2020 INSIDE YOUR MEDIA PACK

The transatlantic law firm close to home Find out more here

12 SEPTEMBER 2019 NEWS n ISSUE 415 RENEWS.BIZ REGULAR THIS WEEK CfD3 bidders shrug off legal challenge UK officials are evaluating final bids Olsen push for 480MW from developers in the third Contracts for Difference allocation round. p2

Outage at Hornsea 1 sparks blame game mega-farms in Norway Last month’s power outage at Orsted’s 1.2GW was caused by its Norwegian developer Fred heights of 200 metres and energy regulator NVE next to a similar timeline to turbines “incorrectly” shutting down as Olsen Renewables has taken rotor diameters of 140 to year if the developer secures Hoyanger, the source said, ISSUES protection systems responded to a dip the wraps off early-stage 160 metres will be deployed, public support from the and plans are again based in the network’s voltage, according to a proposals to build a pair of depending on how many local Hoyanger and Gaular on 6MW-plus hardware with National Grid report. p3 up to 480MW post-subsidy landowners sign up to the municipalities, the source 200-metre tips and up to mega-farms in its home project, a source said. added. 160-metre rotors. Turbine service wrinkle stalls territory. Fred Olsen has so far Construction is earmarked The company currently installation at 30MW Taranto Consultations are underway penned agreements with for the mid-2020s. has two wind farms awaiting Renexia has pushed back offshore with local communities for around 30 landowners and Fred Olsen is also a licence approval decisions installation at its 30MW Taranto near- the Hoyanger project in the is holding discussions with progressing the Lauvdalsheia from NVE. The 100MW shore wind farm off the coast of Puglia Sognog Fjordane coastal several more. development in Bygland in the Laksefjorden and 100MW in south-east Italy. p5 county in western Norway. A wind farm licence southern coastal county of Digermulen are both located Between 40 and 80 application could be Aust-Agder. in the southern county of 6MW-plus turbines with tip submitted to Norwegian Project teams are working Telemark. Publication dates; OFFSHORE Surprise switch to Spain for Penguin wave project Finnish wave developer Wello Clean Energy from Ocean is to install its latest Penguin Waves-backed project, which Partners hoist ‘for sale’ sign device at Spanish marine test consisted of three Penguin at 396MW Merkur p7 centre Bimep after an EU- machines to be installed at Readership backed project off EMEC by 2020, has ended. p2 Mayflower pegs investment was terminated. The developer was granted levels to US bid power price The around 1MW Penguin €17m of Horizon 2020 p10 WEC2 unit will shortly be funding by the European Ambulance chasing offshore towed to Bimep’s grid- Commission in 2015 for the Costs squeeze driving culture of hair- connected site in Armintza array scheme. trigger damages claims across supply in the Basque region for The company installed a chain. deployment this autumn. prototype device at Billia Croo Two-page Focus starts on p11 The device is currently in March 2017 that sank in moored off Hatston on the March this year. Orkney mainland awaiting Paakkinen said Wello has NEWS transportation to Spain. secured funding from Basque Slo-mo grid offers pile on The machine was shipped energy agency EVE for the RESS stress in p4 to Scotland in July from the installation and operation of Advertising Netaman fabrication yard in the machine at Bimep. SSE takes second bite at the Estonian capital Tallinn for “This new project has the 100MW in Highlands p8 installation at the European potential to set in motion Vattenfall puts suppliers on Marine Energy Centre’s Billia more projects in and around CUTTING THE RIBBON: EDF Renewables has inaugurated notice over human rights Croo test site. the area with many parties its Contract for Difference-backed 177MW Dorenell wind p9 Wello chief executive Heikki already showing interest in farm near Huntly in Moray, north-east Scotland, featuring Berlin hinting at 5GW Paakkinen was unable to developing the site further,” 59 V105-3MW turbines with tip heights of 126 specifications p3 offshore target boost p15 state why the developer’s he claimed. metres Photo: EDF Renewables Inspired by renewable energy. www.innogy.com

PORT AGENCY & STEVEDORING SERVICES IN ALL IRISH PORTS 25 JULY 2019 n WWW.RENEWS.BIZ

Contact: Keith Wiggins, Commercial Manager T: +353 (0)1 819 2622 E: [email protected] www.doyleshipping.ie SPECIAL IRELAND SPECIAL REPORT 2019 REPORTS Media Pack Publication dates; Exclusive business information on the renewables industry Readership p2 Dawn of a new era Our approach to news uses reNEWS, real-time news customised daily alert service a content-rich and highly Advertising in Ireland multiple digital platforms, website www.renews.biz, and coverage at key industry targeted media proposition specifications p3 200m+

Lidars are the backbone of onshore wind measurements. From wind resource including our flagship a number of in-depth events with our Live@ Digital for advertisers. Can you afford assessment and construction monitoring through to permanent mast replacement. fortnightly digital newsletter special market reports, a Dailies. All these provide to miss out? ONLINE ADVERTS Advert placement Adding Value through Experience opportunities; www.owcltd.com Advertising 10 April 2019 LiVE @IF19 ew or wants to pic industry brains WEDNESDAY’S Industry has a central role to play in HIGHLIGHTS specifications p4 E EEALE EE ES „ ISSE EESI helping New ork authorities plan how Hard work starts TIS EEK to reach the states new 9GW by 203 SSE eyeing 1.6GW installed capacity target, according to 1<6(5'$ p2 aing ports shipshape Competition or cooperation? Using -DFNXSFKDUWHUȴUVWIRU for US suppliers European examples, this session 6LHPHQV*DPHVD2 0 has chartered ackup Irish R΍VKRUH duo OE is going all out to The supply chain must explores how US ports could cooperate 3DFLȴF2UFDWRFDUU\RXWWKHEXONRI SSE Renewables is in the is a 444 square-kilometre play. The areas were chosen WKHWXUELQHVXSSOLHUȇVRSHUDWLRQVDQG early stages of developing DUHDVRPHNPR΍FRXQWLHV following a phased site ΍VKRUHZLQGWHFKQRORJ\ mae leasing easier innovate to keep pace with to ensure each can play its best role to PDLQWHQDQFHLQ(XURSHDQZDWHUVRYHU WZRPDMRUZLQGIDUPVR΍WKH Dublin, Meath and Louth. selection process in Ireland LVHYROYLQJWRPHHWWKH The Bureau of Ocean Energy the rapid growth of the US VXSSRUWR΍VKRUHZLQG WKHQH[WPRQWKVp2 coast of east Ireland. 66(KDVLGHQWLȴHGWZR that included resource and 2GHPDQGVRIDGHYHORSPHQW Daily Foreshore lease potential cable landfall constraints analysis. Public FRPPXQLW\IRFXVHGRQUHGXFLQJ Management is committed to R΍VKRUHZLQGLQGXVWU\DQG Empire 2, 9.00am-10.00am (VWDEOLVKPHQWSHUPLWELGIRU DSSOLFDWLRQVKDYHEHHQȴOHG locations around Balbriggan consultations are due to start WKHOHYHOLVHGFRVWRIHQHUJ\DQG VXSSRUWLQJWKHR΍VKRUHZLQGVHFWRU overcome multiple challenges, 0:)XKDLR΍7DLZDQ with authorities in Dublin to in Dublin or north of Clogher in the coming weeks. WDFNOLQJQHZPDUNHWV 7DLZDQ*HQHUDWLRQV&RUSRUDWLRQbKDV carry out site investigations Head in Louth. The new sites take SSE’s 7KDWSURJUHVVLVFDWDORJXHG and is working on a series of policy IPF19 has heard. DSSOLHGIRUDQHVWDEOLVKPHQWSHUPLW for the 800MW Braymore Celtic Sea Array covers SLSHOLQHRIR΍VKRUHSURMHFWV in the reNews 2΍VKRUH7HFKQRORJ\ PHDVXUHVWRVWUHDPOLQHOHDVLQJ p3 Liz Burdock, CEO of Tale o the red tape IRULWV0:)XKDLZLQGIDUPR΍ Point project to the north and an area of 689 square in the country beyond 2GW.

SPONSORED BY LIVE@ 26 June 2019 LiVE @ GLOBAL OFFSHORE WIND 2019

Official Digital WEDNESDAY’S HIGHLIGHTS News MeDia PartNer Scaling up is sector’s Done deal per year £100m fitness regime for Orsted, MHI Vestas, , Innogy, UK supply chain players Siemens Gamesa and Baroness Brown The Offshore Wind Growth Partnership next great challenge of Cambridge discuss how the industry for the offshore will kick off a full-scale review of the UK The offshore industry has will deliver the UK offshore wind DIGITAL supply chain to identify the areas with advanced significantly over sector deal. the best potential for expansion. p2 recent years but has yet to Platinum Suite — Stream A, reach full maturity, Global 09.30-10.45 Offshore Wind 2019 was told. Executives grapple with Key speakers at the London .biz equality questions event said supply chains Float on A striking gender imbalance is will have to become more What can we learn from operational preventing the global offshore sophisticated if the sector is floating projects and what’s next in wind industry from reaching its full to successfully lead the global the growth of this critical technology? potential, GOW 2019 has heard. p3 energy transition away from Equinor, Innogy, DNV GL and Crown news fossil fuels. VITAL ASSETS: Offshore wind wind we can tackle global warming Estate Scotland discuss. DAILIES MHI Vestas chief executive is on track to become a key weapon and deliver a great industry and jobs.” Platinum Suite — Stream A, Orsted signs up to Atlantic Philippe Kavafyan argued in the fight against climate change, Pinchbeck added that the UK’s 11.30-12.30 cable repair co-op the next phase of growth will according to RenewableUK deputy 30GW by 2030 sector deal will entail wind sector Orsted has signed a framework have to come predominately chief executive Emma Pinchbeck infrastructure investments of £46bn. deal with Global Marine Group for from developing existing (standing). Also pictured on the opening A view from the boardroom wire repairs at UK offshore wind technology more efficiently. She told delegates during the session stage (seated, left to right) are Broadcaster Emma Howard in farms that will be will be conducted “I really don’t think the opening GOW 2019 session the Iberdrola global business offshore conversation with Orsted UK director via the Atlantic Cable Maintenance challenge is innovation industry can also spur economic managing director Jonathan Cole, Matthew Wright. Agreement. p4 or the cost of energy. We growth. “For years we haven’t talked Equinor New Energy Solutions Innovation Theatre, 11.40-12.00 need to scale up. What our about the climate change case for this executive vice president Pal Eitrheim, industry should really think business but politics now has woken MHI Vestas chief executive Philippe THE INTERVIEW about is how we can simplify up to the level of that challenge. Kavafyan, Offshore Renewable Energy Go west everything we do and do “We have to do more than we Catapult test and validation director The US-based Business Network for Introduction; more of it.” thought. If we invest in climate change Tony Quinn and Innogy director of Offshore Wind hosts a series of quick- Today, Equinor senior vice president Wind turbines have yet technologies and invest in future offshore wind investment Richard fire presentations on the supply chain of wind and low carbon solutions to become “the backbone technologies like floating offshore Sandford. Photo: reNews opportunities in the US market. Stephen Bull. p5 of electricity supply” like Innovation Theatre, 12.00-12.30 industrial gas turbines did in that can be achieved through Pal Eitrheim, executive vice the 1980s and 1990s, said research and development.” president at Equinor’s New Comprehensive Government going for Offshore Renewable Energy Innovation is a “huge part” Energy Solutions division, Scaling up exports gold Catapult test and validation of the future that extends to said floating wind will be the A panel of experts from companies International Trade Secretary Liam director Tony Quinn. improving operations and industry’s “next big thing”. including Siemens Gamesa discuss the Events & dates; Fox has urged UK companies to take “I don’t think we are there maintenance functions using “But we need our suppliers latest offshore wind turbine technology advantage of government support to yet with wind,” he said. “We drone technology, said Innogy on board and we need to put trends. help win export orders in the offshore are an immature industry. We director of offshore wind our efforts into reducing the Platinum Suite — Stream C, wind sector. p6 have got fantastic benefits investment Richard Sandford. cost base.” 15.30-16.30

innogy. A global leader Advertising in renewable energy and shaping the future market reports of offshore wind. Rolling news at www.re Make innogy your renewables partner of choice. Find us at GOW2019, at the innogy business lounge, and let’s talk business! specifications p6 innogy.com

Offshore Technology Yearbook OFFSHORE TECHNOLOGY YEARBOOK Introduction; Sponsorship; Advertising specifications p7 2 O19

PROFILES Introduction; Benefits; Annual rates p8

SUBSCRIBERS & Advertising opportunities TESTIMONIALS From ongoing annual campaigns to one-off ads, we can help plan and advise the best campaign to suit specific requirements. For any advertising enquiries please contact one of the reNEWS sales team: p9 Sales Manager Sales & Marketing Executive Sales Executive Tom Allerston Stephanie Partridge Guy Dano +44 (0)1962 849 302 +44 (0)1962 890 468 +44 (0)1962 890 440 [email protected] [email protected] [email protected] 2020 Media Pack REGULAR ISSUES & SPECIAL REPORTS 02 Special Reports In addition to our regular and ‘Global Offshore Wind’. in-depth reporting, we also Advertising in these special publish separate special reports is an excellent way to reports. These features focus ensure ‘being seen’ as they on specific areas of interest are very popular with our Fortnightly within the renewables readers. industry and include For publication dates ‘Scotland’, ‘OTY’, ‘Ireland’, please see below.

Digital Newsletter Scotland OTY Established in 2002, the Europe, following projects Throughout 2020, reNEWS 19 March 11 June

reNEWS digital newsletter is from planning to construction Premium will also be 21 MARCH 2019 n WWW.RENEWS.BIZ

regarded as a leading source and operation. comprehensively covering the SCOTLAND SPECIAL REPORT 2019 of information on offshore It is published twice a global onshore & offshore wind and marine renewables month, 24 times a year via wind, energy storage and Scotland comes in in Northern Europe and email. For a list of publishing wave & tidal markets through from the worldwide, and for onshore schedule dates please see a selection of dedicated cold wind in the UK, Ireland and below right. features. Promote your presence If you haven’t seen a copy of prior to industry events such reNEWS Premium why not take a as Energy Storage Europe, free trial to receive 3 free issues! IWEA Annual Conference, Wind Data as a Service. Lidar rental, field services, fleet management, power systems and more. Based in Scotland, supporting Scottish wind. Ocean Energy Europe and many more! Readership by sector Ireland Global Offshore Wind 16 July 19 November reNEWS is a paid turbine manufacturers,

PORT AGENCY & STEVEDORING SERVICES IN ALL IRISH PORTS subscription based model. marine technology reNEWS 25 JULY 2019 n WWW.RENEWS.BIZ 22 NOVEMBER 2018 n WWW.RENEWS.BIZ RENEWLEGAL.COM [email protected]

Contact: Keith Wiggins, Commercial Manager T: +353 (0)1 819 2622 E: [email protected] www.doyleshipping.ie The newsletter is not sent companies and those in the PREMIUM IRELAND SPECIAL REPORT 2019 GLOBAL OFFSHORE WIND REPORT 2018 to individuals who do not services industry. January order it, therefore marketing As we offer a free trial 9 23 Riding the tailwinds material is neverReadership Figures ‘wasted’ on of reNEWS, allowing an February non-readers. individual to request three 6 20 Dawn of Onshore & Offshore Wind Developer As a premiumConsultancy content free consecutive issues Governing Body a new era March 5 19 in Ireland Marine Technologies publication,NGO's / Industry AssociaIon reNEWS is read over a two-month period, Onshore Wind Developer by senior decision-makers advertisements will not only Offshore Wind Developer in the windServices and marine be seen by paid subscribersTurbine Manufacturer April 2 23 200m+

Lidars are the backbone of onshore wind measurements. From wind resource Like the wind, technology evolves. UIlity industry. Contractor / Supplier but also by these trialists. Other / Academia assessment and construction monitoring through to permanent mast replacement. Our Lidars are bankable and now also IEC Classified. Click. Our readership includes The reNEWS readership May 7 21 utilities, developers, is broken down into the June 4 18 contractors, consultancies, following main sectors (key 05 OFFSHORE 25 July 2019 government bodies, NGO’s, follows clockwise direction): IRELAND 08 12 September 2019 are expected to be fully operational PPAs pushed centre stage within the next two months. IN BRIEF The National Renewable Energy HEADLINE ACT: GE Renewable n Marine contractor DeepOcean Laboratory will assess the potential of Energy’s Tullahennel project – shared mooring lines to reduce the n Tekmar Energy has been chosen one of only two corporate PPAs he Irish wind sector has warned has begun laying the export cable the market faces challenges July need for anchors to outer turbines by installation contractor Jan De Nul to signed to date electricity from the operational 37MW 2 16 Turbine service for EDPR’s WindFloat Atlantic project provide cable protection systems for Photo: GE Renewable Energy to meet an ambitious 2030 and so slash costs. T Tullahennel in County Kerry 20km off the coast of Viana do Castelo Taiwan Power Company’s 109.2MW government target that calls for However, developers point out that in in Portugal. Ocean Yield vessel hundreds of megawatts of projects Earlier this year, Invis Energy(pictured) and . n More than 400 businesses have Changhua wind farm off the coast Ireland consenting is more challenging Connector is carrying out the work for backed by corporate power purchase US tech giant Amazon signed the joined New Jersey’s offshore wind of the Asian island. The UK company and development costs are higher, wrinkle stalls Portuguese grid operator REN. agreements (PPAs). second, for electricity from the 91MW supply chain registry since it launched will provide its TekLink Generation 8 Meenbog, expected online in 2021. whilst projects backed by support Contractor Bourbon Offshore will Industry insiders say diverging less than six months ago. technology for array and export lines. The terms were not disclosed but schemes bank €80/MWh-plus for shortly tow out the first WindFloat expectations between operators and 15 years. platform and associated MHI Vestas off-takers is the key stumbling block to experts say corporates are currently installation at n Dutch foundations fabricator Sif “There are a small number of off- 3% n Turbine manufacturers and asset offering wind farm owners short-term 8.4MW turbines for installation. such deals, which are to account for owners have formed a North America has opened a sales office in Japan. takers in the market and to date the 15% of the total 12GW of renewables deals of between three and 10 years committee under the auspices of the The Tokyo base will be the first terms are shorter than the generators n Semco Maritime will shortly capacity expected online by the end at power prices in the region of €40 produced five of the project’s Global Wind Organisation to optimise point of contact for offshore wind want… a generator needs a term of 30MW Taranto formalise a partnership with a local of the next decade under Dublin’s per megawatt-hour. August 10 years minimum,” said Dublin law 10 monopile foundations supply chain and talent recruitment developers active in the region, the 6 20 Italian developer Renexia has company to enhance provision of climate action plan. The pricing is driven largely by 8% featuring integrated transition from certified training providers. company said. the PPA boom in the Nordic market, firm ByrneWallace head of energy and pushed back offshore marine engineering services for US Just two onshore wind corporate pieces at facilities in Bilbao, Singapore fabricator Sembcorp natural resources Gavin Blake. installation at its 30MW offshore wind farms. The company PPAs have been signed to date. where rates have been driven northern Spain. n Virginia utility Dominion Energy Marine has been awarded a contract Experts predict the new auction- Taranto near-shore wind farm has been working with a US-based The first, in 2017, was between GE by falling state supports and a The first units are expected is to reinvest money raised from rate by Jan De Nul to fabricate 15 based system RESS will give a more off the coast of Puglia in the consultancy on the Vineyard Wind Renewable Energy and Microsoft for progressive planning regime that to sail from the yard at the jacket foundations for the 378MW realistic cost of energy for Irish wind south-east of the country. project off Massachusetts and other overcharges in its $300m, 12MW allows next-generation turbines to end of November. Formosa 2 wind farm off Taiwan. but believe off-takers will still need to Work was due to begin recent project bids. Coastal Virginia offshore wind pilot, push down energy costs. MPI Offshore will mobilise put better terms on the table. this month but has been “We are overlaying (power which is due to be installed starting its jack-up Resolution in n Dutch wind engineering Despite the challenges, there is 22% postponed until December transmission) experience with knowledge in spring 2020, along with other Rotterdam later this year consultancy Pondera and South reason for optimism. Lawyers and due to ongoing insolvency about regulations, standards and initiatives. for the job of installing Korea’s Hanmi Global have been consultants report an uptick in activity proceedings at turbine permitting issues relevant to the US September foundations and turbines. n First power has been delivered appointed joint owner’s engineer in the last six months. The number of supplier Senvion. market,” said offshore technology N149/5.X 3 17 Water depths are as little as by the consortium developing the off-takers is growing, driven largely by Project sources said the from the 120MW Formosa 1 phase director Tommy Flindt. 100MW Jeju Hanlim wind farm off the tech companies that are responsible German company has already four metres in places and will two wind farm off Taiwan. Six call for a bespoke installation coast of the Asian nation. HIGHLY FLE for building a wave of power-hungry manufactured the 10 3MW n The US National Offshore Siemens Gamesa 6MW turbines have XIBLE SITEABILITY approach. started generating with a total of data centres due online in the coming machines that will feature at Wind Research and Development news.biz 5 MW Taranto must be online re + POWER OUTPUT years, and so-called tier-two heavy Taranto but the developer Consortium has selected a floating 10 machines installed, according to by July 2020 to qualify for a UP TO 17 % HIGHER AEP energy users such as agri-food needs to lock in a new service project for its first R&D technology project partner Orsted. All 20 turbines €161.70 per megawatt-hour 5.X companies. agreement for the hardware award, which is valued at $300,000. MW Several developers may opt to hitch before installation can begin. feed-in tariff and €40/MWh their wagons to corporate PPAs as a Basque fabricator grid connection premium. way to avoid the uncertainty of RESS Haizea Wind Group has auctions. According to Natural Power October 8 22 country director Marc Lamphiere, 13% such a move makes sense. “If you are a developer, spending cash ahead of a (RESS) auction is a 5.4 MW 5.6 bit of a lottery. If you have a reliable MW partner that is committed to buy megawatts, you can develop broadly speaking around a certain price,” he said. 5.1 The picture on corporate PPAs will Team up for success MW become clearer once the detailed November design for RESS is published, which 5 19 Seaway Heavy Lifting (SHL) and Seaway Offshore Cables will allow developers to settle on long- (SOC), both companies in Subsea 7’s Renewables & Heavy term strategies. However, unlocking Lifting Business Unit, provide EPCI, T&I and Integrated the 15% by 2030 target may need a Services to the offshore energy sector. SHL performs the helping hand from government. transportation and heavy lifting of offshore structures and Dublin has said it will work with SOC manages and performs marine cable installation, IDA Ireland, the national agency trenching activities and related IMR services. responsible for attracting inward EVEN MORE FLEXIBILITY. investment, and a new industry This combination of SHL, SOC and Subsea 7’s people, advisory group to be established by the Sustainable Energy Authority of strength, experience, vessels and facilities provides Clients EVEN MORE POWER. Ireland to develop “effective policy with a uniquely capable partner across a wide array of December tools” for PPAs. 3 17 services The next step in the evolution of Delta4000 Gavin Blake believes some form of state guarantee may be required to give comfort to the PPA equation. nordex-online.com www.seawayheavylifting.com Another senior source added: “If www.seawayoffshorecables.com we can streamline the development 12% process and cut costs to support driving energy prices down there are corporates out there willing to do deals. How fast that can happen is anyone’s guess.” n

Power Purchase Agreements RENEWS.BIZ Visit our website RENEWABLE ENERGY NEWS n ISSUE 412 25 JULY 2019 18% THIS WEEK Scotland redrawing To avoid disappointment,

GE shows off first nacelle for offshore leaseand NE9. The formermap contains 12MW Haliade-X turbine Kirkcudbright Bay and Holyrood ministers are high risk constraints including GE Renewable Energy is hot on the trail features potential constraints mulling an updated draft of a shipping route while the he Irish wind industry is of orders for its new 12MW Haliade-X from herring spawning Marine Scotland’s offshore latter is a low risk area next to embarking on a new era of offshore turbine after unveiling the first grounds, Ministry of Defence wind sectoral plan that the consented 850MW Moray growth thanks to unprecedented nacelle for the platform this week. p2 use and proximity to a special T includes new areas of search West wind farm. high-level policy backing from the protection area. and several redesigned zones. Farther south, one area government. Onshore developers secure your advertising 4% Herring also affect SW2, Naked ambitions in 7GW UK Two sites in the outer Solway of search with sub-60-metre are collectively working on a multi- offshore wind auction off the south-east tip of the Firth off the south-west coast waters in the outer Firth of gigawatt pipeline to reach an 8.2GW The Crown Estate has modified a Mull of Galloway, with visual have been included in the Forth has been omitted and capacity target by 2030 and offshore controversial ‘highest-bid’ tender impacts and commercial latest blueprint that has been others nearby remodelled. players are refining 10GW of projects design as part of a new three-stage shipping among the other sent for approval, according Concerns over seabird after Dublin for the first time set a process unveiled last week for the identified risks. to sources. populations as well feedback sector goal of 3.5GW by end-decade, upcoming 7GW Round 4 UK offshore Both Solway Firth zones, news Ireland 2019 The zones have the from fishing representatives as detailed in the re wind auction. INSIGHT p9 which were not in an initial potential to support fixed- are the chief reason for report out today. Subscribers who do draft published last year, bottom projects of 500MW to the changes, according to not receive their copy should contact 1% have been identified following Empire-builder Equinor 750MW given water depths sources, who added the [email protected]. industry feedback highlighting launches US gravity-based former issue will make space now in any of of less than 60 metres, it is 3% foundation design race a lack of fixed-foundation understood. Analysis carried development challenging. Equinor has issued invitations to opportunites in the earlier “We anticipate that formal out for Marine Scotland has The latest draft plan, which tender for the design of gravity-based document. adoption and publication of categorised both locations as will establish acreage to be foundations that will feature at its Senior development the final plan... will take place medium risk. made available in Crown 816MW Empire Wind project off the US sources said the acreage is in 2020,” he added. The first, dubbed SW1, Estate Scotland’s upcoming east coast. p13 among the best for offshore Crown Estate Scotland is is located due south of ScotWind leasing round, is wind in Scotland but will be due to pre-launch the multi- expected to be published in 2% tough to develop, chiefly due gigawatt leasing round by the The next issue of renews October. 7% to visual impacts and public end of the month. will be published on A government spokesman opposition. The process will include a 15 August 2019 said “ministers are currently 7% The updated draft also chance to examine indicative these publications by considering... options” and includes a redesign of sites drafts of offer documents as Holyrood is aware of “some OFFSHORE potentially suitable for fixed- well as guidance notes on the developers’ concerns” foundation deployment on application form, according to Local players to take strain around the availability of the east coast such as two a spokeswoman. on foundations off Vietnam fixed foundation acreage. p4 areas in the Moray Firth, NE8 US planners give Vineyard source. Union representatives sore head over power cables BiFab looks setunderstood. to get BiFab slice owner DFof the Neart pie BiFab is in advanced talks in Scotland said, however, that p6 TREE-HUGGER: The first Barnes said it is “cautiously Onshore & Offshore with Saipem over the supply a contract for eight jackets turbine has been installed Offshore starter for eastern optimistic of success”. at Engie and Susi Partners’ of eight jacket foundations will be a “paltry return” for the Mediterranean diet “We are working flat out to CONTACTING THE SALES TEAM for EDF Renewables’ 450MW local supply chain. starts on p10 200MW-plus Tonstad wind secure additional work for our Two-page Focus wind farm BiFab has meanwhile farm in Norway featuring (Methil and Burntisland) yards off east Scotland. reopened its Methil yard to Wind Developer NGO’s / Industry Association Turbine Manufacturer 51 Siemens Gamesa in Fife. We believe discussions Discussions between ensure the company meets 4.1MW machines. Three are heading in the right NEWS the Scottish fabricator and an end-of-year schedule for units will be downrated direction,” said a spokesman. Lofty ambitions for turbines preferred lead foundations the delivery of pin piles for the to reduce noise. Norsk A signed deal would secure at SPR extension in Scotland contractor are progressing 950MW Moray East wind farm Hydro is buying the output the employment of several p3 positively although a final off Scotland. to power aluminium hundred staff, according to a Dutch auction last chance to production. Photo: Tonstad Vindpark deal is some weeks away, it is Consultancy Onshore Wind Developer Utility win SDE+ supports p5 LIVE by providing a Watch our offshore wind project videos Offshore Wind Developer vanoord.com/wind Governing Body Contractor / Supplier sustainable future Marine Technologies Services Other / Academia 2020 Media Pack REGULAR ISSUES & SPECIAL REPORTS 03

22 October 2015 WIND 03 19 November 2015 NEWS 08 19 November 2015 GLOBAL OFFSHORE 09 19 November 2015 MARINE 07 said. SPR is also ROUND 3 RUNNERS AND FALLERS EDF timeline pushing on with its Nova Scotia IN BRIEF IN BRIEF 08 Project MW Developer Consent milestone NEWS SHORTS East Anglia zone. Vestas finds 1200 RWE Abandoned November 2013 Wavepower staffs up to n Buccleuch Estates and 2020 Nordex gets hands at Beck Burn n The renewables unit of German n Siemens’ wind and renewables pre-tax profit of €36m, up from Plans for the 1.2GW EA3 are said to be n Vattenfall has sold 19 Danish wind sowing the Renewables are fine-tuning plans EDF Energy Renewables is utility EnBW has posted an adjusted business posted a profit of €72m in its €22.8m in the year-ago period, on the “progressing incredibly well” with the Dogger Bank Creyke Beck A&B 2400 Statoil, Statkraft, RWE and SSE Consented February 2015 farms featuring 88 turbines to Green for the up to 168MW North Lowther to start construction at its EBITDA of €156m for the first nine fiscal fourth quarter versus a loss of back of a 50% jump in sales to €685m. developer looking to lodge a consent Dogger Bank Teeside A&B 2400 Statoil, Statkraft, RWE and SSE Consented August 2015 Power Partners for an undisclosed seeds for a AA months of 2015, up 7.4% on the €60m in the same period last year. A The manufacturer said its takeover of Energy Initiative, a wind farm complex nine-turbine Beck Burn wind an extra turn application in the “near future”. Dogger Bank Teeside C&D 2400 Statoil, Statkraft, RWE and SSE Discontinued and handed seabed back to Crown Estate in August 2015 sum. The 65MW disposal is part of find winning technology 19 NOVEMBER 2015 RENEWABLE ENERGY NEWS n ISSUE 324 RENEWS.BIZ in Dumfries and Galloway, Scotland. on 72MW Irish prize farm in Cumbria in the second year-earlier period. Onshore wind slight drop in onshore turbine orders Acciona, expected to be completed in Construction will launch two to three the Swedish utility’s strategy to focus tidal power Somerset marine developer for prototype deployment learn from it and improve the East Anglia 1 714 SPR Consented June 2014, due online 2020 farm production and the ramp-up of was offset by growth in the services 2017, will result in a 15% to 18% cut THIS WEEK The partners held a second round Nordex has secured a so the swap will come at the Infrastructure Development quarter of 2016 to meet the years after a positive decision, if given. East Anglia 3 1200 SPR Application filed to the Planning Inspectorate in November 2015 on “larger” wind projects. Wavepower Technologies is in 2016. Possible test sites next concept,” he said. Senvion on verge of maiden EDF turns of public exhibitions in recent weeks 29-turbine supply deal cost of 14.5MW in headline site lies to the east of the Renewables Obligation cut-off the 288MW Baltic 2 offshore project business. in the cost of energy by 2018. The wind farm is expected to beanfeast seeking to hire 15 engineers include Falmouth’s FabTest, Rubie-Todd said of speed in East Anglia 4 1200 Vattenfall PINS application expected to be filed in fourth-quarter 2016 Irish victory to showcase a 42-turbine layout north for West Clare Renewable capacity. semi-state developer’s of March 2017. compensated for the negative impact feature up to 172 7MW-plus turbines n Vestas won an order from China’s Nova Scotia’s government has to support plans to deploy Wales’s South Pembrokeshire Wavepower is driven by cost the tables of run-of-river plants, EnBW said. n Nordex banked a third-quarter news Hornsea 1 1200 Dong Energy Consented December 2014, due online 2020 Senvion is close to landing its first EU grant opens of Wanlockhead based on hardware Energy’s 72.5MW Slievecallan Eight Nordex machines operational 84MW Mount The developer is understood re .biz in the northern half of the lease area Hanas for 25 V110-2MW turbines. reaffirmed its commitment to a prototype device off the wave site, Orkney’s European of energy and maintenance ever Irish supply contract with MM82 EDF Energy Renewables and of between 3MW and 4MW. wind farm in the west of have meanwhile been officially Lucas project. to be in talks with two turbine off Lowestoft. Hornsea 2 1800 Dong Energy Under examination by PINS, consent decision due March 2016 The Danish manufacturer will supply tidal energy in the Canadian British Isles next year. Marine Energy Centre and rather than the best turbines in the final shake-up at two partner Force 9 have been Feasibility studies have reduced Ireland. inaugurated at ESB’s 20MW suppliers, including Vestas, for new turbines EA3 will be linked to Bramford Hornsea 3 1200 Dong Energy PINS application expected to be filed in first-quarter 2016 the hardware to the Wanglejing province’s Electricity Plan The company will boost its Ireland’s Galway Bay. hydrodynamic efficiency. Galetech Energy wind farms. p2 given the all clear on appeal the project from an initial up to 140 The contract has yet to Woodhouse wind farm in n Provento Ireland has the project near Solway Moss. Vestas is to offer its coming added. Vestas is upgrading in Suffolk via 140km subsea export Moray 1100 EDP/Repsol Consented March 2014, awaiting next CfD round Niujijuan wind farm in the Ningxia Hui 2015-2040. 20-strong engineering team Wavepower co-founder “We’re not looking at Lower costs to build the seven-turbine turbines. Further consultation is be signed but an agreement County Waterford, which appealed against local A consent variation will allow 3.45MW Class 1 and 2 its 3.3MW onshore turbines cables and 37km underground wires. Navitus Bay 970 Eneco/EDF Rejected by Secretary of State September 2015 autonomous region next year. Officials aim to have to 35 with positions available and chief executive David oscillating water columns.” Craigton and Spittalhill wind planned ahead of an eventual Section for 2.5MW N90 machines features a mix of N80 and authority rejection of its models with a blade length of turbines, currently being to 3.45MW across all wind A converter station will be required to up to 22MW of capacity for electrical, mechanical, Rubie-Todd said the company The longer-term aim to unlock new horizons at Rampion 400 Eon/GIB/Enbridge Final investment decision May 2015, expected online 2018 10GW UK farm near Stirling in Scotland. 36 application. is in the bag, according to N90 hardware. 12MW Crilly wind farm on the up to 51.5 metres. upgraded from the 3.3MW regimes to increase energy change DC power to AC. n RWE Innogy recorded a “marked in production or active design, modelling and tank has whittled down 250 device is to be both a device Rhiannon, Irish Sea 2200 Centrica/Dong Abandoned 2014 offshore Holyrood officials this week local sources. Construction is John Sisk and Sons and the Donegal and Tyrone border. EDF will launch a tender for platform, in an optional power performance by up to 12%. Vattenfall’s 1.2GW EA4 project improvement” in earnings in the first development by the early testing specialists. New concepts to a “handful”. manufacturer and site Seagreen A&B 1050 SSE/Fluor Consented October 2014, in limbo prize, says overturned local authority n ABO Wind has applied to Perth expected to get underway in Kirby Group were responsible civil engineering works when a mode of up to 3.6MW for the The V105, V112, V117 and in the north of the zone, which is three quarters of the year, boosting 2020s in the Bay of Fundy. offices are currently under “I hope to have some developer. Rudd rejection based largely on and Kinross Council to build the 2016 with awards imminent for civil and electrical works at n Galetech Energy has turbine deal is finalised, which highest-speed onshore sites V126 are being improved via also in the Planning Inspectorate the operating result €251m year on Progress toward large- construction in Glastonbury. sort of test in the sea next “Our dream is to make Energy Secretary Amber Rudd has Scotrenewables visual impacts. The wind farm 11-turbine Green Burn project near for electrical and civil the project. won consent for a revised is expected to be next month. such as those in Scotland. a combination of larger rotor system, is expected to require four also be responsible for installation number of elements with the offshore is due to end on 3 March. The year to €280m largely due to the scale deployment will follow Wavepower, which claims year,” he said, adding that commercially viable wave sketched plans for up to 10GW of near the Carron Reservoir Alyth. engineering packages. substation at its consented The developer is working to The Danish manufacturer sizes, optimisation of load 160km seabed export cables and from 2019 and ongoing operations substation the subject of a “flexible government then has a further six commissioning of the 576MW Gwynt y passage of the Marine to have £50m of backing from the company will likely energy devices, build out new offshore wind post-2020 with at Orkney tidal device developer will be installed next to the from the Horizon 2020 will feature turbines of up to The site, next to SSE’s operational West Clare is linked with n Bord na Mona has kicked 23MW Carrickallen wind farm meet the remaining planning said the boost would be carrying structures, optimised 37km underground links running and maintenance services. Ramboll is approach” that could result in a months to make a consent decision Mor wind farm off Wales and 295MW Renewable Energy Act and the private investors including deploy a variety of different projects ourselves and sell least three competitive rights auctions Scotrenewables has bagged first device, which is due to Competitive Low Carbon 125 metres and top power is 36.8MW Drumderg wind farm, would Craydel Group as well as a off consultations with An in Cavan. Project construction conditions imposed by achieved by operating power converters and control to an onshore converter station at designing foundations. number of awards. but Statkraft and development Nordsee Ost off Germany. setting up of a new area for chairman and Pensions technologies before deciding electricity. planned over the next four years. p3 approximately €10m in be deployed shortly at the Energy Call 3 with sign-off expected to be 21MW. feature 3MW hardware with tips of up number of local landowners. Bord Pleanala ahead of will start next year. Carlisle City Council. the hardware at a slightly system changes. Bramford. SPR kicked off a number of major The majority of deals will be in partner RWE are said to be confident commercial projects. Direct founder Adam Norris, on a device to take to market. “If can have kit in the water funding from the European European Marine Energy imminent, according to EDF is elsewhere preparing to 126.5 metres. Emma Tinker of HgCapital sits an application for the up higher tip speed to achieve The new control system tendering competitions in July for place by February 2016, the Scottish of a positive outcome. n Envision Energy has appointed The plan also states that said the enlarged team “I’m expecting us to put generating power by the end SPR bid to lift Union’s Horizon 2020 R&D Centre’s Fall of Warness test sources. to file a Section 36 application on the board. to 30-turbine Cloncreen an increased nominal significantly increases input n the run-up to 2020, SPR is packages including array cable supply developer said. The up to 288-turbine wind fram Skanska to manage construction new sector research funding will develop one or more something in the water and it of the decade supplying clean wind complex to 112MW programme to build and site off Orkney, by the end of Development partners for its proposed Fallago Rig 2 n SSE has updated plans for an Slievecallan was originally wind farm in County Offaly. power rating within existing and outputs for a flexible steaming ahead with its 714MW and installation, and foundation Statkraft’s 900MW , off is scheduled to be logistics at the Kafjarden wind farm in will be available from the as-yet-undecided wave not work, so we’ll do it at low energy in the UK that would ScottishPower Renewables has filed to I deploy a next-generation the decade. They will share include Irish tidal project project in the Scottish HVDC interconnector between the based on Vestas V90 turbines The expected Strategic certifications. and future-ready set-up, the EA1 project. The developer said supply and installation at the Round the last Round 2 project still in built in a single rolling phase with first Sweden, which will feature four of the Department of Energy to energy converter concepts cost and relatively quickly to be awesome.” build an ‘old school’ third phase at its floating turbine. the same export cable. developer DP Energy, Belfast Borders. The 12-turbine Scottish mainland and the Outer Chief product manager company claimed, adding construction of the £2bn offshore 3 project. development, is also quietly getting on power by 2020, although a final layout Chinese company’s 3MW turbines and leverage private funds and Beinn an Tuirc wind farm. p9 The Stromness company The second turbine is to shipyard Harland & Wolff and extension with tip heights of Hebrides with the western terminus Jan Hagen said the higher the ethernet-based product wind farm will gear up in 2017 and full Tenders were invited in September with gaining consent for its electrical remains undecided. five 2.3MW units. Envision is also to complement Offshore Energy IN BRIEF will build a medium voltage feature an energy storage mooring outfit TFI Marine, as 126.5 metres will have a top converter station now planned at Developers pull out output requires a trade-off in reduces physical components operations are scheduled for the turn for transmission works including system prior to a planned 2017 Development and construction open a new office in Hamburg. Research Association awards. OFFSHORE version of its 2MW SR2000 system to enhance the well as EMEC. power of 41.4MW and is on a Arnish Point near Stornoway rather terms of a narrower operating housed in the turbine by 40%. of the decade. export and onshore cables and construction start. phases will be delivered by a joint The opening of the n Turin developer Wave for Energy out of the water for maintenance. The in the Indian Ocean. A first stage of Cable switch slows tie-in at machine, to be dubbed project’s overall electrical Scotrenewables’ floating reduced footprint versus an than at Gravir. scissors in Scotland temperature window and Vestas expects to Siemens has been lined up to offshore and onshore substations. The Planning Inspectorate’s ongoing Statkraft-RWE project team managed n French floating foundation Maritime Link interconnector will grid-connect its Inertial Sea cost of the first phase of the Marina di 1MW at a site off the Andaman and Borkum Riffgrund 2 p10 SR2000-MV, it is understood. efficiency and business case. turbine is the second marine earlier 17-machine layout. The subsea cable route has reactive power capabilities. erect a 3.45MW upgrade supply 102 7MW turbines and will These are being broken into a examination of the £4bn development by the Norwegians. n specialist company Ideol and China in late 2017 or early 2018 will Wave Energy Converter by the end of Pisa project is estimated at €200,000. Nicobar Islands will be extended in The new 2MW iteration Funding will be allocated energy project to receive cash also been tweaked as a result. The Willowind has slimmed down Muirden Energy has “We are trying to optimise demonstrator by next Steel are to collaborate on potential allow excess tidal and wind January. Cabling was due to start this phases, reaching up to 30MW. Tender game plan at 900MW REALISTIC under this particular call. project is not expected online until designs for its now-54.4MW meanwhile reduced the size power production on a summer with first deliveries offshore wind projects in Taiwan. power to be bundled with week and is expected to be completed n Bluewater Energy’s BlueTEC Triton Knoll p16 Offshore wind Danish developer end-decade. Linfairn wind farm in South of its proposed West Garty SOLUTIONS TO site-specific basis and we will likely by the end of 2016. for export. by mid-January. The 100kW device floating tidal platform has been n Apple has committed to a €1m Wavestar’s 1MW wave device Ayrshire, south-west Scotland. wind farm in the Scottish be able to tailor it between Hagen said some of the n The Renewables InfrastructureG Additional development was put in place off Sicily in August. upgraded with Tocardo’s larger T2 Ocean Energy Industry Fund to finding its mojo ONSHORE within an offshore wind farm The offshore wind sector is n has launched a third The London developer has Highlands following an ENVIRONMENTAL 3.45MW and 3.6MW,” he said. upgraded components have Group has raised £78m via a share opportunities, including turbine. The 200kW machine has support prototype deployment at in the Belgian is in honing its craft with projects bond with the aim of raising up reduced turbine numbers objection raised by the local “We can have individual already been deployed in issue, positioning it to “take advantage licences and access to Nova n 40South Energy has installed the doubled BlueTEC’s capacity. Ireland’s Galway Bay test site. Up to Muirhall buys assorted AES line to receive around €17m. across the world-leading to £25m to assist in building six from 25 to 17 with tips now council. dialogues with customers operational turbines. of the strong pipeline of attractive Scotia markets, will be granted first of two planned H24 wave energy €250,000 will be awarded each year. wind assets in Scotland p4 ISSUES Scotrenewables’ initial Northern European market renewable energy projects in pegged at 126.5 metres and Turbine numbers at the site about site conditions, investment opportunities currently on a competitive basis. converters off the coast of Pisa, Italy. n Seabased of Sweden has signed Airvolution looks to stretch SR2000 features a 64-metre being built the UK. hardware of up to 3.2MW in near Helmsdale in Sutherland wind speeds, turbulence, n Vestas posted a third-quarter under consideration”. Chief executive Michele Grassi said a memorandum of understanding n Sabella has started generating arms at new acquisition p13 floating hull incorporating in record The company said the projects the frame. have been cut by one to 17. E temperature range, opex net profit of €206m, up from Plato heading testing of the 50kW device would last with New Delhi-based developer power from its D10 turbine near two 1MW rotors mounted on times and in are already in the first stages of Plans for a northern Tips have been lowered from and capex to find the best €102m a year earlier, as n Lightsource Renewable Energy “several months” before it is hauled Seafaradays Energy for a wave project Ouessant island off Brittany. retractable legs. construction and that investors are in is to invest £2bn in the Indian solar for the water MARINE ever more construction compound have 120 to 110 metres. possible solution.” orders rose 50% to 1508MW It is currently undergoing routine line for a return of 5.5% per annum. been dropped while access Planners previously raised The 3.6MW turbines can in the three months. Year-to- sector over the next five years. The Tidal developer Sustainable Wavepower staffs up to find FINAL PREPARATIONS: the developer’s 2MW SR2000 device commissioning by Harland & manner. roads and the amount of concerns about landscape be ordered and delivered on date orders total 6275MW, up up to 3GW campaign is part of a Marine Energy is preparing to winning technology Photo: Scotrenewables p7 is due to be installed at EMEC by the year-end Wolff at Belfast Harbour. Costs n Lancashire County Pension Fund forest felling necessary to and visual impacts from the the same timeline as standard from 4290MW at this stage wider £10bn package of co-operation deploy a 50kW Plato device remain an is taking a minority stake in 500MW accommodate the wind farm project. 3MW platform machines, he of 2014. unveiled last week between the UK at Orkney’s European Marine France hits brakes on Round 3 auction issue although industry is of EDF Energies Nouvelles wind assets have been reduced. Fresh council guidance D and India. Energy Centre. France has delayed its will take place after coming and questioned whether determined to address the in Portugal. Scottish ministers will have will be provided to ministers, SSE flies in wild weather The Isle of Wight company promised Round 3 offshore presidential elections. preparations over the next 18 current upward curve. the final say on the proposal who again will make the final SSE’s renewable energy in construction in the UK on n National Grid has given the is on site and will install renews.biz wind auction until the second Consultation on zones for months will survive likely post- The renews Global Offshore under Section 36 powers. decision on West Garty under generation jumped in the first track to meet the Renewables green light to the use of modular an anchoring system at half of 2017. the around 3GW round will election policy shake-ups. 2015 special report will Section 36 powers. half of the year on the back of Obligation deadline of end- transformer stations at UK offshore EMEC’s Fall of Warness grid- wind farms. Siemens developed Environment Minister kick off in the first quarter of Round 3 is due to feature be sent out separately to 2HSD(CDMSHÖB@SHNM@MC$U@KT@SHNM wet and windy weather in its March 2017 and another connected test bed once it OpenHydro fights the fat n SSE will hold a supply chain core markets. 472MW holding consent. the concept, which places mini- receives a licence from Marine Segolene Royal told the next year on the new timeline. up to six zones and would subscribers later today. $( 2BQDDMHMF@MC2BNOHMF F Costs take centre stage as major tidal European Wind Energy Preliminary technical surveys double the country’s offshore Anyone who does not day for local businesses next Output in the UK and The timing and substance substations atop extended turbine Scotland. turbine deployments loom in Canada Association 2015 conference will follow in the third quarter. wind capacity to 6GW receive the data-heavy month for the 32-turbine $( #DRHFM@MC/QNIDBS,@M@FDLDMS Ireland rose to 3163GWh in of the next Contracts foundations. The first of four Plato devices and France. in Paris this week that the Industry sources expressed assuming Round 1 and 2 are document should contact Bhlaraidh wind farm in the 2S@JDGNKCDQ$MF@FDLDMS@MC,@M@FDLDMS the six months to September for Difference allocation to be deployed at EMEC by n Lekela Power partners Mainstream Two-page focus starts on p11 long-awaited competition disappointment at the delays fully constructed. [email protected] Highlands, where RJ McLeod +@MCNVMDQ+H@HRNM@MC6@XKD@UHMF from 2337GWh in the same round will have particular 2017 is expected to be online and Vestas are the lead period of 2014. Onshore and “implications” for onshore, and Actis have signed a memorandum at the turn of the year. Providing the expertise in the planning, /NRS "NMRDMS2DQUHBDR contractors. offshore wind output was up offshore and Scottish islands of understanding with the Egyptian SME has meanwhile H engineering and installation of offshore wind farms. Full construction at the around 50% while hydro grew wind, the company warned. Electricity Transmission Company for a completed recruitment of wind farm near Invermoriston some 25%. SSE is continuing its asset 250MW wind farm in the Gulf of Suez. seven new members of in the Great Glen is due to Operating profit for the six optimisation programme via staff, including an Orkney- Tel: +44 117 929 5250 Offshore Geoscience Engineering Consultancy C kick off in spring 2016 in time 5HRHSTR@S$6$ /@QHR 2S@MC* months was £702m, up from the sale of operational and n Vestas is planning to build a new based project engineer. [email protected] to qualify for supports under res-offshore.com/eia £530m last time. The utility in-development wind projects blade factory in India. Riff Hutchinson has been www.atlasprofessionals.com www.windcatworkboats.com the Renewables Obligation developer said it has 441MW with up to 300MW still on the appointed production B feasibility • engineering • installation • operation regime. of new onshore wind projects block. renews.biz manager.

19 November 2015 OFFSHORE 16 19 November 2015 GLOBAL OFFSHORE 08 19 November 2015 GLOBAL OFFSHORE 03 19 November 2015 GLOBAL OFFSHORE 44

CT Offshore vessel Sia will be GLOBAL COUNTDOWN DEMONSTRATOR CHECK-UP RWE buys IN BRIEF installing Siemens on duty to install 87 inter-array Project, Country MW Lead developer Turbine Capex per megawatt-hour for the 450MW Neart na Gaoithe at Project MW Developer Update Tender game plan at 27 6MW turbines from cables at Dong’s mighty 660MW On the books in 2015 04 for wind farms £114/MWh. Heavy seas for DoE Aqua Ventus Maine 12 UMaine/Emera/Cianbro Continuing design and engineering, n Walney 3 wind farm starting in in grid link Team Humber Marine Alliance next autumn and Gwynt y Mor, UK 576 RWE Siemens 3.6MW £2bn reaching final The UK bids raised eyebrows but BOEM conducting environmental and other local representatives were Dudgeon is due to go live in 2017. spring 2017 Photo: CT Offshore assessment Humber Gateway, UK 219 Eon MHI Vestas 3MW £800m investment decision in 2020. underscore the expectation that due to meet a trade delegation from Eon is already taking strides Even market leader Dong is coy, increased competition in Europe’s back-up Kentish Flats 2, UK 49.5 Vattenfall MHI Vestas 3.3MW £165m Atlantic City 24 Fishermen’s Energy Requested DoE extension, switched to Required RWE has tapped EDS Group Germany this week to strengthen 900MW Triton Knoll onshore for its 400MW Rampion saying that because of the increasing offshore wind markets will accelerate demo developers Siemens turbines, trying to re-apply Westermost Rough, UK 210 Dong Siemens 6MW £850m to provide contingency cover ties between Siemens supply chain Partners Statkraft and Contracts for Difference will be pre-qualified before a wind farm and kicked off substation number of competitive tenders “it savings across the board as well as hree demonstration projects The developer switched to Siemens for ORECs Amrumbank, Germany 288 Eon Siemens 3.6MW €1bn for the grid connection at its players in Cuxhaven and north-east RWE are looking to award round. selection process focused on civil engineering at the start of would make it more difficult for us to providing a yardstick for progress awarded $47m each by the US turbines instead of XEMC machines Icebreaker (Lake Erie) 18 Leedco To select turbines by end-2015, Baltic 2, Germany 288 EnBW Siemens 3.6MW €1.3bn completed geotech studies, finalising 576MW Gwynt y Mor wind . preferred bidder status for all “We do not know what will wider scheme optimisation November, marking the debut for make the ‘right’ offer if we disclose towards the €100/MWh holy grail. Department of Energy have in hope of overcoming state Borkum Riffgrund 1, Germany 312 Dong Siemens 4MW €1.25bn T monobucket foundation design farm off Wales. A delegation from the Virginia tier-one contracts at the up to be in the allocation pot. We produces a winner. Round 3 construction. recent or current cost levels”. Approaching the latter will be been granted extensions until May regulators’ objections to the Chinese Virginia 12 Dominion Requested DoE extension, re-tendering The specialist company Offshore Wind Consortium in the US 900MW Triton Knoll wind farm are aiming to remain flexible Triton is likely to feature Trenching and duct-laying of cable Borkum West 2.1, Germany 200 Trianel Areva/Adwen 5MW €1bn 2016 after missing key milestones this manufacturer. The NJ Senate has Auction results are giving some crucial for what follows. The majority construction to reduce costs will carry out quarterly will meet representatives from Hull at off Lincolnshire by the third to ensure that we optimise HVAC technology for its grid started at the end of October with Butendiek, Germany 288 WPD Siemens 3.6MW €1.3bn indication of future cost curves. of governments have largely parked summer. The DoE said it expects “to passed a bill that would force DanTysk, Germany 288 Vattenfall Siemens 3.6MW €1.05bn WindFloat Pacific 25 Principle/Deepwater Requested DoE extension, downsized investigations of onshore and the local university early next month quarter of next year. our bid. Our goal is to secure connection although that exploratory works also kicking off Vattenfall is building the 400MW Horns the difficult decision on how best to finalise the current evaluation this fall”. regulators to approve the project but from 30MW, looking for power offshore export assets in a bid to discuss a possible memorandum of New project director James a CfD based on 900MW,” element remains subject to a offshore. The wind farm off Brighton Global Tech 1, Germany 400 Global Tech Areva/Adwen 5MW €1.7bn Rev 3 based on a bid of 77 ore/kWh, decarbonise by 2030 with even fewer Fishermen’s Energy is seeking to re- it has yet to clear the assembly. purchase agreement to avoid shutdowns estimated understanding. Cotter said the developers Cotter said. live planning application with on England’s south coast will feature Nordsee Ost, Germany 295 RWE Senvion 6.15MW €1.05bn albeit that price is described as a having mapped a specific role for apply for offshore renewable energy Dominion Power is trying to cut to cost £125,000 per day. want to work collaboratively “We are a R2 project a decision due from DECC 116 MHI Vestas V112-3.45MW Luchterduinen, Netherlands 129 Eneco/Mitsubishi MHI Vestas 3MW €450m one-off due to unique circumstances. offshore wind. certificate funding for its reconfigured the cost of its 12MW Virginia test make a decision whether to proceed governor is backing Principle Power/ format for EDS chief executive Ryan n Dong has signed up Raytheon with potential suppliers to competing with R3 projects. next September. turbines and is set to go live in 2018. Fukushima demo, Japan 7 Fukushima Forward Mitsubishi 7MW ¥12.5bn Iberdrola secured a UK Contract “We cannot take success for $220m, 24MW Atlantic City project project by issuing separate request- in spring 2016. The Bureau of Ocean Deepwater’s Wind’s floater proposal Henderson said all offshore UK to implement a radar mitigation “drive value” and make the We should be competitive if The development team TOTAL 3.55GW for Difference in February for the granted,” said one market player. “We in New Jersey after a last-ditch court for-proposal packages for foundation Energy Management has granted and has formed a task force to wind farms should have an solution for the 258MW Burbo 2 Round 2 wind farm one of the not the most competitive.” recently also filed for a non- four-way international alliance 714MW East Anglia 1 with a £119/MWh must earn our place in the market appeal failed. design and construction, foundation environmental approval for the pilot, recommend off-take options. “The Coming in 2016 action plan as export cables wind farm that will remove clutter most competitive in the North Water depths at the site material change that will A pulled the trigger on the £1.5 bid and Mainstream picked up a CfD with every step that we take.” n “We’re asking now that a new installation, turbine erection, cable which features twin GE/Alstom Haliade principle focus right now is securing carry the highest risk of failure from air traffic control at John Lennon Sea. are 18 metres and monopile extend and reconfigure an billion, 336MW Galloper wind farm Gode 1&2, Germany 582 Dong Siemens 6MW €2.2bn application window be opened for supply and installation, as well as 150 6MW turbines on Keystone a revenue contract,” said Deepwater of any project component. Liverpool airport. Installation work is Initial tie-ups will be sealed foundations could carry next- already controversial onshore off Suffolk last month with the UK Westermeerwind, Netherlands 144 Westermeerwind Siemens 3MW €400m state-water projects,” said Fishermen’s transmission interconnection. twisted jacket foundations. Wind chief executive Jeff Grybowski. “We have been involved due to wrap up next year to coincide early next year, he said, generation turbines of 6MW, substation at Bicker Fen. Green Investment Bank, Siemens Block Island, US 30 Deepwater GE/Alstom 6MW $360m Germany to steal the UK’s thunder chief operating officer Paul Gallagher. The regulated utility expects to On the Pacific coast, a new Oregon In the meantime the project has in every single export with construction at the Round 2.5 although the exact size of 7MW or 8MW, said Cotter, Financial close at Triton Financial Services and Macquarie Donghai Bridge 2, China 102 Shanghai Donghai Shanghai 3.6MW €340m ermany is playing catch-up with a much more sedate pace with no shrunk from 30MW to a maximum cable repair in the UK this project. the prize on offer remains although smaller hardware is anticipated in 2017 with Capital teaming up with RWE Innogy. Formosa demo, Taiwan 8 Formosa Wind Siemens 4MW tbc Gthe world-leading UK offshore projects going online in 2016 and 25MW. Two to three 6MW to 8MW year. There have been five to be confirmed pending will get the vote if the costs fit. onshore construction to start Onshore construction of the TOTAL 866GW wind market thanks to the flurry of 730MW to go live in 2017 across two turbines on WindFloat platforms will breakages and it is a lot more n MT Hojgaard has been cleared the outcome of the next Two or three manufacturers the same year. substation at Leiston started this installations continuing through the commercial builds and two demos. be deployed 29km off Coos Bay in artwork Scheduled for 2017 common than some think,” he of any liability for the cost of repairs month with site enabling works water depths averaging 350 metres. Blyth, UK 42.5 EDF tbc £149m end of 2017. Roles will reverse in 2018 with the added. to grouted foundations at Eon’s already complete. Cabling will begin Rope access blade repair, BOEM is expected to publish an Burbo 2, UK 256 Dong MHI Vestas 8MW £896m The country will ride above the UK building 1976MW and Germany Aside from Gwynt y Mor 174MW off at Sizewell beach next spring with i n s p e c t i o n s a n d environmental assessment in 2016. Dudgeon, UK 402 Statoil Siemens 6MW £1.5bn ongoing Northern European build 785MW while 2019 will see-saw back itself, other UK offshore Scotland. The Supreme Court in offshore construction kicking off gap with 582MW expected online in the other way with 1038MW going up Hywind 2, UK 30 Statoil Siemens 6MW Nkr2bn c o a t i n g s r e p a i r s p e c i a l i s t s wind farms to suffer export London dismissed an appeal against later in the summer. First power is 2016 and 1481MW due to go live the in the UK and 1452MW in Germany. Nordergrunde, Germany 111 WPD Senvion 6.15MW €410m outages over the past year a lower court ruling and confirmed no expected in summer 2017 with full following year ahead of a change to Overall by end-decade around “...Leedco aims to select a include Vattenfall’s 300MW damages would be paid to the utility operations slated for March 2018. Nordsee 1, Germany 332 Northland Senvion 6.15MW €1.2bn We require artwork to feed-in support levels. 10GW will be live in the UK with Sandbank, Germany 288 Vattenfall Siemens 4MW €1.2bn Thanet and Eon’s 174MW developer. Siemens will supply and install 56 Front runners place The UK will by comparison run at Germany hitting up to 7.7GW. n WHY YOU CHOOSE US 3MW turbine by year-end Robin Rigg, EDS said. The contractor said it will book 6MW turbines using a Swire Blue Veja Mate, Germany 400 Highland Siemens 6MW €1.5bn Dkr195m held in reserve as income Ocean vessel. Wikinger, Germany 350 Iberdrola Adwen 5MW €1.4bn Offshore Painting Services is an ISO and IRATA accredited for the 18MW Icebreaker Alstom name this year as a result. Foundations will be installed by Gemini, Netherlands 600 Northland Siemens 4MW €2.8bn organisation offering complete corrosion protective solutions is laid to rest GeoSea vessel Innovation with Sif Belwind 2, Belgium 165 Nobelwind MHI Vestas 3.3MW €655m and repair services to the renewable energy sector in particular, freshwater pilot...” be compiled in InDesign n ScottishPower Renewables is and Smulders sub-contracted to bet on next decade Tahkoluoto, Finland 50 Hyotytuuli tbc €120m and the construction industry in general, specialising in high Alstom’s offshore wind mulling potential development of the fabricate the monopiles. Electrical Zhuhai Guishan, China 198 China Southern Ming Yang 3MW €640m specification coatings and blade repairs, including working at height. business will be rebranded East Anglia 2 wind farm off eastern works for the substation onshore ong, ScottishPower Renewables Planning Inspectorate’s desk with a TOTAL 3.22GW The DoE has deployed a lidar- as GE following the tie-up England. Discussions are ongoing “to and later offshore will be conducted Trio of developers and Vattenfall are among the decision due back in March 2016. equipped buoy to help characterise Expected in 2018 between the two companies. agree what a future EA2 project could by an Alstom and Petrofac joint few developers to start on Paperwork for Dong’s 2GW Hornsea 3 the wind resource. D Galloper, UK 336 RWE Siemens 6MW £1.54bn OUR SERVICES INCLUDE New chief executive Anders look like” in the southern part of the venture with jackets and topside laying plans for blueprints for the next decade. is expected to be filed by the year-end Two alternate projects have wherever possible to produce Soe Jensen said development Round 3 zone. to be produced by Heerema in The Danish giant is striding forward or early 2016. Race Bank, UK 580 Dong Siemens 6MW £2bn received a total of $6.7m each Rampion, UK 400 Eon MHI Vestas 3.45MW £1.3bn IRATA rope access Transition piece and tower of the 6MW Haliade 150 Hartlepool. their gigawatt-plus at its newly-acquired Hornsea Round 3 “We already knew that the (Hornsea surface coatings repair following further funding this week to turbine will continue as n The Crown Estate has appointed its VBMS has bagged a contract zone off the Yorkshire coast. Dong zone) had around 3GW of potential Walney 3 East, UK 330 Dong Siemens 7MW £1.16bn Wind turbine blade continue development and could win Walney 3 West, UK 330 Dong MHI Vestas 8MW £1.16bn repairs Substation surface coatings planned. former head of offshore wind Huub for array cable design, supply and Round 3 wind farms already has the 1.2GW Hornsea 1 and but after the takeover we wanted repair full backing if any of the original three “Customers always came den Rooijen as director of energy, installation with JDR sub-contracted 1GW Hornsea 2 projects in the system to scope the area ourselves and Arkonabecken, Germany 385 Eon tbc €1.3bn Wind turbine blade drop out. 150dpi RGB PDFs with all first and that will continue but minerals and infrastructure with to supply the 56 wires. The former with the former expected online in look closely at what Merkur, Germany 400 DEME/Windreich GE/Alstom 6MW €1.7bn inspections Wind turbine and tower cleaning The Lake Erie Energy Development we will look to change the way immediate effect. The switch follows TOWER POWER: Sembmarine the three-level topside. the jacket is taking shape as company will also supply and install 2020. we were happy to Rentel, Belgium 294 Otary Siemens 7MW €1.25bn L Corporation (Leedco) aims to select a we work and how far we can the departure of Rob Hastings. is on schedule to deliver Transformers have also been well. We are going very much the NKT-manufactured export line. n renews.biz Hornsea 2 is currently on the develop,” an insider 09 TOTAL 3.06GW 3MW turbine from a shortlist of three push the offshore industry the substation for Statoil’s delivered. to plan and we are getting OUR PHILOSOPHY “well-proven” suppliers by year-end Pencilled in for 2019 going forward,” said the Dane. n Danish offshore wind marine 402MW Dudgeon wind farm SPT Offshore is due to good feedback from (client) for the 18MW Icebreaker freshwater Beatrice, UK 588 SSE Siemens 7MW £2.1bn The Company prides itself on being built upon foundations based fonts fully embedded. What “One thing we will be contractor DBB Jack-Up has secured off the east coast of England supply suction-bucket feet for Siemens,” he added. pilot. Fred Olsen Windcarrier will Neart na Gaoithe, UK 450 Mainstream Siemens 7MW £1.6bn on an ethos of excellence, with each member of the team making doing is looking to put more €100m of financing after raising the in August 2016. the foundation, a UK first. Dudgeon, off the seaside provide the full marine spread using their individual contribution; customer service and delivery is emphasis on designing future money through a four-year senior The jacket (pictured) is well Sembmarine managing town of Cromer in Norfolk, Borkum Riffgrund 2, Germany 450 Dong MHI Vestas 8MW €1.8bn K US vessels. products. Our capabilities secured bond. advanced at the company’s director Paul Thomson said: will feature 67 Siemens 6MW Borkum West 2.2, Germany 250 Trianel/EWE tbc €720m paramount in all that we do, supported by a commitment to Dosecc Exploration and Gardline have just got much greater,” Lowestoft yard with structural “We just have a few external turbines and is expected to Deutsche Bucht, Germany 252 Highland tbc €1bn technician training and development. Geosurvey this summer conducted he added. renews.biz work nearly complete on platforms to complete and go live in 2017. Hohe See, Germany 500 EnBW tbc €2bn geotechnical studies to inform final does NOT work well are POSITIVE SOLUTIONS Horns Rev 3, Denmark 400 Vattenfall MHI Vestas 8MW €1.6bn design of the Universal Foundation Industry training forum the European Energy Centre Near-shore round, Denmark 350 Various, tbc tbc tbc MAKING CONTACT monobucket. Leedco must report to has approved renews as suitable to help professionals (FOR RENEWABLES CHALLENGES) Borssele 1, Netherlands 350 tbc tbc tbc the DoE in March 2016. read gain qualifications in renewables technologies. With offices in Liverpool and we are able to quickly Stay in the know Borssele 2, Netherlands 350 tbc tbc tbc A University of Maine-led group mobilise our experienced technicians throughout the UK and when on the road www.ramboll-environ.com Nathan Swankie [email protected] Norther, Belgium 350 Electrawinds tbc €1.2bn expects to complete design and beyond, for both on- and offshore projects. adverts created as ‘images’ J Northwester 2, Belgium 224 InControl et al tbc €896m engineering by year-end for the two- MULTIPLE TOTAL 4.51GW turbine, 12MW Aqua Ventus floating reNEWS.biz www.offshorepaintingservices.co.uk DIGITAL NOTE: Indicative capital expenditure is a renews figure based on information from developers and other sources project featuring Volturnus concrete or, if no independent information is available, £3.5m or €4m per megawatt installed. Tidal zone wind farms [email protected] 0151 792 8627 semi-submersible floating foundations PLATFORMS are not listed in this table, including a number of planned developments off China and the Bac Lieu 1 and 2 off and composite towers. n I Vietnam. Developments with timetables that cannot be independently confirmed have also been excluded. using for example Photoshop. We then lose clarity when we distil into a PDF. All logos and Display Advertising Mechanical Data Advertising Rates graphics must be vectors. Rates per issue Graphic providers working Dimensions Ref: Name (exc. VAT where Notes on Macs may be asked to (width x depth) applicable) forward InDesign ‘packages’ (containing original images and fonts, etc) to mitigate Regular Issues conflicts with our PC-based production system. A Front Page – Shoulder advertisements 36.2mm x 36.2mm (square) £385 €450 Minimum booking of 6 ads The advertisement should be full-colour and can include B Front Page – Banner 210.0mm x 36.0mm £750 €865 Minimum booking of 6 ads a link so that when the reader places their cursor over the C Inside pages – Small boxes 79.8mm x 61.5mm £360 €430 Minimum booking of 6 ads ad they can click through to your website or specific web D Inside pages – Quarter portrait 79.8mm x 176.5mm £680 €785 N.B. Ad placements are page. It is important that you sold on a ‘first come, inform us of any embedded E Inside pages – Half-page portrait 121.2mm x 232.3mm £1,025 €1,185 first served’ basis and URLs when the artwork is page numbers are submitted. Our production F Inside pages – Half-page landscape 204.0mm x 136.7mm £1,025 €1,185 process requires that we not guaranteed, with re-embed this information exception of the front G Inside pages – Tower advert 79.8mm x 291.0mm £855 €980 before publication; if we are page, pages 2 & 3, and unaware of its existence the H Inside pages – Large box 121.2mm x 93.5mm £575 €670 the last page. link may be lost.

I Back page – Banner 204.0mm x 36.0mm £235 €290 Please send your ad by email to [email protected]

BOOKING DEADLINE: Special Reports Regular Issues – ideally A Front Page – Shoulder advertisements 36.2mm x 36.2mm (square) £435 €505 2 weeks before publication Special Reports – ideally N.B. This is 2mm deeper than 3 weeks before publication B Front Page – Banner 210.0mm x 38.0mm £899 €1,030 the Regular Issue banner ARTWORK DEADLINE: F Inside pages – Half-page landscape 204.0mm x 136.7mm £1,025 €1,185 Regular Issues – ideally 1 week before publication J Inside pages – Quarter landscape 204.0mm x 68.3mm £680 €785 Special Reports – ideally 2 weeks before publication K Inside pages – Quarter portrait 100.5mm x 137.5mm £680 €785

L Inside pages – Half-page portrait 152.2mm x 184.4mm £1,025 €1,185 2020 Media Pack ONLINE ADVERTISING 04 Join the go-to source for breaking industry news

Get your brand in front of the DON’T MISS OUT! industry heavy hitters and 86,000* monthly average unique users connect directly with potential Mdesk (*latest 6 months, source: Google Analytics) Mmob customers across the global renewables sector. reNEWS.BIZ provides up to the minute coverage of the DESKTOP & MOBILE renewable energy sector. An Advertising Data / Rates mob advert on the dynamic website N will place you in front of your All below advertising spaces are sold on a 30 day basis Ndesk competitors, showcasing your with the exception of listings on the jobs pages which are for 60 days. O company’s services within the Desktop Mobile Cost industry. Name Ref: Ref: (exc. VAT where applicable) With thousands of unique users coming to our site every HOMEPAGE (*THESE OPTIONS ALSO APPEAR ON SOME ADDITIONAL INFORMATION PAGES) desk month, this really is the best Leaderboard* Mdesk Mmob £1,850 €2,100 Q O place to be seen by your target P / Q mob market – from offshore wind Middle Banner Ndesk Nmob £1,350 €1,550 P d O to solar we have it covered! MPU* OO £1,075 €1,240 e Information on this page Skyscraper Pdesk Pmob £815 €945 s shows the many advert k opportunities from which you Marquee Qdesk Qmob £1,999 €2,250 can choose. OFFSHORE WIND SECTOR PAGES DESKTOP Leaderboard Mdesk Mmob £1,350 €1,550 MPU OO £1,350 €1,550 P Rmob ADVERT SIZES d Dimensions Skyscraper Pdesk Pmob £1,025 €1,185 e Name in pixels Story Banner Rdesk Rmob £815 €945 Rdesk s (width x depth) k O Leaderboard 960 x 90 px ONSHORE WIND SECTOR PAGES Middle Banner 728 x 110 px Leaderboard Mdesk Mmob £899 €1,045 MPU 300 x 250 px MPU OO £499 €590 Mdesk Skyscraper 160 x 600 px Skyscraper Pdesk Pmob £399 €480 S S Marquee 728 x 300 px Story Banner Rdesk Rmob £399 €480 Story Banner 500 x 100 px S OTHER SECTOR PAGES S Listing 225 x 85 px WAVE & TIDAL, SOLAR, ENERGY STORAGE, FINANCE, GRID, HYDRO, OTHER, PEOPLE MOBILE Leaderboard Mdesk Mmob £399 €480 ROTATIONS & FORMAT Rotations (M, N, O, P, Q, R): Conference & Job Listings (S): ADVERT SIZES MPU OO £299 €365 Dimensions n There can be up to 3 advertisers on n Jpeg, png or gif file. Between Name in pixels Skyscraper Pdesk Pmob £299 €365 each online position at any one time. 72–96 dpi and in RGB format. (width x depth) Story Banner Rdesk Rmob £199 €255 Each advert will have an equal share Leaderboard 320 x 80 px of visibility. Pop up PDF for Job Listings (S) EVENTS PAGE – to open at 100%: Middle Banner 320 x 80 px Leaderboard Mdesk Mmob £525 €620 Format (M, N, O, P, Q, R): n 95mm wide x 130mm deep MPU 300 x 250 px n Jpeg, png, gif or animated gif file. (1/4 portrait). Skyscraper 300 x 250 px Skyscraper Pdesk Pmob £525 €620 Between 72–96 dpi and in full colour. Format: ideally designed using Marquee 300 x 250 px Listing SS £525 €620 NB: Flash ads are accepted – In-Design or Quark; fonts and Story Banner 320 x 80 px JOBS PAGE however as some devices don’t hyperlinks embedded; text as vectors; Listing 225 x 85 px support this technology please provide full colour. Leaderboard Mdesk Mmob £199 €255 the fallback images for all flash slides/ For updated MPU OO £199 €255 adverts. online statistics Skyscraper desk mob £199 €255 CONTACT THE P P SALES TEAM Listing (2 months) SS £199 €255 2020 Media Pack DAILY EMAIL NEWSLETTERS 05 ‘Served before FEATURES The benefits of advertising on the ten different reNEWS Daily Newsletters breakfast in an include: S n Premium Leader-board positions easy to digest (at both the top and bottom of the newsletters) and MPU inserts format’ n Competitive rates

The reNEWS Daily Newsletters banner position, and as an n Newsletters sent early morning keep recipients up-to-date MPU (illustrated below). (all newsletters set from 2am) ready 5 days a week. Choose from Push your brand out in the recipient’s inbox for breakfast 10 different email newsletters, to thousands of eager which cover various sectors recipients a month with the n Two advertisers at a time only and regions: Offshore Wind, reNEWS Daily Newsletters , at (rotating on an even daily basis) Onshore Wind, Wave & competitive costs! Tidal, Solar, Energy Storage, n Newsletters are sent out five Finance, Europe, Americas, For prices and working days a week, all year round UK News, and All News. booking details Advertising is offered at the PLEASE SPEAK TO n The newsletters are an opt-in top and bottom of the email OUR SALES TEAM service for a specific readership in a prominent leader-board – this is not a bulk bought list

st n All fresh news from the previous BE SEEN 1 WITH OUR day in bite sized chunks. DAILY NEWS SERVICE O ACROSS ALL DEVICES

“reNEWS daily newsletters keep the company on top of any breaking news – they are bite-sized golden nuggets Advertising Data / Rates of information often Duration Cost Ref: Newsletter sector delivered ahead of any – 1 month (exc. VAT) other media outlet” S / O All News Working days £499 €590 S / O Offshore Wind News Working days £499 €590

S / O Onshore Wind News Working days £399 €480

S / O UK News Working days £399 €480

S / O Wave & Tidal News Working days £299 €365 “My day would be incomplete without the S / O Solar News Working days £299 €365 daily newsletters for offshore S / O Energy Storage Working days £299 €365

wind – served before S / O Finance News Working days £299 €365 breakfast each morning in S / O Europe News Working days £299 €365 an easy to digest and most informative format” S / O Americas News Working days £299 €365

DIMENSIONS & FORMAT

n Daily Newsletter leaderboard n Please advise us of the URL you dimensions are: 320 pixels wide x 80 would like the advert to link to. pixels deep. MPUs are standard size – 300 pixels wide x 250 pixels deep. n Please send your advertisement n We accept static: Jpeg, png or gif by email to [email protected] files. 2020 Media Pack LIVE@ DIGITAL DAILIES 06 Stay connected with Advertising Data / Rates Rates per Dimensions issue (exc. Ref: Name our Digital Dailies (width x depth) VAT where applicable) reNEWS produces digital daily Drive traffic

Adding Value Experts with through Experience LIVE@ Digital Dailies newsletters for a number of to your website energy www.owcltd.com xodusgroup.com SPONSORED BY IND 2019 prestigious industry events. Not exhibiting? @ GLOBAL OFFSHORE W 26 June 2019 LiVE WEDNESDAY’S A Front page – Shoulder ads 36.2 x 36.2mm £435 €505 HIGHLIGHTS These are sent to all our Getting your Official Digital Done deal News MeDia PartNer Scaling up is sector’s Orsted, MHI Vestas, Iberdrola, Innogy, Siemens Gamesa and Baroness Brown £100m fitness regime for of Cambridge discuss how the industry subscribers, as well as being message across UK supply chain players next great challenge will deliver the UK offshore wind The Offshore Wind Growth Partnership sector deal. The offshore industry has will kick off a full-scale review of the UK Platinum Suite — Stream A, advanced significantly over Y Front page – Banner 210.0 x 65.0mm £899 €1,030 supply chain to identify the areas with 09.30-10.45 p2 recent years but has yet to available on our website as a in the conference the best potential for expansion. reach full maturity, Global Offshore Wind 2019 was told. Float on Key speakers at the London Executives grapple with What can we learn from operational event said supply chains equality questions floating projects and what’s next in free download. specials is the next will have to become more the growth of this critical technology? A striking gender imbalance is sophisticated if the sector is preventing the global offshore Equinor, Innogy, DNV GL and Crown to successfully lead the global Estate Scotland discuss. wind industry from reaching its full wind we can tackle global warming p3 energy transition away from Platinum Suite — Stream A, K Quarter portrait 100.5 x 137.5mm £680 €785 potential, GOW 2019 has heard. VITAL ASSETS: Offshore wind fossil fuels. and deliver a great industry and jobs.” best thing to being is on track to become a key weapon 11.30-12.30 MHI Vestas chief executive Pinchbeck added that the UK’s in the fight against climate change, Philippe Kavafyan argued 30GW by 2030 sector deal will entail Orsted signs up to Atlantic according to RenewableUK deputy the next phase of growth will infrastructure investments of £46bn. cable repair co-op chief executive Emma Pinchbeck A view from the boardroom have to come predominately Also pictured on the opening Orsted has signed a framework (standing). are Broadcaster Emma Howard in there! from developing existing session stage (seated, left to right) Drive delegates conversation with Orsted UK director deal with Global Marine Group for She told delegates during the technology more efficiently. Iberdrola global business offshore wire repairs at UK offshore wind opening GOW 2019 session the Matthew Wright. “I really don’t think the managing director Jonathan Cole, farms that will be will be conducted industry can also spur economic Innovation Theatre, 11.40-12.00 challenge is innovation Equinor New Energy Solutions growth. “For years we haven’t talked F Half-page landscape 204.0 x 136.7mm £1,025 €1,185 via the Atlantic Cable Maintenance or the cost of energy. We executive vice president Pal Eitrheim, to your stand Agreement. p4 about the climate change case for this need to scale up. What our MHI Vestas chief executive Philippe business but politics now has woken Go west industry should really think Kavafyan, Offshore Renewable Energy up to the level of that challenge. The US-based Business Network for Catapult test and validation director THE INTERVIEW about is how we can simplify “We have to do more than we Offshore Wind hosts a series of quick- everything we do and do Tony Quinn and Innogy director of thought. If we invest in climate change fire presentations on the supply chain Looking to build your brand, As well as flagging more of it.” offshore wind investment Richard technologies and invest in future Photo: reNews opportunities in the US market. Wind turbines have yet Sandford. Today, Equinor senior vice president technologies like floating offshore Innovation Theatre, 12.00-12.30 to become “the backbone of wind and low carbon solutions of electricity supply” like Pal Eitrheim, executive vice Stephen Bull. p5 that can be achieved through G Tower advert 79.8 x 291mm £855 €980 industrial gas turbines did in president at Equinor’s New raise your profile and up event highlights, research and development.” Scaling up the 1980s and 1990s, said Energy Solutions division, Innovation is a “huge part” A panel of experts from companies Offshore Renewable Energy said floating wind will be the Government going for of the future that extends to including Siemens Gamesa discuss the Catapult test and validation industry’s “next big thing”. exports gold improving operations and latest offshore wind turbine technology director Tony Quinn. “But we need our suppliers International Trade Secretary Liam maintenance functions using trends. promote your products and our Digital Dailies “I don’t think we are there on board and we need to put Fox has urged UK companies to take drone technology, said Innogy Platinum Suite — Stream C, yet with wind,” he said. “We our efforts into reducing the advantage of government support to director of offshore wind 15.30-16.30 are an immature industry. We cost base.” help win export orders in the offshore investment Richard Sandford. have got fantastic benefits services to the industry? An also keep delegates wind sector. p6 Sponsorship of LIVE@ Digital Dailies £POA €POA advert in the reNEWS LIVE@ in touch with innogy. A global leader in renewable energy and shaping the future World LiVE @ RENEWABLEUK 2015 #RUKACE15 6 October 2015 NEWS 02 of offshore wind. Class Subsea Digital Dailies connects you industry news Make innogy your renewables Power Programme partner of choice. Find us at Cable n BOWING OUT: Rob GOW2019, at the innogy business Provider Highlights Hastings, director of Nordex bags lounge, and let’s talk business! energy and infrastructure

Visit JDR at Global Offshore Wind at the Crown Estate, is Stand 118 KEYNOTE ADDRESS McCaffery, our Senior innogy.com stepping down after a directly to thousands of from outside the WWW.JDRGLOBAL.COM Professor Management Team and AA decade at the Sir David the RenewableUK Board turbine arm UK seabed King of Directors. Hear about landlord to 24 June 2015 LiVE @ R-UK GLOBAL OFFSHORE WIND 2015 the valuable work we work in other Special Representative are doing on behalf of fields of the for Climate Change, our members. Join our at Acciona industry professionals. conference walls. low carbon German manufacturer €366.4m in cash and 16.1 WEDNESDAY’S Professor Sir David A. team for a drink at the INSIDE industry. Nordex is to acquire Spanish million in new shares valued HIGHLIGHTS King, will deliver the Speakers’ Spotlight at the Recruitment company Acciona’s turbine at €26 each for Acciona Offshore kit up for grabs keynote address on RenewableUK stand. RO ripples will hit for Hastings’ business in a cash and shares Windpower. as doors shut at Red7 unit Day 2 at 10:00-10:25 successor deal worth around €785m. Main shareholder Skion/ The assets of Red7 Marine’s offshore Keynote Address, DECC in Conference Room SOCIAL EVENT has already The takeover will create Momentum will also offload business have been put up for sale Secretary Amber Rudd 3B. This session is The RES Networking begun, said what Nordex called “a new some of its shares in Nordex after the company was wound up with The must-see event of the two open to all visitors. Look Reception CE. Photo: Crown Estate major player in the wind to Acciona Energia, which will the loss of 47 jobs. p2 days with the offshore and wider out for a preview in Day 1, RES stand 95 offshore – Ewing renewables industry looking for some industry”. The buyer will pay remain involved in wind farm tomorrow’s renews Live@ Exhibition Hall 17:00 – 19:00 ownership and operation. Scottish Energy Minister clarity and justification on a range of RenewableUK 2015. Local content in R-UK focus Once the deal is complete Floaters on verge of Fergus Ewing is warning the government policies. Developers need to push debate how best to entice UK Skion/Momentum will hold a going mainstream year-early closure of the 9.30-10.30, Platinum 1 SOCIAL EVENT local content in British companies into the sector, 5.7% of Nordex with Acciona The global floating offshore wind Renewables Obligation will RenewableUK Industry Open to all event offshore wind projects to particularly if they are first holding 29.9%. Acciona has market is set to move from the trial have a “massive” impact on Connect, Day 1 attendees with a valid show the UK is still a thriving time entrants. agreed not to raise its voting stage to “commercial scale-up”, the offshore wind industry. Debate: Offshore Wind to 2030 RenewableUK, Stand 140, pass for Day 1. The RES market despite “uncertain” BVG Associates consultant position in Nordex above 30% according to UK innovation body ORE DECC policies for the Scotland Energy Minister Fergus Exhibition Hall 16:15 – 17:00 Networking Reception government policy. Alun Roberts, who is also for the next three years. Catapult. p3 onshore sector will have Ewing sets the stage and then will take place at the RES A debate at RenewableUK taking part in the session, said Acciona produces 1.5MW a knock-on effect across heavy-hitters from Vattenfall, stand in the Exhibition 2015 on Tuesday running from his company “has developed and 3MW turbines for other technologies, the Siemens, RenewableUK, Dong and Hall at the end of Day 1. 2020 reNEWS LIVE@ 14:30 to 15:30 and entitled a robust methodology (for deployment across all wind Northwester 2 getting Holyrood minister said ahead ScottishPower “hash out” the post- Don’t miss this Local Content: Measuring measuring local content) that classes. The company has project ducks in a row of his appearance at the 2020 landscape. A chance for current and opportunity to catch up Progress and Understanding minimises the extra workload four production facilities Northwester 2 is aiming to secure all RenewableUK Global Offshore 11.15-12.30, Platinum 1 future RenewableUK with colleagues, make Best Practice will see industry on wind farm owners and located in the US, Brazil and the necessary permits for its self-titled Wind conference in London. members to meet our new contacts and network leaders including Siemens and their supply chains, which will Spain with another under 224MW wind farm off Belgium over “There is no clarity,” he told HOPPING TO IT: Vattenfall has installed three turbines to Chief Executive, Maria over a drink or two. the next 12 months. p4 renews. “The fact is that many date at its 49.5MW Kentish Flats 2 wind farm off eastern Construction Lessons Learned ScottishPower Renewables be discussed.” construction in India. of these companies that have England. The £165m extension, featuring 15 MHI Vestas A bit of what to do and what not to sunk millions into onshore V112 3.3MW machines, is the UK’s only scheduled new do with your offshore wind farm, RWE to keep British schemes, which now may not offshore wind construction this year. Photo: Vattenfall featuring contributions from Senvion, investment party going happen, are also invested in Fred Olsen Windcarrier, Bilfinger and RWE has pledged that Gwynt y Mor, the offshore industry. Parliament on Monday that strategy. “I don’t want to trade Dong. ADVERTISING OPPORTUNITIES its 576MW wind farm off north Wales “Confidence will be lost she had held and will continue insults. I want to safeguard a 14.00-15.15, Platinum 2 COLLABORATION that was officially opened last week, is and people will go elsewhere. to hold many discussions with renewable future and build on just part of its ongoing commitment to (They will think) if the her devolved counterparts. the success Scotland has seen the UK. p5 government can do that The Whitehall minister within the industry. Networking Reception INNOVATION on a whim then what is to is due to give the keynote “The plans are irrational Siemens plays host as the industry stop them doing something speech at the opening of and when a government acts takes refreshment, relaxes and UK workboat players similar to other technologies, the R-UK conference, facing irrationally they have to be discusses the implications of what EXCELLENCE want to double-bunk including offshore, at some the industry for the first prepared for legal challenges.” will undoubtedly have been a busy Crew transfer vessel operators are point in the future.” time since delivering the RO The minister said setting a first day. working with the Maritime and Ewing said he urged UK bombshell. framework for a renewables 17.00-19.00, Stand 80 LiVE @ GLOBAL SPONSORED BY OFFSHORE WIND 2019 Coastguard Agency to double the Energy Secretary Amber Rudd Ewing said he is not world post-2020 is now key hat a great time number of technicians each boat is to hold a consultation period looking for arguments with and he urged the government 25 June 2019 renews.biz 05 allowed to carry to offshore wind on the plans before they Westminster but that he to establish a clear policy for International to be holding our for rolling industry news updates farms to 24. p6 were unveiled last week but fundamentally “disagrees” the future, including targets, WGlobal Offshore capacity at record low prices. on your PC and mobile that she declined. Rudd told with the Conservative Party as soon as possible. Wind 2019 event in London. Welcome to Global I am optimistic that this will This is a landmark year for the be achieved, thanks to our industry. We are only halfway member companies’ tenacity K An experienced T&D partner who cares Partnering Forum Global Offshore Wind through it so far and yet we in driving down costs while have already taken a series of Offshore Wind 2019 improving efficiency. as much about your project as you do. quantum leaps forward. As the UK is the biggest Now that’s something to be proud of. This is a year in which RenewableUK chief executive Hugh offshore wind market in the UK has strengthened the world, the global sector its commitment to leading McNeal (pictured) sets the scene for convenes here to do business, “IPF” 2020 2020 the world in tackling climate to look at our success and change and offshore wind will speakers, exhibitors and delegates at learn from it. be a key technology in helping a momentous time for the industry Innovation is a key theme us to achieve our ambitions. of the conference, with Y After years of hard work by report in May set out a bold the next steps for floating 'XEOLQȏ*DOZD\ȏ/LPHULFNȏ/RQGRQȏ:DUULQJWRQȏ*ODVJRZȏ%UXVVHOV the industry and ministers, global leadership on the most wind, robotics and artificial vision for the UK to build on delegations and politicians the offshore wind sector important issue facing every intelligence high on the the landmark 2008 Climate from around the world. deal published in March nation. agenda. Rhode Island Change Act, including a The latter includes provides an unprecedented So how can this industry The implementation of the suggestion that up to 75GW Republican Governor of level of commitment from play its part? That is what sector deal is also a key topic of offshore wind could be Massachusetts Charlie government with a regular we will be discussing at at this event. deployed by 2050. Baker, a strong advocate pipeline of auctions stretching This week will see the The government’s for action to tackle into the years ahead. launch of the Offshore Wind response less than SPONSORED BY Convention Centre, Manchester Central The sector deal puts climate change, two weeks ago, Growth Partnership, an LiVE @ ALL-ENERGY 2015 6 May 2015 02 3 May 2018 offshore wind at the heart of the deployment of OFFSHORE 04 agreeing to the CCC’s investment of £100m that will the UK’s clean energy future, offshore wind and the proposal to set a help UK companies seeking quadrupling our capacity by 25 – 26 June development of energy legally-binding target ExCeL London to grow their business in the IN BRIEF 2030. All businesses constantly storage. of net zero emissions rapidly-growing global market. Time for planners to Storage as a service to In addition, Providence urge the government to Much more work lies ahead n US private equity outfit North Sea at Norddeich in Lower by 2050, sets a benchmark for the Contracts for provide certainty and offshore RenewableUK’s biggest event to fully deliver the sector deal Centerbridge Partners has completed Saxony. The €15m facility includes other countries to follow. Difference auction process wind is the first renewable of the year, here at ExCeL, and I am very proud to be its acquisition of German turbine offices, recreation rooms, a canteen That decision chimes now underway is clearly ‘unlock future growth’ technology to secure it. accentuate positive manufacturer Senvion from India’s and a four-storey warehouse. The with the industry’s major involved in it, helping to grow with the record high levels uppermost in many people’s The UK should take a much present his plans for reform Suzlon Group. The deal was agreed Danish developer will use the base Meanwhile, the Committee global players, the innovative this industry so that we can all Offering energy storage “as services instead of hardware, has meanwhile teamed of public support for action minds, with expectations more constructive approach to All-Energy attendees in January for a cash consideration of to co-ordinate construction and O&M on Climate Change’s net zero firms in our thriving supply reap the enormous economic a service” is key to capturing Carson will say. up with Capitas Finance to and it maintains the UK’s that we can deliver a record to consenting offshore on Thursday during the €1bn plus potential earnings-related at its 312MW Borkum Riffgrund and value for behind-the-meter “In the future, systems offer a storage-as-a-service chain, international trade and environmental benefits of amount of new offshore wind wind farms, according to an Environmental, Planning payments. Centrebridge has said it 584MW Gode Wind 1&2 projects. installations, Edinburgh will be managed together finance model to spread the offshore wind. Photo: RenewableUK industry leader. and Development debate at will continue to bankroll innovation consultancy Delta Energy in a cluster, community or investment cost of battery Decision-makers currently 1.30 pm. at Senvion. n Granada Material Handling has & Environment will tell network,” she said ahead of systems. Attend Europe’s read planning documents “It is disproportional. Meanwhile, shareholders have won a contract from Sembmarine All-Energy delegates on the event. The offering provides a Publishing Publishing 2ƝVKRUH:LQG that detail all the potential Planning Inspectorates look authorised Suzlon to issue new equity SLP to manufacture, deliver and Thursday. “Transitioning the business fixed payment for Powerstar’s /HDGHUVƃ3ULQFLSOH negative impacts of a project at things like bird strike shares and sell SE Forge Ltd. commission two davit cranes for Delta senior analyst model to an energy-as-a- Virtue storage systems with Meeting Point while considering few of possibilities, which in reality the Siemens-built transmission and Jenny Carson and principal service offering, based around latter payments following as the positives, said Royal are much less than ever n ABB has bagged a two-year distribution platform at the 402MW analyst Charmaine Coutinho energy needs as opposed energy savings accrue to the HaskoningDHV director of expected, then visual impact turbine and electrical equipment Dudgeon wind farm off north Norfolk. will highlight the changing to individual technology end-user. 21–23 April 16 & 17 June 10TH ANNUAL 6HL]H*OREDO'HYHORSPHQW renewables development and so on. The biggest threat servicing contract at Centrica’s 194MW The four-metre tall ‘Python’ cranes business model for the sector elements such as battery and Powerstar chief financial OFFSHORE 2SSRUWXQLWLHVDQG0D[LPLVH Rufus Howard. to wildlife is inaction,” he Lynn and Inner Dowsing wind farm weigh one tonne each. during a presentation at 11:00 PV, also widens accessibility officer Robert Macklin said: 2SHUDWLQJ5HYHQXH 6 Months “We are not just talking continued. off Lincolnshire, which features 54 on Thursday in Morar/Ness. and attractiveness to a “We aim to understand the WIND EUROPE Design • Finance • Construct • about the worst case scenario “Offshore wind farms get Siemens 3.6MW units. n HiDef Aerial Surveying has Successful companies are greater range of customers.” individual requirement and Install • Operate • Maintain FREE Rent* here, we are talking about WE WANT MORE: Lincs slated for subsidies but we secured a second one-year contract likely to be those marketing Storage supplier Powerstar deliver a bespoke package.” 2ND ANNUAL having to consider a huge Photo: Centrica never hear any comparisons n made up Vattenfall’s for delivery of high-resolution range of worst case scenarios with the subsidies made for single largest investment area during digital video services at the 270MW 'HYHORSDQG'HSOR\ FLOATING all happening for just one change. It needs to be made nuclear, oil and gas. It dwarfs the first quarter of 2015, when low off the east coast IN BRIEF BESS set for OFFSHORE WIND &RPPHUFLDO6FDOH3URMHFWV BOOKING DEADLINE: BOOKING DEADLINE: offshore wind farm. clear that it is unlikely these offshore (wind).” production volumes and falling of England. The company already n UK developer Off Grid Energy “The chances of one worst negatives could happen but Howard said the UK needs electricity prices hit earnings. EBITDA provides ornithological and marine has installed a storage system rebrand and case scenario happening the wealth of positives an to look at the positives, stood at Skr13.5bn versus Skr16.5bn mammal studies across Centrica’s for distribution gridco UK Power 11-12 NOVEMBER 2019 is minimal, let alone more offshore farm will bring if built including the jobs created, in the same period last year. portfolio of offshore wind projects. Networks Services to charge UPS new link-ups than that. It is completely are huge,” he said. the benefits of infrastructure The developer said the first year of electric delivery vehicles at a London Hilton London Canary Wharf, London unrealistic and completely “It needs to be better projects, money plugged n Dong has inaugurated an post-construction monitoring at Lincs depot. The Ingenium U-BESS monitors in UK drive 13 April 2020 8 June 2020 unfair. balanced and we need to look to the UK economy, a low operations centre for the German has yielded important results. depot load remotely at a low-voltage Battery Energy Storage Find out more about “We use a precautionary at reforming these planning carbon future and action on substation and makes stored energy Solutions will unveil a rebrand MARKING TERRITORY: the exciting land and property principle and that needs to applications.” Howard will climate change. renews.biz available to cover any unavoidable at the end of this month as recently completed 29MW opportunities available on capacity deficit. it targets the deployment of 650 Aylesford storage project 80 Attendees 46% Developer/ 25+ Hours of 100MW of grid-scale assets by Speakers Swans Offshore Energy Park in Kent Photo: g2 Operator Unrivalled n NEC Energy Solutions is to supply the year-end. Networking in the North East of England G Orsted with a 20MW storage system The London storage in February and are 6-7 MAY l SECC GLASGOW 6L[+XQGUHGRƦVKRUHZLQGOHDGHUVZLOOJDWKHULQ/RQGRQWKLV1RYHPEHUIRUDQLQWLPDWH for the Danish developer’s Carnegie developer will announce undergoing the final stages ARTWORK DEADLINE: ARTWORK DEADLINE: EXVLQHVVHYHQWWKDWVSHFLDOLVHVLQOHDUQLQJDQGQHWZRUNLQJ7KHWZRGD\DJHQGDSURYLGHV VISIT: Stand 82 Road project near Liverpool, due a name change and new of commissioning ahead of OHDGLQJLQVLJKWVIRUERWKGHYHORSHUVDQGRSHUDWRUVORRNLQJWRH[SORLWQHZPDUNHW online by the year-end. partnerships on 30 May, participation in National Grid’s RSSRUWXQLWLHVDQGLPSURYHRSHUDWLRQDOHƦLFLHQF\DQG\LHOG * Offer includes 6 months rent according to co-founder Firm Frequency Response free office accommodation in the n The global battery energy storage Nicholas Beatty. balancing market. 'RZQORDGWKHEURFKXUHKHUH Swans Centre for Innovation system market will be worth $8.54bn BESS has stepped up The deployments, which 15 April 2020 10 June 2020 MEET US AT THE GIANT GLASGOW SCIENCE by 2023, up from an estimated $1.98bn activity in recent months with both feature BYD lithium- www.swansoffshore.co.uk NETWORKING EVENING CENTRE in 2018, due to increasing demand for the installation of the 29MW ion batteries, raised BESS grid-connected solutions and falling Aylesford scheme in Kent and installed capacity to 63MW. TONIGHT - 18.00 During the evening, explore the Science Centre’s three floors TIMINGS lithium-ion prices, according to a report 20MW Claredown in Essex. BESS also owns the 10MW packed with hundreds of interactive exhibits that will fascinate. 18:00 Doors open Free to attend drinks reception and by Research and Markets. Independent connections Kings Barn Farm capacity 18:15 Please gather for the networking evening Floor 1 is home to some visitor favourites and introduces you provider g2 Energy tackled a market project in West Sussex to some basic science concepts in a fun and interactive way. Lord Provost’s speech in All-Energy extends a warm welcome to all attendees to the 2015 n Korean companies Hanwha Energy full on-site balance of plant initially developed by Anesco. Work together to see if you can solve the brainteasers in the the Atrium Giant Networking Evening and Civic Reception. We are delighted and LSIS are to provide energy contract and grid connection Beatty said Hill Farm in Maths Factor Zone. See a glimpse into your future with our Age 18:20 – 20:30 The Giant you are here with us in our new home of Glasgow and are fully storage systems for two 100MW for the Kent facility. Leicestershire, another 10MW appreciative of your ongoing support and commitment in helping Machine. Networking Evening and battery projects at Lumcloon and All-Energy to remain as the focal point of the industry’s calendar Floor 2 is home to four zones: My World of Work!, MindWorks, Civic Reception continue Both Aylesford and site acquired from Anesco, is and the largest gathering of renewable energy professional Science Fundamentals and Be Creative, Be Innovative. throughout the Science in County Offaly, Claredown were deployed due online in September. Ireland. The consented projects will assembled within the UK. Floor 3 is home to an exhibition all about you. In BodyWorks, you Centre participate in transmission system 15 May 2019 02 On behalf of the entire All-Energy team, we would very much like are the experimentF and the scientist. Complimentary drinks operator Eirgrid’s DS3 balancing 100MW Tilbury charge for RWE to extend our immense gratitude to all of the key stakeholders The dramatic hands-on exhibits allow you to take on the role of and canapés will be served 2019 service tenders this year. RWE Generation has taken the of open-cycle gas turbines. LiVE @ ALL-ENERGY and industry partners, both in Glasgow and throughout the the snot barrier, burn some energy in the giant hamster wheel, throughout the evening. UK and Europe, for all of their amazing help and support in perform a virtual autopsy and bust some moves at the DNA disco. wraps off plans to incorporate The scheme, located in successfully delivering All-Energy this year. We would especially n Siemens has launched a lithium- a 100MW storage facility at Thurrock, is slated to be online like to thank the Lord Provost & Glasgow City Council for their Throughout the floors, our science communicators are there to ion battery solution for all-electric and its proposed 2.9GW Tilbury in the early 2020s. help you to explore and make your experience memorable. ongoing assistance, and for their generosity in hosting this Civic hybrid energy storage applications. Energy Centre in Essex. RWE is expected to submit Leask launches ‘pocket-size’ Reception to welcome us to Glasgow. Enerrgy & MarineMa BlueVault is designed to ensure The German company has a development consent order Wednesday continuity of power, minimise carbon submitted an EIA scoping application to the Planning highlights WindEnergy Hamburg We look forward to welcoming you to another exciting dioxide emissions and maximise report to Energy Secretary Inspectorate by April 2019. and can be deployed from the asset life, performance and safety, the Greg Clark for the full project, The project will replace submersible anchormetres deep and is capable drill of rig Community chest company said. which would also feature a RWE’s Tilbury B -fired industries at All-Energy 2019. back of a multi-purpose work day at All-Energy tomorrow, doors open at 08.30am. UK contractor Leask Marine operating in water depths of Highlands and Islands All-Energy 2020 2.5GW combined-cycle gas- , which is The hardware, designed to boat. is displaying a new custom- up to 90 metres. Enterprise hosts a full-day renews.biz fired power plant and 300MW currently being demolished. install seabed anchors, can Leask Marine business built compact submersible The 30-tonne rig can fit in showcase of innovative, low drill boreholes up to 800 development manager 2020 drilling rig (pictured) for the a 40-foot shipping container carbon, community and local millimetres wide and six Claire Palmer said the new wave, tidal and floating wind energy projects from across equipment will reduce the Scotland. need for customers to hire Community and Local Energy much larger drills from the oil Seminar Theatre, 10:30-17:00 and gas industry. SEC Glasgow “They are over-engineered Offshore account for marine renewables and Offshore wind industry big often subject to limited Hamburg Messe hitters from Orsted, Siemens periods of availability,” she Gamesa, Iberdrola, Vattenfall added. and ORE Catapult guide The company spent £1.6m All-Energy delegates through of its own cash to develop the big issues. the drill in addition to a und Congress N149/5.X Lomond auditorium, 11:00-12:30 £489,000 grant from Scottish Enterprise. The revolution will be XIBLE SITEABILITY Palmer said the rig is HIGHLY FLE electrified designed for quick and safe 5 MW+ POWER OUTPUT ‘Preparing for the electric FORMAT deployment, even in turbulent revolution: technology 5.X waters, reducing drilling time UP TO 17 % HIGHER AEP MW economies and energy’ and costs. “Having worked is the first of five sessions with many wave and tidal hosted by BEIS-funded UK energy companies we know Research and Innovation there is a gap in the market during All-Energy. for this rig,” she added. Dochart, 11:00-12:30 Leask is meanwhile n n targeting further growth in We require artwork to be compiled The advertisement should be full- Speed dating developers the renewables sector having All-Energy hosts a series of acquired Wallsend-based one-to-one speed dating Publishing Publishing marine anchor producer meetings with renewables 5.6 Raptor Anchoring. developers in the dedicated MW The contractor has also Share Fair area located in InDesign wherever possible to colour and can include a link so that set up a new business unit across the exhibition hall in Ireland and is close to above the Central Boulevard. securing its first marine 13 & 14 May 22–25 September Mezzanine, 11:00-12:45 and services contract in the 13:00-15:00 country. produce 150dpi RGB PDFs with all when the reader places their cursor Around the world in 90 minutes Take a tour of emerging offshore wind markets 5.1 including the US, Japan, BOOKING DEADLINE: BOOKING DEADLINE: fonts fully embedded. over the ad they can click through to MW India, Taiwan and China with organisations including Iberdrola, Advent RE, ORE Catapult and Mott MacDonald. 4 May 2020 14 September 2020 What does NOT work well are your website or specific web page. Photo: All-Energy Lomond auditorium, 16:00-17:30

Nova tidal pluswhere battery the system couldbuzz Tidal turbine developer be used to replace diesel EVEN MORE FLEXIBILITY. Nova Innovation is exploring adverts created as ‘images’ using for It is important that you inform us generators. deployment of hybrid marine Chief executive Simon energy and battery projects EVEN MORE POWER. Forrest said Nova recently ARTWORK DEADLINE: ARTWORK DEADLINE: to provide power to island added a Tesla Powerpack at communities following a The next step in the evolution of Delta4000 an existing tidal array off the successful demonstration. Shetland coast as part of a example Photoshop. We then lose of any embedded URLs when the The company is eyeing demo to generate on-demand opportunities in Scotland, nordex-online.com power from the array. Wales, France and Canada, 6 May 2020 16 September 2020 clarity when we distil into a PDF. All artwork is sent over. Our production logos and graphics must be vectors. process requires that we re-embed this To avoid disappointment, secure your advertising information before publication; if we n Graphic providers working on are unaware of its existence the link space in any of our 2020 reNEWS LIVE@ Digital Dailies Macs may be asked to forward may be lost. by CONTACTING THE SALES TEAM now! InDesign ‘packages’ (containing original images and fonts, etc) to n Please send your advertisement mitigate conflicts with our PC-based by email to [email protected] production system. 2020 Media Pack OFFSHORE TECHNOLOGY YEARBOOK 07 Display Advertising Mechanical Data Rates (per issue Dimensions Ref: Name exc. VAT where (width x depth) applicable) Offshore Technology Yearbook F Inside pages – Half-page landscape 204.0mm x 136.7mm £1,025 €1,185 G Inside pages – Tower advert 79.8mm x 291.0mm £855 €980 J Inside pages – Quarter landscape 204.0mm x 68.3mm £680 €785 K Inside pages – Quarter portrait 100.5mm x 137.5mm £680 €785 8 Full-page, including inside covers 210.0mm x 297mm £POA €POA HEADLINE Sponsorship of OTY (see green box below) £POA €POA SECTION Sponsorship of OTY (see green box below) £2,500 €2,795

2O16 14 2O16 16 2-B Energy 2B6 Bonus 2.3 MW Siemens SWT-4.0-130 2-B Energy 2B6 ProjEct DEPLoYMENt VItAL StAtIStIcS IEC class I Key characteristics Key characteristics Key characteristics Radical two-bladed downwind turbine The Bonus 2.3MW partly represents the The new G4 platform is a comprehensive Key characteristics Offshore projects Rotor diameter 140.6m designed for 40-year service life, with ‘an ‘classic’ Danish design philosophy, including evolutionary further development and Get ahead of the market Radical two-bladed downwind turbine designed for 40-year service life, with ‘an One wind farm in development – Power rating 6.0MW integral plant approach.’ It further has two especially a non-integrated high-speed redesign of the SWT-3.6-120. It includes the integral plant approach.’ It further has two nacelle levels, a passive cooler platform, a (2 units, UK, aimed for commissioning in Number of blades 2 nacelle levels, a passive cooler platform, a drivetrain with three-point gearbox SWT-4.0-130, and the SWT-4.0-120 sister self-aligning ‘soft yaw’ system, and a lattice-type welded truss tower. The latter ‘open’ early 2017); perhaps rated above 6.0MW Orientation Downwind self-aligning ‘soft yaw’ system, and a lattice- support, fixed-speed(s) and induction model version with 120-metre rotor of the structure extends from the seabed to the nacelle yaw bearing. Operation Pitch-controlled variable speed Product status Head mass n.a. type welded truss tower. The latter ‘open’ generator; switch to CombiStall with pitch 3.6MW SWT-3.6-120. The SWT-4.0-130 2 structure extends from the seabed to the able blades, first introduced in Bonus 1 remains a dedicated lightweight offshore Product notes Prototype installation completed in Specific power 386W/m nacelle yaw bearing. MW (54m); CombiStall offers superior turbine with high-speed drivetrain and 1. Modular platform design aimed at rapid future up scaling in line with market Eemshaven (NL) at September 30, 2015 Prototype Onshore second half 2015 by taking up one of our Introduction Announced 2007 output control with a near-constant output several design features promoting cost- demand; Product notes level above rated and independent of effective service-friendly upkeep; among 2. ‘Soft yaw’ capability means that the rotor follows wind direction changes Track record Usage Offshore 1. Modular platform design aimed at rapid weather conditions, and eliminates the others fitted with new aero-elastically automatically in normal operating mode, and then only requires some nacelle yaw Onshore prototype Power electronics Medium voltage future up scaling in line with market need for bi-annual blade angle adjustment; tailored slender B63 blades. dampening motion. In emergency situations, like a combination of extreme weather generation system eliminates ‘traditional demand; two-speed generator. and/or turbine failure, eight yaw motors are activated for bringing the turbine in a full size transformer’ at turbine level. 2. ‘Soft yaw’ capability means that the Product notes safe non-operating position. The extra ninth motor provides system redundancy; Drive train Three-stage gearbox with side rotor follows wind direction changes Product notes 1. The evolutionary SWT-4.0-130 further 3. Modest 78-metre rated tip speed. torque supports and a DFIG. automatically in normal operating mode, 1. Fitted with in-house developed and builds on the success of the original and then only requires some nacelle manufactured one-piece-moulding SWT-3.6-107 and SWT-3.6-120 successor, yaw dampening motion. In emergency Bonus B40 blades; offering higher AEP and reduced LCOE; situations, like a combination of extreme 2. Successor of Bonus 2 MW, and the 2. New-generation aero-elastically tailored weather and/or turbine failure, eight outcome of a long-time successful slender blades. They were a key enabler Bonus 2.3 MW ProjEct DEPLoYMENt VItAL StAtIStIcS yaw motors are activated for bringing the company evolutionary product in combining improved performance with SPONSORSHIP turbine in a safe non-operating position. development and optimizing strategy; reduced turbine loading IEC class Initially likely none; The extra ninth motor provides system 3. No hints for a switch to pitch-controlled 3. The SWT-4.0-130 according the supplier Offshore projects later SWT-2.3-82 VS, IEC IA Key characteristics redundancy; variable speed in March 2003, but offers around 13% yield increase 3 wind farms / project turbine – Rotor diameter 82.4m The Bonus 2.3MW partly represents the ‘classic’ Danish design philosophy, including 3. Modest 78-metre rated tip speed. introduced later that year - Bonus 2.3 compared to the SWT-3.6-120 at typical Samsø (10 units, 2002, DK)*; Power rating 2.3MW especially a non-integrated high-speed drivetrain with three-point gearbox support, MW VS; 9-10m/s mean wind speed sites. Rødsand/Nysted (72 units, 2003, DK); Number of blades 3 fixed-speed(s) and induction generator; switch to CombiStall with pitch able blades, 4. Siemens acquired Bonus Energy in Frederikshavn (1 unit, 2003, DK); Orientation Upwind A page-turner for first introduced in Bonus 1 MW (54m); CombiStall offers superior output control with October 2004. a near-constant output level above rated and independent of weather conditions, and * one Samsø turbine lost a complete head Operation CombiStall (active stall) eliminates the need for bi-annual blade angle adjustment; two-speed generator. (nacelle + rotor) at November 28, 2015 controlled fixed speed Head mass 136T (Nacelle 82T, Rotor 54T); Product notes Product status figures SWT-2.3-82 VS 2 1. Fitted with in-house developed and manufactured one-piece-moulding Bonus B40 No more available Specific power 431W/m PACKAGES Prototype 1999 blades; 2. Successor of Bonus 2 MW, and the outcome of a long-time successful company Track record Introduction n.a. evolutionary product development and optimizing strategy; Onshore and offshore total numbers; Usage Onshore and offshore 3. No hints for a switch to pitch-controlled variable speed in March 2003, but 506 units Power electronics None introduced later that year - Bonus 2.3 MW VS; Drive train Non-integrated high-speed 4. Siemens acquired Bonus Energy in October 2004. geared with three-point gearbox support. anyone involved HEADLINE SPONSOR G ProjEcT DEPLoYMENT ProjEcT DEPLoYMENT ProjEcT DEPLoYMENT Offshore projects Offshore projects Offshore projects One wind farm in development – (2 units, 3 wind farms / project turbine – First installed offshore in 2015; UK, aimed for commissioning in early Samsø (10 units, 2002, DK)*; under construction: 2017); perhaps rated above 6.0MW Rødsand/Nysted (72 units, 2003, DK); Sandbank (72 units, 2017, GE) Your COMPANY LOGO Frederikshavn (1 unit, 2003, DK); and Gemini (150 units, 2017, NL) Product status * one Samsø turbine lost a complete head Prototype installation completed in (nacelle + rotor) at November 28, 2015 Product status Eemshaven (NL) at September 30, 2015 Commercially available Product status Track record No more available Track record Onshore prototype Offshore total numbers - n.a. on the front cover (A); Track record Onshore and offshore total numbers; in the industry 506 units VITAL STATISTIcS VITAL STATISTIcS VITAL STATISTIcS your COMPANY NAME IEC class I IEC class Initially likely none; IEC class IB F Rotor diameter 140.6m later SWT-2.3-82 VS, IEC IA Rotor diameter 130m Power rating 6.0MW Rotor diameter 82.4m Power rating 4.0MW Number of blades 2 Power rating 2.3MW Number of blades 3 Orientation Downwind Number of blades 3 Orientation Upwind Operation Pitch-controlled variable speed Orientation Upwind Operation Pitch-controlled variable speed This resource publication n Current turbines Head mass n.a. Operation CombiStall (active stall) Head mass 240T (Nacelle 140T Rotor 100T) on every page (B) Specific power 386W/m2 controlled fixed speed Specific power 301W/m2 Prototype Onshore second half 2015 Head mass 136T (Nacelle 82T, Rotor 54T); Prototype Onshore, December 2012; Introduction Announced 2007 figures SWT-2.3-82 VS initially fitted with 120-metre rotor Usage Offshore Specific power 431W/m2 Introduction 2012; start serial Power electronics Medium voltage Prototype 1999 production 2015; features a comprehensive generation system eliminates ‘traditional Introduction n.a. Usage Offshore; full size transformer’ at turbine level. Usage Onshore and offshore Power electronics Siemens NetConverter 6 HALF-PAGE ADVERTS Drive train Three-stage gearbox with side Power electronics None and MV-transformer in tower base torque supports and a DFIG. Drive train Non-integrated high-speed Drive train Non-integrated high-speed geared with three-point gearbox geared with four-point gearbox catalogue of the past, present n Historic turbines one in each section (C); support. support and future of offshore wind plus COMPANY 2O16 15 2O16 14 2-B Energy 2B6 ProjEcT DEPLoYMENT VITAL STATISTIcS 2-B Energy 2B6 ProjEct DEPLoYMENt VItAL StAtIStIcS IEC class I IEC class I Offshore projects Rotor diameter 140.6m Key characteristics Offshore projects Rotor diameter 140.6m Key characteristics n One wind farm in development – Power rating 6.0MW One wind farm in development – Power rating 6.0MW turbine development. It Floating concepts Radical two-bladed downwind turbine designed for 40-year service life, with ‘an Radical two-bladed downwind turbine designed for 40-year service life, with ‘an (2 units, UK, aimed for commissioning in Number of blades 2 BRANDING on ALL integral plant approach.’ It further has two nacelle levels, a passive cooler platform, a (2 units, UK, aimed for commissioning in Number of blades 2 integral plant approach.’ It further has two nacelle levels, a passive cooler platform, a early 2017); perhaps rated above 6.0MW Orientation Downwind self-aligning ‘soft yaw’ system, and a lattice-type welded truss tower. The latter ‘open’ early 2017); perhaps rated above 6.0MW Orientation Downwind self-aligning ‘soft yaw’ system, and a lattice-type welded truss tower. The latter ‘open’ Operation Pitch-controlled variable speed structure extends from the seabed to the nacelle yaw bearing. Operation Pitch-controlled variable speed structure extends from the seabed to the nacelle yaw bearing. Product status Head mass n.a. Product status Head mass n.a. 2 Prototype installation completed in Specific power 386W/m2 Product notes Prototype installation completed in Specific power 386W/m Product notes Eemshaven (NL) at September 30, 2015 Prototype Onshore second half 2015 1. Modular platform design aimed at rapid future up scaling in line with market Eemshaven (NL) at September 30, 2015 Prototype Onshore second half 2015 1. Modular platform design aimed at rapid future up scaling in line with market includes sections on floating Introduction Announced 2007 Introduction Announced 2007 demand; demand; marketing campaigns, Track record Usage Offshore Track record Usage Offshore 2. ‘Soft yaw’ capability means that the rotor follows wind direction changes 2. ‘Soft yaw’ capability means that the rotor follows wind direction changes Onshore prototype Power electronics Medium voltage automatically in normal operating mode, and then only requires some nacelle yaw Onshore prototype Power electronics Medium voltage automatically in normal operating mode, and then only requires some nacelle yaw generation system eliminates ‘traditional dampening motion. In emergency situations, like a combination of extreme weather generation system eliminates ‘traditional dampening motion. In emergency situations, like a combination of extreme weather full size transformer’ at turbine level. and/or turbine failure, eight yaw motors are activated for bringing the turbine in a full size transformer’ at turbine level. and/or turbine failure, eight yaw motors are activated for bringing the turbine in a Drive train Three-stage gearbox with side safe non-operating position. The extra ninth motor provides system redundancy; Drive train Three-stage gearbox with side safe non-operating position. The extra ninth motor provides system redundancy; torque supports and a DFIG. wind, installation vessels, n Installation vessels and PROMOTION on 3. Modest 78-metre rated tip speed. torque supports and a DFIG. 3. Modest 78-metre rated tip speed.

Bonus 2.3 MW ProjEcT DEPLoYMENT VITAL STATISTIcS Bonus 2.3 MW ProjEct DEPLoYMENt VItAL StAtIStIcS foundation suppliers, cable IEC class Initially likely none; IEC class Initially likely none; reNEWS.BIZ Offshore projects later SWT-2.3-82 VS, IEC IA Offshore projects later SWT-2.3-82 VS, IEC IA Key characteristics Key characteristics 3 wind farms / project turbine – Rotor diameter 82.4m The Bonus 2.3MW partly represents the ‘classic’ Danish design philosophy, including 3 wind farms / project turbine – Rotor diameter 82.4m The Bonus 2.3MW partly represents the ‘classic’ Danish design philosophy, including Samsø (10 units, 2002, DK)*; Power rating 2.3MW especially a non-integrated high-speed drivetrain with three-point gearbox support, Samsø (10 units, 2002, DK)*; Power rating 2.3MW especially a non-integrated high-speed drivetrain with three-point gearbox support, Rødsand/Nysted (72 units, 2003, DK); Number of blades 3 fixed-speed(s) and induction generator; switch to CombiStall with pitch able blades, Rødsand/Nysted (72 units, 2003, DK); Number of blades 3 fixed-speed(s) and induction generator; switch to CombiStall with pitch able blades, Frederikshavn (1 unit, 2003, DK); Orientation Upwind first introduced in Bonus 1 MW (54m); CombiStall offers superior output control with Frederikshavn (1 unit, 2003, DK); Orientation Upwind first introduced in Bonus 1 MW (54m); CombiStall offers superior output control with * one Samsø turbine lost a complete head Operation CombiStall (active stall) lay vessels and service fleets. n Cable-lay vessels a near-constant output level above rated and independent of weather conditions, and * one Samsø turbine lost a complete head Operation CombiStall (active stall) a near-constant output level above rated and independent of weather conditions, and (nacelle + rotor) at November 28, 2015 controlled fixed speed eliminates the need for bi-annual blade angle adjustment; two-speed generator. (nacelle + rotor) at November 28, 2015 controlled fixed speed eliminates the need for bi-annual blade angle adjustment; two-speed generator. Head mass 136T (Nacelle 82T, Rotor 54T); Head mass 136T (Nacelle 82T, Rotor 54T); Product status figures SWT-2.3-82 VS Product notes Product status figures SWT-2.3-82 VS Product notes 2 No more available Specific power 431W/m2 1. Fitted with in-house developed and manufactured one-piece-moulding Bonus B40 No more available Specific power 431W/m 1. Fitted with in-house developed and manufactured one-piece-moulding Bonus B40 Prototype 1999 blades; Prototype 1999 blades; Track record Introduction n.a. 2. Successor of Bonus 2 MW, and the outcome of a long-time successful company Track record Introduction n.a. 2. Successor of Bonus 2 MW, and the outcome of a long-time successful company The fifth annual edition Onshore and offshore total numbers; Usage Onshore and offshore evolutionary product development and optimizing strategy; Onshore and offshore total numbers; Usage Onshore and offshore evolutionary product development and optimizing strategy; 506 units Power electronics None 3. No hints for a switch to pitch-controlled variable speed in March 2003, but 506 units Power electronics None 3. No hints for a switch to pitch-controlled variable speed in March 2003, but Drive train Non-integrated high-speed introduced later that year - Bonus 2.3 MW VS; Drive train Non-integrated high-speed introduced later that year - Bonus 2.3 MW VS; geared with three-point gearbox 4. Siemens acquired Bonus Energy in October 2004. geared with three-point gearbox 4. Siemens acquired Bonus Energy in October 2004. of the respected OTY – n CTV operators support. support. Siemens SWT-4.0-130 ProjEcT DEPLoYMENT VITAL STATISTIcS IEC class IB Key characteristics Offshore projects Rotor diameter 130m The new G4 platform is a comprehensive evolutionary further development and First installed offshore in 2015; Power rating 4.0MW redesign of the SWT-3.6-120. It includes the SWT-4.0-130, and the SWT-4.0-120 sister under construction: Number of blades 3 published in June 2020 – will Sandbank (72 units, 2017, GE) Orientation Upwind model version with 120-metre rotor of the 3.6MW SWT-3.6-120. The SWT-4.0-130 remains a dedicated lightweight offshore turbine with high-speed drivetrain and and Gemini (150 units, 2017, NL) Operation Pitch-controlled variable speed several design features promoting cost-effective service-friendly upkeep; among others Head mass 240T (Nacelle 140T Rotor 100T) 2 fitted with new aero-elastically tailored slender B63 blades. Product status Specific power 301W/m Commercially available Prototype Onshore, December 2012; Product notes initially fitted with 120-metre rotor bring readers seven sections n Fabrication yards 1. The evolutionary SWT-4.0-130 further builds on the success of the original SWT-3.6- Track record Introduction 2012; start serial 107 and SWT-3.6-120 successor, offering higher AEP and reduced LCOE; Offshore total numbers - n.a. production 2015; 2. New-generation aero-elastically tailored slender blades. They were a key enabler in Usage Offshore; combining improved performance with reduced turbine loading Power electronics Siemens NetConverter 3. The SWT-4.0-130 according the supplier offers around 13% yield increase compared and MV-transformer in tower base to the SWT-3.6-120 at typical 9-10m/s mean wind speed sites. Drive train Non-integrated high-speed packed with information: geared with four-point gearbox support Offshore Turbine Yearbook K K

18 20 June 2019 OTY includes vital SPONSORED BY

SponSored by J 2 O19 information on (A) deployment, turbine

03

SponSored by specifics and history, 2O16 (B)equipped with a distance condition- compared with coastal monitoring systems and multiple 02 onshore equivalents. sensors. A shared feature is a In these pioneering medium-speed drive train with BABY STEPS: the world’s first offshorePhoto: Dong permanent magnet generator and wind farm, Vindeby, employed 450kW cases turbine designers and support 164 to 180-metre rotor diameters. Bonus turbines Another radical option is the multi- HISTORIC structure development partners and is an indispensable The output leap between the early rotor turbine. The principle has been had to cope with many uncertainties less complex. However, the maximum 450kW and latest 8MW turbines around since the mid-1920s but including their limited understanding aerodynamic efficiency is about approaches a factor of 18. only one 300kW unit with four of specific marine conditions so its 38% versus typically 45% to 50% for rotors became reality. A Dutch long-running success is all the more horizontal-axis formats while power ome observers see the future of 6MW Multiwind MWT-6000 concept surprising. output control is far more complex. was never built the offshore wind industry as large described in OTY2016 However, while the Wind World S These known disadvantages, two-bladed turbines because they but this year Vestas erected a 900kW and Bonus machines may look largely combined with the fact that there is enable more efficient sea transport prototype with four rotors. desktop reference for similar to today’s 6MW to 8MW ‘super little to no offshore experience with logistics and single-hoist installation Experts differ on the likely pace FORMAT & DEADLINES class’ turbines, the differences in vertical axis wind turbines (VAWT), SPONSORED BY of complete heads. Integration of a and even a possible limit to further technology along with the marine and must be compensated by clear helicopter-landing platform is also up-scaling of offshore wind turbines, environmental challenges are vast. benefits in order to force successful technically feasible. including what could be the most The MHI Vestas V164-8.0MW and market entry and staying power. TURBINES Others reckon two-bladed rotors optimal solutions and sizes. Adwen AD 8-180 models are currently Yet market breakthrough with are dynamically unbalanced requiring Three-bladed, high-speed geared the world’s most powerful turbines. radical concepts has so far proven advanced control strategies and/or designs still dominate but the coming Both are dedicated offshore machines hard, typically hampered by n n anyone involved in the use of a teeter hub to overcome this years will see a rapidly growing role We require artwork to be compiled The advertisement should be full- designed for demanding high-wind, bankability and track record demands, inherent disadvantage especially for direct drive and medium-speed deep-water locations far from shore. real risk and risk perception. manifest during yawing. turbines in the 6MW to 8MW class. They operate with advanced pitch Furthermore, full industrialisation Vertical-axis Darrieus type turbines Siemens is talking about the introduction controlled variable speed and are of a new 7MW to 8MW turbine might have their supporters, especially in of 10MW to 12MW hardware. require an investment in the region of combination with floating structures. Only time will tell which future €200m to €250m. These factors above LISTINGS GUIDE Radical concepts like the 10MW turbine technologies, sizes and Turbines in OTY2016 have all explain why proven conventional Aerogenerator garnered huge initial configurations will ultimately proven the industry, at whatever been listed in order of wind technology is preferred, pushed in InDesign wherever possible to colour and can include a link so that current, future and historic publicity. absolute winners in the market. IB/S by powerful established suppliers VITAL STATISTICS models from pages 4, 21 and Darrieus installations can draw 24, respectively. Images are wielding the necessary financial clout. IEC class 128m/132m from all directions without needing a 5MW reproduced courtesy of the PROJECT DEPLOYMENT Rotor diameter relevant manufacturer unless yaw system, thus making the designs 3 otherwise stated. Power rating Upwind Offshore projects Number of blades Natural Power Off shore 0 Orientation level. produce 150dpi RGB PDFs with all when the reader places their cursor Pitch-controlled variable speed250T Operation 2 Turbine Inspections 2 Product status Head mass 389W/m /377W/m 2013 (onshore) Adwen AD 5-132 No longer commercially available Specific power 2014 following discontinuation of Adwen in Prototype Our qualifi ed engineers perform: Offshore Key characteristics wake of Siemens and Gamesa merger Introduction → Factory inspections Usage Inside nacelle Advanced medium-speed geared turbine model that built on the initial pioneering → Onsite turbine assembly monitoring Track record Power electronics fonts fully embedded. over the ad they can click through to Gamesa G128-4.5MW turbine, which appeared as a prototype in 2008. The innovative It is free to Semi-integrated tube-shape → Snagging and commissioning drive train technology was jointly developed with ZF Wind Power, formerly Hansen 1. Onshore prototype in Canary Islands, Drive train medium-speed geared inspections Transmissions. The 5MW successor models for both onshore and offshore were an in- Spain Blade inspections house optimisation of the 4.5MW G128-4.5MW. Offshore versions were only available → with single-piece rotor blades. → End of warranty inspections → Periodic health inspections Product notes subscribers and will → Client representative for WTG What does NOT work well are your website or specific web page. 1. G132-5.0MW offshore model renamed Adwen AD 5-132; this model was also package management available with a 128-metre rotor diameter. (C) 2. Suitable for placement on monopile-type support structure due to favourable head naturalpower.com mass despite its power rating and rotor size. VITAL STATISTICS I/S 135m [email protected] 3. Cast housing contains main shaft and two rotor bearing, and is flanged to a two- IEC class stage planetary gearbox and PMG; flexible coupling in between gearbox and PMG. 5.0MW PROJECT DEPLOYMENT Rotor diameter 3 4. Adwen product line discontinued in wake of Siemens-Gamesa merger. Power rating be distributed at adverts created as ‘images’ using for It is important that you inform us Upwind Offshore projects Number of blades 1 – Wikinger, Germany (70 units, 2018) Orientation Pitch-controlled variable speed Operation 2 375T (nacelle 235T; rotor349W/m 140T) 2 O19 20Product June status 2019 77 Head mass 2013 Adwen AD 5-135 No longer offered for commercial sale Specific power 2011 following discontinuation of Adwen Prototype Offshore major offshore wind example Photoshop. We then lose of any embedded URLs when the Key characteristics product line in wake of merger of Siemens Introduction Nexans Evolution of offshore-dedicated first-generation ‘super class’ Multibrid M5000-116 VITAL STATISTICSand Gamesa Usage Tower base Builder/shipyard E Ogrey Mek Verksted Power electronics Skagerrak with new enlarged rotor, +35% rotor swept area and in-house blades. Fully integrated highly compact Track record in Farsund Drive train drive train comprising 1.5-stage Product notes Year 1 M5000-135 prototype,1976 70 offshore Description 1. Generates ±8% more energy than the M5000-116 at 9 metres per second mean Designer N/A planetary gearbox with i = 1:10 step-up Purpose-built ship designed for the transport and installation of submarinewind speed high- sites found on the French coast, but diminishing difference at higher Length 118.25 metres ratio and PMG incorporated in compact shows. clarity when we distil into a PDF. All artwork is sent over. Our production voltage power cables wind speed (North Sea) sites. Width 32.15 metres single load-carrying cast structure 2. German engineering consultancy Aerodyn Energiesysteme presented initial concept Draft 5.4 metres Capabilities of this patented design with 100-metre rotor diameter in 1998. Deadweight 9373 tonnes 1) Installation of HVDC and HVAC export cables 3. The third Multibrid 5MW technology owner/licensee Prokon Nord installed M5000 DWT turntable capacity 7000 tonnes 2) Cable burial prototype in 2004; this initial model has rather small nacelle and was later renamed Max speed 10 knots onshore version. The fourth owner Areva Wind (51% share 2007) developed a new Accommodation 60 crew Current deployment offshore version with spacious service-friendly nacelle. A range logos and graphics must be vectors. process requires that we re-embed this N/A 4. Gearbox journal bearings are a genuine wind industry novelty. Single rotor bearing. 5. Full nacelle exchange when major mechanical issue occurs. of advertising and SECTION SPONSOR information before publication; if we

NKT VITAL STATISTICS FIRST FULL-PAGE ADVERT Victoria Builder/shipyard Kleven Norway Year 2017 n Designer SALT Shipdesign sponsorship opportunities Graphic providers working on are unaware of its existence the link Description Length 140 metres Fuel-efficient DP3 vessel capable of simultaneous dual HVDC and fibre optic cable- Width 29.6 metres laying and deep sea HVAC installation Draft 7.2 metres Deadweight 12,700 tonnes in chosen section; Capabilities DWT turntable capacity 7000 tonnes, 1) Installation of HVDC and HVAC export cable installation 4000 tonnes Macs may be asked to forward may be lost. 2) Beaching capabilities – HEADLINE and SECTION – Max speed 14 knots Accommodation 100 crew Current deployment 2019–20: Export cable installation at EDPR’s 950MW Moray East are available (see right). Book plus COMPANY InDesign ‘packages’ (containing now to avoid disappointment. BRANDING on some original images and fonts, etc) to n BOOKING DEADLINE: marketing campaigns, mitigate conflicts with our PC-based 14 May 2020 and PROMOTION on production system. n ARTWORK DEADLINE: reNEWS.BIZ *=$)LUVW&KRLFHLQ862෇VKRUH:LQG 21 May 2020 DQG3RUW'HYHORSPHQW

• Block Island Wind Farm | Geotechnical Investigation )LUVW862෇VKRUH:LQG)DUP • New Bedford Marine Commerce Terminal | Design Team )LUVWDQG2QO\2෇VKRUH:LQG3RUWLQ$PHULFD • South Fork Wind Farm | Geotechnical Investigation • Skipjack Wind Farm | Geotechnical Investigation For more information, contact: Speak to SALES for Send your advertisement by email to Diane Baxter, P.E. | [email protected] Wayne Cobleigh | [email protected] ZZZJ]DFRPR૽VKRUHZLQG

Known for excellence. Built on trust. the package prices [email protected] 2020 Media Pack PROFILES 08 Reach your target audience through our web traffic! Join the growing list of progress, contact details accessible to prospective companies benefitting from and range of services to our customers. the extra exposure provided reNEWS.BIZ readers. And with all these benefits by our Company Profiles page. Each Profile is linked to available to you for an annual This fantastic service reNEWS coverage of your cost of just £549+VAT (€640), provides organisations the company, so positive news can you really afford to miss platform to promote company stories from the past are easily out?

FEATURES This unique marketing package will benefit your company in many ways, including: n 300 word biography, plus image n Latest five stories that your and headline. company has had on reNEWS.biz will n Company name and logo. be listed on your page, to the left of n Social media page icons and links your biography. (if applicable). n Office address and location. n As well as a link to the company n Telephone numbers. Profiles page from the top of our n One click email and website Homepage, your company logo will addresses. also be on a scrolling banner link n Company video (dependent on towards the bottom of our Homepage, format). and on the Profiles front page. DON’T MISS OUT! Promote your company to our 86,000* monthly average unique users (*latest 6 months, source: Google Analytics) each month for just £549+VAT (€640) per year

To book your slot on our Company Profiles page, or for more information, please contact our sales team 2020 Media Pack SUBSCRIBERS & TESTIMONIALS 09 Can you afford to miss out on “reNEWS is an invaluable “EDS HV started advertising source of renewables industry “We subscribe to reNEWS’ the inside track? with reNEWS in 2016 and related news and detail that is fortnightly publication to have been very happy with informative and beneficial” receive all the latest exclusive At reNEWS we pride ourselves With 24 issues a year on digging up news available packed full of important the results over the past two news on the global wind energy only to subscribers. We business information vital to years. The variety of options market. Advertising in reNEWS’ watch the development your company, reNEWS is a and construction markets ‘must read’. that are available plus the publication & online provides more closely than other We offer three levels of helpful advice we have received “We subscribe to reNEWS the ideal platform for us to publications, which is why subscription (see table below) the most knowledgeable to provide all company and from reNEWS staff on how to for quick access to exclusive target companies in the wider people and companies in organisation sizes with an enhance our campaign has industry news. As one of the offshore wind sector and to the renewables industry buy affordable way of keeping up reNEWS. to date. made the decision to continue leading renewable energy increase brand awareness” advertising an easy one. EDS publications, reNEWS is also Subscription Levels Rates (*exc. VAT) HV has also been subscribers an important platform for us to Single subscription £470* €555 to reNEWS digital newsletter promote our presence through Multiple user subscription (up to 10 users) £1,625* €1,840 for many years and we are advertising” continually impressed by the Corporate subscription (unlimited users) £2,825* €3,175 quality of the news they provide To discuss our on the offshore wind sector.” subscription options in more detail, please get in touch with SALES: [email protected] A SELECTION OF OUR CLIENTS