Templeton Reconnaissance Report
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Draft – Massdot Capital Investment Plan 1
DRAFT – MASSDOT CAPITAL INVESTMENT PLAN 1 To our customers I am pleased to present the Massachusetts Department of Transportation’s (MassDOT) draft five-year Capital Investment Plan (CIP). Over the coming weeks, we look forward to your feedback on the proposed projects that are funded. This document, in many respects, is the outcome of both Governor Patrick and the Legislature’s seven year effort to deliver on transportation reform and investment. In 2007, an immediate transportation needs bond bill was passed and signed into law, and the Governor created the first ever Mobility Compact to enable the historically siloed transportation agencies to work together to improve our system. One year later, the Patrick Administration worked with the Legislature to enact the $3.0 billion Accelerated 1 Secretary of Transportation Richard Davey offering remarks at the 2013 Bridge Program to address hundreds of crumbling bridges in Transportation Day on the Hill event at the State House. Massachusetts. In 2009, Governor Patrick and the Legislature delivered landmark transportation reform legislation that eliminated bureaucracies, improved safety and the customer experience, saved the taxpayer hundreds of millions of dollars and created MassDOT. In 2011 and 2012, the Patrick Administration launched a series of statewide conversations to hear the public’s vision for the future of transportation in the Commonwealth and ideas for how to equitably pay for it. This past July, new transportation reforms and additional resources became available to invest in transportation. And now, we are publishing the first consolidated transportation capital plan in the Commonwealth’s recent history. This CIP is designed to be a transparent, comprehensive plan that describes how MassDOT is funded and provides a roadmap for balancing in our statewide transportation needs with fiscally constrained transportation resources. -
180 Potowomut River Basin
180 POTOWOMUT RIVER BASIN 01117000 HUNT RIVER NEAR EAST GREENWICH, RI LOCATION.--Lat 41°38’28", long 71°26’45", Washington County, Hydrologic Unit 01090004, on right bank 45 ft upstream from Old Forge Dam in North Kingstown, 1.5 mi south of East Greenwich, and 2.5 mi upstream from mouth. DRAINAGE AREA.--22.9 mi2. PERIOD OF RECORD.--Discharge: August 1940 to current year. Prior to October 1977, published as "Potowomut River." Water-quality records: Water years 1977–81. REVISED RECORDS.--WSP 1621: 1957–58; 1995. GAGE.--Water-stage recorder. Datum of gage is 5.42 ft above sea level. REMARKS.--Records good. Flow affected by diversions for supply of East Greenwich, North Kingstown, Warwick, and Quonset Point (formerly U.S. Naval establishments). AVERAGE DISCHARGE.--62 years, 46.9 ft3/s. EXTREMES FOR PERIOD OF RECORD.--Maximum discharge, 1,020 ft3/s, June 6, 1982, gage height, 3.73 ft, from rating curve extended above 440 ft3/s; maximum gage height of 6.78 ft, Aug. 31, 1954 (backwater from hurricane tidal wave); no flow at times in water years 1948, 1960, 1971, 1975–77, 1983, 1986–87, caused by closing of gate at Old Forge Dam. EXTREMES OUTSIDE PERIOD OF RECORD.--Maximum stage since at least 1915, about 8.5 ft Sept. 21, 1938 (backwater from hurricane tidal wave). EXTREMES FOR CURRENT YEAR.--Maximum discharge, 836 ft3/s, Mar. 22, gage height, 3.43 ft; minimum, 6.0 ft3/s, Oct. 30, Sept. 20. DISCHARGE, CUBIC FEET PER SECOND, WATER YEAR OCTOBER 2000 TO SEPTEMBER 2001 DAILY MEAN VALUES DAY OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP 1 13 7.7 -
Annual Report 2011
Annual Report 2011 Massachusetts Division of fisheries & WilDlife Wayne F. MacCallum Director Julie English, Administrative Assistant Jack Buckley Rob Deblinger, Ph.D. Deputy Director Deputy Director Administration Field Operations Laura Cooke (part-year) Debbie McGrath Administrative Assistant to the Administrative Assistant to the Deputy Director, Administration Deputy Director, Field Operations and Field Headquarters Clerical Supervisor An Agency of the Department of Fish & Game Table of Contents The Board Reports .............................................................................................4 Fisheries ...........................................................................................................11 Wildlife .............................................................................................................25 Habitat Management on Private Lands ...........................................................40 Natural Heritage & Endangered Species Program .........................................45 Information & Education ................................................................................51 Hunter Education ............................................................................................57 District Reports ................................................................................................61 Wildlife Lands ..................................................................................................75 Federal Aid Program ........................................................................................82 -
Hydrology of Massachusetts
Hydrology of Massachusetts Part 1. Summary of stream flow and precipitation records By C. E. KNOX and R. M. SOULE GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1105 Prepared in cooperation with Massachusetts Department of Public ff^orks This copy is, PI1R1rUDLIt If PROPERTYr nuri-i LI and is not to be removed from the official files. JJWMt^ 380, POSSESSION IS UNLAWFUL (* s ' Sup% * Sec. 749) UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON : 1949 UNITED STATES DEPARTMENT OF THE INTERIOR J. A. Kruft, Secretary GEOLOGICAL SURVEY W. E. Wrather, Director For sale by the Superintendent of Documents, U. S. Government Printing Office Washington 25, D. G. - Price 91.00 (paper cover) CONTENTS Page Introduction........................................................ 1 Cooperation and acknowledgments..................................... 3 Explanation of data................................................. 3 Stream-flow data.................................................. 3 Duration tables................................................... 5 Precipitation data................................................ 6 Bibliography........................................................ 6 Index of stream-flow records........................................ 8 Stream-flow records................................................. 9 Merrimack River Basin............................................. 9 Merrimack River below. Concord River, at Lowell, Mass............ 9 Merrimack River at Lawrence, Mass............................... 10 North Nashua River near Leominster, -
Burlington Admission to the MWRA Waterworks System
THE COMMONWEALTH OF MASSACHUSETTS WATER RESOURCES COMMISSION 100 CAMBRIDGE STREET, BOSTON MA 02114 REPORT OF THE FINDINGS, JUSTIFICATIONS, AND DECISION OF THE WATER RESOURCES COMMISSION Relating to the Approval of the Town of Burlington’s Request for an Interbasin Transfer Pursuant to M.G.L. Chapter 21 § 8C DECISION On November 12, 2020, by a ten to one (10-1) vote, the Massachusetts Water Resources Commission (WRC) approved the Town of Burlington’s request for an Interbasin Transfer to join the Massachusetts Water Resources Authority (MWRA) Water Works System. This vote was taken after review of the facts provided by the Town of Burlington, analysis of the associated data, and consideration of comments received concerning this request. INTRODUCTION On November 26, 2019, the WRC received a request from the Town of Burlington for approval of an action to increase the present rate of interbasin transfer under the Interbasin Transfer Act (ITA) (M.G.L. Chapter 21 §§ 8B-8D) as part of a Draft Environmental Impact Report (DEIR) submitted to the Massachusetts Environmental Policy Act (MEPA) office. The DEIR proposed a water supply transfer through an interconnection to MWRA. Additional information was requested by the WRC and received in the Final EIR, submitted in February 2020. The Secretary’s Certificate on the FEIR was issued on April 17, 2020. The WRC accepted Burlington’s application as complete at its May 14, 2020 meeting. Burlington is proposing to purchase a maximum of 6.5 million gallons per day (MGD) of water from MWRA to supplement its existing water supply source, the Mill Pond Reservoir (Figure 1). -
T Ro U T Sto C K E D Wat E Rs
2021 MASSACHUSETTS TROUT STOCKED WATERS CONNECTICUT VALLEY DISTRICT Daily stocking updates can be viewed at Mass.gov/Trout. All listed waters are stocked in the spring. Bold waters are stocked in spring and fall. AGAWAM: Westfield River GILL: Fall River AMHERST: Adams Brook, Amethyst Brook, GRANBY: Bachelor Brook, Dufresne Farm Pond Cushman Brook, Fort River, Mill River, Puffers Pond GREENFIELD: Fall River, Green River (Factory Hollow Pond) HADLEY: Fort River, Harts Brook, Mill River, USFW BELCHERTOWN: Jabish Brook, Metacomet Lake, Pond Quabbin Reservoir, Scarboro Brook, Swift River HAMPDEN: Scantic River, South Branch Mill River BERNARDSTON: Fall River, Shattuck Brook HATFIELD: Mill River BRIMFIELD: Dean Pond, Foskett Mill Stream,Little Alum Pond, Mill Brook, Quaboag River, Quinebaug HOLLAND: Hamilton Reservoir, Holland Pond, River, Sherman Pond Quinebaug River CHICOPEE: Chicopee Reservoir HOLYOKE: Broad Brook COLRAIN: East Branch North River, Green River, LEVERETT: Doolittle Brook, Roaring Brook, Sawmill North River, West Branch North River River CONWAY: Bear River, Deerfield River, Poland Brook, LEYDEN: Green River, Shattuck Brook South River LUDLOW: Broad Brook, Chapin (Haviland) Pond, DEERFIELD: Deerfield River, Mill River Chicopee River EAST LONGMEADOW: South Branch Mill River MONSON: Chicopee Brook, Chicopee Brook Reservoir, Conant Brook, Quaboag River, Scantic EASTHAMPTON: Broad Brook, Hannum Brook, River Manhan River, Nashawannuck Pond, North Branch Manhan River MONTAGUE: Goddard Brook, Millers River, Sawmill River ERVING: Keyup -
Belchertown, MA Waterbody Assessment, 305(B)/303(D), And
MA34-27_2008 CaldwellCaldwell Brook Brook Fort River (5) MA36-29_2008 Fort River Cadwell Creek (2) New Salem Knights 202 Pelham ThurstonThurston Brook Brook Pond 9 MA36077_2008 Cadwell Creek Knights Pond (2) ScarboroScarboro BrookBrook JabishBrook JabishBrook MontagueBrook MontagueBrook Quabbin Reservoir PlumPlum BrookBrook Hop Brook Baby Carriage Brook Baby Carriage Brook MA34035_2008 Amherst Lake Holland (4c) Arcadia Lake MA34005_2008 Metacomet Arcadia Lake (5) Lake MA34051_2008 Ware Metacomet Lake (5) Jarish Brook Batchelor Brook Peppers Mill MA34-06_2008 Pond Lampson Brook (5) MA34-07_2008 Bachelor Brook (4a) MA36121_2008 Peppers Mill Pond (3) MA34-07_2008 Bachelor Brook (4a) MA34024_2008 Lampson Brook MA36129_2008 Forge Forge Pond (5) Quabbin Reservoir (4a) (TMDL) Pond Weston Brook 9 MA36-09_2008 Swift River (2) MA34-23_2008 Belchertown Beaver Granby Weston Brook (5) Brook 202 MA34037_2008 MA36010_2008 Ingraham Brook Pond (4c) Beaver Lake (4c) JabishJabish CanalCanal Turkey Hill Brook Turkey Hill Brook 21 Swift River MA36-09_2008 Swift River (2) Swift River Roaring Brook StonyBrook StonyBrook Jabish Brook MA36-06_2008 Ware River (5) Swift MA34-19_2008 River Galusza Stream MuddyMuddy BrookBrook Stony Brook (5) Broad Brook Broad Brook 181 Ware River Ware River 32 BroadBroad BrookBrook CanalCanal MA36117_2008 Pattaquattic Pond (2) Muddy MA36-10_2008 Brook Swift River (3) MA36145_2008 Springfield Forest Springfield Reservoir (2) Reservoir Lake Stony MA36014_2008 Brook Bennett Street Pond (3) Second PondBrook Second PondBrook Higher Brook MA36043_2008 MA36063_2008 Forest Lake (4c) Ludlow MA36-10_2008 Swift River (3) Crystal Lake (2) MA36003_2008 HarrisHarris BrookBrook Ware Alden Pond (5) River Notes: MA36-07_2008 Ware River (2) Palmer 1) Adapted from Final Massachusetts Year 2008 Integrated List of Waters; M A 36 -06_ 2008 available at http://www.mass.gov/dep/water/resources/08list2.pdf M A 36 -22_ 2008 M A 36 -07_ 2008 2) Waterbodies shown without an identified category are assigned as Category 3 by definition. -
Route 122 Lost Villages Scenic Byway H V R D CO a a N O P a R N U
ROUTE 122 ~ LOST VILLAGES SCENIC BYWAY Welcome to Oakham Home of the Lost Village of Coldbrook Springs A History of Oakham Pre-1675 The present town of Oakham was virgin forest occupied by Nipmuck Indians who made seasonal camps in the area for hunting, About Historic Coldbrook Springs Village fishing, and farming. 1675 During the King Philip War (167 5–1676) a 150 square mile area known as Naquag became the stronghold for Indian activity. This MAP INDEX included what is now Barre, Rutland, Hubbardston, parts of Princeton 27 Evander Parker and Paxton. Menamesit, just west of Naquag and Mount Wachusett, 28 Thomas Kennedy in present day Princeton, served as gathering places for the Nipmuck, Narragansett, and Wampanoag tribes. Many of the surviving Native 29 Nellie Potter Americans left the region looking for new homes. Those that remained 30 Nellie Potter were forced to live in four “Indian Towns” under close supervision by 30A Potter Pond Dam the colonists. This left the area of Naquag open for colonial expansion. 30B Potter Pond Dam 1686 In 1686, five Nashaway Indians, who claimed ownership of 31 Enrico Perticarari Coldbrook House in Coldbrook Springs Village The once bustling village of Coldbrook Springs is now Naquag, sold this territory to a group of land speculators from 32 Oren Carpenter Lancaster for “25 pounds hard cash.” a scenic byway with no evidence of its past history 33 Frank Izzi 1722 Scotch-Irish immigrants began to buy lots in this area; the except for the stone monument erected in 2005 by 34 Samuel Bruno town of Rutland was incorporated as a Congregational community. -
2019 Annual Report
2019 Annual Report Massachusetts Division of Fisheries & Wildlife 161 Annual Report 2019 Massachusetts Division of Fisheries & Wildlife Mark S. Tisa, Ph.D., M.B.A. Director 163 Table of Contents 2 The Board Reports 6 Fisheries 60 Wildlife 82 Natural Heritage & Endangered Species Program 98 Information & Education 114 Hunter Education 116 District Reports 138 Wildlife Lands 149 Archivist 150 Federal Aid 152 Personnel Report 154 Financial Report Front Cover: Jim Lagacy, MassWildlife Angler Education Coordinator, teaches Fisheries Management to campers at the Massachusetts Junior Conservation Camp in Russell. Photo by Troy Gipps/MassWildlife Back Cover: A blue-spotted salamander (Ambystoma laterale), a state-listed Species of Special Concern, rests on an autumn leaf at the Wayne F. MacCallum Wildlife Management Area in Westborough. Photo by Troy Gipps/MassWildlife Printed on Recycled Paper. 1 The Board Reports Joseph S. Larson, Ph.D. Chairperson Overview 32 years of experience with MassWildlife, including as the The Massachusetts Fisheries and Wildlife Board consists Assistant Director of Fisheries for 25 years; as the Depu- of seven persons appointed by the Governor to 5-year ty Director of the agency for the previous 3 years (March terms. By law, the individuals appointed to the Board are 2015—April 2018); and most recently as its Acting Director, volunteers, receiving no remuneration for their service to effective April 30, 2018. The Fisheries and Wildlife Board ap- the Commonwealth. Five of the seven are selected on a pointed Director Tisa because of his lifelong commitment to regional basis, with one member, by statute, representing wildlife and fisheries conservation and his excellent record agricultural interests. -
Otsego County 'New York Geographical __D Historical
O T S EG O C O U N TY ' NEW YO RK G e o gr a ph i c a l __d H i s t o r i c a l F R O M T H E E A R L I E S T S E T T L E M E N T T O T H E P R E S E N T TIM E . W ITH C O U N TY A N D TO W N S H IP M A P S F R O M . OR IG IN A L D R A W IN G S By W ‘ a B E D IN F . B A C ON , p . N ONEONTA, . Y. T ON ONTA H ER AL D P lis h r H E E , ub e s . 1 2 90 . P R EF A C E Th ere is a growing demand for the means of local geo a a n d u graphic l historical st dy in schools, and this little manual is intended to meet this dem and for the schools of Otsego County . It was originally prepared in manuscript for classes in the Oneonta State Normal school and now, with the approval and encou ragement of the school commissioners and teachers of ff . the county, is o ered in its present form In its preparation I have had the pleasu re of visiting every n towshipin the county , thus gaining information at first hand and from the most relia ble sources . -
Water Quality Report: 2014 Quabbin Reservoir Watershed Ware River Watershed
Water Quality Report: 2014 Quabbin Reservoir Watershed Ware River Watershed Quabbin Reservoir from Rattlesnake Hill (Peter Deslauriers, May 21, 2014) June 2015 Massachusetts Department of Conservation and Recreation Office of Watershed Management Division of Water Supply Protection ABSTRACT This report is a summary of water quality monitoring methods and results from 24 surface water stations established throughout the Quabbin Reservoir and Ware River watersheds and other special investigative samples. The Department of Conservation and Recreation (DCR), Division of Water Supply Protection (DWSP), is the state agency charged with the responsibility of managing Quabbin Reservoir and its surrounding natural resources in order to protect, preserve, and enhance the environment of the Commonwealth and to assure the availability of pure water to future generations. The Environmental Quality Section manages a comprehensive water quality monitoring program to ensure that Quabbin Reservoir and its tributaries meet state water quality standards. As part of this task, the Environmental Quality Section performs the necessary field work, interprets water quality data, prepares reports of findings, and makes changes as necessary. This annual summary is intended to meet the needs of watershed managers, the concerned public, and others whose decisions must reflect water quality considerations. Quabbin Reservoir water quality in 2014 satisfied the requirements of the Filtration Avoidance Criteria established under the Environmental Protection Agency Surface Water Treatment Rule. Monitoring of tributaries is a proactive measure aimed at identifying general trends and problem areas that may require additional investigation or corrective action. Compliance with state surface water quality standards among the tributaries varied with minor exceedances attributed to higher pollutant loads measured during storm events, wildlife impacts on water quality, and natural attributes of the landscape. -
NHDES TFC Presentation
STATEWIDE TARGET FISH COMMUNITY ASSESSMENT Public Information Meeting – August 27, 2018 Prepared for: Presented by: 1 MEETING AGENDA • Background on Target Fish Community (TFC) Models • Overview of the Phases of the Process • Examples • River-Specific Discussions 2 TFC MODEL DEVELOPMENT • Method derived from Bain and Meixler (2000) and (2005) methods • Meant to characterize the relative abundance (percentage) of species in a river based on data from similar rivers • Reference river data are not from “pristine” or “unimpacted” conditions, but should be from riverine areas that are considered good quality and are not severely degraded • NHDES has used these methods previously for the Souhegan and lower Lamprey River. This project developed TFC models for 22 Designated River systems 3 TFC MODEL DEVELOPMENT PHASES • Delineation of Designated River segments • Current fish community shifts that change along the river • Physical characteristics that change along the river • Selection of Reference Rivers with similar characteristics to the Designated River segments • GIS – Physical characteristics • Selection of Reference River Fish Community Data • Processing to remove stocked fish and non-native species • Evaluation of Data Sufficiency – Do we have Reference River Data to provide strong/accurate models? • Development of TFC Model for each Designated River segment 4 TFC MODEL DEVELOPMENT – APPLIED TO EACH DELINEATED SEGMENT Physical Characteristics of a River GIS Initial Final Exercise All Fish Data Data GIS Final Fish Community Fish Screening