City of Toronto: Get Involved
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
STAFF REPORT ACTION REQUIRED 8304 Sheppard Avenue East
STAFF REPORT ACTION REQUIRED 8304 Sheppard Avenue East - Official Plan & Rezoning Applications - Preliminary Report Date: February 16, 2010 To: Planning and Growth Management Committee From: Chief Planner and Executive Director Wards: Ward 42 – Scarborough-Rouge River Reference 10 102286 ESC 42 OZ Number: SUMMARY These applications were made on or after January 1, 2007 and is subject to the new provisions of the Planning Act and the City of Toronto Act, 2006. These applications propose a Toronto Transit Commission (TTC) Light Rail Vehicle (LRV) Maintenance and Storage Facility at 8304 Sheppard Avenue East. This facility is intended to serve the Sheppard East, Eglinton Crosstown and Scarborough Malvern Light Rail Transit (LRT) lines which are all part of the Transit City Plan. This report provides preliminary information on the above-noted applications and seeks Planning and Growth Management Committee’s direction on the further processing of the applications and on the community consultation process. These applications seeks to permit a maintenance and storage facility which is a key component of the Transit City Plan. Accordingly, staff is of the view that the application should be deemed a matter of City-wide interest and that all planning reports be routed through and the public Staff report for action – Preliminary Report - 8304 Sheppard Avenue East 1 meeting held before the Planning and Growth Management Committee. The applications should proceed through the normal planning process in terms of community consultation. Staff will attempt to combine the community consultation for these Planning Act applications with the second public open house to be held as part of the required Environmental Assessment process. -
Transit Planning in Toronto: Roles, Priorities and Our Decision Making Framework
INFORMATION ONLY ____________________________________________________________________________ Subject: Transit Planning in Toronto: roles, priorities and our decision making framework Date: July 29, 2015 At the TTC Board meeting on July 29, 2015, Jennifer Keesmaat, Chief Planner, City of Toronto will deliver a presentation titled “Transit Planning in Toronto: roles, priorities and our decision making framework.” Original signed by Vincent Rodo Chief Financial & Administration Officer 1-17 Transit Planning in Toronto: Roles, Priorities and our decision making framework TTC Board Meeting July 29, 2015 Jennifer Keesmaat, Chief Planner and Executive Director City Planning Division PLANNING A GREAT CITY, TOGETHER Overview of Presentation 1. Role of the City Planning Division in Transit Planning 2. Key Transit Planning Projects • SmartTrack/RER • Relief Line Project Assessment • Scarborough Subway Extension Project Assessment • Metrolinx LRT Program • King Streetcar Enhancements • “Feeling Congested?” Transportation Official Plan Review ruill_TORDNIO 2 City Planning Division PROGRAMS • Application Review • Business Performance & Standards • Civic Design • Committee of Adjustment • Design Review • Community Policy • Environmental Planning • Graphics & Visualization • Heritage Preservation • Official Plan & Zoning By-law • Outreach and Engagement • Public Art • Research & Information • Strategic Initiatives • Transit Planning • Waterfront Renewal 3 Transit Implementation Unit Objective Transit planning in the City of Toronto requires a transparent, -
Transit City Progress Update
Toronto Transit City Light Rail Plan City – TTC Team Progress Update February, 2008 Transit City Progress Update CATEGORIES 1. Light Rail Lines and Facilities 2. Vehicles 3. System and Design Standards 4. Processes 1 Progress Update – Light Rail Lines and Facilities PRIORITIZATION OF LINES • report to Commission : November 14, 2007 • lines evaluated against 31 criteria • results: confirm top 3 priorities: – Sheppard East LRT – Etobicoke-Finch West LRT – Eglinton Crosstown LRT • endorsed by Commission, Metrolinx 2 Criteria for Evaluation of Transit City LRT Lines Line Performance: Environmental: • Ridership • Number of Car-Trips Diverted / Replaced – Existing • Reduction in Greenhouse Gases – Projected • Current Market Share / Mode Split • New Rapid Transit Coverage, Reach Constructability, Physical Challenges: – Area (hectares) – Population • Major Physical Challenges, Obstacles – Full-time Jobs • Municipal Right-of-Way Available – Part-time Jobs • Designated, Recognized in Official Plan • Major Generators • Community, Political Acceptance, Support – En Route • Access to Yard, Maintenance Facilities – Terminals – New (Annual) Passenger-Trips/Route-Kilometre – Total (Annual) Passenger-Trips/Route-Kilometre Capital Cost: • Cost/Rider • Construction, Property Costs • Vehicle Costs City- and Region-Building: • Pro-rated Maintenance Facility Costs • Supports MoveOntario 2020 Objectives • Total Cost/Kilometre • Supports Places to Grow Principles • Supports Toronto Official Plan Objectives – Serves Priority Neighbourhoods – Avenues – Re-urbanization -
Eglinton Crosstown Light Rail Transit
The City of Toronto holds public consultations as one way to engage residents in the life of their city. Toronto thrives on your great ideas and actions. We invite you to get involved. Eglinton Crosstown Light Rail Transit (LRT) Transit Project Assessment Study Notice of Commencement and Public Open Houses starting November 23, 2009 Public Consultation We are holding seven Open Houses where you can learn more about this transit project, ask questions, and share your comments. All Open Houses will be held from 6:30pm to 9:00pm. Location and Dates: York Memorial Collegiate, 2690 Eglinton Avenue West Etobicoke Olympium, 590 Rathburn Road Monday, November 23, 2009 Tuesday, November 24, 2009 Northern Secondary School, 851 Mount Pleasant Road Richview Collegiate, 1738 Islington Avenue Wednesday, November 25, 2009 Thursday, November 26, 2009 CNIB Conference Centre, 1929 Bayview Avenue Don Montgomery Community Centre, 2467 Eglinton Avenue East Wednesday, December 2, 2009 Tuesday, December 8, 2009 Beth Shalom Synagogue, 1445 Eglinton Avenue West Thursday, December 10, 2009 Background The Toronto Transit Commission (TTC) and the City of Toronto are planning a new Light Rail Transit (LRT) route along Eglinton Avenue from Kennedy Subway Station to Pearson International Airport. The LRT will link to the Yonge Subway at Eglinton Station and to the Spadina Subway at Eglinton West Station. As part of the Transit City light rail network, this route will connect with the proposed Don Mills LRT, Jane LRT, and Scarborough-Malvern LRT. The Eglinton Crosstown LRT will provide modern, accessible and comfortable light rail transit service. The LRT will operate underground from Laird Drive in the east to Keele Street in the west, as the width of Eglinton Avenue in this area is too narrow to accommodate street level LRT. -
(BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion. -
Relief Line South Environmental Project Report, Section 5 Existing and Future Conditions
Relief Line South Environmental Project Report Section 5 - Existing and Future Conditions The study area is unique in that it is served by most transit modes that make up the Greater 5 Existing and Future Conditions Toronto Area’s (GTA’s) transit network, including: The description of the existing and future environment within the study area is presented in this • TTC Subway – High-speed, high-capacity rapid transit serving both long distance and local section to establish an inventory of the baseline conditions against which the potential impacts travel. of the project are being considered as part of the Transit Project Assessment Process (TPAP). • TTC Streetcar – Low-speed surface routes operating on fixed rail in mixed traffic lanes (with Existing transportation, natural, social-economic, cultural, and utility conditions are outlined some exceptions), mostly serving shorter-distance trips into the downtown core and feeding within this section. More detailed findings for each of the disciplines have been documented in to / from the subway system. the corresponding memoranda provided in the appendices. • TTC Conventional Bus – Low-speed surface routes operating in mixed traffic, mostly 5.1 Transportation serving local travel and feeding subway and GO stations. • TTC Express Bus – Higher-speed surface routes with less-frequent stops operating in An inventory of the existing local and regional transit, vehicular, cycling and pedestrian mixed traffic on high-capacity arterial roads, connecting neighbourhoods with poor access transportation networks in the study area is outlined below. to rapid transit to downtown. 5.1.1 Existing Transit Network • GO Rail - Interregional rapid transit primarily serving long-distance commuter travel to the downtown core (converging at Union Station). -
Matrix of Public Comments Received and Reponses Provided
MATRIX OF PUBLIC COMMENTS RECEIVED AND RESPONSES PROVIDED Eglinton Crosstown LRT Project Detailed Comments and Responses from April 25, 2008 – February 22, 2010 The following table lists comments and / or questions received from members of the public in reference to the Eglinton Crosstown LRT line, from the project’s inception (beginning April 25, 2008) and continuing through to February 22, 2010. These detailed comments were received through various outlets including telephone conversations, email correspondence, fax or letter. Once a comment or question was received, a response was generated by the appropriate project team member and sent out by either the Public Consultation Unit at the City of Toronto, LURA Consulting or the TTC (refer to “Response” column). During the noted timeframe, a total of 584 comments were received and responded to. Each email or phone call was identified by an ID number, linking it to any attachments that might have accompanied the correspondence. In addition, each comment (email, phone call, fax or letter) had the potential to include numerous issues, concerns or question s. Please refer to the “Subject” Column for a summary of the more detailed communication listed in the “Comment / Question” column. Total number of people only requresting to be placed on the mailing list: 54 ID # Date Source Subject Response Date out 203 25-Apr-08 Email Support for better Transit. Sent by Councillor’s office. No details provided therefore no response. N/A Comment: Lives near Trethewey and Eglinton and have to put up with traffic congestion, heavy gas emissions and noise. This area needs to improve. -
Upper Canada Railway Society
INCORPORATED 1952 NUMBER 478 AUGUST 1989 TT\ Cr^uvjit : t ^ i>T. • \ ' , • ^ yd ;'.:-t-;"^ ' ( UPPER CANADA RAILWAY SOCIETY BOX 122 STATION "A" TORONTO, ONTARIO Former CPR business car 2, still in its original maroon paint and gold lettering, is pictured near the site of Leaside Station, Toronto, on July 15, 1989. It rests on a section of new track, slightly over two car lengths long, laid beside the main line but not connected. The car will be available for rent for meetings and other gatherings. It will be repainted in its CPR colours. Thompson The first TTC PCC, .A-1 class 4000, is loaded aboard a truck at Hillcrest Yard on June 21, 1989, for its return to the Rockwood streetcar museum. The car was in the Harvey Shop after being-displayed at the 1988 CNE for the 50th anniversary of PCCs in Toronto. p Thomp.son On July 31, 1989, TTC track crews were busy laying track on Spadina Ave. north from Lakeshore Rd., leading up to the new bridge over the railway tracks. The tracks will be in a raised concrete reservation, similar to the one on Oueens Quay. This view looks northwest from the abandoned CNR High Line embankment . , , „ „, --John D. Thompson , August 1989 UGRS Newsletter 3 Observations from a former Montreal commuter By Bob Sandusky . Vacationing near Dorion, Quebec for a few days in July cartwheel past my eyes. A teen-aged commuter had disembarked provided an opportunity to revisit a few haunts from my CP before his time, with spectacular results but no injury except to ', Lakeshore commuting days of 1965 to 1973. -
M I N U T E S Toronto Transit Commission
M I N U T E S TORONTO TRANSIT COMMISSION Meeting No. 1892 Wednesday, January 23, 2008 A meeting of the Toronto Transit Commission was held in Committee Room 1, Toronto City Hall, 100 Queen Street West, Toronto, Ontario on Wednesday, January 23, 2008 commencing at 1:15 p.m. A. Giambrone (Chair), J. Mihevc (Vice-Chair), M. Thompson, S. Hall, B. Saundercook, P. Milczyn, S. Bussin and A. Perruzza (Commissioners), G. Webster (Chief General Manager), V. Rodo (General Manager – Executive & General Secretary), R. Cornacchia (General Manager – Operations), J. Sepulis (General Manager – Engineering & Construction), B. Leck (General Counsel), A. Chocorlan (Manager - Materials & Procurement), M. Roche (Chief Financial Officer), S. Blakey (Executive Director - Human Resources), A. Smith (Chief Marketing Officer), M. Stambler (Manager – Service Planning), W. Buffett (Assistant General Secretary) and F. Stanois (Coordinator – Secretariat Services) were present. A. Giambrone was in the Chair. R. Thacker, General Superintendent, Wheel-Trans was present for Item No. 13. ______________________________________________ DECLARATION OF INTEREST – MUNICIPAL CONFLICT OF INTEREST ACT - NIL MINUTES OF PREVIOUS MEETING VICE-CHAIR MIHEVC MOVED THAT THE COMMISSION APPROVE THE MINUTES FROM MEETING NOS. 1890 AND 1891 AND THAT THE CHAIR AND GENERAL SECRETARY BE AUTHORIZED TO SIGN THE SAME. THE MOTION BY VICE-CHAIR MIHEVC CARRIED. BUSINESS ARISING OUT OF THE MINUTES – NIL COMMITTEE OF THE WHOLE RESOLUTION a) Committee of the Whole Agenda – January 23, 2008 THE COMMISSION RECEIVED THE COMMITTEE OF THE WHOLE AGENDA FROM THE MEETING HELD ON JANUARY 23, 2008. b) Committee of the Whole Resolution VICE-CHAIR MIHEVC MOVED THAT THE COMMISSION MEET AS THE COMMITTEE OF THE WHOLE AT 9:00 A.M., OR LATER ON WEDNESDAY, FEBRUARY 27, 2008 TO DEAL WITH LITIGATION OR POTENTIAL LITIGATION MATTERS, LABOUR RELATIONS OR EMPLOYEE NEGOTIATIONS AND TO RECEIVE ADVICE WHICH IS SUBJECT TO SOLICITOR-CLIENT PRIVILEGE. -
Transit City Bus Plan August 2009 TRANSITCITY BUS PLAN
Transit City Bus Plan August 2009 TRANSITCITY BUS PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY.................................................................................................... 1 1.0 INTRODUCTION ...................................................................................................... 11 2.0 CURRENT TTC INITIATIVES TO IMPROVE BUS SERVICE ............................................ 12 2.1 MORE-FREQUENT BUS SERVICE, MORE HOURS OF THE DAY ............................ 12 2.2 MAKING BUS SERVICE MORE-RELIABLE, BETTER QUALITY ................................ 13 2.2.1 Hiring Excellent Front-Line Employees..................................................... 13 2.2.2 Customer-Focussed Training ................................................................... 13 2.2.3 Front-Line Workers: Eyes and Ears of the TTC ........................................ 14 2.2.4 More-Reliable Buses, More Accessible, More Amenities .......................... 14 2.2.5 Route Supervisors Help Make it Happen ................................................. 15 2.2.6 Improving and Expanding Wheel-Trans Specialized Service .................... 17 2.3 MAKING BUS SERVICES ACCESSIBLE FOR EVERYONE ....................................... 18 2.4 MAKING BUSES BETTER FOR THE ENVIRONMENT............................................. 19 2.5 IMPROVING CUSTOMER AMENITIES AND SERVICE INFORMATION ................... 19 2.5.1 Service Disruption Notifications.............................................................. 19 2.5.2 Next Vehicle Arrival System: -
Request for Approval of the Scarborough-Malvern Lrt Environmental Assessment Study
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: AUGUST 26, 2009 SUBJECT: REQUEST FOR APPROVAL OF THE SCARBOROUGH-MALVERN LRT ENVIRONMENTAL ASSESSMENT STUDY ACTION ITEM RECOMMENDATION It is recommended that the Commission: 1. Approve the recommendation, of the joint City/TTC Scarborough-Malvern Transit Project Assessment Study, for a Light Rail Transit (LRT) line from Kennedy Station to Sheppard Avenue East along Eglinton Avenue, Kingston Road, Morningside Avenue, Ellesmere Road, and Military Trail, as outlined in this report; 2. Forward this report to the City of Toronto, requesting that City Council, at its meeting on September 30, 2009, approve the recommendations of the Scarborough-Malvern LRT Transit Project Assessment Study and authorize submission of the Environmental Project Report (EPR) to the Ministry of Environment; 3. Note that City Planning is proceeding to amend Map 5 of the Toronto Official Plan to identify Morningside Avenue (from Kingston Road to Sheppard Avenue East) and sections of the roadways in the general vicinity of the University of Toronto Scarborough Campus (portions of Military Trail and Ellesmere Road) as part of the Official Plan’s “Surface Transit Priority Network”, in support of this project; 4. Note that City Planning is proceeding to amend the Right-of-Way widths shown on Map 3 of the Toronto Official Plan for a section of Morningside Avenue, north of Kingston Road to 36 metres (from 30m) and Military Trail between Ellesmere Road and Morningside Avenue to 36 metres (from 27m). FUNDING Funding for the Scarborough-Malvern LRT Preliminary Planning and Environmental Assessment was included in the TTC 2009-2013 Capital Program as approved by City Council on December 10, 2008. -
Developing Toronto's Transit Network Plan: Phase 1
EX13.3 STAFF REPORT ACTION REQUIRED Developing Toronto's Transit Network Plan: Phase 1 Date: March 3, 2016 To: Executive Committee City Manager, Deputy City Manager, Cluster B and Chief Planner & From: Executive Director, City Planning Division Wards: All Reference Number: SUMMARY Significant investment has been made by all three orders of government to expand the transit network and address years of underinvestment in a critical infrastructure system for Toronto. The Toronto York-Spadina Subway Extension (TYSSE), Eglinton LRT (Mount Dennis to Kennedy) and Finch West LRT will be in service by 2021. In order to sustain recent progress, planning for new transit expansion projects must keep pace given the lead times to plan, design and build complex infrastructure. The purpose of this report is to recommend advancing planning and technical analysis on SmartTrack, Scarborough Subway Extension, Relief Line and Waterfront Transit, in order to set the stage for upcoming discussions on funding and financing new transit. In particular, this report recommends: • Finalizing the SmartTrack concept by narrowing the planning analysis to focus on key elements: an optimized Eglinton West LRT extension to Pearson Airport; and two SmartTrack/GO RER integration options that propose an urban service frequency at 11 existing GO RER stations with 4 to 8 new stations on the Kitchener GO and Stouffville/Lakeshore East GO Corridors; • Approving Pape to Downtown via Queen/Richmond as the preferred corridor for the Relief Line, and proceed to determine the preferred alignment and stations; • Completing the review of corridor options and related work for the Scarborough Subway Extension, and develop recommendations to integrate the proposed, optimized Eglinton East LRT into the University of Toronto Scarborough Campus secondary plan; and identify areas in need of an Avenue Study to facilitate intensification along the proposed LRT corridor.