Hazardous Paint Management Capability Statement Cti Consultants Pty Ltd Abn 56 003 824 815 July 2020
Total Page:16
File Type:pdf, Size:1020Kb
HAZARDOUS PAINT MANAGEMENT CAPABILITY STATEMENT CTI CONSULTANTS PTY LTD ABN 56 003 824 815 JULY 2020 INTRODUCTION EQUIPMENT CTI Consultants Pty Ltd is recognised as CTI possesses a range of specialised equipment Australia’s leading consultancy in lead and for use in detecting and monitoring lead, hazardous paint management, having been active including:- in this field since 1991. The directors of CTI Consultants hold qualifications relevant to lead • Portable XRF Lead Analyser paint management and have extensive experience in this subject. Niton XLp 300 portable XRF for field use in detecting and quantifying lead in paint. is a qualified chemist and Fred Salome • High Volume Air Samplers corrosion technologist with more than 35 years experience in the heavy-duty coatings industry. Ecotech 3000 high volume air samplers for He has completed training as a Competent measuring the concentration of Total Suspended Person/Supervisor for de-leading work under a Particulate (TSP) lead, dust and other US OSHA and US EPA accredited training contaminants in ambient air (to AS 2724.3). program run by the SSPC. • Paint Inspection Equipment He is a NACE International Certified Coating Inspector (Marine) and a NACE Protective Full range of paint inspection equipment including Coatings Specialist, and was until recently a lead electronic dry film thickness gauges, paint lecturer in the NACE Coating Inspection Program. inspection gauges, pull-off adhesion tester and surface profile gauges, and a range of equipment Fred has been actively involved in hazardous paint for determining levels of residual contamination on management since 1991 and has published a surfaces. number of articles on the subject. Since 1994 Fred has been delivering CTI’s training courses on Low power field magnifiers and high power hazardous paint management. laboratory microscopes. Until his semi-retirement in 2017, Fred was a Laboratory equipped for basic chemical and paint member of Standards Australia Committees testing procedures. MT/14 and CH/03, and was the chairman of Subcommittee CH/3/11, “Lead paint management” Access to a wide range of chemical analytical during the 2017 rewrites of AS/NZS 4361.1 and laboratories and universities for performing AS/NZS 4361.2. specialist analysis on paints. Carol Bodle holds an Honours Degree in Medical Science, a Masters Degree in Applied Science (Occupational Health and Safety), and a Graduate Certificate of Industrial Hygiene from Deakin University. Carol has been a director of CTI since 1995. She is actively involved in carrying out and reviewing assessments for lead hazards and risk assessments and in managing CTI’s safety training programs for workers exposed to hazardous paints. Hazardous Paint Management Consultancy No. of Pages: 6 CAPABILITY STATEMENT HAZARDOUS PAINT MANAGEMENT JULY 2020 • Queensland Rail; Macrossan Railway Bridge; CAPABILITIES Environmental Monitoring (c/- Southern Steeplejacks; 1993 to 1996) CTI personnel are qualified and experienced in • National Rail, Two Wells Railway Bridge and carrying out a wide range of hazardous paint Hutt River Bridge, SA (c/- Southern management and related services, including:- Steeplejacks; 1994-1997) • Tasmanian Road Bridges Lead Paint Removal; • Surveys for Hazardous Paints Contract Administration and environmental On-site surveys for the detection and monitoring (1994/95, 1996/97, 1997/98 and quantification of hazardous metals and other 1998/99) constituents in paint as well as surveys for • Dept. of Land & Water Conservation; Stevens contamination of the environment including soil, Weir (Deniliquin) & Yarrawonga Weir dust, water and air. (c/- Southern Steeplejacks; 1997) • NSW RTA Bridge Section, Sydney Harbour • Hazardous Paint Management Bridge, North Approaches (design of air Specifications monitoring program, 1995) Preparation of specifications or work programs for • NSW RTA Prince Alfred Bridge over the effective treatment of hazardous paint, Murrumbidgee River, Gundagai (design of development of Hazardous Paint Compliance environmental monitoring program, 1998) Plans (HPCP) and Hazardous Paint Management • Queensland Rail; Alexandra Railway Bridge, Protocols (HPMP) . CTI can also recommend Rockhampton, Qld, – provision of appropriate contractors or suppliers. environmental monitoring services (c/- Lothway TBS, 1998) • Environmental Monitoring • Queensland Rail; Charley’s Creek Railway Ground surveys for hazardous contaminants in Bridge, Chinchilla, Qld – provision of soil & sediment, surveys for contamination in environmental monitoring services (c/- Thomas water and ambient air monitoring programs. Contracting, 1999) Assessment of contaminated wastes. • Queensland Rail; Antigua Railway Bridge, Maryborough, Qld, – provision of • Occupational Risk Assessments environmental monitoring services and on-site Workplace exposure monitoring and other health training of lead paint operators (c/- Diamond risks; advice on medical surveillance programs; Protective Coatings; 1999) risk assessments and design and implementation • ESSO/BHP Longford Gas Plant reconstruction, of control programs; hazardous paint awareness Risk assessment and review of OH&S systems training and safety inductions. and practices, (c/- Lothway TBS, 1999). • Queensland Main Roads; Review of EXPERIENCE environmental and OH&S specifications, Border Bridge and Captain Cook bridge/Riverside Expressway (1998/99). Major clients and recent projects involving • Queensland Main Roads; Border Bridge, hazardous paint management are as follows. Goondiwindi – provision of environmental monitoring services (c/- Gardner Perrott, 1999) INDUSTRIAL LEAD PAINT MANAGEMENT • VicRoads, Merri River Bridge, Warnambool – (SPECIFICATIONS AND/OR ENVIRONMENTAL provision of environmental monitoring services MONITORING) (c/- TPC Painting Contractors, 1999) Survey background levels of lead in the • VicRoads, Albert River Bridge, South environment; design and/or implementation of Gippsland – provision of environmental environmental monitoring programs for lead paint monitoring services (c/- Thomas Contracting, removal works, for a range of clients, including the 1999) Transport for NSW (formerly NSW RTA), Sydney • AWT Engineering (Sydney Water), trains (formerly NSW State Rail) and Tasmanian specifications for lead paint removal, heritage Dept. of Transport. Fence at Centennial Park, Pipe Bridges at Duck, Subiaco & Vineyard Creeks, Aqueducts Specific projects include: at Wolli Creek, Cooks River & Khartoum Road (1998/99), Aqueducts at Mosman and Lane • NSW RTA; Ryde Bridge, Background Cove (2000), Thackeray Street Aqueduct, Environmental Monitoring and Review of Camellia (2001) contractor QA and Compliance (NSW RTA, • Princes Bridge, Melbourne – Coating 1993-1995) assessment and development of lead paint • NSW City Rail, Tempe Bridge, Environmental management specification, Maunsell Partners, Monitoring (c/- Wilson Welders, 1994) 2000 CTI Consultants Pty Ltd Page 2 of 6 CAPABILITY STATEMENT HAZARDOUS PAINT MANAGEMENT JULY 2020 • Sydney Water Pipe Bridges at Subiaco Creek • Thackeray Pipe Bridge Refurbishment, & Vineyard Creek, Provision of environmental Provision of environmental monitoring services monitoring services (Transfield Coatings, 2000) and coating inspection Networks Alliance 2007. • Burdekin River Bridge (Home Hill, • Como Bridge Refurbishment, Provision of Queensland); Preparation of Environmental environmental monitoring services and coating Management Plan, Provision of Environmental inspection Networks Alliance 2008/09. monitoring and Review of Worker Protection • Warragamba Dam Upgrade, Provision of Procedures including on-site inductions and environmental monitoring services, Geotech training (2000-2016) Engineering, 2008/11. • Sydney Water Aqueducts and Pipe Bridges at • Port Adelaide Viaduct, Provision of Cooks River and Wolli Creek; Provision of environmental monitoring services, environmental monitoring services (Lothway Baulderstone 2009/10. TBS, 2001) • Herbert River Bridge, Provision of • Nepean River Railway Bridge at Penrith; environmental monitoring services and training, Condition survey and specification; NSW Rail Contract Resources, 2010. Infrastructure Corporation, 2001 • Bungambrawatha Bridge (Albury) Provision of • Victoria Bridge at Picton; Lead Paint environmental monitoring services and site Management Study for RTA Southern Region audits NSW RTA, 2008. (c/- Environmental Risk Management Pty Ltd, • Swan Hill Bridge Provision of environmental 2001) monitoring services and site audits NSW RTA, • Sydney Water Centennial Park Heritage 2008/09. Fence, Provision of environmental monitoring • Martin Bridge (Taree) Provision of services (Lothway TBS, 2001) environmental monitoring services, training and • Wayatinah Woodstave Pipeline, Hydro Electric site audits NSW RTA, 2008/09. Commission of Tasmania - Provision of • Elevated Water Tank (Railcorp) at Waterfall environmental monitoring services and OH&S (SA) Provision of environmental monitoring monitoring (Transfield Coatings, 2001) services Giovenco Ind., 2009. • Sydney Water Reid Park Aqueduct (Mosman) • Torrens River and Birkenhead Bridges, SA - – Provision of environmental monitoring Provision of environmental monitoring services services (Lothway TBS, 2002) and site audits (Thomas Contracting, 2009). • Sydney Catchment Authority, Warragamba • Rothwell Road Aqueduct (Sydney) Provision of Dam Valve House – Lead Survey, environmental monitoring services and site specifications, 2002 and 2016 audits Lothway-TBS, 2009/10. • Hammerhead Crane at Garden