ESPAI BARÇA Projekterläuterung Umbau und Erweiterung Stadion FC

10. September 2015 ESPAI BARÇA

AGENDA

CITY: MASTER PLAN

PROJECTS ECONOMY & FINANCE

CALENDAR

ARCHITECTURAL COMPETITIONS ESPAI BARÇA

PROJECT UNITS

UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN NOU NOU CAMPUS BARÇA DESPÍ, MINIESTADI

CITY: MASTER PLAN ESPAI BARÇA

CITY: MASTER PLAN

PROTECT & INCREASE FC BARCELONA’S PROPERTY: 36 HECTARES FOR SPORTS USE ESPAI BARÇA

CITY: MASTER PLAN

• TAKE ADVANTAGE OF 19 HECTARES IN LES CORTS • RE-VALUE OUR PROPERTY, A MOTOR FOR GROWTH ESPAI BARÇA

URBANISM LES CORTS

• COLABORATION WITH EXPERTS: GARRIGUES LAW FIRM, BCA ARQUITECTURA, RACC, PROMOACSA, SGM, JUAN PABLO MITJANS • MEETINGS WITH TECHNICHAL TEAMS: FCB & BARCELONA MUNICIPALTIY: 9 MONTHS • AGREED DRAFT WORKING DOCUMENT BETWEEN TECHNICAL TEAMS: CLUB & BARCELONA

UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS

ESPAI BARÇA

URBANISM LES CORTS: OBJECTIVES

A. FREE-UP LES CORTS CAMPUS B. REORGANIZE IMMEDIATE AREA C. ELIMINATE VEHICLES FROM SURFACE AREAS D. SEPARATE PEDESTRIAN & VEHICULAR TRAFFIC E. WIDEN SIDEWALKS F. IMPROVE MOBILITY & ACCESSES G. URBANIZE: CREATE PUBLIC PLAZA H. OPEN UP TO NEIGHBORHOOD

UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS

ESPAI BARÇA

URBANISM: CIUTAT ESPORTIVA

• PB2 ARQUITECTES, PWC • PROVISIONAL APPROVAL SJD 14 MAY 2015 • INICIAL APPROVAL SJD 22 JANUARY 2015 • PENDING DEFINITIVE APPROVAL FROM GENERALITAT

UP1 UP2 UP3 UP4 UP5 URBANISM ST JOAN DESPÍ, MINIESTADI

PROJECTS ESPAI BARÇA

WHAT HAVE WE DONE?

1. FUNCTIONAL PROGRAMS 2. BIM MODEL OF CAMP NOU 3. STRUCTURE & FOUNDATIONS STUDIES OF CAMP NOU 4. GEOTECHNICAL STUDIES OF LES CORTS CAMPUS 5. EXISTING & FUTURE INSTALLATION STUDIES 6. ROOF STUDIES FOR NOU CAMP NOU 7. F&B STUDIES 8. MOBILITY STUDIES 9. SMART 10. SUSTAINABILITY

UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA DESPÍ, MINIESTADI

ESPAI BARÇA

WHAT BENEFITS HAVE WE ATTAINED?

1. ENSURE THE PROGRAM FITS WITHIN THE 600 M € APPROVED BUDGET

2. DEVELOP PRECISE BUDGETS FOR EACH AREA OF THE PROJECT

3. PLANNING CONTROL: DEVELOP A CONSTRUCTION SCHEDULE

4. REDUCE RISKS AND UNKNOWNS DURING ALL PHASES OF PROJECT

UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA DESPÍ, MINIESTADI

ESPAI BARÇA

1. FUNCIONAL PROGRAM

OBJECTIVE • ELABORATE REPORTS AND SCHEMATIC PLANS WITH ALL STAKEHOLDER REQUIREMENTS

RESULTS & BENEFITS • DEFINITION OF REQUIRED AREAS SO THAT ARCHITECTS DEVELOP INFORMED PROPOSALS • CALCULATE THE PRECISE COSTS CORRESPONDING TO FUNCTIONAL REQUIREMENTS

CONSULTANT • MB&A

UP1 UP2 UP3 UP4 UP5 URBANISM ST JOAN NOU CAMP NOU NOU PALAU BLAUGRANA DESPÍ, MINIESTADI

ESPAI BARÇA

2. BIM: CAMP NOU STRUCTURE

OBJECTIVE • CREATION OF A 6D MODEL ‘BUILDING INFORMATION MODELLING’: 3D + COSTS + SCHEDULE + FACILITY MANAGEMENT

RESULTS & BENEFITS • AN INNOVATIVE PROJECT, WITH INFORMATION REGARDING STRUCTURE, INSTALLATIONS, MATERIALS, COSTS, MAINTENANCE • FACILITATE THE EXCHANGE AND COORDINATION OF INFORMATION BETWEEN THE DIFFERENT PLANNERS AND CONSULTANTS

CONSULTANTS • SOLUMETRICS, ELOI COLOMA, EIPM & ENGIPROJECTS

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

3. STRUCTURE & FOUNDATIONS

OBJECTIVES • 25 EXCAVATIONS TO TEST THE POSITION & CONDITION OF STRUCTURE • STUDY THE EFFECT OF NOU CAMP NOU ON THE CURRENT STRUCTURE

RESULTS & BENEFITS • IDENTIFY ALL THE IMPROVEMENTS REQUIRED FOR THE NEXT 100 YEARS • FACILITATE THE CONSTRUCTION PROCESS AND REDUCE UNKNOWNS AND RISKS

CONSULTANT • BAC

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

4. GEOTECHNICAL STUDY

OBJECTIVE • ANALIZE THE SOIL AND STUDY COMPOSITION • OBTAIN RECOMMENDATIONS REGARDING THE MOST APPROPRIATE CONSTRUCTION TECHNIQUES

RESULTS & BENEFITS • 34 TESTS REACHING A DEPTH OF 40 METERS • ENSURE THE CONSOLIDATION OF THE CONSTRUCTION ON THE LAND

CONSULTANT • BOSCH & VENTAYOL

UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA DESPÍ, MINIESTADI

ESPAI BARÇA

5. INSTALLATIONS

OBJECTIVE • SCAN, IDENTIFY & DOCUMENT ALL THE CURRENT ELECTRICAL, GAS & WATER INSTALLATIONS • PLAN & DIMENSION THE FUTURE NECESSITIES

RESULTS & BENEFITS • IMPROVE CONSTRUCTION PLANNING TO MINIMIZE IMPACT ON OPERATIONS • IDENTIFY EXISTING INSTALLATIONS FOR REUSE & OPPORTUNITIES FOR RENEWABLE ENERGY • INCORPORATE GAS FOR KITCHENS

CONSULTANTS • ELIN & GESCONRED

UP1 UP2 UP3 UP4 UP5 URBANISM ST JOAN NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA DESPÍ, MINIESTADI

ESPAI BARÇA

6. NOU CAMP NOU ROOF OPTIONS

OBJECTIVE • STUDY ROOF OPTIONS WHICH COMPLY WITH REQUIREMENTS • COST CONTROL: 15% OF NOU CAMP NOU BUDGET

RESULTS & BENEFITS • REPORT WITH 6 POSSIBLE ROOF OPTIONS TO INCLUDE IN ARCHITECTURE COMPETITION BRIEF • COVER & PROTECT ALL SPECTATORS, IMPROVE ATMOSPHERE, COMFORT, TEMPERATURE, SHADOWS, AIRFLOWS • OPPORTUNITY TO INCORPORATE PHOTOVOLTAIC AND GREY WATER SYSTEM • MINIMIZE IMPACT ON THE GRASS

CONSULTANT • SBP

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

6. NOU CAMP NOU ROOF OPTIONS

OPTION 1. CABLE DOME • MARACANA (RIO DE JANEIRO)

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

6. NOU CAMP NOU ROOF OPTIONS

OPTION 2. RING TRUSS ROOF • AVIVA (DUBLIN) • VTB-ARENA OF MOSCOW (UNDER CONSTRUCTION)

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

6. NOU CAMP NOU ROOF OPTIONS

OPTION 3. CANTILEVER • ALLIANZ ARENA (MUNICH) • OLIMPIC STADIUM OF BERLIN

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

6. NOU CAMP NOU ROOF OPTIONS

OPTION 4. MEGA-TRUSS • SAN SIRO (MILAN) • AMSTERDAM ARENA • EMIRATES STADIUM (LONDON)

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

6. NOU CAMP NOU ROOF OPTIONS

OPTION 5. RING CABLE ROOF (ONE COMPRESSION RING) • NATIONAL STADIUM IN BRASILIA • VOLKSWAGEN ARENA (WOLFSBURG)

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

6. NOU CAMP NOU ROOF OPTIONS

OPTION 6. RING CABLE ROOF (TWO COMPRESSION RINGS) • BAYARENA (BAYER LEVERKUSEN) • OLIMPIC STADIUM IN SEVILLA

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

6. NOU CAMP NOU ROOF OPTIONS

OPTION 1. CABLE DOME OPTION 2. RING TRUSS ROOF OPTION 3. CANTILEVER

OPTION 4. MEGA-TRUSS OPTION 5. RING CABLE ROOF (ONE COMPRESSION OPTION 6. RING CABLE ROOF (TWO COMPRESSION RING) RINGS)

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

6. NOU CAMP NOU ROOF OPTIONS

OPTION 1. CABLE DOME OPTION 2. RING TRUSS ROOF OPTION 3. CANTILEVER

OPTION 4. MEGA-TRUSS OPTION 5. RING CABLE ROOF (ONE COMPRESSION OPTION 6. RING CABLE ROOF (TWO COMPRESSION RING) RINGS)

UP1 UP2 UP3 UP4 UP5 NOU CAMP NOU

ESPAI BARÇA

7. FOOD & BEVERAGE

OBJECTIVE • F&B REQUIREMENTS 365 DAYS A YEAR

RESULTS & BENEFITS • NEW & MODERN F&B SERVICES • ATTAIN A MORE ATTRACTIVE BUSINESS PLAN FOR THE CLUB

CONSULTANT • CENTERPLATE

UP1 UP2 UP3 UP4 UP5 URBANISM ST JOAN NOU CAMP NOU NOU PALAU BLAUGRANA DESPÍ, MINIESTADI

ESPAI BARÇA

8. MOBILITY

OBJECTIVE • CREATE A PUBLIC PLAZA FREE OF VEHICLES • NEW UNDERGROUND PARKING

RESULTS & BENEFITS • IMPROVE MOBILITY & MORE EFFICIENT EVACUATION • CREATION OF AN OPEN PLAZA & CAMPUS FOR CITY

CONSULTANT • BCA ARQUITECTURA, PCG, RACC, IDOM & MOMENTUM

UP1 UP2 UP3 UP4 UP5 CAMPUS BARÇA

ESPAI BARÇA

9. SMART BARÇA

OBJECTIVE • CONNECTIVITY WIFI & 4G • IMPROVED EXPERIENCE • INTERACTIVITY & PERSONALIZATION

RESULTS & BENEFITS • APP WITH REAL TIME INFORMATION, REPLAYS, F&B, MERCHANDISING, ACCESS, TRANSIT, & SECURITY INFORMATION • E-TICKETING • ON DEMAND F&B

UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA DESPÍ, MINIESTADI

ESPAI BARÇA

10. SUSTAINABILITY – URBAN CERTIFICATE

UP1 UP2 UP3 UP4 UP5 UP6 URBANISME LES URBANISME SJD I NOU CAMP NOU NOU PALAU CAMPUS BARÇA GLOBAL CORTS NOU MINIESTADI BLAUGRANA

ESPAI BARÇA

10. SUSTAINABILITY – ORGANIZATIONAL CHART

UP1 UP2 UP3 UP4 UP5 UP6 URBANISME LES URBANISME SJD I NOU CAMP NOU NOU PALAU CAMPUS BARÇA GLOBAL CORTS NOU MINIESTADI BLAUGRANA

ESPAI BARÇA

10. SUSTAINABILITY - DIAGRAM

UP1 UP2 UP3 UP4 UP5 UP6 URBANISME LES URBANISME SJD I NOU CAMP NOU NOU PALAU CAMPUS BARÇA GLOBAL CORTS NOU MINIESTADI BLAUGRANA

ESPAI BARÇA

10. SUSTAINABILITY

INICIATIVES • MAINTAIN 45.000 M 2 OF EXISTING FLOOR SLABS 1. DEMOLITION • RECYCLING FROM DECONSTRUCTION • ENVIRONMENTAL CERTIFICATION • REDUCTION OF ELECTRICAL CONSUMPTION THROUGH SELF GENERATION • SOLAR PANELS ON THE ROOF 5. OPERATION 2. SCRAP • LED TECHNOLOGY • REDUCTION OF WATER CONSUMPTION THROUGH IMPLEMENTATION OF GREY WATER SYSTEM • REDUCE FUTURE MAINTENANCE COSTS

CONSULTANTS • SBP, TRANSSOLAR, ELIN & GESCONRED

4. CONSTRUCTION 3. PRODUCTION

UP1 UP2 UP3 UP4 UP5 URBANISM LES CORTS URBANISM ST JOAN NOU CAMP NOU NOU PALAU BLAUGRANA CAMPUS BARÇA DESPÍ, MINIESTADI

ESPAI BARÇA

UP3 NOU CAMP NOU

1. NEW 47.000 M2 ROOF THAT COVERS 100% SPECTATORS 4. 6.000 M2 PHOTOVOLTAIC PANELS

5. GUTTERS FOR WATER COLLECTION 2. CATWALK WITH LED PITCH LIGHTING, NEW SOUND SYSTEM & WIFI ACCESS POINTS 6. FAMILY TIER WITH VIEWS OF FCB’S PUBLIC PLAZA

3. HIGH RESOLUTION LED SCOREBOARDS 7. NEW TRIBUNA 3RD TIER ESPAI BARÇA

UP3 NOU CAMP NOU

8. AWAY FANS CORNER GOL NORD-LATERAL FOR IMPROVED 11. NEW PRESS ZONE WITH IMPROVED SERVICES SECURTIY 12. MASTER CAMERA LOWERED TO IMPROVE BROADCASTING 9. NEW BATHROOMS COMPLIANT WITH REGULATIONS 13. DOUBLE HEIGHT ATRIUM

10. NEW, IMPROVED CONCESSIONS & KITCHEN FACILITIES 14. RAISED PLATFORM TO OPTIMIZE INGRESS, EGRESS & SAFETY ESPAI BARÇA

UP3 NOU CAMP NOU

15. LED FASCIA BOARDS FOR SEATING BOWL ANIMATION 18. NEW HORIZONTAL CIRCULATIONS

16. FIRST TIER WITH IMPROVED SIGHTLINES 19. NEW VERTICAL CIRCULATIONS WITH ELEVATORS & ESCALATORS

17. NEW POSITIONS FOR REDUCED MOBILITY PERSONS WITH 20. RING OF 91 VIP SUITES , 4 SUPERBOXES & 1 RESTAURANT IMPROVED SERVICES ESPAI BARÇA

UP3 NOU CAMP NOU

21. PITCH CLUB WITH CAPACITY FOR 1.000 SPECTATORS 23. NEW UNDERGROUND PARKING

22. PITCH WITH LATEST TECHNOLOGICAL SYSTEMS 24. NEW FOUNDATION WITH RECYCLED STEEL FROM DECONSTRUCTIONS ESPAI BARÇA

RESULTS

ARCHITECTURAL COMPETITION BRIEFS FOR NOU CAMP NOU & NOU PALAU (MORE THAN 1.500 PAGES): • URBANISM - LES CORTS • FUNCTIONAL PROGRAMS NOU PALAU I NOU CAMP NOU • BIM MODEL OF CAMP NOU ENSURE THE CREATIVITY OF THE ARCHITECTS BY • TOPOGRAPHY STUDY PROVIDING A DETAILED BASE OF INFORMATION • GEOTECHNICAL STUDY DEFINING REQUIREMENTS OF THE CLUB & CITY: • UTILITIES – ELECTRICAL, WATER & GAS INFRASTRUCTURE • INSTALLATIONS REQUIRED BY FCB • CAMP NOU STRUCTURAL STUDIES • CONSTRUCTION CALENDAR 2017-2021 • NCN ROOF OPTIONS • BUDGET OF 600 M € • FOOD & BEVERAGE • MOBILITY • CONSTRUCTION PHASING • COST ANALYSIS

UP1 UP2 UP3 UP4 UP5 CAMPUS BARÇA

ECONOMY & FINANCE ESPAI BARÇA

FINANCING

OBJECTIVE • GUARANTEE THAT THE FINANCING WILL NOT LIMIT CLUB RESOURCES: o TO CONTINUE INVESTING IN OUR SPORTS TEAM o NO INCREASE TO SOCIO SEASON TICKET PRICES o REPAY DEBT FINANCING WITHIN 5 YEARS

RESULTS & BENEFITS • PROCESS TO FIND A CONSULTANT TO ADVISE ON THE SALE OF TITLE RIGHTS o AEG, G2, HIGHLIGHT EVENT, IEG, IMG, NAVIGATE RESEARCH, REPUCOM, VAN WAGNER • MEETINS WITH FINANCIAL INSTITUTIONS & INVESTORS o OVER 10 MEETINGS & CONFERENCES

TOTAL ESPAI BARÇA 600 M€ ESPAI BARÇA

BUSINESS PLAN

OBJECTIVE • BUSINESS PLAN DEVELOPMENT • GUARANTEE THE CLUB AN INCREASE OF 30% IN EBITDA

RESULTS & BENEFITS 40M € • MARKET RESEARCH TO MEASURE MARKET DEMAND: EBITDA o 5.600 COMPANIES IN CATALUNYA/MADRID ESPAI BARÇA o 6.786 SOCIS  ANALYSIS OF SPONSORSHIP VALUATIONS: TITLE RIGHTS 125M € + 30% 125M € AND OTHER SPONSORSHIP EBITDA FCB EBITDA FCB Stabilized Estimated VIP / HOSPITALITY Stabilized Estimated CONSULTANTS 2021 / 2022 GA TICKETING 2021 / 2022 • ISG & AEG MARKETING PARKING FOOD & BEVERAGE MEETINGS & EVENTS ESPAI BARÇA

COSTS CONTROL

OBJECTIVES • GUARANTEE THAT THE PROGRAM COMPLIES WITH BUDGET PRESSUPOST RESULTS & BENEFITS • DETAILED COST ANALYSIS BASED ON MEASUREMENTS, MATERIALS, EQUIPMENTS • IDENTIFICATION OF RISKS IN TIME FOR VALUE ENGINEERING 600 M€ CONSULTANTS • RLB & PFM ESPAI BARÇA

PROCUREMENT PROCESS - TRANSPARENCY & OBJECTIVITY

OBJECTIVES • GUARANTEE THE INDEPENDENCE & OBJECTIVITY OF PROCUREMENT PROCESSES PUBLICITY

RESULTS & BENEFITS

• DESIGN OF A PROCUREMENT PROCEDURE ECONOMIC TRANS- PARENCY • ADVICE REGARDING THE DEFINITION OF EVALUATION CRITERIAS FOR PROCUREMENT • PROCUREMENT AUDIT PRINCIP • ESPAI BARÇA WEBSITE TO IMPROVE TRANSPARENCY LES

CONSULTANTS QUALITY EFFCIENCY • ERNST & YOUNG

EFFECTIVE- NESS CALENDAR ESPAI BARÇA

CALENDAR 2015

JUNE - JULY 2015 NOV. – DEC. 2015 ARCHITECTURE TECHNICAL REVISION COMPETITION NCN I ARCHITECTURE NPB – Phase 1 COMPETITION NCN I NPB 24 MAY 2015 AUGUST 2015 SEP. 2015 MUNICIPAL FINALIST LIST SUBMISSION ELECTIONS ARCHITECTURE URBANISM LES COMPETITION NCN I NPB CORTS

GEN FEB MAR ABR MAI JUN JUL AGO SET OCT NOV DES

JULY 2015 AUGUST - OCT. 2015 22 JAN 2015 MAR – MAY 2015 MAY 2015 DEFINITIVE ARCHITECTURE INICIAL APPROVAL ARCHITECTURE NOU MINIESTADI APPROVAL COMPETITION NCN I URBANISM SJD COMPETITION NOU ARCHITECTURE URBANISM NPB – Phase 2 MINIESTADI WINNER SJD

14 MAY 2015 JULY 2015 DEC. 2015 PROVISIONAL ELECTIONS WINNER ANNOUNCED APPROVAL FC BARCELONA NCN I NPB URBANISM SJD ESPAI BARÇA

CALENDAR 2016-2021

SEASON 2017/18 INAUGURATION NOU MINIESTADI SEASON 2017/18 CONSTRUCTION NCN I NPB

2016 2017 2018 2019 2020 2021

JAN 2016 SEASON 2019/20 SEASON 2021/22 CONSTRUCTION NOU MINIESTADI INAUGURATION NOU PALAU INAUGURATION NOU CAMP NOU BLAUGRANA JAN 2016 PROJECT DEVELOPMENT NCN I NPB ARCHITECTURAL COMPETITIONS ESPAI BARÇA

INTERNATIONAL ARCHITECTURAL COMPETITIONS – NOU CAMP NOU & NOU PALAU BLAUGRANA

COMPETITION WITH TWO PHASES

JURY: FORMED BY 9 MEMBERS • 5 FCB: 4 BOARD MEMBERS + 1 ARCHITECT • 3 COAC MEMBERS • 1 BARCELONA CITY COUNCIL MEMBER

TECHNICAL COMMISSION: FORMED BY 9 MEMBERS • 7 FCB • 2 COAC MEMBERS

ESPAI BARÇA

INTERNATIONAL ARCHITECTURE COMPETITIONS – NOU CAMP NOU & NOU PALAU BLAUGRANA

COMPETITION WITH TWO PHASES: RFQ + RFP

FIRST PHASE: PREQUALIFICATION • 5 JUNE: COMPETITION BRIEF WITH RULES & CRITERIAS FOR THE SELECTION OF THE SHORTLIST PUBLISHED ON FCB’S WEBSITE • 5 JUNE – 6 JULY: SUBMISSION PERIOD FOR TEAM PREQUALIFICATION • JULY / AUGUST: REVIEW BY THE TECHNICAL COMISSION & SELECTION OF FINALISTS BY JURY

SECOND PHASE: REQUEST FOR PROPOSAL • SEPTEMBER: COMPETITION BRIEF WITH RULES & REGULATIONS COMPLETE WITH TECHNICAL DOCUMENTATION SUBMITTED TO FINALIST TEAMS • NOVEMBER: SUBMISSION OF ARCHITECTURAL PROPOSALS • DECEMBER: REVIEW BY TECHNICAL COMMISSION & FINAL SELECTION BY JURY • JANUARY: WINNERS ANNOUNCED

ESPAI BARÇA

CALENDARI COMPETICIONS

03 SETEMBRE 2015 GENER 2016 COMENÇA 2a VOLTA EL JURAT ESCULL ALS AGOST 2015 CONCURSOS GUANYADORS DE LES COMPETICIONS D’UP3 LA COMISSIÓ TÈCNICA 15 NOVEMBRE 2015 ENTREGA LES & UP4 ENTREGA RECOMANACIONS AL GENER 2016 DOCUMENTACIONS 2a JURAT CONTRACTE I INICI VOLTA CONCURS UP4 PROJECTE

JUN JUL AGO SEP OCT NOV DEC GEN

AUGUST 2015 EL JURAT 5 JUNY 2015 SELECCIONA 6-8 1 DESEMBER 2015 DESEMBRE 2015 PARTICIPANTS PUBLICACIÓ 6 JULIOL 2015 ENTREGA LA COMISSIÓ TÈCNICA PER LA 2a VOLTA DOCUMENTS ENTREGA DOCUMENTACIONS 2a ENTREGA LES CONCURSOS DOCUMENTACIONS 1a VOLTA CONCURS UP3 RECOMANACIONS AL UP3 & UP4 VOLTA CONCURSOS JURAT

UP1 UP2 UP3 UP4 UP5 UP6 NOU CAMP NOU NOU PALAU BLAUGRANA

ESPAI BARÇA

COMPETITION ANNEXES – APPROX. 1.500 PAGES UP3 UP4 • PLEC DE BASES • PLEC DE BASES • PROPOSTA MPGM LES CORTS-PLANTA • PROPOSTA MPGM LES CORTS-PLANTA • NOU CAMP NOU PROGRAMA • NOU PALAU BLAUGRANA PROGRAMA • ESPAI BARÇA CAMPUS-PROJECTE BÁSIC APARCAMENT • ESPAI BARÇA CAMPUS-PROJECTE BÁSIC APARCAMENT • CAMP NOU ESTUDI TOPOGRÁFIC EMPLAÇAMENT • PALAU BLAUGRANA ESTUDI TOPOGRÁFIC EMPLAÇAMENT • CAMP NOU ESTUDI GEOTÉCNIC • PALAU BLAUGRANA ESTUDI GEOTÉCNIC • CAMP NOU MODEL ASBUILT 3D BIM • PALAU BLAUGRANA MODEL ASBUILT 3D BIM • CAMP NOU ESTUDI DE L’ESTRUCTURA EXISTENT • PALAU BLAUGRANA ASBUILT INSTALACIONS • NOU CAMP NOU ESTUDI DE LES PROPOSTES DE COBERTA • NOU CAMP NOU REQUERIMENTS F&B • CAMP NOU ASBUILT INSTALACIONS • NOU CAMP NOU REQUERIMENTS SMART • NOU CAMP NOU REQUERIMENTS F&B • NOU CAMP NOU CONCEPTES DE SOSTENIBILITAT • NOU CAMP NOU REQUERIMENTS SMART • DOCUMENTACIÓ GRÁFICA DESCRIPTIVA DE LES PROPOSTES I • NOU CAMP NOU CONCEPTES DE SOSTENIBILITAT DETALL D’ENTREGABLES • DOCUMENTACIÓ GRÁFICA DESCRIPTIVA DE LES PROPOSTES I DETALL • PLANTILLA D’ESTIMACIÓ DE COST D’ENTREGABLES • CALENDARI GLOBAL BÁSIC D’EXECUCIÓ DEL PROJECTE • PLANTILLA D’ESTIMACIÓ DE COST • MODEL DE CONTRACTE DE SERVEIS DE GENERAL PLANNER • CALENDARI GLOBAL BÁSIC D’EXECUCIÓ DEL PROJECTE • NOU PALAU BLAUGRANA RENDERINGS CONCEPTUALS • MODEL DE CONTRACTE DE SERVEIS DE GENERAL PLANNER • DECLARACIÓ RESPONSABLE • NOU CAMP NOU RENDERINGS CONCEPTUALS • CAMP NOU IMATGES HISTÓRIQUES • DECLARACIÓ RESPONSABLE UP1 UP2 UP3 UP4 UP5 UP6 NOU CAMP NOU NOU PALAU BLAUGRANA

ESPAI BARÇA

UP3 PARTICIPANTS - 26 TOTAL (LOCAL PARTICIPATION REQUIRED) • !#!/,&G& FCB& • '/*&G&,!-&!"/&!326(5#!5/4&G& !!'&!326(5#!5#4&G&3>4!-! 3(!&G& (&-!!(/&1!3(!(/& • !%+&G&,:!!&:7!34&!3!'(5#!54& • *!!-&!3!'(5#!5#-&G&!41&!3!'(5#!5#-& • !361&G& /%(++&5!++#3&"#&!326(5#!563!& • *44&"#4(&-&&3/61&G&,!5#/&!326(5#!5/4& • !5#+(#3&5/,&4'##'!-&G&,!,#-&"/,(-&/?#3-#45&%#33$& • -(**#-&4#**#(&G&)/!-&1!4!6!+&?&3!,/-&!64(0& • (&&G&("/,&G& !!4& • 1!55#3-&G&&1/&G&!( & • !36;&:&/35(;&G&&!3!#4&"#&4#5!&@& /-#5&G&5:14!& • 1/16+/64&G&)/4#1&,(!4&!326(5#!5#4&G&3!3&!326(5#!5#4& • "1&!3!'(5#!54&G& 6(9!"#?,!3&!3(5&G& &!&!326(5#!563!& • 158&!3!'(5#!54&G&!!"(&&3/61G4'!3#& • %#3-!-"#4&!326(5#5(4&!4/!(!"/4&G)(-#5&6 !!'&!326(5#!5#4& • 4/65/&,/63!&!326(5#!5/4&G-# !-&5#33!"#4&,6-5!./+!& • &#-4+#3&41/354&G&/! & • 47EB&G&%3!-!&%#3-!-"#;&!32& • &,1&G&!+/-4/& !+!&6#3&3(#3!&G&!(!&G& !3!#+/? !+!-;0&!326(5#!5#4& • 6-456"(/&G&!44&!3!'(5#!*5#-G)1!,G,!-4(++!& • &3(,4'!8G!5#+(#3&%#33#5&GLj"(&!!3,#&1(-/4& • 7!+/"#&(&1(453#& • '#!5'#38(!*&456"(/&G&8//&G&#, 5& 7(4(/-D7#-6#&G& >(>&& • '*4&!3!'(5#!563#&G&!/9&G& !5++#&(&3/(&&!326(5#!5#4 • • ;!'!&'!"("&!3!'(5#!54&G&&!46++!&!326(5#!563!&

UP1 UP2 UP3 UP4 UP5 UP6 NOU CAMP NOU

ESPAI BARÇA

UP3 EVALUATION

UP3 FINAL DISTRIBUTION (26 TOTAL) COMPLEIX REQUERIMENTS ADMINISTRATIUS EXCELLENT CVS & EXPERIENCE

BONS GENERAL PLANNERS 27%

31% MODERATE CVS

EXPERIÈNCIA EXCEL·LENT EN ESTADIS

12% MODERATE EXPERIENCE 31%

ELIMINATED FOR RECOMANATS ADMINISTRATIVE REASONS

UP1 UP2 UP3 UP4 UP5 UP6 NOU CAMP NOU

ESPAI BARÇA Projekterläuterung Umbau und Erweiterung Stadion FC Barcelona

10. September 2015