Hydrology of Massachusetts

Total Page:16

File Type:pdf, Size:1020Kb

Hydrology of Massachusetts Hydrology of Massachusetts Part 1. Summary of stream flow and precipitation records By C. E. KNOX and R. M. SOULE GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1105 Prepared in cooperation with Massachusetts Department of Public ff^orks This copy is, PI1R1rUDLIt If PROPERTYr nuri-i LI and is not to be removed from the official files. JJWMt^ 380, POSSESSION IS UNLAWFUL (* s ' Sup% * Sec. 749) UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON : 1949 UNITED STATES DEPARTMENT OF THE INTERIOR J. A. Kruft, Secretary GEOLOGICAL SURVEY W. E. Wrather, Director For sale by the Superintendent of Documents, U. S. Government Printing Office Washington 25, D. G. - Price 91.00 (paper cover) CONTENTS Page Introduction........................................................ 1 Cooperation and acknowledgments..................................... 3 Explanation of data................................................. 3 Stream-flow data.................................................. 3 Duration tables................................................... 5 Precipitation data................................................ 6 Bibliography........................................................ 6 Index of stream-flow records........................................ 8 Stream-flow records................................................. 9 Merrimack River Basin............................................. 9 Merrimack River below. Concord River, at Lowell, Mass............ 9 Merrimack River at Lawrence, Mass............................... 10 North Nashua River near Leominster, Mass........................ 14 Nashua River at East Pepperell, Mass............................ 15 South Branch Nashua River at Clinton, Mass...................... 16 Assabet River at Maynard, Mass.................................. 19 Concord River at Lowell, Mass................................... 20 Concord River below River Meadow Brook, at Lowell, Mass......... 21 Sudbury River at Pramingham Center, Mass........................ 22 Lake Cochituate Outlet at Cochituate, Mass...................... 25 Ipswich River Basin............................................... 28 Ipswich River at South Middleton, Mass.......................... 28 Ipswich River near Ipswich, Maas................................ 29 Mystic River Basin................................................ 30 AberJona River at Winchester, Mass.............................. 30 Mystic Lake near Medford, Mass.................................. 31 Charles River Basin............................................... 32 Charles River at Charles River Village, Mass.................... 32 Charles River at Waltham, Mass.................................. 33 Mother Brook at Dedham, Mass.................................... 34 Neponset River Basin.............................................. 35 Neponset River at Norwood, Mass................................. 35 Taunton River Basin............................................... 36 Taunton River at Titicut near Bridgewater, Mass................. 36 Taunton River at State Farm, Mass............................... 37 Wading River near Norton, Mass.................................. 38 Providence River Basin............................................ 39 Blackstone River at Worcester, Mass............................. 39 Blackstone River at Northbridge, Mass........................... 40 Blackstone River at Woonsocket, R. I............................ 41 QuinsIgamond River at North Qrafton, Mass....................... 42 Mumford River at East Douglas, Mass............................. 43 Thames River Basin................................................ 44 Quinebaug River at Westville, Mass.............................. 44 Quinebaug River at Quinebaug, Conn.............................. 45 Little River at Buffumvllle, Mass............................... 46 Connecticut River Basin........................................... 47 Connecticut River at Turners Falls, Mass........................ 47 Connecticut River at Montague City, Mass........................ 49 Connecticut River at Sunderland, Mass........................... 50 Connecticut River at Holyoke, Mass.............................. 52 Connecticut River at Thompsonville, Conn........................ 53 Millers RiVer near Winchendon, Mass............................. 54 Millers River at South Royalston, Mass.......................... 56 Millers River at Erving, Mass................................... 57 Sip Pond Brook near Winchendon, Mass............................ 59 Priest Brook near Winchendon, Mass.............................. 61 Otter River near Gardner, Mass.................................. 62 East Branch Tully River near Athol, Mass........................ 63 Moss Brook at Wendell Depot, Mass............................... 65 Deerfield River at Charlemont, Mass............................. 67 Deerfield River at Shelburne Falls, Mass........................ 68 Deerfield River near West Deerfield, Mass....................... 69 North River at Shattuckville, Mass.............................. 70 Mill River at Northampton, Mass................................. 71 Ware River at Cold Brook, Mass.................................. 72 Ware River at Gibbs Crossing, Mass.............................. 73 Chicopee River at Indian Orchard, Mass.......................... 75 Swift River at West Ware, Mass.................................. 76 East Branch Swift River near Hardwlck, Mass.................... 78 Quaboag River at West Warren, Mass.............................. 79 III IV CONTENTS Stream-flow records Continued. Connecticut River Basin Continued. Page Quaboag River at West Brlmfleld, Mass........................... 80 Mill River at Springfield, Mass................................. 82 Westfleld River at Knlghtvllle, Mass............................ 83 Westfleld River near Westfleld, Mass............................ 35 Middle Branch Westfleld River at Qoss Heights, Mass............. 87 West Branch Westfleld River at Huntington, Mass................. 89 Westfleld Little River at outlet of Cobble Mountain Reservoir near Westfleld, Mass.......................................... 90 Westfleld Little River near Westfleld, Mass..................... 91 Borden Brook near Westfleld, Mass............................... 93 Farmlngton River near New Boston, Mass.......................... 94 Housatonlc River Basin............................................ 96 Housatonlc River at Coltsvllle, Mass............................ 96 Housatonlc River near Great Barrlngton, Mass.................... 97 Housatonlc River at Falls Village, Conn......................... 99 Hudson River Basin................................................ 101 Hooslc River at Adams, Mass..................................... 101 Hooslc River near Wllllamstown, Mass............................ 102 North Branch Hooslc River at North Adams, Mass.................. 103 Duration tables................................................... 104 Index of precipitation records...................................... 109 Precipitation records............................................... 112 Acushnet.......................................................... 112 Adams............................................................. 113 Agawam............................................................ 115 Amherst........................................................... 113 Ashburnham........................................................ 115 Ashby............................................................. 115 Ashland........................................................... 115 Athol (Fryville).................................................. 116 Athol (Water Works)............................................... 116 Attleboro......................................................... 117 Barnstable (Water Co.).......................... ... ............. 117 Barnstable (Hyannis).............................................. 118 Barre (Ware River Intake)........................................ 118 Barre............................................................. 119 Bedford........................................................... 119 Belchertown....................................................... 119 Belchertown (Springfield Water Works)............................. 120 Berlin............................................................ 120 Beverly........................................................... 120 Blllerlca (North)................................................. 121 Blandford......................................................... 121 Boston............................................................ 122 Boston (b)........................................................ 123 Boston Arnold Aboretum).......................................... 124 Boston Brookllne Pumping Station)................................ 124 Boston Chestnut Hill)............................................. 124 Boston West Roxbury)............................................. 125 Boylston.......................................................... 126 Bralntree......................................................... 126 Brldgewater (State Farm) (a)...................................... 127 Brldgewater (State Farm) ( b)...................................... 127 Brlmfleld (West).................................................. 127 Brockton (City Hall).............................................. 127 Brockton (Sewage Disposal Works).................................. 128 Cambridge City Hall)............................................
Recommended publications
  • Restoration Plan and Environmental Assessment for the Industri-Plex Superfund Site Town of W Oburn, Middlesex County, Massachusetts
    Rest oration Plan and Environmental Asses sment for the Industri-Plex Superfund Site Draft for Public Review February 19, 2020 Prepared by: Industri-Plex NRDAR Trustee Council Commonwealth of Massachusetts U.S. Fish and Wildlife Service National Oceanic and Atmospheric Administration With support from: Abt Associates 6130 Executive Boulevard Rockville, MD 20852 Abt Associates Report Title Insert Date ▌1-1 This page intentionally left blank Industri-Plex RP/EA February 19, 2020 ▌i CONTENTS CONTENTS List of Acronyms ...................................................................................................................... iv Executive Summary ................................................................................................................. vi 1. Introduction to the Restoration Plan and Environmental Assessment ..................... 1 1.1. Trustee Responsibilities and Authorities ................................................................. 1 1.2. Summary of Industri-Plex NRDAR Settlement ........................................................ 2 1.3. Summary of Natural Resource Injuries ................................................................... 2 1.4. Purpose and Need for Restoration .......................................................................... 4 1.5. Restoration Goals ...................................................................................................4 1.6. Coordination and Scoping ....................................................................................... 4
    [Show full text]
  • DEERFIELD RIVER WATERSHED Assessment Report
    DEERFIELD RIVER WATERSHED Assessment Report 2004-2008 Downstream of Fife Brook Dam The Commonwealth of Massachusetts Executive Office of Environmental Affairs The Commonwealth of Massachusetts Executive Office of Environmental Affairs 251 Causeway Street, Suite 900 Boston, MA 02114-2119 Mitt Romney GOVERNOR Kerry Healey LIEUTENANT GOVERNOR Tel: (617) 626-1000 Fax: (617) 626-1181 Ellen Roy Herzfelder or (617) 626-1180 SECRETARY http://www.state.ma.us/envir November 19, 2004 Dear Friends of the Deerfield River Watershed: It is with great pleasure that I present you with the Assessment Report for the Deerfield River Watershed. The report helped formulate the 5-year watershed action plan that will guide local and state environmental efforts within the Deerfield River Watershed over the next five years. The report expresses some of the overall goals of the Executive Office of Environmental Affairs, such as improving water quality, restoring natural flows to rivers, protecting and restoring biodiversity and habitats, improving public access and balanced resource use, improving local capacity, and promoting a shared responsibility for watershed protection and management. The Deerfield River Watershed Assessment Report was developed with input from the Deerfield River Watershed Team and multiple stakeholders including watershed groups, state and federal agencies, Regional Planning Agencies and, of course, the general public from across the Watershed. We appreciate the opportunity to engage such a wide group of expertise and experience as it allows the state to focus on the issues and challenges that might otherwise not be easily characterized. From your input we have identified the following priority issues: • Water Quantity • Water Quality • Fish Communities • Wildlife and Terrestrial Habitat • Open Space • Recreation I commend everyone involved in this endeavor.
    [Show full text]
  • Massachuse S Bu Erflies
    Massachuses Bueries Spring 2020, No. 54 Massachusetts Butteries is the semiannual publication of the Massachusetts Buttery Club, a chapter of the North American Buttery Association. Membership in NABA-MBC brings you American Butteries and Buttery Gardener . If you live in the state of Massachusetts, you also receive Massachusetts Butteries , and our mailings of eld trips, meetings, and NABA Counts in Massachusetts. Out-of-state members of NABA-MBC and others who wish to receive Massachusetts Butteries may order it from our secretary for $7 per issue, including postage. Regular NABA dues are $35 for an individual, $45 for a family, and $70 outside the U.S, Canada, or Mexico. Send a check made out to “NABA” to: NABA, 4 Delaware Road, Morristown, NJ 07960 . NABA-MASSACHUSETTS BUTTERFLY CLUB Ofcers: President : Steve Moore, 400 Hudson Street, Northboro, MA, 01532. (508) 393-9251 [email protected] Vice President-East : Martha Gach, 16 Rockwell Drive, Shrewsbury, MA ,01545. (508) 981-8833 [email protected] Vice President-West : Bill Callahan, 15 Noel Street, Springeld, MA, 01108 (413) 734-8097 [email protected] Treasurer : Elise Barry, 363 South Gulf Road, Belchertown, MA, 01007. (413) 461-1205 [email protected] Secretary : Barbara Volkle, 400 Hudson Street, Northboro, MA, 01532. (508) 393-9251 [email protected] Staff Editor, Massachusetts Butteries : Bill Benner, 53 Webber Road, West Whately, MA, 01039. (413) 320-4422 [email protected] Records Compiler : Mark Fairbrother, 129 Meadow Road, Montague, MA, 01351-9512. [email protected] Webmaster : Karl Barry, 363 South Gulf Road, Belchertown, MA, 01007. (413) 461-1205 [email protected] www.massbutteries.org Massachusetts Butteries No.
    [Show full text]
  • Transcanada Hydro Northeast Inc. Deerfield River Project (Lp 2323)
    TRANSCANADA HYDRO NORTHEAST INC. DEERFIELD RIVER PROJECT (LP 2323) LOW IMPACT HYDROPOWER CERTIFICATION APPLICATION ATTACHMENT C PROJECT DESCRIPTION Project Overview TransCanada Hydro Northeast, Inc. (the Company) owns and operates the Deerfield River Project (the Project) on the Deerfield River, a major tributary to the Connecticut River. The Project is located in Bennington and Windham Counties in Vermont, and in Berkshire and Franklin Counties in Massachusetts. It consists of eight developments: Somerset, Searsburg, Harriman, Sherman, Deerfield No. 5, Deerfield No. 4, Deerfield No. 3 and Deerfield No.2, having a total installed capacity of 86 megawatts (MW). All dam operations and generation operations are controlled remotely from the Deerfield River Control Center in Monroe Bridge Massachusetts, located near the Deerfield No. 5 Dam. The Project area encompasses about a 65-mile reach of the river, including reservoirs. Two other developments not owned by the company are also located within this area. They are Brookfield Renewable Power’s Bear Swamp Project located downstream of the Deerfield No. 5 development; and Consolidated Edison’s Gardner Falls Project located downstream of the Deerfield No. 3 development. Exhibit 1 depicts the general Project area. Settlement Agreement The Deerfield River Project was one of the first FERC Projects to be relicensed under a comprehensive Settlement Agreement approach executed in 1994. A five-year cooperative consultation process involving state and federal resource agencies, various non-governmental organizations (NGOs) and the licensee (at that time New England Power Company) resulted in settlement by the parties. The process of reaching this agreement included examination of the power and non-power tradeoffs and effects of a wide variety of operational scenarios.
    [Show full text]
  • Statistical Framework for Water Quality Load Estimation
    Water Tuftsand University People Environmental Studies Lunch & Learn Richard M. Vogel Oct 20, 2011 Tufts University Medford, MA Outline Tufts University Emerging Issues: Water and People: Some Big Problems Water Supply – Boston Metro Region Water and Urbanization Water and Climate Water and Food Water and Human Water Use Outline Tufts University Emerging Issues: Water and People: An Intro to some big problems Water and Health Water Supply – NYC and Boston Water and Urbanization Water and Climate Water and Food Water and Human Water Use Water and People: Why do people know so little about water? Tufts University Hydrologic science is an interdisciplinary science which involves the interfaces among earth, ocean and atmospheric sciences. Hydrology is a geoscience Why isn‟t it taught like geology, biology, meteorology, or chemistry? Water Problems are Human Problems Tufts University Global Population Growth 10 8 6 4 2 Population in Billions in Population 0 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 YEAR (AD) Water Problems Result From Human Influences and they are Ramping Up Tufts University Water and People Tufts University Water Pollution and Water Scarcity Are the two biggest water challenges of the 21st Century Water and People Tufts University Today, 1 out of 6 people, more than a billion Suffer from inadequate access to safe freshwater Tufts University Water and Poverty Tufts University Irrigation can lift rural poor out of poverty Tufts University Average income levels & irrigation intensity in India Income per capita Income
    [Show full text]
  • Ffy 2019 Annual Listing of Obligated Projects Per 23 Cfr 450.334
    FFY 2019 ANNUAL LISTING OF OBLIGATED PROJECTS PER 23 CFR 450.334 Agency ProjInfo_ID MassDOT _Project Description▼ Obligation FFY 2019 FFY 2019 Remaining Date Programmed Obligated Federal Advance Federal Fund Fund Construction Fund REGION : BERKSHIRE MassDOT 603255 PITTSFIELD- BRIDGE REPLACEMENT, P-10-049, LAKEWAY DRIVE OVER ONOTA 10-Jul-19 $2,919,968.00 $2,825,199.25 Highway LAKE MassDOT 606462 LENOX- RECONSTRUCTION & MINOR WIDENING ON WALKER STREET 15-Apr-19 $2,286,543.00 $2,037,608.80 Highway MassDOT 606890 ADAMS- NORTH ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION TO ROUTE 21-Aug-19 $800,000.00 $561,003.06 Highway 8A (HODGES CROSS ROAD) MassDOT 607760 PITTSFIELD- INTERSECTION & SIGNAL IMPROVEMENTS AT 9 LOCATIONS ALONG 11-Sep-19 $3,476,402.00 $3,473,966.52 Highway SR 8 & SR 9 MassDOT 608243 NEW MARLBOROUGH- BRIDGE REPLACEMENT, N-08-010, UMPACHENE FALLS 25-Apr-19 $1,281,618.00 $1,428,691.48 Highway OVER KONKAPOT RIVER MassDOT 608263 SHEFFIELD- BRIDGE REPLACEMENT, S-10-019, BERKSHIRE SCHOOL ROAD OVER 20-Feb-19 $2,783,446.00 $3,180,560.93 Highway SCHENOB BROOK MassDOT 608351 ADAMS- CHESHIRE- LANESBOROUGH- RESURFACING ON THE 25-Jun-19 $4,261,208.00 $4,222,366.48 Highway ASHUWILLTICOOK RAIL TRAIL, FROM THE PITTSFIELD T.L. TO THE ADAMS VISITOR CENTER MassDOT 608523 PITTSFIELD- BRIDGE REPLACEMENT, P-10-042, NEW ROAD OVER WEST 17-Jun-19 $2,243,952.00 $2,196,767.54 Highway BRANCH OF THE HOUSATONIC RIVER BERKSHIRE REGION TOTAL : $20,053,137.00 $19,926,164.06 Wednesday, November 6, 2019 Page 1 of 20 FFY 2019 ANNUAL LISTING OF OBLIGATED PROJECTS PER
    [Show full text]
  • Views of the Blackstone River and the Mumford River
    THE SHlNER~ AND ITS USE AS A SOURCE OF INCOME IN WORCESTER, AND SOUTHEASTERN WORCESTER COUNTY, MASSACHUSETTS By Robert William Spayne S.B., State Teachers College at Worcester, Massachusetts 19,3 A thesis submitted to the Faculty of Oberlin College in partial fulfillment of the requirements for the Degree of Master of Arts in the Department of Geography CONTENTS Ie INTRODUCTION Location of Thesis Area 1 Purpose of Study 1 Methods of Study 1 Acknowledgments 2 II. GEOGRAPHY OF SOUTHERN WORCESTER COUNTY 4 PIiYSICAL GEOGRAPHY 4 Topography 4 stream Systems 8 Ponds 11 Artificial 11 Glacial 12 Ponds for Bait Fishing 14 .1 oJ Game Fishing Ponds 15 Climatic Characteristics 16 Weather 18 POPULATION 20 Size of Population 20 Distribution of Population 21 Industrialization 22 III. GEOGRAPHICAL BASIS FOR TEE SHINER INDUSTRY 26 Recreational Demands 26 Game Fish Resources 26 l~umber of ;Ponds 28 Number of Fishermerf .. 29 Demand for Bait 30 l IV. GENERAL NATURE OF THE BAIT INDUSTRY 31 ,~ Number of Bait Fishermen 31 .1 Range in Size of Operations 32 Nature of Typical Operations 34 Personality of the Bait Fishermen 34 V. THE SHINER - ITS DESCRIPTION, HABITS AND , CHARACTERISTICS 35 VI. 'STANDARD AND IlIIlPROVISED EQUIPMENT USED IN .~ THE IhllUSTRY 41 Transportation 41 Keeping the Bait Alive 43 Foul Weather Gear 47 Types of Nets 48 SUCCESSFUL METHODS USED IN NETTING BAIT 52 Open Water Fishing 5'2 " Ice Fishing 56 .-:-) VII. ECONOMIC IMPORTANCE OF THE SHINER INDUSTRY ~O VIII. FUTURE OUTLOOK FOR THE SHINER INDUSTRY 62 IX. BIBLIOGRAPHY 69 x. APPENDIX 72 LIST OF ILLUSTRATIONS Following Page .
    [Show full text]
  • Metro Boston Regional Climate Change Adaptation Strategy - WORKING DRAFT
    Metro Boston Regional Climate Change Adaptation Strategy - WORKING DRAFT - Funding provided by the Federal Sustainable Communities Program and the Barr Foundation Revised June 2015 By: Metropolitan Area Planning Council 60 Temple Place Boston, MA 02111 617.933.0700 www.mapc.org With assistance from: Tellus Institute 11 Arlington St. Boston, MA 02116 Acknowledgements This report was originally produced in June 2014 by the Metropolitan Area Planning Council, and revised on June 1 , 2015 after discussion and approval by the MAPC Executive Committee. Technical assistance was provided by Martin Pillsbury, Environmental Director (Project Manager); Julie Conroy, Senior Environmental Planner (Primary Author); Sam Cleaves, Senior Regional Planner (Author); Bill Wang, GIS Analyst; and Barry Keppard, Public Health Division Manager; James Goldstein, Senior Fellow, Tellus Institute; and William Dougherty, President, Climate Change Research Group. Editing and continued guidance was provided by Marc Draisen, MAPC Executive Director. The Metro-Boston Regional Climate Change Adaptation Strategy (RCCAS) was undertaken with funds from the U.S. Department of Housing and Urban Development, the U.S. Environmental Protection Agency, and the U.S. Department of Transportation’s Sustainable Communities Program and the Barr Foundation. We would also like to thank the MAPC Officers for their continued support: Lynn Duncan, President; Keith Bergman, Vice President; Shirronda Almeida, Secretary; and Taber Keally, Treasurer. Special appreciation goes to the members of the RCCAS Advisory Committee for their continuous assistance and leadership: John Bolduc Environmental Planner Cambridge Community Development Dept. Wayne Castonguay Executive Director Ipswich River Watershed Assoc. Hunt Durey Acting Director MA Dept. of Ecological Restoration Kwabena Kyei-Aboagye MA Urban Program Manager U.S.
    [Show full text]
  • Section 3: Community Setting
    SECTION 3: COMMUNITY SETTING Regional Context The Town of Holland is nestled in the southeast corner of Hampden County, Massachusetts on the Connecticut border. It is bordered by the towns of Brimfield to the north, Wales to the west, Sturbridge to the east and Union, Connecticut to the south. Nipmuck State Forest in Connecticut forms the southern town border while Brimfield State Forest lies west of Town, and Tantaique Reservation lies east of town. Holland is within commuting distance of the Springfield; Worcester; Boston; Providence, Rhode Island; and Hartford, Connecticut areas. Access to major highways is convenient with Interstate Route 84 cutting across the very southeastern corner of town, and the Massachusetts Turnpike (Interstate 90) and Massachusetts Route 20 running north of Town. The Town of Holland encompasses about 13 square miles of rolling, wooded hills. Though there is some open land, forest dominates the uplands. In the hardwood dominated forests are scattered wetlands providing biological and scenic diversity. The town is bisected by the headwaters of the Quinebaug River and the associated water bodies of Hamilton Reservoir, and Lake Siog (Holland Pond). The river, ponds, reservoir, and numerous wetlands make up a wetland complex that not only dominates the town’s character but also is important in terms of its recreational value, scenic beauty, and wildlife habitat. Holland also has large areas of undeveloped forested lands, which are of regional conservation value. Besides sharing history, land uses, and landscapes, Holland and its neighbors share municipal services such as emergency response and schools. This cooperation, primarily between Holland, Wales, and Brimfield, allows each town to benefit from improved services difficult for a small town to provide on its own.
    [Show full text]
  • Deerfield and CT River Project History.Pmd
    HISTORY OF HYDROELECTRIC DEVELOPMENT ON THE CONNECTICUT AND DEERFIELD RIVERS HISTORY OF HYDROELECTRIC DEVELOPMENT ON THE CONNECTICUT AND DEERFIELD RIVERS INTRODUCTION increasingly complex. While the Depression limited further growth of the industry, a new era emerged In 1903, Malcolm Greene Chace (1875-1955) and after World War II, with streamlined management Henry Ingraham Harriman (1872-1950) established structures and increased regulations and Chace & Harriman, a company that, in its many government involvement (Cook 1991:4; Landry and incarnations over the course of the following Cruikshank 1996:2-5). The first of the 14 decades, grew into one of the largest electric utility hydroelectric facilities built on the Connecticut and companies in New England. The company built a Deerfield rivers by Chace & Harriman and its series of hydroelectric facilities on the Connecticut successors were developed in the early 1900s, and Deerfield rivers in Vermont, New Hampshire shortly after the potential of hydroelectric power and western Massachusetts, which were intended was realized on a large scale. Subsequent facilities to provide a reliable and less expensive alternative were constructed during the maturation of the to coal-produced steam power. Designed primarily industry in the 1920s, and two of the stations were to serve industrial centers in Massachusetts and completed in the post-World War II era. The history Rhode Island, the facilities also provided power to of the companies that built these stations is residential customers and municipalities in New intrinsically linked with broader trends in the history England. Chace & Harriman eventually evolved of electricity, hydropower technology, and industrial into the New England Power Association (NEPA) architecture in America.
    [Show full text]
  • Deerfield River Watershed Association
    A Watershed-Based Plan to Maintain the Health and Improve the Resiliency of the Deerfield River Watershed Franklin Regional Council of Governments Staff: Kimberly Noake MacPhee, P.G., CFM, Land Use and Natural Resources Program Manager Mary Chicoine, Senior Land Use and Natural Resources Planner Ryan Clary, Senior GIS Specialist Alyssa Larose, Land Use and Natural Resources Planner Megan Rhodes, AICP, Senior Transportation/Land Use Planner With technical assistance provided by: Fuss & O’Neill, Inc., Erik Mas, PE Field Geology Services, John Field, Ph.D., P.G. and Nicolas Miller Franklin Conservation District Deborah Shriver Consulting, Deborah M. Shriver Acknowledgements: Watershed stakeholders provided valuable comments and insight during the development of this plan. This plan also benefitted from the assistance and advice of the following organizations and individuals: Brian Yellen, Researcher, Department of Geosciences, UMass Amherst Andy Fisk, Executive Director, Connecticut River Conservancy Rita Thibodeau, District Conservationist, USDA, NRCS Carrie Banks, MA Division of Ecological Restoration, Dept. Fish & Game Erin Rodgers, Ph.D., Western New England Project Coordinator, Trout Unlimited Michael B. Cole, Ph.D., Cole Ecological Will Sloan Anderson, Franklin Land Trust Photographs: Cover Deerfield River landscape Matthew MacPherson http://mattmacpherson.com Pp. 2-3 Deerfield River landscape Matthew MacPherson http://mattmacpherson.com P. 11 Flooding in Deerfield Town of Greenfield P. 39 Crowningshield property Franklin Land Trust P. 45 Dam sites Erin Rodgers, Trout Unlimited Pp. 82-105 Maps, figures and photos Field Geology Services This project has been financed with Federal Funds from the Environmental Protection Agency (EPA) to the Massachusetts Depart- ment of Environmental Protection (the Department) under an s.
    [Show full text]
  • Waterbody Name Lat Long Location Town Stage Ruler Rationale Number # Subwatershed A-01-01-010 BB010 No Beaver Brook Beaver Brook Jewish Comm
    Master Site List 2007 Site Rev. Site Watershed CWF Waterbody Name Lat Long Location Town Stage Ruler Rationale Number # Subwatershed A-01-01-010 BB010 No Beaver Brook Beaver Brook Jewish Comm. 42.29549 -71.83817 On footbridge located south of Worcester On footbridge Baseline near beginning Ctr. northerly driveway at 633 of Beaver Brook Salisbury St. at the Jewish Community Center A-01-01-030 BB030 No Beaver Brook Beaver Brook Park Ave. 42.25028 -71.83142 Upstream of confluence of Worcester On abutment on To compare with Carwash Beaver Brook and Tatnuck south side of street Tatnuck Brook just Brook at Clark Fields carwash on above confluence Park Ave. A-02-01-010 BMB010 No Broad Meadow Broad Meadow Dunkirk 42.24258 -71.77599 At end of Dunkirk Ave, slightly Worcester Baseline where brook Brook Brook downstram of culvert. outfalls from culvert A-02-01-020 BMB020 No Broad Meadow Broad Meadow Dupuis Ave. 42.23554 -71.77297 Walk around lawn. Just before Worcester To monitor impacts of Brook Brook Beaver Brook enters pipe 50' Beaver Dam - see how upstream of pipe. quality improves after going through natural area A-02-01-040 BMB040 No Broad Meadow Broad Meadow Holdridge 42.23092 -71.76782 Downstream of stone bridge on Worcester 15 feet below Midway on course Brook Brook Holdridge Trail - on the west stone bridge on through wildlife sanctuary bank tree A-02-01-050 BMB050 No Broad Meadow Broad Meadow Dosco 42.19267 -71.75017 Beside Dosco Sheet Metal Millbury Attached to Dorothy Brook as it flows Brook Brook Company; 30 yards downstream concrete wall into the Blackstone River from Grafton St.
    [Show full text]