Historical Manuscript Collection-St. Louis.] MISSOURI HISTORICAL REVIEW Published Quarterly by THE STATE HISTORICAL SOCIETY OF MISSOURI COLUMBIA, MISSOURI JAMES W. GOODRICH EDITOR LYNN WOLF GENTZLER ASSOCIATE EDITOR LEONA S. MORRIS RESEARCH ASSISTANT ANN L. ROGERS RESEARCH ASSISTANT Copyright 1993 by The State Historical Society of Missouri 1020 Lowry Street, Columbia, Missouri 65201 The Missouri Historical Review (ISSN 0026-6582) is owned by The State Historical Society of Missouri and is published quarterly at 10 South Hitt, Columbia, Missouri 65201. Send communications, business and editorial correspondence and change of address to the State Historical Society of Missouri, 1020 Lowry Street, Columbia, MO 65201. Second class postage is paid at Columbia, Missouri. SOCIETY HOURS: The Society is open to the public from 8:00 A.M. to 4:30 P.M., VOLUME LXXXVIII Monday through Friday, and Saturday from 9:00 A.M. to 4:30 P.M., except legal holidays. NUMBER 1 Holiday Schedule: The Society will be closed November 25-28, December 24-26 and December 31-January 2.
    [Show full text]
  • California Highways and Public Works, March-April 1961
    ALIBORNIA H 1 g h V11~~/ S and Pubi is Works Looking west along fhe complefed section of the Ventura Freeway in fhe San Fernando Valley. The view is from Hazeltine Avenue. (See article "District VII" beginning on page 3) r California, ig hwa, Y sand Public Works Official Journal of the Division of Highways, Department of Public Works, State of California Vol. 40 March-April Nos. 3-4 CONTENTS Page S.F. Vista - -- — ---------- ---------- — -------------------------------- 2 District VII ___----_---- -_- By E. T. Telford, Assistant State Highway Engineer Sco#ia Bridge ----- -------------------------- -------------- -- 24 By George W. Thomson, Resident Engineer AukumRoad --------------- — ------ --------------------- — ------- ---- ----- 27 By Robert C. Downer, Road Commissioner, EI Dorado County RuralFringe -------- -------------- — ----- ------ ------------ -- -------------- --30 By Bamford Frankland, Headquarters Right-of-Way Agent U.S. 466 ________ 35 By M. F. Silva, Resident Engineer I.T.T.E. ----- ---- — ----------------------------------------------------- ------—-— --------- 39 California Roadsides-2 _ ----------------------------------------___________ 40 Paver Control --_-------__---_-------_------------------------------------------------- -------_---__- 48 By W. H. Crawford, District Construction Engineer Salinas Valley -- -- ------- ---- ------ — — — ---- -- — — ----- ------- 52 By A. M. Nash, District Engineer FloodProblems ----- — — ------------------ --------------------------------------------------- 56 By T. E. Ferneau, Assistant
    [Show full text]