Changes to Bus Stops in the Ealing Broadway Area

Total Page:16

File Type:pdf, Size:1020Kb

Changes to Bus Stops in the Ealing Broadway Area Changes to bus stops in the Ealing Broadway area Consultation Report October 2014 Changes to bus stops in the Ealing Broadway area Consultation Report Contents 1 Introduction .............................................................................................................................. 5 2 The consultation ...................................................................................................................... 7 3 Responses from members of the public ................................................................................ 8 4 Analysis of responses ............................................................................................................. 9 5 Responses from statutory bodies and other stakeholders ................................................. 13 Appendix A – All issues raised for Question 8 ........................................................................... 17 Appendix B – List of stakeholders consulted ............................................................................. 17 Appendix C – Consultation Material ............................................................................................ 17 1 Introduction We have been working with Ealing Council to improve the area around Ealing Broadway station, including the pedestrian area in front of the station itself. Some of this work has already started and as part of this we need to make a number of permanent changes to where bus routes stop in and around Ealing Broadway and Haven Green. In March and April of this year we consulted on our proposed changes to bus stopping arrangements. The consultation ran from 21 March to 2 May. We are proposing to change stopping arrangements to the following bus routes in the area: 65, 112, 226, 297, E7, E8, E9, E10 and E11. The map below shows current stopping arrangements: Changes to the bus stop infrastructure • The bay on the east side of Haven Green currently used as the last stop for route 65 (stop B) will be removed • The two stops for buses going towards Boston Manor, Northfields or Hanger Lane (stops F and G) have been merged into one stop (F) • The two stops at the western end of the Haven Green diagonal road (stops Z3 and Z4) will be merged into one stop • The two stops at the northern end of Haven Green (stops X1 and A) will be merged into one stop Proposed changes to where bus routes stop • Table 1 shows the proposals with changes highlighted in red • Table 2 shows other stops in the area that will not be changing • Table 3 shows how the routes would be grouped together Table 1: Routes with changes Route Current Proposed Last stop First stop Last stop First stop 65 B F C C 112 X1 F A F 226 X1 C D D 297 X1 C A Z4 E7 A A X2 F E8 X1 F A F E9 X2 E A E E10 D D A Z4 N11 X1 F A F Table 2: Routes with no changes Route Current Proposed Last stop First stop Last stop First stop E1 (both D D D D directions) Route Current Proposed E2 E E (Greenford) E2 F F (Brentford) N7 (Russell F F Square) N7 E E (Northolt) Table 3: routes in each of the main stopping areas Bus stopping Service group Detailed arrangements Stops removed area ‘Northern’ Alighting point for routes Route E7 will set down at Stop X1 removed (stops A and X2) 112, 297, E7, E8, E9, stop X2. All other routes will E10. set down at stop A. ‘Centre’ Route 65 Route 65 will set down and (stop C) pick up here. ‘Diagonal road’ Services towards Routes 226 and E1 will set Stop Z3 removed (stops D, E and Greenford or Perivale down and pick up at stop D. Z4) Routes E2 (Greenford), E9 and N7 (Northolt) will serve stop E. Routes 297 and E10 will pick up at stop Z4. ‘Southern’ Services towards Boston Routes 112, E2 (Brentford), Stop G (already (stop F) Manor, Northfields or E7, E8, N7 (Russell removed) Hanger Lane Square) and N11 will serve stop F. Buses will stand between trips at stops C, X2, Z1/Z2 and Z4. This report contains details of the consultation and summarises the responses we received. We have also produced a separate document that specifically deals with issues raised in the consultation. 2 The consultation The consultation was designed to enable us to understand stakeholder and public opinion about our proposed changes to stopping arrangements in the Ealing Broadway area. The potential outcomes of the consultation are: • We decide the consultation raises no issues that should prevent us from proceeding with the scheme as originally planned. • We modify the scheme in response to issues raised in consultation • We abandon the scheme as a result of issues raised in the consultation. 2.1 Consultation objectives The objectives of the consultation were: • To give stakeholders and the public easy to understand information about the proposals and allow them to respond • To understand the level of support or opposition for the change • To understand any issues that might affect the proposal of which we were not previously aware • To understand concerns and objections • To allow respondents to make suggestions 2.2 Who we consulted The consultation intended to seek the views of the general public and stakeholders which included Ealing Council, London TravelWatch, Members of Parliament, Assembly Members, local interest groups and associations. A list of the stakeholders we consulted is shown in Appendix B and their responses are outlined in Section 4. 2.3 Consultation material, distribution and publicity The consultation was published online via our consultation tool. We explained the background to the proposal and asked for any comments that people may have. We sent an email to stakeholders and another email to registered Oyster card users of all the affected bus services. The email included a direct link to the online consultation. The email to registered Oyster users targeted 16, 971 customers. We also publicised the consultation in local bus stops. 3 Responses from members of the public We received 402 written responses from members of the public. 98 per cent (395) of the responses were online. 2 per cent (7) were received by email or post. Figure 3.1: How responses were received By post or email 2% Online 98% The consultation asked eight questions in total (5 general and 3 specific). Of the general questions we asked respondents for their name, email address, post code, and if they were responding on behalf of an organisation. We also asked respondents how they had heard about the consultation (see Figure 3.2). Table 3.2: Type of source 350 300 250 200 150 100 50 0 Saw an Received an Read about Not Through advert on email from Other it in the Answered social media the TfL TfL press website % 82% 11% 2% 1% 1% 1% Number of response 331 46 10 6 5 4 4 Analysis of responses The following three questions specifically asked respondents about the scheme: Question 6: Do you use bus services in the Ealing Broadway and Haven Green area? Question 7: Do you support the changes we have proposed? Question 8: Do you have any further comments? Question 6: Do you use bus services in the Ealing Broadway and Haven Green area? 388 respondents answered this question. Table 4.1 below indicates the result of the answer. Figure 4.1 Do you use bus services in the Ealing Broadway and Haven Green area? 400 350 300 250 200 150 100 50 0 Yes No Not Answered % 96% 1% 4% Number of response 383 5 14 The majority of respondents (96 per cent) indicated that they use bus services in the Ealing Broadway and Haven Green area. 1 per cent of respondents stated they do not use bus services in the area and 4 per cent did not answer this question. Question 7: Do you support the changes we have proposed? 396 respondents answered this question. Table 5.2 below indicates the result of the answer. Figure 4.2 Do you support the changes we have proposed? 300 250 200 150 100 ] 50 0 Yes Partly No No opinion Not Answered % 65% 21% 10% 3% 2% Number of response 261 83 41 11 6 65 per cent of respondents indicated they support the proposed changes. 21 per cent indicated partial support for the proposals. 10 per cent of respondents were opposed to the proposed changes. Question 8: Do you have any further comments? Individual comments within every response we received have been coded to one or more codes as appropriate. As respondents mentioned more than one issue, or comment, there are more codes than the total number of respondents. For some issues sub-codes have been created in order to further analyse the responses. The key themes are as follows: Supportive comments Generally support proposals 80 Location specific comments 297 and/or E10 – Proposed first stops are too far from 20 the station 65 - Stop C will be too congested/crowded 13 297 and/or E10 - Should serve Stop C 9 Stop F will be too congested/overcrowded 7 65/E2/E8 - Should have a common stop 6 Ealing Broadway - Too much congestion outside 4 station 65 - New drop off point gives easier access to Ealing 3 Broadway 65 - New drop off point is now safer 3 E1/E10 - Should have a common stop 3 Haven Green stops - Too much congestion at stops 3 E2/E9 - Need to have better interworking 2 E2/E9/226 - Should have a common stop 2 E7/E9 - Should have a common stop 2 Ealing Broadway - Should have an integrated bus 2 station E1/E7 - Should have a common stop 1 Negative comments Do not move bus stop 15 Opposed with reason 14 Opposed generally 3 General issues Countdown - Need more signs at stops 18 General stand issues - congestion of buses 17 Shelters - Need bigger ones to accommodate 5 passengers 65 – Increase frequency 4 E8 - Frequency increase/capacity/double deck 3 112/226 - Do not like proposal/ should keep common 3 stop 112 - Frequency increase/capacity/double deck 2 E9/E11 - Withdraw E9/ Extend E11 to Barnhill Estate 2 65 - Extend through to Ham 1 65 - Service issues 1 226 - Poor service 1 E10 - Extend to Chiswick Business Park 1 Other Alternative suggested 22 Not scheme related 7 Not affected by the change 3 Concerns Concerns about people with mobility difficulty 3 Concerns about impact on traffic 2 Concern about safety 1 Concern about the consultation 1 132 responses with 38 issues/ themes were generated from question 8.
Recommended publications
  • N11 Bus Time Schedule & Line Route
    N11 bus time schedule & line map N11 Liverpool Street - Ealing Broadway View In Website Mode The N11 bus line (Liverpool Street - Ealing Broadway) has 2 routes. For regular weekdays, their operation hours are: (1) Ealing Broadway: 12:21 AM - 4:51 AM (2) Liverpool Street: 12:15 AM - 11:45 PM Use the Moovit App to ƒnd the closest N11 bus station near you and ƒnd out when is the next N11 bus arriving. Direction: Ealing Broadway N11 bus Time Schedule 81 stops Ealing Broadway Route Timetable: VIEW LINE SCHEDULE Sunday 12:21 AM - 4:51 AM Monday 12:21 AM - 4:51 AM Liverpool Street Station (L) 192 Bishopsgate, London Tuesday 12:21 AM - 4:51 AM Wormwood Street (Y) Wednesday 12:21 AM - 4:51 AM 99 Bishopsgate, London Thursday 12:21 AM - 4:51 AM Old Broad Street (LL) Friday 12:21 AM - 4:51 AM 5 Old Broad Street, London Saturday 12:21 AM - 4:51 AM Bank Station / Queen Victoria Street 1 Poultry, London St Paul's Churchyard (SH) Old Change Court, London N11 bus Info Direction: Ealing Broadway St Paul's Cathedral (SJ) Stops: 81 10 Saint Paul's Church Yard, London Trip Duration: 83 min Line Summary: Liverpool Street Station (L), City Thameslink Stn / Ludgate Circus (F) Wormwood Street (Y), Old Broad Street (LL), Bank 65 Ludgate Hill, London Station / Queen Victoria Street, St Paul's Churchyard (SH), St Paul's Cathedral (SJ), City Thameslink Stn / Shoe Lane (H) Ludgate Circus (F), Shoe Lane (H), Fetter Lane (W), Fleet Street, London Chancery Lane (W), The Royal Courts Of Justice (P), Aldwych / Drury Lane (R), Savoy Street (U), Bedford Fetter Lane (W) Street
    [Show full text]
  • Neighbourhood Governance Note of Ealing Broadway Ward Forum Meeting ______
    Neighbourhood Governance Note of Ealing Broadway Ward Forum Meeting ______________________________________________________________________________________ Ealing Broadway Ward Forum meeting – held at 8pm until 9.30pm on Wednesday 8 October 2008 in the hall of St Stephen’s Church Centre, W5. Present: Councillors Young (Chairman), Potts and Scott Attendees: over 83 people attended with 65 people signing the attendance sheet. Note taker: Evelyn Gloyn (EG) - Neighbourhood Co-ordinator South Item Notes Actions/Information 1/2 Chairman’s Introduction and the Role of the Ward Forums People were offered light refreshments as they arrived and the meeting started promptly at 8 pm in the hall of St Stephen’s Church Centre. Councillor Anthony Young (Chairman) opened the meeting with introductions and explained the purpose of ward forums; the old area committees had been reviewed and were not effective as few attended. Ward forums were proposed in their place. Their purpose is so people could find out more about what is happening in their local and their concerns about the local (ward) area could be raised; and they could also discuss how they would like to spend £40,000 within the ward on capital projects. The Neighbourhood Co-ordinator explained her role; she To contact your 1 Item Notes Actions/Information will post notes from the meetings with action points on the Neighbourhood Co-ordinator council’s website, then be working with both Councillors Evelyn Gloyn and council colleagues to address the concerns raised and Email:[email protected] attend a further 2/3 ward meetings ward per year. She will Tel: (020) 8825 8021 also be producing 2 ward newsletters over the year.
    [Show full text]
  • Rail Accident Report
    Rail Accident Report Derailment of a passenger train at Ealing Broadway 2 March 2016 Report 24/2016 December 2016 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2016 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.gov.uk/raib DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Preface Preface The purpose of a Rail Accident Investigation Branch (RAIB) investigation is to improve railway safety by preventing future railway accidents or by mitigating their consequences. It is not the purpose of such an investigation to establish blame or liability. Accordingly, it is inappropriate that RAIB reports should be used to assign fault or blame, or determine liability, since neither the investigation nor the reporting process has been undertaken for that purpose. The RAIB’s findings are based on its own evaluation of the evidence that was available at the time of the investigation and are intended to explain what happened, and why, in a fair and unbiased manner.
    [Show full text]
  • Standard Schedule UL38-57272-Ssu-TE-1-5
    Schedule UL38-57272-sSu-TE-1-5 Schedule information Route: UL38 No. of vehicles used on 10 schedule: Service change: 57272 - SCHEDULE, STRUCTURAL Implementation date: 24 December 2020 Day type: sSu - Special Sunday Operator: TE - ABELLIO LONDON (WEST) Option: 1 Version: 5 Schedule comment: Option comment: Option 1 Timing points Timing point Transit node Stop ACTNSN Acton Town Station Q210 ACTON TOWN STATION 33851 Acton Town Station ACTNSN Acton Town Station Q210 ACTON TOWN STATION 33852 Acton Town Station CSWKBPES Chiswick Business Park, East Side Stand J3448 CHISWICK PARK CSWKBPChiswick Business Park, East Side ES EALBTB Ealing Broadway, The Broadway Q906 EALING BROADWAY CENTRE 733 Ealing Broadway Station EALBTB Ealing Broadway, The Broadway Q906 EALING BROADWAY CENTRE 734 Ealing Broadway Station EALCSN Ealing Common Station QB04 EALING COMMON STATION 4639 Ealing Common Station EALCSN Ealing Common Station QB04 EALING COMMON STATION 688 Ealing Common Station GUNNSN Gunnersbury Station NF03 CHISWICK H R/OXFORD RD N RR71 Gunnersbury Station GUNNSN Gunnersbury Station NF07 GUNNERSBURY STATION 1049 Gunnersbury Station GW SOUTHALL (ARMSTRONG WAY) J5321 SOUTHALL (ARMSTRONG WAY) BUS GW SOUTHALL (ARMSTRONG WAY) GARAGE - AB HAMMBLJ Hammersmith Bus Station, Lower, Stop J 6905 HAMMERSMITH BUS STATION BP5004 Hammersmith Bus Station HAMMBR Hammersmith, Beadon Road 6909 HAMMERSMITH MET STATION 29966 Hammersmith Stn / H&C and Circle Lines NFLDSN Northfields Station QA06 NORTHFIELDS STATION BP3594 Northfields Station NRHWND H Northfields Ave, Windmill Road Hesitation Point J3123 NORTHFIELDS, NORTHFIELDS NRHWN Northfields Ave, Windmill Road Hesitation Point AVE/WINDMILL RD D H SEALSN South Ealing Station QA03 SOUTH EALING STATION 15697 South Ealing Station TURNSN Turnham Green Station NG03 HIGH ROAD CHISWICK LANE 29149 Chiswick Lane TURNSN Turnham Green Station NG03 HIGH ROAD CHISWICK LANE 6153 Chiswick Lane Page 1 of 10 UL38-57272-sSu-TE-1-5 Crosslinks This schedule has no trips with crosslinks.
    [Show full text]
  • Submissions to the Call for Evidence from Organisations
    Submissions to the call for evidence from organisations Ref Organisation RD - 1 Abbey Flyer Users Group (ABFLY) RD - 2 ASLEF RD - 3 C2c RD - 4 Chiltern Railways RD - 5 Clapham Transport Users Group RD - 6 London Borough of Ealing RD - 7 East Surrey Transport Committee RD – 8a East Sussex RD – 8b East Sussex Appendix RD - 9 London Borough of Enfield RD - 10 England’s Economic Heartland RD – 11a Enterprise M3 LEP RD – 11b Enterprise M3 LEP RD - 12 First Great Western RD – 13a Govia Thameslink Railway RD – 13b Govia Thameslink Railway (second submission) RD - 14 Hertfordshire County Council RD - 15 Institute for Public Policy Research RD - 16 Kent County Council RD - 17 London Councils RD - 18 London Travelwatch RD – 19a Mayor and TfL RD – 19b Mayor and TfL RD - 20 Mill Hill Neighbourhood Forum RD - 21 Network Rail RD – 22a Passenger Transport Executive Group (PTEG) RD – 22b Passenger Transport Executive Group (PTEG) – Annex RD - 23 London Borough of Redbridge RD - 24 Reigate, Redhill and District Rail Users Association RD - 25 RMT RD - 26 Sevenoaks Rail Travellers Association RD - 27 South London Partnership RD - 28 Southeastern RD - 29 Surrey County Council RD - 30 The Railway Consultancy RD - 31 Tonbridge Line Commuters RD - 32 Transport Focus RD - 33 West Midlands ITA RD – 34a West Sussex County Council RD – 34b West Sussex County Council Appendix RD - 1 Dear Mr Berry In responding to your consultation exercise at https://www.london.gov.uk/mayor-assembly/london- assembly/investigations/how-would-you-run-your-own-railway, I must firstly apologise for slightly missing the 1st July deadline, but nonetheless I hope that these views can still be taken into consideration by the Transport Committee.
    [Show full text]
  • Ealing Broadway Station the Broadway Ealing W5 2Nt
    Planning Committee 13/08/2014 Schedule Item: 03 Ref : P/2013/5387 Address: EALING BROADWAY STATION THE BROADWAY EALING W5 2NT Ward: Ealing Broadway Proposal: Redevelopment of station including the provision of a canopy over revised entrance, new facade, remodelled concourse, new lifts, remodelled staircases, platform canopies, waiting room and control building, waiting shelter, extended platforms at eastern end, footbridge at eastern end of platforms, lighting and associated works (Schedule 7 submission under the Crossrail Act 2008) Drawing numbers: WSN1C-EAR-DRG-BEN-000052; WSN1C-EAR-DRG-BEN- 000063; WSN1B-ALL-DRG-AEA-000066; WSN1B-ALL-DRG- AEA-000067; WSN1B-ALL-DRG-AEA-000068; WSN1B-ALL- DRG-AEA-000069; WSN1B-ALL-DRG-AEA-000071; WSN1B-ALL-DRG-AEA-000075; WSN1B-ALL-DRG-AEA- 000078; (received 20.11.2013), WSN1C-EAR-DRG-BEN- 000050 Rev P01; WSN1C-EAR-DRG-BEN-000051A Rev P01; WSN1C-EAR-DRG-BEN-000053A Rev P01; WSN1C-EAR- DRG-BEN-000055 Rev P01; WSN1C-EAR-DRG-BEN-000056A Rev P01; WSN1C-EAR-DRG-BEN-000057 Rev P01; WSN1C- EAR-DRG-BEN-000058 Rev P01; WSN1C-EAR-DRG-BEN- 000060 Rev P01; WSN1C-EAR-DRG-BEN-000061 Rev P01; WSN1C-EAR-DRG-BEN-000062 Rev P01; WSN1C-EAR-DRG- BEN-000064 Rev P01; WSN1C-EAR-DRG-BEN-000065 Rev P01; WSN1C-EAR-DRG-BEN-000066 Rev P01; WSN1C-EAR- DRG-BEN-000067 Rev P01; WSN1C-EAR-DRG-BEN-000068 Rev P01; and WSN1B-CNS-PLD-NCA-000011 Rev A01 (received 26.06.2014) Type of Application: Crossrail Submission Application Received: 03/12/2013 Revised: 26/06/2014 Page 1 of 29 Planning Committee 13/08/2014 Schedule Item: 03 Report by: Peter Lee Executive Summary: Recommendation: APPROVE subject to Conditions This application relates to Ealing Broadway railway station which is located in central Ealing, to the east of The Broadway (the B455) and to the north of the Uxbridge Road.
    [Show full text]
  • 83-483-N83 Consultation Report
    Consultation on proposed changes to bus route 83 and the introduction of new route 483 Consultation Report June 2016 1 Consultation on proposed changes to bus route 83 and the introduction of new route 483 Consultation Report 2 Contents 1 Introduction .................................................................................................. 2 2 The consultation .......................................................................................... 2 3 Responses from members of the public ...................................................... 4 4 Responses from statutory bodies and other stakeholders ......................... 14 Appendix A – Consultation materials .............................................................. 19 Appendix B – Leaflet distribution area ............................................................. 24 Appendix C - Postcode Analysis ..................................................................... 25 Appendix D – All comments received .............................................................. 30 Appendix E – List of stakeholders consulted ................................................... 39 1 1 Introduction We recently consulted stakeholders and the public about a proposed change to bus route 83 and the introduction of a new bus route, numbered 483. The consultation took place for a period of six weeks from Monday 11 January to Monday 22 February 2016. This report explains the background to the scheme and consultation, and summarises the responses. Route 83 is a 24-hour service that runs
    [Show full text]
  • Ealing Broadway Interchange Study
    EALING BROADWAY INTERCHANGE STUDY Final Report August 2010 EALING BROADWAY INTERCHANGE STUDY Final Report August 2010 Prepared for: Prepared by: London Borough of Ealing Steer Davies Gleave Perceval House 28-32 Upper Ground 14-16 Uxbridge Road London London SE1 9PD W5 2HL +44 (0)20 7910 5000 www.steerdaviesgleave.com Contents CONTENTS 1 EXECUTIVE SUMMARY ............................................................................. 1 2 EALING BROADWAY ................................................................................ 5 The Study Area ....................................................................................... 5 Highway Network .................................................................................... 6 London Underground & National Rail Services .................................................. 7 Bus Services ........................................................................................... 7 Taxis .................................................................................................... 9 Interchange ......................................................................................... 10 Pedestrian Environment .......................................................................... 11 Cycle Network ...................................................................................... 11 Urban Realm ........................................................................................ 13 3 PREVIOUS STUDIES AND INITIATIVES .........................................................
    [Show full text]
  • Minutes PDF 94 KB
    MINUTES Meeting: Environment Committee Date: Wednesday 16 January 2019 Time: 10.00 am Place: Committee Room 5, City Hall, The Queen's Walk, London, SE1 2AA Copies of the minutes may be found at: www.london.gov.uk/mayor-assembly/london-assembly/environment Present: Caroline Russell AM (Chair) Leonie Cooper AM (Deputy Chair) Tony Arbour AM Jennette Arnold OBE AM Shaun Bailey AM Tom Copley AM David Kurten AM 1 Ap ologies for Absence and Chair's Announcements (Item 1) 1.1 Apologies for absence were received from Dr Onkar Sahota AM, for whom Tom Copley AM substituted. 2 Declarations of Interests (Item 2) 2.1 The Committee received the report of the Executive Director of Secretariat. 2.2 Resolved: That the list of offices held by Assembly Members, as set out in the table at Agenda Item 2, be noted as disclosable pecuniary interests. City Hall, The Queen’s Walk, London SE1 2AA Enquiries: 020 7983 4100 minicom: 020 7983 4458 www.london.gov.uk Greater London Authority Environment Committee Wednesday 16 January 2019 3 Minutes (Item 3) 3.1 Resolved: That the minutes of the meeting held on 6 December 2018 be signed by the Chair as a correct record. 4 Summary List of Actions (Item 4) 4.1 The Committee received the report of the Executive Director of Secretariat. 4.2 Resolved: That the completed and outstanding actions arising from its previous meetings of the Committee be noted. 5 Action Taken under Delegated Authority (Item 5) 5.1 The Committee received the report of the Executive Director of Secretariat.
    [Show full text]
  • TREC Section 4: Acton Town Station/Gunnersbury Park to Boston Manor Station (Optional Extension to Ealing Broadway)
    TREC Section 4: Acton Town Station/Gunnersbury Park to Boston Manor Station (optional extension to Ealing Broadway). Distance: 8.4 km (5.4 miles). Public Transport: Section 4 starts at Acton Town Underground Station (District and Piccadilly lines), finishing at Boston Manor Underground Station (Piccadilly Line). There is an optional exit en route at Brentford Station or an optional 3.7 km (2.3 miles) extension from Boston Manor to Ealing Broadway Station (using part of the TREC Section 1 route). Surface and Terrain: The first half of the route is along level paths, including through parks: Gunnersbury and Carville Hall Park South; however the section along the Thames Path and the River Brent/Grand Union Canal Walk does involve some steps (an alternative route avoiding the steps is suggested); the route eventually reaches Boston Manor Park and Station. Refreshments: Acton Town Station; Gunnersbury Park Café; Brentford High Street (near Brentford Lock); Boston Manor Park Café (seasonal), Boston Manor Station and shops nearby. Covid-19 restrictions: Check availability of refreshments and toilets before your walk. Public Toilets: Acton Town Station (charge); Gunnersbury Park; Boston Manor Park Café (seasonal). The route starts from south-west Acton, one of the seven towns of the London Borough of Ealing, Acton means "oak farm" or "farm by oak trees". This final section of TREC does stray into the north east of the London Borough of Hounslow going through parts of old Brentford, however as this was historically part of the Parish of Ealing when it did extend to the River Thames we think it’s appropriate to include in TREC.
    [Show full text]
  • Planning for Schools Development Plan Document SD8A Consultation Statement
    Planning for Schools Development Plan Document SD8A Consultation Statement 8th July 2015 1 INTRODUCTION 1.1 This statement has been prepared in accordance with Regulation 22(1) (c) of the Town and Country Planning (Local development) (England) Regulations 2012 (‘the Regulations’). It details the publication procedures undertaken by the Council for the Planning for Schools Development Plan Document (PfS DPD) in compliance with the Regulations. The statement seeks to show how the local planning authority has prepared the plan in accordance with Regulation 18 and has dealt with any representations received relating to a local plan in accordance with Regulation 20. 1.2 For clarity, this statement has been divided into two sections as follows • Section two deals with representations received at the Initial and Options stage. It sets out which bodies and persons were invited to make representations, details of the consultation and a brief analysis of the representations received. The summary of the main issues and how those issues were addressed is published in the standalone report titled EB4 ‘ Planning for Schools DPD, Issues and Options, Representations Report’ (February 2015). • Section three deals with representations received at the Publication stage. It details the publication procedures undertaken by the Council, the number of representations received and a summary of the main issues raised in the representations. 1.3 This consultation statement is also supplemented by a full summary (Part B – in an excel spreadsheet sheet form) of any Regulation 20 representations received together with the detailed responses and recommendations of the Council. A summary of the spreadsheet will also be provided in the appendices – Appendix D.
    [Show full text]
  • London Assembly (Mayor's Question Time) Date: Thursday 19 March 2020 Time: 10.00 Am Place: Chamber, City Hall, the Queen's Walk, London, SE1 2AA
    MINUTES Meeting: London Assembly (Mayor's Question Time) Date: Thursday 19 March 2020 Time: 10.00 am Place: Chamber, City Hall, The Queen's Walk, London, SE1 2AA Copies of the minutes may be found at: www.london.gov.uk/mayor-assembly/london-assembly/whole-assembly Present: Len Duvall AM (Chair) Florence Eshalomi AM MP Shaun Bailey AM Susan Hall AM (Deputy Chairman) Siân Berry AM Joanne McCartney AM Andrew Boff AM Caroline Pidgeon MBE AM Leonie Cooper AM Keith Prince AM Unmesh Desai AM Caroline Russell AM Tony Devenish AM Dr Onkar Sahota AM Andrew Dismore AM Peter Whittle AM City Hall, The Queen’s Walk, London SE1 2AA Enquiries: 020 7983 4100 minicom: 020 7983 4458 www.london.gov.uk Greater London Authority London Assembly (Mayor's Question Time) Thursday 19 March 2020 1 Apologies for Absence and Chair's Announcements (Item 1) 1.1 In the absence of the Chair and Deputy Chairman of the Assembly, who had both given apologies for absence, and in accordance with Standing Order 2.1C, the Assistant Director, Committee & Member Services conducted the election of a Chair for the meeting. 1.2 Dr Onkar Sahota AM moved and Susan Hall AM seconded that Len Duvall AM be appointed as Chair for the duration of the meeting. 1.3 There being one nomination before the Assembly, it was: Resolved: That Len Duvall AM be appointed Chair for the duration of the meeting. [Len Duvall AM in the Chair] 1.4 The Chair then presided over the election of a Deputy Chairman for the duration of the meeting.
    [Show full text]