DOCSLIB.ORG
Explore
Sign Up
Log In
Upload
Search
Home
» Tags
» Pinjar Power Station
Pinjar Power Station
Ancillary Service Costs: Spinning Reserve, Load Rejection Reserve and System Restart Costs (Margin Values and Cost LR) for 2021/22 Determination
Environmental Protection Authority ENVIRONMENTAL PROTECTION AUTHORITY
Appendix E. Energy Price Limits Based on Aero-Derivative Gas Turbines Using Alternative Gas Price Forecast Appendix F
Answers to Questions Prior to Hearing
Neerabup Preliminary Decommisioning Plan
Annual Planning Report 2020
Proposed Revisions DBNGP Access Arrangement
Carbon Emissions Inventory Major Resource Projects – AGEIS 2012
WHEATBELT SNAPSHOT SERIES: POWER and ENERGY Version 1 – July 2014 Networks Such As the National Electricity Market (NEM)
Annual Report 2005 Western Power Annual Report 2005
Due Diligence Study for North Country System Reinforcements in 2010, System Studies Review
DEC Yearbook 2010-118.72 MB
Pdf (311.43Kb)
ANNUAL PLANNING REPORT 2017 T 13 10 87 TTY 1800 13 13 51 TIS 13 14 50 F (08) 9225 2660 E
[email protected]
1
Attachment 3: P1 Reference Service Terms and Conditions
Pinjar Gas Turbine Power Station: Environmental Review and Proposed Combined Cycle Extensions
Kwinana Gas-Fired Power Station (Water Cooled Condenser)
Attachment 2 Options Paper: Mid West Energy Project (Southern Section)
Top View
CUMULATIVE Contentst Vol. 70 Part 2 Sub Part 6 (December)
POWER and ENERGY Networks Such As the National Electricity Market (NEM)
Pdf (541.02Kb)
Wholesale Electricity Market Modelling and Backcasting Report
Transmission Line from Pinjar Gas Turbine to Cataby Substation
Annual Planning Report 2015/16
Wheatbelt Snapshot Series
Investigation Report Under-Frequency Load Shedding Event on 10 January 2020
Mining the Age of Entitlement State Government Assistance to the Minerals and Fossil Fuel Sector
PRIOR to HEARING (ROUND 2) ENERGY SOURCE SYNERGY ASSET ENERGY SENT out (Gwh) MUJA POWER STATION COLLIE POWER STATION KWINANA
Economics and Industry Standing Committee
Proposed Revisions DBNGP Access Arrangement
Annual Report 2017 Annual Report ABN 58 673 830 106
Wagerup Cogeneration Project
2019 Western Australia Gas Statement of Opportunities
Western Power