DOCSLIB.ORG
Explore
Sign Up
Log In
Upload
Search
Home
» Tags
» Viking Link
Viking Link
Total Length = Approximately 760 Km 1400 MW (1.4 GW) Capacity Operational in 2022
Requirements for Interconnection of HVDC Links with DC-DC Converters
Interconnectors
UK Onshore Scheme Statement of Community Involvement
Application to Introduce Implicit Loss Handling on the Skagerrak Interconnector
National Grid Media Centre
The Electricity Act 1989 and the Acquisition of Land Act 1981 the National Grid Viking Link Limited (Viking Link Interconnector)
Amanda Manns
The North Sea Grid
Challenges and Opportunities for the Nordic Power System Nordic Power System
Press Release: Siemens Wins Order for First HVDC Link Between Great
TEN-E Regulation – Pre-Application Notification United Kingdom
Non-Technical Summary for the TEN-E Regulations
Calculating Target Availability Figures for HVDC Interconnectors – Viking Link Model
Viking Link, an End to End Environmental Assessment
Press Release: Work Begins on the Converter Station for National Grid's
Viking Link Underground Cable Route Corridor Options Confirmed
Using the Smart Grid Lab to Test a Power Oscillation Damping Controller for Modular Multilevel Converters
Top View
Decision on the Final Project Assessment of the Viking Link Interconnector to Denmark
Planning Proof of Evidence
Electricity Candidate Projects Submitted to Be Included in the New Union List of Projects of Common Interest
Interim Status Quo Report on Offshore Linear Energy Infrastructure in the North Sea Region
The Impact of Brexit on the EU Energy System (November 2017)
TECHNICAL ISSUES RELATED to NEW TRANSMISSION LINES in DENMARK West Coast Line from German Border to Endrup and Endrup‐Idomlund
Total Length = Approximately 760 Km 1400 MW (1.4 GW) Capacity Operational in 2022
Viking Link Confirms Preferred Underground Cable Route Corridor
Integration of Windpower
Project National Grid Viking Link Limited (Viking Link
Viking Link Interconnector Connecting Danish and British Electricity Systems
Viking HVDC Link Submarine Cable Route Development Final Report
Viking-Link-Final-Banners-A4.Pdf
Brexit, Electricity and the No-Deal Scenario Perspectives from Continental Europe, Ireland and the UK
Viking Link Jævnstrømskabel Til Storbritannien
Viking Link Confirms Preferred Underground Cable Route Corridor
Total Length = Approximately 760 Km 1400 MW (1.4 GW) Capacity Operational in 2022